Transmission Projects PG&E SCE 1. Cottle 230 kv Ring Bus Project 2. Carrizo Plain Solar Generation 3. Calpine Russell City Energy Center (Eastshore - San Mateo & Dumbarton-Newark) 4. Bridgeville Bk. #2 Replacement to 60 kv 5. Eastshore Sub- Convert 230kV to BAAH and replace 230/115kV Bank #2 6. Oakland X 115kV Sub- Replace XFMRs 3 & 4 7. (G-Int) Sun Power - California Valley Solar Ranch Generation Interconnection Project (Caliente Switching Station) 8. Gold Hill - Horseshoe 115 kv Line Reconductor 1. Whirlwind - connect to Manzana 300MWs of wind power 2. Mohave 500kV Substation Reconfiguration Phase 4: disconnect Nevada 69kV TB tie & Aux Bank. 3. Lugo 220kV Sub reconfiguration 4. Barre-Del Amo and Barre-Ellis No. 2 220 kv Lines (Del Amo-Ellis loop-in project) 5. Devers - CPV Sentinel modifications phase 3 6. Devers - CPV Sentinel modifications phase 4 7. El Segundo 220kV Sub- Add 280 MWs of generation & new RAS (old SCEX92) SDGE APS BPA IID 1. Borrego 69kV Sub- interconnect Borrego Solar Project via TL6960 2. (WSM Model) Add additional generation at Ghost (GHOST), El Centro (ELCENTRO) 1. Perrin Ranch New 500kV Sub- Existing Moenkopi-Yavapai 500kV line loops into the sub 1. John Day-McNary NEW 500kV line & McNary BAAH reconfiguration phase 1 2. John Day-McNary NEW 500kV line & McNary BAAH reconfiguration phase 2 3. Ostrander 500kV Sub- Perform Line swaps 1. Ave 58 Sub- Install a 161/92kV 225 MVA transformer at Ave 58 substation the new transformer 2. Add new IID Sun Peak solar generating unit at Niland (NILAND) substation 3. IID s 92kV system expansion (20 new and 10 modified subs) LADWP 1. Add additional Wind Generation at LADWP Milford Valley (MILFORDV) generating station NEVAD-VEA 1. 9 new substations in NEVADA for VEA boundary and loop flow Page 1 of 7
NEVP SMUD SRP 1. Harry Allen NEW 345/230kV Bank 2 1. Cambell 230kV ring bus configuration 1. Palo Verde 500kV Sub- New CB 978 & SWs 970, 977 & 979 and New Bank 7 2. Kyrene 500kV Sub- New 500/230 kv Bank 8 to terminate at the New CB 948 & SWs 946 & 947 and 945 on the 500 kv section - phase 1 3. Kyrene 500kV Sub- New 500/230 kv Bank 8 to terminate at the New CB 948 & SWs 946 & 947 and 945 on the 500 kv section - phase 3 4. Randolph & Abel New 230kV Subs w/5 new lines to Browning & Dinosaur Page 2 of 7
Generation Projects 1. Atwell Island PV Solar Generating Facility Capacity: 20 MW RES_ID = ATWELL_1_SOLAR POD: 115 kv bus at Smyra-Alpaugh substation 2. Virginia Ranch Dam Powerhouse Capacity: 1 MW RES_ID = BANGOR_6_HYDRO POD: 60 kv bus at BANGOR substation 3. Shiloh III Wind - Phase B Capacity: 100 MW RES_ID = BRDSLD_2_SHLO3B POD: 230 kv bus at Birds Landing (BRDSLD) substation 4. Agnews QF Conversion Capacity: 41.5 MW RES_ID = CALPIN_1_AGNEW POD: 115 kv bus at Agnew Co-Gen (CALPIN) substation 5. Sempra Copper Mountain II Project (CM92) Capacity: 92 MW RES_ID = COPMT2_2_SOLAR2 POD: 230 kv bus at Merchant substation 6. GEYS11_7_UNIT11 - Increase EMS PMAX from 74.4 to 85 MW Capacity: 85 MW RES_ID = GEYS11_7_UNIT11 POD: 13.8 kv bus at GEYS11 substation 7. Lightbeam Power Company Gridley Main Two Capacity: 2.5 MW RES_ID = GRIDLY_6_SOLAR POD: 60 kv bus at Gridley Substation 8. Kiara Anderson Solar Biomass Conversion Capacity: 6.8 MW RES_ID = JESSUP_1_HUDSON POD: 115 kv bus at JESSUP substation 9. NRG Solar Alpine Capacity: 66 MW RES_ID = NEENCH_6_SOLAR POD: 66 kv bus at SCE Neenach substation 10. PNOCHE_1_UNITA1 - Increase EMS PMAX from 47.4 to 57 MW Page 3 of 7
Capacity: 57 MW RES_ID = PNOCHE_1_UNITA1 POD: 115 kv bus at PNOCHE substation 11. POEPH_7_UNIT 2 - Increase EMS PMAX from 60 to 68.5 MW Capacity: 68.5 MW RES_ID = POEPH_7_UNIT 2 POD: 13.8 kv bus at POEPH substation 12. 2158-Stroing Capacity: 0.5 MW RES_ID = RBLUFF_6_SOLAR POD: 60 kv bus at Red Bluff (RBLUFF) substation 13. ABEC Bidart-Stockale Capacity: 0.6 MW RES_ID = TUPMAN_1_BIOGAS POD: 115 KV bus at TUPMAN substation 14. VACADX_1_UNITA1 - Increase EMS PMAX from 48.5 to 57 MW Capacity: 57 MW RES_ID = VACADX_1_UNITA1 POD: 115 kv bus at VACADX substation 15. Gestamp Solar Joya Del Sol Capacity: 1.5 MW RES_ID = WFRESN_1_SOLAR POD: 115 kv bus at West Fresno substation 16. Alta Wind VII Capacity: 168 MW RES_ID = ALT6DN_2_WIND7 POD: 220 kv bus as Cal Portland Company Substation 17. Alta Wind IX Capacity: 132 MW RES_ID = ALT6DS_2_WIND9 POD: 220 kv bus at Windhub substation 18. Antelope Valley Solar Ranch 1 Capacity: 250 MW RES_ID = AVSOLR_2_SOLAR POD: 230 kv bus at WHIRWD substation 19. Mammoth G1 Capacity: 10 MW RES_ID = CONTRL_1_CASAD1 Page 4 of 7
POD: 115 kv bus at Control substation 20. Mammoth G2 Capacity: 12 MW RES_ID = CONTRL_1_CASAD2 POD: 115 kv bus at Control substation 21. Mammoth G3 Capacity: 10 MW RES_ID = CONTRL_1_CASAD3 POD: 115 kv bus at Control substation 22. SunEdison Corona Capacity: 1 MW RES_ID = CORONS_2_SOLAR POD: 230 kv bus at Miraloma substation 23. NRG El Segundo Energy Center Capacity: 275 MW, 275 MW RES_ID = ELSEGN_2_UN1011, ELSEGN_2_UN2021 POD: 230 kv bus at El Segundo substation 24. Manzana Wind Project Capacity: 189 MW RES_ID = MANZNA_2_WIND POD: 220 kv bus at WHIRWD substation 25. Wind Resource 1 Capacity: 8.7 MW RES_ID = NZWIND_6_CALWND POD: 66 KV bus at NZWIND substation 26. RENWD_1_QF - Increase EMS PMAX from 10 to 10.5 MW Capacity: 10.5 MW RES_ID = RENWD_1_QF POD: 115 kv bus at RENWD substation 27. Pacific Wind Project /EnXco Capacity: 250 MW RES_ID = ROSMDW_2_WIND1 POD: 220 kv bus at Whirlwind substation 28. SPVP044 Peris RT Solar Capacity: 8 MW RES_ID = VALLEY_5_RTS044 POD: 500 kv bus at VALLEY substation 29. SCE CSU San Bernardino Fuel Cell (EFC001) Page 5 of 7
Capacity: 1.4 MW RES_ID = VISTA_2_FCELL POD: 220 kv bus at VISTA substation 30. BORDER_6_UNITA1 - Increase EMS PMAX from 47 to 52 MW Capacity: 52 MW RES_ID = BORDER_6_UNITA1 POD: 69 kv bus at BORDER substation 31. NRG Borrego Solar Capacity: 26 MW RES_ID = BREGGO_6_SOLAR POD: 69 kv bus at Borrego Valley Substation 32. ESCNDO_6_UNITB1 - Increase EMS PMAX from 46.9 to 52 MW Capacity: 52 MW RES_ID = ESCNDO_6_UNITB1 POD: 69 kv bus at ESCNDO substation 33. South Bay Water Reclamation Fuel Cell Capacity: 1.4 MW RES_ID = SYDRO_6_FCELL POD: 69 kv bus at San Ysidro substation 34. University of California San Diego Capacity: 2.8 MW RES_ID = UCMTG_6_FCELL POD: 69 kv bus at University of California Metering Page 6 of 7
Scheduling Changes 1. Remove MOHAVE69 2. Add IPPUTAH Remove the MOHAVE69 scheduling and tie point (see Transmission Projects, under SCE #2). All market resources at MOHAVE69 will be removed when the model is deployed. Add new scheduling point IPPUTAH between Mona, Gonder and IPP. Market participant will be able to start registering resources at the new scheduling point after the model is deployed. Page 7 of 7