Cádiz Bay tram-train: the first experience over Spanish conventional tracks

Size: px
Start display at page:

Download "Cádiz Bay tram-train: the first experience over Spanish conventional tracks"

Transcription

1 Margarita Novales, Emilio Conles 1 Cádiz Bay tram-train: the first experience over Spanish conventional tracks Submission date: June 29 th, Number of words: 5480 Number of figures: 8 Equivalent number of words: =7480 words. Corresponding author: Margarita Novales. Authors: Margarita Novales. Civil Engineer, PhD. Railways Associate Professor. University of A Coruña. Address: ETS Ingenieros de Caminos, Canales y Puertos. Campus de Elviña, s/n. E A Coruña. Spain Telephone: +(34) Ext.:1452 Fax: +(34) mnovales@udc.es Emilio Conles. Civil Engineer. Researcher. University of A Coruña. Address: ETS Ingenieros de Caminos, Canales y Puertos. Campus de Elviña, s/n. E A Coruña. Spain Telephone: +(34) Ext.:5422 Fax: +(34) econles@udc.es

2 Margarita Novales, Emilio Conles 2 ABSTRACT Tram-train systems are an evolution of light rail in which the vehicle can run on the tram tracks that have been implemented specifically for the system, but it can enter, at a given point, into conventional railway tracks that have been implemented for and are used by conventional railway vehicles. In this way, urban light rail services can be extended further away from the city center, avoiding part of the cost of new infrastructure, and offering a seamless link between the urban center and the suburban areas. The fact of running on different kinds of tracks, with different types of superstructure and geometric characteristics, as well as different standards in relation to safety and other subjects, makes the design of tram-train systems especially complex. The aim of this paper is to describe some of the most important technological challenges for the implementation of Cádiz Bay tram-train. It is the first tram-train developed over Spanish conventional railway tracks belonging to ADIF (Administrador de Infraestructuras Ferroviarias, Administrator of Railway Infrastructures). Some of the main technological features of this tram-train are: 1,668 mm trackgauge, with the possibility of a future transformation to 1,435 mm; a partially low-floor tram-train vehicle, to cope with the two kinds of stations/stops (urban and railway ones); a tram-train wheel with wide flange, to match the conventional railway tracks, which leads to wide-grooved rails in the new urban stretches of the network; dual-voltage vehicle V dc; among other aspects that will be presented in the paper. 1 INTRODUCTION As it is known, tram-train systems are an evolution of light rail in which the vehicle can run on the tram tracks that have been implemented specifically for the system, but it can enter, at a given point, into conventional railway tracks that have been implemented for and are used by conventional railway vehicles. In this way, light rail services can be extended further away from the city center, avoiding part of the cost of new infrastructure, and offering a seamless link between the urban center and the suburban areas. The first tram-train system developed in the world was the one of Karlsruhe (Germany), which was opened on September 27 th, Since then, several cities and countries have implemented or are planning the use of this solution, as it is the case, among others, of Saarbrücken, Nordhausen, Kassel and Heilbronn (Germany), Mulhouse, Bordeaux, Nantes and Strasbourg (France), Sheffield-Rotherham (United Kingdom) and Aarhus (Denmark). The advantages, technological challenges, drawbacks or complexity for implementing tram-train systems have been deeply studied during the last two decades, and several papers have been published in relation to this subject, as [1 to 8]. The aim of this paper is to describe some of the most important technological challenges for the implementation of Cádiz Bay tram-train, which is planned to be partially inaugurated at the end of It is the first tram-train developed over Spanish conventional railway tracks belonging to ADIF (Administrador de Infraestructuras Ferroviarias, Administrator of Railway Infrastructures). ADIF is a state-owned Spanish company that manages the Spanish national railway network (the lines that have not been transferred to Regional Governments). This project has been promoted and is managed by the Agencia de Obra Pública de la Junta de Andalucía, the regional company that manages public works in Andalucía, which belongs to the Consejería de Fomento y Vivienda de la Junta de Andalucía. 2 CÁDIZ BAY TRAM-TRAIN NETWORK 2.1 Infrastructure The Cádiz Bay tram-train network is shown in Figure 1. It comprises two kinds of stretches: The new urban-suburban stretch (the blue line in the figure) from Chiclana city center to the link with the conventional railway line, running through San Fernando city center. This part of the line starts in the South with the Chiclana council stretch (2 km), in La Hoya industrial park, going northwards in parallel to N-340 road until the integration into the urban zone of Chiclana (Reyes Católicos and Alameda del Solano avenues), going out of the city through another industrial park zone. Then there is an interurban stretch between Chiclana and San Fernando (7 km).

3 Margarita Novales, Emilio Conles 3 It continues with the urban stretch of San Fernando (3.5 km), running through Real Street. It ends with the interurban stretch until the link located in La Ardila (1 km). The overall length of these tracks is 13.5 km. The foreseen total cost is around 225 M (280 M$) [9], which means an average cost of M /km (20.74 M$/km). The existing conventional railway track, belonging to the Sevilla-Cádiz railway line. The tram-train enters this line by means of the link located at La Ardila, which is shown in Figure 2. At this point the new stretch to San Fernando and Chiclana is linked to the railway line by means of a fly-over and new switches (that are not built yet in the figure). The tram-train runs on this conventional railway track to Cádiz, through 10.3 km. This stretch runs on surface in the first zone and then it is laid underground, from Ciudad de La Coruña Avenue to Cádiz railway station. The frequency of conventional railway services existing on this track is approximately of 1 hour from 5 am to 11 pm. FIGURE 1 Cádiz Bay tram-train network.

4 Margarita Novales, Emilio Conles 4 FIGURE 2 La Ardila link between new tram-train line and existing conventional railway line. Courtesy of Vía Libre and Agencia de Obra Pública de la Junta de Andalucía belonging to the Consejería de Fomento y Vivienda de la Junta de Andalucía. The overall length of the network is 23.7 km, and it will have a total of 22 stops/stations, including 5 existing stations in the conventional railway stretch. The served population within a distance of up to 1000 m to the stops/stations is 233,483 inhabitants. The expected demand is 6.14 million passengers/year. The planned frequency for the tram-train services is 15 minutes. 2.2 Rolling stock The service will be provided by means of 7 tram-train vehicles manufactured by the Spanish company CAF (Construcción y Auxiliar de Ferrocarriles). The total acquisition cost for them is 43.3 M (53.9 M$). This high value (6.19 M /vehicle or 7.71 M$/vehicle) is due to the small amount of vehicles, whose design has had to be customized in every detail in order to fulfill compatibility conditions to run on conventional railway tracks as well as on the new urban stretches. The vehicles are composed of three cars with a total length of 38,140 mm and a width of 2,650 mm. These vehicles have a maximum capacity of 299 passengers (84 seated), considering 6 passengers/m 2. The total weight of an empty vehicle is tonnes. The maximum speed will be 100 km/h on the conventional railway track, 70 km/h over the suburban stretches of the new line, and 20 km/h on the urban zones. The whole line, between both terminuses, will be covered in 28 minutes (with a very good commercial speed of around 50 km/h). Acceleration values of the vehicle are as follows: maximum acceleration for the vehicle full of passengers (considering the extreme value of 8 passengers/m 2 ): 1.06 m/s 2 for 0-40 km/h, 0.78 m/s 2 for km/h and 0.50 m/s 2 for km/h. The maximum deceleration with service brake and full vehicle (8 passengers/m 2 ) is 1.10 m/s 2, while the emergency braking leads to 2.50 m/s 2 under the same conditions. The main reference parameters for the layout of the new stretches of the track are: limit value for longitudinal gradients of unlimited length, 4.0%; for sustained longitudinal gradients with limited length of 750 m, 6.5%; for exceptional cases, 8.0%. minimum horizontal curve radius: 50 m. maximum superelevation 150 mm; recommended superelevation rate of change 2 mm/m; exceptional superelevation rate of change 3 mm/m.

5 Margarita Novales, Emilio Conles Future extension plans There is a future plan to extend the tram-train service to Puerto Real. This plan would entail the construction of a second bridge (named Puente de La Pepa) over the bay with tram-train superstructure. This line could be extended to Jerez de la Frontera providing its airport with a tram-train service. Nevertheless, it is difficult to think about the realization of this project in the near future, due to the severe crisis suffered by the Spanish economy. 3 CÁDIZ BAY TRAM-TRAIN TECHNICAL CHALLENGES 3.1 Track-gauge There are several solutions for the case that the tram-train would have to run on existing urban and railway networks with different track-gauge, as can be seen in [3]. Nevertheless, when the tram-train system is going to be developed at the same time as the urban network (that is, building new tracks for its circulation in the urban zone), the recommended approach is to build the tram-train with the same trackgauge as the existing railway tracks. This is the best way to ensure an easy compatibility between the tram-train and the railway network in relation to this subject. As the only existing tracks of Cádiz Bay tram-train were the ones belonging to the conventional railway network, the track-gauge of the new tracks has been selected as the same as the one in such conventional tracks. Thus, Cádiz Bay tram-train is being built with Spanish conventional track-gauge (1,668 mm, also known as Iberian track-gauge). This fact means that it is the first light rail (and tramtrain) system with 1,668 mm track-gauge in Spain (and in the whole Western Europe), as all of the earlier Spanish light rail systems have been implemented with 1,000 or 1,435 mm track-gauge. Nevertheless, track-gauge in Spain is a tricky issue nowadays. While the conventional network has, in general, the Iberian track-gauge (1,668 mm), the new high-speed railway lines have (and will continue being built) with standard track-gauge (1,435 mm). This fact has led to several track-gauge borders (places where the track-gauge changes) in several locations of the Spanish railway network, in addition to the existing borders in the link to the French (and European) network. Although Spain is, perhaps, the main power in relation to track-gauge interchangers technology, these borders are becoming an increasingly important problem for railway operations in Spain. So, the old idea of changing the trackgauge of the whole Spanish network has entered the fray again in the last years. Of course, changing the track-gauge once and for all would be extremely expensive, and would lead to operational inconveniences that have to be taken into account. In order to facilitate an eventual future track-gauge change, the renewals of the main lines are carried out, for about the last two decades, using polyvalent sleepers. These sleepers are specifically designed to allow the track-gauge change by only relocating the rails and the fastenings without replacing the sleepers of the track, in order to make this change easier, faster and cheaper. The Sevilla-Cádiz railway line (which is going to be used by Cádiz Bay tram-train) is not an exception to this track-gauge problem. It has 1,668 mm track-gauge now, but the possibility of a trackgauge change in the short or mid-term future cannot be ruled out. This fact has led to a unique and complicated solution for Cádiz Bay tram-train: it is being implemented in Spanish track-gauge, but it has been designed considering the option of changing the track-gauge of the whole system to the standard value (1,435 mm) at a later time. In this way the tram-train operation is guaranteed even in the case that this gauge change finally would be realized in the Sevilla-Cádiz railway line. This option of changing tram-train gauge in the future has implications in the design of several aspects of the system: The tram-train vehicle, as every equipment in the vicinity of or in contact with vehicle wheelsets, has to be designed to allow this change and to run properly for both gauge alternatives. The suburban stretches of new tram-train lines, which has been built with a conventional railway superstructure of Iberian track-gauge, but with polyvalent sleepers to allow the future track-gauge change, as can be seen in Figure 3. The track structure in this zone is composed of a minimum thickness of 30 cm of ballast, 25 cm of sub-ballast, polyvalent sleepers (type PR-01) and 54 E1 rail type. The urban stretches of new tram-train lines, which need to be prepared for track-gauge change. This change will be the most expensive operation, as tram-train urban lines have the

6 Margarita Novales, Emilio Conles 6 superstructure shown in Figure 3 (although with some variations in different areas of the line due to anti-vibration treatment). As the figure presents, the track superstructure is composed of a concrete layer where the rails are fixed in the trough or rail duct by an elastomeric material. For changing the trackgauge, the covering material of the street (large stone slabs) will have to be removed, then the elastomer has to be eliminated as well (which will be a difficult operation), and then the rails can be relocated in the new position for the standard gauge. This sequence of work will lead, as can be supposed, to high costs of the track-gauge changing. In addition, the rails may remain permanently deformed as a result of this extraction, which can make them unusable (and so, new rails can have to be purchased). On the other hand, the track-gauge change would lead to operational problems in the urban stretches, as the service will have to be interrupted or seriously limited, using only one of the tracks in a single-track mode in order to make the track-gauge change in the other one, making then the same process with the second parallel track. FIGURE 3 Track superstructure: a) new tram-train suburban stretches; b) new tram-train urban stretches. Courtesy of Sacyr Vallehermoso. Another option for solving the problem of the possible future track-gauge change of the conventional railway line could have been the use of an urban mixed-gauge track with three rails. This option was dismissed because of the impacts that the existence of six grooved rails would have had in the streets, especially considering the use of a wide-groove (see section 3.4). This impact would have been even worse for the case of turnouts and crossings.

7 Margarita Novales, Emilio Conles Passenger access One important issue in the implementation of a tram-train (or any other kind of transit) system is to guarantee a safe, quick and easy access to the vehicles for all sort of passengers, regardless the station or stop in which they enter the system. Nevertheless, for tram-train this is not a trivial issue due to differences in floor height and car width of urban light rail vehicles in relation to conventional trains. These differences lead to important dissimilarities in the design of railway stations and urban or light rail stops, mainly in the height of the platform and in its distance to the center of the track. In general, modern European urban rail systems do not accept the use of high-platform stops in the city environment, as they imply important problems of urban integration and higher space occupation. So, the problem of stop/station compatibility between tram-train and railway systems has to be solved either on the railway stations or in the vehicles. The solution on the railway stations can be the implementation of new platforms, either parallel or in series to the existing ones (see [2]), in such a way that the new platforms have the appropriate geometry to fit the urban vehicle, leading to adequate values of horizontal gaps and vertical distances. Nevertheless, as the stations of the conventional railway line used by the Cádiz Bay tram-train are located underground, the option of implementing new platforms would be extremely expensive, so it was rejected. Given this fact, the only remaining alternative is to solve the problem in the vehicle. This was the option adopted in the Cádiz Bay tram-train. To get an easy access from every kind of stop/station, the Cádiz vehicle is partially low-floor, with two double doors in each side of the vehicle located in its highfloor area, and another two in its low-floor zone (see Figure 4). So, the access height for stations in the railway stretches is 790 mm, while it is 380 mm for the rest of the stops. The usable door width is 1,300 mm and the height is 2,010 mm. In any case, a passenger with disabilities needs to have the possibility to enter the vehicle through the low-floor area (corresponding to new urban and suburban stretches of the line), and leave it through the high-floor zone (corresponding to existing conventional railway stretches of the line), or vice versa. As the vertical distance between both floor levels is too high, the option of an internal ramp in the vehicle would be a source of trouble, and this is the reason why the tram-train vehicle has been provided with an internal electric elevator, which is shown in Figure 5. This solution obviously has an impact in the vehicle capacity, as this zone of the vehicle (approximately 2 m 2 ) cannot be occupied with standing passengers when the elevator is being used by a passenger with disabilities, which leads to a decrease in the maximum vehicle capacity of 12 passengers (considering 6 passengers/m 2 ) over a total of 299. In any case, the use of an internal ramp would have had a similar or worse effect, as the ramp is not a comfortable zone for passengers to stand, and it would take more interior space in the vehicle. FIGURE 4 Scheme of the Cádiz tram-train vehicle. Courtesy of CAF (Construcción y Auxiliar de Ferrocarriles).

8 Margarita Novales, Emilio Conles 8 FIGURE 5 Cádiz tram-train interior elevator. a) High-floor level; b) Intermediate position; c) Low-floor level; d & e) Control device. Courtesy of CAF (Construcción y Auxiliar de Ferrocarriles). On the other hand, the tram-train vehicle is narrower than conventional trains (2.65 m in comparison to 2.90 m). In order to avoid an excessive horizontal gap between the tram-train vehicle and the platform in conventional railway stations, the tram-train is provided with a retractable ramp that is unfolded before the doors open (see Figure 6).

9 Margarita Novales, Emilio Conles 9 FIGURE 6 Retractable ramp for easy access to tram-train in conventional railway stations. a) General view of the doors; b) Ramp deployment; c) Final position of the ramp before opening doors; d) Doors opened with retractable ramp unfolded. Courtesy of CAF (Construcción y Auxiliar de Ferrocarriles). 3.3 Trucks As shown in Figure 4, the vehicle has four trucks, three of them are power trucks (each one with a total weight of 6.26 tonnes), while the other is a carrying one (4.97 tonnes). The carrying truck is located under the intermediate car. There are six engines in the vehicle (two in each power truck), with a total power of 900 kw. Primary suspension has rubber-metal springs, while secondary suspension has coil springs. The first and the last trucks of the vehicles are equipped with flange lubricator and sand-dispensers. The wheels are elastic and are mounted on wheelsets. The brake disks are mounted on the wheelsets and their size cannot be very large due to the need for an eventual change of track-gauge to 1,435 mm in the future. 3.4 Wheel-rail interface As previously stated, the Cádiz tram-train vehicles will run on existing conventional railway tracks, as well as on new built urban and suburban light rail tracks. The new tram tracks have been provided with wide-grooved rails (type Ri Ph 37N), to allow the tram-train vehicle to use the same wheel profile as the conventional commuter trains (see Figure 7). The only difference is the wheel diameter, which is 640/580 mm for new/worn wheels of tram-train vehicles, in contrast to 890/790 mm for commuter trains.

10 Margarita Novales, Emilio Conles 10 FIGURE 7 Rail and wheel profile of Cádiz tram-train. a & b) Rail profile of the Cádiz tram track; c) Cádiz tram-train wheel profile. Courtesy of CAF (Construcción y Auxiliar de Ferrocarriles) and Sacyr Vallehermoso. UIC (International Union of Railways) Leaflet [10] states the minimum value of wheel flange height according to wheel diameter. For wheel diameters between 330 and 630 mm the minimum flange height is 32 mm, while for diameters from 630 to 760 mm a value between 30 and 32 mm is recommended (being 30 mm preferable). As Cádiz tram-train wheel flange height (29 mm) does not fulfill the recommendation, detailed studies and tests have been carried out about the running performance over the turnouts and crossings of conventional railway tracks. 3.5 Structural strength The Cádiz tram-train vehicle has been designed to withstand a compressive force in buffers of 600 kn, which is the usual value for tram-train systems. This value is lower than the one required in the last version of the European Standard EN :2010 [11] for P-II type conventional railway vehicles (passenger cars and fixed units). The tram-train type of vehicle is not covered within this standard, and

11 Margarita Novales, Emilio Conles 11 this is why this 600 kn value had to be established by the agreement of the certification group (see point 4 in this paper), by considering the experience of other European tram-trains, as well as the results of simulations and risk analysis. Indeed, when the tram-train vehicle runs on conventional railway tracks, sharing the network with conventional trains, the same level of safety as if the tram-train vehicle had been provided with a buffer resistance of 1500 kn must be guaranteed. For complying with this condition, simulations have been performed with the crash scenarios established in the European Standard EN 15227:2008 [12], for both the real tram-train vehicle and a theoretical vehicle similar to the real one but with a buffer resistance of 1500 kn. The results of these simulations have shown that the deformation of the real vehicle will be larger than for the theoretical one, although the decelerations will be lower. In any case, every obtained value fulfills the limits established in the European Standard EN 15227: Traction power supply Spanish conventional railway lines, when electrified, have a traction power supply of 3000 V dc, while the usual value for light rail systems is 750 V dc (which has been the one selected for urban and interurban stretches of Cádiz Bay tram-train). In order to allow the vehicle to use both kinds of lines, it has been designed as a dual-voltage one, having the ability to run under both power supply voltages ( V dc). This dual-voltage approach is the most usual solution for European tram-train systems, although different types of traction power supply are present in the railway lines of each country (1500 V dc, 3000 V dc, V ac, V ac, among other values). Appropriate transition zones between the two types of traction power supply have to be provided, in which the change is made automatically by the vehicle, while the driver only has to open the circuit-breaker. These transition zones are provided with a downwards slope in the direction of travel, in such a way that even in the case that the vehicle has to stop in this zone, it will move in this direction once the brake is not applied. On the other hand, the vertical contact force applied by the pantograph to the catenary is different for conventional trains than for light rail vehicles, being N for the former and around 80 N for the latter. Anyway, as using 100 N is not a problem for urban and suburban lines in Cádiz, this contact force has been used as the unique one for the Cádiz tram-train vehicle. 3.7 Crossing with conventional trains running over adjacent track Another technological challenge for the tram-train vehicle, arising from the compatibility to run on both kinds of networks, is the requirement of withstanding the efforts caused by the crossing with other vehicles, which may run at speeds up to 160 km/h on adjacent tracks. Simulations have been made for the crossing of the tram-train vehicle with the most unfavorable locomotive that will share the railway lines with the tram-train vehicles. During these simulations, the pressure levels over the vehicles have been determined in order to establish their influence on the vehicle s behavior, on doors and windows behavior, as well as on passengers comfort. Some modifications have had to be introduced into the initial door design in order to avoid problems when crossing with the most unfavorable locomotive at such speeds. 3.8 Additional coupling elements for rescuing The coupling elements of the tram-train vehicle have had to be adapted in order to guarantee that it can be rescued by any kind of train that may run on the railway track (not only by another tram-train, but also by a locomotive or by another passenger vehicle). This fact is necessary in order to avoid severe interference in the railway line operation in case of a tram-train failure. The coupler has been subjected to the standard approval process for railway and light rail systems. It is equipped with anti-climber devices and with a height adapter for recuing by conventional railway vehicles.

12 Margarita Novales, Emilio Conles Signaling and communication systems The tram-train vehicle has to be able to recognize and activate the signaling of any type of track on which it will run. On the other hand, it is necessary that the control center can always contact the vehicle, whatever the point of the network in which it is located. The Cádiz tram-train is provided with a train to wayside communication system, as well as GSM-R (Global System for Mobile Communications - Railway). GSM-R is the European standard for railway communications, which is used in every high-speed line in Spain, and is being extended to the rest of the lines. This system makes it possible to know the location of the vehicle at any moment, providing accurate and fast information to the operator and to users. On the other hand the tram-train vehicle has also digital ASFA (Anuncio de Señales y Frenado Automático, that is, Signal Announcement and Automatic Braking system), which is the current signaling system in the conventional railway track used by the Cádiz Bay tram-train. In addition, it has SAE (Sistema de Ayuda a la Explotación, that is, Operation Support System), which is the usual equipment for light rail in Spain. Furthermore these vehicles are equipped with event register, fire detection system, passengercounter device, and CCTV (closed circuit television) with two interior cameras per car, two rear-view cameras per cabin, two front-view cameras and a 10.4 inches screen for each driver seat. The vehicle s cabin is shown in Figure 8. Finally, the exterior lighting of the vehicle has to comply with railway and urban standards. FIGURE 8 Driving cabin of the Cádiz tram-train vehicle. Courtesy of CAF (Construcción y Auxiliar de Ferrocarriles). 4 CERTIFICATION PROCESS The fact that the tram-train vehicle needs to run not only on conventional railway tracks, but also on tram tracks, makes it impossible to fulfill every requirement established in the certification standards mandatory for operation over Spanish conventional railway tracks (these standards are stated in [13]). This circumstance has imposed the need for establishing a working group and a commission that have studied every breach of the standards, justifying its reason and guaranteeing that they do not result in additional operational or safety problems for the conventional railway network. This commission is composed by members of: ADIF (Administrador de Infraestructuras Ferroviarias), the entity responsible for managing the national railway network in Spain; General Directorate of Railways, the office in charge of railways in the Spanish Public Works Ministry; Renfe Operadora, the main railway operator in Spain, up to date, state-owned company; Agencia de Obra Pública de la Junta de Andalucía, the public works agency of the Regional Government of Andalucía, region in which the Cádiz Bay tram-train is developed;

13 Margarita Novales, Emilio Conles 13 CAF, the manufacturer of the vehicles; CETREN, a certification company recognized by the Spanish government and the European Union; and Ineco-Tifsa, one of the main railway engineering consultancies in Spain. 5 CONCLUSIONS The main characteristics of the Cádiz Bay tram-train system have been shown in this paper, emphasizing the technological challenges that the need for compatibility with conventional railway tracks and with urban and interurban light rail tracks imposes on this system. Once again, as in previous tram-train systems implemented in other countries, these technological challenges have proven to be solvable with the combination of an adequate configuration of the new tracks and a smart and thorough design of the vehicle. Some of the main technological features of this tram-train are: a 1,668 mm track-gauge, with the possibility of a future change to 1,435 mm; a partially low-floor tram-train vehicle, to suit the two kinds of stations/stops (urban and railway ones); a tram-train wheel with wide flange, to fit the conventional railway tracks, which leads to wide-grooved rails in the new urban stretches of the network; compressive strength in buffers of 600 kn, which being lower than the value required for type II conventional railway vehicles, has led to the need to prove the same level of safety by means of simulations; and a dual-voltage vehicle ( V dc). The fact that the tram-train vehicle needs to run not only on conventional railway tracks, but also on tram tracks, makes it impossible to fulfill every requirement established in the certification standards mandatory for operation over Spanish conventional railway tracks. This circumstance has imposed the need for establishing a working group and a commission that have studied every breach of the standards, justifying its reason and guaranteeing that they do not imply additional operational or safety problems for the conventional railway network. 6 ACKNOWLEDGEMENTS Authors thank the contributions to this paper from: Agencia de Obra Pública de la Junta de Andalucía, the regional company that manages public works in Andalucía, which belongs to the Consejería de Fomento y Vivienda de la Junta de Andalucía. Authors specifically acknowledge Santiago Bobo, Project and Transport Infrastructure Works Manager, for their collaboration providing information about the Cádiz Bay tram-train system. CAF (Construcción y Auxiliar de Ferrocarriles), the manufacturer of the Cádiz tram-train vehicle. Authors specifically thank Agustín Uría, Ekaitz Baza, Ainara González and Claudio García for their collaboration providing information and documentation about the vehicle. SyV (Sacyr Vallehermoso), the builder of one of the new urban-interurban stretches of the Cádiz Bay tram-train. Authors specifically acknowledge Ignacio Gargallo for his collaboration providing information and documentation about the new track construction. Vía Libre, a Spanish journal specialized in railways, for allowing the authors to use some of its pictures in this paper. REFERENCES 1. Novales, M. Bugarín, M.R., Tranvitrén y tren-tranvía. Hacia una mejora del aprovechamiento de las infraestructuras ferroviarias. Ed. Colegio de Ingenieros de Caminos, Canales y Puertos. Madrid, ISBN: Novales, M. Bugarín, M.R., Passenger access to tram-train systems. Problems and solutions [Accesso passeggeri ai sistemi tram-treno. Problemi e soluzioni]. Ingegneria Ferroviaria, nº 2, 2011, pp ISSN: Novales, M., Orro, A., Bugarín, M.R., Madrid tram-train feasibility study conclusions, Proceedings of the Institution of Mechanical Engineers - Journal of Rail and Rapid Transit, Vol. 217, nº 1, 2003, pp ISSN: Novales, M., Orro, A., Bugarín, M.R., Tram-train: new public transport system, Transportation Research Record, nº 1793, 2002, pp ISSN: Novales, M., Orro, A., Bugarín, M.R., Development of new wheel profile adapted to combined operation on railroad and light-rail tracks, 84 th Transportation Research Board Annual Meeting, Washington (USA), January 9-13, 2005.

14 Margarita Novales, Emilio Conles Light Rail Committee of the UITP (Union Internationale des Transports Publics), Track sharing (working document), UITP, Montpellier, Brown, V., Goodyear, T., Griffin, T., Robey, C., Technical Report: Shared track standards. LRT and heavy rail, Regional Railways, Network Southeast, British Rail Research, June Griffin, T., Light rail transit sharing the Railtrack system, Proceedings of the Institution of Civil Engineers - Transport, 2, 1996, pp ISSN: X. 9. Julián, A., Rodríguez, A., El tren tranvía de la Bahía de Cádiz preparado para el 2013, Vía Libre, nº 563, May 2012, pp ISSN: UIC (International Union of Railways), Leaflet Trailing stock: wheels and wheelsets. Conditions concerning the use of wheels of various diameters, 4 th edition, Paris, May ISBN: CEN (European Committee for Standardization), EN :2010: Railway applications. Structural requirements of railway vehicle bodies. Part I: Locomotives and passenger rolling stock (and alternative method for freight wagons), CEN, Brussels, CEN (European Committee for Standardization), EN 15227:2008: Railway applications. Crashworthiness requirements for railway vehicle bodies, CEN, Brussels, Ministerio de Fomento de España, Especificación Técnica de Homologación de Material Rodante Ferroviario. Unidades Autopropulsadas, Centro de Publicaciones, Secretaría General Técnica, Ministerio de Fomento, ISBN:

Eurailspeed Parallel Session D.3. Julen Barrutia Commercial Director for Europe, CAF

Eurailspeed Parallel Session D.3. Julen Barrutia Commercial Director for Europe, CAF Eurailspeed Parallel Session D.3 Julen Barrutia Commercial Director for Europe, CAF High Speed in the technological development of CAF CONSTRUCCIONES Y AUXILIAR DE FERROCARRILES, S.A. EurailSpeed 2005

More information

GENERAL OVERVIEW OF HIGH-SPEED IN EUROPE

GENERAL OVERVIEW OF HIGH-SPEED IN EUROPE GENERAL OVERVIEW OF HIGH-SPEED IN EUROPE Prof. Dr. Eng. Andrés López Pita CENIT TECHNICAL UNIVERSITY OF CATALONIA (SPAIN) PARIS, 19 JUNE 2006 CONVENTIONAL LINES OPTIONS FOR INCREASING THE RUNNING SPEED

More information

Study on System Dynamics of Long and Heavy-Haul Train

Study on System Dynamics of Long and Heavy-Haul Train Copyright c 2008 ICCES ICCES, vol.7, no.4, pp.173-180 Study on System Dynamics of Long and Heavy-Haul Train Weihua Zhang 1, Guangrong Tian and Maoru Chi The long and heavy-haul train transportation has

More information

Proportion of the vehicle fleet meeting certain emission standards

Proportion of the vehicle fleet meeting certain emission standards The rate of penetration of new technologies is highly correlated with the average life-time of vehicles and the average age of the fleet. Estimates based on the numbers of cars fitted with catalytic converter

More information

The tram-train: Spanish application

The tram-train: Spanish application The tram-train: Spanish application M. Nova.les, A. Orro & M. R. Bugs.rin Transportation Group, Technical School of Civil Engineering, University ofla Coruiia, Spain. Abstract The tram-train is a new urban

More information

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE Title of the measure: SPA51-PIVE Efficient-Vehicle Incentive Programme General description PIVE Programme was approved in Cabinet Meeting of 27 September 2012 with an initial budget allocation of 75 million,

More information

CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects. October Version 1.0

CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects. October Version 1.0 CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects October 2015 Version 1.0 Introduction Aerodynamic loads on the trackbed generated by the passing of trains at high speed may cause individual

More information

POSITION PAPER Version 3.0

POSITION PAPER Version 3.0 POSITION PAPER Version 3.0 Revision of the Technical Specification for Interoperability / Energy (ENE) Brussels, September 26 th, 2012 1. REFERENCE DOCUMENT UNION RAIL SYSTEM - SUBSYSTEM Energy - TSI Energy

More information

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form. Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form. THE PROBLEM LIGHT RAIL THE SOLUTION? INTRODUCTION Light rail transit (LRT) provides the opportunity

More information

Railway Engineering: Track and Train Interaction COURSE SYLLABUS

Railway Engineering: Track and Train Interaction COURSE SYLLABUS COURSE SYLLABUS Week 1: Vehicle-Track Interaction When a railway vehicle passes over a track, the interaction between the two yields forces on both vehicle and track. What is the nature of these forces,

More information

S&C: Understanding Root Causes & Assessing Effective Remedies C4R Final Dissemination Event, Paris 15 th March 2017

S&C: Understanding Root Causes & Assessing Effective Remedies C4R Final Dissemination Event, Paris 15 th March 2017 Capacity for Rail S&C: Understanding Root Causes & Assessing Effective Remedies C4R Final Dissemination Event, Paris 15 th March 2017 Presenter: Dr Yann Bezin Institute of Railway Research, University

More information

Switch design optimisation: Optimisation of track gauge and track stiffness

Switch design optimisation: Optimisation of track gauge and track stiffness 1 Switch design optimisation: Optimisation of track gauge and track stiffness Elias Kassa Professor, Phd Department of Civil and Transport Engineering, NTNU Trondheim, Norway E-mail: elias.kassa@ntnu.no

More information

Flanging and Hemming of Auto Body Panels using the Electro Magnetic Forming technology

Flanging and Hemming of Auto Body Panels using the Electro Magnetic Forming technology Flanging and Hemming of Auto Body Panels using the Electro Magnetic Forming technology P. Jimbert 1, I Eguia 1, M. A. Gutierrez 1, B. Gonzalez 1, G. S. Daehn 2, Y. Zhang 2, R. Anderson 3, H. Sundberg 4,

More information

Selection of Technologies to Integrate Urban and Suburban Public Rail Transport

Selection of Technologies to Integrate Urban and Suburban Public Rail Transport Selection of Technologies to Integrate Urban and Suburban Public Rail Transport Kurt Rieckhoff 22 nd Metros & Railways Technology Meeting Instructons for presentation The presentation must be in English

More information

NATIONAL REPORT: SPAIN. At 31/12/2015

NATIONAL REPORT: SPAIN. At 31/12/2015 NATIONAL REPORT: SPAIN At 31/12/2015 Network length Spain is the European country with the longer high capacity road network, reaching 16,705 km. Nevertheless, only 3,404 km out of the total are toll motorways

More information

Speed Limit on Railway Curves. (Use of SuperElevation on Railways)

Speed Limit on Railway Curves. (Use of SuperElevation on Railways) Speed Limit on Railway Curves (Use of SuperElevation on Railways) Introduction When a train rounds a curve, it has a tendency to want to travel in a straight direction and the track must resist this movement,

More information

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS CONTACT: Adif International Department Sor Ángela de la Cruz, 3 28020, Madrid, Spain +34 917 744 247 adifinternational@adif.es international.adif.es ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS CUTTING-EDGE

More information

The Global Evolution of HSR. Lessons from the Spanish Experience. Application to U.S. High Speed Rail Acknowledgements CONTENT

The Global Evolution of HSR. Lessons from the Spanish Experience. Application to U.S. High Speed Rail Acknowledgements CONTENT High-Speed Rail: HighI t International ti l Case C Studies St di Wh t llessons can th What the U.S. U S learn l from the Spanish experience? Al Engel, PE, Vice President, Director HSR, AECOM CONTENT The

More information

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010 Interoperability TSIs applicable to Railway vehicles Innotrans, 21-24 September, 2010 1. Purpose of the presentation 2. Geographical scope (Directives and TSIs) 3. Technical scope of TSIs 4. TSIs applicable

More information

Why the original concept of HSL adopted in different countries has. differentiated situation.

Why the original concept of HSL adopted in different countries has. differentiated situation. Why the original concept of HSL adopted in different countries has evolved towards a more differentiated situation. Content Brief overview of the different HSL concepts throughout the world. Why departing

More information

A REVIEW OF HIGH-SPEED RAIL PLAN IN JAVA ISLAND: A COMPARISON WITH EXISTING MODES OF TRANSPORT

A REVIEW OF HIGH-SPEED RAIL PLAN IN JAVA ISLAND: A COMPARISON WITH EXISTING MODES OF TRANSPORT Civil Engineering Forum Volume XXII/3 - September 2013 A REVIEW OF HIGH-SPEED RAIL PLAN IN JAVA ISLAND: A COMPARISON WITH EXISTING MODES OF TRANSPORT Eko Hartono Transport System and Engineering, Universitas

More information

Prerequisites for Increasing the Axle Load on Railway Tracks in the Czech Republic M. Lidmila, L. Horníček, H. Krejčiříková, P.

Prerequisites for Increasing the Axle Load on Railway Tracks in the Czech Republic M. Lidmila, L. Horníček, H. Krejčiříková, P. Prerequisites for Increasing the Axle Load on Railway Tracks in the Czech Republic M. Lidmila, L. Horníček, H. Krejčiříková, P. Tyc This paper deals with problems of increasing the axle load on Czech Railways

More information

New generation of gauge changeover Facilities: The UNICHANGER Project

New generation of gauge changeover Facilities: The UNICHANGER Project New generation of gauge changeover Facilities: The UNICHANGER Project Dr. I.J. Iglesias High Speed Operations and Engineering Direction. Technical Coordination Director. ADIF. Summary 1. The problem of

More information

Power Supply Systems in Spain

Power Supply Systems in Spain New developments in High Speed Power Supply Systems in Spain Carlos RABANOS Rail Energy Systems Deputy Director High Speed Operations and Engineering Directorate, ADIF, Spain July 12th 2012, Session: Infrastructure

More information

Regional and Suburban Transport

Regional and Suburban Transport Regional and Suburban Transport Autorail Grande Capacité France On behalf of the French Regions, the SNCF ordered 500 Autorails Grande Capacité (AGC) for suburban, regional or interregional services. The

More information

HOW TO DELIVER PUBLIC TRANSPORT ON REDUCED BUDGET

HOW TO DELIVER PUBLIC TRANSPORT ON REDUCED BUDGET LONDON MAY 25, 2011 HOW TO DELIVER PUBLIC TRANSPORT ON REDUCED BUDGET Marc Le Tourneur Direction de l Innovation et du Développement Sinotropher Conference London - May 25, 2011 - SUMMARY PART - 1 Climate

More information

NUMERICAL ANALYSIS OF LOAD DISTRIBUTION IN RAILWAY TRACK UNDER WHEELSET

NUMERICAL ANALYSIS OF LOAD DISTRIBUTION IN RAILWAY TRACK UNDER WHEELSET Journal of KONES Powertrain and Transport, Vol., No. 3 13 NUMERICAL ANALYSIS OF LOAD DISTRIBUTION IN RAILWAY TRACK UNDER WHEELSET Piotr Szurgott, Krzysztof Berny Military University of Technology Department

More information

Vossloh Rail Vehicles

Vossloh Rail Vehicles Vossloh Rail Vehicles Economic Mobility June 2010 Vossloh Rail Vehicles Business Areas LOCOMOTIVES Diesel-Electric Electric Shunting Components for locomotives (bogies) PASSENGER VEHICLES Metros Tramways

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

Simulation of railway track maintenance trains at MATISA

Simulation of railway track maintenance trains at MATISA Simulation of railway track maintenance trains at MATISA MultiBody Simulation User Group Meeting Rémi ALLIOT, Solution Consultant, Dassault Systèmes SE Jacques ZUERCHER, Head of Calculation Department,

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

MIKLOS Cristina Carmen, MIKLOS Imre Zsolt UNIVERSITY POLITEHNICA TIMISOARA FACULTY OF ENGINEERING HUNEDOARA ABSTRACT:

MIKLOS Cristina Carmen, MIKLOS Imre Zsolt UNIVERSITY POLITEHNICA TIMISOARA FACULTY OF ENGINEERING HUNEDOARA ABSTRACT: 1 2 THEORETICAL ASPECTS ABOUT THE ACTUAL RESEARCH CONCERNING THE PHYSICAL AND MATHEMATICAL MODELING CATENARY SUSPENSION AND PANTOGRAPH IN ELECTRIC RAILWAY TRACTION MIKLOS Cristina Carmen, MIKLOS Imre Zsolt

More information

The evaluation of endurance running tests of the fuel cells and battery hybrid test railway train

The evaluation of endurance running tests of the fuel cells and battery hybrid test railway train The evaluation of endurance running tests of the fuel cells and battery hybrid test railway train K.Ogawa, T.Yamamoto, T.Hasegawa, T.Furuya, S.Nagaishi Railway Technical Research Institute (RTRI), TOKYO,

More information

Innovative track systems for mainline and urban rail transportation

Innovative track systems for mainline and urban rail transportation Presseinformation Press release Information de presse Pfleiderer AG Postfach 1480 D-92304 Neumarkt Telefon +49 (0) 9181 28 8044 Telefax +49 (0) 9181 28 606 Pfleiderer track systems at InnoTrans 2004, from

More information

CEN and CENELEC Position Paper on the European Commission s proposal for a Directive on the deployment of alternative fuels October 2013

CEN and CENELEC Position Paper on the European Commission s proposal for a Directive on the deployment of alternative fuels October 2013 CEN European Committee for Standardization European Committee for Electrotechnical Standardization CEN Identification number in the EC register: 63623305522-13 Identification number in the EC register:

More information

An International Mission 12 May Isabelle Fonverne, UIC

An International Mission 12 May Isabelle Fonverne, UIC An International Mission 12 May 2016 Isabelle Fonverne, UIC UIC in 2016 2 240 Members in 95 countries 2 UIC, its missions Promoting the development of rail transport at world level, in order to meet challenges

More information

Rubber tyred Tram : another solution to urban mobility?

Rubber tyred Tram : another solution to urban mobility? Rubber tyred Tram : another solution to urban mobility? Bombardier TVR City of Nancy TransLohr City of Clermont-Ferrand Plzen, April 6th, 2011 By Hervé MAZZONI Deputy Director Transport System Department

More information

Manufacturing operating and maintaining different rolling stock

Manufacturing operating and maintaining different rolling stock Manufacturing operating and maintaining different rolling stock Business model with a corporate centre and three different activity areas Renfe-Operadora Railway transport operator in Spain PASSENGERS:

More information

AN ANALYSIS OF DRIVER S BEHAVIOR AT MERGING SECTION ON TOKYO METOPOLITAN EXPRESSWAY WITH THE VIEWPOINT OF MIXTURE AHS SYSTEM

AN ANALYSIS OF DRIVER S BEHAVIOR AT MERGING SECTION ON TOKYO METOPOLITAN EXPRESSWAY WITH THE VIEWPOINT OF MIXTURE AHS SYSTEM AN ANALYSIS OF DRIVER S BEHAVIOR AT MERGING SECTION ON TOKYO METOPOLITAN EXPRESSWAY WITH THE VIEWPOINT OF MIXTURE AHS SYSTEM Tetsuo Shimizu Department of Civil Engineering, Tokyo Institute of Technology

More information

Interrelation between Wavelengths of Track Geometry Irregularities and Rail Vehicle Dynamic Properties

Interrelation between Wavelengths of Track Geometry Irregularities and Rail Vehicle Dynamic Properties THE ARCHIVES OF TRANSPORT VOL. XXV-XXVI NO 1-2 213 Interrelation between Wavelengths of Track Geometry Irregularities and Rail Vehicle Dynamic Properties Bogdan Sowinski Received January 213 Abstract The

More information

Special edition paper

Special edition paper Efforts for Greater Ride Comfort Koji Asano* Yasushi Kajitani* Aiming to improve of ride comfort, we have worked to overcome issues increasing Shinkansen speed including control of vertical and lateral

More information

The distributor valve

The distributor valve The distributor valve Understanding the operation of a pneumatic brake, and in particular of the operating principles of the pneumatic control, relies on understanding the global operation of the main

More information

Fast track to Sustainable Mobility. SNCF V350 CATENARY CERTIFICATION with respect to the TSI-ENE

Fast track to Sustainable Mobility. SNCF V350 CATENARY CERTIFICATION with respect to the TSI-ENE Fast track to Sustainable Mobility SNCF V350 CATENARY CERTIFICATION with respect to the TSI-ENE 1 The French Railway Network 3630 km of highspeed tracks 300 km at 270km/h 2730 km at 300km/h 600 km at 320km/h

More information

Certain considerations in the alignment design of urban railways

Certain considerations in the alignment design of urban railways Urban Transport XVIII 649 Certain considerations in the alignment design of urban railways B. Kufver 1 & G. Hallert 2 1 Ferroplan, Sweden 2 WSP International, Sweden Abstract Railway alignment has a high

More information

Electric Vehicle Charging. How, When and Where?

Electric Vehicle Charging. How, When and Where? Electric Vehicle Charging. How, When and Where? 1.- INTRODUCTION The Electric Vehicle (EV) is a media reality that does not represent the scarce number of vehicles circulating through our roads. This situation

More information

High Speed S&C Design and Maintenance

High Speed S&C Design and Maintenance High Speed S&C Design and Maintenance Dr Sin Sin Hsu Head of Track Engineering, NRHS 1 st March 2018 What is a High Speed Turnout? Three main parts: Switch Geometry, profile, components Intermediate Part

More information

NUMERICAL ANALYSIS OF IMPACT BETWEEN SHUNTING LOCOMOTIVE AND SELECTED ROAD VEHICLE

NUMERICAL ANALYSIS OF IMPACT BETWEEN SHUNTING LOCOMOTIVE AND SELECTED ROAD VEHICLE Journal of KONES Powertrain and Transport, Vol. 21, No. 4 2014 ISSN: 1231-4005 e-issn: 2354-0133 ICID: 1130437 DOI: 10.5604/12314005.1130437 NUMERICAL ANALYSIS OF IMPACT BETWEEN SHUNTING LOCOMOTIVE AND

More information

TE 73 TWO ROLLER MACHINE

TE 73 TWO ROLLER MACHINE TE 73 TWO ROLLER MACHINE Background The TE 73 family of machines dates back to original Plint and Partners Ltd designs from the 1960s. These machines are all to the overhung roller design in which test

More information

PUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY

PUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY PUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY Johannes de Jong E-mail: johannes.de.jong@kone.com Marja-Liisa Siikonen E-mail: marja-liisa.siikonen@kone.com

More information

UIC/ UNIFE Technical Recommendations (TecRec)

UIC/ UNIFE Technical Recommendations (TecRec) UIC/ UNIFE Technical Recommendations (TecRec) An Introduction and Overview Enno Wiebe, Manager Research Projects and Programmes, UIC European Standardisation and Regulation 2 11th UIC Sustainability Conference,

More information

WHEEL TREAD PROFILE EVOLUTION FOR COMBINED BLOCK BRAKING AND WHEEL-RAIL CONTACT RESULTS FROM DYNAMOMETER EXPERIMENTS

WHEEL TREAD PROFILE EVOLUTION FOR COMBINED BLOCK BRAKING AND WHEEL-RAIL CONTACT RESULTS FROM DYNAMOMETER EXPERIMENTS 1 th International Conference on Contact Mechanics and Wear of Rail/Wheel Systems (CM215) Colorado Springs, Colorado, USA WHEEL TREAD PROFILE EVOLUTION FOR COMBINED BLOCK BRAKING AND WHEEL-RAIL CONTACT

More information

DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE. 29 March Jean-Pierre ORSI Director Europe SYSTRA

DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE. 29 March Jean-Pierre ORSI Director Europe SYSTRA DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE Jean-Pierre ORSI Director Europe SYSTRA 1 Fundamental parameters of the Trans-European high speed railway system. Speed increase on conventional

More information

Defending public transport, defending equality

Defending public transport, defending equality Defending public transport, defending equality European Parliament, Brussels GUE/NGL 28th June, 2018 The access to transports and public investments in infrastructures Ricard Riol Jurado President of PTP

More information

Double gauge High-Speed. interoperability and scope

Double gauge High-Speed. interoperability and scope Double gauge High-Speed electric-diesel train: increasing interoperability and scope Victorino PÉREZ FERNÁNDEZ Manager of European Affairs, Renfe, Spain 12/07/2012, Session: Rolling Stock 4 Technical development

More information

Maximum Superelevation: Desirable, Allowable, and Absolute

Maximum Superelevation: Desirable, Allowable, and Absolute Maximum Superelevation: Desirable, Allowable, and Absolute Nazmul Hasan, M. Eng. SNC-Lavalin Inc. ancouver, ON ABSTRACT The maximum values of superelevation are often qualified as desirable, allowable

More information

AEB System for a Curved Road Considering V2Vbased Road Surface Conditions

AEB System for a Curved Road Considering V2Vbased Road Surface Conditions , pp.8-13 http://dx.doi.org/10.14257/astl.2015.86.03 AEB System for a Curved Road Considering V2Vbased Road Surface Conditions Hyeonggeun Mun 1, Gyoungeun Kim 1, Byeongwoo Kim 2 * 1 Graduate School of

More information

Toward the Realization of Sustainable Mobility

Toward the Realization of Sustainable Mobility GIES 2008 Toward the Realization of Sustainable Mobility March 13, 2008 Toyota Motor Corporation Senior Technical Executive Hiroyuki Watanabe 1 CO 2 Emission from Transportation Sector Distribution by

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

Featured Articles Utilization of AI in the Railway Sector Case Study of Energy Efficiency in Railway Operations

Featured Articles Utilization of AI in the Railway Sector Case Study of Energy Efficiency in Railway Operations 128 Hitachi Review Vol. 65 (2016), No. 6 Featured Articles Utilization of AI in the Railway Sector Case Study of Energy Efficiency in Railway Operations Ryo Furutani Fumiya Kudo Norihiko Moriwaki, Ph.D.

More information

Train Group Control for Energy-Saving DC-Electric Railway Operation

Train Group Control for Energy-Saving DC-Electric Railway Operation Train Group Control for Energy-Saving DC-Electric Railway Operation Shoichiro WATANABE and Takafumi KOSEKI Electrical Engineering and Information Systems The University of Tokyo Bunkyo-ku, Tokyo, Japan

More information

Development of Motor-Assisted Hybrid Traction System

Development of Motor-Assisted Hybrid Traction System Development of -Assisted Hybrid Traction System 1 H. IHARA, H. KAKINUMA, I. SATO, T. INABA, K. ANADA, 2 M. MORIMOTO, Tetsuya ODA, S. KOBAYASHI, T. ONO, R. KARASAWA Hokkaido Railway Company, Sapporo, Japan

More information

Simulation of a Narrow Gauge Vehicle using SIMPACK, Model Validation using Scaled Prototypes on Roller-Rig

Simulation of a Narrow Gauge Vehicle using SIMPACK, Model Validation using Scaled Prototypes on Roller-Rig Simulation of a Narrow Gauge Vehicle using SIMPACK, Model Validation using Scaled Prototypes on Roller-Rig Politecnico di Torino Dipartimento di Meccanica N. Bosso, A.Gugliotta, A. Somà Blue Engineering

More information

Reducing Train Weight and Simplifying Train Design by Using Active Redundancy of Static Inverters for the Onboard Supply of Rolling Stock

Reducing Train Weight and Simplifying Train Design by Using Active Redundancy of Static Inverters for the Onboard Supply of Rolling Stock IJR International Journal of Railway, pp. 89-93 The Korean Society for Railway Reducing Train Weight and Simplifying Train Design by Using Active Redundancy of Static Inverters for the Onboard Supply of

More information

SCHALKE LOCOMOTIVES KEEP YOUR BUSINESS ON TRACK

SCHALKE LOCOMOTIVES KEEP YOUR BUSINESS ON TRACK SCHALKE LOCOMOTIVES KEEP YOUR BUSINESS ON TRACK Schalke locomotives provide maximum versatility and can be used to perform a variety of tasks in suburban and regional passenger rail transport systems.

More information

Innovative designs and methods for VHST 2 nd Dissemination Event, Brussels 3 rd November 2016

Innovative designs and methods for VHST 2 nd Dissemination Event, Brussels 3 rd November 2016 Capacity for Rail Innovative designs and methods for VHST 2 nd Dissemination Event, Brussels 3 rd November 2016 Miguel Rodríguez Plaza Adif Introduction C4R WP 1.2: VHST 2 Objectives: To identify market

More information

Official Journal L 104. of the European Union. Legislation. Non-legislative acts. Volume April English edition. Contents REGULATIONS

Official Journal L 104. of the European Union. Legislation. Non-legislative acts. Volume April English edition. Contents REGULATIONS Official Journal of the European Union ISSN 1977-0677 L 104 English edition Legislation Volume 56 12 April 2013 Contents II Non-legislative acts REGULATIONS Commission Regulation (EU) No 321/2013 of 13

More information

SCHALKE LOCOMOTIVES KEEP YOUR BUSINESS ON TRACK

SCHALKE LOCOMOTIVES KEEP YOUR BUSINESS ON TRACK SCHALKE LOCOMOTIVES KEEP YOUR BUSINESS ON TRACK The ultimate specialists and uniquely developed to suit exacting customer requirements, these locomotives offer a high power density under extreme conditions

More information

Submission to Greater Cambridge City Deal

Submission to Greater Cambridge City Deal What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a

More information

Sustainable Rail Strategy The Value of Quality

Sustainable Rail Strategy The Value of Quality Graz University of Technology Institute of Railway Engineering and Transport Economics Sustainable Rail Strategy The Value of Quality Peter Veit June 30 th, 2015 www.ebw.tugraz.at Challenge Graz, Austria

More information

General approach to High Speed Rail. Iñaki Barrón de Angoiti UIC, Director of Passengers Department Paris, France

General approach to High Speed Rail. Iñaki Barrón de Angoiti UIC, Director of Passengers Department Paris, France General approach to High Speed Rail Iñaki Barrón de Angoiti UIC, Director of Passengers Department Paris, France Summary High speed is expanding dramatically around the world A highly beneficial transport

More information

MODERN TRAMS IN SCANDINAVIA

MODERN TRAMS IN SCANDINAVIA May 2017 Banekonference MODERN TRAMS IN SCANDINAVIA Besançon, France Agenda Introduction to SYSTRA Group profile, expertise & services Tramway à la française concept Our view of a modern tram Our general

More information

Sustainable Urban Development Railways and its Interfaces with the Urban Areas

Sustainable Urban Development Railways and its Interfaces with the Urban Areas Milko Papazoff, UIC, ASEAN Representative Sustainable Development Ulaanbaatar, Mongolia, 4 h October 2018 Sustainable Urban Development Railways and its Interfaces with the Urban Areas UIC Members all

More information

INTERIOR NOISE OF A KOREAN HIGH-SPEED TRAIN IN TUNNELS

INTERIOR NOISE OF A KOREAN HIGH-SPEED TRAIN IN TUNNELS INTERIOR NOISE OF A KOREAN HIGH-SPEED TRAIN IN TUNNELS Sunghoon Choi, Chan-Woo Lee, Jae-Chul Kim, and Joon-Ho Cho Noise and Vibration Research Group, Korea Railroad Research Institute, Woulam-dong, Uiwang-city,

More information

Comparison of different 600 kw designs of a new permanent magnet generator for wind power applications

Comparison of different 600 kw designs of a new permanent magnet generator for wind power applications Comparison of different 600 kw designs of a new permanent magnet generator for wind power applications E. Peeters, Vito, Boeretang 200, 2400 Mol, Belgium, eefje.peeters@vito.be, tel +32 14 33 59 23, fax

More information

Analysis and assessment of eco-driving strategies for train drivers training. Claudio Migliorini Stefano Ricci Eros Tombesi

Analysis and assessment of eco-driving strategies for train drivers training. Claudio Migliorini Stefano Ricci Eros Tombesi Claudio Migliorini Stefano Ricci Eros Tombesi Topics Aims and working phases Factors affecting energy consumption Tools and available data Performance indicators Case study sections Presentation of main

More information

Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center

Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center 11 Operation & Maintenance Business Department, Land Transportation Systems & Components

More information

Labelling Smart Roads DISCUSSION PAPER 4/2015

Labelling Smart Roads DISCUSSION PAPER 4/2015 DISCUSSION PAPER 4/2015 December 2015 TABLE OF CONTENTS 1. Introduction... 3 2. The Smart Roads of the Future... 3 3. : Sustainability of road infrastructure... 4 4. : Sustainability in mobility management

More information

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES Table of contents TABLE OF CONTENTS Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF CONTENTS TABLE OF TABLES TABLE OF FIGURES INTRODUCTION I.1. Motivations I.2. Objectives I.3. Contents and structure I.4. Contributions

More information

DEVELOPMENT OF A DRIVING CYCLE FOR BRASOV CITY

DEVELOPMENT OF A DRIVING CYCLE FOR BRASOV CITY DEVELOPMENT OF A DRIVING CYCLE FOR BRASOV CITY COVACIU Dinu *, PREDA Ion *, FLOREA Daniela *, CÂMPIAN Vasile * * Transilvania University of Brasov Romania Abstract: A driving cycle is a standardised driving

More information

WLTP for fleet. How the new test procedure affects the fleet business

WLTP for fleet. How the new test procedure affects the fleet business WLTP for fleet How the new test procedure affects the fleet business Editorial Ladies and Gentlemen, The automotive industry is facing a major transformation process that will also affect the fleet business

More information

Experimental investigation on vibration characteristics and frequency domain of heavy haul locomotives

Experimental investigation on vibration characteristics and frequency domain of heavy haul locomotives Journal of Advances in Vehicle Engineering 3(2) (2017) 81-87 www.jadve.com Experimental investigation on vibration characteristics and frequency domain of heavy haul locomotives Lirong Guo, Kaiyun Wang*,

More information

Transportation Infrastructure WGF 2017

Transportation Infrastructure WGF 2017 Transportation Infrastructure WGF 2017 Stuart Woods VP Geospatial Division Leica Geosystems AG. Growing Population THE WORLD'S POPULATION IS GROWING TODAY 7.4BN - 10BN IN 40 YEARS 2 Mapping the Unknown

More information

Curbing emissions and energy consumption in the transport sector how can we deal with it in Warsaw 2012 Annual POLIS Conference

Curbing emissions and energy consumption in the transport sector how can we deal with it in Warsaw 2012 Annual POLIS Conference Curbing emissions and energy consumption in the transport sector how can we deal with it in Warsaw 2012 Annual POLIS Conference Perugia, 29 30 November 2012 1 Covenant of Mayors (under the auspices of

More information

High Speed Passenger Rail Interoperability in North America

High Speed Passenger Rail Interoperability in North America High Speed Passenger Rail Interoperability in North America APTA Rail Conference - Boston Thomas Peacock Larry D. Kelterborn June15, 2011 Discussion Topics The New Transportation Vision Meaning of Interoperability

More information

Investigating the impact of track gradients on traction energy efficiency in freight transportation by railway

Investigating the impact of track gradients on traction energy efficiency in freight transportation by railway Energy and Sustainability III 461 Investigating the impact of track gradients on traction energy efficiency in freight transportation by railway G. Bureika & G. Vaičiūnas Department of Railway Transport,

More information

FENEBUS POSITION PAPER ON REDUCING CO2 EMISSIONS FROM ROAD VEHICLES

FENEBUS POSITION PAPER ON REDUCING CO2 EMISSIONS FROM ROAD VEHICLES FENEBUS POSITION PAPER ON REDUCING CO2 EMISSIONS FROM ROAD VEHICLES The Spanish Federation of Transport by Bus (Fenebús) is aware of the importance of the environmental issues in order to fully achieve

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 26.5.2011 Official Journal of the European Union L 139/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 26 April 2011 concerning a technical specification for interoperability relating to the

More information

Analysis and evaluation of a tyre model through test data obtained using the IMMa tyre test bench

Analysis and evaluation of a tyre model through test data obtained using the IMMa tyre test bench Vehicle System Dynamics Vol. 43, Supplement, 2005, 241 252 Analysis and evaluation of a tyre model through test data obtained using the IMMa tyre test bench A. ORTIZ*, J.A. CABRERA, J. CASTILLO and A.

More information

What is model validation? Overview about DynoTRAIN WP5. O. Polach Final Meeting Frankfurt am Main, September 27, 2013

What is model validation? Overview about DynoTRAIN WP5. O. Polach Final Meeting Frankfurt am Main, September 27, 2013 What is model validation? Overview about DynoTRAIN WP5 O. Polach Final Meeting Frankfurt am Main, September 27, 2013 Contents Introduction State-of-the-art on the railway dynamic modelling Suspension modelling

More information

Non-contact Deflection Measurement at High Speed

Non-contact Deflection Measurement at High Speed Non-contact Deflection Measurement at High Speed S.Rasmussen Delft University of Technology Department of Civil Engineering Stevinweg 1 NL-2628 CN Delft The Netherlands J.A.Krarup Greenwood Engineering

More information

SECTION 11 INTERMODAL EQUIPMENT

SECTION 11 INTERMODAL EQUIPMENT SECTION 11 INTERMODAL EQUIPMENT ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 11 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED TABLE OF CONTENTS Section Description Page No. 11.1 SCOPE... 11-1

More information

Tram-train systems in Europe and realization in Szeged-Hódmezővásárhely Dr. Zoltán Ádám Németh Szeged Transport Ltd., directorial agent

Tram-train systems in Europe and realization in Szeged-Hódmezővásárhely Dr. Zoltán Ádám Németh Szeged Transport Ltd., directorial agent Tram-train systems in Europe and realization in Szeged-Hódmezővásárhely Dr. Zoltán Ádám Németh Szeged Transport Ltd., directorial agent What is a tram-train? Karlsruhe What is a tram-train? Kassel What

More information

The future role of storage in a smart and flexible energy system

The future role of storage in a smart and flexible energy system The future role of storage in a smart and flexible energy system Prof Olav B. Fosso Dept. of Electric Power Engineering Norwegian University of Science and Technology (NTNU) Content Changing environment

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

Tram Train opportunities for the future

Tram Train opportunities for the future Tram Train opportunities for the future A presentation to APPLRG by Ian Ambrose - Future Railway Development Manager 12th November 2007 Key objectives Development of a new service to rail users Providing

More information

Track Circuit Assister Configuration for Rail Vehicles

Track Circuit Assister Configuration for Rail Vehicles Track Circuit Assister Configuration for Rail Synopsis This Standard mandates where TCAs shall be fitted onto a vehicle and how they shall be set up. It also contains the requirements for testing a TCA.

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION CLC/TS 50591 SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION November 2013 ICS 45.060.10 English version Specification and verification of energy consumption for railway rolling

More information

Synthesis of Cal Poly Senior Projects Relating to Public Transportation in San Luis Obispo County

Synthesis of Cal Poly Senior Projects Relating to Public Transportation in San Luis Obispo County Synthesis of Cal Poly Senior Projects Relating to Public Transportation in San Luis Obispo County In partial fulfillment of CE 424 Professor Eugene Jud By David Thornhill November 14, 2007 Purpose The

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

The design and implementation of a simulation platform for the running of high-speed trains based on High Level Architecture

The design and implementation of a simulation platform for the running of high-speed trains based on High Level Architecture Computers in Railways XIV Special Contributions 79 The design and implementation of a simulation platform for the running of high-speed trains based on High Level Architecture X. Lin, Q. Y. Wang, Z. C.

More information