OPTIMIZED STEAM TURBINE GOVERNOR CONTROLLING SINGLE OR MULTIPLE GRID FAULTS

Size: px
Start display at page:

Download "OPTIMIZED STEAM TURBINE GOVERNOR CONTROLLING SINGLE OR MULTIPLE GRID FAULTS"

Transcription

1 Proceedings of ASME Turbo Expo 2012 GT2012 June 11-15, 2012, Copenhagen, Denmark GT OPTIMIZED STEAM TURBINE GOVERNOR CONTROLLING SINGLE OR MULTIPLE GRID FAULTS Martin Bennauer SIEMENS AG Energy Sector Fossil Power Generation Division Mülheim an der Ruhr, Germany Christian Kreischer TU Dortmund University Department of Electrical Engineering and Information Technology Institute of Electrical Drives and Mechatronics Dortmund, Germany Jens Rosendahl SIEMENS AG Energy Sector Fossil Power Generation Division Mülheim an der Ruhr, Germany Heribert Werthes PowerDyn GmbH Essen, Germany ABSTRACT This paper uses simulation results to figure out how SIEMENS handles a single grid fault of a three phase short circuit close to the power plant and a multiple grid fault of a load rejection due to a three phase short circuit close to the power plant. The correct response of the steam turbine governor to the single and the multiple grid fault can increase power plant availability, prevent steam turbine trips and reduce overspeed. Therefore the power supply to the electrical grid can still be maintained, and in case of a de-stabilized electrical grid a black-out could be prevented. If the steam turbine trips caused by the single or the multiple grid fault the steam turbine runs down and has to be restarted. This could take several hours as worst case. During this time the power plant is not available to support and stabilize the electrical grid. If the steam turbine governor is able to handle the single grid fault, the power plant is still connected to the grid. This will not further stress the de-stabilized electrical grid. If the steam turbine governor is able to handle the multiple grid fault, the house load of the power plant will still be provided by the steam turbine. The operator could resynchronize the power plant with the de-stabilized electrical grid as fast as possible. In both cases for the single and the multiple grid fault the power plant remains available by the optimized steam turbine governor. INTRODUCTION Many European Grid Codes stipulate that a power plant must withstand short circuits in the power transmission system during a specified fault clearing time without damage to support voltage and frequency stability on the grid. The Nordic Grid Code [1] for example demands stability of the generator for a single grid fault like a three phase short circuit close to the power plant for a minimum fault clearing time of 250 ms. This special customer demand exists for small power generation units connected to the medium-voltage power grid as well as for large fossil power plants. The examples discussed in the following work deal with a large steam turbine power plant. Grid Codes do not necessarily assume that power plants must also be able to control another fault occurring a few seconds later. Since load rejection to house load can certainly occur following a short circuit, e.g. during extreme weather conditions or environmental disasters, it would be of great advantage to enhance the power plant availability if a multiple grid fault of this kind could also be controlled. For the multiple grid fault it is assumed that the power plant described here is connected to the grid via two transmission lines. During storm a three-phase short circuit (for example a tree cuts all three 1 Copyright Siemens Energy, Inc All rights reserved.

2 phases) occurs in one of the two transmission lines which is cleared after 250 ms. Thereafter a two-phase short circuit (for example two phases contact each other) occurs in the remaining second transmission line which result in a load rejection to house load for the power plant. The rejection of electrical load shortly after a short circuit can give rise to very high overspeeds however and these will cause tripping by the dedicated overspeed protection system. An overspeed trip results in shutdown of the turbine generator and the extended downtimes associated with it. The main benefit of load rejection to house load as compared with the shutdown by a protection system is the immediate re-establishment of availability, i.e. the power plant could be synchronized with the grid only a few seconds later. A SIEMENS steam turbine generally has a combined speed/load controller with PI structure. The setpoints of position for the valves are determined by the setpoint of the load via proportional and integral components as long as the generator breaker is closed and the speed and grid frequency are constant. By the occurrence of a sudden change to stationary operation which leads to greater deviations from the nominal speed, automatic switchover to the speed controller is performed. Than the output of the speed controller throttles the valves and controls indirectly the mechanical torque of the turbine that corresponds to the active power output of the generator. The simulations are based on a previously validated NETOMAC (Network Torsion Machine Control, [2]) model of a steam turbine power plant on the grid with a rated power of 1000 MVA. The model has been improved constantly. The investigation of interdependencies between turbine control, generator and grid was topic of several interdisciplinary research projects. SINGLE GRID FAULT In the event of a single grid fault, a generator must supply active and reactive power for as long as possible so as to support the stability of frequency and voltage. If, however, the generator slips out of synchronism with the grid or if the shaft train is endangered due to overspeed, for example, the turbine generator must immediately be disconnected from the grid and switched to house load operation. The controller monitors the electrical power on the generator terminals. If specified limits (load band around zero) are exceeded, fast travel mode is triggered for the valves and the mechanical load is decreased as quickly as possible. The valves remain closed for a hold time of approx. 1.5 s, after which time they are slowly reopened. It is impossible to distinguish between load rejection to house load and a grid short circuit on the basis of the active power of the terminals at the beginning of the event. Unlike load rejection, electrical active power returns after a grid short circuit once the fault has been cleared and the valves must then reopen. The generator then must continue to supply active and reactive power to the grid, so as to stabilize frequency and voltage. This means that if the short circuit is active for 250 ms or less, no slip must occur on the shaft train and the mechanical power input must not be decreased completely [3]. Since decreasing the turbine momentum has a stabilizing effect [4], immediate fast closure of the valves enhances the dynamic behavior of the shaft train in the case of the single grid fault like the three-phase short circuit. Because the electrical power continues to oscillate through zero several times, the controller interprets it as another load drop when the lower limit values (load band around zero) are violated. The load rejection identification function integrated in steam turbine controllers makes it possible to differentiate between a short circuit and load rejection. This controller module supplies a signal which is set only once for a short time following a short circuit and which is subsequently blocked for several seconds, i.e. until the after-effects of the grid fault have abated for the most part. Figure 1 shows the results of the simulation. The mechanical momentum is restored quickly and electrical power reaches the steady-state condition after about 8 s. Stable voltage and frequency accompany this steady-state electrical power. Figure 1: Single grid fault with a fault clearing time of 250 ms It can also be seen that the IP and HP valves close quickly and that they reopen completely after a short time. The speed oscillates around the rated value within a deviation of a few percent, i.e. the machine is stable. The power on the generator terminals exhibits the familiar behavior of a steam power plant in the event of a three-phase grid short circuit with the associated fault clearing times [5]. From the point of view of stability, significantly longer fault clearing times or connections to weak power grids can generally only be controlled by means of special control measures, such as Fast Valving [4] or Early Valve Actuation. Serious grid faults like a three-phase short circuits cannot be tested on real applications economically and therefore investigations have to rely on adequate simulation models. The simulation results of the model have to be validated somehow with available measurements of existing power plants. For example a good agreement with measurements of a load rejection to house load is appropriate to show that the dynamic model is adequate for the following investigations. The results of the simulation of load rejection shown in figure 2 illustrate the behavior of the steam turbine power plant 2 Copyright Siemens Energy, Inc All rights reserved.

3 following a decrease in the power on the terminals to house load. Fast closure of valves is also necessary during load rejection to house load so as to protect against overspeed. Since the same criteria are fulfilled as during a grid short circuit, fast travel mode is automatically actuated once. The valves must remain closed thereafter, however, until such time as the active power of the turbine generator has reached the house load level. The signal for load rejection is first delayed by several 100 ms for this purpose, until it has been ensured that a grid short circuit has not occurred. If the power stays close to zero for significantly longer than the fault clearing time, the control can be switched over to house load. rejection identification function immediately triggers fast travel mode for the IP and HP valves (second diagram in figure 3) by issuing the transient grid disturbance signal. As shown in the third diagram the fast travel mode decreases the mechanical load as fast as possible and the valves stay closed for a preset time of approximately 1.5 s before reopening again. For all following simulations results the fault is active for a fault clearing time (FKZ) of 250 ms which corresponds to the worst case. During the fault the generator cannot deliver active power to the grid. The remaining mechanical power of the steam turbine therefore initially results in an acceleration of the shaft and an small increase of the shaft speed (third diagram in figure 3). Figure 2: Load rejection to house load Following fast closure of the valves, the mechanical momentum decreases slowly due to the high moment of inertia. This causes the shaft train to accelerate, thus permitting it to absorb the excess turbine power which can no longer be transferred to the grid. The speed increases up to about 6 % above the rated value, as can be seen from the bottom graph in figure 2. After that the speed controller largely determines the control signal for valve opening. This causes the valves to remain closed and the driving torque of the turbine is reduced to zero as specified until the speed falls below the setpoint. MULTIPLE GRID FAULT The behavior of the current control system and the turbine generator on the grid in response to a multiple grid fault in the form of load rejection to house load occurring shortly after a three phase grid short circuit close to the power plant is described below. Special attention is paid to the level of overspeed relative to the speed at rated operation. If the specified requirements are to be fulfilled, the protection system must not trip due to high overspeeds ( 110 % of the rated speed). MULTIPLE GRID FAULT: LOAD REJECTION DURING VALVE HOLD TIME The first diagram in figure 3 shows the active power of the Generator over time related to the nominal apparent power. After one second of simulation time the three phase grid short circuit is initiated close to the high voltage side of the transformer. The power on the generator terminals decreases instantly due to the drop in voltage to almost zero. The load Figure 3: Multiple grid fault with 1 s delay prior to load Although the generator power is immediately restored following the fault clearing, it exhibits major oscillations around the rated value until steady state operation resumes a few seconds later, assuming no further fault has occurred. In the case illustrated in figure 3, however, load rejection to house load occurs 1 s after fault clearing, i.e. while the power oscillations resulting from the grid short circuit are still active. Because load rejection occurs during the valve hold time, the control system can generally handle it without any problem. However it is important to mention that a delay time - labeled TLAW - in the diagram remains between the detected start of the load rejection and the second actuation of fast travel mode. The load rejection signal which triggers fast travel mode the second time is delayed by time TLAW in order to differentiate between the grid short circuit and a load rejection. Since both faults exhibit the same behavior initially and the same measures are required in both cases, fast travel mode is first triggered by the transient grid disturbance signal and is later confirmed by the load rejection signal. Hence, TLAW is an individual preset value of the load rejection identification function. However, because the transient grid disturbance signal is inhibited for some time, the delayed load rejection signal must trigger fast travel mode in the second instance. As we can see from figure 3, this correlation does not cause any problems in the event of a 1 s delay between the two events, as the valves are still closed when load rejection occurs and are only partly reopened after the time TLAW has elapsed. The turbine momentum is accordingly low in this condition and 3 Copyright Siemens Energy, Inc All rights reserved.

4 the shaft train is accelerated only slightly. The final diagram shows that the maximum overspeed is only approximately 2 %. MULTIPLE GRID FAULT: LOAD REJECTION FOLLOWING VALVE REOPENING Based on the above considerations we can conclude that load rejection can only result in significant overspeeds once the valves have reopened and the turbine momentum has increased to higher levels. Figure 4 illustrates such a case for the power plant as an example. At the time when load rejection occurs, that is to say 2.6 s after fault clearing, the valves are already partly open and the turbine momentum is accordingly high (refer to second and third diagram in figure 2). The delay time TLAW is problematic here, as the valves remain open during this time in the absence of a load. Because the momentum increases during this time, the shaft train is accelerated for a longer period than it would be in the event of load rejection to house load without a prior grid fault. The overspeed of approximately 8 % which occur as a result is in the range not yet monitored by the speed protection system. The time of 2.6 s between the two faults results in maximum overspeed determined by the model used in this study. Figure 4: Multiple grid fault with 2.6 s delay prior to load For this reason a value as low as possible should be set for TLAW, so that overspeeds are limited to avoid an unnecessary speed protection trip in the event of the multiple grid fault. MULTIPLE GRID FAULT: LOAD REJECTION AFTER INHIBIT TIME FOR TRANSIENT GRID DISTURBANCE HAS ELAPSED The inhibit time for the transient grid disturbance signal ensures that load rejection identification is reset to the basic state once this time has elapsed. This means that the control system will treat any subsequent fault in exactly the same way as the initial fault. It is assumed that once the inhibit time has elapsed the effects of the first fault will have abated to such an extent that they will have no effect on a subsequent fault. In the event of load rejection to house load following by the fault clearing time for the grid short circuit plus the inhibit time, it follows that the unit will behave as if two independent faults have occurred. This behavior is shown in figure 5. The time between the end of the three-phase short circuit and the event of the load rejection to house load is 7.5 s in the considered simulation. The overspeed after the load rejection to house load, which can be treated as a single event, exceeds the rated speed about 6 % and therefore is not critical regarding the protection system (refer to load rejection in figure 2). Figure 5: Multiple grid fault with 7.5 s delay prior to load SUMMARY Large-scale steam power plants must be able to withstand a single grid fault like a three-phase grid short circuit close to the power plant for a specified fault clearing time without damage and must support voltage and frequency stability on the grid, e.g. the Nordic Grid Code [1] demands a minimum time of 250 ms. The control concept of SIEMENS steam power plants meets these requirements and is also capable of controlling further load rejection to house load occurring a few seconds later. Load rejection to house load increases availability of the power plant as compared with shutdown by a protection system, as the plant can be synchronized with the grid only a few seconds after this event. Although such multiple grid fault occurs infrequently, their handling might be of high interest in case of stability problems in larger grid areas, e.g. during extreme weather conditions or environmental disasters. The load rejection identification function in the control system of SIEMENS steam turbines is capable of handling the single and the multiple grid fault. The simulations performed on the power plant model using NETOMAC [2] show that overspeeds which trigger protection trips do not occur when load rejection occurs subsequent to a grid short circuit. The delay time preset by the parameter TLAW must be set to a low value which still allows a sure distinction between load rejections to house load and three-phase short circuits. NOMENCLATURE A Ampere FKZ Fault clearing time HP High pressure IP Intermediate pressure M 10 6 NETOMAC Digital simulation software (Network Torsion Machine Control) p.u. Per unit Registered trademark 4 Copyright Siemens Energy, Inc All rights reserved.

5 s TLAW V Second Delay time for load rejection identification Voltage Permission for Use: The content of this paper is copyrighted by Siemens Energy, Inc. and is licensed to ASME for publication and distribution only. Any inquiries regarding permission to use the content of this paper, in whole or in part, for any purpose must be addressed to Siemens Energy, Inc. directly. REFERENCES [1] Nordic Grid Code 2007 (Nordic collection of rules). [2] Kulicke, B., Digitalprogramm NETOMAC zur Simulation elektromagnetischer und magnetischer Ausgleichsvorgänge in Drehstromnetzen. Elektrizitätswirtschaft, H78, S [3] Kulig, T. S., Auswirkungen von Störfällen in elektrischen Energieübertragungsnetzen auf Kraftwerksturbosätze. Habilitationsschrift, Fernuniversität Hagen. [4] Canay, M., Bloch, H., Fast Valving, ein Mittel zur Netzstabilität. Brown Boveri Mitt. 6-79, S [5] Kindermann, W., Fork, K., Verhalten der Dampfturbinen-Leistungsregelung großer Kraftwerksblöcke bei Netzkurzschlüssen. VGB Kraftwerkstechnik 59, Heft 6, S Copyright Siemens Energy, Inc All rights reserved.

COMPARISON OF DIFFERENT METHODS FOR EXCITATION OF SYNCHRONOUS MACHINES

COMPARISON OF DIFFERENT METHODS FOR EXCITATION OF SYNCHRONOUS MACHINES Maszyny Elektryczne Zeszyty Problemowe Nr 3/2015 (107) 89 Stefan Schmuelling, Christian Kreischer TU Dortmund University, Chair of Energy Conversion Marek Gołȩbiowski Rzeszow University of Technology,

More information

Enhancement of Transient Stability Using Fault Current Limiter and Thyristor Controlled Braking Resistor

Enhancement of Transient Stability Using Fault Current Limiter and Thyristor Controlled Braking Resistor > 57 < 1 Enhancement of Transient Stability Using Fault Current Limiter and Thyristor Controlled Braking Resistor Masaki Yagami, Non Member, IEEE, Junji Tamura, Senior Member, IEEE Abstract This paper

More information

Unit Protection System for Pumped-Storage Power Stations

Unit Protection System for Pumped-Storage Power Stations Unit Protection System for Pumped-Storage Power Stations 1. Introduction In many power systems, pumped-storage power stations are used in addition to run-of-river power stations. These power stations serve

More information

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE

FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE FAULT ANALYSIS OF AN ISLANDED MICRO-GRID WITH DOUBLY FED INDUCTION GENERATOR BASED WIND TURBINE Yunqi WANG, B.T. PHUNG, Jayashri RAVISHANKAR School of Electrical Engineering and Telecommunications The

More information

Close-Open (Short-Circuit) Time Results Interpretation

Close-Open (Short-Circuit) Time Results Interpretation Application Note Close-Open (Short-Circuit) Time Results Interpretation Close-Open (C-O, trip-free) cycles simulate closing on a short circuit. In the actual event, the breaker closes first, then the protection

More information

ECEN 667 Power System Stability Lecture 19: Load Models

ECEN 667 Power System Stability Lecture 19: Load Models ECEN 667 Power System Stability Lecture 19: Load Models Prof. Tom Overbye Dept. of Electrical and Computer Engineering Texas A&M University, overbye@tamu.edu 1 Announcements Read Chapter 7 Homework 6 is

More information

Motor Performance Data for Electric Actuators Accutronix MX and L120 Series. Limitorque Actuation Systems

Motor Performance Data for Electric Actuators Accutronix MX and L120 Series. Limitorque Actuation Systems FCD LMAPS1331-01 (Replaces 130-50001) 80 5.20 0.13 1.20 4.40 0.16 2.20 7.60 0.26 2.20 7.60 0.2.20 7.60 0.2 Motor Performance Data for Electric Actuators Accutronix MX and L120 Series Table of Contents

More information

Journal of American Science 2015;11(11) Integration of wind Power Plant on Electrical grid based on PSS/E

Journal of American Science 2015;11(11)   Integration of wind Power Plant on Electrical grid based on PSS/E Integration of wind Power Plant on Electrical grid based on PSS/E S. Othman ; H. M. Mahmud 2 S. A. Kotb 3 and S. Sallam 2 Faculty of Engineering, Al-Azhar University, Cairo, Egypt. 2 Egyptian Electricity

More information

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 61 CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 3.1 INTRODUCTION The modeling of the real time system with STATCOM using MiPower simulation software is presented in this

More information

Statcom Operation for Wind Power Generator with Improved Transient Stability

Statcom Operation for Wind Power Generator with Improved Transient Stability Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 4, Number 3 (2014), pp. 259-264 Research India Publications http://www.ripublication.com/aeee.htm Statcom Operation for Wind Power

More information

Protection of Power Electronic Multi Converter Systems in AC and DC Applications

Protection of Power Electronic Multi Converter Systems in AC and DC Applications Protection of Power Electronic Multi Converter Systems in AC and DC Applications Prof. Norbert Grass Technische Hochschule Nürnberg, Institute for Power Electronic Systems, Nuremberg, Germany, Norbert.Grass@th-nuernberg.de

More information

Grid Stability Analysis for High Penetration Solar Photovoltaics

Grid Stability Analysis for High Penetration Solar Photovoltaics Grid Stability Analysis for High Penetration Solar Photovoltaics Ajit Kumar K Asst. Manager Solar Business Unit Larsen & Toubro Construction, Chennai Co Authors Dr. M. P. Selvan Asst. Professor Department

More information

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Abstract: G. Thrisandhya M.Tech Student, (Electrical Power systems), Electrical and Electronics Department,

More information

New method for the protection of gas turbines against overload and overspeed

New method for the protection of gas turbines against overload and overspeed New method for the protection of gas turbines against overload and overspeed Protection of gas turbines against overload and overspeed 1. Summary Gasturbine generator sets, in particular with aeroderivative

More information

Application Note. First trip test. A circuit breaker spends most of its lifetime conducting current without any

Application Note. First trip test. A circuit breaker spends most of its lifetime conducting current without any Application Note First trip test A circuit breaker spends most of its lifetime conducting current without any operation. Once the protective relay detects a problem, the breaker that was idle for maybe

More information

Hydrodynamic Couplings for Conveyor Drives Klaus Maier

Hydrodynamic Couplings for Conveyor Drives Klaus Maier (1) Information: Hydrodynamic Couplings for Conveyor Drives This presentation is intended to discuss the issue how the requirements of a conveyor drive can be implemented and supported by the hydrodynamic

More information

Islanding of 24-bus IEEE Reliability Test System

Islanding of 24-bus IEEE Reliability Test System Islanding of 24-bus IEEE Reliability Test System Paul Trodden February 17, 211 List of Figures 1 24-bus IEEE RTS, with line (3,24) tripped and buses 3,24 and line (3,9) uncertain....................................

More information

Torque Limiting Couplings Reliable Energy Production

Torque Limiting Couplings Reliable Energy Production Torque Limiting Couplings Reliable Energy Production 1 The Challenges in Energy Extraction Energy extraction from natural resources can be quite unpredictable. To be effective you need to be able to control

More information

Generator Speed Control Utilizing Hydraulic Displacement Units in a Constant Pressure Grid for Mobile Electrical Systems

Generator Speed Control Utilizing Hydraulic Displacement Units in a Constant Pressure Grid for Mobile Electrical Systems Group 10 - Mobile Hydraulics Paper 10-5 199 Generator Speed Control Utilizing Hydraulic Displacement Units in a Constant Pressure Grid for Mobile Electrical Systems Thomas Dötschel, Michael Deeken, Dr.-Ing.

More information

Effect of crowbar resistance on fault ride through capability of doubly fed induction generator

Effect of crowbar resistance on fault ride through capability of doubly fed induction generator ISSN: 2347-3215 Volume 2 Number 1 (January, 2014) pp. 88-101 www.ijcrar.com Effect of crowbar resistance on fault ride through capability of doubly fed induction generator V.Vanitha* and K.Santhosh Amrita

More information

ICEC The 27 th International Conference on Electrical Contacts. presented by Peter Meckler

ICEC The 27 th International Conference on Electrical Contacts. presented by Peter Meckler Authors: Peter Meckler, E-T-A Elektrotechnische Apparate GmbH, Altdorf, Germany Frank Gerdinand, E-T-A Elektrotechnische Apparate GmbH, Altdorf, Germany Roland Weiss, Siemens AG, Erlangen, Germany Ulrich

More information

Islanding of 24-bus IEEE Reliability Test System

Islanding of 24-bus IEEE Reliability Test System Islanding of 24-bus IEEE Reliability Test System Paul Trodden February 14, 211 List of Figures 1 24-bus IEEE RTS, with line (3,24) tripped and buses 3,24 and line (3,9) uncertain....................................

More information

New Method for Improving On-Line Loading Rates on Mechanical Governors By Gerald G. Runyan

New Method for Improving On-Line Loading Rates on Mechanical Governors By Gerald G. Runyan New Method for Improving On-Line Loading Rates on Mechanical Governors By Gerald G. Runyan Abstract Properly tuned and calibrated, mechanical governors provide excellent frequency control, passing all

More information

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 106 CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 5.1 INTRODUCTION Inherent characteristics of renewable energy resources cause technical issues not encountered with conventional thermal,

More information

Operational Experience with Startup Optimization for Steam Boilers. E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants

Operational Experience with Startup Optimization for Steam Boilers. E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants Operational Experience with Startup Optimization for E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants Starting up economically BoilerMax is a predictive boiler load-margin computer implementing

More information

Appendix A: Motion Control Theory

Appendix A: Motion Control Theory Appendix A: Motion Control Theory Objectives The objectives for this appendix are as follows: Learn about valve step response. Show examples and terminology related to valve and system damping. Gain an

More information

Numerical Investigation of Diesel Engine Characteristics During Control System Development

Numerical Investigation of Diesel Engine Characteristics During Control System Development Numerical Investigation of Diesel Engine Characteristics During Control System Development Aleksandr Aleksandrovich Kudryavtsev, Aleksandr Gavriilovich Kuznetsov Sergey Viktorovich Kharitonov and Dmitriy

More information

Application Note: Protection of Medium-Power Motors With SIPROTEC Compact 7SK80

Application Note: Protection of Medium-Power Motors With SIPROTEC Compact 7SK80 Application Note: Protection of Medium-Power Motors With SIPROTEC Compact 7SK80 Motor settings using the SIPROTEC Compact motor protection relay 7SK80 is explained below. Information is given on how to

More information

Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm

Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm Downloaded from orbit.dtu.dk on: Apr 07, 2019 Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm Arana Aristi, Iván; Johnsen, D. T.; Soerensen, T.; Holbøll, Joachim Published

More information

DEEP SEA ELECTRONICS PLC

DEEP SEA ELECTRONICS PLC COMPLEX SOLUTIONS MADE SIMPLE DEEP SEA ELECTRONICS PLC DSE704 AUTOSTART CONTROL MODULE OPERATING MANUAL 057-042 704 Operating Instructions Issue 2.1 18/06/2007 11:27:00 JR - 1 - Deep Sea Electronics Plc

More information

DG SYNCHRONIZING &AMF PANEL

DG SYNCHRONIZING &AMF PANEL A 80, Sector 80, Phase 2, Noida 201305, Utter Pradesh, India DG SYNCHRONIZING &AMF PANEL Clients Bharat Petroleum Corp.Ltd PROJECT- DG Synchronization panel with AMF function. Design BY:- Errection By

More information

CENELEC TC 8X/WG 06 System Aspects of HVDC Grids

CENELEC TC 8X/WG 06 System Aspects of HVDC Grids CENELEC TC 8X/WG 06 System Aspects of HVDC Grids Best Paths Dissemination Event Paris, 5 November 2015 Frank Schettler (Siemens, Convenor) Overview Introduction to CLC TC 8X/WG 06 Scope and present status

More information

Stability, Protection and Control of Systems with High Penetration of Converter Interfaced Generation

Stability, Protection and Control of Systems with High Penetration of Converter Interfaced Generation Stability, Protection and Control of Systems with High Penetration of Converter Interfaced Generation Final Project Report S-56 Power Systems Engineering Research Center Empowering Minds to Engineer the

More information

WITHOUT MUCH OF A STIR

WITHOUT MUCH OF A STIR WITHOUT MUCH OF A STIR The Train of the Future is Light and Fast and, Above All, Safe By Sigfried Loose S afely operating rail vehicles means taking numerous components into consideration. The vehicle

More information

INVESTIGATION OF THE IMPACT OF SWITCHING A HEAVILY LOADED TRANSMISSION LINE ON OPERATION OF A POWER PLANT WITH TURBINE-GENERATOR UNITS

INVESTIGATION OF THE IMPACT OF SWITCHING A HEAVILY LOADED TRANSMISSION LINE ON OPERATION OF A POWER PLANT WITH TURBINE-GENERATOR UNITS Investigation of the Impact of Switching a Heavily Loaded Transmission Line on Operation of a Power Plant with Turbine-generator Units INVESTIGATION OF THE IMPACT OF SWITCHING A HEAVILY LOADED TRANSMISSION

More information

Power Conditioning of Microgrids and Co-Generation Systems

Power Conditioning of Microgrids and Co-Generation Systems Power Conditioning of Microgrids and Co-Generation Systems Nothing protects quite like Piller piller.com Content 1 Introduction 3 2 Basic requirements of a stable isolated network 3 3 Requirements for

More information

Ancillary Services & Essential Reliability Services

Ancillary Services & Essential Reliability Services Ancillary Services & Essential Reliability Services EGR 325 April 19, 2018 1 Basic Products & Ancillary Services Energy consumed by load Capacity to ensure reliability Power quality Other services? o (To

More information

Boosting the Starting Torque of Downsized SI Engines GT-Suite User s Conference 2002

Boosting the Starting Torque of Downsized SI Engines GT-Suite User s Conference 2002 GT-Suite User s Conference 2002 Hans Rohs Inst. For Combustion Engines (VKA) RWTH Aachen Knut Habermann, Oliver Lang, Martin Rauscher, Christof Schernus FEV Motorentechnik GmbH Acknowledgement: Some of

More information

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor World Leader in Modular Torque Limiters Installation and Maintenance Instructions PTM-4 Load Monitor 1304 Twin Oaks Street Wichita Falls, Texas 76302 (940) 723-7800 Fax: (940) 723-7888 E-mail: sales@brunelcorp.com

More information

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Rong Cai, Mats Andersson, Hailian Xie Corporate Research, Power and Control ABB (China) Ltd. Beijing, China rong.cai@cn.abb.com,

More information

Regulatory frameworks for Dynamically Positioned vessels operating in closed bustie mode: the grey zone

Regulatory frameworks for Dynamically Positioned vessels operating in closed bustie mode: the grey zone Regulatory frameworks for Dynamically Positioned vessels operating in closed bustie mode: the grey zone Abstract For many years the design of DP vessels operating in closed bustie mode has been evaluated

More information

Composite Load Model Sensitivity Study

Composite Load Model Sensitivity Study Composite Load Model Sensitivity Study An Analysis of the Sensitivity of WECC Grid Planning Models to Assumptions Regarding the Composition of Loads NERC LMTF Meeting Salt Lake City, UT January 12, 2016

More information

T5S4P3 Synchronous Condensers Application. Mr. Marco Schenone Mr. Sandro Tuscano Mr. Alessandro Oldrati

T5S4P3 Synchronous Condensers Application. Mr. Marco Schenone Mr. Sandro Tuscano Mr. Alessandro Oldrati Mr. Marco Schenone Mr. Sandro Tuscano Mr. Alessandro Oldrati 1 Introduction Ansaldo Energia has recently completed the manufacture, installation and commissioning of two synchronous condenser sets for

More information

Electric Networks/Ina Lehto Updated Original 12/2011

Electric Networks/Ina Lehto Updated Original 12/2011 1 TECHNICAL APPENDIX 2 TO THE GUIDELINES CONNECTING AN ELECTRICITY GENERATION INSTALLATION TO THE DISTRIBUTION NETWORK CONNECTING AN INSTALLATION WITH A NOMINAL RATED CAPACITY OF OVER 100 These instructions

More information

LESSONS LEARNED FORSMARK EVENT Presented To IEEEE

LESSONS LEARNED FORSMARK EVENT Presented To IEEEE LESSONS LEARNED FORSMARK EVENT Presented To IEEEE Thomas Koshy Member of the Task Group on Forsmark Chief of Mechanical & Electrical Engineering Office of Research, USNRC Thomas.Koshy@nrc.gov 1 Agenda

More information

Reduction of Network Peak Power and Power Swing Demand in Mine Hoist Applications

Reduction of Network Peak Power and Power Swing Demand in Mine Hoist Applications Reduction of Network Peak Power and Power Swing Demand in Mine Hoist Applications Borje Johansson ABB AB Process Automation, Mining, Vasteras, Sweden ABSTRACT: A mine hoist is probably the worst load on

More information

Prepared. FUNCTION 3 Start up 3 Continuous operation 3 Shut down 3 Stand still 3

Prepared. FUNCTION 3 Start up 3 Continuous operation 3 Shut down 3 Stand still 3 1(5) TABLE OF CONTENTS TABLE OF CONTENTS 1 PURPOSE OF THE SYSTEM 2 GENERAL DESCRIPTION OF THE SYSTEM 2 MAIN COMPONENTS 2 FUNCTION 3 Start up 3 Continuous operation 3 Shut down 3 Stand still 3 DISTURBANCES

More information

THE EFFECT OF DISTURBANCES IN THE ELECTRICAL POWER SYSTEM ON TORQUE MOMENTS OF THE HIGH-POWER TURBINE SET SHAFT

THE EFFECT OF DISTURBANCES IN THE ELECTRICAL POWER SYSTEM ON TORQUE MOMENTS OF THE HIGH-POWER TURBINE SET SHAFT THE EFFECT OF DISTURBANCES IN THE ELECTRICAL POWER SYSTEM ON TORQUE MOMENTS OF THE HIGH-POWER TURBINE SET SHAFT The results presented in this paper have been obtained through research co-financed by the

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

BLADEcontrol Greater output less risk

BLADEcontrol Greater output less risk BLADEcontrol Greater output less risk 2 Expensive surprises? Unnecessary downtime? Rotor blade monitoring increases the output of your wind turbine generator system 3 Detect damage at an early stage For

More information

Elbtalwerk GmbH. Universität Karlsruhe Elektrotechnisches Institut. Switched Reluctance Motor. Compact High-torque Electric Motor. Current.

Elbtalwerk GmbH. Universität Karlsruhe Elektrotechnisches Institut. Switched Reluctance Motor. Compact High-torque Electric Motor. Current. Elbtalwerk GmbH Switched Reluctance Motor Compact High-torque Electric Motor Current B1 Winding A1 D4 C1 C4 Pole D1 Rotation B4 A2 Rotor tooth Shaft A4 B2 Field line D3 C2 C3 D2 Stator A3 B3 Cooling air

More information

AP1000 European 7. Instrumentation and Controls Design Control Document

AP1000 European 7. Instrumentation and Controls Design Control Document 7.3 Engineered Safety Features AP1000 provides instrumentation and controls to sense accident situations and initiate engineered safety features (ESF). The occurrence of a limiting fault, such as a loss

More information

The behavior of the cycloconverter fed gearless drive under abnormal electrical conditions

The behavior of the cycloconverter fed gearless drive under abnormal electrical conditions Mining The behavior of the cycloconverter fed gearless drive under abnormal electrical conditions Reprint Authors: Kurt Tischler Siemens AG, Mining Technologies, Erlangen, Germany Reprint: WORKSHOP SAG

More information

Copyright 2003 Advanced Power Technologies, Inc.

Copyright 2003 Advanced Power Technologies, Inc. Overview of the Standard for Interconnecting Distributed Resources with Electric Power Systems, IEEE 1547 and it s potential impact on operation of the Distributed Generation (DG) systems and on the design

More information

ANALYSIS OF BREST-OD-300 SAFETY DURING ANTICIPATED OPERATIONAL OCCURRENCES

ANALYSIS OF BREST-OD-300 SAFETY DURING ANTICIPATED OPERATIONAL OCCURRENCES ANALYSIS OF BREST-OD-300 SAFETY DURING ANTICIPATED OPERATIONAL OCCURRENCES D.V. Didorin, V.A. Kogut, A.G. Muratov, V.V. Tyukov, A.V. Moiseev (NIKIET, Moscow, Russia) 1. Brief description of the aim and

More information

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection B. Bagen, D. Jacobson, G. Lane and H. M. Turanli Manitoba

More information

Working like a power plant The P-Q behaviour of wind power stations has to meet the grid connection rules

Working like a power plant The P-Q behaviour of wind power stations has to meet the grid connection rules Working like a power plant The P-Q behaviour of wind power stations has to meet the grid connection rules Dr. Ing. Steffen Prinz Prof. Dr.-Ing. habil. Dietrich Stade 1. Introduction In wind power stations,

More information

Advanced emergency braking systems for commercial vehicles

Advanced emergency braking systems for commercial vehicles German Road Safety Council 2016 Advanced emergency braking systems for commercial vehicles Resolution taken on 9 September 2016 based on recommendations of the DVR Executive Committee on Vehicle Technology

More information

Job Sheet 2 Aerodynamics Power Control

Job Sheet 2 Aerodynamics Power Control Job Sheet 2 Aerodynamics Power Control Power Control Power control is an important feature of a wind turbine. It regulates the speed of rotation of the rotor assembly when wind is present. For stand-alone

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

Chapter 7: DC Motors and Transmissions. 7.1: Basic Definitions and Concepts

Chapter 7: DC Motors and Transmissions. 7.1: Basic Definitions and Concepts Chapter 7: DC Motors and Transmissions Electric motors are one of the most common types of actuators found in robotics. Using them effectively will allow your robot to take action based on the direction

More information

ASRM Energy-efficient and power optimized motion profiles Inspiring change in intralogistics. Unrestricted Siemens AG 2018

ASRM Energy-efficient and power optimized motion profiles Inspiring change in intralogistics. Unrestricted Siemens AG 2018 ASRM Energy-efficient and power optimized motion profiles Inspiring change in intralogistics siemens.com/conveyor-technology-asrm ASRM value added topics Speed synchronism & Load distribution Minimizing

More information

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1. Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.3, 5/16/18 1.0 Scope This document is currently limited in scope to inverter interfaced PV installations

More information

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

An advisory circular may also include technical information that is relevant to the rule standards or requirements. Revision 0 Electrical Load Analysis 2 August 2016 General Civil Aviation Authority advisory circulars contain guidance and information about standards, practices, and procedures that the Director has found

More information

Performance Analysis of Transient Stability on a Power System Network

Performance Analysis of Transient Stability on a Power System Network Performance Analysis of Transient Stability on a Power System Network Ramesh B Epili 1, Dr.K.Vadirajacharya 2 Department of Electrical Engineering Dr. Babasaheb Ambedkar Technological University, Lonere

More information

FINITE-ELEMENT ANALYSIS OF ACCIDENTAL ENERGIZING OF AN OFF-LINE TURBOGENERATOR*

FINITE-ELEMENT ANALYSIS OF ACCIDENTAL ENERGIZING OF AN OFF-LINE TURBOGENERATOR* Vol. 2(37), No. 1, 2017 POWER ELECTRONICS AND DRIVES DOI: 10.5277/PED170104 FINITE-ELEMENT ANALYSIS OF ACCIDENTAL ENERGIZING OF AN OFF-LINE TURBOGENERATOR* ADAM GOZDOWIAK, PIOTR KISIELEWSKI, LUDWIK ANTAL

More information

(by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka Matsinen, Reijo Virtanen, and Antti Vilhunen)

(by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka Matsinen, Reijo Virtanen, and Antti Vilhunen) Technical Paper: Low voltage ride-through testing of wind turbine converters at ABB helps wind turbines meet the requirements of IEC 61400-21 more quickly (by authors Jouko Niiranen, Slavomir Seman, Jari-Pekka

More information

DEEP SEA ELECTRONICS PLC DSE3210 Configuration Suite Software Manual

DEEP SEA ELECTRONICS PLC DSE3210 Configuration Suite Software Manual DEEP SEA ELECTRONICS PLC DSE3210 Configuration Suite Software Manual Document Number 057-152 Author : Paul Gibbons DSE3210 Configuration Suite Software Manual Issue 1 DSE3210 Configuration Suite Software

More information

Doubly fed electric machine

Doubly fed electric machine Doubly fed electric machine Doubly fed electric machines are electric motors or electric generators that have windings on both stationary and rotating parts, where both windings transfer significant power

More information

Is Throttle Pressure Control a Self- Regulating or an Integrating Process?

Is Throttle Pressure Control a Self- Regulating or an Integrating Process? Output Is Control a Self- Regulating or an Integrating Process? By Jacques F. Smuts, Ph.D., P.E. Self-regulating and integrating processes respond differently and require the use of different tuning methods.

More information

Motor Protection. Voltage Unbalance & Single-Phasing

Motor Protection. Voltage Unbalance & Single-Phasing For Summary of Suggestions to Protect Three-Phase Motors Against Single-Phasing see the end of this section, page 137. Historically, the causes of motor failure can be attributed to: Overloads 30% Contaminants

More information

TRITON BTM. Bearing Temperature Monitoring. High measuring accuracy. Engine protection. Very low false alarm probability.

TRITON BTM. Bearing Temperature Monitoring. High measuring accuracy. Engine protection. Very low false alarm probability. Bearing Temperature Monitoring BTM Control Unit Control Unit Oil Tray Temperature Sensors Engine protection Easy to install Simple principle Fast reaction time High measuring accuracy Very low false alarm

More information

FLUDEX - thermal switching equipment. Operating instructions BA en 04/2012. FLENDER couplings

FLUDEX - thermal switching equipment. Operating instructions BA en 04/2012. FLENDER couplings FLUDEX - thermal switching equipment Operating instructions FLENDER couplings FLUDEX - thermal switching equipment Application Operation Fitting 1 2 3 Component description 4 Operating instructions Translation

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd Embedded Generation - Technical Access Standards Embedded Generation - 5 MW or Greater ELE SP 0003 Public 1 October 2014 TABLE OF CONTENTS TABLE OF CONTENTS Abbreviations...

More information

Asia Pacific Research Initiative for Sustainable Energy Systems 2011 (APRISES11)

Asia Pacific Research Initiative for Sustainable Energy Systems 2011 (APRISES11) Asia Pacific Research Initiative for Sustainable Energy Systems 2011 (APRISES11) Office of Naval Research Grant Award Number N0014-12-1-0496 Hydrogen Energy System Simulation Model for Grid Management

More information

Impact of Islanding and Resynchroniza?on on Distribu?on Systems

Impact of Islanding and Resynchroniza?on on Distribu?on Systems 1 Impact of Islanding and Resynchroniza?on on Distribu?on Systems Authors: Dr. Vijay Sood Damanjot Singh Kush Duggal 2 Contents Introduction System Description Rural Radial Distribution System Urban Meshed

More information

Turbo boost. ACTUS is ABB s new simulation software for large turbocharged combustion engines

Turbo boost. ACTUS is ABB s new simulation software for large turbocharged combustion engines Turbo boost ACTUS is ABB s new simulation software for large turbocharged combustion engines THOMAS BÖHME, ROMAN MÖLLER, HERVÉ MARTIN The performance of turbocharged combustion engines depends heavily

More information

SINAMICS SM150. 4/2 Overview. 4/2 Benefits. 4/2 Design. 4/6 Function. 4/8 Selection and ordering data. 4/8 Options

SINAMICS SM150. 4/2 Overview. 4/2 Benefits. 4/2 Design. 4/6 Function. 4/8 Selection and ordering data. 4/8 Options /2 Overview /2 Benefits /2 Design /6 Function /8 Selection and ordering data /8 Options Technical data /1 General technical data /15 Control properties /15 Ambient conditions /16 Installation conditions

More information

Design Standards NEMA

Design Standards NEMA Design Standards Although several organizations are involved in establishing standards for the design, construction, and application of motor control centers, the primary standards are established by UL,

More information

Tester for Motor-Driven Relays Type Siemens SICO 1225 M A N U A L

Tester for Motor-Driven Relays Type Siemens SICO 1225 M A N U A L Tester for Motor-Driven Relays Type Siemens SICO 1225 M A N U A L 8 Technical Data Operating temperature range 5 C 40 C Power supply 230 V, 50 Hz net Power input 25 W Protection degree IP 42 Protection

More information

with discrete output (Overspeed) with auxiliary input (Synchronizer and Load Sharing)

with discrete output (Overspeed) with auxiliary input (Synchronizer and Load Sharing) Document: Digital Speed Governor Versions SDG-25 SDG-35 with discrete output (Overspeed) with auxiliary input (Synchronizer and Load Sharing) Integrated Heatsink Programming and Diagnostic Port Mode and

More information

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION Summary Abhay Kumar Mata Prasad R C Maheshwari Asea Brown Boveri Ltd. 4th Floor, 71 Nehru Place, New Delhi

More information

Transient Stability Analysis with PowerWorld Simulator

Transient Stability Analysis with PowerWorld Simulator Transient Stability Analysis with PowerWorld Simulator 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com Transient Stability Basics Overview

More information

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Modular Standardized Electrical and Control Solutions for Fast Track Projects Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive

More information

Analysis of the tyre choice for noise emission measurements within the context of vehicle type approval and COP compared to on road operation

Analysis of the tyre choice for noise emission measurements within the context of vehicle type approval and COP compared to on road operation TEXTE 04/2010 Analysis of the tyre choice for noise emission measurements within the context of vehicle type approval and COP compared to on road operation Development of criteria for more efficient imbedding

More information

Steering Actuator for Autonomous Driving and Platooning *1

Steering Actuator for Autonomous Driving and Platooning *1 TECHNICAL PAPER Steering Actuator for Autonomous Driving and Platooning *1 A. ISHIHARA Y. KUROUMARU M. NAKA The New Energy and Industrial Technology Development Organization (NEDO) is running a "Development

More information

AP Plant Operational Transient Analysis

AP Plant Operational Transient Analysis www.ijnese.org International Journal of Nuclear Energy Science and Engineering Volume 3 Issue 2, June 2013 AP1000 1 Plant Operational Transient Analysis LIU Lixin 1, ZHENG Limin 2 Shanghai Nuclear Engineering

More information

SINAMICS GM150 IGCT version

SINAMICS GM150 IGCT version /2 Overview /2 Benefits /2 Design /6 Function /8 Selection and ordering data /8 Options Technical data /14 General technical data /15 Control properties /15 Ambient conditions /16 Installation conditions

More information

Technical Guide No. 7. Dimensioning of a Drive system

Technical Guide No. 7. Dimensioning of a Drive system Technical Guide No. 7 Dimensioning of a Drive system 2 Technical Guide No.7 - Dimensioning of a Drive system Contents 1. Introduction... 5 2. Drive system... 6 3. General description of a dimensioning

More information

Introduction: Supplied to 360 Test Labs... Battery packs as follows:

Introduction: Supplied to 360 Test Labs... Battery packs as follows: 2007 Introduction: 360 Test Labs has been retained to measure the lifetime of four different types of battery packs when connected to a typical LCD Point-Of-Purchase display (e.g., 5.5 with cycling LED

More information

NERC Load Modeling Activities. Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016

NERC Load Modeling Activities. Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016 NERC Load Modeling Activities Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016 Introduction Kickoff January 2016 LMTF webpage Chair: Dmitry Kosterev,

More information

Wind Power Inverter WINDY BOY 5000A/6000A

Wind Power Inverter WINDY BOY 5000A/6000A Wind Power Inverter WINDY BOY 5000A/6000A User Manual WB5A-6A-BA-BEN114530 TBEN-WB50-60A Version 3.0 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Information on this Manual.........................

More information

PUMPED STORAGE - GRID REQUIREMENTS FOR BEHAVIOR OF LARGE MOTOR- GENERATORS AND CONFIRMATION OF COMPLIANCE THROUGH SIMULATION

PUMPED STORAGE - GRID REQUIREMENTS FOR BEHAVIOR OF LARGE MOTOR- GENERATORS AND CONFIRMATION OF COMPLIANCE THROUGH SIMULATION PUMPED STORAGE - GRID REQUIREMENTS FOR BEHAVIOR OF LARGE MOTOR- GENERATORS AND CONFIRMATION OF COMPLIANCE THROUGH SIMULATION Jiri KOUTNIK Voith Hydro Holding GmbH & Co. Jiri.Koutnik@Voith.com KG, Heidenheim,

More information

Behavior of a turbocharged gas engine during a low voltage ride through

Behavior of a turbocharged gas engine during a low voltage ride through Behavior of a turbocharged gas engine during a low voltage ride through Peter Schäffert, Josef Thalhauser, Herbert Schaumberger, Uwe Liebscher GE Jenbacher GmbH & Co OG Content Introduction Grid code Behavior

More information

Standard Drives A & D SD Application Note

Standard Drives A & D SD Application Note SENSORLESS VECTOR CONTROL (SVC) Version A, 30.07.99 More detail of Vector Control principles are explained in DA64 Section 2. Some examples of SVC are given in Sections 4.2, 4.3 and 4.4. The MICROMASTER

More information

Fifteenth National Power Systems Conference (NPSC), IIT Bombay, December 2008

Fifteenth National Power Systems Conference (NPSC), IIT Bombay, December 2008 Performance Evaluation of Composite Islanding and Load Management System using Real Time Digital Simulator Sachin Srivastava, Meera K.S, R.S. Shivakumara Aradhya and Sunil Verma Abstract A Composite Islanding

More information

Document Code: 1 (8) Issuing date: Status:

Document Code: 1 (8) Issuing date: Status: Document Code: 1 (8) Project : MULTI FUEL CFB BOILER SIMULATOR Author: Approved: Employer: JJA Document title: SYSTEM DESCRIPTION TURBINE CONTROL Submitted for: Employer reference: Other information: Document

More information

ENERGY RECOVERY SYSTEM FROM THE VEHICLE DAMPERS AND THE INFLUENCE OF THE TANK PRESSURE

ENERGY RECOVERY SYSTEM FROM THE VEHICLE DAMPERS AND THE INFLUENCE OF THE TANK PRESSURE The 3rd International Conference on Computational Mechanics and Virtual Engineering COMEC 2009 29 30 OCTOBER 2009, Brasov, Romania ENERGY RECOVERY SYSTEM FROM THE VEHICLE DAMPERS AND THE INFLUENCE OF THE

More information

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information