5. Other Relevant Data

Size: px
Start display at page:

Download "5. Other Relevant Data"

Transcription

1 5. Other Relevant Data 5 - TOPOGRAPHICAL SURVEY 5-2 GEOTECHNICAL INVESTIGATION 5-3 TRAFFIC VOLUME SURVEY 5-4 STRUCTURAL SOUNDNESS OF EXISTING BRIDGES 5-5 BRIDGE LOCATION STUDY

2 Appendix 5- Topographical Survey

3

4

5

6 SD-5 SD- SFOR Bridge Proposed Location 2 SD-4 SD-6 Appendix 5-2 Geotechnical Investigation SD-8 SD-3 Proposed Location SD-7 SD-2 Existing DOBOJ Bridge Map of Borehole Locations on DOBOJ

7 BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD JOB No. 348/02 BOBORING No. SD- SHEET OF JOB No. 348/02 BOBORING No. SD-4 SHEET OF Nippon Koei Co., Ltd. and Doboj, nizvodno od Nippon Koei Co., Ltd. and Doboj, nizvodno od PROJECT Central Consultant Inc. DATE STARTED 2/08/ 2002.g. LOCATION SFOR-vog mosta na PROJECT Central Consultant Inc. DATE STARTED /8/2003 LOCATION SFOR-vog mosta na TYPE BORING GCR 300 DATE COMPLETED //2002.g. GROUND ELEVATION 40,6 m TYPE BORING DATE COMPLETED /20/2003 GROUND ELEVATION 35,2 DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C u (kn/m 2 ) & φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) Cu (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) DEPTH (m) TYPE SAMPLE NUMBER STRATIGRAPHIC PLOT % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C u (kn/m 2 ) & φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) Cu (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION Q u TEST (kn/m 2 ) DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) 0 0 WITH REST BILDING MATRIALS 2 2 SILTY CLAY OCCSSIONAL COBBLES AND STIFF AND BRAWN GRAVEL WITH SADN ROCK 4 GRAVEL WITH VERY DENSE SILT WITH GRAVEL 6 SILT CLAY WITH AND OCCASIONAL GRAVEL E CLAY STIFF TO HARD GRAY ROCK TO RED 9 CLAY VERY HARD CLAY WITH GRAVEL GREY AND BRAWN GRAY WITH BROWN CLAY GARD GRAY AND SMAL RED CLAY HARD CLAY WITH GRAVEL GRAY TO SMOLGREN 2 HARD GREY AND BROWN CLAY HARD 3 GRAY TO BROWN CLAY VERY HARD GREY CLAY HARD LIGHT GREY CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL POCKET PEN (kn/m 2 ) & Q u METAMORPHIC 500 DRILLER WATER ENCOUNTERED ORGANIC AND COBBLES CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL DRILLER POCKET PEN (kn/m 2 ) & Q u WATER ENCOUNTERED METAMORPHIC ORGANIC AND COBBLES MADE GROUND SILT CLAY TOP BEDROCK MADE GROUND SILT CLAY TOP BEDROCK

8 BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD JOB No. 348/02 BOBORING No. SD-2 SHEET OF JOB No. 348/02 BOBORING No. SD-3 SHEET OF Nippon Koei Co., Ltd. and Doboj, right of the Nippon Koei Co., Ltd. and Doboj, in the river PROJECT Central Consultant Inc. DATE STARTED Decenber,2002. LOCATION banke river PROJECT Central Consultant Inc. DATE STARTED January 02,2003. LOCATION BOSNA TYPE BORING GCR 300 DATE COMPLETED Decenber 2,2002. GROUND ELEVATION 4,76 m TYPE BORING GCR 300 DATE COMPLETED January 04,2003. GROUND ELEVATION 38,8 m DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) SILLTY BRAWN SILTI WITH GRAVEL VERY DENSE GREY AND BRAWN 2 COBBELS AND LITH GREY 3 SILTY CLAY OCCASIONAL GRAVEL 3 STIF TO HARD, GREY GRAVEL WITH GRAVEL VERY STIFF TO HARD GREY AND BRAWN SILTY CLAY 4 OCCASIONAL GRAVEL STIF TO HARD, GREY CLAY HARD 3 CLAY HARD GREY GREY CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL POCKET PEN (kn/m 2 ) & Q u METAMORPHIC 500 DRILLER WATER ENCOUNTERED ORGANIC AND COBBLES CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL DRILLER POCKET PEN (kn/m 2 ) & Q u WATER ENCOUNTERED METAMORPHIC ORGANIC AND COBBLES MADE GROUND SILT CLAY TOP BEDROCK MADE GROUND SILT CLAY TOP BEDROCK

9 BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD JOB No. 085/03 BOBORING No. SD-5 SHEET OF JOB No. 085/03 BOBORING No. SD-6 SHEET OF Nippon Koei Co., Ltd. and Doboj, left in the bank Nippon Koei Co., Ltd. and Doboj, left in PROJECT Central Consultant Inc. DATE STARTED 0/04/ 2003 LOCATION of the river BOSNA PROJECT Central Consultant Inc. DATE STARTED 03/04/2003 LOCATION the river BOSNA TYPE BORING GCR 300 DATE COMPLETED 0/04/2003 GROUND ELEVATION 39,03 TYPE BORING GCR 300 DATE COMPLETED 05/04/2003 GROUND ELEVATION 35,32 DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) WITH AND WITH OCCASIONAL OCCASIONAL GRAVEL GRAVEL GREY AND SMOLBILDING 2 MATERIALS GRAVEL WITH GREY SILT WITH SMOL , BROWN CLAY HARD BROWN SILT CLAY SITH SMOL ROCK KRECNJAK 7 ROCK, DIABAZ CLAY VERY STIFF TO 9 SILTY CLAY CLAY HARD BROWN TO ICCASIONAL GRAVEL GREY AND SMOLRED HARD, RED TOGRAY TO BROWN SILTY GREY CLAY HARD GREY CLAY WITH SMOL BAND TO BROWN BROWN SILTY GREY CLAY WITH SMOL AND OCCASIONA GRAVEL HARD GREY TO RED ROCK GRAVEL HARD GREY TO RED CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL POCKET PEN (kn/m 2 ) & Q u METAMORPHIC 500 DRILLER WATER ENCOUNTERED ORGANIC AND COBBLES CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL DRILLER POCKET PEN (kn/m 2 ) & Q u WATER ENCOUNTERED METAMORPHIC ORGANIC AND COBBLES MADE GROUND SILT CLAY TOP BEDROCK MADE GROUND SILT CLAY TOP BEDROCK

10 BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD JOB No. 085/03 Aneks 342/02 BOBORING No. SD-7 SHEET OF JOB No. 085/03 Aneks 342/02 BOBORING No. SD-8 SHEET OF Nippon Koei Co., Ltd. and Doboj, in Nippon Koei Co., Ltd. and Doboj, in PROJECT Central Consultant Inc. DATE STARTED 30/04/2003 LOCATION the river BOSNA PROJECT Central Consultant Inc. DATE STARTED 02/05/2003 LOCATION the river BOSNA TYPE BORING GCR 300 DATE COMPLETED 0/05/2003 GROUND ELEVATION 37,85 TYPE BORING GCR 300 DATE COMPLETED 03/05/2003 GROUND ELEVATION 42, DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) GRAVEL AND PARTS AND GRAVEL OF ROCK AND GRAVEL SMALL Y CLAY (LIGHT COFFIE TO GREY) SMALL Y CLAY 8 (LIGHT COFFIE TO GRAY) CLAY LIOW PLASTICITY(GRAY) CLAY LOW PLASTICITY 9 (GRAY) CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL POCKET PEN (kn/m 2 ) & Q u METAMORPHIC 500 DRILLER WATER ENCOUNTERED ORGANIC CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND AND COBBLES GRAVEL DRILLER POCKET PEN (kn/m 2 ) & Q u WATER ENCOUNTERED METAMORPHIC ORGANIC AND COBBLES MADE GROUND SILT CLAY TOP BEDROCK MADE GROUND SILT CLAY TOP BEDROCK

11 SM-3 SM-2 SM-4 Existing MODRICA Bridge SM-5 SM- SM-6 Map of Borehole Location on MODRICA

12 BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD JOB No. 348/02 BOBORING No. SM- SHEET OF JOB No. 348/02 BOBORING No. SM-2 SHEET OF Nippon Koei Co., Ltd. and MODRICA, right on the Nippon Koei Co., Ltd. and MODRICA, left on the PROJECT Central Consultant Inc. DATE STARTED November 29, LOCATION Bosna river PROJECT Central Consultant Inc. DATE STARTED November 29, LOCATION Bosna river TYPE BORING GCR 300 DATE COMPLETED December 02, GROUND ELEVATION 2,65 m TYPE BORING GCR 300 DATE COMPLETED December 03, GROUND ELEVATION 98,9 m DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) Y SILT YELLOW TO BROWN 2 CLAY WITH OCCASIONAL YELLOW TO BROWN GRAVEL WITH GRAVEL SMALL SILTY GRAVEL WITH SMALL 4 AND CLAY GRAVEL SILT WITH SOME 6 COBBLE AND VERY STIFF BROWN COBBLES WITH SMALL AND CLAY SILTY GRAVEL STIFF 8 AND BROWN SILTY WITH GRAVEL WITH 9 BROWN STIFFY CLAY VERY HARD CLAY VERY HARD GRAY TO GREEN GREY COBBLES AND BOUDERS WITH CLAY VERY HARD GRAVEL SILT WITH 3 SAME STIFF TO HARD BROWN CLAY HARD TO GREY GRAVEL WITH AND COBBLES SILT WITH GRAVEL VERY DENSE 2 GRAY TO BROWN CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL POCKET PEN (kn/m 2 ) & Q u METAMORPHIC 500 DRILLER WATER ENCOUNTERED ORGANIC AND COBBLES 27 CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL DRILLER POCKET PEN (kn/m 2 ) & Q u WATER ENCOUNTERED METAMORPHIC ORGANIC AND COBBLES MADE GROUND SILT CLAY TOP BEDROCK MADE GROUND SILT CLAY TOP BEDROCK

13 BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD JOB No. 085/03 BOBORING No. SM-3 SHEET OF JOB No. 085/03 BOBORING No. SM-4 SHEET OF Nippon Koei Co., Ltd. and MODRICA, left of the Nippon Koei Co., Ltd. and MODRICA, left in the PROJECT Central Consultant Inc. DATE STARTED 24/03/2003 LOCATION banke river BOSNA PROJECT Central Consultant Inc. DATE STARTED 30/03/2003 LOCATION river BOSNA TYPE BORING DATE COMPLETED 24/03/2003 GROUND ELEVATION 2,05 m TYPE BORING GCR 300 DATE COMPLETED 3/03/2003 GROUND ELEVATION 98,03 m DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) 0 0 WITH SMOL GRAVEL AND VERY DENSE GREY Y BROWN GRAVEL AND OCCASIONAL SILTY 2 GREY TO BROWN CLAY WITH STIFF TO HARD GRAVEL AND 4 BROWN BILTY CLAY WITH SMOL WOTHER GREY TO BROWN 5 CLAY WITH SILTI GRAVEL AND OCCASIONAL GRAVEL 6 CLAY WITH SMOL GRAVEL 7 YELLOW TO BROWN AND BROWN GRAVEL AND 7 CLAY WITH 8 CLAY WITH SMOL AND GRAVEL CLAY, VERY HARD AND GRAVRL, 8 RED TO BROWN BROWN CLAY WITH SMOL GRAVEL AND BROWN SILTI AND GRAVEL, BROWN 2 CLAY VGGY HARD BROWN CLAY WITH SMOL GRAVEL AND BROWN CLAY VGGY HARD 23 BROWN CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL POCKET PEN (kn/m 2 ) & Q u METAMORPHIC 500 DRILLER WATER ENCOUNTERED ORGANIC AND COBBLES CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL POCKET PEN (kn/m 2 ) & Q u METAMORPHIC 500 DRILLER WATER ENCOUNTERED ORGANIC AND COBBLES MADE GROUND SILT CLAY TOP BEDROCK MADE GROUND SILT CLAY TOP BEDROCK

14 BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD BASIC DESIGN STUDY ON THE PROJECT FOR RECONSTRUCTION OF THE MAIN BRDGES ON ROAD NETWORK IN BOSNIA AND HERZEGOVINA BOREHOLE TEST RECORD JOB No. 085/03 BOBORING No. SM-5 SHEET OF JOB No. 085/03 BOBORING No. SM-6 SHEET OF Nippon Koei Co., Ltd. and MODRICA, right in the Nippon Koei Co., Ltd. and MODRICA, right of the PROJECT Central Consultant Inc. DATE STARTED 27/03/2003 LOCATION river BOSNA PROJECT Central Consultant Inc. DATE STARTED 2/03/2003 LOCATION banke river BOSNA TYPE BORING GCR 300 DATE COMPLETED 28/03/2003 GROUND ELEVATION 98,57 m TYPE BORING GCR 300 DATE COMPLETED 23/03/2003 GROUND ELEVATION 2,65 m DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) DEPTH (m) SAMPLE TYPE NUMBER STRATIGRAPHIC PLOT CLASSIFICATION % FINES PROFILE % COARSE DESCRIPTION S.P.T. VALUE* (BLOWS/0-cm) S.P.T. VALUE* (BLOWS/-20cm) S.P.T. VALUE* (BLOWS/20-30cm) MOISTURE CONTENT (%) BULK UNIT WT. KN/m 3 SHEAR STRENGTH kn/m 2 WATER CONTENT % STD. PENETRATION TEST* N-VALUE (BLOW/300mm) C (kn/m 2 )&φ LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX CONSOLIDATION TEST SPECIFIC GRAVITY SIEVE (W & D) C u (kn/m 2 ) TRIAXIAL φ DEGREES UNCONFINED COMPRESSION TEST (kn/m 2 ) Q u DRY UNIT WEIGHT SHEAR VANE (kn/m 2 ) , BROWN GRAVEL AND CLAY, BROWN AND CLAY AND OCCASIONAL YELLOW TO GRAVEL RED 2 RED GRAVEL AND GRAVEL SILTY WITH SOME GRA ROCK GRAVEL WITH CLAY WITH COBBLE AND COBBLES GRAVEL AND STIFF 7 TO HARD BROWN GRAVEL AND CLAY WITH OCCASIONAL 27 GRAVEL CLAY WITH AND 3 GRAVEL STIFF TO HARD BROWN CLAY W\ITH GRAVEL AND VERY HARD BROWN CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL POCKET PEN (kn/m 2 ) & Q u METAMORPHIC 500 DRILLER WATER ENCOUNTERED ORGANIC AND COBBLES 27 CLASSIFICATION AS PER ASTM D WATER DEPTH HOURS AFTER DRILLING LEGEND GRAVEL DRILLER POCKET PEN (kn/m 2 ) & Q u WATER ENCOUNTERED METAMORPHIC ORGANIC AND COBBLES MADE GROUND SILT CLAY TOP BEDROCK MADE GROUND SILT CLAY TOP BEDROCK

15 Appendix 5-3 Traffic Volume Survey () Doboj Bridge Date: 27, November, 2002 (Wednesday) Location:Doboj Bridge Time Passenge Tractor, of Each of Each Buses Trucks direction Pedestria Motorcycle r Roadrolle Bicycle direction 2axles, 4 or more n Cars Mini Bus Bus r etc 3axles axles To Tuzla To Doboj To Tuzla To Doboj 2:00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00-20: :00-2: :00-22: :00-23: :00-0: Sub :00 - : :00-2: :00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00 - : :00 - : :00-2: Sub Grand Date: 28, November, 2002 (Thursday) Location:Doboj Bridge Time Passenge Tractor, of Each of Each Motorcycle r Buses Trucks direction direction Mini Bus Medium Roadrolle Bicycle Pedestria 2axles, 4 or more n Cars r etc Bus over 3axles axles To Tuzla To Doboj To Tuzla To Doboj 2:00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00-20: :00-2: :00-22: :00-23: :00-0: Sub :00 - : :00-2: :00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00 - : :00 - : :00-2: Sub Grand

16 Traffic Volume Survey (2) SFOR Bailey Bridge (Doboj) Date: 27, November, 2002 (Wednesday) Location:SFOR Bailey Bridge (Doboj) Passenge Tractor, of of Buses Trucks Each direction Pedestria Time Motorcycle r Each direction Mini Bus Medium Roadrolle Bicycle 2axles, 4 or more n Cars r etc Bus over 3axles axles To Tuzla To Doboj To Tuzla To Doboj 2:00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00-20: :00-2: :00-22: :00-23: :00-0: Sub :00 - : :00-2: :00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00 - : :00 - : :00-2: Sub Grand Date: 28, November, 2002 (Thursday) Location:SFOR Bailey Bridge (Doboj) Time Passenge Tractor, of of Motorcycle r Buses Trucks Each direction Each direction Mini Bus Medium Roadrolle Bicycle Pedestria 2axles, 4 or more n Cars r etc Bus over 3axles axles To Tuzla To Doboj To Tuzla To Doboj 2:00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00-20: :00-2: :00-22: :00-23: :00-0: Sub :00 - : :00-2: :00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00 - : :00 - : :00-2: Sub Grand

17 Traffic Volume Survey (3) Doboj Railway Station Date: 27, November, 2002 (Wednesday) Location: Doboj Railway Station Tractor, Passenger Time Motorcycle Buses Trucks Roadroller Bicycle Pedestrian Cars 2axles, 4 or more Mini Bus Bus etc 3axles axles 2:00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00-20: :00-2: :00-22: :00-23: :00-0: Sub :00 - : :00-2: :00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00 - : :00 - : :00-2: Sub Grand Date: 28, November, 2002 (Thursday) Location: Doboj Railway Station Tractor, Passenger Time Motorcycle Buses Trucks Roadroller Bicycle Pedestrian Cars Medium Bus 2axles, 4 or more Mini Bus etc over 25 pass 3axles axles 2:00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00-20: :00-2: :00-22: :00-23: :00-0: Sub :00 - : :00-2: :00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00 - : :00 - : :00-2: Sub Grand

18 Traffic Volume Survey (4) Modrica Bridge Date: 27, November, 2002 (Wednesday) Location:Modrica Bridge Time Passenge Tractor, of of Buses Trucks Each direction Pedestria Motorcycle r Each direction Mini Bus Medium Roadrolle Bicycle 2axles, 4 or more n Cars r etc Bus over 3axles axles To Doboj To Modrica To Doboj To Modrica 2:00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00-20: :00-2: :00-22: :00-23: :00-0: Sub :00 - : :00-2: :00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00 - : :00 - : :00-2: Sub Grand Date: 28, November, 2002 (Thursday) Location:Modrica Bridge Time Passenge Tractor, of of Motorcycle r Buses Trucks Each direction Each direction Mini Bus Medium Roadrolle Bicycle Pedestria 2axles, 4 or more n Cars r etc Bus over 3axles axles To Doboj To Modrica To Doboj To Modrica 2:00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00-20: :00-2: :00-22: :00-23: :00-0: Sub :00 - : :00-2: :00-3: :00-4: :00-5: :00-6: :00-7: :00-8: :00-9: :00 - : :00 - : :00-2: Sub Grand

19 Appendix 5-4 Structural Soundness of Existing Bridges ) Doboj Bridge Table Investigation sheet of Doboj Bridge Doboj Bridge Bridge Data Status of Damages Width Style 5 spans RC continuous T-section girders bridge 7 spans RC continuous slab bridge Length 23,200 Soan (8,950+3@25,000+8,950)+(2,000+5@5,000+4,700+3,400) total road way 3,900 9,000 sidewalk Abutment Pier Foundation Concrete Deck Slab Main Girder Abutment Pier 2,250 (effective width: 2,050) 2 Reversed T type abutment (inference) River basin Wall type Flood prone area Pile Bent River basin : Unknown Flood prone area : Piers (inference) 5 spans RC continuous T-section girders bridge : Vital cracks with soaking lime are observed on the center of concrete deck slabs. In the part of right bank side, some concrete separations with rusted naked reinfocements are foound. The overhanging concrete slab has cracks each 20 to 50cm with soaking lime. 7 spans RC continuous slab bridge :30 to 40% of lower surface of concrete deck slab is covered by white soaking lime with plenty of craks. The soaking lime is formed like iccles with drops. Many concrete separations with rusted reinforcement are observed. 5 spans RC continuous T-section girders bridge :Compering with the concrete slab, the main girder has smoller numbers of cracks, but the lower flange has some concrete separation. In the part of the jointing hinged bearing, compressed crushing is happend. Honycomb concrete which will cause concrete separation is observed on the main girders. 7 spans RC continuous slab bridge : In many parts, vital concrete separations with seriously rusted reinfocing bars are found. In the center of the bridge, water is soaking out from the downstream side girder always. 5 spans RC continuous T-section girders bridge :The abutment on left bank has vertical deep cracks on upper streamside and imprint of reinforcing on the bearing bed. 7 spans RC continuous slab bridge :The abutment on right bank which is reformed in front of previous abutment base has no damage. 5 spans RC continuous T-section girders bridge :Few concrete separations are found on the surface of piers in the river basin. The pier, which connects the two sets of girders, has horizontal crack with soaking lime on the construction joints. 7 spans RC continuous slab bridge :Two piers on the flood prone area, which is tied to concrete deck slabs, have no vital damages. But there are two doubt points of rusted reinfocements. Inspection Foundation Schumitdhammer Neutralization Unknown superstructure Main girder : 220kg/cm2 Concrete slab : 230kg/cm2 sbustructure Hinged bearing piers : 77kg/cm2 Depth : 5 to mm Right bank side first span main girder) Durability* Rank : E (Dangerous) * : The durability assessment of the construction department of Tokyo Metropolis

20 2) Modrica Bridge Table Investigation sheet of Modrica Bridge Bridge Data Width Modrica Bridge Style 5 spans RC continuous T-section girders bridge RC simple beam bridge Length 84,700 Soan (28,700+3@4,300+4,000)+6,400 total road way sidewalk 9,400 6,000,700(effective width:,500) 2 Abutment Reversed T type abutment Pier River basin Wall type Portal-frame (rebuilt) Foundation Concrete Deck Slab River basin : Spread foundation Piers : caisson foundation On the center deck slab between main girders and floor beams, a few vital longitudinal cracks and shear cracks from the corner of main girders and floor beams are occurred. On the 3rd span from left bank, there is a prints of repaired about 80cm diamater hole on deck slab. There are some danger spots which will fall down possibly. Cracks with soaking lime are seen on the over hanging slab. No damage is found in the new first span on left bank side. Status of Damages Main Girder Abutment Pier Regarding to the main girders, plenty of shear and moment cracks on the point of intermediate supports, and many moment cracks near the center of spans, are observed more than each 50cm. On the lower surface, concrete separations, naked reinforcements, and rusted reinforcement by shortage of covering concrete are seen. The abutment on left bank was extended, when new first span was rebuilt. The extension has no damage. Foundation Comfirmd by Drawings. Unknown damages. Inspection Schumitdhammer superstructure Main girder : 460kg/cm2 Concrete slab : 460kg/cm2 sbustructure Right : 330kg/cm2 Wall type pier : 480kg/cm2 (Top of pier) Neutralization Depth : to mm Left abutment) Durability* Rank : E (Dangerous) * : The durability assessment of the construction department of Tokyo Metropolis

21 Appendix 5-5 Bridge Location Study ) COMPARATIVE STUDY ON DOBOJ BRIDGE LOCATION As discussed in Appendix 6-4 of this report, it is difficult to reuse the existing Doboj Bridge by reinforcement. Accordingly, options for building a new bridge are studied as shown in Figure 2-3 in the main report. The following two options of bridge location is considered. Bridge Location Option : Plan of a new bridge between the existing bridge and SFOR bridge. Bridge Location Option 2: Plan of a new bridge on the by-pass route located on the confluence of Bosna and Spreca rivers, about km downstream side of the existing Doboj bridge. Option was proposed by the JICA Study Team at the onset of the basic design study in BiH. On the other hand, Option 2 was proposed by the Road Directorate of RS as stated in the Minutes of Discussions dated November 8, It was selected among several locations by the Road Directorate as its easier land acquisition. As a result of the comparative study shown in next page, Option 2 is judged more favorable than Option since it is advantageous in economic construction cost, improvement of highway geometry, traffic safety, implication of Doboj City Urban Road Plan, etc.

22 Plan for Proposed Location 2 SFOR- Bailey Bridge Raising height meter up Plan for Proposed Location Raising height meter up Figure Location Map of Doboj Bridge EXISTING DOBOJ

23 Plan for Proposed Location - Plan of new bridge construction located between the Plan for Proposed Location 2 - Plan of a new bridge construction on the by-pass route existing bridge and SFOR bailey bridge located on the downstream side of the confluence of the Bosna and Spreca rivers Preconditions ) New bridge construction plan at the mid-point between the existing bridge and the SFOR bailey ) New bridge construction plan on the by-pass route located on the river confluence bridge 2) Construction of by-pass road and the railroad underpass is needed. Contents of plan ) ( Grant Aid ) ) ( Grant Aid ) - Construction of a new bridge (bridge length of 200 m) - Construction of a new bridge (bridge length = 200 m) - Approach roads to the existing roads (including the construction of two intersections) - Approach roads from abutment to the new by-pass road (each 50 m on both sides of the - Embankment - Embankment - Ancillary works such as road lightings - Ancillary works such as road lightings 2) ( RS undertaking ) 2) ( RS undertaking ) - Improvement of the existing roads to meet the design flood level - Construction of by-pass road (E 73: 0.3meter higher than the exting road, M4-3:.2 meter higher than the exting road) - Construction of intersections (2 places) - Construction of railroad underpass Type of bridge - PC 2 span T-girder bridge with pre-tensioning method and PC 4 span T-girder bridge with - PC 5 span T-girder bridge with post-tensioning method precast segmental method post-tensioning method (precast segmental method and PC 3 span T-girder bridge with pretensioning method - Span length 6 m x m x m x 3 = 200 m - Span length 40 m x 5 = 200 m - Width 3.80 m Same width as the existing bridge ) - Width 2.20 m Reduction of the width of sidewalk ) - Substrucu re 7 wall type bridge piers and 2 inverted T-type abutments - Substrucu re 4 wall type bridge piers, 2 inverted T-type abutments Comparative evaluation - Improvement level The life span of a new bridge can be guaranteed as a normal permanent bridge. The life span of a new bridge can be guaranteed as a normal permanent bridge. -2 Access road The construction of intersection connected to the existing road is necessary. Reconstruction of the existing roads is required for the design flood level. (E 73: 0.3meter higher than the exting road, M4-3:.2 meter higher than the exting road) is necessary. None -3 Improvement level of The alignment of the road can not be improved. The running speed (30 to 40 km/h) will not be highway improved because the road passes through the city area. The alignment of the road will be improved to the design speed of 80 km/hr. -4 Traffic flow The traffic flow (to/from TUZLA) The alignment of the road can not be improved. The traffic flow (to/from TUZLA) The long distance traffic flow can be improved. -5 Structure of superstructure Comparison Table for the route of the Doboj Bridge Traffic to/from Doboj station Same as present. Traffic to/from Doboj city The traffic flow is unchanged. This bridge's sidewalk width must be the same as that of the exiting bridge. For the concrete structure, painting is not necessary. Expropriation(land acquisition and housing compensation) is necessary. Small area (approx m2) The traffic density will be almost same as at present and the environment will not be improved. Traffic to/from Doboj station Same as present. Traffic to/from Doboj city Simpified and improved This bridge's sidewalk width is.2m, because there are less pedestrians on a new bridge than the exsiting bridge. For the concrete structure, painting is not necessary. Expropriation is necessary. Wide area (land to construct the access road needs approx. 22,000 m2) Through traffic will be distributed to the by-pass and the environment will be improved significantly. This is a by-pass plan conforming to the Doboj City Road Plan. -6 Necessity for land acquisition -7 Environment of city area on the left bank -8 Implication of Boboj City Road Plan The Doboj City Road Plan is not considered. -9 Construction period (substantial period) 24 months (6 months) 24 months (6 months) - Cost borne by the grant aid (Cost ratio),4,00 - Cost borne by the RS,00 Cost for construction 40,000,000 The existing road should be raised.,68 Cost for construction New by-pass road Cost for Land acquisition approx m2 Cost for Land acquisition approx. 22,000 m2 Evaluation

24 2) COMPARATIVE STUDY ON MODRICA BRIDGE LOCATION The following two options were examined for determining the bridge location. The location map of the two options is shown in Figure 2-4 in the main report. Bridge Location Option : Improvement plan of the existing bridge. Bridge Location Option 2: Construction plan to build a new bridge on the by-pass route. Option was proposed by the JICA Study Team at the onset of the basic design study in BiH. Option 2 was proposed by the Road Directorate of RS after examination of several conceivable route options when the JICA Study Team was conducting the field surveys in RS. The main reason that the Road Directorate chose Option 2 is because of easier land acquisition. After comparison study by the JICA Study Team between two options as per Table in next page, Option 2 was judged favorable since it is advantageous in improvement of highway geometry, structural durability, implication of role as EU Motorway Corridor Vc (Police (HR) Sarajevo (BiH) Osjek (HR) Budapest (HU)), etc. even though Option was advantageous on the view point of construction cost.

25 EXISTING MODRICA Bridge Plan for Proposed Location Plan for Proposed Location 2 Figure Location Map of Modrica Bridge

26 Comparison Table for the route of the Modrica Bridge Plan for Proposed Location - Improvement plan for the superstructure of the exisiting bridge Plan for Proposed Location 2 - Construction plan of new bridge on by-pass Preconditions ) Improvement plan for the exisiting bridge. ) Plan of new bridge construction on by-pass route. 2) As a result of stability calculation and test of material strength for the existing bridge, the 2) The alignment of the road will be improved for the design speed of 80 km/hr. superstructure and the abutments need reconstruction, the columns of piers can be re-used. Contents of plan ) ( Grant Aid ) ) ( Grant Aid ) - Removal of the superstructure of existing bridge 29.5m+4.3mx3+29.5m=82.9m) - Construction of new bridge (bridge length = 240 m) - Construction of new steel superstructure (83 m) - Approach road (before and after the bridge of 50 m with the total of 0 m) - Removal and construction of 2 abutments for existing bridge, and improvement of existing pier beam - Embankment - Construction of approach road, embankment, and ancillary facilities - Construction of approach road, embankment, and Bridge facilities 2) ( RS undertaking ) 2) ( RS undertaking ) - Construction and removal of detour (Including 50 m for temporary bridge) - Construction of by-pass road (Including the construction of small bridge and 2 intersections) Type of bridge - Steel 5 span plate girder bridge - PC 6 span T-girder bridge with post-tensioning method Precast segment - Span length m m x m = 83 m - Span length 40 m x 6 = 240 m - Width 2.20 m - Width 2.20 m - Substrucu re type 2 reversed T-type abutments, improvement of existing pier beam - Substruc ure type 5 wall-type bridge piers, 2 inverted T-type abutments Comparative evaluation - Improvement Improvement level is lower than the by-pass plan The life span of a new bridge can be ensured as a normal permanent bridge. level -2 Detour/Access The temporary detour and temporary bridge are necessary during the bridge rehabilitation The existing bridge can be usde as detour. road works The alignment of the road can not be improved. -3 Improvement The alignment of the road will be improved for the design speed of 80 km/h. The running speed (30 to 40 km/h) can not be improved. level of highway This plan follows the JICA BiHTMAP. This plan cannot meet the JICA BiHTMAP. With the improvement of intersection, the traffic flow at intersections will be -4 Intersection Intersection can not be improved. improved. -5 Structure of The steel girder is applicated to reduce weight lighter than the superstructure of existing superstructure bridge. The cost for PC T-girder is lesser than metal type bridge. Regular painting works are needed. For the concrete structure, painting works are not necessary. -6 Necessity for land acquisition The lease of land for detour is necessary (small area). Expropriation is necessary (approx. 26,000 m2) -7 Construction period (substantial months 26 months (8 months) period) -8 Cost borne by the grant aid (Cost ratio) Cost borne by the Cost for construction 84,000,000 Construction and removal of detour RS.00.8 Cost for construction Access road Cost for Land acquisition None Cost for Land acquisition 43,000,000( approx. 26,000 m2) Evaluation

27

28

Terminology, Shaft Comparison & General Discussion

Terminology, Shaft Comparison & General Discussion Helical Foundation Systems: Topics We Will Cover Considerations for the Design and Installation of Helical Pile Foundations Presented by: Kyle Olson, PE Senior Structural Engineer Foundation Supportworks,

More information

A&A CONSULTANTS, INC Pine Hollow Road McKees Rocks, PA 15136

A&A CONSULTANTS, INC Pine Hollow Road McKees Rocks, PA 15136 A&A CONSULTANTS, INC. 1800 Pine Hollow Road McKees Rocks, PA 15136 Telephone: (412) 323-2200 Fax: (412) 323-2202 Civil, Geotechnical & Structural Engineers Ms. Lisa L. Cessna, Executive Director Washington

More information

Appendix F-1 Description of the Long-Term Alternatives

Appendix F-1 Description of the Long-Term Alternatives Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace

More information

BRIDGEBY BURLEIGH LAW, P.E. Bringing Back the Big Four. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River.

BRIDGEBY BURLEIGH LAW, P.E. Bringing Back the Big Four. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River. Bringing Back the Big Four BRIDGEBY BURLEIGH LAW, P.E. PHOTOS BY HNTB Burleigh Law (blaw@hntb.com) is a senior

More information

REPORT ON SCALA PENETROMETER IRREGULARITY

REPORT ON SCALA PENETROMETER IRREGULARITY REPORT ON SCALA PENETROMETER IRREGULARITY Associated Test Method(s) NZS4402: 1988 supplement Test 6.5.2 Author(s) SJ Anderson, Geotechnics Ltd Report Date May 2010 NZS4402: 1988 supplement Test 6.5.2 Page

More information

Plastic Hinging Considerations for Single-Column Piers Supporting Highly Curved Ramp Bridges

Plastic Hinging Considerations for Single-Column Piers Supporting Highly Curved Ramp Bridges Plastic Hinging Considerations for Single-Column Piers Supporting Highly Curved Ramp Bridges Western Bridge Engineers Seminar Reno, NV Greg Griffin, P.E., S.E. - Senior Bridge Engineer e Griffin, P.E.,

More information

4.5 COMPOSITE STEEL AND CONCRETE

4.5 COMPOSITE STEEL AND CONCRETE 4.5 COMPOSITE STEEL AND CONCRETE 4.5.1 RULES OF THUMB 4.5 Composite Steel and Concrete (1/11) Typical starting point Overall concrete depth 130mm (Grade 30) Depth of profiled decking 60mm Size beam with

More information

McCALLUM TESTING LABORATORIES, INC.

McCALLUM TESTING LABORATORIES, INC. McCALLUM TESTING LABORATORIES, INC. Geotechnical Engineering, Materials Testing & Environmental Services Crestline Realty Corporation 39 Edwin Drive Virginia Beach, VA 2362 November 29, 11 Attention: Subject:

More information

Transportation Engineering II UNIT - I

Transportation Engineering II UNIT - I Transportation Engineering II UNIT - I I. Components of a Permanent Way: A. Rails: Rails are the I-section members of a track laid in two parallel lines to provide a level surface for the movement of trains.

More information

Construction Noise Memorandum

Construction Noise Memorandum Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551

More information

LOADS BRIDGE LOADING AND RATING. Dead Load. Types of Loads

LOADS BRIDGE LOADING AND RATING. Dead Load. Types of Loads BRIDGE LOADING AND RATING LOADS 0 1 Types of Loads Bridges are subjected to many different types of loads. There are three important types of bridge loads: Dead load Live load Other loads Dead Load Dead

More information

2018 LOUISIANA TRANSPORTATION CONFERENCE. Mohsen Shahawy, PHD, PE

2018 LOUISIANA TRANSPORTATION CONFERENCE. Mohsen Shahawy, PHD, PE 2018 LOUISIANA TRANSPORTATION CONFERENCE Sunday, February 25 - Wednesday, February 28, 2018 DEVELOPMENT OF U-BEAM PRESTRESSED CONCRETE DESIGN STANDARDS Mohsen Shahawy, PHD, PE SDR Engineering Consultants,

More information

Comparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions.

Comparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions. The International Journal of Engineering and Science (IJES) ISSN (e): 2319 1813 ISSN (p): 23-19 1805 Pages PP 67-71 2018 Comparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions.

More information

Multideck 80-V2 Features and Applications

Multideck 80-V2 Features and Applications Features and Applications is designed to incorporate all the advantages of the Multideck 60-V2 but in a deeper profile to provide longer spans up to 5.4m unpropped. Concrete Volume Savings Due to its unique

More information

Multideck 50-V2 Features and Applications

Multideck 50-V2 Features and Applications Features and Applications is a dovetail profile deck with a depth of 50mm providing spans up to 4m unpropped. Greater Design Efficiency The larger range of Multideck gauge thicknesses available allow much

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Delhi Mass Rapid Transport System Project Phase 2 (V) Loan Agreement: March 31, 2010 Loan Amount:

More information

US 191 Load Rating Past and Present. By Ron Pierce, P.E.,S.E., CBI David Evans & Associates Bridge Operations Services Practice Leader

US 191 Load Rating Past and Present. By Ron Pierce, P.E.,S.E., CBI David Evans & Associates Bridge Operations Services Practice Leader US 191 Load Rating Past and Present By Ron Pierce, P.E.,S.E., CBI David Evans & Associates Bridge Operations Services Practice Leader Inspection Experience Bridge Inspection with Idaho Transportation Department

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

for U Sheet Piles mm wide

for U Sheet Piles mm wide for U Sheet Piles 00-00mm wide Modular model applicable to U Sheet Piles (00-00mm wide) Silent Piler F0 Flexible and Functional Formula The F0 features a new modular design developed by optimising all

More information

The FRACOF Composite Slab Test

The FRACOF Composite Slab Test The FRACOF Composite Slab Test Experiment, Predictions & Results Anthony Abu & Ian Burgess Fire Resistance Assessment of partially protected COmposite Floors - FRACOF Introduction To increase the use of

More information

Overburden drilling catalogue

Overburden drilling catalogue Atlas Copco Ground Engineering Products Overburden catalogue Symmetrix overburden systems Overburden Drilling Catalogue Atlas Copco Overburden Drilling System... 3 The Symmetrix System... 4 Drilling overburden...

More information

TYPICAL SPECIFICATION ECP Steel Pier PPB-300 Utility Bracket System

TYPICAL SPECIFICATION ECP Steel Pier PPB-300 Utility Bracket System 1.01 Typical Installation Scope TYPICAL SPECIFICATION ECP Steel Pier PPB-300 Utility Bracket System Section 1- General Furnish labor, equipment, tools and material to install the PPB-300 Steel Piers as

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

AASHTO Manual for Assessing Safety Hardware, AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015

AASHTO Manual for Assessing Safety Hardware, AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015 AASHTO Manual for Assessing Safety Hardware, 2015 AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015 Full Scale MASH Crash Tests (NCHRP 22-14(02)) Conducted several

More information

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian

More information

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension Appendix C 5% Design Plan and Profile Drawings/ Additional Design Information The 5% plan and profile drawings were provided in a separate volume with the Draft Local EA and have not changed. Hard copies

More information

Detroit River International Crossing Study. The Best Alternative At This Time For Being Considered The Preferred Alternative

Detroit River International Crossing Study. The Best Alternative At This Time For Being Considered The Preferred Alternative Detroit River International Crossing Study The Best Alternative At This Time For Being Considered The Preferred Alternative Build Alternatives Included in DRIC DEIS Alternative Interchange Plaza Crossing

More information

Janice Fortunato Senior Director Business Partnerships

Janice Fortunato Senior Director Business Partnerships Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these

More information

Evaluation of Pile Setup using Dynamic Restrike Analysis in Alabama Soils

Evaluation of Pile Setup using Dynamic Restrike Analysis in Alabama Soils 45 th STGEC - Mobile, AL Oct. 29, 2014 CE Pile 360 Setup Spring AL 13 Evaluation of Pile Setup using Dynamic Restrike Analysis in Alabama Soils Eric Steward, Ph.D. Assistant Professor University of South

More information

APPENDIX 1-2 PRESENTATION MATERIAL(2)

APPENDIX 1-2 PRESENTATION MATERIAL(2) Project for Comprehensive Urban Transport Plan of the Greater Yangon (YUTRA) Data Collection Survey on The Project for Construction of Yangon Urban Expressway () FINAL REPORT APPENDIX 1-2 PRESENTATION

More information

January 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future

January 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future January 13, 2012 AACE Annual Meeting, Wickenburg, AZ I-15 in Arizona. Its Past, Present, and Future Jean A. Nehme, Ph.D., P.E. State Bridge Engineer, ADOT Presentation Overview Location, History, and Photographs

More information

BRE/TSLAB Vulcan Comparisons. Roger Plank Anthony Abu & Ian Burgess

BRE/TSLAB Vulcan Comparisons. Roger Plank Anthony Abu & Ian Burgess BRE/TSLAB Vulcan Comparisons Roger Plank Anthony Abu & Ian Burgess Tensile Membrane Action Tensile Area Peripheral compression BRE Bailey Method Rigid plastic theory with large change of geometry Yield

More information

Economics of Driven Pile Foundations

Economics of Driven Pile Foundations Economics of Driven Pile Foundations 2013 PDCA Professors Driven Pile Institute ( PDPI ) June 24-28, 2013 Van E. Komurka, P.E., D.GE, F.ASCE Wagner Komurka Geotechnical Group, Inc. 1 Talk Outline Define

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

Soil Stabilization FIELD REPORT WILL FERGUSON. TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102

Soil Stabilization FIELD REPORT WILL FERGUSON. TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102 2016 Soil Stabilization FIELD REPORT WILL FERGUSON TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102 TABLE OF CONTENTS SOIL STABILIZATION FIELD REPORT Overview Page 2 Test Pads Specs of Construction

More information

TE-II (10CV63) Ballast

TE-II (10CV63) Ballast Lecture-09 10CV63 TE-II Introduction Ballast The ballast is a layer of broken stones, gravel, moorum, or any other granular material placed and packed below and around sleepers for distributing load from

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

CFIRE December 2009

CFIRE December 2009 i BRIDGE ANALYSIS AND EVALUATION OF EFFECTS UNDER OVERLOAD VEHICLES (PHASE 1) CFIRE 02-03 December 2009 National Center for Freight & Infrastructure Research & Education College of Engineering Department

More information

TITLE: EVALUATING SHEAR FORCES ALONG HIGHWAY BRIDGES DUE TO TRUCKS, USING INFLUENCE LINES

TITLE: EVALUATING SHEAR FORCES ALONG HIGHWAY BRIDGES DUE TO TRUCKS, USING INFLUENCE LINES EGS 2310 Engineering Analysis Statics Mock Term Project Report TITLE: EVALUATING SHEAR FORCES ALONG HIGHWAY RIDGES DUE TO TRUCKS, USING INFLUENCE LINES y Kwabena Ofosu Introduction The impact of trucks

More information

Aluminum Box Culverts

Aluminum Box Culverts Steel and Aluminum s The Solution for Small Bridge Replacement: s Contech s are a practical and costefficient solution for small bridge replacement. They have a lower installed cost because they are faster

More information

Anchor Tools. Catalog 4A December Phone: Web: hubbellpowersystems.com December 2014.

Anchor Tools. Catalog 4A December Phone: Web: hubbellpowersystems.com December 2014. Anchor Tools Catalog 4A Page 4A-1 Page 4A-3 4A-4 4A-5 4A-6 4A-7 4A-8 4A-9 4A-10 4A-11 4A-12 4A-13 4A-14 4A-15 TABLE OF CONTENTS Subject How to match Chance PISA Anchors with Installing Wrenches PISA Drive

More information

FOOTBRIDGE ELEVATION SCALE 1:100

FOOTBRIDGE ELEVATION SCALE 1:100 OVERALL BRIDGE LENGTH 20000 DAIRY FLAT HIGHWAY END STEEL HANDRAIL BOTH SIDES 20 CURTAIN WALL 1900 20 CURTAIN WALL D1 RL.m A 2 B E1 RL.7m E 1% LONGITUDINAL GRADE E12 E11 E1 STEEL HANDRAIL BOTH SIDES 4 E14

More information

Geoscience Testing laboratory (Al Ain)

Geoscience Testing laboratory (Al Ain) Soil 1 In-situ Density by Sand Replacement Method Using Large Pouring Cylinder & Small Pouring Cylinder In-place Density Test by Sand Cone Method BS 1 Part ASTM D 1556 Dry Density Moisture Content Relationship

More information

LAL LAL WIND FARM YENDON SECTION. Feasibility of haulage routes. WestWind Energy Pty Ltd. 10/01/2008 Job No. CG107800

LAL LAL WIND FARM YENDON SECTION. Feasibility of haulage routes. WestWind Energy Pty Ltd. 10/01/2008 Job No. CG107800 LAL LAL WIND FARM YENDON SECTION Feasibility of haulage routes 10/01/2008 Job No. CG107800 WestWind Energy Pty Ltd Cardno Victoria Pty Ltd trading as Cardno Grogan Richards ABN 84 006 346 087 150 Oxford

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

Exhibit F - UTCRS. 262D Whittier Research Center P.O. Box Lincoln, NE Office (402)

Exhibit F - UTCRS. 262D Whittier Research Center P.O. Box Lincoln, NE Office (402) UTC Project Information Project Title University Principal Investigator PI Contact Information Funding Source(s) and Amounts Provided (by each agency or organization) Exhibit F - UTCRS Improving Safety

More information

California University of Pennsylvania (CALU) Maglev Sky Shuttle

California University of Pennsylvania (CALU) Maglev Sky Shuttle California University of Pennsylvania (CALU) Maglev Sky Shuttle No. 119 Thomas E. Riester, P.E. Mackin Engineering Company, RIDC Park West, 117 Industry Drive, Pittsburgh, PA 15275 triester@mackinengineering.com

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK The Old School Stillhouse Lane Bedminster BS3 4EB Contact: Dr Dimitris Xirouchakis Tel: +44 (0)117-9471000 Fax: +44 (0)117-9471004 E-Mail:

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Conceptual Design of Hybrid Cable-Stayed Bridge with Central Span of 1000 m Using UHPC

Conceptual Design of Hybrid Cable-Stayed Bridge with Central Span of 1000 m Using UHPC Engineering, 2013, 5, 744-750 http://dx.doi.org/10.4236/eng.2013.59089 Published Online September 2013 (http://www.scirp.org/journal/eng) Conceptual Design of Hybrid Cable-Stayed Bridge with Central Span

More information

CONFEDERATION LINE EAST SEGMENT

CONFEDERATION LINE EAST SEGMENT The O-Train Confederation Line project is the first stage in Ottawa s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit

More information

PRODUCT DESCRIPTION. X-Tension DS. is suitable for all road types: Motorways, country roads, city streets for speed categories up to 110 km/h.

PRODUCT DESCRIPTION. X-Tension DS. is suitable for all road types: Motorways, country roads, city streets for speed categories up to 110 km/h. INDEX Introduction 2 Product Description 3 Installation 6 Specifications 7 Crash Tests Table 8 Reusability 9 FAQ 10 Annexes 14 Drawings 15 Pictures 16 Crash Tests Results 18 Approvals 23 INTRODUCTION Improving

More information

Bridge Types Discussion. January 18, 2008 Oversight Team Meeting

Bridge Types Discussion. January 18, 2008 Oversight Team Meeting Bridge Types Discussion January 18, 2008 Oversight Team Meeting What do we want to accomplish? Review the type of bridges appropriate for project Examples Cost ranges Discuss staff s preliminary recommendation

More information

COST ANALYSIS FOR BRIDGE AND CULVERT. Essam A. Mostafa

COST ANALYSIS FOR BRIDGE AND CULVERT. Essam A. Mostafa Seventh International Water Technology Conference IWTC7 Cairo 1-3 April 2003 357 COST ANALYSIS FOR BRIDGE AND CULVERT Essam A. Mostafa Associate Professor, Irrigation & Hydraulics Department, Faculty of

More information

CONSULTING Engineering Calculation Sheet. Reference Sheets - Pile Cap Capacity (Generic) Tables XX

CONSULTING Engineering Calculation Sheet. Reference Sheets - Pile Cap Capacity (Generic) Tables XX Job No. Sheet No. E N G I N E E R S Consulting Engineers jxxx 1 Pile Cap Capacity (Generic) Input Characteristic strength of concrete, f cu ( 60N/mm 2 ; HSC N/A) 40N/mm 2 OK Yield strength of longitudinal

More information

Under Sleeper Pads on the Ofoten Line

Under Sleeper Pads on the Ofoten Line Under Sleeper Pads on the Ofoten Line Bjørn G. Larsen, Infrastructure Division and Alf Helge Løhren, Technology Jernbaneverket 19th Nordic Seminar on Railway Technology 2016 Luleå, Sweden Content Test

More information

ANNEX B SPECIFICATIONS FOR THE PROTECTION OF LEVEL CROSSINGS

ANNEX B SPECIFICATIONS FOR THE PROTECTION OF LEVEL CROSSINGS ANNEX B SPECIFICATIONS FOR THE PROTECTION OF LEVEL CROSSINGS ) INTRODUCTION Definition: A level crossing arises from the intersection of a road with the railway. It then creates a problem, since the level

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT

More information

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT

More information

6.3 SUBSTRATE COMPOSITION AND QUALITY

6.3 SUBSTRATE COMPOSITION AND QUALITY 6.3 SUBSTRATE COMPOSITION AND QUALITY 6.3.1 METHODS The Wolman pebble count procedure (Wolman, 1954) is used to measure the diameter of the intermediate axis of 100 randomly selected stones along transects

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUTURE June 1 4, 2016 RE-TESTING OF A FIRE-DAMAGED RIDGE Alexander M.. Au, Senior ridge Engineer, Highway Standards ranch, Ontario Ministry of Transportation, anada ASTRAT A proof load

More information

APPENDIX A Basis of Design and Design Criteria Memorandum

APPENDIX A Basis of Design and Design Criteria Memorandum APPENDIX A Basis of Design and Design Criteria Memorandum Job No: Y01-500 Files are stored in: Engineering / Client / Yolo/Y01500 Buckeye and Rumsey/Rumsey CR 41 over Cache Creek, CAD files stored in:

More information

GRITTING FOR IMPROVED EARLY LIFE SKID RESISTANCE OF STONE MASTIC ASPHALT SURFACES

GRITTING FOR IMPROVED EARLY LIFE SKID RESISTANCE OF STONE MASTIC ASPHALT SURFACES GRITTING FOR IMPROVED EARLY LIFE SKID RESISTANCE OF STONE MASTIC ASPHALT SURFACES Ed Baran, Queensland Department of Transport and Main Roads, Australia Russell Lowe, Queensland Department of Transport

More information

Michigan Division Federal Highway Administration Update

Michigan Division Federal Highway Administration Update Federal Highway Administration Update Ted Burch, P.E. Assistant Division Administrator FHWA Michigan Division 2010 Michigan Bridge Conference Topics ARRA Update Scour Evaluation & POAs Load Rating & Posting

More information

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements Existing Conditions Belmont Circle Bourne, MA Speakers Pam Haznar, MassDOT Ed Hollingshead, Fay Spofford & Thorndike Heather Ostertog, Fay, Spofford & Thorndike Goals for Group Local Knowledge Work through

More information

Multideck 60-V2. Contents

Multideck 60-V2. Contents The original and still the most popular deck in the market is a 60mm high, structurally efficient trapezoidal profile providing an excellent composite union between steel and concrete to maximise the load

More information

SHIP COLLISION: REPAIR & REHABILITATION OF A CABLE STAYED BRIDGE

SHIP COLLISION: REPAIR & REHABILITATION OF A CABLE STAYED BRIDGE Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey SHIP COLLISION: REPAIR & REHABILITATION OF A CABLE STAYED BRIDGE Sumitaka KURINO 1, Hiroshi KUDO 2, Masaru KUDO 3 and Yuichi YAMAMOTO 4 ABSTRACT

More information

Contract No: OASRTRS-14-H-MST (Missouri University of Science and Technology)

Contract No: OASRTRS-14-H-MST (Missouri University of Science and Technology) Smart Rock Technology for Real-time Monitoring of Bridge Scour and Riprap Effectiveness Design Guidelines and Visualization Tools (Progress Report No. 7) Contract No: OASRTRS-14-H-MST (Missouri University

More information

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS D-Rail Final Workshop 12 th November - Stockholm Monitoring and supervision concepts and techniques for derailments investigation Antonella

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision Weight Allowance Reduction for Quad-Axle Trailers CVSE Director Decision Brian Murray February 2014 Contents SYNOPSIS...2 INTRODUCTION...2 HISTORY...3 DISCUSSION...3 SAFETY...4 VEHICLE DYNAMICS...4 LEGISLATION...5

More information

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders.

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders. BRIDGE INSPECTION BRIDGE NO./NAME SI - 3041: Mt. Brenton FSR (2.00 KM) Inspection Date: October 31 st 2012 Inspected By: D. Chen, D. Harrison Year Built: 1995 Number of Spans: 1 Span Lengths: Superstructure

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit

Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit Page 1 of 7 Transport by road overweight and overdimension loads that do not require a pilot or overdimension permit Level 4 Credits 9 Purpose This unit standard is for drivers who transport overweight

More information

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS 1 PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS Paul Mak, PE, SE - DMJM HARRIS 515 S. Flower Street 9th Floor, Los Angeles, CA 90071. Tel 213-593-8337 Fax 213-593-8622

More information

The all-steel pipe braces are available in lengths from 7-6 to 52-6 and designed for formwork, precast and tilt-up bracing applications.

The all-steel pipe braces are available in lengths from 7-6 to 52-6 and designed for formwork, precast and tilt-up bracing applications. Pipe Braces Pipe Braces The all-steel pipe braces are available in lengths from 7-6 to 52-6 and designed for formwork, precast and tilt-up bracing applications. Adjustable Pipe Braces have a telescoping

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

Traffic Accident Statistics

Traffic Accident Statistics 2000 Missouri State Highway System Traffic Accident Statistics Missouri State Highway System Traffic Accident Statistics Table of Contents Subject Chapter 1: Statewide Traffic Accident Statistics, Introduction

More information

VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur DEPARTMENT OF CIVIL ENGINEERING SUBJECT NAME: HIGHWAY ENGINEERING

VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur DEPARTMENT OF CIVIL ENGINEERING SUBJECT NAME: HIGHWAY ENGINEERING VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur 603 203 DEPARTMENT OF CIVIL ENGINEERING SUBJECT CODE: CE6504 SUBJECT NAME: HIGHWAY ENGINEERING YEAR: III SEM : V QUESTION BANK (As per Anna University

More information

Project Description - 1 -

Project Description - 1 - Project Description The Mother Ann Lee Hydroelectric Station is located at Lock and Dam 7 on the Kentucky River. This dam is part of a system of 14 lock and dams installed on the Kentucky River between

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Why? Faster To reduce the duration of the process

Why? Faster To reduce the duration of the process BUTE Department of Construction Management and Technology 20.10.2015 Why? Faster To reduce the duration of the process Cheaper To reduce costs (where labour is expensive) Easier To reduce (heavy) manual

More information

1. Highway Traffic Act Weight & Dimension Limitations

1. Highway Traffic Act Weight & Dimension Limitations GUIDELINES FOR OVERSIZE/OVERWEIGHT VEHICLES May 2012 1. Highway Traffic Act Weight & Dimension Limitations An oversize/overweight permit is required when the dimensions or weight of a vehicle(s) exceeds

More information

Pedestrians Road Safety

Pedestrians Road Safety Pedestrians Road Safety Overview According to the World Health Organization, the World Bank, the FIA Foundation for the Automobile and Society and the Global Road Safety Partnership collaborative report

More information

Appendix D. List of Existing Structures

Appendix D. List of Existing Structures A120 Braintree to A12 Technical Appraisal Report Appendix D. List of Existing Structures B3553T41-JAC-HGN-00-REP-C-0002 Page 134 of 135 A120 Braintree to A12 - Existing Structures Existing Structure Name

More information

AVISSAWELLA TOWN DEVELOPMENT PROJECT

AVISSAWELLA TOWN DEVELOPMENT PROJECT AVISSAWELLA TOWN DEVELOPMENT PROJECT TRANSPORT REQUIREMENTS Presentation of Findings Transportation Engineering Division University of Moratuwa March 2000 PRESENT TRANSPORT ISSUES Railways underutilised

More information

Appendix 5 Sample Specifications. Specifications for Socioeconomic Survey in Rural Areas in Myanmar

Appendix 5 Sample Specifications. Specifications for Socioeconomic Survey in Rural Areas in Myanmar Part 6-2 Appendix 5 Appendix 5 Sample Specifications Appendix 5-1 Appendix 5-2 Appendix 5-3 Appendix 5-4 Appendix 5-5 Appendix 5-6 Specifications for Socioeconomic Survey in Rural Areas in Myanmar Technical

More information

Northern Line Extension Project

Northern Line Extension Project 1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer 2 Northern Line Extension Battersea 2020 - part of the wider Northern Line story 3 Contents Project Background

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

Rehabilitating Crossing Surfaces Effect of Sub-Structure Design on Long-Term Performances of Highway-Railway At-Grade Crossings

Rehabilitating Crossing Surfaces Effect of Sub-Structure Design on Long-Term Performances of Highway-Railway At-Grade Crossings Rehabilitating Crossing Surfaces Effect of Sub-Structure Design on Long-Term Performances of Highway-Railway At-Grade Crossings by Jerry G. Rose, Ph.D.,P.E. Professor of Civil Engineering University of

More information

First published June 2007 Copyright China Trend Building Press Limited

First published June 2007 Copyright China Trend Building Press Limited First published June 2007 Copyright China Trend Building Press Limited trend@building.com.hk In order to construct the foundations, piers and portal frames for the viaduct, a 1.8 km-long temporary access

More information

0 Issued for Information SHS 10/06/16 JAL 10/10/16 JCP 10/10/16

0 Issued for Information SHS 10/06/16 JAL 10/10/16 JCP 10/10/16 Project/Plant: Unit(s): Plant Gorgas Gypsum Pond Units 6-7 Title/Subject: Slope Stability Analysis of Plant Gorgas Gypsum Pond Dam Purpose/Objective: Analyze slope stability of the Plant Gorgas Gypsum

More information