LIVERPOOL MODULE (LS)
|
|
- Elmer Wells
- 6 years ago
- Views:
Transcription
1 LIVERPOOL MODULE (LS) PAGE LS LS 3 LS 4 LS 5 LS 6 LS 7 LS 8 LS 9 LS 0 LS LS LS 3 LS 4 LS LS 6 RLS No LOCATION MANCHESTER OXORD ROAD TO LIVERPOOL LIME STREET 3 Manchester Oxford Rd to Salford Crescent - Down 3 Salford Crescent to Manchester Oxford Rd - Up 8 Castlefield Jnc. to Glazebrook - Down 8 Glazebrook to Castlefield Jnc. - Up 9 Glazebrook to Allerton Jnc. - Down 9 Allerton Jnc. to Glazebrook - Up Allerton Jnc. to Lime Street - Down Lime Street to Allerton Jnc. - Up SHUNT MAPS KEY TO MAP SYMBOLS MANCHESTER OXORD ROAD TRAORD PARK GLAZEBROOK WARRINGTON CENTRAL HUNTS CROSS LIVERPOOL LIME STREET ROUTE PLAN Typical colour light signals with position lights, theatre box and junction indicator Line speed and applicable direction Theatre box showing possible destination Dorman aspect LED signal capable of showing red, yellow and green aspects (yellows can flash) Line Speed (usually shown to right of applicable line) and mileage 0.49 Typical signal number RJ Signal Box NRN number Name of line TURNBACK SIDING Typical Ground Position Light Typical Limit of Shunt eature name and mileage Widnes Station. Page LS
2 RLS No 3 Depot Manchester Piccadilly Drawn by DC 04/06 Checked by SL 04/08 Issue 04/ Manchester Piccadilly to Salford Crescent - Down Note:- Differential speed limits may apply to this map but only the line speed for class, and 5 trains and applicable "SP" classes are shown for clarity.70 See RLS No 38 DN BOLTON See RLS No 3 Windsor Bridge North Jnc MP505 MP507 Salford Crescent Station.59 9m 9m MP509 9./.55 Windsor Bridge South Jnc 9.0/ MP503 MP503BR Ordsall Lane Jnc Windsor Bridge Panel (ROM MP50) Limit of AC electrification Castlefield Jnc XU See RLS No 8 SG MP50 DOWN BOLTON MP46 Deansgate Station m MP455 Oxford Road Panel P - 05m P - 60m Oxford Road Station 89.9 P3-37m -4 PP-A 89.8 P4-6m Bay - 05m 89. MP MP447 MP445 MP MP Manchester Piccadilly West Jnc 88.7 MP5 MP DOWN OXORD RD UP OXORD ROAD See RLS No MP All A.C. overhead lines controlled by Crewe ECO - NRN 75 - Int' 75 All lines TCB Page LS
3 RLS No 3 Depot Manchester Piccadilly Drawn by DC 04/06 Checked by SL 04/08 Issue 04/ UNCONTROLLED WHEN PRINTED Salford Crescent to Oxford Road - Up See RLS No MP Manchester Piccadilly West Jnc Oxford Road Station Platform Lengths (-4 PP-A) P - 05m P - 60m P3-60m P4-6m Bay - 05m MP458 Deansgate Station m Castlefield Jnc Limit of AC electrification 89.8 Ordsall Lane Jnc Windsor Bridge South Jnc 9.0/.46 9./.55 Salford Crescent Station.59 Windsor Bridge North Jnc Note:- Differential speed limits may apply to this map but only the line speed for class, and 5 trains and applicable "SP" classes are shown for clarity MP Note; Cut out signs incorrectly show mph U D MP436 MP MP46 MP48 MP438-4 B MP46 MP46BR MP466 MP50 MP50BR UP BOLTON UP BOLTON UP OX RD UP OXORD ROAD MP B MP98 35 MP46 CA All A.C. overhead lines controlled by Crewe ECO - NRN 75 - Int' 75 MP508 MP506 MP504 9m 9m See RLS No 3 3 MP4 DOWN OXORD RD MP44 MP88 U D 4 See RLS No 8 Oxford Road Panel Windsor Bridge Panel (TO MP50) 5 All lines TCB See RLS No Page LS 3
4 RLS No 8 Depot - Manchester Piccadilly Drawn by DC 04/06 Checked by SL 04/08 Issue 04/ Castlefield Jnc. to Glazebrook East - Down Note:- Differential speed limits may apply to this map but only the line speed for class, and 5 trains and applicable "SP" classes are shown for clarity Glazebrook East Junction S.B See RLS No 9 GE8 Absolute Block applies between Glazebrook East S.B. and Warrington Central S.B Dorman type single head signals capable of showing multiple colours and with LED "Hot Spot" in upper left periphery GE50 DOWN PASSENGER LOOP Irlam Station.5 44m GE GE38 DOWN LIVERPOOL Irlam Viaduct (Manchester Ship Canal) 6.4 Can show flashing yellow GE03 lixton Station m GE05 Chassen Road Station 8. 44m Exceptional rail head conditions 8.50 MP765 Urmston station 9.0 5m Exceptional rail head conditions 9. MP763 Humphrey Park Station.7 Short Platform! 68m MP76 Trafford Park Station.68 37m DOWN LIVERPOOL MP756 Limit of electrification Trafford Park Sidings 3.35 Trafford Park West Jnc MP745 Manchester United.C. Halt 3.70 CDT 45m MP744 Trafford Park East Jnc. 3.0 MP74 TRAORD PARK REVERSING LINE m T P MP733 X 33 MUST STOP CLOSE TO MP745 All A.C. overhead lines controlled by Crewe ECO - NRN 75 - Int' Castlefield Junction 89.67/ EMU - DMU MP73 MP703 MP70 / DOWN LIVERPOOL See RLS No 3 Oxford Road Panel TCB applies between Castlefield Jnc. and Glazebrook East Jnc. S.B. Page LS 4
5 RLS No 8 Depot - Manchester Piccadilly Drawn by DC 04/06 Checked by SL 04/08 Issue 04/ Glazebrook East to Castlefield Jnc - Up Castlefield Junction 89.67/33.57 See RLS No 3 Note:- Differential speed limits may apply to this map but only the line speed for class, and 5 trains and applicable "SP" classes are shown for clarity Dorman type single head signals capable of showing multiple colours and with LED "Hot Spot" in upper left periphery 3.58 Trafford Park East Jnc. 3.0 MP743 Manchester United.C. Halt m Trafford Park West Jnc Trafford Park Sidings 3.35 Limit of electrification Trafford Park Station.68 37m MP47 MP70 MP705 MP73 MP755 MP759 Humphrey Park Station.7 Short Platform! 68m UP LIVERPOOL UP LIVERPOOL / Oxford Road Panel All A.C. overhead lines controlled by Crewe ECO - NRN 75 - Int' 75 MP735 TRAORD PARK REVERSING LINE - EMU - DMU MP76 Exceptional rail head conditions 9. MP764 Urmston station 9.0 0m Exceptional rail head conditions 8.50 Chassen Road Station 8. 44m lixton Station 7.65 m GE06 Irlam Viaduct (Manchester Ship Canal) 6.4 GE04 GE0 Irlam Station.5 m UP LIVERPOOL GE0 DOWN PASSENGER LOOP 07 Glazebrook East Junction S.B UP MAIN GE7 TCB applies between Glazebrook East Jnc. S.B. and Castlefield Jnc. GE3 GE6 See RLS No 9 Absolute Block applies between Glazebrook East S.B. and Warrington Central S.B. Page LS 5
6 RLS No 9 Depot - Manchester Piccadilly Drawn by DC 04/06 Checked by SL 04/08 Issue 04/ UNCONTROLLED WHEN PRINTED Note:- Differential speed limits may apply to this map but only the line speed for class, and 5 trains and applicable "SP" classes are shown for clarity Allerton Junction 0.00/87.74 Glazebrook East to Allerton Junction - Down See RLS No Allerton Junction S.B All A.C. overhead lines controlled by Crewe ECO - NRN 75 - Int' 75 Exceptional rail head conditions Hunts Cross West Jnc. 6./ Limit of AC electrification Hunts Cross Station m m Limit of DC electrification Hunts Cross S.B HC Exceptional rail head conditions 7.60 Halewood Station 8. 07m Hough Green Station 0.4 8m AN55 HC95 HCR HC83 HC83R DOWN MAIN DOWN CHESHIRE DOWN HUNTS CROSS CHORD DMU SIDING All DC 3rd Rails controlled by Sandhills ECR ECO - NRN 70 - Int' /9/, HC9 HC93 M E HC89 3 UP & DOWN ELECTRIC Widnes Station. 03m WC WCR WC09 Sankey Station.67 9m WC09R WC Viaduct 8. WC4 WC37 Warrington Central Station 8. 3m 6m Warrington Central S.B PL destination - along up main for shunt purposes TCB applies between Warrington Central S.B. and Allerton Jnc WC3 WC 75 WC9 DM UM WC DM UM WC WCR Padgate Station.3 Short Platform! 9m 65 Birchwood Station.44 70m.50 Dorman type single head signals capable of showing multiple colours and with LED "Hot Spot" in upper left periphery GE36 GE36R GE37 75 DOWN MAIN Glazebrook S.B Glazebrook Station 4.37 Short Platform! 88m See RLS No 8 Absolute Block applies between Glazebrook East S.B. and Warrington Central S.B. Page LS 6
7 RLS No 9 Depot - Manchester Piccadilly Drawn by DC 04/06 Checked by SL 04/08 Issue 04/ Allerton Junction to Glazebrook East - Up See RLS No 8 Glazebrook Station 4.37 Short Platform! 90m GE3 Birchwood Station.44 7m WC49 Padgate Station.3 Short Platform! 90m WCR49 UP MAIN 65 Glazebrook S.B Note:- Differential speed limits may apply to this map but only the line speed for class, and 5 trains and applicable "SP" classes are shown for clarity Stop WC5 Absolute Block applies between and Warrington Central S.B. and Glazebrook East S.B. Warrington Central S.B WC5 Warrington Central Station 8. 6m 3m Viaduct WC WC53 WC53R UP MAIN WC54 Sankey Station.67 98m WC54R WC0 WC0R Widnes Station. 03m HC86 Hough Green Station 0.4 8m HC88 HC88R UP MAIN Halewood Station 8. 07m Exceptional rail head conditions 7.60 Hunts Cross S.B Limit of DC electrification Hunts Cross Station 7.07 m Limit of AC electrification M B HC9 UP & DOWN ELECTRIC HC 536 DMU SIDING HC90 UP CHESHIRE All DC 3rd Rails controlled by Sandhills ECR ECO - NRN 70 - Int' /9/, Exceptional rail head conditions Hunts Cross West Jnc. 6./ Limit of DC electrification HC544 HC94 UP HUNTS CROSS CHORD TCB applies between Allerton Jnc. and Warrington Central S.B. 0.0 Allerton Junction S.B Allerton Junction / See RLS No All A.C. overhead lines controlled by Crewe ECO - NRN 75 - Int' 75 Page LS 7
8 RLS No Depot - Manchester Piccadilly Drawn by DC 04/06 Checked by SL 04/08 Issue 04/ Allerton Junction to Liverpool Lime St - Down Liverpool Lime Street Station Platform Lengths (All permissive) Metres Liverpool Lime Street S.B ast Line Mileage Russell Street Tunnel (3yds) 93./93.36 Lime Street Tunnels (Up slow line) 7 yds total 93.7 Mount Pleasant Tunnels (34yds) 93.09/93. Crown Street Tunnel (57yds) 9.73/ SIDING E LS5/9/ D SIDING D U LS7/8 LS9A LS/35 NECK LS9B LS59 LS6/ /3 SIDING B US LS6/68 LS70 LS7 SIDING A LS93 Slow line mileage 0.6/0. 0.3/ / / /0.58 Smithdown Lane Tunnel (94yds) 9.69/ /0.63 Overbury Street Tunnel (44yds) 9.43/9.50 Edge Hill West Junction 9.4 Tunnel Road Tunnels (D = 74yds, Others = 58yds) 9.9/9.3 LE49 XOS Edge Hill Station 9. 7m 4 m (P) Edge Hill East Junction 9.75 Edge Hill P.S.B. (LE) XO S LS LE35 LE43 LE9 DOWN AST DOWN MAIN rom LE35 LS3 LE5 LE45 3 DOWN SLOW rom LE53 S LE43.0/.09.0./..3 Wavertree Junction LE9 LE5 DOWN SLOW 75 LE LE7 DOWN AST LE LE3 Mossley Hill Station m m 4 AN05 AN West Allerton Station m 4 99m Allerton West Junction 88.8 AN0 DOWN SLOW AN03 DOWN AST All A.C. overhead lines controlled by Crewe ECO - NRN 75 - Int' 75 Note:- Differential speed limits may apply to this map but only the line speed for class, and 5 trains and applicable "SP" classes are shown for clarity AN53 Liverpool South Parkway Station m AN60 All lines TCB 07 Allerton Junction See RLS No 9 Allerton Junction S.B Page LS 8
9 RLS No Depot - Manchester Piccadilly Drawn by DC 04/06 Checked by SL 04/08 Issue 04/ UNCONTROLLED WHEN PRINTED Liverpool Lime Street to Allerton Jnc - Up Allerton Junction S.B All A.C. overhead lines controlled by Crewe ECO - NRN 75 - Int' 75 See RLS No 9 All lines TCB Allerton Junction SI AN33 Liverpool South Parkway Station m AN36 07 Allerton West Junction 88.8 AN Note:- Differential speed limits may apply to this map but only the line speed for class, and 5 trains and applicable "SP" classes are shown for clarity West Allerton Station m 97m AN3 UP AST AN7 3 UP SLOW AN9 AN4 AN0 AN04 AN06 AN Mossley Hill Station m 36m AN0 AN UP AST UP SLOW AN4 AN6 75 Wavertree Junction 9.00 LE 9.4 LE8 80 Edge Hill P.S.B. (LE) Edge Hill East Junction 9.75 LE0 UP MAIN Slow Line Mileage ast Line Mileage Edge Hill Station.3 m 4m 9. Tunnel Road Tunnels (D = 74yds, Others = 58yds)./. 9.9/9.3 Edge Hill West Junction.0 LE4 9.4 Overbury Street Tunnel (44yds).0/ /9.50 LE48 LE46 LE44 3 C M LE4 LE58 US LE54 U D Smithdown Lane Tunnel (94yds) 0.59/ /9.73 Crown Street Tunnel (57yds) 0.56/ /9.76 LS47 Mount Pleasant Tunnels (34yds) 0.36/ / LS8A LS8B 0.8/0.3 Lime Street Tunnels (Up slow line) 7 yds total 0.3/0.7 NECK US U D Russell Street Tunnel (3yds) 0.6/0. 93./93.36 Liverpool Lime Street S.B Platform Lengths (All permissive) Metres Liverpool Lime Street Station 93.5 NCK S NCK S LS84D LS95 SIDING A LS84C LS89B LS84B LS90 SIDING B LS89A 3 4 LS84A LS55A 5 LS53 LS66 SIDING D LS55B SIDING E LS46 LS54A LS54B Page LS 9
10 MANCHESTER OXORD ROAD Oxford Road Panel MP445, MP447 & MP449 camera viewpoint MP44 & MP443 camera viewpoint UP OXORD ROAD 35 Note; Cut out sign incorrectly shows MPH MP445 MP44 MP443 MP436 MP MP48 MP44 MP46 Manchester Oxford Road MP3 MP456 MP456 - See note below! MP98 MP98 camera viewpoint 3 4 B DOWN OXORD ROAD MP MP449 MP4 MP44 MP44,MP443, MP445 & MP447 camera viewpoint MP5 I A SHUNT IS REQUIRED AT THE WEST END O THE STATION ROM PLATORM TO PLATORM, YOU WILL NEED YELLOW AT THE PLATORM END SIGNAL - MP44, MP443, MP445, MP447, OR MP449. PROCEED OUT ONTO THE DOWN OXORD ROAD AND STOP BEHIND POSITION LIGHT MP98. CHANGE EN AND ATER CLEARANCE O MP98 PROCEED INTO INDICATED PLATORM -4 OR B (PLATORM 5).. I YOU HAVE MORE THAN ONE NON-CORRIDOR UNIT THEN CHANGE EN IN THE CESS ON THE WALL SIDE.. SHUNTING WITH UNITS MAY REQUIRE CLEARANCE O MP456 ON THE DOWN OXORD ROAD TOWAR DEANSGATE. TAKE GREAT CARE IN MOVING TOWAR THIS SIGNAL. NOTES:- PLATORM TO PLATORM (WEST END O STATION) Page LS 0
11 TRAORD PARK MP755 Trafford Park West Jnc. MUC Halt MP745 PLATORM LINE (P) ( EMU) Trafford Park East Jnc. MP743 MP74 Oxford Road Panel UP LIVERPOOL DOWN LIVERPOOL O MP74R MP73 ( EMU) LIMIT O AC ELECTRIICATION MP744 REVERSING LINE (T) MP735 P T MP733 MP745 camera viewpoint MP743 camera viewpoint MP735 camera viewpoint MP733 camera viewpoint ROM THE DOWN LIVERPOOL INTO THE REVERSING SIDING OR THE MOVE INTO TRAORD PARK REVERSING SIDING YOU WILL NEED YELLOW AND A "T" THEATRE INDICATION AT MP733 TO PROCEED INTO THE MPH SIDING AND STOP BEHIND MP735 ROM THE DOWN LIVERPOOL INTO MUC HALT OR THE MOVE INTO MUC HALT YOU WILL NEED YELLOW AND A "P" THEATRE INDICATION AT MP733 THEN PROCEED OVER THE MPH CROSSOVER INTO THE MPH PLATORM LINE. STOP BEHIND MP743 AND AWAIT ITS CLEARANCE. NOTE: I YOU HAVE TWO 33'S YOU WILL NEED TO DRAW UP VERY CLOSE TO MP745 WHICH IS AT THE END O THE PLATORM ON THE RIGHT HAND SIDE. Page LS
12 GLAZEBROOK GE3 Glazebrook East Jnc Signal Box GE8 GE0 Glazebrook East S.B Irlam Station GE6 GE47 GE38 GE50 UP MAIN DOWN MAIN DOWN PASSENGER LOOP GE GE3 & GE6 camera viewpoint GE8 camera viewpoint GE50 & GE38 camera viewpoint DOWN MAIN TO UP MAIN (INCLUDING IRLAM TURN BACK) OR A TRAIN COMING ROM MANCHESTER AND RETURNING, YOU WILL NEED POSITION LIGHTS AT GE38 ON THE DOWN MAIN OR GE50 IN THE DOWN PASSENGER LOOP AND STOP BEHIND GE6 GROUND SIGNAL. CHANGE EN AND ATER CLEARANCE O GE6 (WHICH IS ON THE RIGHT HAND SIDE) PROCEED OVER THE MPH CROSSOVER ONTO THE UP MAIN. UP MAIN TO DOWN MAIN OR A TRAIN COMING ROM LIVERPOOL AND RETURNING YOU WILL NEED A YELLOW ASPECT AT GE3 AND STOP BEHIND SHUNTING DISC GE8. CHANGE EN AND ATER CLEARANCE O GE8 (WHICH IS ON THE RIGHT HAND SIDE) PROCEED OVER THE MPH CROSSOVER ONTO THE DOWN MAIN. TO ASSIST A TRAIN ROM THE RONT STOOD AT GE38 OR GE50 I YOU HAD TO ASSIST A TRAIN ROM THE RONT THAT IS STOOD AT GE38 ON THE DOWN MAIN OR GE50 IN THE DOWN PASSENGER LOOP YOU WOULD BE ROUTED AROUND IT VIA THE ALTERNATIVE ROUTE TO GE38 OR GE50 AS APPLICABLE. YOU WILL THEN NEED THE POSITION LIGHT AT THAT SIGNAL TO TAKE YOU BEHIND GE47 SHUNTING DISC. CHANGE EN AND OLLOW INSTRUCTIONS ROM THE SIGNALLER Page LS
13 WARRINGTON CENTRAL PL destination - along Up Main for shunt purposes Warrington Central Stop and telephone DM UM WC3 No SIDING Stop and telephone Warrington Central S.B WC37 75 WC4 CE SIDING WC3 WC5 DM UM WC WC9 WC3 No SIDING UP MAIN DOWN MAIN WC5 75 WC5 & WC3 camera viewpoint WC9 camera viewpoint WC camera viewpoint WC3 camera viewpoint DOWN MAIN TO UP MAIN TRAINS ARRIVING ROM MANCHESTER AND NEEDING TO RETURN CAN DO SO IN TWO WAYS;. YOU WILL NEED A YELLOW ASPECT AT WC3 TO TAKE YOU INTO THE DOWN PLATORM. CHANGE EN AND AWAIT CLEARANCE O WC3 (WHICH IS ON THE RIGHT HAND SIDE) TO TAKE YOU OVER THE MPH CROSSOVER ONTO THE UP MAIN. YOU WILL NEED A YELLOW ASPECT AND A No4 JUNCTION INDICATOR AT WC3 TO TAKE YOU OVER THE MPH CROSSOVER AND INTO THE UP PLATORM. CHANGE EN AND AWAIT CLEARANCE O WC5 ROM UP MAIN TO DOWN MAIN TRAINS ARRIVING ROM THE LIVERPOOL DIRECTION AND NEEDING TO RETURN WILL NORMALLY GET A YELLOW ASPECT AT WC5 AND THEN STOP BEHIND WC9. CHANGE EN AND AWAIT CLEARANCE O WC9 WITH "DM INDICATION (WHICH IS ON THE RIGHT HAND SIDE) THEN PROCEED OVER THE MPH CROSSOVER INTO THE DOWN PLATORM. ROM MAIN LINES TO SIDINGS OR ACCESS TO THE SIDINGS YOU WILL NEED CLEARANCE O EITHER WC5 POSITION LIGHT OR WC3 POSITION LIGHT (WHICH IS ON THE RIGHT HAND SIDE) WHICH WILL TAKE YOU INTO No OR No SIDINGS (MPH). ROM SIDINGS TO MAIN LINES OR EXIT ROM THE SIDINGS YOU WILL NEED CLEARANCE O EITHER WC3 (No SIDING) OR WC (No SIDING) WHICH ARE BOTH RIGHT HANDED SIGNALS. EITHER "UM" OR "DM" INDICATIONS WILL TAKE YOU ONTO THE UP MAIN OR DOWN MAIN RESPECTIVELY. THE SPEED OR THE SIDINGS AND CROSSOVER IS MPH AND TO RETURN TO LIVERPOOL YOU WILL NEED THE "DM" INDICATION OR THE DOWN MAIN. Page LS 3
14 HUNTS CROSS TO ALLERTON TMD UHCC DHCC US HC94 LIMIT O DC ELECTRIICATION HC538 HC539 HC544 Hunts Cross West Jnc UHCC = UP HUNTS CROSS CHORD DHCC = DOWN HUNTS CROSS CHORD US = UP SOUTHPORT = DOWN SOUTHPORT HC537 HC9 HC93 HC95 UP AND DOWN ELECTRIC UP CHESHIRE DOWN CHESHIRE LIMIT O AC ELECTRIICATION HC9 M B DMU SIDING HC536 M E HC87 HC89 Hunts Cross 3 Bay HC90 LIMIT O DC ELECTRIICATION BE AWARE O THIRD RAIL ON UP CHESHIRE I WALKING IN 6 OOT Hunts Cross S.B HC HC536 camera viewpoint HC95 & HC93 camera viewpoint HC89 camera viewpoint HC camera viewpoint ROM DOWN CHESHIRE TO UP CHESHIRE TRAINS ARRIVING ROM MANCHESTER AND NEEDING TO RETURN WILL NEED A YELLOW ASPECT AND No4 JUNCTION INDICATOR AT HC THEN PROCEED OVER THE MPH CROSSOVER INTO THE UP PLATORM (TAKE CARE WHEN MOVING TOWAR HC89 AT THE END O THE PLATORM). CHANGE EN AND AWAIT CLEARANCE O HC90. AN ALTERNATIVE WOULD BE TO PROCEED TO HC95 AND UPON CLEARANCE O A YELLOW ASPECT DROP DOWN BEHIND HC544 GROUND POSITION LIGHT. CHANGE EN AND ATER CLEARANCE O HC544 (WHICH IS ON THE RIGHT HAND SIDE) PROCEED TO THE UP CHESHIRE OR UP AND DOWN ELECTRIC AS DIRECTED BY THE SIGNALLER. ROM UP CHESHIRE TO DOWN CHESHIRE TRAINS ARRIVING ROM LIVERPOOL AND NEEDING TO RETURN WILL NEED A YELLOW ASPECT AT HC94 AND STOP IN THE UP PLATORM BEHIND HC89 (TAKE CARE WHEN MOVING TOWAR HC90 AT THE END O THE PLATORM). CHANGE EN AND AWAIT CLEARANCE O HC89 (WHICH IS ON THE RIGHT HAND SIDE). YOU WILL GET AN "M" INDICATION TO TAKE YOU IN THE DOWN DIRECTION ON THE UP LINE TOWAR HC93 OR AN "E" INDICATION TO TAKE YOU THROUGH THE UP AND DOWN ELECTRIC LINE LOOP TO HC9. TO ACCESS THE DMU SIDING OR ACCESS TO THE DMU SIDING AT HUNTS CROSS YOU NEED A POSITION LIGHT AT HC89 THEN PROCEED INTO THE MPH CROSSOVER AND INTO THE MPH DMU SIDING. STOP BEHIND HC536. Page LS 4
15 LIVERPOOL LIME STREET LS95 LS89B LS90 LS89A LS84C LS84A LS84D LS84B LS93 LS70 LS55A LS55B LS54A LS54B Russel Street Tunnel Lime Street Tunnels Mount Pleasant Tunnels LS8A LS7 LS6 UP SLOW /68 LS59 LS9B LS8B LS6/0/3 DOWN SLOW NECK -9 LS LS9A UP AST DOWN AST LS7/8 LS47 LS5/9/ 6 LS66 LS53 S NCK S ALL LINES MPH NCK -9 LS46 7 R O O R 8 O O 9 O O Liverpool Lime St Station Liverpool Lime St S.B LS 84D/C/B & 89B Viewpoint HC8A & B camera viewpoint TO CHANGE PLATORMS DOING A SHUNT AT LIME STREET CAN BE SUMMED UP AS HAVING TO GO OUT TO THE URTHEST GROUND POSITION LIGHT ON EITHER THE UP SLOW (LS6/68) OR THE UP AST (LS7/8). BOTH O THESE GROUND POSITION LIGHTS ARE RIGHT HANDED SIGNALS. ONE OTHER WAY IS TO GO BEHIND LS9A WHICH IS IN THE NECK. YOU CAN CHANGE TO AND ROM ANY PLATORM VIA THESE METHO. THE MOVES STARTING ROM THE PLATORMS AND GOING VIA THE UP AST YOU WILL NEED A POSITION LIGHT AND AN "" THEATRE INDICATION AT ONE O THE PLATORM STARTING SIGNALS. OR THE NECK THE INDICATION WILL BE "NCK" AND I YOU ARE GOING VIA THE UP SLOW YOU WILL NEED A YELLOW ASPECT WITH EITHER "S" OR "" THEATRE INDICATION UNTIL YOU REACH EITHER LS8A ON THE UP SLOW OR LS 8B ON THE DOWN SLOW WHERE YOU WILL THEN BE SIGNALLED WITH THE POSITION LIGHT TO TAKE YOU BEHIND LS6/68 GROUND POSITION LIGHT. PLATORMS TO 4 THE ONLY SHUNTS WHERE YOU DO NOT NEED TO GO ALL THE WAY OUT IS BETWEEN PLATORMS TO 4. OR THESE MOVES YOU WILL NEED A POSITION LIGHT AND "S" INDICATION TO STOP BEHIND LS7 GROUND POSITION LIGHT WHICH IS IN RUSSELL STREET TUNNEL AND IS A RIGHT HANDED SIGNAL. Page LS
16 MANCHESTER PICCADILLY ROUTE MAP INDEX BLACKPOOL NORTH Poulton le ylde Layton Preston Kirkham and Wesham Salwick Leyland Euxton Balshaw Lane Chorley LIVERPOOL CROSS REERENCE MAP NUMBER PAGE NUMBER 3 LS/3 8 LS4/5 9 LS6/7 LS8/9 Adlington Wigan North Western Blackrod Ince Horwich Parkway LIVERPOOL LIME STREET Edge Hill Destination Station Mossley Hill West Allerton Liverpool South Parkway Hunts Cross LEGEND Halewood Hough Green Widnes 9 CHESTER Birchwood Glazebrook Irlam Padgate Warrington Central Sankey for Penketh Mouldsworth Delamere Cuddington Hindley lixton Urmston Chassen Road Lostock Gralam Northwich Greenbank Westhoughton Lostock Daisy Hill Hag old Atherton Walkden Mooreside Swinton Knutsford Plumley Mobberley 8 Ashley Hale Salford Crescent Trafford Park T Humphrey Park Altrincham Manchester United Navigation Road MANCHESTER AIRPORT Alderley Edge Chelford Bolton Moses Gate arnworth Kearsley Clifton Deansgate Styal Salford Central 3 East Didsbury Gatley Oxford Road MANCHESTER PICCADILLY Mauldeth Rd Burnage Heald Green Handforth Wilmslow MANCHESTER VICTORIA Cheadle Hulme Guide Ardwick Ashburys Bridge lowery ield Gorton airfield Belle View Newton for Hyde Hyde Levenshulme Ryder Brow North Godley Reddish North Hattersley Heaton Chapel Brinnington Reddish South Hyde Central Broadbottom STOCKPORT Denton Dinting Bredbury Davenport Woodley HADIELD Woodsmoor Hazel Grove GLOSSOP Bramhall Middlewood Romily Disley Marple Poynton New Mills Newtown ROSE Strines urness Vale HILL Adlington Whaley Bridge New Mills Central Chapel-en-le-rith Chinley Dove Holes Edale Prestbury BUXTON Hope Goostrey Bamford Holmes Chapel Macclesfield Hathersage Sandbach Congleton Grindleford Dore CREWE SHEIELD Alsager Kidsgrove Longport STOKE ON TRENT Page LS 6
LNW North Route. Sectional Appendix Module 6
Module NW6 LNW North Route Sectional Appendix Module 6 October 29 ( LIST OF MODULE PAGES AND DATES Page Date Last Changed 1 3 October 29 2 3 October 29 3 3 October 29 4 3 October 29 5 3 October 29 6 3
More informationFriends of WALKDEN station MANCHESTER HUB. Response to Network Rail Stakeholder Consultation
Friends of WALKDEN station MANCHESTER HUB Response to Network Rail Stakeholder Consultation November 2009 Foreword This document has been compiled by the Friends of Walkden Station (FOWS) in response to
More informationLiverpool or Sefton Park - Belle Vale Belle Vale - Allerton (Penny Lane) or Allerton Library
173 174 Liverpool or Sefton Park Belle Vale Belle Vale Allerton (Penny Lane) or Allerton Library serving: Southport Belle Vale (173, 174) Formby Lee Park (174) West Kirby Heswall Wallasey Birkenhead Bromborough
More informationClass 142 Diesel Multiple Unit
Class 142 Diesel Multiple Unit Contents How to install... 2 Technical information... 3 Liveries... 4 Cab guide... 12 Keyboard controls... 13 Features... 14 Manual destination blind... 15 Electronic destination
More informationStreet Area AHG Works Location Organisation Works Reference Traffic Management. Works Description
Page 1 of 7 19/02/2018 19/02/2018 Sandbach North CE AHG Congleton SANDBACH ROAD NORTH JUNC SANDBACH ROAD CHURCH LAWTON ALSAGER CHESHIRE 19/02/2018 26/02/2018 Crewe CE AHG Congleton OPP 35 TO OPP 31 ON
More informationYour guide to public transport during the Sea Odyssey event in Liverpool April 2012
Your guide to public transport during the Sea Odyssey event in Liverpool 20-22 April 2012 The Sea Odyssey, Liverpool Changes to public transport On 20, 21 and 22 April 2012, the routes of many bus services
More informationA Presentation of the case for and applications of. TramTrain. A low cost, clean, sustainable mode. for Cheshire, Warrington & Merseyside
A Presentation of the case for and applications of TramTrain A low cost, clean, sustainable mode for Cheshire, Warrington & Merseyside 21 st January 2010 Macclesfield Town Hall By Jim Harkins FCILT Managing
More informationThe Project North West Electrification Programme
Assessment of Technical Specifications for Interoperability on Projects Background The European Union has mandated moving towards interoperable railways to lower boundaries for cross-eu running of trains.
More informationTIMETABLE PLANNING RULES
TIMETABLE PLANNING RULES London North Western 2019 TIMETABLE Version 4.1 Issued by John Thurgood Timetable Production Manager for London North Western The Quadrant Elder Gate Milton Keynes Central Buckinghamshire
More informationA development by TO LET NEW TRADE UNITS 3,000-45,000 SQ FT ENTER ASHTON ROAD BREDBURY SK6 2RF
A development by ASHTON ROAD BREDBURY SK6 2RF TO LET NEW TRADE UNITS 3,000-45,000 SQ FT WWW.BREDBURY25TRADEPARK.COM ENTER DESCRIPTION The scheme comprises a new development of self-contained units that
More informationWithdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.
SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into
More informationCover Illustration: Stockport No. 322 (EDB576) a 1951 all-crossley DD42/7 withdrawn in seen here passing the depot. (Larry Goddard).
CONTENTS Stockport Corporation Transport - Fleet History 1901-1969.. Stockport Corporation Transport - Tram Fleet List 1901-1951... Stockport Corporation Transport - Trolleybus Fleet List 1913-1919 Stockport
More informationNHS Pathways 111 Directory of Services. Jackie Heardman Local DoS Lead
NHS Pathways 111 Directory of Services Jackie Heardman Local DoS Lead Directory of Services (DoS) The DoS consists of a collection of services, split into service types, listed under a commissioning organisation
More informationWEEKLY OPERATING NOTICE
PRIVATE AND NOT FOR PUBLICATION B.R.31262/3 British Rail L M E A S T E R N REGION 3 9 WEEKLY OPERATING NOTICE CONTAIN ING TEMPORARY SPEED RESTRI CTI ONS TEMPORARY ENGINEERING W O R K S SIGNALLING A N D
More informationA development by TO LET NEW TRADE UNITS 3,000-45,000 SQ FT ENTER ASHTON ROAD BREDBURY SK6 2RF
A development by ASHTON ROAD BREDBURY SK6 2RF TO LET NEW TRADE UNITS 3,000-45,000 SQ FT WWW.BREDBURY25TRADEPARK.COM ENTER DESCRIPTION The scheme comprises a new development of self-contained units that
More informationRE: Mechanex 2018 Build-up/Breakdown
Dear Exhibitor, RE: Mechanex 2018 Build-up/Breakdown Following are guidelines for build-up and breakdown: 1) Build-up Monday 14th May Space Only Exhibitors Shell Scheme Exhibitors 10.00am 7.00pm 12.00pm
More informationATO for High Speed Lines. Trevor Foulkes M.A., C.Eng, FIRSE, FIET Head of Control-Command and Signal Engineering
ATO for High Speed Lines Trevor Foulkes M.A., C.Eng, FIRSE, FIET Head of Control-Command and Signal Engineering Rebalancing Britain; redefining rail travel HS2 is a unique opportunity to: Alleviate the
More informationBusTimes. 25 July Bus 344 Route changed to serve Waverley Road Estate instead of Grosvenor Road and Marlborough Road. Minor timetable changes.
25 July 2011 BusTimes Changes since the last edition Bus Route changed to serve Waverley Estate instead of Grosvenor and Marlborough. Minor timetable changes. Bus Numbers Serving Glossop Simmondley Gamesley
More informationMERSEYSIDE ROUTE UTILISATION STRATEGY (RUS): CHESHIRE COUNTY COUNCIL S COMMENTS ON THE DRAFT FOR CONSULTATION SECTION 2: CHESHIRE SCHEMES AND ISSUES
MERSEYSIDE ROUTE UTILISATION STRATEGY (RUS): CHESHIRE COUNTY COUNCIL S COMMENTS ON THE DRAFT FOR CONSULTATION 1.0 INTRODUCTION Cheshire County Council welcomes the opportunity extended to stakeholders
More informationBus timetable 1, 2. Liverpool - Chester. These services are provided by Stagecoach. Valid from 3 September
Valid from 3 September 07 Bus timetable, Liverpool Chester These services are provided by Stagecoach LIVERPOOL Sir Thomas Street BIRKENHEAD Bus Station ROCK FERRY BROMBOROUGH EASTHAM Bridle Road HOOTON
More informationGUIDE TO TRAFFIC MARSHALLING AT ExCeL LONDON
Traffic Parking at Excel for contractors There are currently 54 individual parking bays for arctic size vehicles under the North side of the venue and these will be used for vehicles that require more
More informationLNWR Society Drawing List - Road, Signal, Tools & Track
Road Vehicles ROAD001 4 Wheel 3 ton One Horse Delivery Van Open Cart Plan, Side & End elevations Drg No 101 1897 ROAD002 4 Wheel 4 ton Two Horse Delivery Van Open Cart Plan, Side & End elevations Drg No
More informationUncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012
GE/RT8000/HB15 Rule Book Handbook 15 Duties of the machine controller (MC) and on-track plant operator Handbook 15 Issue 1 Valid from June 2011 Published by: RSSB Block 2 Angel Square 1 Torrens Street
More informationEnhancements Delivery Plan. December 2017
Enhancements Delivery Plan December 2017 Contents Introduction 3 Cross route projects 4 East West Rail 14 Electric Spine 20 Anglia 25 Midland Mainline Programme 32 Kent 44 Transpennine Route Upgrade 51
More informationBroadmeadows BROADMEADOWS (10 1/2 MILES)
Broadmeadows BROADMEADOWS (10 1/2 MILES) Broadmeadows is situated at the top of the long climb out of the Moonee Ponds Creek valley. It served the established communities of Keilor (to the west) and Campbellfield
More informationClass 350 Enhancement Pack
Class 350 Enhancement Pack Contents How to Install... 2 Liveries... 3 Keyboard Controls... 7 Features... 8 Train Management System (TMS)... 9 Train Protection and Warning System (TPWS) Mk4... 14 Uncoupling
More informationTable 2.1 Staffing grades Head of Service
Table 2.1 Staffing grades Head of Service North East Salary band of head of service Children Joint For joint post, % of time spent on Children Other Notes & other activities Gateshead d r 40 60 Newcastle
More informationM60/M62 smart motorways
Public information exhibition Highways England creative N150128 Welcome We re improving the M60 between junction 8 (Carrington Spur) and M62 junction 20 (Rochdale and Oldham). The M60 and M62 are vital
More informationHandbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book
GERT8000-HB15 Rule Book Duties of the machine controller (MC) and ontrack plant operator Handbook 15 Issue 5 September 2017 Comes into force 02 December 2017 Published by: RSSB The authoritative version
More informationHot Spot Recommendations
Recommendations Name of Location MP Curves I-95 Bridge 76-75.5 & Gang Advanced 1 2 1 ise under bridge 125 MPH end of Torresdale Curve 75-75.5 S' Curve 1 3 3 S curves east & west Traffic noise from I-95
More informationTable 2.1 Staffing grades Head of Service
Table 2.1 Staffing grades Head of Service North East Salary band of head of Children Joint For joint post, % of time spent on Children Other Notes & other activities Gateshead c r 40 60 Newcastle upon
More informationThe Picton/Mittagong line was opened in March 1867 as part of the Main South line.
Read below as Bob Newham, Loco Division Passenger Organiser, explores some of the incredible history behind rail in New South Wales. As you will discover, the month of March has many stories to tell March
More informationEnhancements Delivery Plan. June 2017
Enhancements Delivery Plan June 2017 Contents Introduction 3 Cross route projects 4 East West Rail 15 Electric Spine 21 Anglia 26 Midland Mainline Programme 34 Kent 46 Transpennine Route Upgrade 53 LNE
More informationModule T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015
GE/RT8000/T3 Rule Book Module T3 Possession of a running line for engineering work Issue 6 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document
More informationBritish Rail (NORTHEASTERN REGION) GENERALINSTRUCIMIS AND MVI1 ES AFFECTINGNORTHEASTERNREGION TRAMEN WORKINGOVER TIELONDON MIDLAND RHO.
FOR THE INFORMATION OF RAILWAY STAFF ONLY. 13.11.31262/3D No.25D British Rail (NORTHEASTERN REGION) GENERALINSTRUCIMIS AND MVI1 ES AFFECTINGNORTHEASTERNREGION TRAMEN WORKINGOVER TIELONDON MIDLAND RHO SATURDAY18
More informationThis corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.
Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be
More informationSwedish road signs, signals, road markings and signals by policemen
Swedish road signs, signals, road markings and signals by policemen 2006-09 Warning signs Dangerous bend, bend to right Dangerous bends, the first to right Steep hill downwards Road narrows on both sides
More informationTable 2.1 Staffing grades Head of Service
Table 2.1 Staffing grades Head of Service North East Salary band of head of service Children Joint For joint post, % of time spent on Children Other Notes & other activities Gateshead d 40 60 Newcastle
More informationInvestigation into the Department for Transport s decision to cancel three rail electrification projects. Report. Department for Transport
A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Investigation into the Department for Transport s decision to cancel three rail electrification
More informationActivity. Briefing: The activity commences shortly after the arrival of W93 at Mt Victoria (11 55).
Activity Title: W93 Down Local Passenger Service Wednesday only Day / Time: Wednesday only, 11 55am Season & Weather: Summer & Clear Difficulty: Medium Time to complete: 1.5 hours Description: Activity
More informationLONDON BUSES - ROUTE DESCRIPTION
LONDON BUSES - ROUTE DESCRIPTION Printed On: 26 October 2011 16:30:05 ROUTE 8: Bow - Oxford Circus Date of Structural Change: 20 September 2011. Date of Service Change: 20 September 2011. Reason for Issue:
More informationSTATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS
STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT
More informationTerminology. Glossary of Railway. Glossary of Railway Terminology
Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Issue 1 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved
More informationON SHED. The Journal of the 8D Association. Volume 4 Number 2 June St Helens 1960s
ON SHED The Journal of the 8D Association Volume 4 Number 2 June 2014 St Helens 1960s BR Standard 2-6-0 locomotive number 76083 is seen heading south on a freight working towards Ravenhead Junction in
More informationTHE BELT RAILWAY COMPANY OF CHICAGO
THE BELT RAILWAY COMPANY OF CHICAGO CORA Update 2017-003 Effective 0001, June 19, 2017: Summary of Changes: Replacement section for entire BRC Section of CORA Operating Guide Designation of Lines with
More informationInformation about Greater Manchester s plans for a 3 billion investment programme for public transport and proposed congestion charge
What the Council bosses say is in black Manchester Against Road Tolls view is in red Our Future Transport A great move for Greater Manchester Information about Greater Manchester s plans for a 3 billion
More informationSEQUENCE OF OPERATIONS Como-Harriet Streetcar Line
This sequence of Operations applies to streetcars No. 265, No. 322 and No. 1300. Some of the procedures described in this Sequence of Operations do not apply to No. 322 because the controls on that car
More informationNetwork Rail Freedom of Information The Quadrant Elder Gate Milton Keynes MK9 1EN. T E 20 th January 2017.
Network Rail Freedom of Information The Quadrant Elder Gate Miln Keynes MK9 1EN T 01908 782405 E FOI@networkrail.co.uk 20 th January 2017 Dear, Information request Reference number: FOI2016/01435 Thank
More informationStrategic Business Plan: Definition of CP5 enhancements. January 2013
Strategic Business Plan: Definition of CP5 enhancements January 2013 Page Introduction 3 Summary 7 England & Wales CP5 enhancement programme 9 England & Wales - Committed Projects 10 England & Wales -
More informationNo. 38D GENERAL INSTRUCTIONS AND NOTICES
PRIVATE AND NOT FOR PUBLICATION BR.31262/3D LM British Rail (EASTERN REGION) No. 38D GENERAL INSTRUCTIONS AND NOTICES AFFECTING EASTERN REGION TRAINMEN WORKING OVER THE LONDON MIDLAND REGION (Excluding
More informationArriva Trains Wales DMU Pack
Arriva Trains Wales DMU Pack 1 BACKGROUND...... 3 1.1 Class 158...3 1.2 Class 143...3 2 ROLLING STOCK... 4 2.1 Class 158 Arriva Trains Wales...4 2.2 Class 143 Arriva Trains Wales...4 3 DRIVING THE CLASS
More informationMorwell. (88 miles 75 chains 47 links, km)
Morwell (88 miles 75 chains 47 links, 144.372 km) 01.06.1877 Opened with line between Morwell and Sale. Staff and Ticket not provided initially. (VR to 62, Leo Harrigan, WTT) (01.04.1878) By this date,
More informationIssue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology
Glossary of Railway Terminology Issue 5 Glossary of Railway Terminology December 2018 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic
More informationIssue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology
Glossary of Railway Terminology Issue 4 Glossary of Railway Terminology December 2017 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic
More informationKeeping you moving for less Volvo Bus & Coach Parts Catalogue
DEESIDE Tel: 01244 281004 LIVERPOOL Tel: 0151 549 3000 MIDDLEWICH Tel: 01606 830130 PRESTON Tel: 01772 799000 TRAFFORD PARK Tel: 0161 935 4100 Keeping you moving for less Volvo Bus & Coach Parts Catalogue
More informationModule SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015
GE/RT8000/SP Rule Book Module SP Speeds Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk/rgsonline Contents
More informationThe Class 111 Diesel Multiple Unit
The Class 111 Diesel Multiple Unit 1 BACKGROUND...2 Class 111 Diesel Mechanical Multiple Unit...2 2 ROLLING STOCK...3 2.1 BR Green DMBS...3 2.2 BR Green DTCL...3 3 DRIVING THE CLASS 111 DMU...4 3.1 Cab
More informationSignal passed at danger near Ketton, Rutland 24 March 2016
Independent report Signal passed at danger near Ketton, Rutland 24 March 2016 1. Important safety messages To ensure the safe movement of trains, it is essential that drivers carry out a full brake test
More informationTable Station Elements
The overall layout of the station in the Preferred Alternative (Modified Alternative 2) is described in Table 7.5-1. Table 7.5-1 Station Elements Ground Level Mezzanine Level Platform Level Existing/Upgraded
More informationTRANSPORT and ROAD RESEARCH LABORATORY. Department of the Environment Department of Transport SUPPLEMENTARY REPORT 566
TRANSPORT and ROAD RESEARCH LABORATORY Department of the Environment Department of Transport SUPPLEMENTARY REPORT 566 EFFECTS OF A LORRY CONTROL AT LYMM, CHESHIRE by A W Christie and J Prudhoe Any views
More informationMobile Application Redesign
Mobile Application Redesign App logo and start up. App on the homepage. Once the app is opened, this loading page briefly displays. Mobile app logo. Adding a bus route. This is the main page without any
More informationSomerton SOMERTON (13 MILES 42 CHAINS)
Somerton SOMERTON (13 MILES 42 CHAINS) Somerton has had four phases of existence. The first, from 1881 to 1889, was as a simple passenger platform which served the village of Somerton on Sydney Road. Between
More informationPORTLAND TO MAROONA ROUTE ACCESS STANDARDS
PORTLAND TO MAROONA ROUTE ACCESS STANDARDS 1. MAXIMUM AUTHORISED LOADING OUTLINES The loading of all vehicles operating within the Network, or passing through the Network to or from other systems, shall
More informationPARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate.
NEW! Exhibitors will have complimentary parking during move-in (Nov. 9-13) and move-out (after 4pm, Nov. 17 through 12pm, Nov. 19) if they show a valid IAAPA Attractions Expo 2017 exhibitor badge. During
More informationWarrington Tram. The alternative to Urban Road Transport Pollution. A better value scheme than the Western Link Road
Warrington Tram The alternative to Urban Road Transport Pollution A better value scheme than the Western Link Road Light Rail (UK) A short presentation by Jim Harkins FCILT MTPS Chairman, ERG TramForward
More informationHarpur Hill, Buxton, SK17 9JN Telephone: Facsimile:
Harpur Hill, Buxton, SK17 9JN Telephone: 0129 821 8234 Facsimile: 0129 821 8271 Incident involving a collision between two trains on the Big Dipper rollercoaster at Blackpool Pleasure Beach XS/09/135 Project
More informationHEADQUARTERS STRETTON GREEN DISTRIBUTION PARK, LANGFORD WAY, APPLETON, WARRINGTON, WA4 4TZ
PRIME FREEHOLD DISTRIBUTION INVESTMENT WITH FIXED ANNUAL UPLIFTS HEADQUARTERS STRETTON GREEN DISTRIBUTION PARK, LANGFORD WAY, APPLETON, WARRINGTON, WA4 4TZ INVESTMENT SUMMARY BLUE GROUP DX DELIVERED EXACTLY
More informationTroost Corridor Transit Study
Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit
More informationThe Class 101 British Rail Pack
The Class 101 British Rail Pack 1 BACKGROUND...2 Class 101 Diesel Mechanical Multiple Unit...2 2 ROLLING STOCK...4 2.1 British Rail Blue...4 2.2 British Rail Blue/Grey...4 3 DRIVING THE CLASS 101 DMU...5
More informationWarrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH)
Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) 01.02.1873 Open for passengers on Geelong - Ballarat line (Chronological Index) (31.12.1878) By this date, open for general goods (Commissioners
More informationDocument Control Identification. Document History. Authorisation
Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail 1 October 2016 Table of Contents Glossary for this Rule... 4... 9... 9... 9... 10... 11... 12... 13...
More informationDirections to Training Facilities for CSSD Trainings through Wheeler Clinic, Inc.
Wheeler Clinic, Inc., Connecticut Clearinghouse 334 Farmington Avenue, Plainville, CT 06062 (CTCH) Parking is available on site. From Danbury Waterbury Area Take Interstate 84 East to Exit 34 (Crooked
More informationThis corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.
Alignment is double tracked for 80 mph commuter trains, 110 mph CHSR speeds between Bridgeport OR and 78 th Street in Vancouver WA. New alignment for freight trains will allow speeds up to 40 mph over
More informationCIVIL PARKING ENFORCEMENT ANNUAL REPORT
CIVIL PARKING ENFORCEMENT ANNUAL REPORT 2016 2017 Parking Services Stockport Metropolitan Borough Council www.stockport.gov.uk/parking January 2018 Contents Section1... Introduction Section 2. Penalty
More informationNorth Jersey Coast Line
North Jersey Coast Line Page 1 1 ROUTE INFORMATION...... 4 1.1 The Route... 4 1.2 Focus Time Period... 4 2 GETTING STARTED...... 5 2.1 Recommended Minimum Hardware Specification... 5 3 ROLLING STOCK.........
More informationCIVIL PARKING ENFORCEMENT ANNUAL REPORT
CIVIL PARKING ENFORCEMENT ANNUAL REPORT 2017 2018 Parking Services Stockport Metropolitan Borough Council www.stockport.gov.uk/parking January 2019 Contents Section1... Introduction Section 2. Penalty
More informationSOUTH PORTLAND FIRE DEPARTMENT STANDARD OPERATING GUIDELINES
STANDARD OPERATING GUIDELINES Policy #: 5.313 Effective Date: 12/14/2015 Title: Driver Certification and Refresher Training # of pages: 7 Category: Training Classification: Red 1. PURPOSE: To define the
More informationClass 220 Voyager. Copyright Dovetail Games 2015, all rights reserved Release Version 1.0
Class 220 Voyager 1 BACKGROUND... 3 1.1 Class 220 Voyager...3 1.2 Design & Specification...4 2 ROLLING STOCK... 5 3 DRIVING THE CLASS 220 VOYAGER... 7 3.1 Cab Controls...7 3.2 Locomotive Keyboard Controls...9
More informationTIME TABLE NO 82 p-~ ^ I DEUX-MONTAGNES SUB MAY 29, 2009 I I \ PAGE 95
TIME TABLE NO 82 p-~ ^ I DEUX-MONTAGNES SUB MAY 29, 2009 I I \ PAGE 95 i t DEUX-MONTAGNES SUBDIVISION N S LLJ _l ^ 0.0 WELLINGTON 0,0 0, 0 (Jet with St-Hyacinthe Sub.) A k CB1 RUE WILLIAM 0,2 BONAVENTURE
More informationRAILTRACK. East Anglia ALTERATIONS TO PERMANENT WAY AND COMMISSIONING OF NEW SIGNALLING. between MARYLAND and MANOR PARK,
Signalling Notice EA NoA 1996 RAILTRACK East Anglia ALTERATIONS TO PERMANENT WAY AND COMMISSIONING OF NEW SIGNALLING between MARYLAND and MANOR PARK, between FOREST GATE JUNCTION and WOODGRANGE PARK JUNCTION
More informationThe Belt Railway Company of Chicago CORA Guide Revision
BRC CORA Guide Revision No. 4 July 19, 2013 Page 1 of 14 The Belt Railway Company of Chicago CORA Guide Revision BRC CORA Guide Revision No. 4 Date: July 21, 2013 Belt Railway Company of Chicago CORA Guide
More informationRailway operation. What is a Railway? What is a Train? AH2026 Railway Traffic - Market and Planning, BC
Railway operation AH2026 Railway Traffic - Market and Planning, BC 1 What is a Railway? What is a Train? 2 1 What differs Railway from other types of transportation Train driving principle: Locomotives
More informationCLASS 377. Copyright RailSimulator.com 2012, all rights reserved Release Version 1.0
CLASS 377 1 BACKGROUND......... 3 1.1 Class 377...3 1.2 Design & Specification...3 1.3 Class 377 Consist Formations...3 2 ROLLING STOCK...... 4 3 CREATING A CLASS 377 TRAIN SET..... 7 3.1 Scenario Editor
More informationScooter Policy A guide to accessing our trains with a mobility scooter
A guide to accessing our trains with a mobility scooter Introduction TransPennine Express (TPE) is operated by FirstGroup PLC. We provide Intercity rail services connecting key Northern cities and towns
More informationS WSW 67
HANDOUT AT RS A FROM: RS A 909 133½ WSW REGULARITY SECTION A VIA: TO: TPA1, TPA2, TPA3 Test 2 via 843 250½ S and West Raynham map on page 12 of Roadbook. PROCEED AT 26.5 MPH for 5 MILES THEN AT 24.0 MPH
More informationReduced Whole Life Cost by Engineering Design
Reduced Whole Life Cost by Engineering Design Sin Sin Hsu 17 th July 2014 1 Considering the Whole Life Cost From the start of CP5, WLC analysis is mandatory for all infrastructure projects WLC is not a
More informationCTA Capital Construction Update December 12, 2006
Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction
More informationdeparts at 1519hrs.
EE4 Melton Mowbray - 1st May 2013: 1 At 0853, rail staff awaiting the approaching train can be heard chatting. 20311/314 (with 20905/901 - in GBRf livery - at the rear) arrive from Peterborough with 2
More informationHot Spot Recommendations
Gang West East Prison Curve 76-77 294 1 2 Limited Visibility No Philadelphia Tacony Curve 78-79 295 1 1 Long sweeping curve. Noise from I-95 No Philadelphia Ford Curve 81-82 298 1 3 Limited Visibility
More informationTHINK SAFETY FIRST ONE WAY SYSTEM GILL MILL QUARRY. DRIVER and VISITORS INFORMATION PACK
THINK SAFETY FIRST ONE WAY SYSTEM GILL MILL QUARRY DRIVER and VISITORS INFORMATION PACK SMITHS OPERATING HOURS HOW TO FIND US SMITHS WHEN ARRIVING ON SITE WHILST ON SITE Operating Hours HOW TO FIND US
More informationCTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016
CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis
More informationAUTOMOTIVE INVESTMENT PORTFOLIO
AUTOMOTIVE INVEMENT PORTFOLIO THREE RATEGICALLY LOCATED TOYOTA DEALERSHIPS / / I N V E S T M E N T S U M M A RY / / S TO C K P O RT / / R O C H DA LE / / B O LTO N / / C OV E N A N T A N A LYS I S / /
More informationHM Railway lnspectorate
HM Railway lnspectorate RAILWAY ACCIDENT AT STAFFORD A report on a collision that occurred on 4 August 1990 HSE BOOKS O Crown copyright 1994 Applications for reproduction should be made to HMSO First published
More informationBATON ROUGE SUBDIVISION
TRACK CHART & SIDINGS SIDING LENGTH SIDING SWITCH LOCATIONS STATION SIGN S N O O U R T T H STATIONS H METHOD OF OPERATION DEFECT DETECTORS 65 RADIO CHANNELS CALL INS 365.5 GLSR KCS 361.2 UP HAMMOND SUBDIVISION
More informationChapter 5 Route Window NE4 Ilford station. Transport for London
Chapter 5 Route Window NE4 Ilford station ILFORD STATION 5 Route Window NE4 Ilford station 5.6 The construction programme for the station works is expected to take about two years. Operations at Aldersbrook
More informationA technology-enabled future
Network Rail Annual Return 2013 A technology-enabled future A better railway for a better Britain 1 Network Rail Infrastructure Limited Annual Report and Accounts 2012 Advanced on-site welding technology
More informationWORKING TIMETABLE MANDATORY TRAIN SERVICES
(C) Swanage Railway Co. Ltd. 016 SECTION WG (SWANAGE BRANCH) WORKING TIMETABLE OF MANDATORY TRAIN SERVICES WORGRET JCN TO SWANAGE DIESEL GALA 016 6 MAY 014 to 8 MAY 016 (including preview day May) When
More informationBest Practices in Intercity Rail An Infrastructure Manager s Perspective. Nigel Ash Managing Director, Network Rail Consulting TRB January 2014
Best Practices in Intercity Rail An Infrastructure Manager s Perspective Nigel Ash Managing Director, Network Rail Consulting TRB January 2014 Outline Network Rail in Context Page 4 Britain s Classic High
More informationRAILWAY ACCIDENT. Report on the Collision that occurred on 7th November 1980 at Crewe
DEPARTMENT OF TRANSPORT RAILWAY ACCIDENT Report on the Collision that occurred on 7th November 1980 at Crewe IN THE LONDON MIDLAND REGION OF BRITISH RAILWAYS LONDON: HER MAJESTY'S STATIONERY OFFICE DEPARTMENT
More informationWallan WALLAN (29 MILES 40 CHAINS)
Wallan WALLAN (29 MILES 40 CHAINS) Like most of the other stations on the line to Seymour the township of Wallan is located on the Hume Highway and is some 2 kilometres west of the station. The station
More information