Jabiru Aircraft Pty. Ltd. Final Inspection Checklist J200/400. Firewall forward components

Size: px
Start display at page:

Download "Jabiru Aircraft Pty. Ltd. Final Inspection Checklist J200/400. Firewall forward components"

Transcription

1 Jabiru Aircraft Pty. Ltd. Final Inspection Checklist J200/400 Registration No: Aircraft Checklist Pre Ground Test Model: Aircraft Serial No: Firewall forward components Propeller: Prop Size: 60 x 53 Other: Propeller Serial No: Prop Bolts: 1. Check Torque (6 ft/lbs) 2. Check Tracking 3. Torque seal nuts 4. Visual check prop for serviceability Spinner: 1. Spinner screws secure 2. Check Spinner/spinner backing plate has been indexed correctly & marked on spinner & spinner flange. 3. Check spinner tracking with engine running Engine: Engine Serial No: Engine Mount bolts secure: 1. Firewall 2. Engine 3. Thrust washer in place & correct Fuel hose secure: 1. Carburettor to pump 2. pump to bulkhead 3. clamped and tied 4. breather hose a. carburettor to hot air mixer box b. fuel pump to firewall \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 1 of 11

2 Spark Plugs/Coil leads: 1. Check plugs are secure 2. terminal nuts secure 3. CHT sender (12mm terminal) 4. leads secure on plugs 5. leads secure on distributor cap gauge earth wire secure and clipped into coil Ram Air Ducts: 1. Baffles in place 2. Bolts secure x 4 3. springs in place 4. spring lock-wire correct and secure x 2 5. Check Alignment of rubber with top cowl 6. Air Ducts not touching top cowl 7. Cooling tubes directed onto coils Oil: 1. Level correct (4 cylinder 2.4) (6 cylinder 3.4) 2. sump plug wired 3. cooler bracket secure to engine 4. cooler secured to bracket 5. air dam in place 6. check hose route 7. cooler hose clamps secure x 4 8. fire sleeve secure 9. filter secure 10. oil breather hose & bottle secure Throttle cable: 1. cable lock nuts secure on both ends 2. cable end free in carburettor link 3. split pins secure 4. 2 x 5/16 washers between cable and carburettor link 5. cable alignment correct with outer at both ends 6. cable adjustment a) full throttle b) idle Choke Cable: 1. Lock nuts secure both ends 2. cable end free in carburettor link 3. split pin secure 4. cable alignment correct with outer 5. operational Carburettor Heat Cable: 1. Lock nuts secure both ends 2. cable end free in carburettor link 3. split pin secure \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 2 of 11

3 4. cable alignment correct with outer 5. operational Scat Hose: 1. carburettor to hot box a) hose clamps secure b) not bunched up under carburettor c) smooth route 2. hot box to NACA duct a) hose clamps secure b) smooth route 3. hot box to heat muff a) hose clamps secure b) smooth route Nose leg & housing: 1. Tyre pressure checked 20 psi 2. wheel - ease of rotation 3. leg lubricated and ease of rotation 4. assembly all bolts secure in nose leg 5. Housing bolts secure a) ¼ washers on head of bolt 6. rod end secure both sides 7. safety hole within limits 8. Jam nuts secure 9. air valve grommet in place 10. spats screws secure 11. Spring does not become coil bound full deflection Electrical: 1. battery tie down secure 2. battery terminals secure 3. battery earth secure on firewall 4. starter solenoid locknuts & wires secure 5. regulator wires secure & correct 6. temp sender wires secure x 3 (oil & CHT) 7. all wiring cable tied and secure 8. oil pressure wire correct & secure (G terminal) Cowls: 1. Top & Bottom Cowl Alignment (no gaps) 2. Retained Nuts secure & correct 3. Oil Door operational 4. Pin Bent in Oil Door hinge 5. Spinner not touching front of cowl & Propeller 6. Oil Cooler not touching bottom cowling 7. Cylinder Heads not touching Top & Bottom Cowling 8. NACA duct secure with no sharp edges 9. Cam Locks Secure & operational \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 3 of 11

4 Interior Fuel system: 1. filters secure & flow direction correct 2. fuel line secure a) bulk head to fuel pump b) fuel pump to selector valve c) fuel selector valve to gascolator left & right d) gascolator left & right to fuel gauge e) gascolator left & right to rear fuel pickup in wing root f) Fuel Gauge forward fuel line in wing root 3. check hose route (a) (f) 4. check valve operation left & right Check left wing fuel line is attached to left hand side fuel tap. Check right wing fuel line is attached to right hand side fuel tap 5. check valve cover and mount secure to console 6. check finger filters secure Fuel Breather: a. Check breather hose clamps and breather route b. Wing Breather tube to wing root secure c. Wing root breather tube to sharks fin Left & Right hand side secure d. Sharks fin to overflow secure e. Sharks fin secure on fuselage f. Check gauze is not blocked g. Check 1/8 holes have been drilled & clear h. Check Fuel breather tube is secure to body fuel filler i. Fuel Breather check has been conducted: Please note: you must be able to hear air in all three outlets independently by a) Removing filler cap in left wing & blow into sharks fin bocking 1/8 holes b) Removing filler cap in right wing & blow into sharks fin bocking1/8 holes c) With both filler caps in body fuel filler listen to breather outlet under fuselage Fuel Gauge Left & Right: 1. Secured to fuselage 2. Check for leaks 3. Add one litre of fuel to each tank & mark fuel level ensure fuselage is level. 4. Fuel decal in place left & right Fuel Flow Test: 1. Add 20lts of fuel to left & right hand tank 2. check Fuel taps have been indexed i.e. on is on off is off 3. Select left tank only & measure fuel flow a) Fuel pump off lts per minute b) fuel pump on lts per minute 4. Select Right tank only & measure fuel flow a) Fuel pump off lts per minute \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 4 of 11

5 b) fuel pump on lts per minute Controls Rudder: 2. pedal mount bolts secure x 2 3. Rudder peddle keepers secure & correct a) 2 x ¼ bolt secure b) 2 x 5/16 bolts secure c) check jam nuts on push rods secure x 2 d) check safety within limits on push rods x 2 f) check rod end free play at full deflection, both directions 3. Rudder cable a) anchor secure and correct position in clamp b) rod end secure in pedal with ¼ washer c) safety within limits d) jam nuts secured e) rod end free play at full deflections, in both directions f) rudder stoppers adjusted and secure (check 98mm travel left & right) Trim: Brake: 1. handle secure 2. lever pivot secure and split pin 3. friction correct & secure 4. rod end secure 5. check safety hole within limits 6. jam nuts secure 7. cable position in clamp correct & anchor secure 8. operation 9. spring not coil bound with elevator fully deflected up 10. decal fitted and correct 1. handle assembly correct and secure 2. lever pivot secure and split pin (no fee play side to side) 3. rod end secure 4. Pushrod not binding in centre console 5. check safety hole within limits 6. jam nuts secure 7. operation 8. free play 9. fluid level full 10. stainless striker in place 11. handbrake correct and operational \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 5 of 11

6 Throttle: 1. cable anchor secure 2. cable alignment correct 3. cable end free in output lever 4. output lever secure 5. input lever x 2 secure 6. bearing blocks x 2 secure 7. throttle stop correct and secure Horizontal shaft: 1. control stick pivot secure 2. yolk secure (no free play) 3. rod end secure 4. safety hole within limits 5. jam nuts secure 6. elevator cable anchor secure and correct position in clamp 7. cable clear of centre console in all positions (Elevator UP & Aileron to Right Hand Side) 8. rod end free at full deflections 9. bell crank plate secure Aileron Cable: 1. cable anchor - wedges i. left ii. right - R clip i. left ii. right - rivets x 3 TLR i. left ii. right 2. rod ends secure x 2 3. safety within limits x 2 4. jam nuts secure x 2 5. aileron stoppers secure (cannot over centre aileron bellcrank) Seat Belts: 1. check bolts are through nyloc and buckle has free play i. Left ii. Right 2. Operation 3. belts not twisted 4. seat belt anchor secure (lower and upper) 5. Door Frame Compression struts fibreglasses in place with no sharp edges. Headsets: hook secure \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 6 of 11

7 Instrument Panel: 1. secure & level 2. instruments square (Check turn coordinator / slip skid ball is centred). 3. balance ball air bubble not visible 4. switches secure 5. choke cable decal square 6. registration number p-touch on panel 7. Switch decals in place & correct 8. mag guard in place and square with rounded edges 9. all instruments fitted as per order 10. instrument markings correct 11. altimeter QNH correct 12. all instruments operational 13. cigarette lighter installed 14. all avionics as per order and operational Flap handle: Upholstery: Decals: 1. pivot bolt secure & torqued 2. pivot bolt split pin 3. locater bolt secure 4. ease of location in all three positions 5. rod end bolt secure handle - input shaft 6. push rod not binding in all three position 7. safety hole within limits x 2 8. jam nuts secure x 2 9. visual on input lever 10. visual on bearing blocks Check nuts are in safety 1. fitted & clean 2. correct as per order 3. seat covers 4. map pockets 1. warning 2. baggage 3. loading Stall warning: 1. operation correct (suck to ensure reed is correct) 2. gauze and stainless plate installed correctly and clear Doors: LEFT RIGHT 1. operation 2. restraining straps secure and correct length 3. hinge and pin secure 4. catches secure and freely operating 5. visual on door jam \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 7 of 11

8 LEFT RIGHT 6. visual on door seal 7. visual on rope handle 8. visual on top catch 9. decals Do not lean on door Exit Open Owners Manual EXTERIOR Wings: LEFT RIGHT 1. route bolts inspected ( correct tension) x 2 2. strut bolts x 2 inspected, correct tension 3. warning decals x 2 (Do not Tighten) 4. speed fairing secure and clear of strut 5. flap/deflections a) first stage b) second stage c) neutral 6. flaps a) hinge points secure with pivot bolts in safety b) push rod ends secure and not binding in 3 positions c) safety hole within limits d) jam nuts secure e) push rod not fowling on cover strip f) drive shaft output secure g) drain holes have been drilled h) wing route cover strips secure i) top wing strut fairings secure 7. Aileron Deflections a) neutral (level with lower wing skin) b) up deg c) down deg 8. Ailerons a) Hinge pin and retainer secure b) Rod ends secure c) Safety hole within limits d) Jam nuts secure e) Cable anchor secure and correct position in clamp f) Drain holes 9. wing drain hole in trailing edge 10. inspection window secure \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 8 of 11

9 RIGHT 11. Pitot a) secure b) operation c) cover Main Undercarriage: LEFT RIGHT 1. tyre pressure 25 psi 2. ease of rotation 3. calliper secure 4. stub axle secure 5. hubs secure 6. discs secure 7. stub axle extension is secure 8. legs secure x 2 9. spat a) screws secure b) clear of tyre a) retain nuts b) outer edge c) air valve grommet in place d) no step decal in place Fuel cap: 1. filler cap secure 2. Earth wire secure 3. Quick drain a) operation b) lock wired 4. decals in place & correct Elevator Deflections 1. up deg 2. down deg 3. 2mm clearance to stops on fuse Elevator: 1. hinge pins and retainers secure 2. rod ends secure 3. safety within limits 4. jam nuts secure 5. cable anchor secure and correct position in clamp 6. drive plate secure 7. rod end free play at full deflections 8. end-plug not touching end-cap full deflection down \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 9 of 11

10 Trim: Trim Cable: Ventral Fin: Rudder: Static Vent: a) pivots secure b) spring rod a) split pins secure b) springs lubricated c) black block secure and free d) rod ends secure e) safety hole within limit f) jam nuts secure g) rod end free at full deflections a) cable anchor secure and correct position in clamp b) rod ends secure c) safety within limits d) jam nuts secure e) rod end free at full deflections. a) Retained nuts in fuselage secure b) Elevator horn not hitting Cut-out in Ventral (full up deflection.) c) Inspection holes drilled d) Drain holes drill e) Ventral fin secure onto fuselage 1. Deflection a) left mm b) right mm c) 2mm clearance to stops on fuse 2. hinge pin and retainers secure 3. 5mm off set to right 4. rod end secure 5. safety within limits 6. jam nuts secure 7. cable anchor secure and correct position in clamp 8. rod end free at full deflections 1. tip secure 2. holes clear 3. decal in place 4. Suction Test with no leaks (Block second hole in static vent & suck until ASI reads 100kts, hold until stabilised.) \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 10 of 11

11 AIRCRAFT REGISTRATION: S/N# DATE: DEFECT: CORRECTED BY: \\Gateway\library\files\forms\Pre & Flight Testing\Final Inspection Cecklist J doc 13 June 2003 Page 11 of 11

Jabiru Aircraft Pty. Ltd. Final Inspection Checklist. Engine Compartment

Jabiru Aircraft Pty. Ltd. Final Inspection Checklist. Engine Compartment Jabiru Aircraft Pty. Ltd. Final Inspection Checklist Registration No: Aircraft Checklist Pre Ground Test Model: Serial No: Engine Compartment Propeller: Prop Size: 60 x 53 Other:.. Propeller Serial No:

More information

11. Completing the Fuselage Engine Installation

11. Completing the Fuselage Engine Installation 11. Completing the Fuselage Engine Installation Engine Installations 11 1 230399 - Fit Engine Mount Reference: Photo 11.16(a) Parts Required: 4025094 Backing Plate Engine Mount (4) AN4-20A Bolt (4) AN3-11A

More information

Section 1.4 FINAL INSPECTION

Section 1.4 FINAL INSPECTION File Number MDRA C20 MANUAL of PROCEDURES for INSPECTION of METAL, TUBE, FABRIC and WOOD AMATEUR-BUILT AIRCRAFT, INSPECTION AND TECHNICAL INFORMATION RECORD Section 1.4 FINAL INSPECTION GENERAL 1. Have

More information

Mooney Mite M-18X Plans and Drawings Index Arranged by Group Miscellaneous Group

Mooney Mite M-18X Plans and Drawings Index Arranged by Group Miscellaneous Group Miscellaneous Group 110470 Bushings - Special 314410 Airspeed & Altimeter Installation 110190 Arm - Landing Warning 110070 Button - Static Airspeed 213260 Cone - Wing Fillet 110120 Control - Placard 616100

More information

LANCAIR LEGACY PRE-TEST FLIGHT INSPECTION (8-04)

LANCAIR LEGACY PRE-TEST FLIGHT INSPECTION (8-04) LANCAIR LEGACY PRE-TEST FLIGHT INSPECTION (8-04) OWNER PHONE # ADDRESS N SERIAL # AIRCRAFT TYPE DATE / / TACH TIME hrs. TOTAL TIME hrs. EMPTY WEIGHT CG. PAINT & INTERIOR? YES NO ENGINE TYPE PROPELLER ALL

More information

Seabee Annual/100-Hour Inspection

Seabee Annual/100-Hour Inspection Date Completed Seabee Annual/100-Hour Inspection ENGINE Mechanic s Initials 1 Drain engine oil and check for foreign material 2 Check oil screen for proper rotation or looseness 3 Safety Oil Plug 4 Refill

More information

PIPER CUB J3-65 N68952 PRE-FLIGHT CHECKLIST

PIPER CUB J3-65 N68952 PRE-FLIGHT CHECKLIST PRE-FLIGHT CHECKLIST COCKPIT Check airworthiness certificate, registration, weight & balance documentation Battery - CONNECTED Plug in headsets or secure as required Fuel ON Primer CLOSED & LOCKED Carb

More information

Accident Prevention Program

Accident Prevention Program Accident Prevention Program Maintenance Aspects of Owning Your Own Airplane Introduction As an owner-pilot, FAR Part 43 allows you to perform certain types of inspections and maintenance on your airplane.

More information

PIPER CUB J3-65 N68952 PRE-FLIGHT CHECKLIST COCKPIT

PIPER CUB J3-65 N68952 PRE-FLIGHT CHECKLIST COCKPIT PIPER CUB J3-65 N68952 PRE-FLIGHT CHECKLIST COCKPIT Check airworthiness certificate, registration, weight & balance documentation Battery - CONNECTED Plug in headsets or secure as required Fuel ON Magnetos

More information

Lower Fuselage Assembly. Controls

Lower Fuselage Assembly. Controls Lower Fuselage Assembly Jabiru Aircraft Controls Lower Fuselage Assembly 10.11 3 051000 1 Assemble & Fit Control References: Drawings 3000092-7 and 93000K4/1 see (10.12) Photo 10.11(a) to 10.11(i) Parts

More information

Van s Aircraft RV-4. Pilot s Operating Handbook

Van s Aircraft RV-4. Pilot s Operating Handbook Van s Aircraft RV-4 Pilot s Operating Handbook PERFORMANCE SPECIFICATIONS SPAN:.. 23 0 LENGTH:. 19 9 HEIGHT:. 6 8 SPEED: Maximum at Sea Level.. Cruise, 75% Power at 8,000 Ft.. 173 Knots 165 Knots RANGE

More information

Airframe Group Item Description Part Number Size

Airframe Group Item Description Part Number Size Parts List: LS-1 Airframe Group Canopy - LS1 Aluminum sheet, 6061 T6 1241-8.050" x 1.5" 8" Angle, aluminum 6061-T6 987-6 2" x 2" x.125" 6" Bar stock, acetal 42367 1" x 1.25" 3" Bar stock, alum 1125-8 1"

More information

AEROPRO Checklist B Service/Maintenance

AEROPRO Checklist B Service/Maintenance AEROPRO Checklist B Service/Maintenance 2 Periodic maintenance AIRFRAME Maintenance Interval Time Limitation - after first 25 2 hours when reached - after first 50 3 hours when reached - after 100 5 hours

More information

Cessna 172RG WARNING. Maximum Demonstrated Crosswind. Takeoff or landing..15 KTS

Cessna 172RG WARNING. Maximum Demonstrated Crosswind. Takeoff or landing..15 KTS Cessna 172RG INTRODUCTION: This aircraft checklist contains information from the original manufacturer s Pilot Information Manual. Normal procedures associated with optional systems can be found in Section

More information

A Simplified Index of Mooney M-18 Drawings at the NASM

A Simplified Index of Mooney M-18 Drawings at the NASM A Simplified Index of Mooney M-18 Drawings at the NASM Dwg. No. Dwg. date Title Models Remarks IDnum Price 0000 23-Aug-54 M-18 Aileron Crank Mooney M-18 17 x 22 DD-0029487 $2.10 0000 [Lower Pick-Up Strap

More information

100hr and Condition inspection checklist

100hr and Condition inspection checklist 100 Hour and Annual Inspection Guide 100hr and Condition inspection checklist AA-100CONISP-LS1 Revision Date Details 0 4-2009 Original 1 4-2012 Format change AA-100CONISP-LS1 R1-4-2012 100 Hour and Annual

More information

Test Flying should only be performed by a pilot who is licensed, rated and experienced on the aircraft type.

Test Flying should only be performed by a pilot who is licensed, rated and experienced on the aircraft type. Test Flying Procedure: Test Flying should only be performed by a pilot who is licensed, rated and experienced on the aircraft type. In particular, the test pilot should have recently demonstrated an ability

More information

Seabee Annual Inspection Procedures

Seabee Annual Inspection Procedures Procedures Due to the wide variety of Seabee s flying out there, these procedures should be modified to fit YOUR Seabee. Make sure that all AD s are complied with as well as any required Service Bulletins

More information

MOONEY MITE AIRCRAFT DRAWINGS NASM Archives Accession No HOW TO ORDER COPIES OF DRAWINGS

MOONEY MITE AIRCRAFT DRAWINGS NASM Archives Accession No HOW TO ORDER COPIES OF DRAWINGS SI-382712 BLUEPRINT MOONEY MITE AIRCRAFT DRAWINGS NASM Archives Accession No.1989-0028 HOW TO ORDER COPIES OF DRAWINGS NASM s collection of Mooney M-18 Mite drawings is available to restorers, researchers,

More information

22. Preparing for Flight

22. Preparing for Flight 22 Preparing for flight 22. Preparing for Flight Rig the aeroplane ready to fly. 22.1 Airframe 22.1.1 Dihedral and washout The following specifications are intended as a rough indication of the correctness

More information

MD RA Minister's Delegates - Recreational Aviation Représentants du Ministre - Aviation de loisir

MD RA Minister's Delegates - Recreational Aviation Représentants du Ministre - Aviation de loisir Think Safety Pensons Securite MD RA Minister's Delegates - Recreational Aviation Représentants du Ministre - Aviation de loisir Inspection Service Service d'inspection MDRA C20 MANUAL of PROCEDURES for

More information

Check List for Maintenance Valid for SF 25 C Falke. Registration: Engine Type: ROTAX 912 A (1), (2), (3), (4) ROTAX 912 S (2) (3) (4) Owner:

Check List for Maintenance Valid for SF 25 C Falke. Registration: Engine Type: ROTAX 912 A (1), (2), (3), (4) ROTAX 912 S (2) (3) (4) Owner: Check List for Maintenance Valid for SF 25 C Falke Motor Glider Type: SF 25 C Serial No.: Engine Type: ROTAX 912 A (1), (2), (3), (4) ROTAX 912 S (2) (3) (4) Propeller Type: Registration: Year of Production:

More information

MODEL 95 PARTS CATALOG ALPHABETICAL INDEX , 21, 21A 31 3, 4, 4A , 58A 60 61A, 61B, 61C

MODEL 95 PARTS CATALOG ALPHABETICAL INDEX , 21, 21A 31 3, 4, 4A , 58A 60 61A, 61B, 61C A MODEL 5 PARTS CATALOG FIGURE A FIGURE Access Doors, Wing Accessories 7 Accumulatn~.' Propeller Governor Unfeathering. 56 Actuator Aileron T"JJ. Cover, Fl2v Cowl Flap Elevator Tab. Flap. Landing Gear

More information

PIPER AIRCRAFT PA NOTE- Perform all inspections or operations at each oj the inspection. 1. Inspectspinnerandbackplate

PIPER AIRCRAFT PA NOTE- Perform all inspections or operations at each oj the inspection. 1. Inspectspinnerandbackplate PPER ARCRAFT PA-38-111 (.MANTENANCE MANUAL SCHEDULED MANTENANCE. PERODC NSPECTONS. -NOTE- Perform all inspections or operations at each oj the inspection intervals as indicated by a circle (). nspection

More information

RAF BULLDOG MODIFICATION INDEX T Mk 1 SERIES

RAF BULLDOG MODIFICATION INDEX T Mk 1 SERIES RAF BULLDOG MODIFICATION INDEX T Mk 1 SERIES ification Title Class Comments 1 1.4.73 Extension of Flap Shrouds B2 2 4.4.73 Resistor Part No 11212E (ITT Ltd) in Supply to Integral Lighting on CCS Panel

More information

Jump to Table of Contents

Jump to Table of Contents Jump to Table of Contents PIPER AIRCRAFT CORPORATION PA-28R-201, CHEROKEE ARROW III SECTION 3 EMERGENCY PROCEDURES 3.3 EMERGENCY PROCEDURES CHECK LIST ENGINE FIRE DURING

More information

Van s Aircraft RV-7A. Pilot s Operating Handbook N585RV

Van s Aircraft RV-7A. Pilot s Operating Handbook N585RV Van s Aircraft RV-7A Pilot s Operating Handbook N585RV PERFORMANCE SPECIFICATIONS SPAN:..25 0 LENGTH...20 4 HEIGHT:.. 7 10 SPEED: Maximum at Sea Level...180 knots Cruise, 75% Power at 8,000 Ft...170 knots

More information

Interior Pre Flight Documents: Check Control Wheel Lock: Remove Flight Controls: Check Instruments: Check for Damage Switches: Verify All Off Master

Interior Pre Flight Documents: Check Control Wheel Lock: Remove Flight Controls: Check Instruments: Check for Damage Switches: Verify All Off Master Interior Pre Flight Documents: Check Control Wheel Lock: Remove Flight Controls: Check Instruments: Check for Damage Switches: Verify All Off Master Switch ALT/BAT: On Fuel Gauge: Check Quantity Flaps:

More information

PREFLIGHT CHECK COCKPIT RIGHT WING. NORMAL PROCEDURRES CHECKLIST PA-28RT 201 Arrow IV

PREFLIGHT CHECK COCKPIT RIGHT WING. NORMAL PROCEDURRES CHECKLIST PA-28RT 201 Arrow IV NORMAL PROCEDURRES CHECKLIST PA-28RT 201 Arrow IV PREFLIGHT CHECK COCKPIT Control Wheel -- Release Restraints Avionics -- OFF Parking Brake -- SET All Switches -- OFF Mixture -- IDLE CUT-OFF Master Switch

More information

Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur

Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur Lecture - 11 Inspection of Aircraft So, we are now on Cessna 206 edge

More information

INSTALLATION MANUAL FOR JABIRU 5100 AIRCRAFT ENGINE

INSTALLATION MANUAL FOR JABIRU 5100 AIRCRAFT ENGINE INSTALLATION MANUAL FOR JABIRU 5100 AIRCRAFT ENGINE This Manual has been prepared as a guide to correctly install the Jabiru 5100 engine into an airframe. Should you have any questions or doubts about

More information

Owners Manual. Table of Contents 4.1. INTRODUCTION SPEEDS FOR NORMAL OPERATION CHECKLIST & PROCEDURES 4

Owners Manual. Table of Contents 4.1. INTRODUCTION SPEEDS FOR NORMAL OPERATION CHECKLIST & PROCEDURES 4 NORMAL OPERATIONS Table of Contents 4.1. INTRODUCTION 2 4.2. SPEEDS FOR NORMAL OPERATION 2 4.3. CHECKLIST & PROCEDURES 4 4.3.1. PREFLIGHT INSPECTION 4 4.3.2. BEFORE STARTING ENGINE 8 4.3.3. STARTING ENGINE

More information

The tie to tube front windshield was rounded to avoid a distorted by this point.

The tie to tube front windshield was rounded to avoid a distorted by this point. CHANGES IN AIRFRAME IBIS MAGIC GS-700 (2.008) Drilling of plastic polycarbonate drill with 9/64 so that it is an amplitude when riveting. The tie to tube front windshield was rounded to avoid a distorted

More information

Models AA-5, AA-5A & AA-5B Annual or 100-hour Inspection

Models AA-5, AA-5A & AA-5B Annual or 100-hour Inspection Models AA-5, AA-5A & AA-5B Registration Number Serial Number Hours Registered Owner(s) Street Address City State/ Postal Code Provence Inspector Signature License No. Date Airport/City State/ Provence

More information

AA-5 SERIES MAINTENANCE MANUAL MODELS AA-5, AA-SA & AA-5B HOUR INSPECTION PROCEDURE ANNUAL OR 100 HOUR INSPECTION PROCEDURE GUIDELINE

AA-5 SERIES MAINTENANCE MANUAL MODELS AA-5, AA-SA & AA-5B HOUR INSPECTION PROCEDURE ANNUAL OR 100 HOUR INSPECTION PROCEDURE GUIDELINE MODELS AA-5, AA-SA & AA-5B ANNUAL OR 100 - HOUR INSPECTION PROCEDURE ANNUAL OR 100 HOUR INSPECTION PROCEDURE GUIDELINE FAR 43 15 (C) (1) states: Each person performing an annual or 100 hour inspection

More information

INTRODUCTION. This Catalog:

INTRODUCTION. This Catalog: Editor s Note: This Parts Catalog has been reproduced from the original Republic Parts Catalog. Obviously, most of the information is obsolete; the pictures are accurate and up-to-date. If nothing else,

More information

Expanded Flight Checklist Cessna 152

Expanded Flight Checklist Cessna 152 OUTSIDE CHECK INSIDE CABIN 1 Magnetos... OFF 2 Mixture... IDLE CUT OFF 3 Master switch... ON 4 Fuel quantity... CHECKED 5 Master switch... OFF OUTSIDE CABIN 1 Left wing... CHECKED Surface condition Flap

More information

10. Lower Fuselage Assembly Undercarriage

10. Lower Fuselage Assembly Undercarriage 10. Lower Fuselage Assembly Undercarriage Undercarriage 10.27 2 230399 0 Jabiru Undercarriage Configurations There are four combinations of tyres available, utilising two sets of hubs (standard and heavy

More information

CARENADO COPYRIGHTS. Normal & Emergency Checklist

CARENADO COPYRIGHTS. Normal & Emergency Checklist NORMAL PROCEDURES CHECKLIST PREFLIGHT CHECK Control wheel -- RELEASE BELTS Avionics -- OFF Master Switch -- ON Fuel quantity gauges -- CHECK Master switch -- OFF Ignition -- OFF Exterior -- CHECK FOR DAMAGE

More information

SPARE PARTS CATALOGUE

SPARE PARTS CATALOGUE SPARE PARTS CATALOGUE contains spare parts for: ATEC 321/322 Faeta ATEC 122 Zephyr Pricelist valid from: February 1st, 2017 All prices indicated in EUR currency excluding VAT and freight; EX WORKS conditions

More information

Cessna 172P PPL Checklist Page 1

Cessna 172P PPL Checklist Page 1 Cessna 172P PPL Checklist 06-08-2017 Page 1 Cessna 172P PPL Checklist 06-08-2017 Page 2 Checklist Items Informational Items Critical Memory Items PREFLIGHT COCKPIT CHECK (DO-LIST) Pitot Cover -- REMOVE

More information

ILLUSTRATED PARTS CATALOGUE

ILLUSTRATED PARTS CATALOGUE ILLUSTRATED PARTS CATALOGUE contains spare parts for: ATEC 122 Zephyr ATEC 321/322 Faeta ATEC 321 Faeta NG Pricelist valid from: April 1st, 2018 All prices indicated in EUR currency excluding VAT and freight;

More information

X-Air F - Parts Price List

X-Air F - Parts Price List Warning: These prices are outdated and will soon be replaced with current price lists. Please get a currently valid quote before ordering. X-Air F - Parts Price List Part Number 101058 101070 101074 101088

More information

12.0 CONTROLS 3/3/2006. Page 1

12.0 CONTROLS 3/3/2006. Page 1 Page 1 Page 2 SR3500 Rudder Pedal Parts List ITEM DESCRIPTION PART NUMBER QTY 1 MASTER BRAKE PEDAL RP0015 2 2 SLAVE BRAKE PEDAL RP0016 2 3 PUSH ROD RP0017 4 4 SLAVE BRAKE TORQUE TUBE RP0018 2 5 MASTER

More information

FUSELAGE ASSEMBLY SECOND SECTION (of three)

FUSELAGE ASSEMBLY SECOND SECTION (of three) FUSELAGE ASSEMBLY SECOND SECTION (of three) 1 FRONT FLOOR ASSEMBLY The front floor assembly is fabricated from three pieces of the two ply pre-pregnated panel material supplied. The basic floor panel and

More information

ILLUSTRATED PARTS CATALOGUE

ILLUSTRATED PARTS CATALOGUE ILLUSTRATED PARTS CATALOGUE contains spare parts for: ATEC 122 Zephyr ATEC 321/322 Faeta ATEC 321 Faeta NG Pricelist valid from: April 1st, 2018 All prices indicated in EUR currency excluding VAT and freight;

More information

X-Air S - Parts Price List

X-Air S - Parts Price List X-Air S - Parts Price List Part Number Part Name Price AX06070 Trailing edge pin M6 Bolt (but and drill) $1.14 101058 Plate, Exhaust $6.44 101070 Bush, exhaust support $4.59 101074 Exhaust pipe support

More information

SX300 for sale $249,000 or best offer 207 TTSN Airframe, Engine, Propeller Last Condition Inspection Last IFR Pitot-Static Mode-C

SX300 for sale $249,000 or best offer 207 TTSN Airframe, Engine, Propeller Last Condition Inspection Last IFR Pitot-Static Mode-C SX300 for sale $249,000 or best offer 207 TTSN Airframe, Engine, Propeller 11-2017 Last Condition Inspection 01-2017 Last IFR Pitot-Static Mode-C Certification SX300 for sale $249,000

More information

400 2x4/4x4 EFT SHARE OUR PASSION ṬM

400 2x4/4x4 EFT SHARE OUR PASSION ṬM SHARE OUR PASSION ṬM 400 2x4/4x4 EFT Model Number A2009IDG2BETR (Red - 2x4) Model Number A2009IDG2BETZ (Cat Green - 2x4) Model Number A2009IDG4BETR (Red - 4x4) Model Number A2009IDG4BETG (Green - 4x4)

More information

Airworthiness Directive Schedule

Airworthiness Directive Schedule Airworthiness Directive Schedule Aeroplanes Cessna 120 26 November 2015 Notes 1. This AD schedule is applicable to Cessna 120 aircraft manufactured under Federal Aviation Administration (FAA) Type Certificate

More information

Instruction Manual. Wingspan : 1400 mm (55.12 inch) : 1480 mm (58.27 inch) : 5500gr gr. : 6-9 channel/ 8 servo high torque,1 standard

Instruction Manual. Wingspan : 1400 mm (55.12 inch) : 1480 mm (58.27 inch) : 5500gr gr. : 6-9 channel/ 8 servo high torque,1 standard Wingspan : 1400 mm (55.12 inch) g Length : 1480 mm (58.27 inch) Weight : 5500gr - 6000gr Radio : 6-9 channel/ 8 servo high torque,1 standard Engine : GT 22 OS KIT CONTENTS: We have organized the parts

More information

SIZE.120 OR 30CC SCALE 1:5 ARF

SIZE.120 OR 30CC SCALE 1:5 ARF PC21 PILATUS MK2 SIZE.120 OR 30CC SCALE 1:5 ARF SPECIFICATION - Wingspan: 1772mm (69.72in) - Length: 2019mm (79.5 in) - Flying weight: 6.4-7.2 kg - Wing area: 57.6 dm2 - Wing loading: 113g/dm2 - Wing type:

More information

CONTACT OPERATOR F U E L O I L TIRE S P E E D. Vg (best glide, Flps up) KIAS* COM FAIL

CONTACT OPERATOR F U E L O I L TIRE S P E E D. Vg (best glide, Flps up) KIAS* COM FAIL OE-KAS Diamond DA40 / GTN 750 3fly.at: +43 2252 77340 MTOW: 1150 kg (2535 lb) A/C-Size: W: 11,9m H: 2,0m L: 8,0m F P L ( E X A M P L E ) Tower LOAV +43 1 900729201 Maintenance LOAV +43 2252 790894 A I

More information

SERIES GARDEN TRACTORS 1992 PARTS CATALOGUE CONTENTS

SERIES GARDEN TRACTORS 1992 PARTS CATALOGUE CONTENTS 2000 SERIES GARDEN TRACTORS 1992 PARTS CATALOGUE CONTENTS PAGE No. 2000 SERIES GARDEN TRACTOR - CHASSIS, BODY PANELS, WHEELS, SEAT ETC 2 4 2000 SERIES PTO DRIVE, FRONT AXLE, ELECTRICS, MOUNTING FRAME AND

More information

SECTION 4: RV-12 PARTS INDEX

SECTION 4: RV-12 PARTS INDEX SECTION 4: RV-12 PARTS INDEX PART NUMBER NOMENCLATURE SUB-KIT SECT# PAGE# PART TYPE: MAKE FROM MATERIAL: PART NUMBER NOMENCLATURE SUB-KIT SECT# PAGE# PART TYPE: MAKE FROM MATERIAL: A-1201A-L INBD NOSE

More information

Instruction Manual BULLDOG. Wingspan : 1410 mm (55.5in) : 1450 mm (57.1in) : 4900gr gr. Weight. : 6-9 Channel/ 7 servo high torque, 1standard

Instruction Manual BULLDOG. Wingspan : 1410 mm (55.5in) : 1450 mm (57.1in) : 4900gr gr. Weight. : 6-9 Channel/ 7 servo high torque, 1standard Wingspan : 1410 mm (55.5in) Length Weight Radio Engine : 1450 mm (57.1in) : 4900gr - 5600gr : 6-9 Channel/ 7 servo high torque, 1standard : 1.20/ 2 stroke 1.80/ 4 stroke KIT CONTENTS: We have organized

More information

INDEX: Normal Procedures Emergency Procedures Pre Flight Inspection NORMAL PROCEDURES BEFORE STARTING ENGINE

INDEX: Normal Procedures Emergency Procedures Pre Flight Inspection NORMAL PROCEDURES BEFORE STARTING ENGINE INDEX: Normal Procedures Emergency Procedures Pre Flight Inspection NORMAL PROCEDURES BEFORE STARTING ENGINE 1. Preflight Inspection -- COMPLETE 2. Seats, Belts, Shoulder Harnesses -- ADJUST and LOCK 3.

More information

RECOMMENDED MOTOR AND BATTERY SET UP

RECOMMENDED MOTOR AND BATTERY SET UP SPECIFICATION - Wingspan: 1404mm (55.3in) - Length: 1134mm (44. 6 in) - Flying weight: 3.2-3.4 kg - Covering type: Genuine ORACOVER - Spinner size: scale type (not included) - Radio: 4 channel minimum

More information

PA28R ARROW CHECKLIST

PA28R ARROW CHECKLIST PA28R ARROW CHECKLIST 2300.11.0112 1 Normal Procedures Initial PREFLIGHT CHECK General Appearance... CHECKED Position & Taxi Path... CHECKED Tie Downs, Locks, Chocks & Covers... REMOVED Cockpit Controls...UNLOCKED

More information

4A.2 AIRSPEEDS FOR NORMAL OPERATING PROCEDURES

4A.2 AIRSPEEDS FOR NORMAL OPERATING PROCEDURES Normal Operating DA 40 AFM 4A.1 INTRODUCTION Chapter 4A contains checklists and describes extended procedures for the normal operation of the airplane. 4A.2 AIRSPEEDS FOR NORMAL OPERATING PROCEDURES Flight

More information

26-Oct-2017 <NAME> <Aircraft Type> Annual CI / Pre-Buy Examination Checklist. Marc J. Zeitlin A&P #

26-Oct-2017 <NAME> <Aircraft Type> Annual CI / Pre-Buy Examination Checklist. Marc J. Zeitlin A&P # AIRCRAFT INFO Aircraft Serial # Inspection Location Inspection Performed By Airframe Hours (TTAF) Engine Hours (SMOH) Propeller Hours Marc J. Zeitlin A&P #3052594 Annual CI / Pre-Buy

More information

T-51 Mustang - 3/4 Scale Kit

T-51 Mustang - 3/4 Scale Kit T-51 Mustang - 3/4 Scale Kit Description Titan Aircraft is pleased to offer the T-51D Mustang. This P-51D replica incorporates material and systems not commonly found in comparably priced aircraft. This,

More information

Prowler XTX SHARE OUR PASSION ṬM

Prowler XTX SHARE OUR PASSION ṬM SHARE OUR PASSION ṬM Prowler XTX Model Number U2009P3T4EUSV (Steel Blue) Model Number U2009P3T4EOSV (Steel Blue) International Model Number U2009P3T4EUSC (M4 Camo) Model Number U2009P3T4EUSQ (Black - LE)

More information

Prowler XTZ Model Number U2013P4W1PUSU Model Number U2013P4W1POSU - International SHARE OUR PASSION.

Prowler XTZ Model Number U2013P4W1PUSU Model Number U2013P4W1POSU - International SHARE OUR PASSION. 2013 Prowler XTZ Model Number U2013P4W1PUSU Model Number U2013P4W1POSU - International TM SHARE OUR PASSION. TABLE OF CONTENTS 2013 Prowler XTZ (Model No. U2013P4W1PUSU) (Model No. U2013P4W1POSU - International)

More information

Preflight Inspection Cabin EMPENNAGE RIGHT WING Trailing Edge RIGHT WING NOSE

Preflight Inspection Cabin EMPENNAGE RIGHT WING Trailing Edge RIGHT WING NOSE Preflight Inspection Cabin 1. Control Wheel Lock REMOVED 2. Ignition Switch OFF 3. Avionics Power Switch OFF 4. Master Switch ON 5. Fuel Quantity Indicators CHECK QUANTITY 6. Master Switch OFF 7. Fuel

More information

Illustrated Parts Manual. Model Number A2011KSF2BEUZ (Black-Cat Green) A2011KSF2BEOJ (White-Cat Green)

Illustrated Parts Manual. Model Number A2011KSF2BEUZ (Black-Cat Green) A2011KSF2BEOJ (White-Cat Green) Illustrated Parts Manual 2 1 10 DVX 300 Euro Model Number A2011KSF2BEUZ (Black-Cat Green) A2011KSF2BEOJ (White-Cat Green) S H A R E O U R PAS S IO N. TM TABLE OF CONTENTS 2011 ATV DVX 300 Euro Black-Cat

More information

OPERATIONS MANUAL FTO SECTION : 06.04

OPERATIONS MANUAL FTO SECTION : 06.04 06.04.08. OO-WIK SECTION : 06.04 PARTENAVIA OO-WIK PAGE : 1 PRE ENTRY PITOT COVER - REMOVE SNOW / ICE CHECK AIRCRAFT NOSE INTO WIND AIRCRAFT WEIGHT & BALANCE WITHIN LIMITS EXTERNAL (COCKPIT FIRST) PARK

More information

P O H / A F M - (AGX 2017 V1.5)

P O H / A F M - (AGX 2017 V1.5) OE-AGX MTOW = 730 kg / 1.609 lb A/C-Size: W: 10,8 m H: 2,1 m L: 7,2 m F P L ( E X A M P L E ) 7 A/C ID OE-AGX Tower LOAV +43 1 900729201 Mainten. LOAV +43 2252 790894 A I S +43 51703 3211 M E T +43 51703

More information

PA32-RT LANCE II CHECKLIST

PA32-RT LANCE II CHECKLIST PA32-RT LANCE II CHECKLIST 6815.10.1112 1 Normal Procedures PREFLIGHT CHECK Control Wheel... RELEASE BELTS Parking brake... Set Master Switch... ON Fuel Quantity Gauges... check Master Switch... OFF Ignition...

More information

Piper Archer II (PA )

Piper Archer II (PA ) 1. Oil... 6-8 qts, Cap Secure CABIN 1. POH & Documents.. Check Available 2. Magneto Switch...... OFF 3. Pitot/Static Drains... Push to Drain 4. Avionics/Electrical Switches... OFF 5. Master Switch. ON

More information

DVX 300 Euro. Model Number A2012KSF2BEUK SHARE OUR PASSION.

DVX 300 Euro. Model Number A2012KSF2BEUK SHARE OUR PASSION. ATV 2012ATV Illustrated Parts Manual DVX 300 Euro Model Number A2012KSF2BEUK TM SHARE OUR PASSION. TABLE OF CONTENTS 2012 ATV DVX 300 Euro (Model No. A2012KSF2BEUK) BODY PANEL AND HEADLIGHT ASSEMBLY...

More information

Instruction Manual. Wingspan : 2270mm (89.37 inches) : 1870mm (73.62 inches) : 7400gr gr. : 4 channel - 6 standard servo.

Instruction Manual. Wingspan : 2270mm (89.37 inches) : 1870mm (73.62 inches) : 7400gr gr. : 4 channel - 6 standard servo. Wingspan : 2270mm (89.37 inches) g Length : 1870mm (73.62 inches) Weight : 7400gr - 7600gr Radio : 4 channel - 6 standard servo Engine : 25cc-35cc KIT CONTENTS: We have organized the parts as they come

More information

: 6 channel - 9 servo

: 6 channel - 9 servo g Wingspan : 2005mm (78.94 inches) Length : 1640mm (64.57 inches) Weight : 6400g - 6600g Engine : 25cc - 35cc Radio : 6 channel - 9 servo KIT CONTENTS: We have organized the parts as they come out of

More information

1660mm (65.4 in) 1200mm (47.2 in) 2700gr gr 6 channel - 7 servo standard 46/ 2 stroke or 52/ 4 stroke

1660mm (65.4 in) 1200mm (47.2 in) 2700gr gr 6 channel - 7 servo standard 46/ 2 stroke or 52/ 4 stroke Instruction Manual CESSNA-46 1660mm (65.4 in) 1200mm (47.2 in) 2700gr - 3000gr 6 channel - 7 servo standard 46/ 2 stroke or 52/ 4 stroke KIT CONTENTS: We have organized the parts as they come out of the

More information

Instruction Manual book

Instruction Manual book Instruction Manual book SPECIFICATION Wingspan : 1,800mm. 70.87 in. Length : 1,350 mm. 53.15in. Weight : 3.6kg. 7.92lbs. Parts Listing required (not included). Glow Engine : 55-61 2 stroke. 91 4 stroke.

More information

STX-26 Stump Grinder

STX-26 Stump Grinder Form No. 3365-311 Rev B STX-26 Stump Grinder Model No. 23210 Serial No. 310000001 and Up Model No. 23210G Serial No. 310000001 and Up Register at www.toro.com. Original Instructions (EN) *3365-311* B Ordering

More information

1. Ensure Bush Control Column (2) fit factory predrilled holes in Lower Fuselage Main Beam.

1. Ensure Bush Control Column (2) fit factory predrilled holes in Lower Fuselage Main Beam. Assemble & Fit Control References: Drawings 3000092-7 and 93000K4/1 Photo 10.11(a), 10.11(b) Parts Required: 310408N Tube Handle Pivot 3000594 Input Drive Plate 3000394 Horizontal Tube 3100084 Output Yoke

More information

ILLUSTRATED PARTS MANUAL

ILLUSTRATED PARTS MANUAL ILLUSTRATED PARTS MANUAL Wildcat X LTD Model Number U2014WTW1PUSE Model Number U2014WTW1PUSJ Model Number U2014WTW1POSE - International Model Number U2014WTW1POSJ - International TM SHARE OUR PASSION.

More information

Chapter 52 DOORS -Title

Chapter 52 DOORS -Title Chapter 52 DOORS 52-Title Page 1 January 23, 2012 INTENTIONALLY LEFT BLANK 52-Title Page 2 January 23, 2012 LIST OF EFFECTIVE PAGES Chapter Section Page No. Date 52 52-Title 1 January 23, 2012 2 January

More information

PIPER AIRCRAFT CORPORATION

PIPER AIRCRAFT CORPORATION PA-28-181 INSPECTION REPORT ARCHER II ARCHER III PIPER AIRCRAFT CORPORATION (PART NUMBER 230 1039) PIPER AIRCRAFT CORPORATION INSPECTION REPORT This form meets requirements of FAR Part 43 Inspections must

More information

Page 1 of HP B&S Vanguard Engine

Page 1 of HP B&S Vanguard Engine 1405 Page 1 of 41 14 HP B&S Vanguard Engine 1405 Page 2 of 41 14 HP B&S Vanguard Engine Ref # Part Number Qty S/P/F Description BS-28Q777-0647-E1 1 14 HP B&S Vanguard Engine 1 BS-496412 1 Cylinder Assembly

More information

CESSNA 182 CHECKLIST. LEFT WING Trailing Edge 1. Aileron CHECK freedom of movement and security

CESSNA 182 CHECKLIST. LEFT WING Trailing Edge 1. Aileron CHECK freedom of movement and security CESSNA 182 CHECKLIST PRE-FLIGHT INSPECTION CABIN 1. Pilot s Operating Handbook AVAILABLE IN THE AIRPLANE (A.R.R.O.W.E) 2. Landing Gear Lever DOWN 3. Control Wheel Lock REMOVE 4. Ignition Switch OFF 5.

More information

CHECKLIST 1969 CESSNA 172-K. NOTE: Verify all information with airplane's POH

CHECKLIST 1969 CESSNA 172-K. NOTE: Verify all information with airplane's POH CHECKLIST 1969 CESSNA 172-K NOTE: Verify all information with airplane's POH PRE-FLIGHT INSPECTION 1 CABIN 1 A.R.R.O.W. CHECK Airworthiness Cert. In Clear View Registration In Clear View Radio License

More information

PAC 750XL PAC 750XL PAC-750XL

PAC 750XL PAC 750XL PAC-750XL PAC 750XL The PAC 750XL combines a short take off and landing performance with a large load carrying capability. The PAC 750XL is a distinctive type. Its design philosophy is reflected in the aircraft's

More information

N123AX Piper Saratoga II HP (PA-32R-301) Checklist (v23 - Revision 3 April 2011) AIRSPEEDS FOR SAFE OPERATIONS. Best Rate of Climb (gear up, flaps up)

N123AX Piper Saratoga II HP (PA-32R-301) Checklist (v23 - Revision 3 April 2011) AIRSPEEDS FOR SAFE OPERATIONS. Best Rate of Climb (gear up, flaps up) N123AX Piper Saratoga II HP (PA-32R-301) Checklist (v23 - Revision 3 April 2011) AIRSPEEDS FOR SAFE OPERATIS Best Rate of Climb (gear down, flaps up) Best Rate of Climb (gear up, flaps up) Turbulent Air

More information

Retriever PARTS LIST Advance MODEL 5200G(OBSOLETE)

Retriever PARTS LIST Advance MODEL 5200G(OBSOLETE) Retriever PARTS LIST Advance MODEL 5200G(OBSOLETE) 5/85 revised 2/01 FORM NO. 56042131 TABLE OF CONTENTS DESCRIPTION PAGE OUTER BODY...1-2 HYDRAULIC PUMP, ENGINE & FUEL TANK...3-4 HYDRAULIC OIL FILTER,

More information

400 4x4 Euro MODEL NUMBER A2008IDG4BEUR (RED) MODEL NUMBER A2008IDG4BEUG (GREEN) MODEL NUMBER A2008IDG4BEUZ (CAT GREEN) MORE TO GO ON.

400 4x4 Euro MODEL NUMBER A2008IDG4BEUR (RED) MODEL NUMBER A2008IDG4BEUG (GREEN) MODEL NUMBER A2008IDG4BEUZ (CAT GREEN) MORE TO GO ON. 2008 400 4x4 Euro Illustrated Parts Manual MODEL NUMBER A2008IDG4BEUR (RED) MODEL NUMBER A2008IDG4BEUG (GREEN) MODEL NUMBER A2008IDG4BEUZ (CAT GREEN) MORE TO GO ON. TM TABLE OF CONTENTS 2008 ATV 400 4x4

More information

STX-26 Stump Grinder

STX-26 Stump Grinder Form No. 3383-656 Rev B STX-26 Stump Grinder Model No. 23208 Serial No. 314000001 and Up Model No. 23208G Serial No. 314000001 and Up Register at www.toro.com. Original Instructions (EN) *3383-656* B Ordering

More information

M20J-201 Checklist BEFORE STARTING ENGINE

M20J-201 Checklist BEFORE STARTING ENGINE M20J-201 Checklist BEFORE STARTING ENGINE Preflight... COMPLETE Baggage door... LATCHED/LOCKED Door... LATCHED/LOCKED Seatbelts... FASTENED Passenger brief....... [seatbelts/exits/smoking/talking/traffic]

More information

I. DISPATCH PLANNING & AIRCRAFT EXTERIOR CHECK

I. DISPATCH PLANNING & AIRCRAFT EXTERIOR CHECK SCHODACK AVIATION Page 1 of 10 I. DISPATCH PLANNING & AIRCRAFT EXTERIOR CHECK 1. Flight Planning 1. Aircraft requirements & preparation: Required aircraft documents: Airworthiness Certificate Registration

More information

Page: REV 3: Add drill and tap information to Figure 4 DRILL #3, TAP 1/4-28 BOTH ENDS.

Page: REV 3: Add drill and tap information to Figure 4 DRILL #3, TAP 1/4-28 BOTH ENDS. REVISION DESCRIPTION: 1) Page: 32-03 MEMO: Step 4 should not be bold. Fix WD-1213 callout in Figure 3. Page: 32-04 REV 3: Add drill and tap information to Figure 4 DRILL #3, TAP 1/4-28 BOTH ENDS. Add make

More information

Instruction Manual. Congratulations on your purchase of the Flying Legends P-51 Mustang!

Instruction Manual. Congratulations on your purchase of the Flying Legends P-51 Mustang! Instruction Manual Congratulations on your purchase of the Flying Legends P-51 Mustang! The Flying Legends P-51D is a model designed for experienced pilots only. If you are not an experienced pilot that

More information

Table of content. Illustrated Parts Cataloque XA42 XA41

Table of content. Illustrated Parts Cataloque XA42 XA41 Table of content ATA Page Content 23 3 Communication 24 4 Electrical System 25 7 Equipment and Furnishings 27 11 Flight Controls 28 18 Fuel 31 20 Indicating / Recording Systems 32 23 Landing Gear 34 27

More information

I. DISPATCH PLANNING & AIRCRAFT EXTERIOR CHECK

I. DISPATCH PLANNING & AIRCRAFT EXTERIOR CHECK SCHODACK AVIATION Page 1 of 10 I. DISPATCH PLANNING & AIRCRAFT EXTERIOR CHECK 1. Flight Planning 1. Aircraft requirements & preparation: 1. Required aircraft documents: 1. Airworthiness Certificate 2.

More information

ASK 21 - Flight Manual. Check List / 1

ASK 21 - Flight Manual. Check List / 1 Check List / 1 Pre Flight Check 1. Main pins secured? 2. Rear wing attachment pins: is the safety lock visible above the pin? 3. Horizontal tail unit pins secured. Is the spring retainer engaged? 4. Elevator

More information

Skyranger Evolution. Skyranger Classic

Skyranger Evolution. Skyranger Classic Agenda 10.00-10.15 10.15 11.00 11.00 13.30 13.30 14.30 14.30 15.45 15.45-16.00 Welcome, Introduction, Toilets etc.. BMAA Home build system RM, BS, AJ Skyranger evolution and Nynja introduction. Inspecting

More information

ATV 300 DVX CAT GREEN (A2011KSF2BUSZ) Page 1 of 56 AIR INTAKE ASSEMBLY

ATV 300 DVX CAT GREEN (A2011KSF2BUSZ) Page 1 of 56 AIR INTAKE ASSEMBLY 2011 ATV 300 DVX CAT GREEN (A2011KSF2BUSZ) Page 1 of 56 AIR INTAKE ASSEMBLY 2011 ATV 300 DVX CAT GREEN (A2011KSF2BUSZ) Page 2 of 56 AIR INTAKE ASSEMBLY Ref # Part Number Qty S/P/F Description 1 3303-705

More information

Technical data. Part Thread (mm) Nm ±10% Tolerance Sidestand

Technical data. Part Thread (mm) Nm ±10% Tolerance Sidestand section 3 - Torque settings Frame torque settings Sidestand Stand sensor bolt 5 Pre-applied threadlocker Stand plate fixing screw M10x25 43 Pre-applied threadlocker Side stand fastening pin Side stand

More information

Maintenance Instruction 23.1

Maintenance Instruction 23.1 Subject: Replacement of engine GROB 2500 E1/D1 by engine LIMBACH L 2400 EB1.AA Affected Aircraft: Motor glider GROB G 109 (B) Aircraft: Type G 109 (B) Registration Propeller: Type MTV-1-A/L160-03 Serial

More information

Cessna 172S Skyhawk. AFTER LANDING CHECK RPM CHECK 2. Flaps UP 3. Transponder STANDBY 4. Strobes OFF 5. Contact Ground as Required. 121.

Cessna 172S Skyhawk. AFTER LANDING CHECK RPM CHECK 2. Flaps UP 3. Transponder STANDBY 4. Strobes OFF 5. Contact Ground as Required. 121. PRE-LANDING CHECK 1. ATIS/AWOS/ASOS OBTAIN 2. Seat Belts CHECK 3. Autopilot OFF 4. Master Switch ON 5. Ignition BOTH 6. Circuit Breakers ALL IN 7. Landing Light AS REQ. 8. Mixture (Push) RICH 9. Fuel Selector

More information