Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Similar documents
3/25/15 University DC 1H Devonian Completion

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

Athlon Energy Operating LLC

Elevation Resources LLC

Drilling & Completion Summary

DAILY DRILLING REPORT

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

CNL, CCL, GR, CBL. RDMO

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

Gulftex Energy III LP DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT

MORNING DRILLING REPORT

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

Daily Drilling Summary Report

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

Intervention Barriers

OPERATIONS SUMMARY REPORT

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

ISOLATION/UNIVERSAL TOOLS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

Rotary Snubbing Technology Option for Long Reach

DAILY DRILLING REPORT DATE : 08/01/2012

Composite Plugs. Index

Completion Solutions Inc.

MORNING DRILLING REPORT

Current Depth. Proposed TD. Current Operation

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

Daily Drilling Report

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

High Energy Gas Fracturing Test

Current Depth. Proposed TD. Current Operation

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

COMPREHENSIVE OVERVIEW


LEE NAK GUI TCP SERVICE COORDINATOR APPS

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

FRAC STACKS stingercanada.com

Daily Drilling Report

1042 FNL, 1935 FEL - ECTOR, TX

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Daily Drilling Report


Callon Petroleum Company Drilling Report

19,683 8,

Six Years of Continuous Success With Progressing Cavity Pumps in Boscán Oil Field Keys For Success And Lessons Learned

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

SPE Workshop: European Formation Damage 7-8 June 2017 Sofitel Chain Bridge, Budapest, Hungary

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

An Overview of Horizontal Multi-Stage. Kenneth Stevens, Jim Hill Halliburton

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Orientation Information

Case Histories Gas Lifting Gas Wells

Daily Drilling Report

Coil Tubing Intervention in MultiLateral Wells from a Semi-submersible

DAILY DRILLING REPORT

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil

DAILY DRILLING REPORT

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

API6A Valves products CATALOG

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

PRODUCTION HYDRAULIC PACKER FIELD TEST

Parts online Spare parts list

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

Field Overview. Central West Ecuadorian Basin Discovered in 1994 OOIP: 1,605 MBbls Maximum production rate: 65,200 bopd in year 2007 IPS-12-03

DAILY OPERATIONS REPORT Date:

Plug & Abandonment Light Drilling Workover Well Intervention

Drilling & Completion Summary - Ascending

Electric & Air Conveyor

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

Superintendent Rig Checklist

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

HDD ASSIST OVERCOMING DIFFICULT SITUATIONS

HYDRAULIC WORKOVER SERVICES

GLOBAL DRILLING SOLUTIONS, INC STOCK LIST

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

Flow Control & Pressure Reducing Valve with Hydraulic Control (Sizes 3''- 12"; DN80-DN300)

Daily Activity Report

W E L L S I T E S E R V I C E S

ND Pipeline Authority Web Presentation

NeoProducts, LLC New Orleans, LA USA Ph:

Schede tecniche Corsair 300 PDB

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

Drill Pipe Connection Care and Handling

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8" -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8" 12UNF Each 6

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

HAMMER UNIONS AND SWIVEL JOINTS. Sara Sae

Nonexplosiveoilfield Products Global Sales & Service

DAILY DRILLING REPORT

Transcription:

Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217 1.0 6/10/2015 MIRU Archer WL & run RCBL. TOC = 5365' 2.0 6/19/2015 Safety meeting Tested lines 9000 psi, tested csg 3000 psi a lose of 10 psi in 5 min, 6500 psi 15 min a lose of 70 psi, sleeve opened at 7988 psi, Total load 568 bbls, 96 bbls 15% DINEFE, totals 2% KCl biocide water 472 bbls, Max psi 5472, min psi 4389, avg psi 5400, max rate 15 Bpm, min rate 5.1 Bpm, avg rate 12.1 bpm, ISIP 2650, 5 min 2130, 10 min 2093, 15 min 2073, 20 min 2051, 25 min 2036, 30 min 2025 3.0 7/11/2015 MIRU All Frac 3rd Party Vendors 4.0 7/12/2015 Safety Meeting / Test iron. Start toe stage frac - shut down for leak on acid tank. Stg 1 ) Stim with 2500 gal 15% HCl acid. 4587 Bbls FR SW, 25,380 lbs100 Mesh, 49,871 lbs 40/70 White. AIR/AIP= 92/6397 ISIP= 2470 psi. FG=0.71 5.0 7/13/2015 Safety Meeting Finish POH w/stg 2 gun assembly - plug gone, but guns did not fire. WL c/o CCL & meg WL to assess problematic issues. WL c/o shooting panel. Change out vent sub and grease head due to leaks. Stg 2) RIH w/ WL (Plug set on previous run, but guns not fired). Perfs 17,159' - 17,344' / PD= 528 bbls @ 16 bpm @ 5200 psi. Stim with 2,500 gal 15% HCl acid. 10,646 Bbls FR SW, 90,003 lbs100 Mesh 219,771 lbs 30/50 White. AIR/AIP= 95/6,711 ISIP= 2,714 psi. FG=0.74 Stg 3) RIH w/ WL & set plug @ 17,129' Perfs 17,100-16,915 PD= 525 bbls @ x16 bpm @ 4,100 psi. Stim with 2,500 gal 15% HCl acid. 10,612 Bbls FR SW, 90,760 lbs100 Mesh 220,780 lbs 30/50 White. AIR/AIP= 93/7,249 ISIP= 2,138 psi. FG=0.67. Stg 4) RIH w/ WL & set plug @ 16,885' Perfs 16,856' - 16,671' PD= 510 bbls @ 16 bpm @ 3,700 psi. Page 1/7

6.0 7/14/2015 Safety Meeting Stg 4) Stim with 2500 gal 10% HCl acid. 10,668 Bbls FR SW, 90,040 lbs100 Mesh; 220,674 lbs 30/50 White. AIR/AIP= 95 / 6908 ISIP= 2939 psi. FG= 0.76 Stg 5) RIH w/ WL & set plug @ 16,639'. Perfs 16,427' - 16,612' / PD= 429 bbls @ 18 bpm @ 5200 psi. Stim with 2,500 gal 15% HCl acid. 12,734 Bbls FR SW, 90,066 lbs100 Mesh & 220,552 lbs 30/50 White. AIR/AIP= 95 / 6733 - ISIP= 2889 psi. FG=0.75 Stg 6) RIH w/wl & set plug @ 16,397'. Perfs 16,183' - 16,368' / PD= 412 bbls @ 18 bpm @ 4500 psi. Stim with 2,520 gal 15% HCl acid. 10,373 Bbls FR SW, 89,956 lbs100 Mesh 203,233 llbs 30/50 White. AIR/AIP= 95 / 6,950 - ISIP=2,690 psi. FG=0.73 Stg 7) RIH w/wl & set plug @ 16,160'. Perfs 16,122-15,940' / PD= 471 bbls @ 16 bpm @ 5,600 psi. At report Time Pumping Stage #7 Pit Level 15'-5" SL/DE/JS/FC 7.0 7/15/2015 Safety Meeting Stg 7) Stim with 2500 gal 15% HCl acid. 10,667 Bbls FR SW, 90,001 lbs100 Mesh; 220,761 lbs 30/50 White. AIR/AIP= 92 / 6916 ISIP= 3084 psi. FG= 0.78 Stg 8) RIH w/ WL & set plug @ 15,909'. Perfs 15,695' - 15,880' / PD= 401 bbls @ 18 bpm @ 5100 psi. Stim with 2,500 gal 15% HCl acid. 9730 Bbls FR SW, 90,000 lbs 100 Mesh & 120,606 lbs 30/50 White. AIR/AIP=95 / 6865 - ISIP= 2929 psi. FG=0.76 - cut job short to avoid screening out - placed 68% prop in formation. Stg 9) RIH w/ WL & set plug @ 15,662'. Perfs 15,451' - 15,636' / PD= 384 bbls @ 18 bpm @ 5500 psi. Stim with 2,500 gal 15% HCl acid. 10,651 Bbls FR SW, 90,002 lbs100 Mesh & 220,681 lbs 30/50 White. AIR/AIP=94 / 6,626 - ISIP= 3,015 psi. FG=0.77 Stg 10) RIH w/ WL & set plug @ 15,241'. Perfs 15,390' - 15,207'' / PD= 417 bbls @ 16 bpm @ 5,000 psi. Stim with 2,500 gal 15% HCl acid. 10,591 Bbls FR SW, 90,000 lbs100 Mesh & 220,404 lbs 30/50 White. AIR/AIP=92 / 7,076 - ISIP= 3078 psi. FG=0.78 Stg 11 ) RIH w/ WL & set plug @ 15,177'. Perfs 14,963' - 15,146 PD= 405 bbls @ 16 bpm @ 5000 psi. Pit Level 14' 75" DE/JS/FC/SL Page 2/7

8.0 7/16/2015 Safety Meeting Finish POH w/stg 11 Guns - LD guns - ASF. Stg 11) Stim with 2,500 gal 15% HCl acid. 10,653 Bbls FR SW, 90,234 lbs100 Mesh & 221,199 lbs 30/50 White. AIR/AIP=90 / 6341 - ISIP= 3044 psi. FG=0.77 Stg 12 ) RIH w/ WL & set plug @ 14,930'. Perfs 14,721' - 14,904' / PD= 336 bbls @ 16 bpm @ 4800 psi. Stim with 2,500 gal 15% HCl acid. 10,845 Bbls FR SW, 89,380 lbs100 Mesh & 214,028 lbs 30/50 White. AIR/AIP= 91 / 6432 ISIP=3163 psi. FG=0.78 / 98% proppant placed - flushed due to pressure spikes. Stg 13 ) RIH w/ WL & set plug @ 14,689'. Perfs 14,658' - 14,472' / PD= 377 bbls @ 16 bpm @ 4,800 psi. Stim with 2,500 gal 15% HCl acid. 10,451 Bbls FR SW, 90,003 lbs100 Mesh & 220,767 lbs 30/50 White. AIR/AIP= 91 / 6,490 psii ISIP=2,950 psi. FG=0.76. Stg 14 ) RIH w/ WL & set plug @ 14,445'. Perfs 14,414' - 14,231' / PD= 392 bbls @ 16 bpm @ 4,200 psi. At Report Time - Pumping Stage #14 Pit Level - 14' SL/FC/DE/JS 9.0 7/17/2015 Safety Meeting 14 ) Stim with 2,500 gal 15% HCl acid. 10,678 Bbls FR SW, 90,990 lbs100 Mesh & 221,608 lbs 30/50 White. AIR/AIP= 93 / 6,228 psii ISIP=3515 psi. FG=0.82. 15 ) RIH w/wl & plug - misfire - POH & LD tools - pin in connector to firing head had broken causing failure. - 2nd Attempt - RIH w/ WL & set plug @ 14,201'. Perfs13,987' - 14,172' / PD= 689 bbls @ 18 bpm @ 5100 psi. Stim with 2,520 gal 15% HCl acid. 10,677 Bbls FR SW, 90,560 lbs100 Mesh & 220,677 lbs 30/50 White. AIR/AIP= 95 / 6,344 psii ISIP=2,950 psi. FG=0.76. 16 ) RIH w/wl & set plug @ 13,957'. Perfs13,926' - 13,743' / PD= 361 bbls @ 16 bpm @ 4,200 psi. At Report Time - Pumping Stage #16 Pit Level -- 13' 75" SL/FC/DE/JS 10.0 7/18/2015 Stg 16) Stim with 2,500 gal 15% HCl acid. 10,143 Bbls FR SW, 89,514 lbs 100 Mesh & 198,495 lbs 30/50 White. AIR/AIP=93 / 6400 - ISIP 2834 psi. FG 0.75 / Placed 93% prop in perfs - cut short due to pressure spikes. Stg 17) RIH w/ WL & set plug @ 13,713'. Perfs 13,499' - 13,684' / PD= 264 bbls @ 18 bpm @ 5200 psi. Stim with 2,500 gal 15% HCl acid. 10,491 Bbls FR SW, 90,020 lbs 100 Mesh & 194,632 lbs 30/50 White. AIR/AIP 91/6011 - ISIP - 2693 psi. FG=0.73 - Placed 92% prop in perfs - cut short due to pressure spikes - would not roll over - went to flush. Stg 18) RIH w/ WL & set plug @ 13,460'. Perfs 13,348' - 13,255' / PD= 291 bbls @ 16 bpm @ 4,700 psi. Stim with 2,500 gal 15% HCl acid. 10,466 Bbls FR SW, 90,477 lbs 100 Mesh & 210,445 lbs 30/50 White. AIR/AIP=93 /6,230 - ISIP - 2,342 psi. FG=0.69. Stg 19) RIH w/ WL & set plug @ 13,225'. Perfs 13,190' - 13,016' / PD= 267 bbls @ 16 bpm @ 3,800 psi. Pit Level - 13' At Report Time - Stage #19 Frac Page 3/7

11.0 7/19/2015 Safety Meeting SD for pump repair. Stg 19) Stim with 2,500 gal 15% HCl acid. 11,050 Bbls FR SW, 89,555 lbs 100 Mesh & 220,899 lbs 30/50 White. AIR/AIP=91/5853 - ISIP - 2553 psi. FG=0.72. Stg 20) RIH w/ WL & set plug @ 12,981'. Perfs 12,767' - 12,952' / PD= 328 bbls @ 18 bpm @ 4800 psi.stim with 2,500 gal 15% HCl acid. 10,530 Bbls FR SW, 90,093 lbs 100 Mesh & 219,980 lbs 30/50 White. AIR/AIP= 96/6,147 - ISIP - 2,651 psi. FG=0.73. Stg 21) RIH w/ WL & set plug @ 12,737'. Perfs 12,706' - 12,520' / PD= 246 bbls @ 16 bpm @ 3,700 psi.stim with 2,500 gal 15% HCl acid. 10,506 Bbls FR SW, 90,000 lbs 100 Mesh 220,483 lbs 30/50 White. AIR/AIP= 96/6,183 - ISIP -2,447 psi. FG=0.71. Stg 22) RIH w/ WL & set plug @ 12,493'. Perfs 12,464' - 12,279' / PD= 218 bbls @ 16 bpm @ 3,800 psi. Pit Level - 12.5' At Report Time - Stage #22 Frac 12.0 7/20/2015 Safety Meeting Stg 22) Stim with 2,500 gal 15% HCl acid. 10,506 Bbls FR SW, 90,060 lbs 100 Mesh & 221,860 lbs 30/50 White. AIR/AIP=91/5954 - ISIP - 2564 psi. FG=0.72. Stg 23) RIH w/ WL & set plug @ 12,245'. Perfs 12,035' - 12,220' / PD= 249 bbls @ 18 bpm @ 4500 psi.stim with 2,500 gal 15% HCl acid. 10,571 Bbls FR SW, 89,802 lbs 100 Mesh & 218,988 lbs 30/50 White. AIR/AIP= 91/6064 - ISIP - 2793 psi. FG=0.74. Stg 24) RIH w/ WL & set plug @ 12,005'. Perfs 11,788' - 11,976' / PD= 240 bbls @ 18 bpm @ 4100 psi. Stim with 2,520 gal 15% HCl acid. 10,489 Bbls FR SW, 90,091 lbs 100 Mesh & 220,467 lbs 30/50 White. AIR/AIP= 97/6,198 - ISIP - 2,351 psi. FG=0.70. Stg 25) RIH w/ WL & set plug @ 11,761'. Perfs 11,732' - 11,547' / PD= 176 bbls @ 16 bpm @ 3,600 psi.stim with 2,520 gal 15% HCl acid. 10,458 Bbls FR SW, 91,027 lbs 100 Mesh & 219,200 lbs 30/50 White. AIR/AIP= 95/6,171 - ISIP - 2,370 psi. FG=0.70. Stg 26) RIH w/ WL & set plug @ 11,517'. Perfs 11,488' - 11,303' / PD= 144 bbls @ 16 bpm @ 3,300 psi. Pit Level - 11.5' At Report Time - Stage #26 Frac Page 4/7

13.0 7/21/2015 Safety meeting Stg 26 ) Stim with 2500 gal 15% HCl acid. 10,424 Bbls FR SW, 90,024 lbs100 Mesh 220,506 lbs 30/50 White. AIR/AIP= 92/5408 ISIP= 2443 psi. FG= 0.71 Stg 27) RIH w/ WL & set plug @ 11,282 Perfs 11,059-11,244 PD= 168 bbls @ 18 bpm @ 3800 psi. Stim with 2500 gal 10% HCl acid. 10,523 Bbls FR SW, 88,000 lbs100 Mesh 220,605 lbs 30/50 White. AIR/AIP= 94/5618 ISIP= 2467 psi. FG=0.71 Stg 28) RIH w/ WL & set plug @ 11,029 Perfs 10,815-11,000 PD= 184 bbls @ 18 bpm @ 3900 psi.stim with 2,500 gal 15% HCl acid. 10,401 Bbls FR SW, 90,540 lbs100 Mesh 220,732 lbs 30/50 White. AIR/AIP= 96/5,834 ISIP= 2,297 psi. FG=0.69 Stg 29) RIH w/ WL & set plug @ 10,785' Perfs 10,754' - 10,751 PD= 99 bbls @ 16 bpm @ 4,100 psi. Stim with 2,520 gal 15% HCl acid. 10,299 Bbls FR SW, 90,063 lbs100 Mesh 220,108 lbs 30/50 White. AIR/AIP= 96/5,850, ISIP= 2,363 psi. FG=0.70 Stg 30) RIH w/ WL & set plug @ 10,541' Perfs 10,329' - 10,510' PD= 84 bbls @ 16 bpm @ 3,400 psi. Pit Level - 9.75'' At Report Time - Stage #30 Frac 14.0 7/22/2015 Stg 30) Stim with 2,500 gal 15% HCl acid. 10326 Bbls FR SW, 89761 lbs 100 Mesh & 219858 lbs 30/50 White. AIR/AIP= 93/5549 - ISIP - 2307 psi. FG=0.69 Stg 31) RIH w/ WL & set plug @ 10297'. Perfs 10083' - 10268' / PD= 93 bbls @ 18 bpm @ 3300 psi.stim with 2,500 gal 15% HCl acid. 10417 Bbls FR SW, 89973 lbs 100 Mesh & 219662 lbs 30/50 White. AIR/AIP= 93/5437 - ISIP - 1785 psi. FG=0.63 Stg 32 of 32) RIH w/ WL & set plug @ 10046'. Perfs 9839' - 10024' / PD= 105 bbls @ 18 bpm @ 3200 psi.stim with 2,500 gal 15% HCl acid. 10,350 Bbls FR SW, 90,500 lbs 100 Mesh & 223,062 lbs 30/50 White. AIR/AIP= 98/5,481 - ISIP - 2,534 psi. FG= 0.72 RIH w/ WL & set Schlumberger 10 k Composite Bridge Plug @ 9,400' POOH w/setting tool, PSI test to 6,000 psi, held for 5 minutes, then perform negative test. Ok. Shut all wellhead valves. Pit Level is 8.5' Total Fluid to Recover: ACID: 1,920 BBL SLICKWATER: 323,493 BBL PUMPDOWN: 9,786 BBL TOTAL TO RECOVER: 355,199 BBL Page 5/7

15.0 7/23/2015 Rig ProPetro & all associated equipment down. Release all rentals. Total Fluid to Recover: ACID: 1,920 BBL SLICKWATER: 323,493 BBL PUMPDOWN: 9,786 BBL TOTAL TO RECOVER: 355,199 BBL 16.0 8/4/2015 HSM MIRU PU, Function test bop good, PU BHA 4-1/2 JZ bit,bit sub w/bpv, 1 jt bpv, SD for storms to past. Cont to RIH with 2-3/8" P110 PH6 tbg. BH//RW 17.0 8/5/2015 HSM Cont to RIH, Switch over 2-7/8 tbg X-Over 1jt R-Nipple cont in hole. Press test stack.do plug 1 FCP 520 PMP 2500 TQ 800 3 bpm in 3 out, Circ well DO plug 2 FCP 510 PMP 2100 TQ 1300 3 bpm in 3 out,do plug 3 FCP 510 PMP 2100 TQ 1300 3 bpm in 3 out,do plug 4 FCP 480 PMP 2200 TQ 1300 3 bpm in 3 out,tag plug 5 DO plug 5 FCP 500 PMP 2200 TQ 1300 3 bpm in 3 out,do plug 6 FCP 420 PMP 2200 TQ 1300 3 bpm in 3 out,do plug 7 FCP 400 PMP 2500 TQ 1300 3.25 bpm in 3 out,tag plug 8 DO plug 8 FCP 420 PMP 2500 TQ 2000 3.25 bpm in 3 out,do plug 9 FCP 420 PMP 2500 TQ 2400 3.25 bpm in 3 out,do plug 10 FCP 430 PMP 2500 TQ 2500 3.25 bpm in 3 out, Tag plug 11 DO plug 11 FCP 500 PMP 2550 TQ 2400 3.25 bpm in 3 out,do plug 12 FCP 440 PMP 2500 TQ 2600 3.25 bpm in 3 out,do plug 13 FCP 400 PMP 2600 TQ 2600 3.25 bpm in 3 out, Tag plug 14 DO plug 14 FCP 450 PMP 2600 TQ 2700 3.25 bpm in 3 out,do plug 15 FCP 400 PMP 2600 TQ 2500 3.25 bpm in 3 out,do plug 16 FCP 385 PMP 2700 TQ 2700 3.25 bpm in 3 out, Tag plug 17 Circ sweep0s BH/RW Page 6/7

18.0 8/6/2015 HSM Cont circ sweep up,do plug 17 FCP 450 PMP 2700 TQ 3000 3.25 bpm in 3 out,do plug 18 FCP430 PMP 2700 TQ 3000 3.25 bpm in 3 out,do plug 19 FCP 400 PMP 2500 TQ 3000 3.25 bpm in 3 out,tag 20 DO plug 20 FCP 430PMP 2500 TQ 2700 3.25 bpm in 3 out,do plug 21 FCP 430 PMP 2500 TQ 3020 3.25 bpm in 3 out,do plug 22 FCP 460 PMP 2500 TQ 3000 3.25 bpm in 3 out,tag 23 Circ sweep DO plug 23 FCP 460 PMP 2500 TQ 3000 3.25 bpm in 3 out,do plug 24 FCP 400 PMP 2500 TQ 3000 3.25 bpm in 3 out,do plug 25 FCP 400 PMP 2500 TQ 3000 3.25 bpm in 3 out,tag 26 Circ sweep DO plug 26 FCP 400 PMP 2650 TQ 3000 3.25 bpm in 3 out,do plug 27 FCP 385 PMP 2650 TQ 3000 3.25 bpm in 3 out,do plug 28 FCP 385 PMP 2650 TQ 3000 3.25 bpm in 3 out,tag 29 DO plug 29 FCP 400 PMP 2700 TQ 3200 3.25 bpm in 3 out,do plug 30 FCP 400 PMP 2700 TQ 3000 3.25 bpm in 3 out, Circ sweep BH/RW 19.0 8/7/2015 HSM, Circ 2 btms up, Rack swivel bk, Pipe loose cont to circ well. POOH & LD tbg to 9550 ft, RU swivel, pump sweep & circ bottoms up, RD swivel, SICP 440 psi Cont to POOH & LD tbg, 75 jts in hole, Secure Well RD rig floor & prepare to RU SU in daylight hours BH/RW Total loss of drill out fluid 953 bbls 20.0 8/8/2015 Waiting on snubbing unit MIRU Great White snubbing. Snub out of hole. Rig down WO unit & rig up flow back 9 Hrs test: (Flow) 23/64 ck. 0 BO + 342 BW + 0 MCF. TP - 0 psi. LP - psi. CP - 460 psi. Daily Load Rec - 342 Bbls. Cum Load Rec - 342 Bbls ( 0% ). [ BUL - 355451 ]. 21.0 8/9/2015 24 Hrs test: (Flow) 40/64 ck. 0 BO + 2193 BW + 0 MCF. TP - 0 psi. LP - psi. CP - 320 psi. Daily Load Rec - 2193 Bbls. Cum Load Rec - 2535 Bbls ( 1% ). [ BUL - 353258 ]. 22.0 8/10/2015 24 Hrs test: (Flow) 46/64 ck. 369 BO + 1930 BW + 0 MCF. TP - 0 psi. LP - psi. CP - 180 psi. Daily Load Rec - 1930 Bbls. Cum Load Rec - 4465 Bbls ( 1% ). [ BUL - 351328 ]. 23.0 8/11/2015 24 Hrs test: (Flow) 46/64 ck. 493 BO + 1593 BW + 0 MCF. TP - 0 psi. LP - psi. CP - 150 psi. Daily Load Rec - 1593 Bbls. Cum Load Rec - 6058 Bbls ( 2% ). [ BUL - 349735 ]. 24.0 8/12/2015 24 Hrs test: (Flow) 48/64 ck. 315 BO + 1356 BW + 0 MCF. TP - 0 psi. LP - psi. CP - 140 psi. Daily Load Rec - 1356 Bbls. Cum Load Rec - 7414 Bbls ( 2% ). [ BUL - 348379 ]. 25.0 8/13/2015 24 Hrs test: (Flow) 48/64 ck. 338 BO + 1557 BW + 0 MCF. TP - 0 psi. LP - psi. CP - 80 psi. Daily Load Rec - 1557 Bbls. Cum Load Rec - 8971 Bbls ( 3% ). [ BUL - 346822 ]. 26.0 8/14/2015 Key WSU #6060 / Javier HSM & JSA, check pressure, bleed off well. MIRU Kill trk pmp 100 bbw w/ biocide to kill well. ND Frac valve, NU flange, NU Annular. MIRU PU, RU tbg equip, set catwalk, pipe racks. Unload 239 jts 2 7/8 6.5 # L-80 tbg, remove thread protectors, tally tbg. PU 12-2 7/8 6.5 # L-80 mud jts w/ 2 7/8 BP, Desander, ESP. RU spooler, PU 10 jts 2 7/8 6.5 # L-80 tbg. Secure well, clean loc. SDFN CMIC Ricky Harris Page 7/7