FORT MYERS CITY COUNCIL OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA

Size: px
Start display at page:

Download "FORT MYERS CITY COUNCIL OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA"

Transcription

1 Agenda City Council Special Mee ng March 18, :00 PM Historic Preserva on Commission Appeal - Virginia Avenue/ McGregor Boulevard Roundabout MAYOR Randall P. Henderson, Jr. Ward 1 Teresa Watkins Brown FORT MYERS CITY COUNCIL Ward 2 Ward 3 Ward 4 Johnny W. Terolyn P. Kevin Streets, Watson Anderson Jr. Ward 5 Fred Burson OSCAR M. CORBIN, JR. CITY HALL, 2200 SECOND STREET FORT MYERS, FLORIDA Ward 6 Gaile H. Anthony Please complete a "Request to Speak" form if you plan to address the City Council and submit to the City Clerk prior to the start of the mee ng. CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL CITY MANAGER ITEMS FOR CONSIDERATIONS 1. Mayor and City Council to hear the appeal of the determina on of the Historic Preserva on Commission (HPC) from June 28, 2018, to deny Cer ficate of Review No. 18COR08 for the placement of a traffic calming device commonly known as a roundabout, at the intersec on of Virginia Ave. and McGregor Blvd., as requested by Public Works Department / Engineering Division of the City of Fort Myers (Quasi-Judicial)(Ward 4) ADJOURNMENT

2 FORT MYERS CITY COUNCIL AGENDA ITEM SUMMARY AGENDA ITEM NO 1. MEETING DATE: Quasi-Judicial: Yes 3/18/2019 Special Meeting WARD: 4 Finance Review: Legal Review: CITY MANAGER ITEMS FOR CONSIDERATIONS MOTION: Approve. FUNDING SOURCE: N/A MANAGEMENT RECOMMENDATION: Approve the appeal of the determination of the Historic Preservation Commission (HPC) denying the Certificate of Review No. 18COR08, regarding the proposed roundabout at the intersection of Virginia Ave. and McGregor Blvd. as requested by the Public Works Department / Engineering Division of the City of Fort Myers. FISCAL IMPACT: N/A BUDGETED ITEM: No WHAT ACTION ACCOMPLISHES: Provides for the Mayor and the City Council to hear the appeal of the decision of the Historic Preservation Commission (HPC) from June 28, 2018, denying the Certificate of Review for proposed roundabout at the intersection of Virginia Ave and McGregor Blvd. BACKGROUND INFORMATION: In accordance with Sec , of the City of Fort Myers Land Development Code, McGregor Blvd. is designated as a local historic scenic highway. Sec , requires the City obtain a Certificate of Review for landmarks, landmark sites, and within historic districts prior to initiating any changes in appearance of utility installations, lift stations, lighting, walls, fences, structures and buildings on property, easements or streets owned by or franchised by the City. The Public Works Department / Engineering Division of the City of Fort Myers, applied to

3 the Historic Preservation Commission (HPC) for a Certificate of Review at the property located at the intersection of Virginia Ave. and McGregor Blvd. to construct a traffic calming device commonly referred to as a roundabout. On June 28, 2018, the HPC held a public hearing to consider the request. The Community Development Department presented its staff report and made the following recommendations to the HPC: 1. Staff makes a finding that the proposed roundabout is in character with the City of Fort Myers Code of Ordinances, Chapter 114, Sections (5) and , the Secretary of the Interior's Standards for Rehabilitation, numbers 2 & 9 and the City's Comprehensive Plan. 2. Staff recommends to the Historic Preservation Commission the approval of the Certificate of Review, 18COR The proposed installation of a roundabout, relocation of the palm trees, and associated work shall be completed as indicated in this certificate of review. 4. The Certificate of Review shall become effective immediately. The HPC denied a motion by a 3-2 vote to approve the Certificate of Review, providing no finding of fact or rationale supporting its decision in accordance with Sec (c)(4). Pursuant to Section , Land Development Code, Historic Preservation, a person may appeal a decision made by the HPC to the City Council. The Public Works Department / Engineering Division of the City of Fort Myers filed a legally sufficient notice of appeal within the required 30 days. The procedure for conducting the appeal hearing will be presented prior to the hearing for the appeal pursuant to Section The proceeding is quasi-judicial and a decision should be based upon all of the evidence presented at the meeting. The City Council, in reaching a decision, must consider criteria, as well as any other issues that are pertinent and reasonable as follows: a. Whether appeal is of a nature properly brought for a decision, or whether there is an established procedure for handling the request other than through the appeal process. b. The intent of this chapter applied or interpreted. c. The effect the ruling will have when applied generally to this chapter. d. Staff recommendations, the testimony of the appellant and testimony of the general

4 public must also be considered. Cases under this section will be handled as a de novo proceeding and all parties will be entitled to present evidence and testimony as to any law or fact supporting their position in the case. Before granting any appeal, the City Council must find that an error was made in the order, requirement, decision, interpretation, determination or action of the HPC. Person Initiating Request: Steven Belden, AICP, Community Development Director Department: Community Development ATTACHMENTS: Descrip on Upload Date Type Appeal Request with Exhibits 3/4/2019 Backup Material City A orney Le er July 28, /4/2019 Backup Material Traffic Study 3/4/2019 Backup Material HPC Agenda June 28, /4/2019 Backup Material No ce and Map 3/4/2019 Backup Material Surrounding Proper es Map 3/4/2019 Backup Material Mailing Labels 3/4/2019 Backup Material Affidavit of Pos ng Sign 3/4/2019 Backup Material Sign Pictures 3/4/2019 Backup Material HPC Appeal /14/2019 Backup Material

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52 MCGREGOR BOULEVARD / VIRGINIA AVENUE TRAFFIC STUDY Project #16554 Prepared by: DAVID PLUMMER & ASSOCIATES, INC McGregor Boulevard August 21, 2017 Fort Myers, Florida 33901

53 MCGREGOR BOULEVARD / VIRGINA AVENUE TRAFFIC STUDY Introduction The proposed roundabout at McGregor Boulevard / Virginia Avenue (Exhibit 1) was originally designed in 2007, revisited in the 2017 Lee County MPO Roundabout Study, and is now being considered by the City of Fort Myers for construction during the resurfacing project of McGregor Boulevard. The future roundabout will facilitate traffic associated with the Edison Avenue extension, a planned two-lane road connecting US 41 with McGregor Boulevard at Virginia Avenue, Exhibit 2. The roundabout, if determined to be the best solution for the intersection, will provide full access for traffic in all four directions, serve as a traffic calming feature, and replace the need for a future traffic signal. This traffic study has been prepared in support of the roundabout at McGregor Boulevard and Virginia Avenue and summarizes the operational analysis of the roundabout under existing and future traffic conditions. Operational Analysis An operational analysis of the proposed roundabout was performed to ensure it is feasible in terms of providing adequate capacity, acceptable levels-of-service, and appropriate queues. For comparison purposes, the existing two-way stop control (TWSC) and a traffic signal were analyzed in addition to the proposed roundabout. The following scenarios were evaluated in the operational analysis. Existing two-way stop control, under existing 2017 traffic volumes. Existing two-way stop control, under future 2040 traffic volumes. Traffic signal, under existing 2017 traffic volumes. Traffic signal, under future 2040 traffic volumes. Proposed roundabout, under existing 2017 traffic volumes. Proposed roundabout, under future 2040 traffic volumes. AM, Mid-day, and PM peak hour traffic volumes were tested for each scenario. Traffic Data Traffic volumes used in the analysis were obtained from the Edison Avenue Extension Traffic Study dated June 14, That traffic study presented existing 2017 and future 2040 AM, Midday, and PM peak hour turning movement volumes for the intersection. Intersection turning movement counts were conducted for the AM, Mid-day, and PM peak hours and are summarized in Exhibit 3. 1

54 Existing peak hour turning movement volumes were forecasted to the design year 2040 using a combination of the Lee County travel model and other available traffic studies. The future traffic forecasts reflect nearby road network improvements and growth attributed to First Street Village and the high-rise developments along West First Street. Projected volumes also reflect diverted traffic resulting from the Edison Avenue extension functioning as a by-pass to portions of MLK Jr. Boulevard and Victoria Avenue. Future 2040 peak hour turning movement volumes for the intersection under study are presented in Exhibit 4 for the AM, Mid-day, and PM peak hours. For the purposes of this report, McGregor Boulevard is considered the northbound / southbound roadway and Virginia Avenue is considered as the eastbound / westbound roadway. Summary of Results Synchro was used to analyze the two-way stop control and traffic signal while SIDRA was used to analyze the proposed roundabout. All results are based on HCM 6 methodology. The operational analysis output can be found in Appendix A and is summarized as follows. Scenario Two-Way Stop Control Traffic Signal Roundabout McGregor Boulevard / Virginia Avenue - Operational Analysis Summary Peak Hour Existing 2017 Traffic Conditions LOS Delay 3 95% Queue 4 Future 2040 Traffic Conditions V/C Ratio 5 LOS Delay 3 95% Queue 4 V/C Ratio 5 AM C/D F/F MD C/C F/F PM D/E F/F AM A B MD A B PM A C AM A A MD A A PM A A Footnote: 1) EB approach LOS / WB approach LOS 2) Overall intersection. 3) Delay expressed as seconds. Overall intersection. 4) Based on the worst lane group. Expressed as vehicles. 5) Based on the worst lane group. Under existing traffic conditions, each type of traffic control provides an acceptable level of service for the intersection. However, the two-way stop control is expected to fail under future traffic conditions with the Edison Avenue extension, exhibiting excessive delay, poor levels of service and v/c ratios, and significant queues for the overall intersection and on the side-street approaches. 2

55 A traffic signal will provide acceptable levels of service under future traffic conditions with improved levels of service, v/c ratios, delay, and queues when compared to side-street stop conditions. A roundabout at this location is projected to operate at LOS A with improved delay and queues when compared to a traffic signal. V/C ratios are comparable to a traffic signal, with the roundabout exhibiting a slightly higher V/C ratio in the AM and PM peak hours and a lower V/C ratio in the Mid-day peak hour. Compared to a traffic signal, the roundabout has a higher volume to capacity ratio during the PM peak hour, with a V/C ratio of NCHRP Report 672 Roundabouts: An Informational Guide states that volume-to-capacity ratios in the range of 0.85 to 0.90 represent an approximate threshold for satisfactory operation of a roundabout, but it also acknowledges that these are not absolute thresholds. In this case, a volume to capacity ratio of is considered acceptable because it does not exceed the upper range of In addition, the roundabout alternative performs better than the traffic signal from a level-of-service, delay and queue standpoint for all three 2040 peak hours. Although no safety issues have been identified at this intersection, it can be assumed that the roundabout will provide superior safety performance under existing and future traffic conditions. Roundabouts, when compared to traffic signals and stop-controlled intersections, generally have superior safety performance for drivers, pedestrians, and bicyclist. This is due to roundabouts having fewer conflict points, while also forcing drivers to reduce speed in order to traverse the intersection. Other Considerations Although the operational analysis shows the roundabout performs very well, it is important to recognize that the analysis was performed in isolation and, therefore, not influenced by external factors. In reality, the effectiveness of the roundabout (and other intersection traffic control treatments) can be influenced by the traffic flows and operations of nearby intersections, including: McGregor Boulevard / Edison Home pedestrian signal McGregor Boulevard / Larchmont Avenue McGregor Boulevard / West First Street McGregor Boulevard / Victoria Avenue Edison Home Pedestrian Signal The intersection of McGregor Boulevard and Virginia Avenue is directly impacted by the Edison Home pedestrian crossing. At times during peak demand in the peak season, this signal causes downstream queues that back up into the adjacent intersections. This impacts the current operation of the McGregor Boulevard / Virginia Avenue intersection and will hinder the operations of the future intersection, including a future roundabout. Observations of traffic impacts resulting from the Edison Home pedestrian signal were conducted during April, 2017 between 7:00-9:00 AM; 11:30 AM-1:30 PM; and 4:00-6:00 PM. During the morning hours, southbound traffic queues on McGregor Boulevard extended past the West First 3

56 Street intersection only a few times and never past the Virginia Avenue intersection. During midday hours, traffic backed up past West First Street every 3 to 4 minutes and usually dissipated within a minute. Traffic never backed up past Virginia Avenue during the mid-day timeframe. During the PM peak hours, traffic queues extended past West First Street between 4:00 to 5:40 PM. During peak demand, traffic queues extended past Virginia Avenue for nearly 30 minutes. The longest queue observed went past Victoria Avenue, where the last vehicles remained stopped for over 2 minutes and were observed waiting at the crosswalk signal for more than one cycle. Within approximately 10 minutes of the Edison Home closing at 5:30 PM, no pedestrians were observed at the crosswalk and traffic flowed continuously thereafter. Although no pedestrians were observed from 5:40 to 6:00 PM, the crosswalk signal does remain in operation after the Edison Home closes to service the occasional pedestrian. It is important to note that these observations don t reflect the full impact of the peak season. During peak season, southbound queues on McGregor Boulevard resulting from the Edison Home pedestrian signal have been observed extending as far back as the Clifford Street intersection. Aerial images taken in February, 2017 appear to show queues reaching Johnson Street, but no congestion downstream of the pedestrian signal. Significant queues that extend past Virginia Avenue typically occur during times of peak vehicular demand and are not an all-day issue even during peak season. The excessive queueing at the pedestrian crosswalk signal appears to be due to signal timing that is imbalanced, with an excessively long pedestrian phase which prioritizes pedestrian movements to the significant detriment of the motorists. During PM peak times, it was observed that pedestrians typically approach the crosswalk in groups, press the call button, and cross McGregor Boulevard fairly quickly leaving much of the pedestrian phase unused. As a result, lost time of over 20 seconds was observed where vehicles had to remain stopped even though there were no pedestrians crossing the road. The vehicular back-ups are likely to worsen over time as traffic volumes continue to grow. This is an issue that will have similar implications regardless of the traffic control device installed at the McGregor Boulevard / Virginia Avenue intersection. Regardless of the type of traffic control implemented, actions should be taken to minimize back-ups and to ensure traffic flow on McGregor Boulevard is reasonable and does not adversely impact adjacent intersections. While it is critical to safely accommodate pedestrians with a safe and convenient way to cross McGregor Boulevard, too much emphasis on pedestrian movements significantly impedes vehicular mobility during the PM peak hour. Instead, it is desirable to achieve a balance for all users. This can be accomplished through a reevaluation of the pedestrian crosswalk signal timing. The following are options that may improve both vehicular and pedestrian mobility at the Edison Home pedestrian crossing signal. 1. Reduce the pedestrian phase during the PM peak hour. Currently, the signal is set on a pedestrian recall with a phase length of 45 seconds and McGregor Boulevard is set on max recall with a phase length of 60 seconds from 6:00 to 10:00 AM and 4:00 to 7:00 PM. 4

57 Based on field observations, it may be beneficial to remove 20 seconds from the pedestrian phase. 2. Increase the vehicular phase during the PM peak hour to prevent queuing into adjacent intersections. 3. Install a queue detector downstream of the roundabout. When a long queue caused by the crosswalk signal is detected, responsive signal timing can be activated to prevent vehicles from backing up into the Virginia Avenue intersection during times when McGregor Boulevard becomes congested. The detector should be located to ensure vehicles can be cleared before backing up into the roundabout. 4. Widen the existing crosswalk to accommodate larger groupings of pedestrians and encourage pedestrians to cross in platoons. 5. Install curb extensions at the crosswalk to shorten the pedestrian walking distance and, therefore, allow a shorter pedestrian phase. By staging pedestrians in front of the royal palms, they will become more visible to drivers and improve safety. Curb extensions may also act as a traffic calming measure during the day, encouraging lower vehicular speeds. 6. Consider a raised crosswalk to improve pedestrian visibility and encourage lower vehicular speeds. Larchmont Avenue Larchmont Avenue is a three-legged intersection providing all movements and primarily providing access to parking associated with the Edison Home. There are no turn lanes on the Larchmont Avenue approach and left turning vehicles must wait for a gap in traffic in both directions. The intersection is also located very close to West First Street. There is an offset of approximately 75 feet between the two intersections. Under future traffic conditions, these characteristics may result in excessive side street delay, congestion, and potential safety concerns associated with the intersection offset. It is recommended that Larchmont Avenue at McGregor Boulevard be converted to a right-in / right-out only and closed just east of the South Florida Water Management District driveway. This will allow service vehicles to access the South Florida Water Management building. Closure of Larchmont Avenue is consistent with the Edison Home master plan. West First Street McGregor Boulevard / West First Street allows full movement access onto McGregor Boulevard. Drivers turning left onto McGregor Boulevard have to wait for a gap in both directions and, with future traffic volumes, left turning vehicles may back up due to queues on McGregor Boulevard. This is an issue because traffic volumes on West First Street are predominantly right turns and can suffer excessive delay if blocked by left turning vehicles. It is recommended that this intersection be monitored and potentially converted to a directional median opening to prevent lane blockage, reduce side street delay, and improve safety. If a directional median is installed, LeeTran buses can be rerouted to Virginia Avenue to turn left onto McGregor Boulevard. 5

58 Altamont Avenue / Victoria Avenue The signalized intersection at Altamont Avenue / Victoria Avenue / McGregor Boulevard is the intended route for traffic coming to and from US 41. It is characterized by an exclusive left turn and thru/right turn lane on McGregor Boulevard in both directions; an exclusive left turn, thru, and right turn lane, following a sharp curve, on Victoria Avenue westbound; and an exclusive left turn and thru/right turn lane on Altamont Avenue eastbound. The signal at McGregor Boulevard / Victoria Avenue was observed to not have any traffic impacts affecting Virginia Avenue. However, the pavement markings on the Altamont Avenue eastbound approach to the intersection are completely worn out, which makes the proper lane designation confusing to drivers approaching McGregor Boulevard from both the west and east. The situation is made even more confusing by the two departure lanes on Victoria Avenue. Without pavement markings, drivers heading east on Altamont Avenue may mistake the approach lanes as a left/thru and thru/right turn lane. Drivers who mistake the left turn lane as a thru lane represent a safety issue for opposing left turning traffic who may fail to yield. To address this issue, it is recommended that the pavement markings be reinstalled to clarify proper lane designation. Also, as the area develops, consideration should also be given to providing an exclusive right turn lane on eastbound Altamont Avenue. Recommendations A single-lane roundabout at the intersection of McGregor Boulevard / Virginia Avenue is the preferred intersection improvement when compared to a traffic signal or the existing two-way stop control. It provides better operational and safety performance and is consistent with the City s Complete Streets initiative. However, regardless of the eventual traffic control at the McGregor Boulevard / Virginia Avenue intersection (whether it be a two-way stop, traffic signal, or roundabout), future operations will continue to be impacted by the downstream Edison Home pedestrian crossing signal. If corrective actions are not taken to improve traffic flow on McGregor Boulevard, effective traffic operations will be hindered by queues continuing to back up into the Virginia Avenue intersection (and beyond). It is recommended that the following improvements be considered. 1. Coordinate with the Edison Home and Lee County DOT to evaluate and identify improvements to the Edison Home pedestrian signal to ensure efficient and safe operations for both pedestrians and motorists. Consider the following. a) Reduce the overall duration of the pedestrian crossing phase during the PM peak hour to minimize lost time. b) Increase the motor vehicle phase to improve traffic flow during the PM peak hour. 6

59 c) Install a queue detector downstream of the roundabout to allow the pedestrian crosswalk signal to respond to McGregor Boulevard congestion. d) Widen the crosswalk to accommodate larger groupings of pedestrians. e) Construct curb extensions to reduce crosswalk travel distance, improve pedestrian visibility, and calm traffic. f) Install raised crosswalk to improve pedestrian visibility and calm traffic. 2. Convert the intersection of McGregor Boulevard and Larchmont Avenue to a right-in / right-out only. Close Larchmont Avenue east of McGregor Boulevard. 3. Monitor and convert McGregor Boulevard / West First Street to a directional median opening. Reroute LeeTran buses to Virginia Avenue. 4. Reinstall and monitor lane markings for proper lane designation and consider an eastbound right turn lane at McGregor Boulevard / Victoria Avenue. 7

60 Proposed Roundabout Location McGREGOR BOULEVARD/ VIRGINA AVENUE TRAFFIC STUDY INTERSECTION LOCATION 16554/01A/0617 1

61 N US 41 Euclid Ave Edison Ave McGREGOR BOULEVARD/ VIRGINA AVENUE TRAFFIC STUDY EDISON AVENUE EXTENSION 16554/02A/0617 2

62

63

64 APPENDIX A OPERATIONAL ANALYSIS OUTPUT

65 TWO-WAY STOP CONTROL

66 EXISTING 2017

67 HCM 6th TWSC 3: McGregor Blvd & Virginia Ave Intersection Int Delay, s/veh 1.9 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach SE NW NE SW HCM Control Delay, s HCM LOS C D Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A - - D C A - - HCM 95th %tile Q(veh) McGregor Boulevard / Virgina Avenue TWSC 2017 Traffic Conditions, AM Peak Hour Synchro 9 Report

68 HCM 6th TWSC 3: McGregor Blvd & Virginia Ave Intersection Int Delay, s/veh 1.7 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach SE NW NE SW HCM Control Delay, s HCM LOS C C Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A - - C C A - - HCM 95th %tile Q(veh) McGregor Boulevard / Virgina Avenue TWSC 2017 Traffic Conditions, Mid-day Peak Hour Synchro 9 Report

69 HCM 6th TWSC 3: McGregor Blvd & Virginia Ave Intersection Int Delay, s/veh 4 Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver Stage Stage Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage Stage Approach SE NW NE SW HCM Control Delay, s HCM LOS D E Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS A - - E D A - - HCM 95th %tile Q(veh) McGregor Boulevard / Virgina Avenue TWSC 2017 Traffic Conditions, PM Peak Hour Synchro 9 Report

70 FUTURE 2040

71 HCM 6th TWSC 3: McGregor Blvd & Virginia Ave Intersection Int Delay, s/veh Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver ~ Stage Stage Platoon blocked, % Mov Cap-1 Maneuver ~ ~ Mov Cap-2 Maneuver ~ ~ Stage Stage Approach SE NW NE SW HCM Control Delay, s 273 $ HCM LOS F F Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SELn2 SWL SWT SWR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) $ $ HCM Lane LOS A - - F F F B - - HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon McGregor Boulevard / Virgina Avenue TWSC 2040 Traffic Conditions, AM Peak Hour Synchro 9 Report

72 HCM 6th TWSC 3: McGregor Blvd & Virginia Ave Intersection Int Delay, s/veh Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver ~ Stage Stage Platoon blocked, % Mov Cap-1 Maneuver ~ ~ Mov Cap-2 Maneuver ~ ~ Stage Stage Approach SE NW NE SW HCM Control Delay, s $ $ HCM LOS F F Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) $ 839.9$ HCM Lane LOS A - - F F A - - HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon McGregor Boulevard / Virgina Avenue TWSC 2040 Traffic Conditions, Mid-day Peak Hour Synchro 9 Report

73 HCM 6th TWSC 3: McGregor Blvd & Virginia Ave Intersection Int Delay, s/veh Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All Stage Stage Critical Hdwy Critical Hdwy Stg Critical Hdwy Stg Follow-up Hdwy Pot Cap-1 Maneuver ~ ~ Stage Stage Platoon blocked, % Mov Cap-1 Maneuver ~ 15 ~ Mov Cap-2 Maneuver ~ 15 ~ Stage Stage ~ Approach SE NW NE SW HCM Control Delay, s $ HCM LOS F - Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) $ HCM Lane LOS B F A - - HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon McGregor Boulevard / Virgina Avenue TWSC 2040 Traffic Conditions, PM Peak Hour Synchro 9 Report

74 TRAFFIC SIGNAL

75 EXISTING 2017

76 HCM 6th Signalized Intersection Summary 3: McGregor Blvd & Virginia Ave Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(95%),veh/ln Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh LnGrp LOS C A D D A A A A A A A A Approach Vol, veh/h Approach Delay, s/veh Approach LOS D D A A Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay 6.5 HCM 6th LOS A McGregor Boulevard / Virgina Avenue Traffic Signal 2017 Traffic Conditions, AM Peak Hour Synchro 9 Report

77 HCM 6th Signalized Intersection Summary 3: McGregor Blvd & Virginia Ave Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(95%),veh/ln Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh LnGrp LOS D A D D A A A A A A A A Approach Vol, veh/h Approach Delay, s/veh Approach LOS D D A A Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay 5.7 HCM 6th LOS A McGregor Boulevard / Virgina Avenue Traffic Signal 2017 Traffic Conditions, Mid-day Peak Hour Synchro 9 Report

78 HCM 6th Signalized Intersection Summary 3: McGregor Blvd & Virginia Ave Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(95%),veh/ln Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh LnGrp LOS C A D C A A A A A A A A Approach Vol, veh/h Approach Delay, s/veh Approach LOS D C A A Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay 9.7 HCM 6th LOS A McGregor Boulevard / Virgina Avenue Traffic Signal 2017 Traffic Conditions, PM Peak Hour Synchro 9 Report

79 FUTURE 2040

80 HCM 6th Signalized Intersection Summary 3: McGregor Blvd & Virginia Ave Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(95%),veh/ln Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh LnGrp LOS C A C D A A B A B C A A Approach Vol, veh/h Approach Delay, s/veh Approach LOS C D B B Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay 16.6 HCM 6th LOS B McGregor Boulevard / Virgina Avenue Traffic Signal 2040 Traffic Conditions, AM Peak Hour Synchro 9 Report

81 HCM 6th Signalized Intersection Summary 3: McGregor Blvd & Virginia Ave Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(95%),veh/ln Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh LnGrp LOS C A C D A A B A B B A B Approach Vol, veh/h Approach Delay, s/veh Approach LOS C D B B Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay 16.9 HCM 6th LOS B McGregor Boulevard / Virgina Avenue Traffic Signal 2040 Traffic Conditions, Mid-day Peak Hour Synchro 9 Report

82 HCM 6th Signalized Intersection Summary 3: McGregor Blvd & Virginia Ave Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations Traffic Volume (veh/h) Future Volume (veh/h) Initial Q (Qb), veh Ped-Bike Adj(A_pbT) Parking Bus, Adj Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln Adj Flow Rate, veh/h Peak Hour Factor Percent Heavy Veh, % Cap, veh/h Arrive On Green Sat Flow, veh/h Grp Volume(v), veh/h Grp Sat Flow(s),veh/h/ln Q Serve(g_s), s Cycle Q Clear(g_c), s Prop In Lane Lane Grp Cap(c), veh/h V/C Ratio(X) Avail Cap(c_a), veh/h HCM Platoon Ratio Upstream Filter(I) Uniform Delay (d), s/veh Incr Delay (d2), s/veh Initial Q Delay(d3),s/veh %ile BackOfQ(95%),veh/ln Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh LnGrp LOS C A C D A A D A B C A C Approach Vol, veh/h Approach Delay, s/veh Approach LOS C D C C Timer - Assigned Phs Phs Duration (G+Y+Rc), s Change Period (Y+Rc), s Max Green Setting (Gmax), s Max Q Clear Time (g_c+i1), s Green Ext Time (p_c), s Intersection Summary HCM 6th Ctrl Delay 25.7 HCM 6th LOS C McGregor Boulevard / Virgina Avenue Traffic Signal 2040 Traffic Conditions, PM Peak Hour Synchro 9 Report

83 ROUNDABOUT

84 EXISTING 2017

85 LANE SUMMARY Site: 101 [Existing 2017 Traffic Conditions - AM Peak Hour] McGregor Blvd/Virginia Ave Roundabout Lane Use and Performance Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane Lane Cap. Prob. Total HV Cap. Satn Util. Delay Service Veh Dist Config Length Adj. Block. veh/h % veh/h v/c % sec ft ft % % South: McGregor Blvd Lane 1 d LOS A Full Approach LOS A East: Virginia Ave Lane 1 d LOS A Full Approach LOS A North: McGregor Blvd Lane 1 d LOS A Full Approach LOS A West: Virginia Ave Lane 1 d LOS A Full Approach LOS A Intersection LOS A Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Sitetab). Roundabout LOS Method: Same as Signalised Intersections. Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane. LOS F will result if v/c > 1 irrespective of lane delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6). Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option is selected. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. d Dominant lane on roundabout approach SIDRA INTERSECTION 7.0 Copyright Akcelik and Associates Pty Ltd sidrasolutions.com Organisation: DAVID PLUMMER & ASSOCIATES Processed: Tuesday, June 27, :32:43 PM Project: D:\16554_McGregor_Virginia_Roundabout\Roundabout\McGregor_Virginia_Roundabout_76'.sip7

86 LANE SUMMARY Site: 101 [Existing 2017 Traffic Conditions - Midday Peak Hour] McGregor Blvd/Virginia Ave Roundabout Lane Use and Performance Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane Lane Cap. Prob. Total HV Cap. Satn Util. Delay Service Veh Dist Config Length Adj. Block. veh/h % veh/h v/c % sec ft ft % % South: McGregor Blvd Lane 1 d LOS A Full Approach LOS A East: Virginia Ave Lane 1 d LOS A Full Approach LOS A North: McGregor Blvd Lane 1 d LOS A Full Approach LOS A West: Virginia Ave Lane 1 d LOS A Full Approach LOS A Intersection LOS A Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Sitetab). Roundabout LOS Method: Same as Signalised Intersections. Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane. LOS F will result if v/c > 1 irrespective of lane delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6). Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option is selected. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. d Dominant lane on roundabout approach SIDRA INTERSECTION 7.0 Copyright Akcelik and Associates Pty Ltd sidrasolutions.com Organisation: DAVID PLUMMER & ASSOCIATES Processed: Monday, June 19, :56:26 PM Project: D:\16554_McGregor_Virginia_Roundabout\Roundabout\McGregor_Virginia_Roundabout_76'.sip7

87 LANE SUMMARY Site: 101 [Existing 2017 Traffic Conditions - PM Peak Hour] McGregor Blvd/Virginia Ave Roundabout Lane Use and Performance Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane Lane Cap. Prob. Total HV Cap. Satn Util. Delay Service Veh Dist Config Length Adj. Block. veh/h % veh/h v/c % sec ft ft % % South: McGregor Blvd Lane 1 d LOS A Full Approach LOS A East: Virginia Ave Lane 1 d LOS A Full Approach LOS A North: McGregor Blvd Lane 1 d LOS A Full Approach LOS A West: Virginia Ave Lane 1 d LOS A Full Approach LOS A Intersection LOS A Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Sitetab). Roundabout LOS Method: Same as Signalised Intersections. Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane. LOS F will result if v/c > 1 irrespective of lane delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6). Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option is selected. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. d Dominant lane on roundabout approach SIDRA INTERSECTION 7.0 Copyright Akcelik and Associates Pty Ltd sidrasolutions.com Organisation: DAVID PLUMMER & ASSOCIATES Processed: Monday, June 19, :56:27 PM Project: D:\16554_McGregor_Virginia_Roundabout\Roundabout\McGregor_Virginia_Roundabout_76'.sip7

88 FUTURE 2040

89 LANE SUMMARY Site: 101 [Future 2040 Traffic Conditions - AM Peak Hour] McGregor Blvd/Virginia Ave Roundabout Lane Use and Performance Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane Lane Cap. Prob. Total HV Cap. Satn Util. Delay Service Veh Dist Config Length Adj. Block. veh/h % veh/h v/c % sec ft ft % % South: McGregor Blvd Lane 1 d LOS A Full Approach LOS A East: Virginia Ave Lane 1 d LOS A Full Approach LOS A North: McGregor Blvd Lane 1 d LOS A Full Approach LOS A West: Virginia Ave Lane 1 d LOS A Full Approach LOS A Intersection LOS A Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Sitetab). Roundabout LOS Method: Same as Signalised Intersections. Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane. LOS F will result if v/c > 1 irrespective of lane delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6). Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option is selected. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. d Dominant lane on roundabout approach SIDRA INTERSECTION 7.0 Copyright Akcelik and Associates Pty Ltd sidrasolutions.com Organisation: DAVID PLUMMER & ASSOCIATES Processed: Monday, June 19, :56:27 PM Project: D:\16554_McGregor_Virginia_Roundabout\Roundabout\McGregor_Virginia_Roundabout_76'.sip7

90 LANE SUMMARY Site: 101 [Future 2040 Traffic Conditions - Midday Peak Hour] McGregor Blvd/Virginia Ave Roundabout Lane Use and Performance Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane Lane Cap. Prob. Total HV Cap. Satn Util. Delay Service Veh Dist Config Length Adj. Block. veh/h % veh/h v/c % sec ft ft % % South: McGregor Blvd Lane 1 d LOS A Full Approach LOS A East: Virginia Ave Lane 1 d LOS A Full Approach LOS A North: McGregor Blvd Lane 1 d LOS A Full Approach LOS A West: Virginia Ave Lane 1 d LOS A Full Approach LOS A Intersection LOS A Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Sitetab). Roundabout LOS Method: Same as Signalised Intersections. Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane. LOS F will result if v/c > 1 irrespective of lane delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6). Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option is selected. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. d Dominant lane on roundabout approach SIDRA INTERSECTION 7.0 Copyright Akcelik and Associates Pty Ltd sidrasolutions.com Organisation: DAVID PLUMMER & ASSOCIATES Processed: Monday, June 19, :56:28 PM Project: D:\16554_McGregor_Virginia_Roundabout\Roundabout\McGregor_Virginia_Roundabout_76'.sip7

91 LANE SUMMARY Site: 101 [Future 2040 Traffic Conditions - PM Peak Hour] McGregor Blvd/Virginia Ave Roundabout Lane Use and Performance Demand Flows Deg. Lane Average Level of 95% Back of Queue Lane Lane Cap. Prob. Total HV Cap. Satn Util. Delay Service Veh Dist Config Length Adj. Block. veh/h % veh/h v/c % sec ft ft % % South: McGregor Blvd Lane 1 d LOS A Full Approach LOS A East: Virginia Ave Lane 1 d LOS A Full Approach LOS A North: McGregor Blvd Lane 1 d LOS A Full Approach LOS A West: Virginia Ave Lane 1 d LOS C Full Approach LOS C Intersection LOS A Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Sitetab). Roundabout LOS Method: Same as Signalised Intersections. Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane. LOS F will result if v/c > 1 irrespective of lane delay value (does not apply for approaches and intersection). Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6). Roundabout Capacity Model: SIDRA Standard. SIDRA Standard Delay Model is used. Control Delay does not include Geometric Delay since Exclude Geometric Delay option is selected. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. d Dominant lane on roundabout approach SIDRA INTERSECTION 7.0 Copyright Akcelik and Associates Pty Ltd sidrasolutions.com Organisation: DAVID PLUMMER & ASSOCIATES Processed: Monday, June 19, :56:29 PM Project: D:\16554_McGregor_Virginia_Roundabout\Roundabout\McGregor_Virginia_Roundabout_76'.sip7

92 AGENDA HISTORIC PRESERVATION COMMISSION June 28, :00 o clock p.m. Revised 2:00 p.m. Ward 6 Chair Mary-Regina Sabiston (Gina) Mayor Appointee Lisa Belcher Ward 1 Vice Chair John M. Podczerwinsky Alternate Carl Barraco, Jr Ward 2 Brad McGrath Alternate John Joe McKenzie Ward 3 Vacant Ward 4 Kevin Williams Ward 5 Mary Jo Walker CITY COUNCIL CHAMBERS, 2200 SECOND STREET, FORT MYERS, FLORIDA For full agenda Packet Click Here. Larger files may take longer to download. Please complete a Request to Speak form if you plan to address the Historic Preservation Commission and submit to the recording secretary prior to the start of the meeting. CALL TO ORDER Roll Call PUBLIC HEARINGS 1. Public Hearing: Certificate of Review 18COR13, 1639 Menlo Road, Edison Park Historic District: new metal roof. 2. Public Hearing: Certificate of Review 18COR14, 1770 Woodlawn Avenue, Edison Park Historic District: new vinyl fence. 3. Public Hearing: Certificate of Review 18COR15, 2408 Euclid Avenue, Edison Park Historic District: new pool. 4. Public Hearing: Local Landmark Designation 18HL01, 1634 Woodford Street. 5. Public Hearing: Certificate of Review 18COR08, Intersection of McGregor Boulevard and Virginia Avenue, Local Historic Road: approval for a roundabout at the intersection. Page 1 of 2

93 AGENDA HISTORIC PRESERVATION COMMISSION June 28, :00 o clock p.m. Revised 2:00 p.m. 6. Continued Public Hearing: Consider an amendment rewriting Land Development Code Chapter 114 Historic Preservation. Removed by staff. 7. Monthly Code Enforcement Cases 8. Miscellaneous Business 9. Public Comment on Non-Agenda Items Adjourn If a person decides to appeal any decision made by the Historic Preservation Commission with respect to any matter considered at such meeting or hearing, he or she will need a record of the proceedings, and that, for such purpose, he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. Special Requirements: If you require special aid or services as addressed in the Americans with Disabilities Act, please contact the City Clerk s Office at (239) or for the hearing impaired, TDD telephone number (239) Page 2 of 2

94

95

96

97

98

99 CITY OF FORT MYERS AFFIDAVIT OF POSTING NOTICE CITY COUNCIL PUBLIC HEARING Hearing Date/Time: 1 PM MONDAY MARCH TQ City FUe Name/Number: APPEAL HPC DECISION CAS # 18COR08 ROUNDABOUT MCGREGOR AND VIRGINIA Date/Time of Posting; (Please fill in once sign has been posted) STATE OF FLORIDA COUNTY OF LEE Before me this day personally appeared, who being first sworn, disposes and says that he/she has properly posted a notice of public hearing (sign), as provided by the City of Fort Myers, Community Development Department, on the subject property at least fifteen (15) days prior to the above referenced City Council Public Hearing. C. ^/l^rryyo Signature of Applicant or Agent Oheni' Thornyjc /n Name (T5^ed or Printed) Sworn to and subscribed before me thi 2019 A.D. Notaryyhiplic Signature My Commission Expires: /}. ni A. GERMANIS Notary Public - State of Florida I't Commission # GG My Comm. Expires Dec Bonded through National Notary Assn. yp. RETURNED BY: FRIDAY - MARCH 15, 2019

100

101

102

103

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS Prepared for: KTM Design Solutions 528 Kansas City Street, Suite 1 Rapid City, SD 57701 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: Merrimack Valley Metropolitan Planning Organization FROM: James Terlizzi, P.E., Transportation Planning Engineer DATE: March 6, 2017 SUBJECT: Further analysis of the recommendations

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 1082 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets APPENDICES APPENDIX D Synchro Level of Service Output Sheets Lanes, Volumes, Timings NO BUILD 2016 PM 8: 10th St & Thain Rd 10/05/2016 Lane Group NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR

More information

Winnetka Avenue Bike Lanes Traffic Impact Analysis

Winnetka Avenue Bike Lanes Traffic Impact Analysis Winnetka Avenue Bike Lanes Traffic Impact Analysis January 4, 2019 Prepared by City of Los Angeles Department of Transportation Active Transportation Division Winnetka Ave Bike Lanes Traffic Impact Analysis

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction...3 2. Project Description...3 3. Existing Conditions...3 4. Forecast Traffic Demand and Analysis...12 5. Conclusions and

More information

1 st Street Intersection Study

1 st Street Intersection Study TRAFFIC ENGINEERING ASSISTANCE PROGRAM 1 st Street Intersection Study Prepared for: City of Independence In Cooperation With: Iowa Department of Transportation & Iowa Department of Public Safety Governor

More information

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated)

MEMORANDUM. Saint Edward Ballfields Traffic and Parking Analysis (Updated) MEMORANDUM Date: May 26, 2016 To: From: Subject: Debbie Bent and Kris Overleese, City of Kenmore Kendra Breiland and Sarah Keenan, Fehr & Peers Saint Edward Ballfields Traffic and Parking Analysis (Updated)

More information

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE Roadway Segment Level of Service Definitions LOS V/C Congestion/Delay Traffic Description (Used for surface streets,

More information

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA (St. Tammany Parish Mandeville, LA) Prepared For The Pittman Companies Michael N Pittman, MD 328 East Boston St Covington, LA 70433

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825

TRAFFIC IMPACT ANALYSIS FOR. RESIDENCE INN PROJECT Davis, CA. Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 TRAFFIC IMPACT ANALYSIS FOR RESIDENCE INN PROJECT Davis, CA Prepared For: JACKSON PROPERTIES 155 Cadillac Drive, Suite 100 Sacramento, CA 95825 Prepared By: KD Anderson & Associates, Inc. 3853 Taylor Road,

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Congregate Care Facility Billerica, Massachusetts Prepared For: Hawthorn Development, LLC 35 Kettle Court Salem, OR 973 Prepared By: Sebago Technics, Inc. 75 John Roberts Road,

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) APPENDICES Appendix T No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016) 661 Bear Valley Parkway EIR March 2017 APPENDICES This page intentionally left blank 661 Bear Valley

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Weaver Road Senior Housing Traffic Impact Analysis

Weaver Road Senior Housing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 9821 425.339.8266 Weaver Road Senior Housing Traffic Impact Analysis Jurisdiction: City of Snohomish January 218 GTC #17-37

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction...3 II. Project Description...3 III. Existing Conditions...3 IV. Future Traffic Conditions...8 V. Conclusions and Mitigation...14

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Appendix F. Capacity Analysis Worksheets No Build

Appendix F. Capacity Analysis Worksheets No Build Appendix F Capacity Analysis Worksheets No Build 88 9: Rte 35 & Rte 58 WB Off & Rte 58 WB On 7/5/2014 Movement NBL2 NBL NBR SEL SER NEL NET NER SWL SWT SWR Volume (veh/h) 95 0 10 0 0 10 188 0 0 225 38

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by:

HONDA DEALERSHIP LAKE ELSINORE, CALIFORNIA. Prepared by: LOS ANGELES 21 S. Figueroa St, Suite 24 Los Angeles, CA 912 213.337.368 Fax :213.337.3679 ONTARIO 4141 E. Inland Empire Blvd, Suite 25 Ontario, CA 91764 99.481.575 Fax :99.481.5757 SAN DIEGO 6 B St, Suite

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx

Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT TIA Report.docx Prescott Plaza Traffic Impact Analysis APPENDIX 1.1: APPROVED TRAFFIC STUDY SCOPING AGREEMENT 11897-05 TIA Report.docx Prescott Plaza Traffic Impact Analysis This page is intentionally left blank 11897-05

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS 1 FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction... 3 II. Project Description... 3 III. Existing Conditions... 6 IV. Future Traffic Demand... 10 V. Conclusions and Mitigation...

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes. Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 SCREENING... 1 1.1

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

DRAFT. Kanata Mews Development 329 March Road, City of Ottawa. Transportation Brief. Prepared for:

DRAFT. Kanata Mews Development 329 March Road, City of Ottawa. Transportation Brief. Prepared for: Kanata Mews Development Prepared for: Bascorp Management 1611 Ortona Avenue Ottawa, ON K2C 1W4 DRAFT Prepared by: McIntosh Perry Consulting Engineers Ltd. 115 Walgreen Road Carp, ON K0A 1L0 August 19,

More information

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 KUM & GO #300 PECOS STREET & 88 TH AVENUE THORNTON, COLORADO TRAFFIC IMPACT STUDY REVISION 1 PREPARED FOR KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 JANUARY 23, 2014 OA PROJECT NO. 013-1721

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

JMC. November 7, Chairman John P. Ewasutyn and Members of the Planning Board Town of Newburgh Town Hall 308 Gardnertown Road Newburgh, NY 12550

JMC. November 7, Chairman John P. Ewasutyn and Members of the Planning Board Town of Newburgh Town Hall 308 Gardnertown Road Newburgh, NY 12550 JMC JOHN MEYER CONSULTING, PC Site Planning n Civil Engineering n Landscape Architecture Land Surveying n Transportation Engineering n Environmental Studies n Permitting n Construction Services November

More information

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 TO: FROM: Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017 RE: Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street,

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016

SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT SUMMARY OF FINDINGS. May 9, 2016 May 9, 2016 Mr. Jesus "Freddie" Olmos ECORP CONSULTING, INC. 215 North 5 th Street Redlands, CA 92374 SUBJECT: EMERALD NECKLACE IMPLEMENTATION PLAN PHASE 1 TRAFFIC ASSESSMENT Dear Mr. Jesus "Freddie" Olmos:

More information

Sweetwater Landing Traffic Impact Analysis

Sweetwater Landing Traffic Impact Analysis Gibson Traffic Consultants, Inc. 8 Rockefeller Avenue Suite B Everett, WA 98 45.9.8 Sweetwater Landing Traffic Impact Analysis Jurisdiction: City of Snohomish February 8 GTC #7-87 Sweetwater Landing Traffic

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

10 th Street Residences Development Traffic Impact Analysis

10 th Street Residences Development Traffic Impact Analysis Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 425.339.8266 10 th Street Residences Development Traffic Impact Analysis Jurisdiction: City of Snohomish September 2018

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Appendix E: Emission Reduction Calculations

Appendix E: Emission Reduction Calculations Derr Road and Home Road Conversion Feasibility Study Springfield, OH Appendix E: Emission Reduction Calculations Derr Road and Home Road Conversion Feasibility Study Springfield, OH Emission Reduction

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality Traffic Impact Study Final Draft Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T

More information

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

Tijuana River Valley Regional Park Campground and Education Center

Tijuana River Valley Regional Park Campground and Education Center Tijuana River Valley Regional Park Campground and Education Center Draft Report September 2018 Prepared for: County of San Diego 5500 Overland Avenue, Suite 410 San Diego, CA 92123 Prepared by: 3900 Fifth

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

Date: December 20, Project #:

Date: December 20, Project #: To: Craig Rottenberg Long s Jewelers 60A South Avenue Burlington, MA 01803 From: Patrick Dunford, P.E. Senior Project Manager Date: December 20, 2018 Project #: 14416.00 Re: Burlington Mall Proposed Long

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey Traffic Impact Study Residences at Bancroft Block 14, Lot 2 April 30, 2018 REVISED: JANUARY 17, 2019 Prepared For 2 Hopkins Lane, LLC 2701 Renaissance Boulevard King of Prussia, PA 19406 Prepared By Maser

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Proposed CVS/pharmacy

Proposed CVS/pharmacy Traffic Impact and Access Study Proposed CVS/pharmacy West Main Street (Route 1) at Hull Street Clinton, Connecticut PREPARED FOR Arista Development LLC 520 Providence Highway, Suite 9 Norwood, Massachusetts

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information