RV-14 QBF-02 REV 1: In Step 7 (QB), "5-9" was "5-8", and "12-13" was "11-12"

Similar documents
Page: MEMO: In NOTE before Step 5, "Whenever possible, ream using a drill press..." was "Always ream using a drill press...".

Page REV 1: Added 'Step 2: See the "REMOVE THIS TAB, BOTH SIDES" callout near Detail A. Modify four SB375-4 Snap Bushings as shown.

Page: REV 1: In Step 4 "a minimum of 1/16 [1.6 mm] gap" was "an approximately 1/16 [1.6 mm] gap."

SECTION 22: FWD LOWER FUSELAGE VAN'S AIRCRAFT, INC F-1257 RUDDER PEDAL SUPPORT CHANNEL, 4 PLACES WD-1204 ENGINE MOUNT BRACKET, 2 PLACES

Page: 42H-03 REV 1: In Figure 1, replace AN507-6R6 with AN507-6R8

NEW PRODUCT RELEASE. PRODUCT/KIT NAME: 12 Stabilator Tip Fairing Kit

Page REV 1: Added "Step 4: Bend the tabs on the wiring channel to match the slant of the F L & -R Tunnel Sides."

Page REV 1: In Step 1, added reference to fluid fitting clocking. Added Figure 2 and Figure 3.

REVISION DESCRIPTION:

REVISION DESCRIPTION:

REVISION DESCRIPTION:

REVISION DESCRIPTION:

VAN S AIRCRAFT, INC.

REVISION DESCRIPTION:

REVISION DESCRIPTION:

ROLL BAR FRAME 2 PLACES F-1231A-FL ROLL BAR FRAME F-1231C INBOARD F-1231B OUTBOARD ROLL BAR STRAP BAGGAGE BULKHEAD

REVISION DESCRIPTION:

Page: MEMO: In Figure 3, "2X 1 3/32 [27.78 mm]" was "2X 1 3/32 [2.75 mm]"

SERVICE BULLETIN

F-1202D-L PANEL ATTACH STRIP F L UPPER FWD FUSELAGE SKIN RIB F CABIN EGRESS HANDLE F-1240B COVER PLATE

"Figure 2: Trim Washer" was "Figure 1: Trim Washers". Page: 40A-06 REV 1: In Step 6, added "Fully torque the nut."

NOTIFICATION

36-01 REV 1: Updated figure to depict current F Bellcrank configuration.

NOTIFICATION

1) Page: REV 5: Changed depiction to show added hardware and T-01220

12.0 CONTROLS 3/3/2006. Page 1

SECTION 26iS/U: FUEL TANK VAN'S AIRCRAFT, INC. T R OUTBOARD RIB IE-00001X MECHANICAL FUEL GAUGE T R INBOARD RIB T R

REVISION DESCRIPTION: REV 2: Steps re-written for clarity REV 2: Steps re-written for clarity.

STOL CH F8-2 Front Floor Stiffener. Cut and position the Front Floor Stiffener to the Floor 7F8-7. Back drill through the Floor 7F8-7.

Page: REV 3: Add drill and tap information to Figure 4 DRILL #3, TAP 1/4-28 BOTH ENDS.

Section 75-ZA-3 Fin & Rudder Cable Fairing Installation

12NPR Reason For Revision

12/03 EXPLODED VIEW 1) L angles on first rear rib: moved from inboard to outboard side of rib (12/03)

Section 75-FA-4. Forward Fuselage

VAN'S AIRCRAFT, INC. SECTION 40: LIGHTING

AEROPRAKT SERVICE BULLETIN. No. SB A22LS-17 REPLACEMENT OF RUDDER CONTROL SYSTEM CABLES AND FAIRLEADS OF A-22, A-22L, A-22L2 AND A-22LS AIRCRAFT

VAN'S AIRCRAFT, INC. SECTION 19: WING SYSTEMS ROUTING

FUSELAGE CABIN ASSEMBLY

FUSELAGE ASSEMBLY SECOND SECTION (of three)

Airworthiness Directive Schedule

33T Braking system - toe brakes

AIRCRAFT LANDING GEAR CONSTRUCTION MANUAL

TECHNICAL BULLETIN May 2013 Revision A, 11 July 2013 SUBJECT: TAIL ROTOR GEARBOX 3 PIECE FAIRING, MODIFICATION OF

The engine cowling installation and firewall should be inspected and modified as specified in this Service Bulletin.

TEMPORARY REVISION NUMBER

SECTION 42D: SKYVIEW UPDATE INSTRUCTIONS WH SKYVIEW SL-40 HARNESS VAN'S AIRCRAFT, INC. F R INST STACK ANGLE

4-Bulkheads. Bulkheads. December XLR Page 4-1

Improved Fire Protection Retro-Fit Manual for US LSA Airplanes Fire Wall Protecting

FIGURE 2: ADDING FITTINGS TO BRAKE ASSEMBLY (RIGHT SHOWN) FIGURE 1: ATTACHING AND ALIGNING THE MAIN GEAR AXLES

ZODIAC 601 XL. Trim the outboard corner of the front flange of the center spar 6W4-1. Corner should not touch the side of the cabin floor skin 6B10-1.

SECTION 35iS/U: LANDING GEAR & ENGINE MOUNT

TECHNICAL BULLETIN May 2013 SUBJECT: TAIL ROTOR GEARBOX 3 PIECE FAIRING, MODIFICATION OF

REVISION LIST CHAPTER 22: CABIN VENTILATION

Service Bulletin No.: DAC Rev 3 Date Issued: October 27, 1999 Title: 2-Speed Electric Prime Fuel Pump Page: 1 of 8

Service Bulletin. SB-GA Issue 1. Subject: Horizontal Stabiliser Attachment Area Inspection and Reinforcement. Applicability: Amendments:

The tie to tube front windshield was rounded to avoid a distorted by this point.

AIRCRAFT FINISHING Assembling the Front Seat Frames

Jabiru Aircraft Pty. Ltd. Final Inspection Checklist J200/400. Firewall forward components

TEMPORARY REVISION NUMBER

Jabiru Aircraft Pty. Ltd. Final Inspection Checklist. Engine Compartment

FAA approval has been obtained on technical data in this publication that affects airplane type design.

1) Page: 45A-11 REV 1: In the list of audio pot settings before Step 1 AutoP Volume off should be AutoP Volume off SkyView/max Garmin

FIREWALL FORWARD GENERAL

SECTION 4: RV-12 PARTS INDEX

HARTZELL PROPELLER INC.

REVISION LIST CHAPTER 21: FLAP SYSTEM COMPLETION

Vehicle Final Inspection Checklist Form

INSTALLATION INSTRUCTIONS EXTERNAL AUXILIARY FUEL SYSTEM P/N

GlaStar and Sportsman Service Bulletin 67

Airframe Group Item Description Part Number Size

SECTION 47: COWL BAFFLE VAN'S AIRCRAFT, INC. CB RIGHT AFT BAFFLE CB CYLINDER 3 BAFFLE VA-187 4" FLANGED DUCT

SERVICE BULLETIN SB

Service Bulletin No.: DAC Rev 5 Date Issued: 26 November 2010 Title: Engine Fuel System Conversion from IO-240-B17B to IO-240-B3B

SERVICE KIT thru , 631, 634, 675 R thru R F thru F FR thru FR

REVISION LIST CHAPTER 24: MISCELLANEOUS SYSTEMS

TEMPORARY REVISION NUMBER

REVISION LIST CHAPTER 13: FIREWALL FORWARD (PART 1)

SERVICE BULLETIN SB00029 Rev B Page 1 of 19

12NPR Reason For Revision

Ballistic Recovery Systems, Inc. PARACHUTE INSTALLATION MANUAL BRS-1350 LS, AMD 601XL Zodiac

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL PA28/PA32 STC # SA00762SE

Section 75-CA-2. Elevator Controls

Items Included in kit: FOLLOWING ARE THE BRAKE LINE RETROFIT KIT ITEMS

Service Bulletin No.: DAC Rev 2 Date Issued: Oct 04, 2016 Title: Installation of LED Anti-Collision and Position light Assembly

2000 SERIES SPEEDBRAKE INSTALLATION MANUAL MOONEY M20 SERIES & M22 STC NO. SA4342NM NOTE: READ THESE DIRECTIONS BEFORE STARTING!

N398CM. RC-3 Serial Number 387 Zero Timed Restoration Details

TORNADO II, S, & SS FUSELAGE TRACKING

Speed Kit (Tri-Gear aircraft)

Airworthiness Directive Schedule

CIRRUS AIRPLANE MAINTENANCE MANUAL

EXPRESS ASSEMBLY MANUAL SECTION 3 F5-RG/FT WING ASSEMBLY. Procedure 3.050A INSTALLATION OF AILERON TORQUE TUBE ASSEMBLY

2000 SERIES PA-30 / PA-39 STC NO. SA00233SE PA-24 STC NO. SA4150NM

Requires: 100 c.c. gasoline engine, 4-channel radio w/ 9 high torque servos.

PARAVION TECHNOLOGY, INC AIRWAY AVENUE FT. COLLINS, COLORADO 80524

SERVICE BULLETIN SB0017 Rev A Page 1 of 5

A Product Line of Sonex Aircraft LLC 511 Aviation Road Oshkosh, WI Tel. (920) Fax. (920)

D'Shannon Aviation PANEL INSTALLATION INSTRUCTIONS

SD3-60 STRUCTURAL REPAIR MANUAL STABILIZER (FIN) - STRUCTURAL IDENTIFICATION

SD3-60 STRUCTURAL REPAIR MANUAL - STRUCTURAL IDENTIFICATION

Ram 1500 Crew Cab A Ram 2500/3500 Crew Cab A

Transcription:

14401 Keil Road NE, Aurora, Oregon, USA 97002 PHONE 503-678-6545 FAX 503-678-6560 www.vansaircraft.com info@vansaircraft.com Service Letters and Bulletins: www.vansaircraft.com/public/service.htm REVISION DESCRIPTION: RV-14 QBF-02 REV 1: In Step 7 (QB), "5-9" was "5-8", and "12-13" was "11-12"

VAN'S AIRCRAFT, INC. SECTION QB: QUICKBUILD FUSELAGE INSTRUCTIONS DATE: 02/09/15 REVISION: 0 RV-14 PAGE QBF-1

VAN'S AIRCRAFT, INC. NOTE: In this instruction set instructions labeled "QB" are instructions used by Van's Aircraft to assemble the quickbuild structure. "QC" are instructions to be completed during the quality check at Van's Aircraft. The remaining instructions labeled "Builder" are to be completed by the customer. NOTE: Builders should read through all QB and QC sections to check that all work has been completed per the plans and become familiar with the construction of their aircraft. Step 1 (QB): Complete Section 25 Fwd Mid Fuselage Bulkheads. Step 2 (QB): Complete Section 26 Mid Fuselage Lower Structure through Page 9. Step 3 (QB): On Page 26-10 complete Steps 10 and 11 as a Taildragger (do not make the rectangular opening for the tri-gear but dimple the holes indicated in Figure 1 on this page). Step 4 (Tri-Gear Builder): Complete Page 26-10 Step 2. Use a straight edge and draw lines on the bottom of the fuselage marking the tri-gear cutout. From the bottom side cutout the hole per Page 26-10 Steps 7 and 8. Cutting just inside the line then finishing with a file makes for a perfect match to the existing hole above. Step 5 (Tri-Gear Builder): Complete Page 26-10 Steps 4, 5 and 9. Complete Page 26-10 Step 12. Install nutplates per Page 26-11 Steps 4 and 7. Step 6 (QB): Complete Page 26-10 Steps 14-16. F-01483-L F-01483-R 10X DIMPLE #40, FLUSH BOTTOM SIDE. F-01483-L Step 8 (QB): Complete Pages 26-12 and 13. Step 9 (QB): Complete Page 26-14 as a Tail Dragger. This will leave open two holes each side for the A-L & -R attach rivets. Step 10 (QB): Complete Pages 26-15 through 20 as a Tri-Gear. This will add the required structure for adding a step. Step 11 (QB): Complete Page 26-21 as a Tail Dragger. This will leave open two holes each side for the A-L & -R attach rivets. Step 12 (QB): Complete Page 26-22. Step 13 (QB): Complete Section 27 Firewall and Section 28 Fwd Fuselage Lower Structure. Step 14 (QB): Complete Page 29-02. Complete Page 29-03 Steps 4-10. Complete Page 29-04 Steps 1-8. This will leave three open dimpled #40 holes at the forward nutplate locations used to attach the Tri-Gear upper gear leg intersection fairing's. Complete Page 29-05. Double check that the CS-00006 Control Column moves freely. Restrain the column temporarily for shipment. Complete Pages 29-06 through 20. Complete Pages 29-21 Steps 1 and 2. Step 15 (QB): Install the A-L & -R Cover Plates using two temporary soft blind rivets. Step 16 (Tri-Gear Builder): Complete Page 26-10 Step 12, Page 26-11 Steps 4 and 9 and Page 29-04 Steps 10 and 11. This will install the nutplates used to attach the Tri-Gear upper gear leg intersection fairings. Step 17 (Tail Dragger Builder): Complete Page 26-11 Step 10 and Page 29-04 Step 9. This will fill the unused nutplate locations with rivets. Step 20 (Tail Dragger Builder): Remove the temporary rivets holding the A-L & R Cover Plates (see Step 15). Rivet the cover plates permanently in place per Page 26-10 Step 17. Step 18 (Tri-Gear Builder): Remove the A-L & R Cover Plates (see Step 15). Rivet the open holes made on Page 26-10 Step 14 with rivets. See Figure 2. Rivet the holes left open on Page 26-14. See Step 9. Step 19 (Tri-Gear Builder): Remove the bolts attaching the F-01442 Lower Drag Fitting in the tail dragger configuration (installed in Step 14 on this page). Complete Page 29-03 Steps 1-3. FWD UP RIGHT Step 20 (Builder): Complete Page 29-11 Steps 3-11. Complete Page 29-22. Step 21 (Builder): Complete Sections 30,31,32,33 and 34. 2X MATCH-DRILL #40 2X AN426AD3-3 (TRI-GEAR BUILDER) Step 7 (QB): Complete Page 26-11 Steps 1-3, 5-9 and 12-13. This will leave three open dimpled #40 holes at the nutplate locations used to attach the Tri-Gear upper gear leg intersection fairings. 2X DIMPLE #40, FLUSH BOTTOM SIDE FIGURE 1: FORWARD & CENTER BOTTOM SKINS A-L FIGURE 2: COVER PLATE INSTALLATION 2X SOFT TEMP BLIND RIVET PAGE QBF-2 RV-14 REVISION: 1 DATE: 01/02/16

QUICKBUILD FUSELAGE (CONTINUED) VAN'S AIRCRAFT, INC. Step 1 (QB): Complete Pages 35-02 through 09. Step 2 (QB): Complete Page 35-10 except for Step 5. Using twist ties temporarily attach the Wiring Channel Assembly to the F-01455 Sub Panel. Using a single twist tie on each side attach the Wiring Channel Assembly to the F-01451-L & -R Tunnel Sides. Step 3 (QB): Complete Pages 35-11 through 22. NOTE: Before completing Step 4 Make sure that the rudder pedals have been installed first per QBF-2 Step 21! Step 4 (Builder): Complete Page 35-10 Step 5. Step 5 (Builder): Complete Sections 36 and 37. DATE: 12/30/15 REVISION: 1 RV-14 PAGE QBF-3

VAN'S AIRCRAFT, INC. THIS PAGE INTENTIONALLY LEFT BLANK QBF-4 RV-14 0 PAGE REVISION: DATE: 02/09/15