1 Building and Safety Division Policy and Procedure No. A09301 Effective Date January 1, 2017 Expedited Permitting Process Residential RoofTop Mounted Solar Installations Form Solar PV Standard Plan Simplified entral/string Inverter Systems SOPE: Use this plan ONLY for utilityinteractive central/string inverter systems not exceeding a system A inverter output rating of 10kW on the roof of a one or twofamily dwelling or accessory structure. The photovoltaic system must interconnect to the load side of a singlephase A service panel of nominal 120/20Vac with a bus bar rating of 22A or less. This plan is not intended for bipolar systems, hybrid systems or systems that utilize storage batteries, charge controllers, trackers, more than two inverters or more than one D combiner (noninverterintegrated) per inverter. Systems must be in compliance with current alifornia Building Standards odes and local amendments of the authority having jurisdiction (AHJ). Other Articles of the alifornia Electrical ode (E) shall apply as specified in MANUFATURER S SPEIFIATION SHEETS MUST BE PROVIDED for proposed inverter, modules, combiner/junction boxes and racking systems. Installation instructions for bonding and grounding equipment shall be provided, and local AHJs may require additional details. Listed and labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling (E 110.3). Equipment intended for use with PV system shall be identified and listed for the application (E 690.[D]). Job Address: Permit #: ontractor/engineer Name: Signature: Date: Phone Number: License # and lass: Total # of Inverters installed: (If more than one inverter, complete and attach the Supplemental alculation Sheets and the Load enter alculations if a new load center is to be used.) Inverter 1 A Output Power Rating: Inverter 2 A Output Power Rating (if applicable): ombined Inverter Output Power Rating: Watts Watts 10,000 Watts Location Ambient Temperatures (heck box next to which lowest expected temperature is used): 1) Lowest expected ambient temperature for the location (T L ) = Between 1 to Lowest expected ambient temperature for the location (T L ) = Between 6 to 10 Average ambient high temperature (T H ) < 7 Note: For a lower T L or a higher T H, this plan is not applicable. D Information: Module Manufacturer: Model: 2) Module V oc (from module nameplate): Volts 3) Module I sc (from module nameplate): Amps Is Module I sc below 9.6 Amps? Yes No (If No, this plan is not applicable.) ) Module D output power under standard test conditions (ST) = Watts (ST)

2 ) D Module Layout Identify each source circuit (string) for inverter 1 shown on the roof plan with a Tag (e.g. A,B,, ) Number of modules per source circuit for inverter 1 Identify, by tag, which source circuits on the roof are to be paralleled (if none, put N/A) ombiner 1: ombiner 2: Total number of source circuits for inverter 1: 6) Are D/D onverters used? Yes No If No, skip to Step 7. If Yes enter info below. D/D onverter Model #: D/D onverter Max D Input Voltage: Volts Max D Output urrent: Amps Max D Output urrent: Volts Max # of D/D onverters in an Input ircuit: D/D onverter Max D Input Power: Watts 7) Maximum System D Voltage Use A1 or A2 for systems without D/D converters, and B1 or B2 with D/D onverters. A1. Module V O (STEP 2) = x # of modules in series (STEP ) x 1.12 (If 1 T L, STEP 1) = V A2. Module V O (STEP 2) = x # of modules in series (STEP ) x 1.1 (If 6 T L 10, STEP 1) = V Table 1. Maximum Number of PV Modules in Series Based on Module Rated V O for 600 Vdc Rated Equipment (E 690.7) Max. Rated Module V O (*1.12) (Volts) Max. Rated Module V O (*1.1) (Volts) Max # of Modules for 600 Vdc Use for D/D converters. The value calculated below must be less than D/D converter max D input voltage (STEP 6). B1. Module V O (STEP 2) = x # of modules per converter (STEP 6) x 1.12 (If 1 T L, STEP 1) = V B2. Module V O (STEP 2) = x # of modules per converter (STEP 6) x 1.1 (If 6 T L 10, STEP 1) = V Table 2. Largest Module V O for SingleModule D/D onverter onfigurations (with 80 V AFI ap) (E and ) Max. Rated Module V O (*1.12) (Volts) Max. Rated Module V O (*1.1) (Volts) D/D onverter Max D Input (Step #6) (Volts) ) Maximum System D Voltage from D/D onverters to Inverter Only required if Yes in Step 6 Maximum System D Voltage = Volts

3 9) Sizing Source ircuit onductors Source ircuit onductor Size = Min. #10 AWG copper conductor, 90 wet (USE2, PV Wire, XHHW2, THWN2, RHW2) For up to 8 conductors in roofmounted conduit exposed to sunlight at least ½ from the roof covering (E 310) Note: For over 8 conductors in the conduit or mounting height of lower than ½ from the roof, use omprehensive Plan. 10) Are PV source circuits combined prior to the inverter? Yes No If No, use Single Line Diagram 1 and proceed to Step 12. If Yes, use Single Line Diagram 2 with Single Line Diagram and proceed to Step 11. Is source circuit OPD required? Yes No Source circuit OPD size (if needed): 1 Amps Are the source circuits combined on the roof? Yes No If Yes, the D output of the combiner shall have a load break disconnecting means located in the combiner or within 1.8m (6ft) of the combiner (E 690.1(c)). 11) Sizing PV Output ircuit onductors Sizing strings are combined (answered Yes in step 10). Output ircuit onductor Size = Min. #6 AWG copper conductor 12) Inverter D Disconnect Does the inverter have an integrated D disconnect? Yes No If Yes, proceed to step 13. If No, the external D disconnect to be installed is rated for Amps (D) and Volts (D) 13) Inverter Information Manufacturer: Model: Max. ontinuous A Output urrent Rating: Amps Integrated D ArcFault ircuit Protection? Yes No (If No is selected, this plan is not applicable) Grounded or Ungrounded System? Grounded Ungrounded A Information: 1) Sizing Inverter Output ircuit onductors and OPD Inverter Output OPD rating = Amps (Table 3) Inverter Output ircuit onductor Size = AWG (Table 3) Table 3. Minimum Inverter Output OPD and ircuit onductor Size Inverter ontinuous Output urrent Rating (Amps) (Step 1) Minimum OPD Size (Amps) Minimum onductor Size (AWG, 7, opper)

4 1) Point of onnection to Utility Note: Only load side connections are permitted with this plan. Is the PV OPD positioned at the opposite end from input feeder location or main OPD location? Yes No If Yes, use Table row 3 circle the Max combined PV System OPD(s) at 120% based on the busbar rating and main OPD values. If No, use Table, row 3 and circle the Max ombined PV System OPD(s) at 120% based on the busbar rating and the main OPD values. Per 70.12(D)(2)(3): [Inverter output OPD size [Step #1 or S18] Main OPD Size] [bus size x (120%)] Table. Maximum ombined Supply OPDs Based on Bus Bar Rating (Amps) per E 70.12(D)(2)(3)(b) Max ombined PV System OPD(s) at 120% of Bus Bar Rating Max ombined PV System OPD(s) at 100% Bus Bar Rating Bus Bar Rating Main OPD *This value has been lowered to 60 A from the calculated value to reflect 10 kw A size maximum. Reduction of the main breaker is not permitted with this plan. Lineside tap is not permitted with this plan * 60* 0 60* 60*

5 16) Rapid Shutdown The rapid shutdown initiation device shall be labeled according to E 690.6(), and its location shall be shown on the site plan drawing. The rapid shutdown initiation device may be the inverter output or input circuits disconnecting means, the service main disconnect, or a separate device as approved by the AHJ. The disconnecting means shall be identified for the purpose, suitable for their environment, and listed as a disconnecting means. A single rapid shutdown initiation device shall operate all disconnecting means necessary to control conductors in compliance with E Note: heck with the AHJ regarding approval where field verification of reduction of voltage within the time required by E is performed. Rapid shutdown shall be provided as required by E with one of the following methods (Select one): The inverter(s) is within 10 feet of the array, and the location of the inverter is such that uncontrolled PV system conductors are no greater than feet of length within the building. A remotelycontrolled A disconnecting means is required immediately adjacent to or as close as practicable to the inverters, and located within 10 feet of the array. The inverter(s) is within 10 feet of the array, and the location of the inverter is such that uncontrolled PV system conductors are no greater than feet of length within the building. Reduction of the voltage for the inverter output within the time required by E shall be verified in the field, or the inverter output is listed to UL 171 with rapid shutdown capability. Remotelycontrolled D disconnecting means are located within 10 feet of the PV array and D input of the inverter(s), and the locations of the disconnecting means are such that uncontrolled PV system conductors are no greater than feet of length within the building. Reduction of the voltage for the inverter output within the time required by E shall be verified in the field, or the inverter output is listed to UL 171 with rapid shutdown capability. Remotelycontrolled D disconnecting means is located within 10 feet of the array at the D input of inverter(s) connected to a module level DD converter circuit where the DD converter circuit meets the requirements for controlled conductors when disconnected from the inverter. Reduction of the voltage for the DD converter output and the inverter output within the time required by E shall be verified in the field, or the DD converter output and the inverter output are listed to UL 171 with rapid shutdown capability. A UL 171listed and identified inverter(s) with input and output rapid shutdown capability supplying module level DD converter circuit where the DD converter circuit meets the requirements for controlled conductors when disconnected from the inverter. A UL 171listed rapid shutdown system: Manufacturer: Testing Agency Name: System Model Number: System omponents:

6 17) Grounding and Bonding of Modules and Racking System (select one): Racking system listed to UL 2703 using modules identified in the listing. Other method subject to AHJ approval

7 Solar PV Standard Plan Simplified entral/string Inverter Systems for One and TwoFamily Dwellings

8 Solar PV Standard Plan Simplified entral/string Inverter System for One and TwoFamily Dwellings DESRIPTION SOLAR PV MODULE / STRING D/D ONVERTERS INSTALLED? YES / NO (IF YES, STEPS 6 & 8 REQUIRED) SOURE IRUIT JUNTION BOX INSTALLED?: YES / NO SEPARATE D DISONNET INSTALLED?: YES / NO INTERNAL INVERTER D DISONNET: YES / NO ENTRAL INVERTER LOAD ENTER INSTALLED?: YES / NO PV PRODUTION METER INSTALLED?: YES / NO *SEPARATE A DISONNET INSTALLED?: YES / NO ONNET TO INVERTER #2 (USE LINE DIAGRAM 2) * onsult with your local AHJ and /or Utility SINGLELINE DIAGRAM #1 NO STRINGS OMBINED PRIOR TO INVERTER HEK A BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED: GROUNDED (INLUDE GE) UNGROUNDED FOR UNGROUNDED SYSTEMS: D OPD MUST DISONNET BOTH ONDUTORS OF EAH SOURE IRUIT UNGROUNDED ONDUTORS MUST BE IDENTIFIED PER 210.(). WHITEFINISHED ONDUTORS ARE NOT PERMITTED A D B 1 8 M 9 MAIN SERVIE PANEL G PV OPD M MAIN OPD B 2 G A B 10 D IF D/D ONVERTERS ARE USED, HEK THE BOX BELOW THE ORRESPONDING ONFIGURATION ONDUTOR/ONDUIT SHEDULE DESRIPTION AND ONDUTOR TYPE ONDUTOR NUMBER OF SIZE ONDUTORS A USE2 OR PVWIRE EG/GE: B EG/GE: EG/GE: D EG/GE: ONDUIT/ABLE TYPE ONDUIT SIZE ENTER N/A WHERE SUITABLE FOR WHEN NOT USING ONDUIT OR ABLE AS PERMITTED BY ODE D/D ONVERTERS INVERTER PARALLEL D/D ONVERTERS ON ONE SOURE IRUIT (FIXED UNIT VOLE D/D ONVERTERS) D/D ONVERTERS INVERTER D/D ONVERTERS ARE ALL RUN IN SERIES (FIXED SOURE IRUIT VOLE D/D ONVERTERS)

9 Solar PV Standard Plan Simplified entral/string Inverter System for One and TwoFamily Dwellings DESRIPTION SOLAR PV MODULE / STRING D/D ONVERTERS INSTALLED? YES / NO (IF YES, STEPS 6 & 8 REQUIRED) SOURE IRUIT JUNTION BOX INSTALLED?: YES / NO OMBINER BOX (STEPS 11 & 12 REQUIRED) SEPARATE D DISONNET INSTALLED?: YES / NO INTERNAL INVERTER D DISONNET: YES / NO ENTRAL INVERTER LOAD ENTER INSTALLED?: YES / NO PV PRODUTION METER INSTALLED?: YES / NO *SEPARATE A DISONNET INSTALLED?: YES / NO ONNET TO INVERTER #2 (USE LINE DIAGRAM ) * onsult with your local AHJ and /or Utility SINGLELINE DIAGRAM #2 OMBINING STRINGS PRIOR TO INVERTER HEK A BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED: GROUNDED (INLUDE GE) UNGROUNDED FOR UNGROUNDED SYSTEMS: D OPD MUST DISONNET BOTH ONDUTORS OF EAH SOURE IRUIT UNGROUNDED ONDUTORS MUST BE IDENTIFIED PER 210.(). WHITEFINISHED ONDUTORS ARE NOT PERMITTED. MAIN SERVIE PANEL M A D B 1 9 M 10 G PV OPD MAIN OPD A1 B1 B 2 G D 11 E INVERTER A2 OMBINER ONDUTOR/ONDUIT SHEDULE DESRIPTION AND ONDUTOR NUMBER OF ONDUIT/ABLE ONDUTOR TYPE SIZE ONDUTORS TYPE A1 USE2 OR PVWIRE EG/GE: B1 EG/GE: EG/GE: D EG/GE: E EG/GE: B2 ONDUIT SIZE NONOMBINED STRINGS ONDUTOR/ONDUIT SHEDULE (IF APPLIABLE) DESRIPTION AND ONDUTOR NUMBER OF ONDUIT/ABLE ONDUIT SIZE ONDUTOR TYPE SIZE ONDUTORS TYPE A2 USE2 OR PVWIRE EG/GE: B2 EG/GE: ENTER N/A WHERE SUITABLE FOR WHEN NOT USING ONDUIT OR ABLE AS PERMITTED BY ODE D/D ONVERTERS IF D/D ONVERTERS ARE USED, THEY ARE RUN IN SERIES (FIXED SOURE IRUIT VOLE D/D ONVERTERS)

10 D Information: Supplemental alculation Sheets for Inverter #2 (Only include if second inverter is used) Module Manufacturer: Model: S2) Module V oc (from module nameplate): Volts S3) Module I sc (from module nameplate): Amps Is Module I sc below 9.6 Amps? Yes No S) Module D output power under standard test conditions (ST) = Watts (ST) S) D Module Layout Identify each source circuit (string) for inverter 1 shown on the roof plan with a Tag (e.g. A,B,, ) Number of modules per source circuit for inverter 1 Identify, by tag, which source circuits on the roof are to be paralleled (if none, put N/A) ombiner 1: ombiner 2: Total number of source circuits for inverter 1: S6) Are D/D onverters used? Yes No If No, skip to Step S7. If Yes, enter info below. D/D onverter Model #: Max D D/D onverter Max D Input Voltage: Volts Max D Output urrent: Amps Max D Output urrent: Volts Max # of D/D onverters in an Input ircuit: D/D onverter Max D Input Power: Watts

11 S7) Maximum System D Voltage Use systems without D/D converters A. Module V O (STEP S2) = x # of modules in series (STEP S) x f (Step 1) = V Use for systems with D/D converters. The value calculated below must be less than D/D converter max D input voltage (STEP S6). B. Module V O (STEP S2) = x # of modules per converter (STEP S6) x f (Step 1) = V Table 2. Largest Module V O for SingleModule D/D onverter onfigurations (with 80 V AFI ap) (E and ) Max. Rated Module V O (*1.12) (Volts) Max. Rated Module V O (*1.1) (Volts) D/D onverter Max D Input (Step 6) (Volts) S8) Maximum System D Voltage from D/D onverters to Inverter Only required if Yes in Step S6 Maximum System D Voltage = Volts S9) Sizing Source ircuit onductors Source ircuit onductor Size = Min. #10 AWG copper conductor, 90 wet (USE2, PV Wire, XHHW2, THWN2, RHW2) For up to 8 conductors in roofmounted conduit exposed to sunlight at least ½ from the roof covering (E 310) Note: For over 8 conductors in the conduit or mounting height of lower than ½ from the roof, this plan is not applicable. S10) Are PV source circuits combined prior to the inverter? Yes No If No, use Single Line Diagram 1 with Single Line Diagram 3 and proceed to Step S12. If Yes, use Single Line Diagram 2 with Single Line Diagram and proceed to Step S11. Is source circuit OPD required? Yes No Source circuit OPD size (if needed): 1 Amps Are the source circuits combined on the roof? Yes No If Yes, the D output of the combiner shall have a load breaker disconnecting means located in the combiner or within 1.8m (6ft) of the combiner. S11) Sizing PV Output ircuit onductors If strings are combined (answer Yes in Step S10), Output ircuit onductor Size = Min. #6 AWG copper conductor S12) Inverter Disconnect Does the inverter have an integrated D disconnect? Yes No If Yes, proceed to Step S13. If No, the external D disconnect to be installed is rated for Amps (D) and Volts (D)

12 S13) Inverter Information Manufacturer: Model: Max. ontinuous A Output urrent Rating: Amps Integrated D ArcFault ircuit Protection? Yes No (If No is selected, this plan is not applicable) Grounded or Ungrounded System? Grounded Ungrounded A Information: S1) Sizing Inverter Output ircuit onductors and OPD Inverter Output OPD rating = Amps (Table 3) Inverter Output ircuit onductor Size = AWG (Table 3) Table 3. Minimum Inverter Output OPD and ircuit onductor Size Inverter ontinuous Output urrent Rating (Amps) (Step 1) Minimum OPD Size (Amps) Minimum onductor Size (AWG, 7, opper) Load enter alculations (Omit if a load center will not be installed for PV OPDs) S18) Load enter Output: alculate the sum of the maximum A outputs from each inverter. Inverter #1 Max ontinuous A Output urrent Rating [STEP S13] 1.2 = Amps Inverter #2 Max ontinuous A Output urrent Rating [STEP S13] 1.2 = Amps Total inverter currents connected to load center (sum of above) = Amps onductor Size: AWG Overcurrent Protection Device: Amps Load center bus bar rating: Amps an the load center accept more than two breakers? Yes No If Yes, the sum of 12% of the inverter output circuit currents and the rating of the overcurrent device protecting the busbar shall not exceed 120% of the ampacity of the busbar. If No, the sum of the ampere rating of the two PV overcurrent devices shall not exceed the rating of the busbar.

13 Solar PV Standard Plan Simplified entral/string Inverter System for One and TwoFamily Dwellings DESRIPTION SOLAR PV MODULE / STRING D/D ONVERTERS INSTALLED? YES / NO (IF YES, STEPS 6 & 8 REQUIRED) SOURE IRUIT JUNTION BOX INSTALLED?: YES / NO SEPARATE D DISONNET INSTALLED?: YES / NO INTERNAL INVERTER D DISONNET: YES / NO ENTRAL INVERTER *SEPARATE A DISONNET INSTALLED?: YES / NO TO LOAD ENTER ON LINE DIAGRAM 1 * onsult with your local AHJ and /or Utility SINGLELINE DIAGRAM #3 ADDITIONAL INVERTER FOR DIAGRAM #1 INVERTER # 2 HEK A BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED: GROUNDED (INLUDE GE) UNGROUNDED FOR UNGROUNDED SYSTEMS: D OPD MUST DISONNET BOTH ONDUTORS OF EAH SOURE IRUIT UNGROUNDED ONDUTORS MUST BE IDENTIFIED PER 210.(). WHITEFINISHED ONDUTORS ARE NOT PERMITTED A D 8 A B IF D/D ONVERTERS ARE USED, HEK THE BOX BELOW THE ORRESPONDING ONFIGURATION D/D ONVERTERS INVERTER D/D ONVERTERS INVERTER ONDUTOR/ONDUIT SHEDULE DESRIPTION AND ONDUTOR TYPE ONDUTOR NUMBER OF SIZE ONDUTORS A USE2 OR PVWIRE EG/GE: B EG/GE: EG/GE: ONDUIT/ABLE TYPE ONDUIT SIZE ENTER N/A WHERE SUITABLE FOR WHEN NOT USING ONDUIT OR ABLE AS PERMITTED BY ODE PARALLEL D/D ONVERTERS ON ONE SOURE IRUIT (FIXED UNIT VOLE D/D ONVERTERS) D/D ONVERTERS ARE ALL RUN IN SERIES (FIXED SOURE IRUIT VOLE D/D ONVERTERS)

14 Solar PV Standard Plan Simplified entral/string Inverter System for One and TwoFamily Dwellings DESRIPTION SOLAR PV MODULE / STRING D/D ONVERTERS INSTALLED? YES / NO (IF YES, STEPS 6 & 8 REQUIRED) SOURE IRUIT JUNTION BOX INSTALLED?: YES / NO OMBINER BOX (STEPS 11 & 12 REQUIRED) SEPARATE D DISONNET INSTALLED?: YES / NO INTERNAL INVERTER D DISONNET: YES / NO ENTRAL INVERTER *SEPARATE A DISONNET INSTALLED?: YES / NO TO LOAD ENTER ON LINE DIAGRAM 3 * onsult with your local AHJ and /or Utility SINGLELINE DIAGRAM # ADDITIONAL INVERTER FOR DIAGRAM #2 INVERTER # 2 HEK A BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED: GROUNDED (INLUDE GE) UNGROUNDED FOR UNGROUNDED SYSTEMS: D OPD MUST DISONNET BOTH ONDUTORS OF EAH SOURE IRUIT UNGROUNDED ONDUTORS MUST BE IDENTIFIED PER 210.(). WHITEFINISHED ONDUTORS ARE NOT PERMITTED A D 9 A1 B1 D A2 B2 D/D ONVERTERS INVERTER OMBINER ONDUTOR/ONDUIT SHEDULE DESRIPTION AND ONDUTOR NUMBER OF ONDUIT/ABLE ONDUTOR TYPE SIZE ONDUTORS TYPE A1 USE2 OR PVWIRE EG/GE: B1 EG/GE: EG/GE: D EG/GE: ONDUIT SIZE NONOMBINED STRINGS ONDUTOR/ONDUIT SHEDULE (IF APPLIABLE) DESRIPTION AND ONDUTOR NUMBER OF ONDUIT/ABLE ONDUIT SIZE ONDUTOR TYPE SIZE ONDUTORS TYPE A2 USE2 OR PVWIRE EG/GE: B2 EG/GE: ENTER N/A WHERE SUITABLE FOR WHEN NOT USING ONDUIT OR ABLE AS PERMITTED BY ODE IF D/D ONVERTERS ARE USED, THEY ARE RUN IN SERIES (FIXED SOURE IRUIT VOLE D/D ONVERTERS)

15 SOLAR PV STANDARD PLAN Roof Layout Diagram for One and TwoFamily Dwellings Items required: roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points.

Job Address: Permit #: Contractor/Engineer Name: License # and Class: Signature: Date: Phone Number:

Job Address: Permit #: Contractor/Engineer Name: License # and Class: Signature: Date: Phone Number: ity of Long Beach Department of Development Services 333 West Ocean Blvd., 4 th Floor Long Beach, A 90802 Phone: (562) 570-5237 Fax: (562) 570-6753 Website: www.lbds.info Solar PV Standard Plan - Simplified

More information

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings Solar PV Standard Plan Simplified entral/string Inverter Systems for One and TwoFamily Dwellings SOPE: Use this plan ONLY for utilityinteractive central/string inverter systems not exceeding a system A

More information

SOLAR PV standard Plan-Simplified Central/String Inverter Systems for One and Two Family Dwellings

SOLAR PV standard Plan-Simplified Central/String Inverter Systems for One and Two Family Dwellings SOLAR PV standard Plan-Simplified entral/string Inverter Systems for One and Two Family Dwellings 21815 Pioneer Boulevard Hawaiian Gardens, a 90716 (562) 420 2641 E-002-a EFFETIVE : 9-31-2015 SOPE: Use

More information

Solar PV Standard Plan Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Central/String Inverter Systems for One- and Two-Family Dwellings Planning and evelopment Building & Safety ivision Solar PV Standard Plan entral/string Inverter Systems for One and TwoFamily wellings SOPE: Use this plan ONLY for utilityinteractive central/string inverter

More information

Solar PV Standard Plan Simplified Central/String Inverter Systems for 10 KW or less One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for 10 KW or less One- and Two-Family Dwellings Town of Woodside, Building ivision 29 Woodside Rd. Woodside, a. 902 (0) 179 Fax: (0) 1219 www.woodsidetown.org Solar PV Standard Plan Simplified entral/string Inverter Systems for 10 KW or less One and

More information

Use this plan ONLY for utility-interactive central/string inverter systems. This plan is not intended for bipolar systems,

Use this plan ONLY for utility-interactive central/string inverter systems. This plan is not intended for bipolar systems, Solar PV Standard Plan Simplified entral/string Inverter Systems for One and TwoFamily Dwellings (0 KW or Less) Use this plan ONLY for utilityinteractive central/string inverter systems. This plan is not

More information

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings Your City logo here Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems

More information

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings PV TOOLKIT DOCUMENT #3 Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems

More information

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings Roof Top Solar Permit Document 1 Submittal Requirements Bulletin Small Town with a Big Backyard! Solar Photovoltaic Installations 10 kw or Less in One and TwoFamily Dwellings This information bulletin

More information

Solar Standard Plan Simplified Systems for - and Two-Family Dwellings

Solar Standard Plan Simplified Systems for - and Two-Family Dwellings Solar Standard Plan Simplified Systems for and TwoFamily wellings SCOPE: Use this plan ONLY for electrical review of utility central/string inverter systems not exceeding a system AC inverter output rating

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings TOOLKIT DOCUMENT #4 Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings County of Santa Barbara Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for Oneand Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings TOOLKIT DOCUMENT #4 Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters or Modules

More information

STREAMLINED SOLAR CHECKLIST Owner Name:

STREAMLINED SOLAR CHECKLIST Owner Name: STREAMLINED SOLAR CHECKLIST Owner Name: Address: DEPARTMENT OF PUBLIC WORKS AND PLANNING ALAN WEAVER, DIRECTOR This checklist must be completed by the contractor or an authorized agent of the contractor

More information

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems not exceeding a total combined system ac inverter output rating of 10kW on the roof of a one- or two-family dwelling or

More information

Applicant and Site Information Job Address: Permit #:

Applicant and Site Information Job Address: Permit #: TOOLKIT DOCUENT #4 Planning and Building Services Solar Standard Plan Simplified icroinverter and Systems (One- and Two-Family Dwellings) SCOPE: Use this plan ONLY for systems using utility-interactive

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings TOOLKIT DOCUMENT #4 Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters

More information

City of Daly City Department of Economic and Community Development Building Division th Street, Daly City. CA

City of Daly City Department of Economic and Community Development Building Division th Street, Daly City. CA GENERAL REQUIREMENTS City of Daly City Department of Economic and Community Development Building Division 333 90 th Street, Daly City. CA. 94015 A. System size is 10 kw AC CEC rating or less Y N B. The

More information

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less:

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less: Effective Date January 1, 2017 Form 1 Submittal Requirements Bulletin This information bulletin is published to guide applicants through a streamlined permitting process for solar photovoltaic (PV) projects

More information

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1 CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1 Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings This information bulletin is published to guide

More information

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees.

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees. Instructions 1. Fire Department Over the counter Plan checks are optional for solar systems complying with 2015 California Solar permitting guidebook. Although they are optional, they are highly recommended

More information

Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings TOOKIT DOCUMENT #1 Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings This information bulletin is published to guide applicants through a streamlined

More information

Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings This information bulletin is published to guide applicants through a streamlined permitting process for rooftop solar

More information

CITY OF SONOMA - TOOLKIT DOCUMENT #1

CITY OF SONOMA - TOOLKIT DOCUMENT #1 CITY OF SONOMA - TOOLKIT DOCUMENT #1 Submittal Requirements for Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family (Duplex) Dwellings This information bulletin is published to guide

More information

Solar PV Standard Electrical Plan

Solar PV Standard Electrical Plan *** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Permit Number: SCOPE: Standard plan for installation of solar PV systems utilizing 2 wire

More information

PHOTOVOLTAIC SYSTEMS

PHOTOVOLTAIC SYSTEMS PV WORKSHEET STANDARD STRING ARRAY Solar photovoltaic (PV) systems have widely gained acceptance as an alternative energy source. Installations range from small arrays supplying bus stop luminaires to

More information

2016 Photovoltaic Solar System Plan Review List

2016 Photovoltaic Solar System Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Photovoltaic Solar System Plan Review List GENERAL PROJECT INFORMATION PLAN CHECK NO DATE JOB ADDRESS CITY ZIP REVIEWED BY PHONE

More information

Solar PV Standard Electric Plan

Solar PV Standard Electric Plan *** Provide this document to the inspector along with ALL system installation instructions *** SCOPE: Standard plan for the installation of microinverter solar PV systems, not exceeding a total AC output

More information

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly. SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS (ELEC) This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE 2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying

More information

Solar Eligibility Checklist for Expedited Photovoltaic Permitting for One- and Two-Family Dwellings

Solar Eligibility Checklist for Expedited Photovoltaic Permitting for One- and Two-Family Dwellings Solar Eligibility Checklist for Expedited Photovoltaic Permitting for One and TwoFamily Dwellings GEERAL REQUIREMETS A. System size is 10 kw AC CEC rating or less B. System is located in an area with a

More information

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems COUNTY OF SANTA CRUZ PLANNING DEPARTMENT 701 OCEAN STREET, 4 th FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 KATHLEEN MOLLOY PREVISICH, PLANNING DIRECTOR Photovoltaic

More information

Residential Photovoltaic (PV) Packet

Residential Photovoltaic (PV) Packet Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 (916) 774-5332 Fax (916) 774-5394 Residential Photovoltaic (PV) Packet The Roseville Municipal Code

More information

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST The following checklist is an outline of the general requirements found in the 2005 National Electrical Code (NEC) Article 690 for Photovoltaic

More information

Photovoltaic Solar Plan Review

Photovoltaic Solar Plan Review PAIGE B. VAUGHAN, CBO Director of Building and Safety Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail:lbutler@comptoncity.org Building & Safety Department Photovoltaic Solar Plan Review Plan Check

More information

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST The following checklist is an outline of the general requirements found in the 1999 National Electrical Code (NEC) Article 690 for Photovoltaic (PV) Power

More information

Non-Residential Solar Energy Photovoltaic (PV) Packet

Non-Residential Solar Energy Photovoltaic (PV) Packet Development Services Department Building Inspection Division 311 Vernon Street Roseville, California 95678-2649 (916) 774-5332 Fax (916) 774-5394 Non-Residential Solar Energy Photovoltaic (PV) Packet Permit

More information

Solar Power Installation Application

Solar Power Installation Application Solar Power Installation Application This Form must be filled out and submitted to Logan City Light and Power Department and given authorization to proceed PRIOR to installing a solar system. Also, please

More information

CHAPTER 10 ELECTRICAL. Notes:

CHAPTER 10 ELECTRICAL. Notes: CHAPTER 10 ELECTRICAL 1001.0 General Requirements. Electrical wiring and equipment shall comply with the requirements of NFPA 70, National Electrical Code (NEC), or local ordinances. 1002.0 Solar Photovoltaic

More information

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL Photovoltaic (PV) Residential Page 1 of 10 Revision Date: 07/18/2018 INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL INSPECTION CODE: 703 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,

More information

City of Manhattan Beach Community Development

City of Manhattan Beach Community Development City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 12-20-16 ORDINANCE NO. 15-0022 MBMC 9.06

More information

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET Public Works Building Inspection 311 Vernon Street Roseville, California 95678-2649 916.774.5332 fax 916.774.5394 RESIDENTIAL PHOTOVOLTAIC (PV) PACKET Contents of packet: Photovoltaic Checklist (2 pages

More information

ELIGIBILITY CHECKLIST FOR EXPEDITED SOLAR POOL HEATING PERMITTING

ELIGIBILITY CHECKLIST FOR EXPEDITED SOLAR POOL HEATING PERMITTING Building and Safety Division Policy and Procedure No. A093015 Effective Date January 1, 2017 ELIGIBILITY CHECKLIST FOR EXPEDITED SOLAR POOL HEATING PERMITTING GENERAL REQUIREMENTS A. System size is 30

More information

EXPANSION JOINT DETAILS DURA-BLOK CONDUIT SUPPORT CONDUIT ATTACHMENT DETAIL SCALE: NOT TO SCALE GROUNDING WIRE DETAIL SCALE: NOT TO SCALE

EXPANSION JOINT DETAILS DURA-BLOK CONDUIT SUPPORT CONDUIT ATTACHMENT DETAIL SCALE: NOT TO SCALE GROUNDING WIRE DETAIL SCALE: NOT TO SCALE PV SOLAR PROJECT 2 EXPANSION JOINT DETAILS 3 DURA-BLOK CONDUIT SUPPORT PLAN VIEW ISOMETRIC VIEW CONDUIT ATTACHMENT DETAIL SCALE: NOT TO SCALE FOLLOW PANEL CLAW INSTALLATION DRAWINGS FOR PROPER INSTALLATION

More information

Code Calculations. for an Off-Grid PV System

Code Calculations. for an Off-Grid PV System Code Calculations for an Off-Grid PV System John Wiles Sponsored by the Photovoltaic Systems Assistance Center, Sandia National Laboratories Judy LaPointe s home is on its way to becoming a finished, off-grid

More information

Residential microinverter system

Residential microinverter system PV array Rooftop junction box to transition from TC-ER cable to THWN-2 Conduit run over 10 ft. long GARAGE Existing exterior service panel Residential microinverter system If an inverter is dedicated to

More information

SOLAR PV INSTALLATIONS

SOLAR PV INSTALLATIONS Winnipeg Information Bulletin 2016-003-B/E/S/Z SOLAR PV INSTALLATIONS An Information Bulletin is currently being created for City of Winnipeg guidelines for Solar PV Installations and will be published

More information

Electrical Design/Build Guide

Electrical Design/Build Guide 2017 Electrical Design/Build Guide Based on the 2017 National Electrical Code Copyright Durand & Associates 1986-2016 60 C Copper Ampacity 4 - Wire Fill - (Non-Current Carrying Neutral) 4 or 5 - Parallel

More information

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV. Perspectives on PV Microinverters and AC PV Modules Are Different Beasts by John Wiles Microinverters and AC PV modules are becoming very common in residential and small commercial PV systems. See photos

More information

Solar Photovoltaic Power. Overarching Objectives. How many questions? 9/16/2012. From plan review to Final Inspection

Solar Photovoltaic Power. Overarching Objectives. How many questions? 9/16/2012. From plan review to Final Inspection Solar Photovoltaic Power From plan review to Final Inspection Overarching Objectives A understandable and predictable process for both the Installer and the Inspector. The installation of safe, efficient,

More information

ENGINEERING SPECIFICATION

ENGINEERING SPECIFICATION December 206 ENGINEERING SPECIFICATION No. of 6 DATE: 2-9-6 CATEGORY SUBJECT TABLE OF CONTENTS. Overview... 2 2. General Requirements for Service... 3 3. Definitions... 3 4. Abbreviations... 5 5. References

More information

City of Manhattan Beach Community Development

City of Manhattan Beach Community Development City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 10-01-15 ORDINANCE NO. 15-0022 MBMC 9.06

More information

Temporarily Approved Solar Photovoltaic System Electrical Schematics

Temporarily Approved Solar Photovoltaic System Electrical Schematics March 20, 2019 Page 1 of 10 Temporarily Approved Solar Photovoltaic System Electrical Schematics This document is intended as a temporary interpretation of approved solar photovoltaic electrical schematics

More information

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET

RESIDENTIAL PHOTOVOLTAIC (PV) PACKET Development Services Department Building Inspection Division 311 Vernon Street Roseville, California 95678-2649 (916) 774-5332 Fax (916) 774-5394 RESIDENTIAL PHOTOVOLTAIC (PV) PACKET ALL PV Project Applicants:

More information

Know the Code: PV and NEC

Know the Code: PV and NEC Know the Code: PV and NEC September 2014 PV Installer's Course ---NEC Article 690 Highlights 1 First National Electrical Code 1881 September 2014 PV Installer's Course ---NEC Article 690 Highlights 2 The

More information

APPROACHING. The Inverter. 92 IAEI NEWS May.June approaching the inverter

APPROACHING. The Inverter. 92 IAEI NEWS May.June approaching the inverter APPROACHING approaching the inverter The Inverter 92 IAEI NEWS May.June 2009 www.iaei.org by John Wiles approaching the inverter In our top-to-bottom perspective of a photovoltaic (PV) system, we are still

More information

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number: Please print the following information. Interconnect Customer Information Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone

More information

First Responder System Identification Quiz. Presented by the NY-SUN PV Trainers Network

First Responder System Identification Quiz. Presented by the NY-SUN PV Trainers Network First Responder System Identification Quiz Presented by the NY-SUN PV Trainers Network SYSTEM 1 Questions: 1) Is there a solar electric system at the site? 2) What is your next step? SYSTEM 1 3) Given

More information

COVER VICINITY MAP SCOPE OF WORK ELECTRICAL NOTES GOVERNING CODES SHEET INDEX

COVER VICINITY MAP SCOPE OF WORK ELECTRICAL NOTES GOVERNING CODES SHEET INDEX SCOPE OF WORK TO INSTALL A SOLAR PHOTOVOLTAIC (PV) SYSTEM THE POWER ENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY RID THROUH THE EXISTIN ELECTRICAL SERVICE EQUIPMENT. THE PV SYSTEM

More information

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018. SUMMARY This bulletin introduces a new PG&E program that allows the installation of an electric meter socket adapter that will accept a wired connection directly from a residential customer s Photo Voltaic

More information

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements: Checklist for Multi-Family Residential Electric Vehicle Charging Station Article 625 2016 California Electrical code (CEC) General Requirements: Level 1 Charger: 110V dedicated 20 amp circuit No electrical

More information

Load Side PV Connections

Load Side PV Connections Perspectives on PV Load Side PV Connections 705.12(D) in the 2014 NEC by John Wiles Through the exceptional efforts of the members of NFPA NEC Code-Making Panel 4 working with the proposals and comments

More information

Assessing a Site for Installation of Consumption Monitoring

Assessing a Site for Installation of Consumption Monitoring TECHNICAL BRIEF Assessing a Site for Installation of Consumption Monitoring About the Enphase Envoy-S Metered The Enphase Envoy-S Metered communications gateway enables performance monitoring and remote

More information

Washoe County PLAN SUBMITTAL

Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL Solar Photo Voltaic Systems Electrical Generation Systems December 2013 Washoe County Permits Plus Zone 1001 East Ninth Street PO Box 11130 Reno,

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I am inspecting a building addition. They have a 480V to

More information

Green Building Technology

Green Building Technology Green Building Technology Renewable Energy Sources and Design/Specification Guidelines Presented by: Kurt Uhlir & Brian Kustwin Why Renewables? Reduction of SO 2 and NOX along with greenhouse gases such

More information

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC NJCE Market Manager HW Construction Department Wayne, NJ Robert A. Menist Contents Site inspections with attention on Labeling

More information

Types ALB-1 and NLB-1

Types ALB-1 and NLB-1 Types ALB- and NLB- ircuit Breakers for Naval Shipboard Use Types ALB- and NLB- Breakers 5 Volts ac and dc, 50 Amperes Maximum, 5000 Amperes I.. Interrupting Rating 0 50 ampere units: 5,000 amperes ac

More information

Questions from the AHJ To Fuse or Not to Fuse?

Questions from the AHJ To Fuse or Not to Fuse? Questions from the AHJ To Fuse or Not to Fuse? by John Wiles Nearly everyone agrees that the National Electrical Code gets better with every edition. However, new technologies like photovoltaic (PV) power

More information

RGS PV-000. Sheet List

RGS PV-000. Sheet List 007 ANSI Full Bleed B (.00 X 7.00 Inches) 07-0-08 Scope of Work: Energy shall install a 6.600 kw Grid-tied Photovoltaic ("PV") System totaling () Silfab SLA 00 M Modules with () Enphase Energy M0-60-LL-S

More information

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19 -4-0 Bulletin -4-0 Wiring methods for Solar Photovoltaic Systems Rule -018 and -020, Tables 11 and 19 Scope Issued May 2012 (1) Introduction (2) New cable types RPV & RPVU (3) Wiring methods within photovoltaic

More information

PV Installations 2015 Electrical Code & more. Presented by: Ted Olechna Director Codes and Standards Support

PV Installations 2015 Electrical Code & more. Presented by: Ted Olechna Director Codes and Standards Support PV Installations 2015 Electrical Code & more 1 Presented by: Ted Olechna Director Codes and Standards Support What I will Cover: Who ESA is Ontario Electrical Safety Code Solar PV Voltage limitations Conductor

More information

33'-10"± ROOF #1 (2) SUNPOWER SPR E C-AC MICROINVERTER MODULES ROOF #2 (13) SUNPOWER SPR E C-AC MICROINVERTER MODULES 78'-9"± 25'-5"

33'-10± ROOF #1 (2) SUNPOWER SPR E C-AC MICROINVERTER MODULES ROOF #2 (13) SUNPOWER SPR E C-AC MICROINVERTER MODULES 78'-9± 25'-5 PROJECT : 15 x 327 SUNPOWER SPR E20-327-C-AC MICROINVERTER MODULES ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES SYSTEM SIZE: 4.90 kw DC STC ARRAY AREA #1: 35.08 SQ FT. ARRAY AREA #2: 228.02 SQ FT. SUMMARY 15

More information

hat inspectors need to know

hat inspectors need to know W hat inspectors need to know by John Wiles Photovoltaic (PV) power systems are being installed by the thousands throughout the United States. In states like California, New York, New Jersey and a few

More information

CHAPTER 10 ELECTRICAL

CHAPTER 10 ELECTRICAL 1001.0 General Requirements. 1001.1 Electrical Wiring and Equipment. Electrical wiring and equipment shall comply with the requirements of NFPA 70, National Electrical Code (NEC), or local ordinances.

More information

Photovoltaic Installations

Photovoltaic Installations Photovoltaic Installations CanSIA December 2016 Presented by: Malcolm Brown Technical Advisor Western Region Discussion Topics Bulletin 2-11-22 Plan Review Requirements Connection Authorizations for Net

More information

Technical Summary of Battery Energy Storage Systems

Technical Summary of Battery Energy Storage Systems Technical Summary of Battery Energy Storage Systems Based on the 2017 Massachusetts Electrical Code This document summarizes the new Article 706 in the Massachusetts Electrical Code (MEC). Article 706

More information

SECTION SOLAR ENERGY ELECTRICAL POWER GENERATION SYSTEM

SECTION SOLAR ENERGY ELECTRICAL POWER GENERATION SYSTEM PART 1 - GENERAL 1.1 DESCRIPTION SECTION 48 14 00 SOLAR ENERGY ELECTRICAL POWER GENERATION SYSTEM SPEC WRITER NOTES: Delete between // --- // if not applicable to project. Also delete any other item or

More information

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less IMPORTANT NOTES: Customers may not operate their Generating Facility while interconnected to the PG&E system until they receive written permission from PG&E. For a non-exporting Generating Facility, RES-BCT

More information

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS For residential and commercial systems, the combined generation

More information

PV Vault Yielding safety quickly

PV Vault Yielding safety quickly PV Vault Yielding safety quickly Designed with safety in mind ABB now offers the UL 1741 certified Solar Rapid Shutdown Device, PV Vault rated at 600 V DC to meet NEC 690.12 code requirement for string

More information

Introduction. Nexans wire and cable. Contact us for all your wire and cable needs

Introduction. Nexans wire and cable. Contact us for all your wire and cable needs Introduction Nexans is one of the largest wire and cable manufacturers in the world, and in North America. In North America we manufacture in locations across the United States and Canada. We design and

More information

PART A General Conductor Requirements

PART A General Conductor Requirements PART A General Conductor Requirements 6.1 Conductor Insulation Property Table 310.13 of the NEC provides information on conductor properties such as permitted use, maximum operating temperature, and other

More information

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

90.2 Scope. The installation of electrical conductors, equipment and raceways for: NEC Generator Primer Rules on the installation of generators and transfer switches 1 90.2 Scope The installation of electrical conductors, equipment and raceways for: public and private premises Conductors

More information

Pretest Module 24 Three-phase Service Entrance

Pretest Module 24 Three-phase Service Entrance Pretest Module 24 Three-phase Service Entrance 1. What is the most widely used three-phase service entrance system? 2. What are the three most common voltage combinations for three-phase, four-wire systems?

More information

CPS 3Phs String Inverters NEC 2014 Compliance

CPS 3Phs String Inverters NEC 2014 Compliance Application Note: NEC 2014 Compliance Revision: 062016 CPS 3Phs String Inverters NEC 2014 Compliance This application note describes the major changes within the NFPA 70, National Electric Code, specifically

More information

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19 Bulletin 50-4-1 Wiring methods for Solar Photovoltaic Systems Rules 50-018 and 50-020, Tables 11 and 19 Issued December 2012 Supersedes Bulletin 50-4-0 (1) (2) (3) (4) (5) Scope Introduction New cable

More information

Application Note Three Phase String Inverters NEC 2014 Compliance

Application Note Three Phase String Inverters NEC 2014 Compliance Application Note Three Phase String Inverters NEC 2014 Compliance Version 2.0 July 07, 2014 The technical information and cross references of this document are subject to a continuous improvement and the

More information

GPC13M R-410A, 13 SEER. Packaged Air Conditioner. 3, 4, & 5 Tons. Cooling Capacity: 36,000-56,000 BTU/h

GPC13M R-410A, 13 SEER. Packaged Air Conditioner. 3, 4, & 5 Tons. Cooling Capacity: 36,000-56,000 BTU/h GP13M Packaged Air onditioner R-410A, 13 SEER ooling apacity: 36,000-56,000 BTU/h 3, 4, & 5 Tons Standard Features Energy-efficient compressor with internal relief valve EEM blower motor; PS blower motor

More information

A little about me: Course Objective/Intent. Good PV resources:

A little about me: Course Objective/Intent. Good PV resources: A little about me: By: Doug Smith, MCP, CBO Cell: 8015507630 Office: 8015478133 Email: Doug@kimballengcom Web: wwwkimballengcom Happily married for over 13 years I have 3 children (1 girl and 2 boys) Building

More information

SAMPLE PERMIT APPLICATION PACKAGE

SAMPLE PERMIT APPLICATION PACKAGE 2013 Lennox Industries Inc. Dallas, Texas, USA SOLAR - KIT / ACCESSORIES 507154-01 3/2013 Supersedes 506555-01 LITHO U.S.A. SAMPLE PERMIT APPLICATION PACKAGE SUNSOURCE HOME ENERGY SYSTEM SAMPLE PERMIT

More information

March Commercial Distributed Generation with Optional Energy Storage Systems

March Commercial Distributed Generation with Optional Energy Storage Systems March 018 Commercial Distributed Generation with Optional Energy Storage Systems CATEGORY SUBJECT ENGINEERING SPECIFICATION No. 1 of 3 DATE: 03-01-18 TABLE OF CONTENTS 1. Overview.... General Requirements

More information

SECTION SOLAR ENERGY ELECTRICAL POWER GENERATION SYSTEM

SECTION SOLAR ENERGY ELECTRICAL POWER GENERATION SYSTEM PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 30 05 SPEC WRITER NOTES: Use this section only for NCA projects. Delete between // --- // if not applicable to project. Also, delete any other item or paragraph

More information

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for Perspectives on PV A series of articles on photovoltaic (PV) power systems and the National Electrical Code by John Wiles Back to the Grid, Designing PV Systems for Code Compliance 20 IAEI NEWS January.February

More information

Solar circuit protection application guide. Complete and reliable solar circuit protection

Solar circuit protection application guide. Complete and reliable solar circuit protection Solar circuit protection application guide Complete and reliable solar circuit protection Introduction Benefits of Eaton s circuit protection solutions Complete and reliable circuit protection for photovoltaic

More information

OPTIMIZING COMMERCIAL SOLAR

OPTIMIZING COMMERCIAL SOLAR OPTIMIZING COMMERCIAL SOLAR SolarEdge s optimized inverter solution was able to reduce the DC side electrical BOS costs to less than 1 cent per watt for a total savings of almost 50 percent when compared

More information

the National PhotoVoltaic protection note 5 I rated Introduction points of interest When to Fuse, When Not to Fuse

the National PhotoVoltaic protection note 5 I rated Introduction points of interest When to Fuse, When Not to Fuse Sizing Fuses for Photovoltaic Systems per the National Electrical Code PhotoVoltaic protection note 5 By Robert Lyons, Jr. Product Manager Introduction Properly sizing fuses for photovoltaic (PV) systems

More information

CHAPTER V RESIDENTIAL WIRING

CHAPTER V RESIDENTIAL WIRING CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this

More information

ELECTRIC VEHICLE CHARGING FOR BUILDINGS

ELECTRIC VEHICLE CHARGING FOR BUILDINGS PLANNING & DEVELOPMENT SERVICES Office of the Chief Building Official BULLETIN 2015-004-BU/EL June 25, 2015 ELECTRIC VEHICLE CHARGING FOR BUILDINGS This bulletin provides clarification of requirements

More information