APPENDIX G: Contingencies on the ISO System that may Impact Adjacent Systems

Similar documents
ISO Transmission Plan February 2, 2015 APPENDIX H: Contingencies on the ISO System that may Impact Adjacent Systems

SDG&E High Voltage DC WECC Path 46 Rating Increase Comprehensive Progress Report

Decision on the ISO Transmission Plan

Updates and Modifications to Report

APPENDIX F: Project Need and Description

March 7, Subject: Southern California Edison 2011 Annual Progress Report

2016 SDG&E Grid Assessment Results

Updates and Modifications to Report

Agenda Less than $50 Million Projects and Preliminary Economic Assessment Results

Opening Transmission Planning Process Stakeholder Meeting Tom Cuccia Lead Stakeholder Engagement and Policy Specialist November 19-20, 2014

APPENDIX F: 2012 Request Window Submittals

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

SDG&E Valley-Rainbow Project

Introduction and Overview

2019 & 2023 Final LCR Study Results San Diego-Imperial Valley non-bulk sub-areas

2020 & 2024 Draft LCR Study Results SDG&E Non-Bulk System. Frank Chen - Regional Transmission Engineer Lead Stakeholder Meeting March 14, 2019

APPENDIX E: Project Need and Description

Updates and Modifications to Report

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

APPENDIX E: Project Need and Description

Full Network Model Scope for FNM DB61

TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis

Full Network Model Scope for FNM DB2016Q1

for DRECP Alternatives

North Gila Generator Interconnection

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

California Independent. System Operator. Market Overview and Design Construct

CPUC TRANSMISSION PROJECTS AND CONCEPTS-- SCE TERRITORY Third Quarter 2011

PACI RAS Updates. Vahid Madani Pacific Gas and Electric Co. August 2, 2017

Operating Procedure. EIR (webregistry) (POR/POD dropdown) AZPS NGILAN_5_N034 North Gila 500 NRTHGILA500 NRTHGILA500 NORTHGILA500_ITC

Valley - Rainbow Interconnection Project Feasibility Study Report

CPUC TRANSMISSION PROJECTS AND CONCEPTS-- SCE TERRITORY First Quarter 2011 CAPACITY/ VOLTAGE LEVEL

TRANSMISSION CONTROL AGREEMENT APPENDIX A. Facilities and Entitlements

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

TRANSMISSION PROJECTS MODELED IN PHASE IIA DELIVERABILITY STUDY BASECASE

PMUs and Blackout Analysis

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Wheeling Access Charges

Agenda. Draft ISO Transmission Plan Stakeholder Meeting. Tom Cuccia Sr. Stakeholder Engagement and Policy Specialist February 12, 2014

Agenda Day 2. Tom Cuccia Lead Stakeholder Engagement and Policy Specialist

Second Report of the Tehachapi Collaborative Study Group

Full Network Model Scope for FNM DB59

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

Lugo-Victorville RAS. Presentation to RASRS. November 14, Edison Team Members:

Background Information

Agenda Day 2 Preliminary Reliability Assessment Results

TransWest Express Project

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Status of PNM s Completed Transmission Construction Projects 11/30/2017

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Four Corners 230kV Generator Interconnections Group

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Black Hills Project Summary

Load Modeling for Power System Studies

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

California Independent System Operator. Memorandum

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

An Industry Perspective On Emerging Electricity Delivery Technologies

Appendix D Black Hills Project Summary

South Dakota 890 Study

APS and Regional Transmission Systems Overview

Q51 Generation Interconnection

Arizona Energy Consortium Conference

Four Corners Queue Transmission Interconnection Study

Agenda Day 2 Preliminary Reliability Assessment Results

PG&E s 2017 Request Window Proposals CAISO 2017/2018 Transmission Planning Process

April 2012 TRANSMISSION IMPACTS IN THE DRECP

Western Area Power Administration Sierra Nevada Region

NorthernLights HVDC Project

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

WECC Regional Planning Review. Canada/Pacific Northwest Northern California Transmission Line Project. Technical Analysis Committee Report

WECC Regional Planning Pacific Northwest/Canada to Northern California Transmission Project

Circuit Reliability Review

Reliability Must-Run Analysis th BTA Presentation. Bob Smith Manager Transmission Planning June 6, 2006

Agenda Draft Transmission Plan and transmission project approval recommendations

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection

PREPARED DIRECT TESTIMONY

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

PG&E s 2012 Request Window Proposals

Tehachapi Renewable Transmission Project 3.1 OVERVIEW OF PROPOSED PROJECT

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS

Circuit Reliability Review

Western Area Power Administration Sierra Nevada Region

Overview of APS U.S.-JORDAN ELECTRIC POWER TRANSMISSION PARTNERSHIP EXECUTIVE EXCHANGE VISIT. Bob Smith

Welcome. Please Sign In

MTEP13 SPM #2- Central Region. March 25, 2013

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

2013 ANNUAL PROGRESS REPORT

Manual 3: Transmission Operations Updates Version 52

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment.

North Oregon Coast Area Study. Adam Lint

Cascade-Based Planning Analysis. Robert W. Cummings NERC Senior Director of Engineering and Reliability Initiatives

Q217 Generator Interconnection Project

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Moenkopi) Scheduling at Willow Beach. Operating Procedure

IEEE T&D FACTS Panel Session Part II (08TD0140) Wednesday, April 23, 2008

Q92 Asarco Interconnection

BC Hydro System 2011 Annual Progress Report

Transcription:

2016-2017 ISO Transmission Plan March 17, 2017 APPENDIX G: Contingencies on the ISO System that may Impact Adjacent Systems California ISO/MID G-1

2016-2017 ISO Transmission Plan March 17, 2017 Intentionally left blank California ISO/MID G-2

Study Area: PG&E Bulk files: Switch_PGE_Bulk.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files Name 1 CptJ_Olinda_ns_slo.swt N-1 shunt capacitor insertion on Table Mtn and/or Malin if low voltages Captain Jack- Olinda 500 kv, flow rth to South 2 CptJ_Olinda_sn_slo.swt N-1 Captain Jack- Olinda 500 kv, flow South to rth 3 Diablo-g2.swt G-2 FACRI if low voltages 2 Diablo Canyon units 4 Malin-RndMt-dlo-ns-2400_17.swt N-2 5 Malin-RndMt-dlo-ns-2400_20.swt N-2 6 Malin-RndMt-dlo-ns-2400_25.swt N-2 7 Malin-RoundMt-1-slo.swt N-1 shunt capacitor insertion if low Malin-Round Mtn 500 kv # 1 8 Malin-RoundMt-2-slo.swt N-1 voltages Malin-Round Mtn 500 kv # 2 9 LosBanosrth-dlo-sn.swt N-2 load and generation tripping 10 LosBanosrth-dlo-sn_1.swt N-2 load and generation tripping 11 LosBanosrth-dlo-sn_5grp.swt N-2 load and generation tripping 12 LosBanosSouth-dlo-sn_1.swt N-2 load and generation tripping 13 LosBanosSouth-dlo-sn_2.swt N-2 load and generation tripping 14 Midwayrth-dlo-sn.swt N-2 load and generation tripping 15 NESE.swt system separation load and generation tripping, opening ties 16 PaloVerde-g2-OL-MA-RAS.swt G-2 load tripping in Arizona 17 PaloVerde-g2-OL-MA-RAS_sn.swt G-2 18 PDCI-NS-bipolar-2700_17.swt 19 PDCI-NS-bipolar-2700_20.swt 20 PDCI-NS-bipolar-2700_25.swt 21 PDCI-NS-bipolar-noRAS.swt 22 PDCI-NS-monopolar.swt DC bi-pole DCmonopole 23 RoundMt-TableMt-dlo-ns-2400_17.swt N-2 24 RoundMt-TableMt-dlo-ns-2400_20.swt N-2 25 RoundMt-TableMt-dlo-ns-2400_25.swt N-2 26 TableMtSouth-dlo-ns-2400_17.swt N-2 27 TableMtSouth-dlo-ns-2400_20.swt N-2 28 TableMtSouth-dlo-ns-2400_25.swt N-2 29 Teslarth-dlo-ns-2400_17.swt N-2 30 Teslarth-dlo-ns-2400_20.swt N-2 31 Teslarth-dlo-ns-2400_25.swt N-2 NW generation drop, insertion of shunt capacitors, removal of reactors generation tripping, shunt capacitors insertion generation tripping, shunt capacitors insertion generation tripping, shunt capacitors insertion generation tripping, shunt capacitors insertion Malin-Round Mtn 500 kv # 1 &2, several RAS options 500 kv double line outage north of Los Banos, several RAS options 500 kv double line outage south of Los Banos, several RAS options 500 kv double outage rth of Midway rtheast/southeast system separation outage of 2 Palo Verde units PDCI bi-pole outage with several RAS options PDCI mono-pole outage Round Mtn-Table Mtn 500 kv # 1&2, several RAS options 500 kv double line outage south of Table Mtn, several RAS options 500 kv double line outage north of Tesla, several RAS options California ISO/MID/RT Page 1 of 1

Study Area: PG&E Humboldt files: file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files ne California ISO/MID/RT Page 1 of 1

Study Area: PG&E rth Coast & rth Bay files: file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files ne California ISO/MID/RT Page 1 of 1

Study Area: PG&E rth Valley files: See Contigency List file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 1 a16_system_1in5_2018_a3_p1_complete P1 2 a16_system_1in5_2021_a3_p1_complete P1 3 a16_system_1in5_2026_a3_p1_complete P1 4 a16_system_1in5_2018_a3_p2-1 P2-1 5 a16_system_1in5_2021_a3_p2-1 P2-1 6 a16_system_1in5_2026_a3_p2-1 P2-1 7 a16_system_1in5_2018_a3_p2 P2 8 a16_system_1in5_2021_a3_p2 P2 9 a16_system_1in5_2026_a3_p2 P2 10 a16_system_1in5_2018_a3_p5-5 P5-5 11 a16_system_1in5_2021_a3_p5-5 P5-5 12 a16_system_1in5_2026_a3_p5-5 P5-5 13 a16_system_1in5_2018_a3_p7-1 P7 14 a16_system_1in5_2021_a3_p7-1 P7 15 a16_system_1in5_2026_a3_p7-1 P7 California ISO/MID/RT Page 1 of 1

Study Area: PG&E Central Valley files: See Contigency List file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 1 CVLY-P1-2018_RE.otg P1 2 CVLY-P2-2018_RE.otg P2 3 CVLY-P2-1-2018_RE.otg P2-1 4 CVLY-P5-5-2018_RE.otg P5-5 5 CVLY-P7-2018_RE.otg P7 6 CVLY-P1-2021_RE.otg P1 7 CVLY-P2-2021_RE.otg P2 8 CVLY-P2-1-2021_RE.otg P2-1 9 CVLY-P5-5-2021_RE.otg P5-5 10 CVLY-P7-2021_RE.otg P7 11 CVLY-P1-2026_RE.otg P1 12 CVLY-P2-2026_RE.otg P2 13 CVLY-P2-1-2026_RE.otg P2-1 14 CVLY-P5-5-2026_RE.otg P5-5 15 CVLY-P7-2026_RE.otg P7 California ISO/MID/RT Page 1 of 1

Study Area: PG&E Greater Bay Area files: See contingency list file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files>GBA Files 1 GBA-P2-2026_RE.otg P2 2 GBA-P5-5-2021_RE.otg P5-5 3 GBA-P1-2021_RE.otg P1 4 GBA-P2-2018_RE.otg P2 5 GBA-P7-2026_RE.otg P7 6 GBA-P7-2021_RE.otg P7 7 GBA-P2-1-2018_RE.otg P2-1 8 GBA-P1-2026_RE.otg P1 9 GBA-P2-1-2021_RE.otg P2-1 10 GBA-P2-1-2026_RE.otg P2-1 11 GBA-P7-2018_RE.otg P7 12 GBA-P5-5-2018_RE.otg P5-5 13 GBA-P5-5-2026_RE.otg P5-5 14 GBA-P1-2018_RE.otg P1 15 GBA-P2-2021_RE.otg P2 California ISO/MID/RT Page 1 of 2

Study Area: PG&E Greater Bay Area files: See contingency list file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files>GBA Files California ISO/MID/RT Page 2 of 2

Study Area: PG&E Greater Fresno files: SJVL Files file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 1 a16_system_1in5_2018_a14_13_p1_complete P1 2 a16_system_1in5_2021_a14_a13_p1_complete P1 3 a16_system_1in5_2026_a14_a13_p1_complete P1 4 a16_system_1in5_2018_a14_13_p2-1 P2-1 5 a16_system_1in5_2021_a14_a13_p2-1 P2-1 6 a16_system_1in5_2026_a14_a13_p2-1 P2-1 7 a16_system_1in5_2018_a14_13_p2 P2 8 a16_system_1in5_2021_a14_a13_p2 P2 9 a16_system_1in5_2026_a14_a13_p2 P2 10 a16_system_1in5_2018_a14_a13_p5-5 P5-5 11 a16_system_1in5_2021_a14_a13_p5-5 P5-5 12 a16_system_1in5_2026_a14_a13_p5-5 P5-5 13 a16_system_1in5_2018_a14_13_p7-1 P7 14 a16_system_1in5_2021_a14_a13_p7-1 P7 15 a16_system_1in5_2026_a14_13_p7-1 P7 California ISO/MID/RT Page 1 of 1

Study Area: PG&E Kern files: SJVL Files file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files NONE California ISO/MID/RT Page 1 of 1

Study Area: PG&E Central Coast files: file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files ne California ISO/MID/RT Page 1 of 1

Study Area: PG&E Los Padres files: file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files ne California ISO/MID/RT Page 1 of 1

Study Area: SCE Bulk files: List_SCE_Bulk.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 1 Line MOENKOPI 500.0 to ELDORDO 500.0 Circuit 1 2 Line PALOVRDE 500.0 to COLRIVER 500.0 Circuit 1 L-1 L-1 3 Line LUGO 500.0 to VICTORVL 500.0 Circuit 1 L-1 4 Line LUGO 500.0 to MOHAVE 500.0 Circuit 1 L-1 5 Line MOHAVE 500.0 to ELDORDO 500.0 Circuit 1 L-1 6 Line ELDORDO 500.0 to LUGO 500.0 Circuit 1 L-1 7 Line DEVERS 500.0 to VALLEYSC 500.0 Circuit 1 L-1 8 Line DEVERS 500.0 to VALLEYSC 500.0 Circuit 2 L-1 West of Devers (WOD) RAS / Colorado Corridor RAS (future) West of Devers (WOD) RAS / Colorado Corridor RAS (future) 9 Line DEVERS 500.0 to REDBLUFF 500.0 Circuit 1 L-1 Colorado Corridor RAS (future) 10 Line DEVERS 500.0 to REDBLUFF 500.0 Circuit 2 L-1 Colorado Corridor RAS (future) 11 Line COLRIVER 500.0 to REDBLUFF 500.0 Circuit 1 L-1 Colorado Corridor RAS (future) 12 Line COLRIVER 500.0 to REDBLUFF 500.0 Circuit 2 L-1 Colorado Corridor RAS (future) 13 Line SERRANO 500.0 to VALLEYSC 500.0 Circuit 1 L-1 Inland Impire RAS 14 Line N.GILA 500.0 to IMPRLVLY 500.0 Circuit 1 L-1 15 Line MIDWAY 500.0 to VINCENT 500.0 Circuit 1 L-1 16 Line MIDWAY 500.0 to VINCENT 500.0 Circuit 2 L-1 17 Line MIDWAY 500.0 to WIRLWIND 500.0 Circuit 3 L-1 18 Line LUGO 500.0 to VINCENT 500.0 Circuit 1 L-1 19 Line LUGO 500.0 to VINCENT 500.0 Circuit 2 L-1 20 21 Line DEVERS 500.0 to VALLEYSC 500.0 Circuit 1 & 2 Line DEVERS 500.0 to REDBLUFF 500.0 Circuit 1 & 2 L-2 West of Devers (WOD) RAS / Colorado Corridor RAS (future) L-2 Colorado Corridor RAS (future) California ISO/MID/RT Page 1 of 2

Study Area: SCE Bulk files: List_SCE_Bulk.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 22 23 Line COLRIVER 500.0 to REDBLUFF 500.0 Circuit 1 & 2 Line MIDWAY 500.0 to VINCENT 500.0 Circuit 1& 2 L-2 Colorado Corridor RAS (future) L-2 Path 26 RAS 24 Line MIDWAY 500.0 to VINCENT 500.0 Circuit 1& Line MIDWAY 500.0 to WIRLWIND 500.0 Circuit 3 L-2 Path 26 RAS 25 Line MIDWAY 500.0 to VINCENT 500.0 Circuit 2& Line MIDWAY 500.0 to WIRLWIND 500.0 Circuit 3 L-2 Path 26 RAS 26 Line LUGO 500.0 to VINCENT 500.0 Circuit 1 & 2 L-2 Multiple L-1/L-1 combinations of above L-1 contingencies L-1/L-1 Same as above depending on the contingency California ISO/MID/RT Page 2 of 2

Study Area: SCE Tehachapi & Big Creek Corridor files: file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files See contingency list for SCE Bulk system. ne California ISO/MID/RT Page 1 of 1

Study Area: SCE rth of Lugo files: Reliab1415_SCE-NOL_Contingencies.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 1 line_19_line CONTROL - NEVBD501 55.0 ck 1 N-1 2 line_20_line CONTROL - NEVBD502 55.0 ck 1 N-1 3 line_21_line CONTROL - INYO 115.0 ck 1 N-1 4 line_22_line CONTROL - INYOKERN 115.0 ck 1 N-1 Bishop RAS - trips Bishop area generation 5 line_26_line INYOKERN - KRAMER 115.0 ck 1 N-1 6 line_29_line KRAMER-INYOKERN-RANDSB 115 ck 1 N-1 Kramer RAS - trips partial or entire generation rth of Kramer 7 line_46_line CONTROL-COSO-INYOKERN 115 ck 2 N-1 Bishop RAS - trips Bishop area generation 8 All common-mode and N-1-1 combinations that include the aforementioned facilities N-2, Breaker failure, bus outages and N-1-1 California ISO/MID/RT Page 1 of 2

California ISO/MID/RT Page 2 of 2

Study Area: SCE East of Lugo files: Reliab1415_EOL-VEA_Contingencies.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 1 ELDORDO 500/230 kv Bank 3 N-1 2 ELDORDO 500/230 kv Bank 4 N-1 3 Eldorado2 220/500-kV Tran Bnk 5 N-1 4 ELDORDO 500.0 to LUGO 500.0 Circuit 1 N-1 5 LUGO 500.0 to MOHAVE 500.0 Circuit 1 N-1 6 MOHAVE 500.0 to ELDORDO 500.0 Circuit 1 N-1 7 PISGAH 230.0 to CIMA 230.0 to ELDORDO 230.0 Circuit 2 N-1 8 PISGAH 230.0 to CIMA 230.0 to ELDORDO 230.0 Circuit 2 N-1 9 ELDORDO2 230.0 to BOB SS 220.0 Circuit N-1 10 LUGO 230.0 to PISGAH 230.0 Circuit N-1 11 LUGO 230.0 to CALCITE 230.0 to PISGAH 230.0 Circuit N-1 12 All N-2 and N-1-1 combinations that include the aforementioned facilities N-2, Breaker failure, bus outages and N-1-1 13 P1_Eld-Cima-Pisgah-3PHfaultE N-1 14 P1_Eld-Cima-Pisgah-3PHfaultP N-1 15 P1_Lugo-Pisgah-3PHfaultL N-1 16 P1_Lugo-Pisgah-3PHfaultP N-1 17 P4_Eld-Cima-Pisgah_Lugo-Pisgah-1PHfaultP Stuck breaker 18 P4_Eld-Cima-Pisgah_CALCITE-Pisgah-1PHfaultP Stuck breaker 19 P4_Eld-Cima-Pisgah-1PHfaultE Stuck breaker 20 P4_Lugo-Pisgah-1PHfaultL Stuck breaker 21 P4_CAlCITE-Pisgah-1PHfaultL Stuck breaker 22 P5.5_Eldorado230 Bus outage 23 Lugo-ELD-MH-500_RAS N-1-1 with RAS Lugo-Eldorado RAS California ISO/MID/RT Page 1 of 2

s California ISO/MID/RT Page 2 of 2

Study Area: SCE Eastern area files: List_SCE_Eastern.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 1 Line PALOVRDE 500.0 to COLRIVER 500.0 Ckt 1 L-1 2 Line DEVERS 500.0 to VALLEYSC 500.0 Ckt 1 L-1 West of Devers (WOD) RAS / Colorado Corridor RAS (future) 3 Line DEVERS 500.0 to VALLEYSC 500.0 Ckt 2 L-1 West of Devers (WOD) RAS / Colorado Corridor RAS (future) 4 Line DEVERS 500.0 to REDBLUFF 500.0 Ckt 1 L-1 Colorado Corridor RAS (future) 5 Line DEVERS 500.0 to REDBLUFF 500.0 Ckt 2 L-1 Colorado Corridor RAS (future) 6 Line COLRIVER 500.0 to REDBLUFF 500.0 Ckt1 L-1 Colorado Corridor RAS (future) 7 Line COLRIVER 500.0 to REDBLUFF 500.0 Ckt 2 L-1 Colorado Corridor RAS (future) 8 Line DEVERS - MIRAGE 230 kv Ckt 1 L-1 9 Line DEVERS - MIRAGE 230 kv Ckt 2 L-1 10 Line MIRAGE - RAMON 230 kv Ckt 1 L-1 11 Line CVSUB230 - MIRAGE 230 kv Ckt 1 L-1 12 Line J.HINDS - MIRAGE 230 kv L-1 Blythe Energy RAS 13 Line JHINDMWD - EAGLEMTN 230 kv L-1 Blythe Energy RAS 14 Line EAGLEMTN - IRON MTN 230 kv L-1 Blythe Energy RAS 15 CAMINO - GENE - IRON MTN - MEAD 230 KV L-1 Blythe Energy RAS 16 Line BLYTHESC - EAGLEMTN 161 kv L-1 Blythe Energy RAS 17 Line PARKER 230.0 to GENE 230.0 Ckt 1 L-1 18 GenTie Buck Blvd - J.Hinds L-1 19 BLYTHE CCGT OUTAGE G-1 20 Tran DEVERS 500/230 1AA Bank T-1 21 Tran DEVERS 500/230 2AA Bank T-1 22 J.HINDS 25MVAR Shunt Reactor N-1 23 Bus Tie Breaker JHINDMWD - J.HINDS 230 kv C.2 Blythe Energy RAS 24 Line DEVERS 500.0 to VALLEYSC 500.0 Ckt 1 & 2 L-2 West of Devers (WOD) RAS / Colorado Corridor RAS (future) 25 Line DEVERS 500.0 to REDBLUFF 500.0 Ckt 1 & 2 L-2 Colorado Corridor RAS (future) 26 Line COLRIVER 500.0 to REDBLUFF 500.0 Ckt 1 & 2 L-2 Colorado Corridor RAS (future) 27 Line DEVERS - MIRAGE 230 kv Ckt 1 & 2 L-2 Multiple N-1/N-1 combinations of above N-1 contingencies N-1/N-1 Same as above depending on the contingency California ISO/MID/RT Page 1 of 2

Study Area: SCE Eastern area files: List_SCE_Eastern.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files California ISO/MID/RT Page 2 of 2

Study Area: SCE Metro files: List_SCE_Bulk-Metro.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files ne identified California ISO/MID/RT Page 1 of 1

Study Area: San Diego Area files: ImpactListAdjacentSystems_SDGE_201 file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files CAISO-1 CAISO-2 CAISO-3 CAISO-4 CAISO-5 CAISO-6 CAISO-7 Line From 15021 PALOVRDE to 24900 COLRIVER 500 kv Ckt 1 Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1 Line From 14012 DELANEY to 24900 COLRIVER 500 kv Ckt #1 Line From 22930 ECO to 22468 MIGUEL 500 kv Ckt #1 Line From 23310 OCOTILLO To 22885 SUNCREST 500 kv Ckt #1 Line From 22360 IMPRLVLY to 22930 ECO 500 kv Ckt #1 Line From 22360 IMPRLVLY to 23310 OCOTILLO 500 kv Ckt #1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 SPS sheding generation in the greater IV area SPS sheding generation in the greater IV area SPS sheding generation in the greater IV area SPS sheding generation in the greater IV area CAISO-8 Line From Sunrest To Sycamore 230 kc Ckt #1 L-1 Proposed SPS to open Ocotillo- Suncrest 500 kv line while sheding gen in the greater IV area CAISO-9 Line From Sunrest To Sycamore 230 kc Ckt #2 L-1 Proposed SPS to open Ocotillo- Suncrest 500 kv line while sheding gen in the greater IV area CAISO-10 Line From 22609 OTAYMESA To 20149 TJI-230 230 Ckt #1 L-1 CAISO-11 TL23050 From IMPRLVLY To 20118 ROA-230 Ckt #1 L-1 CAISO-12 CAISO-13 Line From 22609 OTAYMESA To 22464 MIGUEL 230 kv Ckt #1 Line From 22609 OTAYMESA To 22464 MIGUEL 230 kv Ckt #2 CAISO-14 Transformer Miguel 500/230 kv Bank 80 T-1 CAISO-15 Transformer Miguel 500/230 kv Bank 81 T-1 CAISO-16 Transformer Suncrest 500/230 kv Bank 80 T-1 CAISO-17 Transformer Suncrest 500/230 kv Bank 81 T-1 L-1 L-1 SPS tripping Otay Mesay and/or Pio Pico generation SPS tripping Otay Mesay and/or Pio Pico generation Proposed SPS to open Miguel Bank 81 while sheding gen in the greater IV area Proposed SPS to open Miguel Bank 80 while sheding gen in the greater IV area Proposed SPS to open Suncrest Bank 81 while sheding gen in the greater IV area Proposed SPS to open Suncrest Bank 80 while sheding gen in the greater IV area California ISO/MID/RT Page 1 of 4

Study Area: San Diego Area files: ImpactListAdjacentSystems_SDGE_201 file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files CAISO-18 P1T_50021_Xfmer IMPRLVLY 500 to IV BK82 MP 500 Ckt 1 0.00 CAISO-19 P1T_50022_Xfmer IMPRLVLY 500 to IV BK81 MP 500 Ckt 1 0.00 T-1 CAISO-20 TDM Power PLANT G-1 CAISO-21 Otay Mesa Power PLANT G-1 CAISO-22 P4CB_IV-8022_IV 8022 50002 & BK81 CB Breaker Fault/Stuck Breaker CAISO-23 TDM Power PLANT - AND - Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1 G-1/L-1 CAISO-24 Otay Mesa Power PLANT - AND - Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1 G-1/L-1 CAISO-25 Otay Mesa Power PLANT - AND - Line From 22930 ECO to 22468 MIGUEL 500 kv Ckt #1 G-1/L-1 CAISO-26 Otay Mesa Power PLANT - AND - Line From 22360 IMPRLVLY to 22930 ECO 500 kv Ckt #1 G-1/L-1 T-1 SPS sheding generation in the greater IV area SPS sheding generation in the greater IV area CAISO-27 Otay Mesa Power PLANT - AND - Line From 23310 OCOTILLO To 22885 SUNCREST 500 kv Ckt #1 G-1/L-1 SPS sheding generation in the greater IV area CAISO-28 Otay Mesa Power PLANT - AND - Line From 22360 IMPRLVLY to 23310 OCOTILLO 500 kv Ckt #1 G-1/L-1 SPS sheding generation in the greater IV area CAISO-29 Line From 15021 PALOVRDE to 24900 COLRIVER 500 kv Ckt 1--AND--Line From 14012 DELANEY to 24900 COLRIVER 500 kv Ckt #1 CAISO-30 CAISO-31 CAISO-32 CAISO-33 Line From 22930 ECO to 22468 MIGUEL 500 kv Ckt #1--AND--Line From 23310 OCOTILLO To 22885 SUNCREST 500 kv Ckt #1 without the IV phase shifting transformers Line From 22930 ECO to 22468 MIGUEL 500 kv Ckt #1--AND--Line From 22360 IMPRLVLY to 23310 OCOTILLO 500 kv Ckt #1 without the IV phase shifting transformers Line From 22360 IMPRLVLY to 22930 ECO 500 kv Ckt #1--AND--Line From 23310 OCOTILLO To 22885 SUNCREST 500 kv Ckt #1 without the IV phase shifting transformers Line From 22360 IMPRLVLY to 22930 ECO 500 kv Ckt #1--AND--Line From 22360 IMPRLVLY to 23310 OCOTILLO 500 kv Ckt #1 without the IV phase shifting transformers IV Gen Sheding SPS and possible cross tripping the tie with CFE IV Gen Sheding SPS and possible cross tripping the tie with CFE IV Gen Sheding SPS and possible cross tripping the tie with CFE IV Gen Sheding SPS and possible cross tripping the tie with CFE California ISO/MID/RT Page 2 of 4

Study Area: San Diego Area files: ImpactListAdjacentSystems_SDGE_201 file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files CAISO-34 CAISO-35 CAISO-36 CAISO-37 CAISO-38 CAISO-39 CAISO-40 CAISO-41 CAISO-42 Line From 22930 ECO to 22468 MIGUEL 500 kv Ckt #1--AND--Line From 23310 OCOTILLO To 22885 SUNCREST 500 kv Ckt #1 with the IV phase shifting transformers Line From 22930 ECO to 22468 MIGUEL 500 kv Ckt #1--AND--Line From 22360 IMPRLVLY to 23310 OCOTILLO 500 kv Ckt #1 with the IV phase shifting transformers Line From 22360 IMPRLVLY to 22930 ECO 500 kv Ckt #1--AND--Line From 23310 OCOTILLO To 22885 SUNCREST 500 kv Ckt #1 with the IV phase shifting transformers Line From 22360 IMPRLVLY to 22930 ECO 500 kv Ckt #1--AND--Line From 22360 IMPRLVLY to 23310 OCOTILLO 500 kv Ckt #1 with the IV phase shifting transformers Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1--AND--Line From 22930 ECO to 22468 MIGUEL 500 kv Ckt #1 Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1--AND--Line From 23310 OCOTILLO To 22885 SUNCREST 500 kv Ckt #1 Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1--AND--Line From 22360 IMPRLVLY to 22930 ECO 500 kv Ckt #1 Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1--AND--Line From 22360 IMPRLVLY to 23310 OCOTILLO 500 kv Ckt #1 Line From 15021 PALOVRDE to 24900 COLRIVER 500 kv Ckt 1--AND--Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1 SPS sheding generation in the greater IV area SPS sheding generation in the greater IV area SPS sheding generation in the greater IV area SPS sheding generation in the greater IV area IV Gen Sheding SPS IV Gen Sheding SPS IV Gen Sheding SPS IV Gen Sheding SPS CAISO-43 CAISO-44 CAISO-45 CAISO-46 CAISO-47 Line From 15021 PALOVRDE to 24900 COLRIVER 500 kv Ckt 1--AND--Line From 14012 DELANEY to 24900 COLRIVER 500 kv Ckt #1 Line From 14012 DELANEY to 24900 COLRIVER 500 kv Ckt #1--AND--Line From 22536 N.GILA to 22360 IMPRLVLY 500 kv Ckt #1 P1T_50021_Xfmer IMPRLVLY 500 to IV BK82 MP 500 Ckt 1 0.00 and P1T_50022_Xfmer IMPRLVLY 500 to IV BK81 MP 500 Ckt 1 0.00 Line From 22609 OTAYMESA To 22466 MIGUEL 230 kv Ckt #1-- AND -- Line From 22609 OTAYMESA To 22467 MIGUEL 230 kv Ckt #2 Line From 24900 COLRIVE To 24374 REDBLUFF 500 kv Ckt #1-- AND -- Ckt #2 T-1-1 L-2 Imperial Valley BK 80 SPS shedding IV generation SPS tripping Otay Mesay and Pio Pico generation L-2 SCE Eastern Gen Sheding SPS California ISO/MID/RT Page 3 of 4

Study Area: San Diego Area files: ImpactListAdjacentSystems_SDGE_201 file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files CAISO-48 CAISO-49 Line From 24801 DEVERS To 24374 REDBLUFF 500 kv Ckt #1-- AND -- Ckt #2 N-2 Mirage-Ramon 230 kv and Mirage-Coachella Valley 230 kv L-2 SCE Eastern Gen Sheding SPS L-2 California ISO/MID/RT Page 4 of 4

Study Area: Valley Electric Association files: Reliab1415_EOL-VEA_Contingencies.zip file location: Market Participant Portal ->Transmission Planning ->2016/2017 ISO Transmission Planning Process -> Files 1 NWEST -DESERT VIEW -INNOVATION 230kV Circuit 1 N-1 2 MEAD S -BOB SS 230kV Circuit 1 N-1 3 ELDORDO2 -BOB SS 230kV Circuit 1 N-1 4 BOB SS-PAHRUMP 230kV Circuit 1 N-1 5 PAHRUMP -INNOVATION 230kV Circuit 1 N-1 6 AMARGOSA -SANDY 138kV Circuit 1 N-1 7 PAHRUMP-GAMEBIRD 138kV Circuit 1 N-1 8 INNOVATION -MERCRYSW 138 Circuit 1 N-1 9 MERCRYSW-JACKASSF -LTHRPWLS 138kV Circuit 1 N-1 10 PAHRUMP-VISTA 138kV Circuit 1 N-1 11 PAHRUMP 138/230kV Tran Bnk 1 N-1 12 PAHRUMP 138/230kV Tran Bnk 2 N-1 13 INNOVATION 230/138kV Tran Bnk 1 N-1 14 All common-mode and N-1-1 combinations that include the aforementioned facilities N-2, Breaker failure, bus VEA local UVLS outages and N- 1-1 15 P5-PAHRUMP-PA212 Stuck breaker VEA local UVLS 16 P5-SANDY-SA222 Stuck breaker VEA local UVLS 17 P5-GAMEBIRD-GB222 Stuck breaker VEA local UVLS 18 P5-VISTA-VI212 Stuck breaker VEA local UVLS 19 P5-VALLEY-SWITCH-VS222 Stuck breaker VEA local UVLS 20 P5-LATHROP-SWITCH-LS212 Stuck breaker VEA local UVLS California ISO/MID/RT Page 1 of 1