1 DMB Proposed Toll Increase December 2018
2 The Delaware River and Bay Authority Bi-state agency established in 1962 Provides Crossings between Delaware and New Jersey Economic development benefitting the areas Responsible for the operation and maintenance of: Delaware Memorial Bridge Cape May-Lewes Ferry Forts Ferry Crossing Five regional airports Business Park 2
3 DRBA Network Collect fees on a per use basis DRBA receives no financial support from either State Revenues utilized for the financing, constructing, operating and maintenance of DRBA assets 3
4 Capital Investment Cost Drivers Aging Infrastructure Bridge spans built in 1951 & 1968 I-295 constructed in the 1950 s Ferry vessels launched in Airports are WWII vintage 4
5 Promises Kept: Completed Projects Recent DMB infrastructure projects: I-295 South Improvements-$40.0MM Toll Collection System-$9.0MM Cable Preservation-$41.5MM Painting-$23.8MM Steel Repairs-$9.0MM Traffic Management System-$3.1MM 5
6 Replace Pin & Link Systems $19.7 Million 6
7 Bridge Painting (Sandblast & Recoat) $48.2 Million Before After 7
8 Other Projects in the DMB Overhaul $24.5 Million Suspender Rope Replacement $40.5 Million Steel Repairs 8
9 Ship Collision Protection $45.2 Million CONCEPT Two (2) Eighty Foot (80 ) Diameter Cells Protecting Each Tower 9
10 Completing the DMB Overhaul $48.2 Million Bridge Painting $45.2 Million Replace Ship Collision Protection $40.5 Million Steel Repair $24.5 Million Suspender Rope Replacement $21.5 Million Deck Repair $19.7 Million Replace Pin & Link Systems and at the Ferry: $9.5 Million Replace Vessel Engines $4.3 Million Replace Transfer Bridges 10
11 Why is a Toll Increase Necessary? Revenue projections are insufficient to provide borrowing capacity or cash to finance the necessary preservation and improvement projects 11
12 History of Toll Increases One-Way Traffic Volumes 20,000, ,000, ,000,000 14,000, * ,000,000 10,000,000 8,000,000 6,000,000 4,000,000 2,000,000 0 *Toll Increase on Commercial Rates Only 12
13 DMB Traffic and Revenues 17.8 Million Vehicles $104.8 Million in Revenue 13
14 DRBA Tolls Are the Lowest in the Region Passenger Car (E-ZPass) Passenger Car (CASH) 5-Axle Commercial Commuter Frequent Traveler DRBA $4.00 $4.00 $25.00 $1.00 $1.25 DRPA $5.00 $5.00 $37.50 $4.00 Not Offered GW Bridge 1 $10.50 $15.00 $85.00 $6.50 Not Offered Ft McHenry 2 $6.00 $8.00 $48.00 $2.80 Not Offered (PANY&NJ) (MdTA) Off Peak Rates Round Trip Rates E-ZPass Rates are for MdTA Customers Only 14
15 Proposed Toll Increase for March 1, 2019 Passenger cars and small trucks increase to $5.00 Commercial vehicles increase by $2.00 per axle Discount Commuters (25 trips in 30 day period) $1.25 per trip Phased-in toll increases for Discount Frequent Travelers (20 trips in 90 day period) $2.25 as of March 2019 $3.00 as of January
16 Proposed Toll Rate Structure Toll Schedule Non-Commercial Passenger Car, Small Truck Passenger Car w/ 1 Axle Trailer Passenger Car w/ 2 Axle Trailer Passenger Car w/ 3 Axle Trailer Passenger Car Discount Traffic Commuters Frequent Travelers Commercial Vehicles 2 Axle Vehicle 3 Axle Vehicle 4 Axle Vehicle 5 Axle Vehicle 6 Axle Vehicle Vehicle Requiring Special Permit Specials (over 6 axles) Current Toll $4.00 $6.00 $8.00 $10.00 $1.00 $1.25 $10.00 $15.00 $20.00 $25.00 $30.00 $60.00 $5.00/axle New Toll 3/1/19 $5.00 $7.50 $10.00 $ /1/19 $1.25 $2.25 3/1/19 $14.00 $21.00 $28.00 $35.00 $42.00 $85.00 $7.00/axle 1/1/ $
17 What Will the Toll Increase Pay For? Ongoing priority projects which preserve and upgrade: Bridge steel and coatings & performance and protection systems Additional projects identified as a result of regular inspections Provides cash and borrowing capacity to fund an estimated $400+ million of necessary capital improvements 17
18 The Public Process Public Hearings Delaware December 5, 2018 New Jersey December 6, 2018 Board Consideration of Proposed Toll Increase - December 18, 2018 Implementation of New Toll Structure - March 1, 2019 For more Information To provide comments Contact_us@drba.net 18
Developing a Toll Demand Model for DelDOT s Statewide Travel Demand Model
Developing a Toll Demand Model for DelDOT s Statewide Travel Demand Model TRB 87 th Annual Meeting Washington, D.C. Introduction DelDOT is facing the same deteriorating infrastructure, increasing congestion
More informationTreasure Island Toll Policy, Affordability and Transit Pass Programs. TIMMA Board Meeting December 11, 2018
Treasure Island Toll Policy, Affordability and Transit Pass Programs TIMMA Board Meeting December 11, 2018 Avoiding Island Gridlock 2 Island Mobility Goals Incentivize transit, walking, and biking Discourage
More informationSEPULVEDA PASS CORRIDOR
SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000
More informationTreasure Island Mobility Management Program
Treasure Island Mobility Management Program Preliminary Toll Policy Recommendations For Buildout Year (2030) Draft TIDA CAB June 2, 2015 About the Treasure Island Mobility Management Program 2003 2008
More informationThe Changing Toll Environment How National Interoperability and All Electronic Toll Collection Are Impacting AAMVA & DMVs
The Changing Toll Environment How National Interoperability and All Electronic Toll Collection Are Impacting AAMVA & DMVs PJ Wilkins Executive Director, The E-ZPass Group Background Toll industry going
More informationOverview of Transit Funding and Planning in the PACTS Region
Overview of Transit Funding and Planning in the PACTS Region Presentation to PACTS Transit Committee and Federal Transit Administration Representatives February 8, 2018 Transit Agencies Agency Communities
More informationProposed HRTAC FY2018 FY2023 Plan of Finance Update
Chair, MICHAEL J. HIPPLE Vice Chair, LINDA T. JOHNSON Executive Director, KEVIN B. PAGE Proposed HRTAC 2018 2023 Plan of Finance Update HRTAC 2018 2023 Six Year Operating and Capital Program of Projects
More informationwhat you need to know FREEWAY IMPROVEMENT PROJECT (GFIP)
what you need to know Road users are already experiencing the benefits of the upgraded Gauteng freeway network through reduced travel time, which means more time to engage in business and doing things
More informationValley Metro Overview. ITE/IMSA Spring Conference March 6, 2014
Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and
More informationNational and Regional Electronic Toll Interoperability
National and Regional Electronic Toll Interoperability Presented to The Oklahoma Traffic Engineering Association October 23,2014 By: David Machamer Toll Operations Director Oklahoma Turnpike Authority
More informationTreasure Island Mobility Management Program
Treasure Island Mobility Management Program Preliminary Toll Policy Recommendations For Buildout Year (2030) Draft SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY May 20, 2015 About the Treasure Island Mobility
More informationDART Priorities Overview
City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee
More informationTask Force Meeting January 15, 2009
Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized
More informationTransportation 2040: Plan Performance. Transportation Policy Board September 14, 2017
Transportation 2040: Plan Performance Transportation Policy Board September 14, 2017 Today Background Plan Performance Today s Meeting Background Board and Committee Direction 2016-2017 Transportation
More informationFactsheet to the. SwissRapide Express. Project. Tomorrow s. Transport. Today
Factsheet to the SwissRapide Express Project Tomorrow s Transport Today I The Project Already today, intercity travellers in Switzerland are faced with crowded trains, regular delays and missed connections
More informationWould you say you approve or disapprove of how Governor Charlie Baker is dealing with the transportation system in your area?
The Barr Foundation Transportation Poll Topline Results Statewide Survey of 709 Massachusetts Registered Voters Field Dates: December 19, 2017 January 9, 2018 Do you have a favorable or unfavorable view
More informationAttachment A. BATA Resolution No. 128 BAY AREA TOLL AUTHORITY TOLL SCHEDULE FOR TOLL BRIDGES (EFFECTIVE JANUARY 1, 2019)
Page 1 of 6 BAY AREA TOLL AUTHORITY TOLL SCHEDULE FOR TOLL BRIDGES (EFFECTIVE JANUARY 1, 2019) BRIDGES AND TOLLS 2 AXLE VEHICLES Antioch Bridge, Benicia-Martinez Bridge, Carquinez Bridge, Dumbarton Bridge,
More informationE-ZPass Vehicle Descriptions
E-ZPass Vehicle Descriptions Class 1 vehicles - two axles, single rear wheels: E-ZPass off-peak toll shall be $7.50 effective September 18, 2011; $8.25 effective the first Sunday in December, 2012; $9.00
More informationAction 6A: HRTAC FY2018 FY2023 Funding Plan
Action 6A: HRTAC 2018 2023 Funding Plan Presentation to: HRTAC Finance Committee Kevin Page, HRTAC Liang Shan, PFM June 5, 2017 PFM Financial Advisors LLC 300 S. Orange Avenue Ste 1170 Orlando, Florida
More informationPurple Line Light Rail P3 Project
Purple Line Light Rail P3 Project TPB Meeting May 18, 2016 1 Topics General Project Overview The P3 Contract Details on The Successful Proposal 2 Recap of Purple Line P3 Events In November 2013 MTA initiated
More informationSH 249 IN GRIMES COUNTY. Open House April 3, 2014
SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss
More informationTechnical Question and Answer No November 2017 Rachel Rowe, Skagit County Public Works FROM: Will Moon, Glosten JOB/FILE NO
GUEMES ISLAND FERRY REPLACEMENT TO: Rachel Rowe, Skagit County Public Works FROM: Will Moon, Glosten JOB/FILE NO. 17097.01 Specific questions raised by the Ferry Committee Question 1 Will reliability of
More informationJanuary 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future
January 13, 2012 AACE Annual Meeting, Wickenburg, AZ I-15 in Arizona. Its Past, Present, and Future Jean A. Nehme, Ph.D., P.E. State Bridge Engineer, ADOT Presentation Overview Location, History, and Photographs
More informationPoint A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017
Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master
More informationMay 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes
May 23, 2011 APTA Bus & Paratransit Conference Metro ExpressLanes Program Overview > Conversion of HOV lanes to HOT lanes on I-10 and I-110 > Multi-modal Integrated Corridor Emphasis > 1 of 6 Nationwide
More informationThe project faces a number of challenges:
On-Track Light Rail Project The Ministry of Transport of the city of Gotham is proposing to construct an elevated 20- kilometer light rail transit (LRT) with 5 passenger stations, connecting several nearby
More informationTraffic Engineers' Report for Fiscal Year 2017
Mid-Bay Bridge Authority Traffic Engineers' Report for Fiscal Year 2017 Mid-Bay Bridge Authority Contents Executive Summary... 1 1. Introduction... 2 2. Mid-Bay Bridge Authority System... 3 3. Mid-Bay
More informationRedefining Mobility Ready or not: Autonomous and connected vehicle planning and policy, now and in the future
Redefining Mobility Ready or not: Autonomous and connected vehicle planning and policy, now and in the future Randy Iwasaki November 30, 2017 WHO WE ARE The Contra Costa Transportation Authority (CCTA)
More informationHorseshoe Bay Terminal Open House
Horseshoe Bay Terminal Open House July 5, 2007 Welcome Aboard The purpose of this Open House is to provide you with information and to receive your input for consideration on the Horseshoe Bay Terminal
More informationNew York s success was built on a transportation system that was fast, safe, and fair. It s time to return to those principles.
New York s success was built on a transportation system that was fast, safe, and fair. It s time to return to those principles. New York wouldn t be New York without our subways, roads, bridges, and tunnels.
More informationLondon 2050 Infrastructure Plan
London 2050 Infrastructure Plan RTPI London Future City Summit Michèle Dix 23 rd October 2014 The background to the 2050 London Infrastructure Plan is the city s expected strong population growth.. By
More informationMETRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only
METRONext Vision & Moving Forward Plans Board Workshop December 11, 2018 Disclaimer This presentation is being provided solely for discussion purposes by the Board of Directors of the Metropolitan Transit
More informationJohn Glenn Columbus International Airport. New terminal and midfield development program
John Glenn Columbus International Airport New terminal and midfield development program New airport terminals come around once every few generations. This is our time. It was 1958 when Columbus last opened
More informationPRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015
PRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015 Agenda A Introduction to PRASA B Funding Allocation and Spending Performance C Strategic Plan D Rail Modernisation
More informationDelaware Electric Cooperative. Solar: What You Need to Know
Delaware Electric Cooperative Solar: What You Need to Know National Solar Industry 9,000 solar companies Employing over 209,000 people Nearly 32 GW currently installed nationwide Enough solar to power
More informationSTRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016
STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit
More information2/1/2018. February 1, Item #1 CITIZENS PARTICIPATION
February 1, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments
More information! " # $ % # & " ' % ( ' ) "
"#!! $% ! " # $ % # " ' % ( ' ) ",-..*-/--0"-00"0**0 2 In agreement with the Terms of Reference, we have conducted an analysis of the road user charges (RUC) paid by the users of the road networks in the
More informationHelp shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary
Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County
More informationHead of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management
BDir Dipl Ing Manfred Silvanus Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management www.bmvi.de AGENDA - Federal Ministry of Transport and Digital
More informationTRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury
TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based
More informationPRESENTATION TO COMMUNITY
1 CONCEPT DESIGN PROPULSION SYSTEM TRADE-OFF ENGINEERS COST ESTIMATE GENERAL UPDATE 2 CONCEPT DESIGN PROPULSION SYSTEM TRADE-OFF ENGINEERS COST ESTIMATE GENERAL UPDATE 3 4 5 6 CONCEPT DESIGN 32 Vehicles,
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY.
Study on Economic Partnership Projects in Developing Countries in FY2010 Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY March 2011 第 1 章 第 2 章 The Ministry of Economy, Trade and Industry
More information4 COSTS AND OPERATIONS
4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this
More informationO-Train Confederation Line Stage 1
O-Train Confederation Line Stage 1 Presented to: Regional Public Works Commissioners of Ontario June 23, 2017 by Steve Cripps, Director, O-Train Construction The Need Ottawa s population is projected to
More informationExecutive Summary. Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico
: Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico The (ES) presents the main observations, conclusions, and recommendations resulting from the evaluation of the
More informationAND THAT Bylaw No , being Amendment No. 27 to Traffic Bylaw No. 8120, be forwarded for reading consideration.
Report to Council Date: File: 1862-01 To: From: Subject: D. Duncan, Manager, Parking Services Parking Rate, Fine and Fee Adjustments Recommendation: THAT Council receives, for information, the report from
More informationFunding Scenario Descriptions & Performance
Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion
More informationREPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES
TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who
More informationLeveraging Funding through Public/Private Partnerships
Leveraging Funding through Public/Private Partnerships New England Railroad Club Expo 2006 Kerry-Jane King New York Power Authority March 28, 2006 New York Power Authority State-owned non-profit public
More informationTransit Access Study
West of Hudson Regional Transit Access Study Open House presentation July 20, 2010 1 Agenda Progress To date Summary of Level 2 Alternatives and Screening Service Plans Bus and Rail Operating and Capital
More informationPaid Parking at Park & Ride Lots: Framing the Issues. Capital Programs Committee May 2014
Paid Parking at Park & Ride Lots: Framing the Issues Capital Programs Committee May 2014 Outline Current Status Industry Review DART Case Study Issues Alternatives Mechanics 2 Current Status: All Lots
More informationProposed FY2015 Budget and Fare Increase
Washington Metropolitan Area Transit Authority Proposed FY2015 Budget and Fare Increase Riders Advisory Council January 8, 2014 1 Washington Metropolitan Area Transit Authority What will riders see from
More informationFor personal use only
AER ISSUES NETWORK REVENUES DRAFT DECISIONS FOR ACT AND NSW ENERGY CUSTOMERS The Australian Energy Regulator (AER) has issued draft decisions on the revenue proposals submitted by ACT and NSW distribution
More informationThe Preferred Alternative: a Vision for Growth on the Northeast Corridor
A Long-Term Vision is Needed The Preferred Alternative: a Vision for Growth on the Northeast Corridor The Federal Railroad Administration (FRA) has released the Tier 1 Final Environmental Impact Statement
More informationUS 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT
US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT April 25, 2012 Tahoe Transportation District (TTD) Tahoe Transportation District (TTD) established 1980 as Bi-State Agency TTD Goals Implement Transportation
More informationMetropolitan Council Transit Capital Improvement Plan. September 23, 2009
1 Metropolitan Council 2010-2015 Transit Capital Improvement Plan September 23, 2009 2 Current Situation Capital facilities require longer range view Recent infusion of UPA, CTIB, and State funds have
More informationPump Station 7 Improvements
Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following
More informationGeorgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at
Overview Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at www.garail.com Commuter rail service between Lovejoy and Atlanta is ready for implementation:
More informationPrepared for: Triborough Bridge and Tunnel Authority. Prepared by: Stantec Consulting Services, Inc.
APPENDIX E History and Projection of Traffic, Toll Revenues and Expenses and Review of Physical Conditions of the Facilities of Triborough Bridge and Tunnel Authority Prepared for: Triborough Bridge and
More informationThe Case for. Business. investment. in Public Transportation
The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend
More informationIntroduction and Background Study Purpose
Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.
More informationProposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1
Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation
More informationJeffrey Busby A/Director, Infrastructure Program Management TransLink Urban Sustainability Accelerator
TransLink: A multi-modal, integrated transport and operations system Jeffrey Busby A/Director, Infrastructure Program Management TransLink Urban Sustainability Accelerator Is the Grass Greener? Transportation
More informationJAGUAR LAND ROVER RESULTS FOR THE THREE MONTHS ENDED 31 DECEMBER th FEBRUARY 2017
JAGUAR LAND ROVER RESULTS FOR THE THREE MONTHS ENDED 31 DECEMBER 2016 14 th FEBRUARY 2017 DISCLAIMER Statements in this presentation describing the objectives, projections, estimates and expectations of
More informationMTA Capital and Planning Review
MTA Capital and Planning Review The Bond Buyer's 5th Annual Metro Finance Conference November 15, 2007 Evolution of the Capital Plan 1 Plan Evolution First five-year plan approved in 1982 to rescue system
More informationPEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps
PEACHTREE CORRIDOR PARTNERSHIP Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Why Peachtree? Why Now? I. THE CONTEXT High Level View of Phasing Discussion Potential Ridership Segment 3 Ease
More informationMunicipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation
Municipal Road and Bridge Revolving Loan Fund 2014 Program Summary Rhode Island Department of Transportation The Basics The FY2014 Budget passed by the Rhode Island General Assembly included Article 20,
More informationDelaware County Engineer s Office
Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying
More informationVanpooling and Transit Agencies. Module 3: Benefits to Incorporating Vanpools. into a Transit Agency s Services
Vanpooling and Transit Agencies Module 3: Benefits to Incorporating Vanpools into a Transit Agency s Services A common theme we heard among the reasons why the transit agencies described in Module 2 began
More informationBalancing the Transportation Needs of a Growing City
Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program
More informationAtlas Arteria. TOLL REVENUE AND TRAFFIC STATISTICS AND APRR / AREA UPDATE 3 rd Quarter 2018
23 October ASX RELEASE Atlas Arteria TOLL REVENUE AND TRAFFIC STATISTICS AND APRR / AREA UPDATE 3 rd Quarter Toll Revenue and Traffic Statistics Atlas Arteria (ALX) today released its September quarter
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationSubmission to Greater Cambridge City Deal
What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a
More informationFederal Funding Opportunities Northeast Drayage Workshop October 13, Reema Loutan Environmental Engineer EPA Region 2
Federal Funding Opportunities Northeast Drayage Workshop October 13, 2010 Reema Loutan Environmental Engineer EPA Region 2 Opportunities Overview Diesel Emission Reduction Program Congestion Mitigation
More informationHISTORY AND PROJECTION OF TRAFFIC, TOLL REVENUES AND EXPENSES REVIEW OF PHYSICAL CONDITIONS TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY
HISTORY AND PROJECTION OF TRAFFIC, TOLL REVENUES AND EXPENSES and REVIEW OF PHYSICAL CONDITIONS Of the Facilities of TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY April 29, 2005 Prepared for the Triborough Bridge
More informationANNUAL GENERAL MEETING OF SHAREHOLDERS PT PETROSEA Tbk. Grand Kemang Hotel, Jakarta Wednesday, 27 May 2009
ANNUAL GENERAL MEETING OF SHAREHOLDERS PT PETROSEA Tbk. Grand Kemang Hotel, Jakarta Wednesday, 27 May 2009 Your Kind Attention Please 1. We are not distribute this presentation material, it can be access
More information2017 TRAFFIC ENGINEERING REPORT
2017 TRAFFIC ENGINEERING REPORT Year 2018 Toll Bridge Traffic Volume And Revenue Projections Retainer Agreement C-686A Submitted to: Delaware River Joint Toll Bridge Commission New Hope Headquarters and
More informationPepco Holdings, Inc. Blueprint for the Future and the Mid-Atlantic Regulatory. Steve Sunderhauf PHI Regulatory Group June 11, 2009
Pepco Holdings, Inc. Blueprint for the Future and the Mid-Atlantic Regulatory Landscape Steve Sunderhauf PHI Regulatory Group June 11, 2009 Who We Are Pepco Holdings, Inc. ( PHI ) is a public utility holding
More informationCalifornia s Emission Reduction Plan for Ports and International Goods Movement
California s Emission Reduction Plan for Ports and International Goods Movement Alternative Maritime Power Conference Los Angeles Harbor Hotel April 24, 2006 California Environmental Protection Agency
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The
More informationThe German Tolling Prospects
The German Tolling Prospects Christian Kohlhase First Secretary (Transport, Building and Urban Affairs) National Governors Association State Summit on Innovative Transportation Funding and Financing Washington,
More informationSales and Use Transportation Tax Implementation Plan
Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,
More informationWARES. October, 2018
WARES October, 2018 1 Project Overview A new 16 mile east-west light rail line between Bethesda in Montgomery County and New Carrollton in Prince George s County Operates mostly on the surface with 21
More informationImplementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Operation Name: ROAD INFRASTRUCTURE
More informationPlanning of the HSR Network
Engineering Services Department A Global Solution in Public Works Project China s High Speed Rail Network Susan Pan, P.E., Manager of Engineering County of Ventura, Planning of the HSR Network Planning
More informationV03. APTA Multimodal Operations Planning Workshop August Green Line LRT
V03 APTA Multimodal Operations Planning Workshop August 2016 Green Line LRT 2 Presentation Outline Past Present Future 3 16/03/2016 RouteAhead Update 4 4 16/03/2016 RouteAhead Update 5 5 16/03/2016 6 6
More informationMetroExpress Improvements
Improvements Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail Commuters Connectors Circulators Project
More informationCAPITAL MARKETS DAY DR FRIEDRICH EICHINER MEMBER OF THE BOARD OF MANAGEMENT OF BMW AG, FINANCE.
March 26, 2015 CAPITAL MARKETS DAY DR FRIEDRICH EICHINER MEMBER OF THE BOARD OF MANAGEMENT OF BMW AG, FINANCE. AGENDA. 1 Financial Status of 2014 2 Chances and Challenges in 2015 3 Towards a strong future
More informationBrownfields to Brightfields
Lori Ribeiro, Brockton Brightfields Consultant LRibeiro@bluewavestrategies.com (781) 648-2605 Brownfields to Brightfields Revitalizing Brockton by Converting a Former Manufactured Gas Plant to a Solar
More informationCapital Needs Assessment Riders Advisory Council July2, 2008
Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair
More informationAppendix C. Parking Strategies
Appendix C. Parking Strategies Bremerton Parking Study Introduction & Project Scope Community concerns regarding parking impacts in Downtown Bremerton and the surrounding residential areas have existed
More informationTHE WAY WE MOVE LRT FOR EVERYONE
THE WAY WE MOVE LRT FOR EVERYONE 2 LRT for Everyone LRT FOR EVERYONE Light rail is about more than transit; it s about transforming Edmonton. As the city grows, so do its transportation needs. LRT is an
More informationWELCOME Open House on Parking
WELCOME Open House on Parking Tonight we re presenting our policy responses for your input on how to best manage our public parking. Parking is a shared community resource. To best serve everyone in our
More informationDavid Chow, P.E., AICP Director, IBI Group
David Chow, P.E., AICP Director, IBI Group Existing Conditions get worst ROADWAY CONDITIONS IN 2030 Daily delay goes from 2.2 to up to 5.4 million hours lost in congestion Unreliability of the roadway
More informationIMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS. Toronto Forum For Global Cities December 2008
IMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS Toronto Forum For Global Cities December 2008 TORONTO S CHALLENGE GTA suffers from traffic congestion The average Torontonian spends seven hours a week
More informationOffice of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report
Office of Transportation Bureau of Traffic Management 1997 Downtown Parking Meter District Rate Report Introduction The City operates approximately 5,600 parking meters in the core area of downtown. 1
More informationINFRASTRUCTURE RENEWAL FOR THE NEXT GENERATION PATCO High Speed Line Power Infrastructure Renewal
PATCO High Speed Line Power Infrastructure Renewal Page 1 of 5 INFRASTRUCTURE RENEWAL FOR THE NEXT GENERATION PATCO High Speed Line Power Infrastructure Renewal This Engineering Excellence Award entry
More informationExpanding Capacity for the Northeast Corridor The Gateway Program
Expanding Capacity for the Northeast Corridor The Gateway Program Petra Todorovich Messick March 4, 2013 Raritan Valley Rail Coalition Somerville, NJ The Northeast Corridor Mainline and Branches 899 Route-miles
More informationRegional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Presentation Outline Transit System Facts Economic Challenges in the Truckee Meadows RTC Transit
More information