SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

Similar documents
Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Winnetka Avenue Bike Lanes Traffic Impact Analysis

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

1 st Street Intersection Study

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825

Weaver Road Senior Housing Traffic Impact Analysis

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

TECHNICAL MEMORANDUM

Appendix E: Emission Reduction Calculations

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by:

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

FORT MYERS CITY COUNCIL OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

JMC. November 7, Chairman John P. Ewasutyn and Members of the Planning Board Town of Newburgh Town Hall 308 Gardnertown Road Newburgh, NY 12550

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

One Harbor Point Residential

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets


LOST LAKE CORRIDOR REVIEW

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

Traffic Impact Analysis Update

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

10 th Street Residences Development Traffic Impact Analysis

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

Sugarland Crossing Gwinnett County, Georgia

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

886 March Road McDonald's Transportation Study

Parking/Traffic Assessment Study

Downtown One Way Street Conversion Technical Feasibility Report

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

Village of Richmond Transportation Brief

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Trim Road, Commercial Development, City of Ottawa

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

Alpine Highway to North County Boulevard Connector Study

Appendix H: Construction Impacts H-2 Transportation

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

Provide an overview of the development proposal including projected site traffic volumes;

Freeway Weaving and Ramp Junction Analysis

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Traffic Impact Study Morgan Road Commerce Park Pasco County, Florida

Sweetwater Landing Traffic Impact Analysis

TECHNICAL MEMORANDUM Upper Broadway Road Diet Summary of Findings

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016

Proposed Office Building Traffic Impact Study Chicago Avenue Evanston, Illinois

Craigieburn Employment Precinct North and English Street

Proposed Pit Development

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Appendix F. Capacity Analysis Worksheets No Build

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

Re: Cyrville Road Car Dealership

830 Main Street Halifax Regional Municipality

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Oakbrook Village Plaza City of Laguna Hills

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

RTE. 1 at RTE. 637 & RTE. 639

Interstate 80 Corridor Study

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

STANDARD LIMITATIONS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

Date: December 20, Project #:

Appendix B: Traffic Reports

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Intersection Control Evaluation

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Wellington Street West

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

INTERSECTION CONTROL EVALUATION

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

V. DEVELOPMENT OF CONCEPTS

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

1012 & 1024 McGarry Terrace

Traffic Impact Analysis Farmington Center Village

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

TRAFFIC IMPACT ANALYSIS

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

APPENDIX G. Traffic Data

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

JRL consulting. March Hartland Developments Limited 1993 Hammonds Plains Road Hammonds Plains, NS B4B 1P3

Transcription:

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited access, partially controlled, one lane in each direction. This intersection is the first intersection west of the Hood Canal Bridge and is subject to long platoons for traffic during a bridge opening. This intersection is in Jefferson County, has rolling terrain and is an NHS route. The posted speed within the project limits is 40 mph. SR 104 had a 2017 AADT of 17,800 with about 7.3% trucks. This project is categorized as an I-2 Safety Improvement (Collision Reduction) project. The intersection of SR 104/Shine Road is an Intersection Analysis Location (IAL) for the year 2016. Ninety percent of the 26 total crashes (2009 2015 crash history) at this intersection were entering at angle type crashes from Paradise Road. This project will provide improved intersection control, which has the potential to reduce number and severity of crashes. This is a 4-leg intersection, about 800 ft. west of the west end of the Hood Canal Floating Bridge. In the westbound direction, a climbing lane begins just past the intersection. There is left-turn channelization on mainline for both directions of travel. There is a right-turn lane for the westbound direction that serves the Paradise Bay Rd. There is no channelization on either

of the minor legs. The vertical grade from the Hood Canal Bridge approaching this intersection is around an incline of 5%, and the 85 th percentile speeds are around 45 mph. This intersection met signal warrants based on a 2005 count. There are times when SR 104 is closed for bridge openings. Given the close proximity of the Hood Canal Bridge, at these times eastbound traffic will often queue well to the west of this intersection. After the bridge is open to traffic, there are often times large platoons of traffic heading both directions. Alternatives Given the safety performance of the existing minor-street stop control, maintaining the existing control is not considered as an alternative for the project. A single-lane roundabout and signalized intersection were evaluated as part of this analysis. SIDRA was used for the roundabout analysis and Synchro was used for the signal analysis. Please refer to appendices for SIDRA and Synchro reports. Existing 2018 PM Peak (PM was critical peak*) Intersection Leg Single-Lane Roundabout Signalized Intersection Level of Service Ave Delay (s) Level of Service Ave Delay (s) SR 104 (West) A 8.8 B 19.7 SR 104 (East) A 6.1 C 22.9 Shine Road A 5.1 C 21.6 Paradise Bay RD A 9.6 B 19.5 Overall I/S A 6.4 C 20.9 *does not represent platoon from bridge opening Feasibility Both the signalized intersection and the single-lane roundabout are feasible alternatives. Below, we will discuss the advantages and disadvantages of each. Signalized Intersection The signalized intersection will likely have a smaller footprint than that of a roundabout, and therefore have minimal to no right-of-way needs. SR 104/Paradise Bay- Shine RD intersection is on a curve and has a downward sloping profile (east-west direction). One concern is the potential for rear-ends generated by a stopped queue from the signal. Another safety concern with a signal is the potential for red light running. Single-Lane Roundabout Per the operational analysis above, the roundabout out-performed the signalized intersection during the PM peak hour. During off-peak hours, it is expected that the roundabout would also out-perform the signal because of the low delay for all entering vehicles. In addition, off-peak hours would typically have free-flow conditions and therefore

higher vehicular speeds. Roundabouts are a preferred intersection control for high speed facilities because of their proven safety performance. During a Hood Canal Bridge closure, traffic on SR 3 can back up 1 to 2 miles (see graphic below). When the bridge opens, a platoon of traffic will send a steady stream of vehicles on SR 104 towards the Shine Road/Paradise Bay Road intersection. With the roundabout alternative, it may be difficult for traffic on Paradise Bay Road and Shine Road to enter westbound SR 104 due to gap availability. One solution to remedy this concern is installing a metered-entrance single-lane roundabout. Metered entrances are endorsed by FHWA in their Roundabout Guide (Chapter 8.1): 8.1.1 Metered entrance Roundabouts operate effectively only when there are sufficient longer and acceptable gaps between vehicles in the circulatory lanes. If there is a heavy movement of circulating drivers, then entering drivers at the next downstream entry may not be able to enter. This situation occurs most commonly during the peak periods, and the performance of the roundabout can be greatly improved with entrance metering. The concept of entrance metering at roundabouts is similar to ramp metering on freeways. A convenient sign is a changeable one that reads Stop on red signal and shows the usual yield sign for a roundabout otherwise. The sign would also include a yellow and red signal above the sign. The operation of the sign would be to show drivers the roundabout sign, display the yellow light and the sign Stop on red signal, and finally display the red light and the same text sign. This would cause entering vehicles to stop and allow the vehicles at the downstream entrance to proceed. A queue length detector on the downstream entrance may be used to indicate to the signal controller when the metering should be activated and deactivated. Once on the circulatory roadway, vehicles are not stopped from leaving the roundabout. A similar treatment has been used at a roundabout in Kennewick, WA on the state highway system with operational issues that are expected at Shine Road. Detection loops can be placed on Paradise Bay Road and Shine Road. When these legs of traffic had been delayed for more than a fixed period or exceed a length of queue, a ramp meter signal can be activated on SR 104 to relieve some of the traffic pressure on the minor legs. This metering signal will likely be activated only during a bridge opening and will deactivate when the SR 104 platoon has cleared.

SR 104/Shine Road/Paradise Bay Road Typical backup on SR 3 during Hood Canal Bridge closure. Relative to a roundabout, a signal does not process vehicles as efficiently. With or without a bridge closure, a signal would propagate longer queues which would increase the potential for high speed, rear end crashes. Safety Analysis From the 2016 IAL (2009 2015 crash history), there were a total of 2 serious injuries and 24 non-serious crashes. 23 out of the 26 crashes were entering-at-angle crashes, and 25 out of the 26 crashes were intersection related. First Collision Type Fatal Serious (indicated by red arrows below) Total Crashes Entering-At-Angle 0 1 23 Same Direction Sideswipe 0 1 1 Rear-End 0 0 2

Under Federal Law, 23 United States Code Section 409, reports, surveys, schedules, lists, or data compiled or collected for the purpose of identifying, evaluating, and planning for safety enhancements or for developing safety projects which may be implemented using Federal-aid highway funds shall not be subject to discovery or admitted into evidence in a Federal or State court proceedings. Since 2016, there has been 4 other crashes; 2 suspected serious injury crashes. 3 of the 4 crashes were entering-at-angle crashes. The roundabout alternative will potentially eliminate all of the entering-at angle crashes and significantly reduce severity of crashes relative to the signal alternative. Community Engagement Community engagement is expected to be conducted in the Spring of 2019. WSDOT will present both the roundabout and signal alternatives. Selection and Conclusion A single-lane roundabout is recommended for this intersection based on the safety improvements and operational benefits. A metered-entrance single lane roundabout should be considered in the future if operational issues with a bridge opening is determined to be an

issue. At a minimum during the initial construction, the hardware and conduit for a metered roundabout should be installed. Attachments: SIDRA Analysis Synchro Analysis

HCM 6th Signalized Intersection Summary 3: Shine Rd/Paradise Bay Rd & SR 104 10/10/2018 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 1 561 2 10 569 130 1 0 13 88 2 6 Future Volume (veh/h) 1 561 2 10 569 130 1 0 13 88 2 6 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1646 1800 1800 1800 1800 1800 1786 1786 1786 1786 1786 1786 Adj Flow Rate, veh/h 4 660 4 12 862 213 4 0 28 104 4 12 Peak Hour Factor 0.25 0.85 0.50 0.83 0.66 0.61 0.25 0.92 0.46 0.85 0.50 0.50 Percent Heavy Veh, % 11 0 0 0 0 0 1 1 1 1 1 1 Cap, veh/h 8 766 5 196 967 819 81 27 348 416 19 37 Arrive On Green 0.01 0.43 0.43 0.11 0.54 0.54 0.26 0.00 0.26 0.26 0.26 0.26 Sat Flow, veh/h 1567 1787 11 1714 1800 1525 85 105 1333 1216 74 143 Grp Volume(v), veh/h 4 0 664 12 862 213 32 0 0 120 0 0 Grp Sat Flow(s),veh/h/ln 1567 0 1798 1714 1800 1525 1523 0 0 1433 0 0 Q Serve(g_s), s 0.2 0.0 23.0 0.4 29.3 5.2 0.0 0.0 0.0 3.4 0.0 0.0 Cycle Q Clear(g_c), s 0.2 0.0 23.0 0.4 29.3 5.2 1.1 0.0 0.0 4.5 0.0 0.0 Prop In Lane 1.00 0.01 1.00 1.00 0.12 0.87 0.87 0.10 Lane Grp Cap(c), veh/h 8 0 770 196 967 819 457 0 0 472 0 0 V/C Ratio(X) 0.48 0.00 0.86 0.06 0.89 0.26 0.07 0.00 0.00 0.25 0.00 0.00 Avail Cap(c_a), veh/h 114 0 1136 196 1137 964 457 0 0 472 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 34.1 0.0 17.8 27.2 14.2 8.6 19.2 0.0 0.0 20.4 0.0 0.0 Incr Delay (d2), s/veh 36.6 0.0 4.7 0.1 8.1 0.2 0.3 0.0 0.0 1.3 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 0.0 9.5 0.2 12.1 1.5 0.4 0.0 0.0 1.6 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 70.8 0.0 22.6 27.3 22.3 8.7 19.5 0.0 0.0 21.6 0.0 0.0 LnGrp LOS E A C C C A B A A C A A Approach Vol, veh/h 668 1087 32 120 Approach Delay, s/veh 22.9 19.7 19.5 21.6 Approach LOS C B B C Timer - Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 22.5 12.4 34.0 22.5 4.9 41.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 18.0 5.0 43.5 18.0 5.0 43.5 Max Q Clear Time (g_c+i1), s 3.1 2.4 25.0 6.5 2.2 31.3 Green Ext Time (p_c), s 0.1 0.0 4.4 0.4 0.0 5.7 Intersection Summary HCM 6th Ctrl Delay 20.9 HCM 6th LOS C Shine Rd 10/10/2018 2018 PM Existing Synchro 10 Report jmn Page 1

Queuing and Blocking Report 2018 PM Existing 10/10/2018 Intersection: 3: Shine Rd/Paradise Bay Rd & SR 104 Movement EB WB WB WB NB SB Directions Served TR L T R LTR LTR Maximum Queue (ft) 227 40 153 53 36 92 Average Queue (ft) 140 15 114 28 11 35 95th Queue (ft) 213 42 162 60 36 84 Link Distance (ft) 762 920 925 803 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 200 200 Storage Blk Time (%) 1 Queuing Penalty (veh) 0 Network Summary Network wide Queuing Penalty: 0 Shine Rd SimTraffic Report jmn Page 1

SITE LAYOUT Site: 101 [SR 104/Paradise/Shine 1-lane 2018 PM] SR 104/Paradise/Shine 1-lane Roundabout SIDRA INTERSECTION 7.0 Copyright 2000-2017 Akcelik and Associates Pty Ltd sidrasolutions.com Organisation: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Created: Monday, October 8, 2018 10:46:20 AM Project: Not Saved

MOVEMENT SUMMARY Site: 101 [SR 104/Paradise/Shine 1-lane 2018 PM] SR 104/Paradise/Shine 1-lane Roundabout Movement Performance - Vehicles Mov OD Demand Flows Deg. Average Level of 95% Back of Queue Prop. Effective Average ID Mov Total HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed veh/h % v/c sec veh ft per veh mph South: Shine Rd 3 L2 1 0.0 0.014 9.5 LOS A 0.1 1.4 0.22 0.51 36.2 8 T1 1 0.0 0.014 5.0 LOS A 0.1 1.4 0.22 0.51 36.3 18 R2 14 0.0 0.014 4.8 LOS A 0.1 1.4 0.22 0.51 35.4 Approach 16 0.0 0.014 5.1 LOS A 0.1 1.4 0.22 0.51 35.5 East: SR 104 1 L2 11 0.0 0.712 10.4 LOS B 7.1 183.4 0.54 0.53 35.1 6 T1 618 5.0 0.712 6.1 LOS A 7.1 183.4 0.54 0.53 35.1 16 R2 141 1.0 0.712 5.7 LOS A 7.1 183.4 0.54 0.53 34.4 Approach 771 4.2 0.712 6.1 LOS A 7.1 183.4 0.54 0.53 35.0 North: Paradise Bay Rd 7 L2 1 3.0 0.005 12.6 LOS B 0.0 0.7 0.64 0.61 33.9 4 T1 1 3.0 0.005 8.1 LOS A 0.0 0.7 0.64 0.61 34.1 14 R2 1 3.0 0.005 7.9 LOS A 0.0 0.7 0.64 0.61 33.3 Approach 3 3.0 0.005 9.6 LOS A 0.0 0.7 0.64 0.61 33.8 West: SR 104 5 L2 96 2.0 0.087 9.1 LOS A 0.4 10.5 0.08 0.63 34.3 2 T1 2 0.0 0.087 4.7 LOS A 0.4 10.5 0.08 0.63 34.5 12 R2 7 0.0 0.087 4.4 LOS A 0.4 10.5 0.08 0.63 33.7 Approach 104 1.8 0.087 8.8 LOS A 0.4 10.5 0.08 0.63 34.3 All Vehicles 895 3.8 0.712 6.4 LOS A 7.1 183.4 0.48 0.55 34.9 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Site tab). Roundabout LOS Method: Same as Signalised Intersections. Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement. LOS F will result if v/c > 1 irrespective of movement delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6). Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. SIDRA INTERSECTION 7.0 Copyright 2000-2017 Akcelik and Associates Pty Ltd sidrasolutions.com Organisation: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Processed: Tuesday, October 9, 2018 6:05:21 AM Project: G:\ Analysis\_State\SR 104\MP 13.76 Shine Rd-Paradise Bay Rd\Sidra\SR 104 Shine Rd.sip7