NEWFOUNDLAND AND LABRADOR COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range BONAVISTA BAY

Size: px
Start display at page:

Download "NEWFOUNDLAND AND LABRADOR COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range BONAVISTA BAY"

Transcription

1 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters 396 Offer Wadham Island NE. end of island l W 3s Square skeleton tower, red Musgrave Harbour Break l 3s Mast. lash 0.5 s; eclipse 2.5 s. Edn 02/11 (N10-066) 399 Muddy Point On point Oc G 6s Square skeleton tower, green and white rectangular lash 4 s; eclipse 2 s Musgrave Harbour light buoy JM l G 4s Green spar, marked JM Musgrave Harbour light buoy JM l G 4s Green spar, marked JM Musgrave Harbour light buoy JM3/ l G 4s Green spar, marked JM3/1. Edn 09/ Musgrave Harbour light buoy JM4/ l 4s ed spar, marked JM4/ Walter s Shoal light buoy JM3/ l G 4s Green spar, marked JM3/3. Edn 07/09 (N09-019) Little Horse Stone light buoy JM l G 4s Green spar, marked JM1. Edn 09/ Musgrave Harbour light buoy JM l 4s ed spar, marked JM2. Edn 09/ Muddy Shag Island l W 4s Cylindrical tower, red and white horizontal bands. 402 South ock light buoy J4 W. of the rock l 4s ed, marked J North Penguin Island E. end island l W 6s Square skeleton tower, red 7.1 lash 0.5 s; eclipse 5.5 s Ships un light buoy JL l G 4s.. Green spar, marked JL3. Page 1 of 10

2 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters Lumsden Inner light buoy JL l 4s ed spar, marked JL Southern Cat Island light buoy JL l G 4s Green spar, marked JL Lumsden range On point of land ' 101.5m from front Skeleton tower, white daymark, red vertical 4.2 Skeleton tower, white daymark, red vertical Lumsden Break South Lumsden Harbour l G 4s Mast. Edn 10/11 (N11-056) South Tickle Lumsden Harbour l 4s Mast. Edn 10/11 (N11-057) 406 H576 Cabot Islands (Bonavista Bay) On largest island l W 10s Octagonal tower, red and white horizontal bands lash 0.2 s; eclipse 9.8 s. Edn 01/15 (N14-066) Cape reels Harbour light buoy J l 4s ed spar, marked J2. Chart:N/A Edn 08/17 (N17-025) Crackers #1 South JC Cape reels VQ(6) +Ll W 10s Yellow and black spar, marked JC. Edn 06/11 (N11-026) Cape reels Harbour light buoy J2/ l 4s ed spar, marked J2/ Cape reels Harbour light buoy J l G 4s Green spar, marked J Cape reels Break l G 4s Cylindrical mast Cape reels Wharf light l 4s Cylindrical mast. Chart: Cape reels Harbour light buoy J l 4s ed spar, marked J4. Chart: 4857 Page 2 of 10

3 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters Crackers # 2 North J Cape reels Q W 1s Black and yellow spar, marked J. Chart: 4857 Edn 06/11 (N11-024) 408 H580 Gull Island (Cape reels) E. of South Bill l W 3s Square skeleton tower, red 409 Charge ock North Cardinal light buoy JX Q W 1s Black and yellow, marked JX. Edn 07/10 (N10-016) 410 Kenny's ocks l W 3s Square skeleton tower, red Tucker's ock light buoy JW l G 4s Green spar, marked JW Harbour ock light buoy JW l G 4s Green spar, marked JW Wesleyville Wharf On seaward end of public wharf l 6s Cylindrical mast. lash 1 s; eclipse 5 s. 412 Wesleyville (Bennets High Island) Bennets High Island l W 3s Square skeleton tower, red 413 Ledger ock light buoy JW2 S. of the rocks l 4s ed spar, marked JW Black Island South JWB Wesleyville Q(6) +Ll W 15s.... Yellow and black spar, marked JWB. Edn 05/11 (N11-017, 019) 415 Newtown NE. end of Honey Pot Island l 4s Cylindrical tower, red and white horizontal bands Newtown Outer light buoy JN l G 4s Green spar, marked JN Newtown Inner light buoy JN l 4s ed spar, marked JN Newtown Inner light buoy JN l G 4s Green spar, marked JN5. Page 3 of 10

4 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters Newtown Outer light buoy JN l 4s ed spar, marked JN Newtown Wharf l G 4s Green mast Valleyfield range On small island ' 457.2m from front Square skeleton tower, white daymark, red vertical 6.5 Square skeleton tower, white daymark, red vertical Squid ocks light buoy JV l G 4s Green spar, marked JV5. Edn 02/10 (N10-009) Heart Island light buoy JV l G 4s Green spar, marked JV Benburry light buoy JV4 Off rock, entrance to Valleyfield Harbour l 4s ed spar, marked JV Candle Cove ocks NE. of the rocks l W 3s Square skeleton tower, red Walkers Point light buoy JV l 4s ed spar, marked JV Valleyfield Wharf On outer end of wharf l 4s 3.4 Cylindrical mast. 421 Pound Cove E. of Pound Cove Island l W 3s Square skeleton tower, red Halfway eef light buoy JN1 East Coast l G 4s Green spar, marked JN1. Edn 08/09 (N09-020) Edn 10/17 (N17-036) 424 Pound ocks Entrance to Greenspond Harbour Q 1s Square skeleton tower, red lash 0.3 s; eclipse 0.7 s. Page 4 of 10

5 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters Harbour ock light buoy JG l G 4s Green spar, marked JG Scammels Lookout W. side of bridge, W. entrance harbour l G 6s Cylindrical mast. 3.3 lash 0.5 s; eclipse 5.5 s. 426 Seine ock W. of Ship Island, Greenspond l 4s Square skeleton tower, red Greenspond range On public wharf ' 61.4m from front Skeleton tower, white daymark, red vertical 3.4 Skeleton tower, white daymark, red vertical 7.4 Visible in line of range. Visible in line of range. 429 South Pound Island On island l W 4s Square skeleton tower, red 430 Puffin Island On E. end of island I W 5s ed and white hexagonal tower, white daymark, red horizontal band. 4.9 lash 0.2 s; eclipse 4.8.s. Horn - Blast 3 s; sil. 27 s. 431 Shoe Cove Point Near Greenspond l W 3s Square skeleton tower, red Wareham ishermen's Wharf On seaward end of wharf l 3s Cylindrical mast. 432 air Islands On Grindstone Head l W 6s Square skeleton tower, red 4.6 lash 0.5 s; eclipse 5.5 s. Chart: Hare Cut Point On point l W 3s Square skeleton tower, red daymark, white horizontal band. 4.6 Chart: Gooseberry Island On SW. point l W 6s Cylindrical tower, red and white horizontal bands. 5.0 lash 0.5 s; eclipse 5.5 s. Chart:4856 Page 5 of 10

6 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters Penneys Cove erry Wharf l 4s Cylindrical mast. Chart: Pennys Cove Point light buoy JPC1 Willis each l G 4s.... Green spar, marked JPC1. Chart:4856 Edn 10/11 (N11-067) Edn 07/17 (N17-022) Edn 10/17 (N17-043) Linton ock light buoy JGM l 4s ed spar, marked JGM4. Edn 07/10 (N10-031) 439 Puffin lat Island l W 4s Square skeleton tower, red Glovertown Wharf l 4s Cylindrical mast Glovertown Harbour ock light buoy JGM l 4s ed spar, marked JGM6. Edn 07/10 (N10-032) Middle Arm light buoy JGM7 Glovertown l G 4s Green spar, marked JGM7. Edn 01/14 (N13-030) Middle Arm light buoy JGM5 Glovertown l G 4s Green spar, marked JGM5. Edn 11/11 (N11-081) Glovertown Yacht Club Wharf l G 4s 2 Mast. 2.6 Edn 11/11 (N11-050) Hail Island East J Willis each Q(3) W 10s Black, yellow and black spar, marked J. Edn 10/11 (N11-065) Varket Channel West Cardinal light buoy J Q(9) W 15s Yellow, black and yellow spar, marked J. Edn 10/11 (N11-066) Willis each East JW VQ(3) W 5s Black, yellow and black spar, marked JW. Edn 10/11 (N11-069) Bacon Bone ock light buoy J l G 4s Green, marked J Burnside light buoy J l 4s ed spar, marked J4. Edn 11/11 (N11-068) Page 6 of 10

7 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters Burnside light buoy J l 4s ed spar, marked J Burnside ock l G 4s Cylindrical mast Happy Adventure East Wharf l 4s 2 Mast. 2.6 Edn 02/ Burnside erry Wharf l 4s Cylindrical mast Salvage light buoy JSA l 4s ed spar, marked JSA Salvage light buoy JSA l G 4s Green spar, marked JSA Salvage light buoy JSA l 4s ed spar, marked JSA Salvage light buoy JSA l 4s ed spar, marked JSA Salvage Wharf l G 4s 2 Mast. 2.1 Edn 10/11 (N05-099) 440 Salvage Harbour Harbour entrance l G 4s Square skeleton tower, green and white rectangular Little Denier Island l W 3s Cylindrical tower, red and white vertical stripes Happy Adventure On western point of entrance l W 6s Square skeleton tower. 6.4 lash 4 s; eclipse 2 s. Whistle - Blast 5 s; sil. 55 s Happy Adventure West Wharf Seaward end of wharf l 4s Mast. Edn 02/ Jamestown Wharf l 4s 3.8 Cylindrical mast Canning Cove Wharf l 4s Cylindrical mast. Page 7 of 10

8 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters Long Toms Cove ock light buoy JCG l 4s.... ed spar, marked JCG2. Chart: Musgravetown Break l G 4s 4 2 Cylindrical mast. 2.1 Chart: Shag Island ock light buoy JCG3 Sweet Bay l G 4s.... Green spar, marked JCG3. Edn 11/17 (N17-053) 442 Big ock light buoy JC l 4s ed spar, marked JC6. Edn 02/10 (N10-008) Chaffey s ock light buoy JC l 4s.... ed spar, marked JC2. Chart: Open Hall Wharf Tickle Cove Wharf Sweet Bay Wharf l G 4s Cylindrical mast. l G 4s Cylindrical mast. l G 4s Cylindrical mast Wolf Island light buoy JSB l 4s.... ed spar, marked JSB Mustard Gull Island ock light buoy JSB l 4s.... ed spar, marked JSB Chance Cove Ledge light buoy JSB l (2+1) 6s.... ed, green and red, marked JSB Clay Cove ock light buoy JT l G 4s.... Green spar, marked JT White Islets North JWT Newman Sound Q W 1s.... Black and yellow spar, marked JWT. Edn 06/12 (N12-011) Saltons Brook light buoy JT l (2+1) G 6s Green, red and green spar, marked JT Plate Cove West Break l 4s 2 Mast. 2.6 Edn 06/12 (N12-013) 44 Saltons Brook light buoy JT l 4s ed spar, marked JT2. Page 8 of 10

9 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters 445 Saltons Brook light buoy JTT l G 4s Green spar, marked JTT H Headquarters Wharf l G 4s 2 Mast. 2.6 Edn 12/16 (N16-071) Tilley s ock light buoy JS l G 4s Green spar, marked JS3. Edn 07/09 (N19-014) Edn 08/10) Hubley s ock light buoy JS l 4s ed spar, marked JS Abbotts Shoal light buoy JS4 Summerville Q 1s ed spar, marked JS4. Edn 06/10 (N10-019) H Summerville Wharf l 4s 2 Cylindrical mast. Operates 24 h. Edn 10/09 (N09-035) Edn 12/16 (N16-082) Edn 01/ Summerville Outer buoy JS l G 4s.... Green spar, marqued JS1. Edn 07/09 (N09-014) Edn 08/10 (N10-016) Princeton Wharf l G 4s Cylindrical skeleton mast Western Head light buoy J l G 4s Green, marked J9. Edn 06/10 (N10-016) Cary ock light buoy JK l G 4s Green, marked JK Duntara Wharf l 4s 2 Cylindrical skeleton mast Brandishes light buoy J Q G 1s Green, marked J7. Edn 09/17 (N17-033) 443 King s Cove Head l W 4s White cylindrical tower King s Cove Wharf l 4s.. Mast. 2.1 Page 9 of 10

10 NEWOUNDLAND AND LABADO COAST List of s, Buoys and in meters Bonavista Outer Shoal light buoy JB l G 4s.... Green spar, marked JB5. Edn 02/10 (N10-007) Bonavista Entrance light buoy JB l G 4s Green spar, marked JB7. Edn 02/ ed ock Shoal light buoy JB l G 4s Green, marked JB3. Edn 07/10 (N10-016) 447 Bonavista Break At outer end of break Q 1s Cylindrical mast Bonavista Outer light buoy JB l 4s ed spar, marked JB Long Liner Wharf On seaward end of public wharf l G 4s 2.8 Cylindrical mast Bonavista loating Wharf l G 4s Mast. 2.1 Edn 03/ Stone Island light buoy JB l 4s ed, marked JB H536 Cape Bonavista E. side of cape l W 10s Skeleton tower, red and white rectangular 12.7 lash 1 s; eclipse 9 s. Horn - Blast 3 s; sil. 27 s. Horn points Brandy ocks West Cardinal light and bell buoy JB Q(9) W 15s Yellow, black and yellow, marked JB. Page 10 of 10

STRAIT OF BELLE ISLE

STRAIT OF BELLE ISLE NEWOUNDLAND AND LABADO COAST List of s, Buoys and 211 H154 Pointe iche 50 41 54.6 057 24 36.8 l W 5s 29.3 15 White octagonal tower, red upper portion. 19.8 lash 0.2 s; eclipse 4.8 s. Edn 07/10 211.1 Little

More information

INLAND WATERS List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Light Characteristics. Nominal Range LAKE ERIE

INLAND WATERS List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Light Characteristics. Nominal Range LAKE ERIE INLAND WATERS List of s, Buoys and og Signals ocal in meters ground og Signals 552 Middle Reefs light buoy EU4 SW. of reefs. 42 52 50.2 78 55 16.2 l R 4s...... Red, marked "EU4". Chart:14832(U.S) 552.1

More information

PACIFIC COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range JUAN DE FUCA STRAIT

PACIFIC COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range JUAN DE FUCA STRAIT PACIIC COAST List of s, Buoys and og Signals ocal ground og Signals JUAN DE UCA STAIT 180 G5288 Carmanah Point On point. 48 6 42.4 124 45 04.8 l 5s 55.6 1 hite octagonal tower with red top lash 0.; eclipse

More information

INLAND WATERS List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Light Characteristics. Nominal Range ST. CLAIR RIVER

INLAND WATERS List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Light Characteristics. Nominal Range ST. CLAIR RIVER INLAND WATERS List of s, Buoys and og Signals ocal og Signals 731.2 St. Clair Cutoff light buoy A14 42 33 09 82 35 10 l R 4s Red, marked "A14". Winter spar. 732 733 Squirrel Island range 42 33 11.7 82

More information

SOUTHERN STRAIT OF GEORGIA

SOUTHERN STRAIT OF GEORGIA PACIIC COAST List of s, Buoys and og Signals ocal in meters ground og Signals SOUTHEN STAIT O EOIA 265.2 5359 Croker Point 48 46 29 123 12 04.5 l 4s 4.6 4 Mast, red and white triangular daymark. 265.5

More information

NORTH CHANNEL - LAKE HURON

NORTH CHANNEL - LAKE HURON in meters ground 983 Campbell ock light buoy J12 On W. side of rock, NE. of Cape Smith. 45 49 36.7 081 33 22.8 l 4s ed spar, marked J12. Seasonal (in place year round). 984 Cape Smith On shore. 45 47 03.9

More information

PACIFIC COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range HARO STRAIT

PACIFIC COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range HARO STRAIT PACIFIC COAST List of s, Buoys and 222.8 Little Zero Rock light buoy V30 W. of Little zero rock, Cordova Bay. 48 31 54.3 123 19 44.7 Q R 1s.. 3 Red, marked V30. Chart:3440 223 G5336 Zero Rock 48 31 25.3

More information

ATLANTIC COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range SAGUENAY RIVER

ATLANTIC COAST List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Nominal. Range SAGUENAY RIVER ATLANTIC COAST List of s, Buoys and og Signals Longitude. ocal in meters ground og Signals SAUENAY RIVER 1773 H2106 Haut-fond Prince On shoal. 48 06 29.6 069 36 51.7 l 2.5s 24.6 18 Cylindrical tower. 25.3

More information

INLAND WATERS 2009 List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Light Characteristics. Nominal Range GEORGIAN BAY

INLAND WATERS 2009 List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Light Characteristics. Nominal Range GEORGIAN BAY INLAND ATES 2009 List of s, Buoys and og Signals ocal ange ground emarks og Signals EOIAN BAY 814 North Point On point, entrance to Tobermory. 45 15 45.7 81 39 55 Iso 4s 10.5 Square skeleton tower, red

More information

INLAND WATERS List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Light Characteristics. Nominal Range OTTAWA RIVER

INLAND WATERS List of Lights, Buoys and Fog Signals. Focal Height in m. above water. Light Characteristics. Nominal Range OTTAWA RIVER in meters ground Lac des Deux Montagnes 1233.3 Pointe Cadieux CAD 45 26 23.4 74 00 17.9 l R 10s Red, green and red, marked "CAD". 1233.55 South Cardinal BAR 45 27 19.4 74 00 07.4 Q(6) +Ll W 15s Yellow

More information

RIGHT OUTSIDE QUARTER LEFT OUTSIDE QUARTER MIDDLE HALF OF CHANNEL

RIGHT OUTSIDE QUARTER LEFT OUTSIDE QUARTER MIDDLE HALF OF CHANNEL To accompany Notice to Mariners 3930/18 On Chart 3095 COOS BAY CONTROLLING S FROM SEAWARD IN FEET AT MEAN LOWER LOW WATER (MLLW) MIDDLE HALF OF CHANNEL ( ENTRANCE RANGE 39 39 4-18 - 1.9 37 ENTRANCE RANGE

More information

Table 1d - FSA for All Returns, Females Tax Year

Table 1d - FSA for All Returns, Females Tax Year PR 10 Newfoundland and Labrador A0A 20,250 597,345 1,920 1,720 2,580 3,150 1,960 1,610 1,360 1,030 1,020 740 550 460 630 470 410 290 290 70 20 A0B 8,850 249,804 780 740 1,200 1,520 1,010 790 540 430 370

More information

SECTION II CORRECTIONS TO PUB 110, LIST OF LIGHTS, 2011 EDITION. (4) Characteristic. (5) Height W period 20s fl. 1.6s, ec. 18.

SECTION II CORRECTIONS TO PUB 110, LIST OF LIGHTS, 2011 EDITION. (4) Characteristic. (5) Height W period 20s fl. 1.6s, ec. 18. CORRECTIONS TO PUB 1, LIST OF LIGHTS, 2011 EDITION 182 -S. head. J 6042 1 19.4 N Fl.W. 81 2. W period 20s fl. 1.6s, ec. 18.4s 220 67 20 Red tower, white band; 9. Visible 18-17. * * * 1840 Cayo Bolivar.

More information

SECTION I NM 1/15 CHART CORRECTIONS

SECTION I NM 1/15 CHART CORRECTIONS CHART CORRECTIONS 411 54Ed. 8/13 LAST NM 49/14 1/15 Submarine cable [L30.1] joining 29 55 N 80 42 W 29 44 N 80 23 W 29 45 N 80 13 W (See 43/14-411) 11009 39Ed. 4/11 LAST NM 49/14 1/15 Submarine cable [L30.1]

More information

SECTION II CORRECTIONS TO PUB 110, LIST OF LIGHTS, 2014 EDITION

SECTION II CORRECTIONS TO PUB 110, LIST OF LIGHTS, 2014 EDITION 10020 Saul Island. H 3654 10252 -Moose Harbor Fog Signal. H 3738 11456 St. Mary's AVIATION LIGHT. J 2855.8 11460 Amelia Island. J 2856 11464 St. Johns. J 2858 11468 St. Augustine. J 2866 11472 Ponce de

More information

APPENDIX L Table 1. Storage and Distribution Study Petroleum Product Storage Facilities - Newfoundland and Labrador

APPENDIX L Table 1. Storage and Distribution Study Petroleum Product Storage Facilities - Newfoundland and Labrador APPENDIX L Table 1 Storage and Distribution Study Petroleum Product Storage Facilities - Newfoundland and Labrador - 2004 Owner/ Feeder Visitation Photo Region Location Type of Facility Operator Terminal(s)

More information

0 to 14 years. 15 to 24 years. 25 to 34 years. Newfoundland and Labrador ,790 36,240 27,060 29,370 33,945 41,810 43,505 41,560 12,300

0 to 14 years. 15 to 24 years. 25 to 34 years. Newfoundland and Labrador ,790 36,240 27,060 29,370 33,945 41,810 43,505 41,560 12,300 80 Newfoundland and Labrador 10 265,790 36,240 27,060 29,370 33,945 41,810 43,505 41,560 12,300 Division No. 1 1001 138,870 19,870 15,325 17,820 18,635 21,230 20,945 19,265 5,790 Portugal Cove South T

More information

CLASSIFICATION

CLASSIFICATION CLASSIFICATION 2018-2019 VB BB SOC SLO IND SOC B-HOC 4A >200 >500 >325 >150 >325 >251 3A 76-199 201-49976 - 325 76-149

More information

Technical Information

Technical Information Technical Information CCC Total Gross Square Footage: 2,200,000 square feet. Elevations for Each Level: Lower Level: 5,197 6 Street Level: 5,214 Upper Level: 5,241 6 (It is 16 6 from the Lower Level floor

More information

NOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

NOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE IS HEREBY GIVEN that construction activities are in progress at the Dudgeon Offshore Wind Farm. Wind turbine generators

More information

Shunt wires SHUNT WIRE (JA type)

Shunt wires SHUNT WIRE (JA type) SHUN WIRE (JA type) 2-ød in-plated in-plated 1 1 art No. JA 1- JA 2- JA - JA 4- JA 5- JA 6- JA 7- JA 8- JA 9- JA 10- JA 11- JA 12- JA 1- JA 14- JA-2501 JA-2502 JA-250 JA-2504 Dimensions ød B 1

More information

Technical Information

Technical Information Technical Information CCC Total Gross Square Footage: 2,200,000 square feet. Lower Level: 114,860 square feet Street Level: 313,525 square feet (Includes theatre) Upper Level: 625,969 square feet Elevations

More information

Direct solenoid and solenoid pilot operated valves

Direct solenoid and solenoid pilot operated valves Direct solenoid and solenoid pilot operated valves Individual mounting Series Inline Manual operator Solenoid 4-way pilot with balanced poppet Air return 33 34 36 3 37 38 5 67 69 44 46 4 47 48P SERIES

More information

Direct solenoid and solenoid pilot operated valves

Direct solenoid and solenoid pilot operated valves Direct solenoid and solenoid pilot operated valves Individual mounting Series Inline Oval shaped armature Encapsulated coil Push pin Manifold mounting Stacking Manifold base plug-in Manifold base plug-in

More information

and zero rpm. Maximum recommended pressure is 110 psi (7.6 bar). Adjustment for speed is explained under Selection Procedure.

and zero rpm. Maximum recommended pressure is 110 psi (7.6 bar). Adjustment for speed is explained under Selection Procedure. CB Construction Single Flange Dual Flange The type CB element assembly is designed and built to provide dependable clutch or brake service in the most exacting industrial applications. It is suited to

More information

Hot Spot Recommendations

Hot Spot Recommendations Gang West East Prison Curve 76-77 294 1 2 Limited Visibility No Philadelphia Tacony Curve 78-79 295 1 1 Long sweeping curve. Noise from I-95 No Philadelphia Ford Curve 81-82 298 1 3 Limited Visibility

More information

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT Philadelphia Regional Port Authority U.S. Army Corps of Engineers Philadelphia District DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT Investigation of Submarine Utility Crossings Stations 249+000 to 515+000

More information

Directions to the PPA Office 508 North Third Street Harrisburg, PA 17101

Directions to the PPA Office 508 North Third Street Harrisburg, PA 17101 Directions to the PPA Office 508 North Third Street Harrisburg, PA 17101 If at any time in your travels you become disoriented and are unsure of how to get here, please call (safely!) and we would be happy

More information

Property Market Report

Property Market Report Property ket Report Dwellings Median Price Comparison Over Last 10 Years 07 April, 17:00:54 District 2008 2009 2010 2011 2012 Northland $325,000 $311,000 $319,000 $331,000 $315,000 $300,000 $309,000 $320,500

More information

South West of England Regional Development Agency

South West of England Regional Development Agency South West of England Regional Development Agency Wave Hub Development and Design Phase Wave Energy Converters Mooring System Study May 200 South West of England Regional Development Agency Wave Hub Development

More information

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS Offshore Wind China 2010 Bergen, 15th March 2010 Olivier Angoulevant Nexans Norway AS At the core of performance At the core of performance : a worldwide leader Worldwide leader in cables, cabling systems

More information

928 Motorsports Oil Control System Installation

928 Motorsports Oil Control System Installation 928 Motorsports Oil Control System Installation For 16 valve Non-Supercharged Motors (Installation on supercharged engines is different, and included with the supercharger kit installation instructions)

More information

Hot Spot Recommendations

Hot Spot Recommendations Recommendations Name of Location MP Curves I-95 Bridge 76-75.5 & Gang Advanced 1 2 1 ise under bridge 125 MPH end of Torresdale Curve 75-75.5 S' Curve 1 3 3 S curves east & west Traffic noise from I-95

More information

Inserts for square and rectangular tubes

Inserts for square and rectangular tubes Inserts for square and rectangular tubes 35 Outer tube dimensions Ribbed inserts/plugs with smooth sliding surface for square and rectangular tubes. The tube inserts are suitable for tubes with a wall

More information

Draft Publicly Owned Lands Map Key

Draft Publicly Owned Lands Map Key Draft Publicly Owned Lands Map Key 74 - Federal 78 - Municipal 79 - School District 80 - State 86 - Prudence Conservancy 1 19 87 74 0 CHASE RD 0.84 Portsmouth Park 2 19 88 74 95 CHASE RD 0.71 Island Park

More information

BERETTA PISTOLS. J9A9F A1, 3 magazines 9 mm Dbl/Sngl 10 Rounds $775 $575-26%

BERETTA PISTOLS. J9A9F A1, 3 magazines 9 mm Dbl/Sngl 10 Rounds $775 $575-26% IMPORTANT NOTE: THIS PRICING IS AVAILABLE ONLY TO CERTIFIED INSTRUCTORS WHO MEET ELIGIBILITY 2017 INSTRUCTOR LIST SPECIFICATIONS AND S SUBJECT TO CHANGE WITHOUT NOTICE. THIS LIST SUPERSEDES ALL PREVIOUSLY

More information

Constricting Type Clutches and Brakes

Constricting Type Clutches and Brakes Constricting Type Clutches and Brakes B Constricting Features B-1 Element Descriptions B-3 CB Elements B-5 Technical and Dimensional Data B-9 Clutch and Brake Applications B-15 Mounting Components B-40

More information

THE NEW HENRY B. GONZÁLEZ CONVENTION CENTER

THE NEW HENRY B. GONZÁLEZ CONVENTION CENTER THE NEW HENRY B. GONZÁLEZ CONVENTION CENTER Now Open 514,000 of contiguous exhibit space 86,878 column free space 54,000 Stars at Night Ballroom the LARGEST in Texas 72 meeting rooms LEARN MORE AT MEETINGS.VISITSANANTONIO.COM

More information

Town Street Location

Town Street Location Concord Abbott Rd. N. of Sewalls Falls Rd. 3,307 1,339 1,276 2,014 1,411 Concord Abbott Rd. E. of US 3 (Fisherville Rd.) 1,669 1,186 1,195 936 Concord Airport Rd. S. of Heights Rd. 11,707 11,488 11,345

More information

Tap Water Quality for Public Water Supplies in Newfoundland and Labrador Nutrients and Metals

Tap Water Quality for Public Water Supplies in Newfoundland and Labrador Nutrients and Metals Bauline Bauline #1 Brook Path Well Mar 13, 2018 0.110 4.1 LTD 0.140 0.005 0.015 LTD LTD 0.008 0.00001 LTD 0.006 LTD LTD 6.000 0.110 LTD LTD LTD 0.0002 0.007 Bay Roberts Bay Roberts, Spaniard's Bay Birchy

More information

URGENT SAFETY RECALL

URGENT SAFETY RECALL Club Car, LLC Post Office Box 204658 Augusta, Georgia 30917-4658 (706) 863-3000 URGENT SAFETY RECALL TO: Authorized Club Car Golf and Utility Vehicle Dealers, Distributors, Branch Offices, Regional Managers

More information

Direct solenoid and solenoid pilot operated valves

Direct solenoid and solenoid pilot operated valves Direct solenoid and solenoid pilot operated valves SIZE 26 mm Individual mounting Valve only No base non plug-in Conform to ISO 15407/1 Manifold mounting Valve only No base non plug-in Conform to ISO 15407/1

More information

GUIDE TO TRAFFIC MARSHALLING AT ExCeL LONDON

GUIDE TO TRAFFIC MARSHALLING AT ExCeL LONDON Traffic Parking at Excel for contractors There are currently 54 individual parking bays for arctic size vehicles under the North side of the venue and these will be used for vehicles that require more

More information

London Transport Heritage Collection

London Transport Heritage Collection London Transport Heritage Collection 1 ROLLING STOCK... 4 1.1 Class 20... 4 1.1.1 Background...4 1.1.2 Design & Specification...5 1.2 Pannier 5700 Class... 5 1.2.1 Background...6 1.2.2 Design & Specification...6

More information

Stir-Ator Parts Book 1965 to Present

Stir-Ator Parts Book 1965 to Present OWNER S MANUAL Stir-Ator Parts Book DAVID MANUFACTURING CO. 1600 12th Street N.E., Mason City, Iowa USA 50401 641-424-7010 Parts List Stir-Ator 2 Stir-Ator Parts List If safety decals are missing or not

More information

R LISTINO PRICE LIST

R LISTINO PRICE LIST R LISTINO PRICE LIST LISTINO PRICE LIST STRIP CTC ONE Aggancio con clip a molla Clip fixing system JA p.38 JB p.44 JATAP 4 JBTAP 4 21 22 22 26 16 4 15 19 21-25 26 26 30 20 6 19 23 25 - STRIP CTC JD p.54

More information

This program is funded by the Hempstead Harbor Protection Committee

This program is funded by the Hempstead Harbor Protection Committee THempstead Harbor Water-Monitoring Report, January 31, 2010T TBelow is a copy of the water-monitoring report update for Hempstead Harbor covering the water-quality-sampling dates from October 7 through

More information

Gone but not forgotten Hydraulic Power in Sydney

Gone but not forgotten Hydraulic Power in Sydney Gone but not forgotten Hydraulic Power in Sydney 1890 1975 J.W. Gibson The predominant sources of energy in Sydney by the 1870s for industry were coal, and gas. Coal had been a source of energy since the

More information

Martin County, Florida 2401 SE Monterey Road Stuart, Florida Address Changes created between 03/08/2019 and 04/08/2019

Martin County, Florida 2401 SE Monterey Road Stuart, Florida Address Changes created between 03/08/2019 and 04/08/2019 Page 1 of 8 ST LUCIE FALLS 12-39-40-002 Update 12-39-40-002-059-00150-0 8904 SW FISHERMANS WHARF DR Update 12-39-40-002-059-00150-0 8918 SW FISHERMANS WHARF DR 8918 SW FISHERMANS WHARF DR 8904 SW FISHERMANS

More information

Population of Communities by Economic Zone Newfoundland and Labrador, 1991 and 1996 Census

Population of Communities by Economic Zone Newfoundland and Labrador, 1991 and 1996 Census 1 10E Davis Inlet 465 386 1 10E * Hopedale 515 591 1 10E * Makkovik 370 367 1 10E * Nain 1,069 996 1 10E * Postville 231 223 1 10C * Rigolet 334 259 1 * Total, 1 2,984 2,822 (Newfoundland Statistics Agency)

More information

APPENDIX B. Origin Destination Study Data

APPENDIX B. Origin Destination Study Data APPENDIX B Origin Destination Study Data - TABLE OF CONTENTS - Page No. EXECUTIVE SUMMARY... 1 Map of the Study area with Site Locations... 2 Summary Table of Results for the TH 14 Corridor Study... 3

More information

Population of Communities (Alphabetic) showing Economic Zone and CCS Newfoundland and Labrador, 1991 and 1996 Census

Population of Communities (Alphabetic) showing Economic Zone and CCS Newfoundland and Labrador, 1991 and 1996 Census 9 4E Abrahams Cove 55 4 5 7M Adeytown 64 7 8 W * Admiral's Beach 275 255 20 U Admiral's Cove 22 3 6 9C * Anchor Point 380 350 8 C Angels Cove 60 53 4 6E * Appleton 526 572 20 U * Aquaforte 88 72 5 A *

More information

MUSKRAT FALLS PROJECT OVERVIEW

MUSKRAT FALLS PROJECT OVERVIEW CIMFP Exhibit P-00136 Page 1 MUSKRAT FALLS PROJECT OVERVIEW Stan Marshall, Nalcor CEO Presentation to MF Public Inquiry September 19, 2018 AGENDA CIMFP Exhibit P-00136 Page 2 Electrical System Basics Churchill

More information

Fire Operations Plan Phillip Island Nature Park Fire Operations Plan

Fire Operations Plan Phillip Island Nature Park Fire Operations Plan Fire Operations Plan 2018-2020 Phillip Island Nature Park Fire Operations Plan 2018-20 1 Fire operations actions This document contains the fire prevention and preparedness works to be conducted within

More information

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks A1 CYLINDER HEAD 1 3TB-11101-01-00 CYLINDER HEAD ASSEMBLY. 1 2 4H7-11133-10-00. GUIDE, INTAKE VALVE..... 4 3 93440-12052-00. CIRCLIP................. 4 4 90116-06475-00. BOLT, STUD............. 4 5 90116-10378-00.

More information

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS NOTICE IS HEREBY GIVEN that construction activities are in progress at the Dudgeon Offshore Wind Farm and Export Cable Corridor. Foundation

More information

Airflex CB Construction Section B

Airflex CB Construction Section B Airflex CB Construction Single Flange Element Dual Flange Element The type CB element assembly is designed and built to provide dependable clutch or brake service in the most exacting industrial applications.

More information

928 Motorsports Oil Control System for the 16V Porsche 928

928 Motorsports Oil Control System for the 16V Porsche 928 928 Motorsports Oil Control System for the 16V Porsche 928 NOTE: Left and Right are always as seen from the driver s seat-as you sit in the car. The following instructions will help you improve the oil

More information

Date of Notice: 4th November 2012 Notice no: 99

Date of Notice: 4th November 2012 Notice no: 99 London Array Ltd. Construction Management Port of Ramsgate Military Road Ramsgate CT11 9LG www.londonarray.com Notice of operations at London Array Offshore Wind Farm Date of Notice: 4th November 2012

More information

Toys spare parts manual

Toys spare parts manual Toys spare parts manual Music & Learning Product: Crazy Sounds Keyboard - Red Product Code: 130453 Spare Part: Microphone Holder - Red Spare Part Code: 50235 Product: Crazy Sounds Keyboard - Pink Product

More information

Customer Profile Report for PLOUGH INN, GOOLE (Punch Outlet Number: ) SHEARBURN TERRACE, GOOLE, DN14 9JJ (DN14 9JJ)

Customer Profile Report for PLOUGH INN, GOOLE (Punch Outlet Number: ) SHEARBURN TERRACE, GOOLE, DN14 9JJ (DN14 9JJ) Customer Profile Report for PLOUGH INN, GOOLE (Punch Outlet Number: 200126) SHEARBURN TERRACE, GOOLE, DN14 9JJ (DN14 9JJ) Age Data Table Count: Index: 0.5 1.5 3.0 5.0 0.5 1.5 3.0 5.0 0-15 479 928 1,809

More information

History. Frankenberg East Germany, 1945 Walter Hunger. Lohr am Main West Germany, Page 2

History. Frankenberg East Germany, 1945 Walter Hunger. Lohr am Main West Germany, Page 2 History Frankenberg East Germany, 1945 Walter Hunger Lohr am Main West Germany, 1958 Page 2 The Hunger Group Wurzburg Frankenberg Lohr am Main Page 3 Hunger Hydraulic UK Ltd Twin Sails Bridge, Poole Upper

More information

H&W LOGISTICS BASE Technical Specifications

H&W LOGISTICS BASE Technical Specifications H&W LOGISTICS BASE The Irish Sea Projects are a substantial work volume in a relatively short period The distance from H&W to the Irish Sea planned offshore Windfarms is comparable to other ports Irish

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

LAWYERS' CREEK, HOLBEACH

LAWYERS' CREEK, HOLBEACH DEFENCE AREA 55 LAWYERS' CREEK, HOLBEACH 1. Area details: The defence area is 1 mile N of Holbeach St. Matthew and 7 miles from Holbeach. County: Lincolnshire. Parish: Holbeach. NGR: centre of area, TF

More information

BLAST NOZZLES BROCHURE

BLAST NOZZLES BROCHURE BLAST NOZZLES BROCHURE TYPES OF BLAST NOZZLES A blast nozzle is designed to accelerate and direct an air and abrasive mixture to the work surface for increased production. Blast nozzles are available in

More information

II. Study Area and Survey Methods

II. Study Area and Survey Methods II. Study Area and Survey Methods Study area and sampling objectives The Florida Keys comprise an archipelago of limestone islands spanning more than 360 km from south of Miami to the Dry Tortugas. With

More information

Direct solenoid and solenoid pilot operated valves

Direct solenoid and solenoid pilot operated valves Direct solenoid and solenoid pilot operated valves Individual mounting Series Inline Oval shaped armature Encapsulated coil Push pin onded balanced poppet Return spring Manifold mounting Stacking plug-in

More information

Wollaston Dudley. Monday to Friday. Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End Stourbridge Interchange Website Page 1

Wollaston Dudley. Monday to Friday. Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End Stourbridge Interchange Website Page 1 7 Wollaston Dudley Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End. Monday to Friday Wollaston, Traffic Island.. 0635 0655 0710 0730 0750 0815 0835 0900 0920 0940 1000 1020 Norton, Shenstone

More information

Train Time: Sight and Sounds Around Me

Train Time: Sight and Sounds Around Me Train Time: Sight and Sounds Around Me The train is coming. The wheels are red and white. The engine is releasing steam. The coupler is a metal piece that hooks the cars together. The air hose is beside

More information

Powder River Basin. Page 3

Powder River Basin. Page 3 Powder River Basin The Powder River Basin (PRB) of and Montanta is the largest low sulfur coal source in the nation. Eight of the ten largest mines in the United States are located in the PRB. Page 3 Absaloka

More information

PROPOSED TRAFFIC RESOLUTION

PROPOSED TRAFFIC RESOLUTION Reference Number: TR 52-18 Location: Frobisher Street and Severn Street - Island Bay Proposal: Information: To provide two new bus stop locations on Frobisher Street, and change the time restriction on

More information

NEW CONTEMPORARY OFFICES FOR GATESHEAD TRINITY GATE TRINITY SQUARE GATESHEAD NE8 1AD

NEW CONTEMPORARY OFFICES FOR GATESHEAD TRINITY GATE TRINITY SQUARE GATESHEAD NE8 1AD TRINITY GATE TRINITY SQUARE GATESHEAD NE8 1AD NEW CONTEPORARY OICES OR GATESHEAD rom 1,000 to 19,339 sq.ft JACKSON STREET Trinity Gate delivers brand new comfort cooled offices at Trinity Square in the

More information

City Hall New Induction and LED Lighting

City Hall New Induction and LED Lighting The City of St. Petersburg is the 4 th largest city in the State of Florida serving a population of 245,314. St. Petersburg was designated as the first city in the state to become a Green City by the Florida

More information

WORLD TRADE CENTER CONSTRUCTION OF WORLD TRADE CENTER TOWER 1

WORLD TRADE CENTER CONSTRUCTION OF WORLD TRADE CENTER TOWER 1 WORLD TRADE CENTER 2009 2014 CONSTRUCTION OF WORLD TRADE CENTER TOWER 1 Four high-speed material hoists Running from ground floor to roof at speeds of up to 700 feet per minute 13 personnel hoists 2 JACOB

More information

Troubleshooting Guide

Troubleshooting Guide R2200/E3200 Brake Problems Tension works in reverse Press and hold start/stop button to reset and start magnet from correct starting position. Brake assembly is defective, replace brake. Console is defective,

More information

Cupolas & Weathervanes

Cupolas & Weathervanes Cupolas & Weathervanes Cupolas 16 Cupola Preassembled in 2 pieces for fast installation Only available with vented louvers Part# Description Size Height CUP16 16 Standard Cupola 16 x 16 25 All cupolas

More information

Cotton Valley Rail Trail Club

Cotton Valley Rail Trail Club Cotton Valley Rail Trail Club Railcar Operating Rules Effective June 07, 2011 Cotton Valley Rail Trail Club Inc. P.O. Box 417 64 Governor Wentworth Highway Wolfeboro Falls, NH 03896 CVRTC Railcar Operating

More information

MICROMARKET REPORT EVERGREEN

MICROMARKET REPORT EVERGREEN quarter one 2012 www.coloradomicroreports.com EVERGREEN NEIGHBORHOODS 10 13 8 11 14 9 15 1 7 16 4 2 5 12 6 3 1. 2. 3. 4. Bear Mountain Brook Forest Conifer Mountain Evergreen Highlands 7. Hangen Ranch

More information

2014 LAKE MINNETONKA SHORELINE BOAT STORAGE COUNT

2014 LAKE MINNETONKA SHORELINE BOAT STORAGE COUNT 2014 LAKE MINNETONKA SHORELINE BOAT STORAGE COUNT INTRODUCTION Beginning in 1971, the Lake Minnetonka Conservation District (LMCD) has conducted an inventory of watercraft stored at riparian and multiple

More information

Performance Through Innovation

Performance Through Innovation World Leading Lifting Accessories Supplier for Bulk & Container Handling Performance Through Innovation INTRODUCTION TO RAM SPREADERS RAM Spreaders ancestral roots began back in 1876 as Ed Mills & Son,

More information

FedEx Express Rates. Effective Sept. 15, 2008

FedEx Express Rates. Effective Sept. 15, 2008 FedEx Express Rates Effective Sept. 15, 2008 Table of Contents FedEx Express Intra-Canada Rates 2 Postal Code Index 3 FedEx First Overnight 4 FedEx Intra-Canada Index 12 FedEx Priority Overnight 14 FedEx

More information

Price List 2017 Exactly the Right Solutions for Your Construction Project. anchored in quality. Valid from 1 st February 2017 REINFORCEMENT TECHNOLOGY

Price List 2017 Exactly the Right Solutions for Your Construction Project. anchored in quality. Valid from 1 st February 2017 REINFORCEMENT TECHNOLOGY FASTENING CONNECTOR MOUNTING List 2017 Exactly the Right Solutions for Your Construction Project Valid from 1 st February 2017 anchored in quality FASTENING CONNECTOR MOUNTING JORDAHL: Our Company JORDAHL

More information

SILVER SPRUCE EXPLORATION. Canada/Mexico. Annual General Meeting April 18, 2008 Northwest River, NL

SILVER SPRUCE EXPLORATION. Canada/Mexico. Annual General Meeting April 18, 2008 Northwest River, NL SILVER SPRUCE EXPLORATION Canada/Mexico Annual General Meeting April 18, 2008 Northwest River, NL C A N A D A Map Area SSE Landholdings Labrador Silver Spruce Resources/Labrador Inuit Lands CMB NW MAP

More information

Performance Through Innovation

Performance Through Innovation World Leading Lifting Accessories Supplier for Bulk & Container Handling Performance Through Innovation INTRODUCTION TO RAM SPREADERS RAM Spreaders ancestral roots began back in 1876 as Ed Mills & Son,

More information

Chapter 5 Route Window NE4 Ilford station. Transport for London

Chapter 5 Route Window NE4 Ilford station. Transport for London Chapter 5 Route Window NE4 Ilford station ILFORD STATION 5 Route Window NE4 Ilford station 5.6 The construction programme for the station works is expected to take about two years. Operations at Aldersbrook

More information

Welcome to Nottingham s tram network

Welcome to Nottingham s tram network Welcome to Nottingham s tram network Welcome to Nottingham s tram network Nottingham Express Transit (NET) has been serving the north of the city for over 12 years. We ve carried over a hundred million

More information

Transportation Effects of Consolidation September 21, 2016

Transportation Effects of Consolidation September 21, 2016 Transportation Effects of Consolidation September 21, 2016 The Challenges and Reality of Transportation in the Connellsville Area School District: 217 square miles (4 th largest in the WPIAL based on square

More information

Bright Fun Designer Organic Bedlinen

Bright Fun Designer Organic Bedlinen Bright Fun Designer Organic Bedlinen 2014 For young and the young at heart Welcome to bramwell designs Bramwell Designs creates fun and bright boutique bedding for Children. All our pieces are hand designed

More information

ADAMS LAKE PINE LAKE RD. Adams Lake 9695 ENZIAN RD. Map Locator

ADAMS LAKE PINE LAKE RD. Adams Lake 9695 ENZIAN RD. Map Locator 9483 9474 800 W BOULTER RD 9670 9680 9533 9694 9820 9695 ENZIAN RD ADAMS 9970 PINE RD Adams Lake Orangeville Twp Fire District 1" = 400' November 2005 HORSESHOE BAWKER Fall Creek L A M M E R S R D HUMMINGBIRD

More information

2015 Calendar Way Down East. Limited Edition

2015 Calendar Way Down East. Limited Edition 2015 Calendar Way Down East From Limited Edition 2016 January 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 April 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

More information

SECTION I NM 40/14 CHART CORRECTIONS

SECTION I NM 40/14 CHART CORRECTIONS CHART CORRECTIONS 400 (INT 400) 3Ed. 12/25/93 LAST NM 35/14 40/14 Delete Light 29 02 N 89 10 W 401 (INT 401) 5Ed. 6/15/91 LAST NM 35/14 40/14 Delete Light 29 01 N 89 10 W 411 54Ed. 8/13 LAST NM 35/14 40/14

More information

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks

CYLINDER HEAD CONTINUED ON NEXT FRAME. Ref. Part No. Number Description Qty Remarks A1 CYLINDER HEAD 1 3TB-11101-00-00 CYLINDER HEAD ASSEMBLY. 1 2 4H7-11133-10-00. GUIDE, INTAKE VALVE..... 4 3 93440-12052-00. CIRCLIP................. 4 4 90116-06475-00. BOLT, STUD............. 4 5 90116-10378-00.

More information

Population of Communities 1 by Census Consolidated Subdivision (CCS) Newfoundland and Labrador, 2006 Census

Population of Communities 1 by Census Consolidated Subdivision (CCS) Newfoundland and Labrador, 2006 Census of Communities 1 by Census Consolidated Subdivision (CCS) CCS Type 2 Community Newfoundland and Labrador 505,469 512,930 1A T Arnold's Cove 1,003 1,024 1A T Chance Cove 310 339 1A T Chapel Arm 451 499

More information

TEMPEST. giant heavy-duty commercial umbrella. premium outdoor living

TEMPEST. giant heavy-duty commercial umbrella. premium outdoor living giant heavy-duty commercial umbrella premium outdoor living THE TEMPEST OFFERS MAXIMUM SHADE AND WEATHER PROTECTION FOR COMMERCIAL ENVIRONMENTS 3.5m Square Tempests installed for Metlifecare at the Poynton

More information

Sunday 18th 21st June

Sunday 18th 21st June Sunday 18th 21st June 10am - 5pm Please be on the sea front at 10.am to see the parade motorbikes and scooters followed by the troops marching with the pipes and drums from Gypsies Green along the sea

More information

Ufs. No Notices to Mariners, SWEDEN Swedish Maritime Administration.

Ufs. No Notices to Mariners, SWEDEN Swedish Maritime Administration. Ufs No 649 2017-05-04 Notices to Mariners, SWEDEN Swedish Maritime Administration Editorial office Swedish Maritime Administration Ufs 601 78 NORRKÖPING Sweden tel: 0771 630 605 e-mail: ufs@sjofartsverket.se

More information

Supplementary Materials for

Supplementary Materials for advances.sciencemag.org/cgi/content/full/3/9/e1603155/dc1 Supplementary Materials for Ghost reefs: Nautical charts document large spatial scale of coral reef loss over 240 years Loren McClenachan, Grace

More information

Date of Notice: 25th November 2012 Notice no: 102

Date of Notice: 25th November 2012 Notice no: 102 London Array Ltd. Construction Management Port of Ramsgate Military Road Ramsgate CT11 9LG www.londonarray.com Notice of operations at London Array Offshore Wind Farm Date of Notice: 25th November 2012

More information

PROPOSED REGULATION OF THE DEPARTMENT OF MOTOR VEHICLES. LCB File No. R September 6, 2012

PROPOSED REGULATION OF THE DEPARTMENT OF MOTOR VEHICLES. LCB File No. R September 6, 2012 PROPOSED REGULATION OF THE DEPARTMENT OF MOTOR VEHICLES LCB File No. R141-12 September 6, 2012 EXPLANATION Matter in italics is new; matter in brackets [omitted material] is material to be omitted. AUTHORITY:

More information