MODEL F90. Water Treatment Equipment Control Valve Installation and Service Manual
|
|
- Noreen Berry
- 5 years ago
- Views:
Transcription
1 MODEL F90 Water Treatment Equipment ontrol Valve Installation and Service Manual
2 TABLE OF ONTENTS Page Installation Sheet... General ommercial Pre-Installation heck Lsit...2 Timer Setting Dimensional Drawing...6 Assembly Drawings and Part Numbers Wiring Diagrams Trouble Shooting
3 INSTALLATION SHEET Equipment Supplier: Address: Phone: Installation Date: Equipment Model: Installer s name: Influent Water Data: Dynamic Inlet Water Pressure: psi Source: ity: Well: Lake: River: otal Hardness: grains/gallon, mg/l (grams/m 3 ) Turbidity: NTU, ph: TDS: olor (Organics): Total Alkalinity: ppm (mg/l), hlorine: ppm (mg/l), Nitrates: ppm (mg/l) Arsenic: ppm (mg/l) Equipment Data: Softener Suspended Solids Filter: arbon Filter: Neutralizing Filter: Nitrate Removal Unit Dealkalizer: Arsenic Removal Unit Dimensions: Mineral tank: Brine tank: inches mm Active medias: Type: Volume: ft 3 Liters Support media: Type: Volume: ft 3 Liters Salt used/regeneration: lbs Kgrams Brining System: Small Medium Large Injector size Backwash Flow ontrol (gpm) Refill Flow ontrol (gpm) Equipment Program: Regeneration start: By clock By meter Outside signal Equipment capacity: gallons m 3 Regeneration days override: Regeneration time: am pm ycle Programming in minutes:.- Backwash 3.- Fast Rinse 2.- Draw and Slow Rinse 4.- Refill Page
4 MODEL F90 General ommercial Pre-Installation heck List WATER PRESSURE: A minimum of 25 pounds of water pressure is required for regeneration valve to operate effectively. ELETRIAL FAILITIES: A continuous 5 volt, 60 Hertz current supply is required. (Other voltages available.) Make certain the current supply is always hot and cannot be turned off with another switch. EXISTING PLUMBING: ondition of existing plumbing should be free from lime and iron buildup. Piping that is built up heavily with lime and/or iron should be replaced. If piping is clogged with iron, a separate iron filter unit should be installed ahead of the water softener. LOATION OF SOFTENER AND DRAIN: The softener should be located close to a drain. BY-PASS VALVES: Always provide for the installation of a by-pass valve. AUTION: Water pressure is not to exceed 20 p.s.i., water temperature is not to exceed 0 F, and the unit cannot be subjected to freezing conditions. INSTALLATION INSTRUTIONS. Place the softener tank where you want to install the unit making sure the unit is level and on a firm base. (Maximum 7 feet apart for twin units.) To provide for expansion and contraction of plastic resin tanks and rigid plumbing loads, use FLEXIBLE FITTINGS at the valve. 2. All plumbing should be done in accordance with local plumbing codes. The pipe size for the drain line should be the same size as the drain line flow control connection. Water meters are to be installed on soft water outlets. Twin units with () one meter shall be installed on common soft water outlet of units. 3. Make sure that the floor is clean beneath the salt storage tank and that it is level. 4. Place approximately " of water above the grid plate (if used) in your salt tank. Salt may be placed in the unit at this time. 5. Place in by-pass position. Turn on the main water supply. Open a cold soft water tap nearby and let run a few minutes or until the system is free from foreign material (usually solder) that may have resulted from the installation. 6. Place the by-pass in service position. 7. Manually index the softener control into service position and let water flow into the mineral tank. When water flow stops, close inlet valve, place control in backwash position to relieve head of air, then gradually open inlet valve to purge remaining air in tank. Return control to service position. 8. Electrical: All electrical connections must be connected according to codes. Use electrical conduit if applicable. Plug into power supply. Page 2
5 MODEL F90 LOK TIMER Timer Setting Procedure How To Set Days On Which Water onditioner Is To Regenerate: Rotate the skipper wheel until the number is at the red pointer. Set the days that regeneration is to occur by sliding tabs on the skipper wheel outward to expose trip fingers. Each tab is one day. Finger at red pointer is tonight. Moving clockwise from the red pointer, extend or retract fingers to obtain the desired regeneration schedule. How To Set The Time Of Day: Press and hold the red button in to disengage the drive gear. Turn the large gear until the actual time of day is at the time of day pointer. Release the red button to again engage the drive gear. How To Manually Regenerate Your Water onditioner At Any Time: Turn the manual regeneration knob clockwise. This slight movement of the manual regeneration knob engages the program wheel and starts the regeneration program.the black center knob will make one revolution in the following approximately three hours and stop in the position shown in the drawing. Even thought it takes three hours for this center knob to complete one revolution, the regeneration cycle of your unit might be set only one half of this time.in any event, conditioned water may be drawn after rinsewater stops flowing from the water conditioner drain line. How to Adjust Regeneration Time:. Disconnect the power source. 2. Locate the three screws behind the manual regeneration knob by pushing the red button in and rotating the 24 hour dial until each screw appears in the cut out portion of the manual regeneration knob. 3. Loosen each screw slightly to release the pressure on the time plate from the 24 hour gear. 4. Locate the regeneration time pointer on the inside of the 24 hour dial in the cut out. 5. Turn the time plate so the desired regeneration time aligns next to the raised arrow. 6. Push the red button in and rotate the 24 hour dial. Tighten each of the three screws. 7. Push the red button and locate the pointer one more time to ensure the desired regeneration time is correct. 8. Reset the time of day and restore power to the unit. RED TIME SET BUTTON POINTER SERVIE POSITION INDIATOR SREW 24 HR. GEAR MANUAL REGENERATION KNOB SKIPPER WHEEL,2 DAY (SHOWS EVERY OTHER DAY REGENERATION) Page 3
6 MODEL F90 METER TIMER ommercial Demand Regeneration ontrol Timer Settings Typical Programming Procedure alculate the gallon capacity of the system, subtract the necessary reserve requirement and set the gallons required by lifting the gallon dial and rotating it so that the number of gallons required is aligned with the white dot on program wheel gear. Release and check for firm engagement with gear. Note, drawing shows 8,750 gallon setting. The capacity (gallons) arrow denotes remaining gallons exclusive of fixed reserve. Note: To set Meter capacity at initial start-up either. Rotate manual regeneration knob one full revolution. or 2. Rotate program wheel manually clockwise or counter clockwise and align white dot with capacity arrow. This procedure must be followed any time the program wheel setting is changed. How To Set The Time Of Day:. Press and hold the red button in to is engage the 24 hour gear. 2. Turn the 24 hour gear until the actual time of day is at the time of day pointer 3. Release the red button to again engage the 24 hour gear. How To Manually Regenerate Your Water onditioner At Any Time:. Turn the manual regeneration knob clockwise one click. 2. This slight movement of the manual regeneration knob engages the program wheel and starts the generation program. 3. The black center knob will make one revolution in the following approximately three hours and stop in the position shown in the drawing. 4. Even though it takes three hours for this center knob to complete one revolution, the regenera tion cycle of your unit might be set for only one half of this time. 5. In any event, conditioned water may be drawn after rinse water stops flowing from the water conditioner drain line. Immediate Regeneration Timers: These timers do not have a 24 hour gear. Setting the gallons on the program wheel and manual regeneration procedure are the same as previous instructions. Service Position Indicator Red Time Set Button 24 Hour Gear Manually Regeneration Knob TIMER OF DAY White Dot TO SET TIME OF DAY- PRESS RED BUTTON AND TURNLARGE DIAL UNTIL TIME IS AT ARROW TO MANUALLY START YLE TURN KNOB LOWISE APAITY (GALLONS) Gallons Label Program Wheel Page 4
7 MODEL F90 TIMER SERIES Regeneration ycle Program Setting Procedure (Brine Tank Refill Separate From Rapid Rinse) How To Set Regeneration ycle Program: The regeneration cycle program on your water condi - tioner has been factory preset, however, portions of the cycle orprogram may be lengthened or shortened in time to suitlocal conditions. F90 Series Timers (Figure to Right) To expose cycle program wheel, grasp timer in upper left Hand corner and pull, releasing snap retainer and swinging timer to the right. To change the regeneration cycle program, the program wheel must be removed. Grasp program wheel and squeeze protruding lugs toward center, lift program wheel off timer. (Switch arms may require movement to facilitate removal.) Return timer to closed position engaging snap retainer in back plate. Make certain all electrical wires locate above snap retainer post. Timer Setting Procedure for F90 Timer How To hange The Length Of The Backwash Time: The program wheel as shown in the drawing is in the service position. As you look at the numbered side of the program wheel, the group of pins starting at zero determines the length of time your unit will backwash. FOR EXPLE: If there are six pins in this section, the time of backwash will be 2 min. (2 min. per pin). To change the length of backwash time, add or remove pins as required. The number of pins times two equal the backwash time in minutes. onditioner will rapid rinse (2 min. per pin). To change the length of rapid rinse time, add or remove pins at the higher numbered end of this section as required. The number of pins times two equals the rapid rinse time in minutes. How To hange The Length Of Brine Tank Refill Time: The second group of holes in the program wheel determines the length of time that your water conditioner will refill the brine tank (2 min. per hole). To change the length of refill time, move the two pins at the end of the second group of holes as required. The regeneration cycle is complete when the outer microswitch is tripped by the two pin set at end of the brine tank refill section. The program wheel, however, will continue to rotate until the inner microswitch drops into the notch on the program wheel. BRINE&RINSE SETION (2 MIN.PER HOLE) PIN STRAGE PROGR WHEEL FOR REGENERATION YLE RAPID RINSE SETION (2 MIN. PER PIN) How To hange The Length Of Brine And Rinse Time: The group of holes between the last pin in the backwash section and the second group of pins determines the length of time that your unit will brine and rinse (2 min. per hole). To change the length of brine and rinse time, move the rapid rinse group of pins to give more or fewer holes in the brine and rinse section. Number of holes times two equals brine and rinse time in minutes. How To hange The Length Of Rapid Rinse: The second group of pins on the program wheel determines the length of time that your water Page 5 BAKWASH SETION (2 MIN. PER PIN) BRINE TANK REFILL
8 Dimensional Drawing Page 6
9 Assembly Drawings and Part Numbers Upper ontrol Drive Assembly Page 7
10 Assembly Drawings and Part Numbers Upper ontrol Drive Assembly Item No. Quantity Part No. Description Item No. Quantity Part No. Description Nut screw Pin screw Pin Bracket-Motor Mounting Plug Driver Gear Nut Pin Plug Bearing-Drive Link Pin Drive Link screw E-Ring am Pin-Drive Link Plug Drive Link Pin screw Bracket-Brine Side screw retaining ring Back Plate Washing mm seal, over Bushing over, Black am shaft 37 40mm seal, over screw Window,Upper over Insulator - Timer Ass'Y O-Ring Switch Screw-cover screw Terminal Block Bracket-Switch Mounting Drive Motor(220V) 2-A Terminal Block Drive Moto(24V) Page 8
11 Assembly Drawings and Part Numbers Lower ontrol Drive Assembly Page 9
12 Assembly Drawings and Part Numbers Lower ontrol Drive Assembly Item No. Quantity Part No. Description Item No. Quantity Part No. Description screw screw Insulation sheet Drive Gear switch Bushing Bracket/switch/mounting lip,pin screw opper indicator retaining ring ondition/sate hand Washer Bearing-drive link Bushing retainingring Bracket-Brine Side screw Fix head-water hammer tube 2 0.4M Water-proof Nylon tube Drive Link retaining ring Pin-Drive Link retaining ring PIN Drive Motor (220V) NUT / A Drive Motor (24V) Back plate mm Seal am shaft over, Black PIN O-Ring - AS am Screw-over screw 38 40mm Seal, window screw Window, front cover Bracket-Motor Mounting Page 0
13 Assembly Drawings and Part Numbers Timer Assembly Page
14 Assembly Drawings and Part Numbers Timer Assembly Item No. Quantity Part No. Description Item No. Quantity Part No. Description Timer Housing Asm Plastical Ball-0.25inch Dia ycle Actuator Gear Main Dirve Gear Hour Gear Program Wheel Timer Plate Pin Screw Idler Shaft Knob Spring - Idler Screw Idler Gear Skipper Wheel Ring Driver Gear Spring-Detent-Skipper Wheel Bracket-Motor BALL Screw Tab Motor Skipper Wheel Screw Ring Plate Screw O-Ring Hinge Bracket Labal-SWA Screw Regeneration Pointer Insulator - Drive Ass'Y Screw switch Spring lip switch Spring-Denent-Main Screw Page 2
15 Assembly Drawings and Part Numbers Meter Timer Assembly Page 3
16 Assembly Drawings and Part Numbers Meter Timer Assembly Item No. Quantity Part No. Description Item No. Quantity Part No. Description Timer Housing Driver Gear Decal-Instructions Motor mounting plate ycle Actuator Gear-SM Hour Gear, Dial 2 Regen Motor2 Ass 'Y - 24V Knob Motor2 Ass 'Y -220V Screw Screw Drive Pinion-Program Button Decal Wheel SM Program skipper wheel Drive Pinion-Program Ass y Wheel Program Wheel Retainer lutch-drive Pinion SM Screw lutch-drive Pinion Decal-Time of Day Spring Spring lip Spring Retainer Spring-Denent-Main Gear Screw Plastical Ball-0.25inch Dia Hinge Bracket Main Drive Gear(SM) Screw Program Wheel(SM) Ass y Insulator Idler Shaft Switch Spring - Idler Switch Idler Gear Screw Motor2 Ass 'Y - 0V Page 4
17 Assembly Drawings and Part Numbers Valve Body Page 5
18 Assembly Drawings and Part Numbers Valve Body Item No. Quantity Part No. Description Item No. Quantity Part No. Description End Plug Asm O-Ring O-Ring Adapter Piston Rod lip-piston Rod Piston NHWB End Plug Asm O-Ring Pipe Plug O-Ring F90 Valve Body O-Ring Screw Piston Rod Piston Upper flange ring O-Ring F90 Valve Seal O-Ring Spacer, port Upper distributor Double layer Spacer Lower flange ring F60 Valve Seal O-Ring Spacer-Port Washing Spacer Nut Screw F60 Valve Body Page 6
19 Assembly Drawings and Part Numbers Medium Brining System Assembly Page 7
20 Assembly Drawings and Part Numbers Medium Brining System Assembly Item No. Quantity Part No. Description Item No. Quantity Part No. Description Stem Guide Asm Screw retaining ring Pipe Plug Spring - Brine Valve Brine Tube Brine Vale Body Injector over O-Ring Screw Piston Rod Screw O-Ring Injector Throat Piston Rod Retainer O-Ring Piston Rod head over Injector Body Pipe Plug-/2NPT Injector Nozzle End plug O-Ring Page 8
21 Assembly Drawings and Part Numbers 3" Meter Assembly P/N: Item No. Quantity Part No. Description Item No. Quantity Part No. Description Screw Meter Body Meter over Assembly Screw O-ring Meter onnector Impeller Nut Impeller Shaft F90 atchment over Impeller Shaft Retainer Page 9
22 Wiring Diagrams System #4 - Single Valve Regeneration TB DELAYED REGENERATION TIMER N.. N.. TM N.. N.. N.. SW TH SW2 TP SW5 BV VDM SW3 H SW4 S IMMEDIATE REGENERATION TIMER UPPER DRIVE N.. LDM SW6 LD N.. N.. TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW -TIMER HOMING SWITH SW2 -TIMER PROGR SWITH SW3 - VAVLE HOMING SWITH SW4 - VALVE STEP SWITH SW5 - BRINE SWITH SW6 - LOWER DRIVE SWITH TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE LOWER DRIVE TM SW TH SW2 TP NOTE : SINGLE TANK TIMELOK, METER DELAYED, OR METER IMMEDIATE REGENERATION. Page 20
23 Wiring Diagrams System #4 - with Remote Starter TB IMMEDIATE REGENERATION TIMER N.. N.. TM N.. N.. N.. SW TH SW2 TP SW5 BV VDM SW3 H SW4 S UPPER DRIVE N.. FLOTROL RM (IMMEDIATE) FLOTROL RM (DELAYED) FLOTROL ET RM TB TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW -TIMER HOMING SWITH SW2 -TIMER PROGR SWITH SW3 - VAVLE HOMING SWITH SW4 - VALVE STEP SWITH SW5 - BRINE SWITH SW6 - LOWER DRIVE SWITH TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE LDM LOWER DRIVE SW6 LD LEAD VAVLE T.B. LEAD VAVLE T.B. LEAD VAVLE T.B. BADGER AR BADGER AR/E TB LEAD VAVLE T.B. LEAD VAVLE T.B. NOTE : SINGLE TANK REMOTE METER DELAYED, OR IMMEDIATE REGENERATION. Page 2
24 Wiring Diagrams System #5 - Interlocked Regeneration LEAD TB INTERLOK ABLE REEPTALE IMMEDIATE REGENERATION TIMER TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW -TIMER HOMING SWITH SW2 -TIMER PROGR SWITH SW3 - VAVLE HOMING SWITH SW4 - VALVE STEP SWITH SW5 - BRINE SWITH SW6 - LOWER DRIVE SWITH(INSIDE) SW7 - LOWER DRIVE SWITH(OUTSIDE) TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE NOTE : TWO TANK INTERLOKED, INDIVIDUAL METER, IMMEDIATE REGENERATION. BOTH TANKS NORMALLY IN SERVIE. ONLY ONE TANK IN REGENERATION, THE OTHER REMAINS IN SERVIE. LAG TB INTERLOK ABLE IMMEDIATE REGENERATION TIMER N.. N.. N.. N.. TM N.. N.. N.. SW TH SW2 TP SW5 BV VDM SW3 H SW4 S LDM N.. N.. SW6 LD LOWER DRIVE SW7 LD UPPER DRIVE TM N.. N.. N.. SW TH SW2 TP SW5 BV VDM SW3 H SW4 S UPPER DRIVE TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW -TIMER HOMING SWITH SW2 -TIMER PROGR SWITH SW3 - VAVLE HOMING SWITH SW4 - VALVE STEP SWITH SW5 - BRINE SWITH SW6 - LOWER DRIVE SWITH(INSIDE) SW7 - LOWER DRIVE SWITH(OUTSIDE) TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE LDM N.. N.. SW6 LD LOWER DRIVE SW7 LD Page 22
25 Wiring Diagrams System #6 - Series Regeneration LEAD TB INTERLOK ABLE REEPTALE IMMEDIATE REGENERATION TIMER N.. N.. TM N.. N.. N.. SW TH SW2 TP TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW -TIMER HOMING SWITH SW2 -TIMER PROGR SWITH SW3 - VAVLE HOMING SWITH SW4 - VALVE STEP SWITH SW5 - BRINE SWITH SW6 - LOWER DRIVE SWITH(INSIDE) SW7 - LOWER DRIVE SWITH(OUTSIDE) SW8 - SIGNAL ALTERNATOR SWITH TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE NOTE : TWO TANK INTERLOKED, SINGLE REMOTE METER, SERIES REGENERATION. BOTH TANKS NORMALLY IN SERVIE. ONLY ONE TANK IN REGENERATION, THE OTHER REMAINS IN SERVIE. LEAD VALVE REGENERATES FIRST, FOLLOWED IMMEDIATELY LAG VALVE. LAG LDM TB LD LD N.. SW6 SW5 LOWER DRIVE N.. BV SW7 VDM SW3 H UPPER DRIVE SW4 S FLOTROL RM (IMMEDIATE) BADGER AR LEAD VAVLE T.B. FLOTROL RM (DELAYED) BADGER AR/e TB LEAD VAVLE T.B. FLOTROL ET RM TB LEAD VAVLE T.B. LEAD VAVLE T.B. LEAD VAVLE T.B. INTERLOK ABLE IMMEDIATE REGENERATION TIMER N.. SW8 SW8 SET TO TRIP FOR SIX MINUTES AFTER BRINE TANK FILL. N.. N.. TM N.. N.. N.. SW TH SW2 TP SW5 BV VDM SW3 H SW4 S UPPER DRIVE TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW -TIMER HOMING SWITH SW2 -TIMER PROGR SWITH SW3 - VAVLE HOMING SWITH SW4 - VALVE STEP SWITH SW5 - BRINE SWITH SW6 - LOWER DRIVE SWITH(INSIDE) SW7 - LOWER DRIVE SWITH(OUTSIDE) TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE LDM N.. N.. SW6 LD LOWER DRIVE SW7 LD Page 23
26 Valve Wiring Diagrams System #7 - Alternating Regeneration LEAD TB INTERLOK ABLE IMMEDIATE REGENERATION TIMER N.. N.. LAG TB LD LD INTERLOK ABLE REEPTALE IMMEDIATE REGENERATION TIMER N.. N.. N.. N.. N.. TM SW TH SW2 TP SW5 BV VDM SW4 H SW3 S TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW -TIMER HOMING SWITH SW2 -TIMER PROGR SWITH SW3 - VAVLE HOMING SWITH SW4 - VALVE STEP SWITH SW5 - BRINE SWITH SW6 - LOWER DRIVE SWITH(INSIDE) SW7 - LOWER DRIVE SWITH(OUTSIDE) SW8 - SIGNAL ALTERNATOR SWITH TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE WS - WIRE SPLIE LDM NOTE : TWO TANK SINGLE REMOTE METER ALTERNATING REGENERATION. ONLY ONE TANK IN SERVIE. THE OTHER IN REGENERATION OR STANDBY. N.. SW6 LOWER DRIVE N.. SW7 SW8 N.. UPPER DRIVE FLOTROL RM (IMMEDIATE) FLOTROL RM (DELAYED) FLOTROL ET RM TB LEAD VAVLE T.B. LEAD VAVLE T.B. LEAD VAVLE T.B. BADGER AR LEAD VAVLE T.B. BADGER AR/E TB LEAD VAVLE T.B. BADGER AR WITH RELAY LEAD VAVLE T.B. TM N.. N.. N.. SW TH SW2 TP SW5 BV VDM SW3 H SW4 S UPPER DRIVE TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW -TIMER HOMING SWITH SW2 -TIMER PROGR SWITH SW3 - VAVLE HOMING SWITH SW4 - VALVE STEP SWITH SW5 - BRINE SWITH SW6 - LOWER DRIVE SWITH(INSIDE) SW7 - LOWER DRIVE SWITH(OUTSIDE) TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE WS - WIRE SPLIE LDM N.. SW6 LOWER DRIVE LD N.. SW7 LD Page 24
27 Multi-Valve System Wiring System #7 - Alternating Regeneration INTERLOK ABLE (ONNET TO NEXT UPSTRE VALVE OR REMOTE METER) INTERLOK ABLE REEPTALE (ONNET TO NEXT DOWNSTRE VALVE OR JUMPER PLUG) NOTE : TWO TO FIVE TANK SINGLE METER ALTERNATING REGENERATION. TO 4 TANKS IN SERVIE. ONE TANK IN REGENERATION OR STANDBY. ALL VALVES IN SYSTEM WIRED ALIKE. LAST VALVE IN STRING REEIVES JUMPER PLUG ASSEMBLY. ONNET JUMPER PLUG TO INTERLOK ABLE REEPTALE. LEAD VALVE INTERLOK ABLE IS ONNETED TO REMOTE METER. SPEIAL MULTIVALVE REMOTE METER OR EQUIV. REQUIRED FOR PROPER OPERATION. TB MODIFIED IMMEDIATE REGENERATION TIMER N.. N.. TM SW TH SW2 TP N.. N.. N.. N.. SW3 SW6 BV VDM SW4 H SW5 S SW3 SET TO TRIP AT THE START OF BAKWASH - 6 MIN. UPPER DRIVE N.. N.. N.. TM - TIMER MOTOR VDM - VAVLE DRIVE MOTOR LDM - LOWER DRIVE MOTOR SW - TIMER HOMING SWITH SW2 - TIMER PROGR SWITH SW3 - TIMER AUX. SWITH SW4 - VAVLE HOMING SWITH SW5 - VALVE STEP SWITH SW6 - BRINE SWITH SW7 - LOWER DRIVE SWITH(INSIDE) SW8 - LOWER DRIVE SWITH(OUTSIDE) SW9 - LOWER DRIVE AUX. SWITH TH - TIMER HOMING TP - TIMER PROGR H - VALVE HOMING S - VAVLE STEP BV - BRINE VALVE LD - LOWER DRIVE TB - TERMINAL BLOK LDM SW7 SW9 LD SW8 LD LOWER DRIVE Page 25
28 System #4 - Typical Single Tank Installation With Optional Meter System #5- Interlock - Typical Twin Tank Installation With Optional Meter Interlock And No Hard Water Bypass Page 26
29 System #6 - Twin Series Regeneration System #7 - Twin Alternator Installtion Note: On System 7 power cord is on Unit 2. Page 27
30 Trouble Shooting Problem ause orrection. Water conditioner fails to regenerate. A. Electrical service to unit has been A. Assure permanent electrical service (check interrupted fuse, plug, pull chain, or switch) B. Timer is defective. B. Replace timer.. Power failure.. Reset time of day. 2. Hard water. A. By-pass valve is open. A. lose by-pass valve. B. No salt is in brine tank. B. Add salt to brine tank and maintain salt level above water level.. Injector screen plugged.. lean injector screen. D. Insuf cient water owing into brine tank. E. Hot water tank hardness. F. Leak at distributor tube. D. heck brine tank ll time and clean brine line ow control if plugged. E. Repeated ushings of the hot water tank is required. F. Make sure distributor tube is not cracked. heck O-ring and tube pilot. G. Internal valve leak. G. Replace seals and spacers and/or piston. H.Service adapter did not return to service. H.heck drive motor and switch. 3. Unit used too much salt. A. Improper salt setting. A. heck salt usage and salt setting. B. Excessive water in brine tank. B. See problem Loss of water pressure. A. Iron buildup in line to water conditioner. A. lean line to water conditioner. B. Iron buildup in water condi tioner.. Inlet of control plugged due to foreign material broken loose from pipes by recent work done on plumbing system. 5. Loss of mineral through drain line. A. Air in water system. B. lean control and add mineral cleaner to mineral bed. Increase frequency of regeneration.. Remove piston and clean control. A. Assure that well system has proper air eliminator control. heck for dry well condition. B. Improperly sized drain line ow control. B. heck for proper drain rate. 6. Iron in conditioned water. A. Fouled mineral bed. A. heck backwash, brine draw, and brine tank ll. Increase frequency of re generation. Increase backwash time. 7. Excessive water in brine A. Plugged drain line ow control. A. lean ow control. B. Plugged injector system. B. lean injector and screen.. Timer not cycling.. Replace timer. tank. D. Foreign material in brine valve. D. Replace brine valve seat and clean valve. E. Foreign material in brine line ow control. E. lean brine line ow control. Page 28
31 Trouble Shooting PROBL EM AUSE ORRETION 8. Softener fails to draw brine. 9. ontrol cycles continuously. 0. Drain flows continuously. A. Drain line flow control is plugged. B. Injector is plugged.. Injector screen plugged. D. Line pressure is too low. E. Internal control leak. F. Service adapter did not cycle. A. Missadjusted, broken or shorted switch. A. Valve is not programing correctly. B. Foreign material in control.. Internal control leak. A. lean drain line flow control. B. lean injector.. lean screen. D. Increase line pressure to 20 P.S.l. E. hange seals, spacers and piston assembly. F. heck drive motor and switches. A. Determine if switch or timer is faulty and replace it, or replace complete power head. A. heck timer program and positioning of control. Replace power head assembly if not positioning properly. B. Remove power head assembly and inspect bore. Remove foreign material and check control in various regeneration positions.. Replace seals and piston assembly. General Service Hints For Meter ontrol Problem: Softener Delivers Hard Water. ause could be that... Reserve apacity Has Been Exceeded. orrection: heck salt dosage requirements and reset program wheel to provide additional reserve. ause could be that... Program Wheel Is Not Rotating With Meter Output. orrection: Pull cable out of meter cover and rotate manually. Program wheel must move without binding and clutch must give positive clicks when program wheel strikes regeneration stop. If it does not, replace timer. ause could be that... Meter Is Not Measuring Flow. orrection: heck meter with meter checker. Page 29
AQT-275 SERIES SERVICE MANUAL CONTROL VALVES
AQT-275 SERIES CONTROL VALVES SERVICE MANUAL Table of Contents General Residential Installation 3 Valve Start-up Procedures 4 Regeneration Cycle Program Setting Procedures 5 Water Conditional Diagrams
More informationAQT-56 POWERFLO SERIES SERVICE MANUAL CONTROL VALVES
AQT-56 POWERFLO SERIES SERVICE MANUAL Table of Contents Products Checking List 3 General Residential Installation Check List 4 AQT-56ST Softener Timer Control Valve Start-up Procedures 5 AQT-56FT Filter
More information65 Series. Valve Operation Manual
65 Series Valve Operation Manual Note: 1. Read all instructions carefully before operation. 2. Avoid pinched o-rings during installation by applying (provided with install kit) NSF certified lubricant
More informationModel Downlow & Uplow
Model 2750 - Downlow & Uplow Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents Job Speciication Sheet... 3 General Commercial Pre-Installation Check
More informationINSTALLATION, OPERATING AND SERVICE MANUAL
INSTALLATION, OPERATING AND SERVICE MANUAL ECONO-mist WATER SOFTENER Demand Regeneration 7-LMC56-75B 7-LM56-75B 7-LM56-100B 7-LM56-150B 7-LM56-200B Congratulations on purchasing your new Lancaster Water
More information3200ET TIMER. Service Manual. IMPORTANT: Fill in pertinent information on page 2 for future reference.
3200ET TIMER Service Manual IMPORTANT: Fill in pertinent information on page 2 for future reference. Installation And Start-Up Procedures Timer Programming Water Hardness System Capacity Regeneration Time
More informationFLECK 2850S SERVICE MANUAL. waterpurification.pentair.com
FLECK 2850S SERVICE MANUAL waterpurification.pentair.com TABLE OF CONTENTS JOB SPECIFICATION SHEET...2 INSTALLATION...3 START-UP INSTRUCTIONS...3 3200 TIMER SETTING PROCEDURE...4 3210 TIMER SETTING PROCEDURE...4
More informationAQT-56SE ELECTRONIC SERIES PROGRAMMING MANUAL CONTROL VALVES
AQT-56SE ELECTRONIC SERIES PROGRAMMING MANUAL TABLE OF CONTENTS General Residential Installation 3 AQT-56SE Keypad 4 Control Operation 5 Master Programming - Setting the Time of Day 6 - Setting the Regeneration
More informationInstallation and Operations Manual
Excalibur Water Systems 3.0 High Capacity Superflow Series QUADPLEX Water Softener Installation and Operations Manual 142 Commerce Park Drive, Units M-O, Barrie ON L4N 8W8 www.excaliburwater.com Water
More informationFleck 2510 & 2510 Econominder
Fleck 2510 & 2510 Econominder Service Manual TABLE OF CONTENTS JOB SPECIFICATION SHEET...1 INSTALLATION...2 START-UP INSTRUCTIONS...2 3200 TIMER SETTING PROCEDURE...3 3210 TIMER SETTING PROCEDURE...4 3200,
More informationFLECK 2750 DOWNFLOW SERVICE MANUAL. waterpurification.pentair.com
FLECK 2750 DOWNFLOW SERVICE MANUAL waterpurification.pentair.com TABLE OF CONTENTS JOB SPECIFICATION SHEET...2 INSTALLATION...3 START-UP INSTRUCTIONS...3 3200 TIMER SETTING PROCEDURE...4 3210 TIMER SETTING
More informationFLECK 2850 CONTROL VALVE
FLECK 2850 CONTROL VALVE SERVICE MANUAL waterpurification.pentair.com TABLE OF CONTENTS JOB SPECIFICATION SHEET...2 INSTALLATION...3 START-UP INSTRUCTIONS...3 3200 TIMER SETTING PROCEDURE...4 3210 TIMER
More informationPre-Treatment Control Valve (Fleck 2850s) & Timer (Fleck SXT)
Operation Manual Pre-Treatment Control Valve (Fleck 2850s) & Timer (Fleck SXT) 1020 Industrial Drive, Orlinda, TN 37141 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1
More informationFLECK 2750 DOWNFLOW SERVICE MANUAL.
FLECK 2750 DOWNFLOW SERVICE MANUAL www.pentairaqua.com TABLE OF CONTENTS JOB SPECIFICATION SHEET...2 INSTALLATION...3 START-UP INSTRUCTIONS...3 3200 TIMER SETTING PROCEDURE...4 3210 TIMER SETTING PROCEDURE...4
More informationBNT 85 /185 Valve Operation Manual
BNT 85 /185 Valve Operation Manual Note: 1. Read all instructions carefully before operation. 2. Avoid pinched o-rings during installation by applying (provided with install kit) NSF certified lubricant
More informationModel 7000XTR. Service Manual. IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference
Model 7000XTR Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents Job Specification Sheet 3 Water Softener Control Valve 4 Valve Installation and Start-Up
More informationPre-Treatment Control Valve (Fleck 3150) & Timer (Fleck SXT)
Operation Manual Pre-Treatment Control Valve (Fleck 3150) & Timer (Fleck SXT) 1020 Industrial Drive, Orlinda, TN 37141 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL
More informationModel Service Manual. IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference
Model 1500 Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents Job Specification Sheet... 3 Installation Instructions... 4 Start-Up Instructions...
More informationModel 2750 Downflow. Service Manual. IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference
Model 2750 Downflow Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents Job Specification Sheet... 3 Installation Instructions... 4 Start-Up Instructions...
More informationModel 2750 Downflow. Service Manual. IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference
Model 2750 Downflow Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents Job Specification Sheet... 3 Installation Instructions... 4 Start-Up Instructions...
More informationProFloSE. Downflow Brining Service Manual. IMPORTANT: Fill in pertinent information on page 2 for future reference.
ProFloSE Downflow Brining Service Manual IMPORTANT: Fill in pertinent information on page 2 for future reference. Job Specification Sheet Job Number Model Number Water Test Capacity Of Unit Max. Per Regeneration
More informationIWT 565 Series Valve Operation Manual
IWT 565 Series Valve Operation Manual Note: 1. Read all instructions carefully before operation. 2. Avoid pinched o-rings during installation by applying (provided with install kit) NSF certified lubricant
More informationOwners Manual Installation Instructions. For Models PTCF PTCF PTCF
Owners Manual Installation Instructions For Models PTCF-5600-09 PTCF-5600-10 PTCF-5600-13 Table of Contents Page 2 Subject Page PURE TECH 2000 Diagram 4 Job Specification Sheet 5 System Overview 6 Pre
More informationFLECK 2900S SERVICE MANUAL. waterpurification.pentair.com
FLECK 2900S SERVICE MANUAL waterpurification.pentair.com TABLE OF CONTENTS JOB SPECIFICATION SHEET 2 INSTALLATION 3 START-UP INSTRUCTIONS 3 3200 TIMER SETTING PROCEDURE 4 3210 & 3220 TIMER SETTING PROCEDURE
More informationFLECK 5600 SERVICE MANUAL. waterpurification.pentair.com
FLECK 5600 SERVICE MANUAL waterpurification.pentair.com TABLE OF CONTENTS JOB SPECIFICATION SHEET...2 INSTALLATION...3 START-UP INSTRUCTIONS...4 MODEL 5600 INSTALLATION AND START-UP PROCEDURES...4 MODEL
More informationSignature Series. Duplex Softener Service Manual
Signature Series Duplex Softener Service Manual Control Start-Up Procedures System Overview Softener Slave Unit #2 (Forward Flow) Shuttle Valve Master Softener Slave Unit #1 (Reverse Flow) Connection to
More informationFLECK 2510 SERVICE MANUAL. waterpurification.pentair.com
FLECK 2510 SERVICE MANUAL waterpurification.pentair.com TABLE OF CONTENTS JOB SPECIFICATION SHEET...2 INSTALLATION...3 START-UP INSTRUCTIONS...3 3200 TIMER SETTING PROCEDURE...4 3210 TIMER SETTING PROCEDURE...4
More information6700XTR Upflow. Service Manual. IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference
6700XTR Upflow Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents Job Specification
More informationTrouble Shooting Guide for WS1 - WS2 Control Valves
Trouble Shooting Guide for WS1 - WS2 Control Valves Page 2 Trouble Shooting Guide for WS1 - WS2 Control Valves 1. No Display on Troubleshooting TC control valves do not have meters so shaded ares are not
More informationModel Service Manual. IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference
Model 2850 Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents Job Specification Sheet... 3 Installation Instructions... 4 Start-Up Instructions...
More informationor OWNER S MANUAL MODEL R
www.superiorwaterandair.com 801-974-9090 or 800-974-7638 OWNER S MANUAL MODEL 48-1000R Table of Contents Introduction...Page 1 Flow Diagrams...Page 3 The Electro-mechanical Timer Programming...Page 4 Extra
More informationDETAILED EQUIPMENT SPECIFICATION MR SERIES WATER SOFTENERS
5356 Hillside Avenue Indianapolis, IN 46220 P: +1 888-56-Water (569-2837) F: +1 317-255-4727 info@nancrede.com www.nancrede.com DETAILED EQUIPMENT SPECIFICATION MR SERIES WATER SOFTENERS 1.0 SCOPE 1.1
More informationFleck 2510 Manual Sediment Filter Installation & Start-Up Guide
Clean Water Made Easy www.cleanwaterstore.com Fleck 2510 Manual Sediment Filter Installation & Start-Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine
More informationDETAILED EQUIPMENT SPECIFICATION MDAS SERIES DEALKALIZERS
5356 Hillside Avenue Indianapolis, IN 46220 P: +1 888-56-Water (569-2837) F: +1 317-255-4727 info@nancrede.com www.nancrede.com DETAILED EQUIPMENT SPECIFICATION MDAS SERIES DEALKALIZERS 1.0 SCOPE 1.1 Provide
More informationDETAILED EQUIPMENT SPECIFICATION MHC SERIES WATER SOFTENERS
2227 South Street P.O. Box 044170 Racine, Wisconsin 53404-7003 Phone: 262-681-1300 Fax: 262-681-1318 www.marlo-inc.com DETAILED EQUIPMENT SPECIFICATION MHC SERIES WATER SOFTENERS 1.0 SCOPE 1.1 Provide
More informationWATER SOFTENER SERIES DAY TIMER INSTALLATION & OPERATING INSTRUCTIONS. Serial No :
WATER SOFTENER SERIES 500 12 DAY TIMER INSTALLATION & OPERATING INSTRUCTIONS Model : Serial No : AS0922-E.. Manufacturer and Supplier of FILTRATION & WATER TREATMENT PRODUCTS for commercial, industrial
More informationWATER SOFTENER SEMI AUTOMATIC INSTALLATION & OPERATING INSTRUCTIONS. Serial No :
WATER SOFTENER SEMI AUTOMATIC INSTALLATION & OPERATING INSTRUCTIONS Model : Serial No : SAS0922.. Manufacturer and Supplier of FILTRATION & WATER TREATMENT PRODUCTS for commercial, industrial and residential
More informationTNT SERIES WATER CONDITIONERS
TNT SERIES WATER CONDITIONERS For Commercial & Industrial Applications Apartment Buildings Boiler Water Treatment Car Washes Commercial Buildings Condominiums Factories Hospitals Laundries Mobile Home
More informationFLECK 5800 LXT DOWNFLOW/UPFLOW SERVICE MANUAL
FLECK 5800 LXT DOWNFLOW/UPFLOW SERVICE MANUAL 2013 Pentair Residential Filtration, LLC www.pentairaqua.com/pro TABLE OF CONTENTS JOB SPECIFICATION SHEET... 2 INSTALLATION... 3 START-UP INSTRUCTIONS...
More informationRayne Guardian Water Conditioner This manual contains information on setting the controller and normal operating maintenance required by the owner
R Water Conditioning Rayne Guardian Water Conditioner This manual contains information on setting the controller and normal operating maintenance required by the owner Model RG1250 Owner s Manual R4043
More informationAquaMatic Series. A100 and A200 Stager Controls
AquaMatic Series A100 and A200 Stager Controls 2 Table of Contents Introduction To AquaMatic Series A100 and A200 Stager Controls3 Specifications 4 Applications 5 Features 6 Cycle Time Programming 7 Setting
More informationFLECK 2815 WATER SOFTENER OR FILTER CONTROL VALVE SERVICE MANUAL
FLECK 2815 WATER SOFTENER OR FILTER CONTROL VALVE SERVICE MANUAL waterpurification.pentair.com TABLE OF CONTENTS JOB SPECIFICATION SHEET... 2 OPERATING PARAMETERS... 3 INSTALLATION... 4 START-UP INSTRUCTIONS
More informationTech Manual Powerline Filter (PF) Series
Tech Manual Powerline Filter (PF) Series Models: PF 2162 PF 2465 PF 3072 PF 3672 PF 4272 PF 4872 Page - 1 TABLE OF CONTENTS 1.0 General Information About this Manual...3 Filtration Technology...5 The Powerline
More informationFLECK 5800 LXT DOWNFLOW/UPFLOW SERVICE MANUAL
FLECK 5800 LXT DOWNFLOW/UPFLOW SERVICE MANUAL waterpurification.pentair.com TABLE OF CONTENTS JOB SPECIFICATION SHEET... 2 INSTALLATION... 3 START-UP INSTRUCTIONS... 4 CONTROL FEATURES... 4 CONTROL OPERATION...
More informationDCS7 Water Softener - Product Manual
pg. 0 Set Up Instructions for DCS7 Water Softener Inspect the packaging of the equipment to confirm that nothing was damaged during shipping. (Figure 1) Remove the resin tank(s) and valve(s) from the packaging.
More informationValue Super Filter Max Installation Manual
Value Super Filter Max Installation Manual Barrie, Ontario, Canada, L4N 4Y8 www.excaliburwater.com EXCALIBUR VALUE SUPER FILTER MAX INSTALLATION MANUAL INSTALLATION PROCEDURES: The Value Super Filter Max
More informationChemical Free Iron Sulphur Filtration System Owner's Operation and Maintenance Manual
Aerobica PDAF-1 054 Chemical Free Iron Sulphur Filtration System Owner's Operation and Maintenance Manual Water Quality Control Systems Limited, 605 Denison Street, Markham, Ontario Tel: 905-944-9465,
More informationModel 5600SXT Upflow. Service Manual. IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference
Model 5600SXT Upflow Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents Job Specification Sheet... 3 Installation Instructions... 4 Start-Up Instructions...
More informationWS2H/ WS3 Error Codes
WS2H & WS3 Troubleshooting Page 1 WS2H/ WS3 Error Codes Possible Errors Code Description 1001 No Encoder Pulses 1002 Unexpected Stall, Main Drive 1003 Run Time To Long, Main Drive 14001 Message Queue Full
More informationFleck 5600SXT Upflow. Service Manual TABLE OF CONTENTS JOB SPECIFICATION SHEET
Fleck 5600SXT Upflow Service Manual TABLE OF CONTENTS JOB SPECIFICATION SHEET...1 INSTALLATION...2 START-UP INSTRUCTIONS...2 TIMER FEATURES...3 TIMER OPERATION...4 MASTER PROGRAMMING MODE CHART...5 MASTER
More informationCommercial Softeners
Commercial Softeners Product Index Page General System Specifications 35 Fleck Commercial Valve Configurations 36 Fleck 9500 1-1/" Systems 37 Fleck 850 1-1/" Systems 38 Fleck 3150 " Systems 39 Fleck 900
More informationSuperior Water And Air
Superior Water And Air 80-974-9090 800-974-7638 OWNERS MANUAL Model 32-CL990 & 48-CL990 General Information Congratulations on having purchased a quality and well built Superior Water Softener. On a normal
More informationTechnical Manual. Models: Standard Softeners High Efficiency Softeners Combination Softeners S150 S250 S250 OD S350 S550 S650 S650 OD Q850 Q850 OD
Technical Manual Models: Standard Softeners High Efficiency Softeners Combination Softeners S150 S250 S250 OD S350 S550 S650 S650 OD Q850 Q850 OD TABLE OF CONTENTS About this Manual... 5 Series Overview...
More informationOrganic Scavengers Fleck Model 2850 SXT Series Operation and Service Manual
Organic Scavengers Fleck Model 2850 SXT Series Operation and Service Manual www.ameriwater.com 800-535-5585 AmeriWater 3345 Stop 8 Rd. Dayton, OH 45414 PN: 98-0132B Table of Contents Page 1.0 INTRODUCTION
More informationSuperior Water And Air OWNER S MANUAL Model 32-CL770 & 48-CL770
Superior Water And Air 80-974-9090 800-974-7638 OWNER S MANUAL Model 32-CL770 & 48-CL770 GENERAL INFORMATION Congratulations on having purchased a quality and well built Superior Water Softener. On a normal
More informationModel 5600SXT Downflow
Model 5600SXT Downflow Service Manual Distributed By: IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference 2325 Cousteau Ct. Vista, CA 92081 (760) 727-3711 (760) 727-4427 www.appliedmembranes.com
More informationIron Blaster System Owner s Manual
Iron Blaster System Owner s Manual CANADIAN ADDRESS 92 Commerce Park Dr. Unit #2 Barrie, ON L4N 8W8 Canada www.waterdepot.com IMPORTANT: Do not make any adjustments to these units, they are factory set.
More informationCAT231.1 PRESSURE GAUGE AND TEST TAP KIT SKID MOUNTING 220V, 50HZ, 1Ø OPERATING CONDITIONS 25 TO 100 PSI 100 F MAX IMUM TEMPERATURE SERIES METER
CAT231.1 STANDARD FEATURES TASK MASTER III - 1 ½ / 2 - FIVE CYCLE 316 STAINLESS STEEL VALVE - SIDE MOUNT SUPER FLOW KIT S ON 2, 3 & 4 SYSTEMS (SERVICE FLOW BYPASS DIAPHRAGM VALVES) ERCt ELECTRONIC TIMER
More informationSILVER COMPOSITE SERIES VALVE Manufactured After June, 2000
RainSoft Division of Aquion Partners, L.P. 2080 E. Lunt Avenue Elk Grove Village, Illinois 60007. Tel: 847.437.9400 www.rainsoft.com ter SILVER COMPOSITE SERIES VALVE Manufactured After June, 2000 Part
More informationMASTER. Water Conditioning Corp. Installation and Operation Manual. MCA Combination Series Residential Units
MASTER Water Conditioning Corp. Installation and Operation Manual MCA Combination Series Residential Units February 2011 Table of Contents Page No. Topic Description 1 Model # and Packaging Packaging Information
More informationCAT231.1 SHUT OFF KIT (SOK) TO PREVENT BYPASS PRESSURE GAUGE AND TEST TAP KIT SKID MOUNTING 220V, 50HZ, 1Ø
CAT231.1 STANDARD TASK MASTER III - 1 ½ VALVE 316 SS - SIDE MOUNT SERVICE FLOW BYPASS DIAPHRAGM VALVES. ERCt ELECTRONIC TIMER 100 PSI EPOXY LINED AND COATED CARBON STEEL MINERAL TANKS ACCUMATIC BRINE SYSTEM.
More informationIRON & MANGANESE REMOVAL FILTER INSTALLATION & OPERATING INSTRUCTIONS. Serial No :
IRON & MANGANESE REMOVAL FILTER INSTALLATION & OPERATING INSTRUCTIONS Model : Serial No : AFIM20-180.. Manufacturer and Supplier of FILTRATION & WATER TREATMENT PRODUCTS for commercial, industrial and
More informationArch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide
Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide 8/28/00 TROUBLESHOOTER S GUIDE PROBLEM CAUSE SOLUTION Insufficient water flow to chlorinator Check water flow through Flow Controller
More informationDrop Feeder Control. Part Number Introduction. Setting the Control. Time Clock operation. Manual Operation
Part Number 28999 Introduction The 28999 Drop Feeder Control is designed to be used with a Chore-Time Drop Feeding System and Chore- Time Flex-Auger System. The control will automatically open the Drop
More informationOrganic Scavenger Fleck Model 7000 SXT Series Operation and Service Manual
Organic Scavenger Fleck Model 7000 SXT Series Operation and Service Manual www.ameriwater.com 800-535-5585 AmeriWater 3345 Stop 8 Rd. Dayton, OH 45414 98-0117B Table of Contents Page 1.0 INTRODUCTION &
More information6600/6700 INDUSTRIAL ELECTRONIC USED ON RESIDENTIAL VALVE L ÉLECTRONIQUE INDUSTRIELLE AU SERVICE
INDUSTRIAL ELECTRONIC USED ON RESIDENTIAL VALVE Adjustable regeneration cycles. Up flow or down flow brining. 6600/6700 Modular conception simplifies the disassembly and the maintenance. Monitored by a
More informationSIMPLEX PREMIUM WATER SOFTENER INSTALLATION AND USER GUIDE
SIMPLEX PREMIUM WATER SOFTENER INSTALLATION AND USER GUIDE 1 TABLE OF CONTENTS 1) Installation... 2 1.1) Pre-installation instructions... 2 1.2) General Installation and Service Warnings... 2 1.3) Site
More informationService Manual SXT Upflow Control Valve for Water Conditioning and Treatment Purposes
Service Manual 6200 SXT Upflow Control Valve for Water Conditioning and Treatment Purposes Table of Contents Job Specificaton Sheet and Valve Specifications...X Installation Instrucitons 6200SXT Upflow...X
More informationWater Specialist EE Control Valve Programming and Cover Drawing Manual
Water Specialist EE Control Valve Programming and Cover Drawing Manual Page 2 EE Man u al EE Man u al Page 3 Table of Contents EE Front Cover and Drive Assembly... 4 Regeneration and Error Screens, Button
More informationLogix Magnum IT and Cv Valves. Installation and Service Manual
Logix Magnum IT and Cv Valves Installation and Service Manual Table Of Contents 1.0 Installation Profile Summary....................................................3 2.0 Introduction to the Logix Magnum
More informationH-125 HE SERIES. Owner s Manual HIGH EFFICIENCY SYSTEM. Manufactured by: HELLENBRAND, INC. Web:
H-125 HE SERIES HIGH EFFICIENCY SYSTEM Owner s Manual p/n 800679 Rev. C Updated 10/02/18 2016-2018 Manufactured by: HELLENBRAND, INC. Web: www.hellenbrand.com Email: info@hellenbrand.com This owner s manual
More informationFLECK 5600SXT DOWNFLOW
FLECK 5600SXT DOWNFLOW SERVICE MANUAL www.pentairaqua.com TABLE OF CONTENTS JOB SPECIFICATION SHEET...2 INSTALLATION...3 START-UP INSTRUCTIONS/FLUSHING & CONDITIONING.4 CONTROL FEATURES...4 TIMER OPERATION...5
More informationModel ProFloSXT Downflow
Model ProFloSXT Downflow Service Manual IMPORTANT: Fill in Pertinent Information on Page 3 for Future Reference Table of Contents IMPORTANT PLEASE READ: The information, specifi cations and illustrations
More informationPRESSURE GAGES AND TEST TAPS
CAT 500.1 FRF series filters. Polyglass 100 psi vessels with top mount Task Master II 1 ½ valve and single point PVC internals. FMF series filters. Carbon steel epoxy lined and coated vessels with side
More informationNUGEN Pure Water Systems Fusion XT. Installation Instructions and Owners Manual
NUGEN Pure Water Systems Installation Instructions and Owners Manual XT-48, XT-60, XT-70, XT-70ER, and XT-90 XT-32C Page 2 Page 3 Table of Contents Your Water Test...3 Pre-Installation Instructions...4
More informationClean and soft water for business needs. Commercial softening equipment. COMMERCIAL WATER SOFTENERS
Clean and soft water for business needs. Commercial softening equipment. COMMERCIAL WATER SOFTENERS Application of Commercial Water Softening Equipment Water hardness is responsible for many maintenance
More informationFLECK MODEL PROFLOSXT DOWNFLOW
FLECK MODEL PROFLOSXT DOWNFLOW SERVICE MANUAL www.pentairaqua.com TABLE OF CONTENTS JOB SPECIFICATION SHEET...3 INSTALLATION INSTRUCTIONS...4 START-UP INSTRUCTIONS...5 TIMER FEATURES...5 TIMER OPERATION...6
More informationInstallation / Operation Manual
Installation / Operation Manual Installation Requirements Pressure Range: 10-150 psi Temperature Range: 40-120 F Max Service Flow Rate: 25gpm NOTE: Position filter on a level surface. Filter must be installed
More informationOwner s Manual. H151 HE - High Efficiency Water Softening System
H151 HE - High Efficiency Water Softening System Owner s Manual Manufactured by: HELLENBRAND, INC. 404 Moravian Valley Road Waunakee, Wisconsin 53597-2509 Web: www.hellenbrand.com Email: info@hellenbrand.com
More informationWater Specialist EI Control Valve Programming and Cover Drawing Manual
Water Specialist EI Control Valve Programming and Cover Drawing Manual Page 2 EI Man u al EI Man u al Page 3 Table of Contents EI Front Cover and Drive Assembly... 4 Regeneration and Error Screens... 5
More informationOwner s Filter Manual. ProMate 6.0 Iron Curtain Junior Filter Manual
ProMate 6.0 Iron Curtain Junior Filter Manual Owner s Filter Manual Manufactured by: Hellenbrand, Inc. 404 Moravian Valley Road Waunakee, Wisconsin 53597 Phone: 608 849-3050 Fax: 608-849-7398 Web: www.hellenbrand.com
More informationCOMMERCIAL UST ADD WATER BULLETIN; ISSUE 1
J UST ADD WATER BULLETIN; ISSUE 1 Welcome to the premiere issue of the Just Add Water bulletin, an Osmonics publication designed to communicate important product and application information regarding our
More informationCATALOG OF REPLACEMENT PARTS
CATALOG OF REPLACEMENT PARTS Water Softeners WS-40 WS-80 WS-55 WS-500 WS-C206 WS-C208 WS-P213 A product of HOBART 701 S. RIDGE AVENUE TROY, OHIO 45374-0001 FORM 43276 (November 2013) F-43276 (November
More informationWater Specialist CI Control Valve Programming and Cover Drawing Manual
Water Specialist CI Control Valve Programming and Cover Drawing Manual Page 2 CI Man u al CI Man u al Page 3 Table of Contents CI Front Cover and Drive Assembly...4 OEM General Instructions...5 OEM Cycle
More informationProblem and Solutions Manual
Problem and Solutions Manual By Caden Bird Table of Contents Table of Contents... iii Introduction... 5 Identifying the Problem... 7 Taking Apart the Valve... 13 Various Problems and Solutions... 23 Putting
More information2) Mark wall at 5 10 for center line of bottom bolt-hole in wall brackets on transition box side of floor.
IN-BAY INSTALLATION 1) Set up transit or level to determine highest point on the floor. From this point establish a level line from which to mark the bracket height on the walls. 2) Mark wall at 5 10 for
More informationWS1TC Series Installation and Operation Manual
WS1TC Series Installation and Operation Manual Table of Contents Installation... 3 Bypass Valve... 4 Start-up Instructions... 6 General Information... 7 User Displays/Settings... 8 Installer Displays/Settings...
More informationTable of Contents. Operational Specifications Agency Approvals Regeneration Cycles Injector & Flow Control Selections...
2200 SOFTENER VALVE The 2200 valve has been certified according to NSF/ANSI 44 by the Water Quality Association for material safety and structural integrity only. Table of Contents Operational Specifications...
More informationETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL
ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL EFFECTIVE JANUARY 10, 2018 Superseding All Previous Parts Lists. The Company reserves the right to make substitution
More information7500 Greensand Filter Installation & Start Up Guide
Clean Water Made Easy www.cleanwaterstore.com 7500 Greensand Filter Installation & Start Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance
More informationINSTALLATION, OPERATING AND SERVICE MANUAL ELECTRONIC WATER SOFTENER TIME CLOCK MODEL FEATURING THE 2002S VALVE
INSTALLATION, OPERATING AND SERVICE MANUAL ELECTRONIC WATER SOFTENER TIME CLOCK MODEL FEATURING THE 00S VALVE 7-LECT-4 7-FESLECT-4 7-LET-4 7-FESLET-4 7-LET-3 7-FESLET-3 7-LET-45 7-FESLET-45 7-LET-60 7-FESLET-60
More informationEngineering Operation & Maintenance. Leak Detector. Advance your process TO REPLACE WIL E-01 WIL E-01
WG Leak Detector Engineering Operation & Maintenance Advance your process WIL-19050-E-02 TO REPLAE WIL-19050-E-01 WIL-19050-E-01 K I P P SENSOR ABLE SPEIFIATIONS The sensor cables utilize high Beryllium
More informationVALVE. Water Treatment Controls ~~~~ SERVICEMANUAL ----
Water Treatment Controls ~~~~ 541-030 VALVE SERVICEMANUAL ---- Assembly: 1. Cut the top of the distributor tube 1/2 inch below the top of the resin tank threads. 2. Chamfer the top of the tube to prepare
More informationSmartChoice. Gen II itwin. Water Conditioning System. Installation, Operation, and Maintenance Manual. Installation, Operation, and Maintenance Manual
SmartChoice TM Gen II itwin Water Conditioning System > > CLOCK REGEN NEXT Installation, Operation, and Installation, Operation, and 7785 East US Hwy 36 Avon, IN 46123 (317) 272-3000 (800) 447-5582 For
More information3200NT Timer Service Manual
Service Manual Valve Serial Number Valve Position 1-LEAd 2-LAg 3-LAg 4-LAg IMPORTANT: Fill in pertinent information on page 3 for future reference. Table of Contents Job Specifications Sheet.....................................................................
More informationGeneral Operation. To set Time of Day. To set Time of Regeneration / Backwash
1 General Operation When the system is operating one of two displays will be shown: time of day or days until the next regeneration. Pressing UP or DOWN will toggle between the two choices. To set Time
More informationINSTALLATION GUIDE STANDARD PRODUCT CODES:
INSTALLATION GUIDE STANDARD PRODUCT CODES: 100, 105, 110, 111, 112, 113, 115, 120, 130, 140, 145, 146, 150, 200, 210, 240, 250, 255, 260, 300, 305, 405, 406, 407, 408, 425, 426, 435, 447, 500, 505, 510,
More information2/17/2017 Timing Belt Service and Repair, Removal and Replacement
http://repair.alldata.com/alldata/article/display.action?componentid=64&itypeid=401&nonstandardid=0&vehicleid=39554&miles=&printfriendly=com 1/22 http://repair.alldata.com/alldata/article/display.action?componentid=64&itypeid=401&nonstandardid=0&vehicleid=39554&miles=&printfriendly=com
More informationADVANCE. Backwashing Filters and Tannin Filter. Installation Instructions & Owner s Manual
ADVANCE Backwashing Filters and Tannin Filter Installation Instructions & Owner s Manual Ta b l e o f Co n t e n t s : Preinstallation Instructions Page 1 Bypass Valve Page 1-2 Installation Page 3-4 Sulfur
More informationModel WS1 Demand. Operation & Maintenance Manual. 114 Vista Parkway Avon, IN New Aqua L.L.C.
Model WS1 Demand Operation & Maintenance Manual 114 Vista Parkway Avon, IN 46123 317-272-6721 2008 New Aqua L.L.C. Page 2 Quick Reference Chart GENERAL OPERATION When the system is operating one of two
More information