1 Indianapolis MPO Annual Listing of Obligated Projects State Fiscal Year 2018
2 Introduction The Indianapolis Metropolitan Planning Organization (MPO) is responsible for regional transportation planning in the Indianapolis urbanized area, as defined by the 2010 Census, as well as the area projected to be urbanized by the year Figure 1 shows the current Indianapolis urbanized area with lighter shading, and the projected urbanized area with a darker shade. Together these areas create the Metropolitan Planning Area (MPA), which contains all of Marion County and portions of the surrounding counties of Hamilton, Hancock, Shelby, Johnson, Morgan, Hendricks and Boone. Figure 1: Indianapolis MPA 1
3 The Planning Process The Indianapolis MPO is responsible for providing a continuing, comprehensive, and cooperative transportation planning process for the expenditure of Federal funds within the MPA as shown in Figure 1. The planning process is carried out through coordination between the MPO and the Indianapolis Regional Transportation Council (IRTC). The IRTC includes representatives from all eligible local governments within the Indianapolis MPA, the Indiana Department of Transportation (INDOT), and other transportation agencies such as IndyGo and the Indianapolis Airport Authority and is comprised of two committees. The Technical Committee consists of planners and engineers from local governments and public agencies within the MPA while the Policy Committee consists of the elected and appointed officials from the same agencies. The IRTC Policy Committee serves as the policy-making body for the MPO and is responsible for officially adopting all plans. The Annual Obligation Report This report serves as an organizational and monitoring tool and works in coordination with the Indianapolis Regional Transportation Improvement Program (IRTIP) to promote planning for an efficient and cohesive transportation system. In creating these reports, the Indianapolis MPO collaborates with other state and local organizations, including INDOT, the Indianapolis Public Transportation Corporation, and the Central Indiana Regional Transportation Authority. The 4-year IRTIP lists the type and location for all federally funded and regionally significant transportation projects scheduled over the four-year period, as well as their funding sources. Since there is potential for slight variations in the IRTIP due to changes in cost and timing of projects, one requirement of the transportation act passed by Congress in 2005 titled the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), is, an Annual Listing of Projects, including investments in pedestrian walkways and bicycle transportation facilities, for which Federal funds that have been obligated in the preceding year shall be published or otherwise made available by the cooperative effort of the State, transit operator, and Metropolitan Planning Organization for public review. The listing shall be consistent with the funding categories identified in each metropolitan Transportation Improvement Program (TIP). In accordance with Federal requirements, the MPO has published its Annual Listing of Federally Obligated Transportation Projects for state fiscal year 2018 (July 1, 2017 June 30, 2018) based on the Federal Financial Management Information System (FMIS). The purpose of this report is to provide to the public, as well as State and local officials, information regarding federal spending on transportation projects within the Indianapolis region, along with a progress report and disclosure of project delivery occurring over a shorter planning period of only one year. If a project is Federally obligated, it means that the Federal government has made a legal commitment to pay or reimburse the state and/or local jurisdictions for the Federal share of a project s eligible costs. The normal split for Federal and local funds contributed to transportation projects is 80% Federal and 20% local. For transit projects, obligation occurs when the Federal Transit Administration (FTA) awards a grant to the eligible recipient. For FHWA, funds become obligated to a project about five weeks following a project being deemed ready for contracts a determination made by INDOT. Obligated projects were not necessarily initiated or completed in the fiscal year shown and the costs shown are not necessarily the final project cost. It is noted that obligated funds may exceed the amount programmed in the IRTIP. Furthermore, the advanced construction (AC) column represents a change in 2
4 the project authorization without changing the federal funds and is used to authorize projects for federal funds without using the funds. Advanced construction funds cannot be reimbursed; therefore, when reimbursement claims are submitted, the advanced construction funds are converted to federal funds that are reimbursable. Projects Summary The projects contained in this report are categorized by type and include bicycle/pedestrian, bridge, road/highway, other, and transit. It should be noted that some projects may include more than one project type. For instance, a roadway project may include a bridge or bike or pedestrian system components even though they are not specifically identified. This report shows that the amount of federal funds obligated in the Indianapolis area in SFY 2018 was $184,312, Of the total, the percentage spent on each category is displayed in Figure 2. Figure 2: Obligated Funds by Project Type (SFY 2018) Bike/Ped 8% Bridge 11% Transit 52% Road/Highway 23% Other 6% 3
5 The following pages list the Federal funds obligated in SFY The information is grouped by project type and sorted by des. number. Questions regarding information provided in this report can be sent to: Steve Cunningham, Principal Planner Kristyn Sanchez, Sr. Transportation Finance Analyst Fund Types Abbreviations CMAQ Congestion Management/Air Quality HSIP Highway Safety Improvement Program IM Interstate Maintenance SRTS Safe Routes to School STBG (formerly STP) Surface Transportation Block Grant (Group I, III, and IV) TAP - Transportation Alternatives Program 5307 Transit Capital and Operating Assistance 5310 Special Transportation Needs (i.e. Disability Services) 5311 FTA Section 5311, Rural Transit 5339 FTA Section 5339, Buses & Bus Facilities NHPP National Highway Performance Program NHS National Highway System PL Planning 4
6 BICYCLE AND PEDESTRIAN PROJECTS Marion Indianapolis Local Enhancement on SPENHC Northside Fairgrounds; Main Rd upgrade and related improvements Bike/Ped TAP $0.00 $105, $0.00 Hancock Cumberland Local Bike/Pedestrian Facilities From Buck Creek Rd Bike/Ped TAP $90, $90, $0.00 N to southern end of Autumn Woods Marion Indianapolis Local Cultural Trail from Virginia Ave - New Jersey Bike/Ped EARMARK, STBG $0.00 ($54,561.89) $0.00 St.; and South St starting from Penns St to Prospect Marion Indianapolis Local 62ND ST FROM KEYSTONE AVE TO ALLISONVILLE RD (MULTI-USE TRAIL) Bike/Ped CMAQ $0.00 ($20,000.00) $0.00 Hendricks Brownsburg Local Bike/Pedestrian Facilities on O'Dell Sycamore Bike/Ped STBG $4, $4, $0.00 Tilden Jefferson Street Johnson Johnson Local Bike/Pedestrian Facilities on Stones Crossing Road Bike/Ped SRTS $0.00 ($0.48) $0.00 Hendricks Avon Local Bike/Pedestrian Facilities on White Lick Creek Bike/Ped STBG $50, $50, $0.00 Trail - Phase 3 Hamilton Westfield Local Old Monon Trail 191st St to 216th St Bike/Ped STBG, TAP $1,300, $1,300, $0.00 Hamilton Fishers Local Bike/Pedestrian Facilities on 106th St to Bike/Ped TAP $0.00 ($40,395.43) $0.00 Fishers Pointe Blvd through Cheeney Creek Park Marion Speedway Local B&O Trail from Main St. to E of Big Eagle Bike/Ped TAP $661, $661, $0.00 Creek Hamilton Westfield N/A Bike/Pedestrian Facilities at Oak Trace Elem. Bike/Ped TAP $0.00 ($1,600.09) $0.00 Hancock Cumberland Local National Road Heritage Trail from Mt Bike/Ped TAP $0.00 ($6,553.60) $0.00 Hamilton Hamilton Local 103rd St. between Pennsylvania & College Bike/Ped STBG, TAP $0.00 ($23,297.92) $0.00 Ave Hamilton Hamilton Local Noblesville/Hamilton Co Riverwalk (E Bike/Ped STBG $120, $120, $0.00 bank)white River SR32 & Logan St Ph2A Marion Indianapolis Local Ellenberger Pk E from Ritter S to aband'd RR Bike/Ped TAP $0.00 ($6.78) $0.00 cooridor E to Arlington Marion McCordsville Local Pedestrian Bridge E of 600 W N of 800 N Bike/Ped STBG $0.00 ($11,363.64) $0.00 Schulz Ditch Hamilton Carmel Local 136th St. Keystone Ave to Grey Rd Path Bike/Ped TAP $0.00 ($10,534.02) $0.00 Hamilton Carmel Local Main St Path from Keystone to Gray Rd Bike/Ped STBG, TAP $0.00 ($22,432.81) $0.00 Hamilton Noblesville Local Midland Trace Trail from Gray Rd. to Hazel Bike/Ped STBG $39, $39, $0.00 Dell Rd. Hamilton Fishers Local 113th St from Olio Rd to Florida Rd Bike/Ped STBG $263, $263, $0.00 Hamilton Fishers Local Nickel Plate Trail Extension Bike/Ped STBG $1,194, $1,114, $0.00 Johnson Franklin Local Bike/Pedestrian Facilities Along Eastview Bike/Ped TAP $0.00 $2,138, ($2,138,422.48) Hendricks Avon Local Bike/Pedestrian Facilities on White Lick Creek Bike/Ped TAP $899, $0.00 $899, Trail 4 Hendricks Avon Local White Lick Creek Trail Phase 2B Bike/Ped STBG $491, $390, $0.00 Marion Indianapolis Local Pedestrian Flashing Beacons Installed at various schools Bike/Ped HSIP, BONUS, STBG $128, $2,122, ($1,993,451.67) Marion Beech Grove Local Churchman Avenue from Emerson Avenue to Bike/Ped STBG $58, $866, ($808,360.00) Arlington Avenue Hamilton Westfield Local SR32 Monon Trail over SR 32 in Westfield Bike/Ped STBG $58, $58, $3,481, Marion Indianapolis Local Market Street Reconstruction Pennsylvania Bike/Ped STBG $500, $500, $0.00 Marion Lawrence Local E 56th St trail from Boy Scout Rd to Franklin Bike/Ped EARMARK $124, $0.00 $124, Rd Marion INDOT I- 465 Signs Lighting Signals And Markings on I465 at I-465 SB entrance ramp and W 56th St; at I- 465 NB exit ramp and W 56th St. Bike/Ped HSIP $0.00 ($2,771.17) $0.00 Hendricks Brownsburg Local Pedestrian Crossing Improvements Bike/Ped HSIP $228, $228, ($172,720.38) Marion Indianapolis Local Signs Lighting Signals And Markings within Bike/Ped HSIP $1, $1, $0.00 1/2 mile of the E Michigan St & Tecumseh St Marion Indianapolis Local Signs Lighting Signals And Markings within 1/2 mile of the N Alabama St and E 16th St Bike/Ped HSIP $2, $2, $0.00 Marion Indianapolis Local Construct ADA Approved Sidewalk Ramps Bike/Ped HSIP $44, $664, ($619,450.06) within 1/2 mile of the N Delaware St & E 25th St Intersection Marion Indianapolis Local Signs Lighting Signals And Markings within 1/2 mile of the N Meridian St & St Clair St Bike/Ped HSIP $2, $2, $0.00 Marion Indianapolis Local Construct ADA Approved Sidewalk Ramps within 1/2 mile of the E Washington St & Arsenal Ave Intersection Bike/Ped HSIP $82, $324, ($242,400.62) Marion Indianapolis Local Construct ADA Approved Sidewalk Ramps Bike/Ped HSIP $0.00 $322, ($348,484.40) Marion Indianapolis Local Signs Lighting Signals And Markings within Bike/Ped HSIP $0.00 $176, ($189,599.02) 1/2 mile of the E Washington St & N Linwood Johnson Franklin US 31 Safety Revisions at Mallory Parkway and US31 Bike/Ped HSIP $531, $509, $21,
7 BICYCLE AND PEDESTRIAN PROJECTS Hamilton Hamilton Local 146th St. River Rd to Herriman Blvd. multiuse Bike/Ped STBG $36, $36, $0.00 path Hamilton Noblesville Local Midland Trace Trail Hazel Dell Rd to Bike/Ped TAP $597, $597, $0.00 Willowview Rd Various INDOT N/A Bike/Pedestrian Facilities Bike/Ped TAP $24, $83, ($83,278.00) Hancock INDOT US 40 Construct ADA Approved Sidewalk Ramps Bike/Ped HSIP $1,059, $177, $0.00 Johnson INDOT SR 135 Construct ADA Approved Sidewalk Ramps Bike/Ped HSIP, STP $332, $342, $13, Hendricks Avon Local Pedestrian bridge across White Lick Creek N Bike/Ped STBG $634, $622, $0.00 of CR 100 S Hendricks Hendricks Local B&O Trail On Railroad corridor from W Hendricks CL to E Hendricks CL Bike/Ped TAP $0.00 $ $0.00 Hamilton INDOT N/A ENHANCEMENT, NOBLESVILLE REHAB OF NKP Bike/Ped TAP $0.00 $0.00 ($131,933.60) 587 STEAM LOCOMOTIVE TOTAL FEDERAL OBLIGATION: $9,562, $13,725, ($2,188,498.45) 6
8 BRIDGE PROJECTS Shelby INDOT CR 875 Br Repl Comp.Cont.Pres.Conc.Box Beam over Bridge STBG $0.00 $143, $992, Buck Creek on CR 875W Hamilton INDOT I-69 Bridge Deck Overlay and Widening on Bridge Bridge STBG $0.00 $11, ($11,751.43) 191 over Geist Reservoir on Olio Road 2.3 Hendricks INDOT SR 39 SMALL STRUCTURE REPLACEMENT, 1.35 Bridge STBG $0.00 ($4,000.00) $0.00 MILES S OF US 36 Hamilton INDOT I-69 Bridge Deck Replacement on 126th Street Bridge STBG $0.00 ($6,593.23) $0.00 Hendricks INDOT SR 39 SMALL STRUCTURE REPLACEMENT, 2.46 MI S Bridge STBG $0.00 ($4,200.00) $0.00 Hendricks INDOT SR 39 SMALL STRUCTURE REPLACEMENT, 3.92 MI S Bridge STBG $0.00 ($3,000.00) $0.00 OF US 36 Morgan INDOT SR 39 Br Repl Conc. Beam Construction on SR39 Bridge BONUS, STBG $0.00 ($533,990.89) $0.00 Bridge over White River Marion Indianapolis Local BRIDGE DECK RECONSTRUCTION & Bridge STBG $0.00 ($1,132.57) $0.00 WIDENING, S EMERSON AVE OVER LITTLE BUCK CREEK Hamilton INDOT US 31 NEW BRIDGE, STEEL CONSTRUCTION, SB Bridge NHS $0.00 ($20,440.44) $0.00 OVER SR 38, LINDLEY DITCH Hendricks INDOT US 36 PCCP Cleaning and Sealing Joints from 0.96 Bridge NHPP, STBG $0.00 ($640,947.35) ($37,505.70) miles E of SR 39 South Jct to 0.09 miles W of SR 267 Hendricks INDOT I- 74 Bridge Deck Overlay on I74 at SR 39 Bridge NHPP $0.00 $4, $0.00 Marion Indianapolis Local Bridge Replacement on EB 82nd Street over I- Bridge NHPP $0.00 $ $ Boone INDOT I-65 Bridge Replacement on Conrail Railroad Bridge IM $0.00 ($495,711.16) $0.00 Bridge over I-65 Marion INDOT I- 65 Bridge Painting on I65 Various bridges Bridge NHPP $0.00 ($5,893.83) $0.00 Marion INDOT I- 70 Bridge Painting on I70 Over Madison Ave and Bridge FREIGHT, IM, NHPP $0.00 ($24,625.06) ($9,583.20) Shelby INDOT I-74 Bridge Painting 1.34 miles E of SR-9 (Knightstown Road) Bridge NHPP $0.00 ($0.64) $0.00 Marion INDOT I- 65 Bridge Painting At Pleasant Run and Pleasant Bridge NHPP $0.00 ($1.48) ($6,399.02) Run Parkway Boone INDOT SR 32 SR32, BR REPL, PRECAST 3 SIDED CULVERT, Bridge STBG $0.00 $0.01 ($17,194.08) Hancock INDOT I-70 Bridge Widening over Sugar Creek WB I-70 Bridge NHPP $0.00 $130, $0.00 Hancock INDOT I-70 Bridge Widening over Sugar Creek (EB I-70) Bridge NHPP $0.00 ($101,557.79) ($41,272.38) Marion INDOT I- 65 Bridge Deck Patching on I65 7 Streets RR Bridge NHPP $0.00 $13, $0.00 Monorail Marion INDOT I- 65 Bridge Painting on I65 Bridge NHPP, STBG $0.00 $17, ($17,634.49) Hamilton INDOT US 31 BR REPL, COMP.CONT.PRES.CONC.BULB T- Bridge NHS $0.00 ($29,102.85) $0.00 BEAM, SB KEYSTONE (SR 431) OVER COOL CREEK Hamilton INDOT US 31 BR REPL, COMP.CONT.PRES.CONC.BULB T- Bridge NHS $0.00 ($39,905.12) $0.00 BEAM, NB KEYSTONE (SR 431) OVER COOL CREEK Hamilton INDOT US 31 NEW BR, COMP.CONT.PRES.CONC.BULB T- Bridge NHS $0.00 ($19,285.31) $0.00 BEAM, NB SR 431 OVER NB US 31 Hamilton INDOT US 31 BRIDGE REPLACEMENT, OTHER CONSTRUCTION, SB 431 RAMP OVER US 31 Bridge NHS $0.00 ($53,093.04) $0.00 Hamilton INDOT US 31 NEW BRIDGE, SB US 31 OVER RANGELINE Bridge NHS $0.00 ($21,767.84) ($8,545.88) Hamilton INDOT US 31 NEW BR, COMP.CONT.PRES.CONC.BULB T- Bridge NHPP $0.00 ($3,892.08) $0.00 BEAM, NB US 31 OVER RANGELINE ROAD Hamilton INDOT US 31 NEW BR, PRECAST 3 SIDED CULVERT, NB Bridge NHPP $0.00 ($46,361.47) $0.00 OVER JONES DITCH Hamilton INDOT US 31 NEW BR, PRECAST 3 SIDED CULVERT, LINDLY ROAD AND RAMP ES OVER LINDLY DITCH Bridge NHS, BONUS $0.00 ($5,529.34) $0.00 Hamilton INDOT US 31 NEW BR, PRECAST 3 SIDED CULVERT, SR 38 Bridge NHS $0.00 ($7,786.42) $0.00 BRIDGE OVER LINDLEY DITCH Boone Boone Co. Local New Bridge Concrete Construction on CR Bridge STBG $0.00 ($86,566.45) $ S Extension over Fishback Creek Marion INDOT I- 70 Bridge Thin Deck Overlay on I70 Bridge on Bridge NHPP $0.00 $354, ($354,725.28) ramp from Indianapolis mid-field terminal access to EB I-70 over I-70 Shelby INDOT SR 252 Bridge Deck Overlay on SR252 Bridge over Bridge STBG $0.00 $138, $0.00 Flatrock River Hamilton INDOT SR 38 Small Structure Replacement on SR Bridge NHPP $0.00 ($26,354.21) $0.00 mi. E. of US 31 Hamilton INDOT SR 32 Small Structure Replacement on SR Bridge BONUS, STBG $171, $118, $0.00 mi E of E jct SR 38 Marion INDOT I- 465 Replace Superstructure on SR1 over I-70 Bridge BONUS, STBG $0.00 $50, $0.00 Howard INDOT SR 26 Bridge Painting on SR miles E of SR- 213 over Mud Creek Bridge STBG $0.00 $96, ($96,363.38) Marion INDOT I- 70 Small Structure Pipe Lining on I miles Bridge IM, NHPP $0.00 ($71,261.47) $0.00 E of I-465 (W Jct) Johnson INDOT SR 135 Small Structure Replacement on SR miles N of SR 144 Bridge NHPP $338, $0.00 $89,
9 BRIDGE PROJECTS Hancock INDOT US 40 Box Culvert Replacement on US mile E Bridge NHPP $0.00 ($9,715.98) $0.00 of the Marion / Hancock Co Line Marion INDOT I- 70 Replace Superstructure on I70 Lynhurst Drive Bridge NHPP $0.00 $182, ($30,440.32) 1.18 miles E of I-465 Marion Indianapolis Local Bridge Replacement on Keystone Ave 0.1 mi Bridge STBG $0.00 ($1,018.72) $0.00 S of Fall Creek Parkway Marion Indianapolis Local LAFAYETTE RD OVER CSX RR,.45 MI NW OF Bridge STBG $0.00 ($331,914.33) $ TH ST Marion Indianapolis Local Bridge Replacement, Pleasant Run Pkwy 0.2 Bridge STBG $5, $5, $0.00 miles NE of Ritter Ave Hamilton INDOT I-69 New Br Steel Girder NB SR 37 over I-69 Bridge IM $0.00 ($289,661.73) $0.00 Johnson INDOT I- 65 I65, BRIDGE DECK OVERLAY, MILES N Bridge IM, NHPP $0.00 ($17,654.69) $0.00 OF SR-44 (CR 600 N) Hendricks, INDOT I- 74 Bridge Deck Overlay over I mi W of I- Bridge NHPP, IM $0.00 ($58,602.20) $0.00 Marion 465 Hendricks INDOT US 36 BRIDGE DECK OVERLAY, EB BRIDGE OVER Bridge NHPP $0.00 ($121,513.90) $0.00 WHITE LICK CREEK, 0.96 MI W OF SR 267 Hendricks INDOT US 36 BRIDGE DECK OVERLAY, WB BRIDGE OVER LINGEMAN CREEK, 0.63 MI W OF SR 267 Bridge NHPP $0.00 ($18,685.42) $0.00 Hendricks INDOT US 136 BRIDGE DECK OVERLAY, BRIDGE OVER WEST Bridge STBG $0.00 ($3,617.74) $0.00 FORK WHITE LICK CREEK, 2.33 MI W OF SR 267 Marion INDOT I- 70 Bridge Deck Overlay on I70 WB ramp to I- 465; SB bridge over I mi E of I-465 Bridge NHPP $0.00 $18, $0.00 Hendricks INDOT SR 267 NEW BRIDGE CONSTRUCTION, BRIDGE OVER Bridge STBG $0.00 ($335,761.47) $0.00 ROGERS CREEK, 0.8 MILE N OF I-70 Hendricks INDOT I- 74 Bridge Deck Overlay on I74 WB over Ross Bridge IM, NHPP $0.00 $135, $0.00 Ditch 0.30 mi E of SR 39 Hendricks INDOT I- 74 Bridge Thin Deck Overlay on I74 EB Bridge Bridge NHPP, STBG $437, $265, $0.00 over SR 267 SB & NB Hendricks INDOT I- 74 Bridge Thin Deck Overlay on I74 WB Bridge Bridge STBG $450, $273, $0.00 over SR 267 SB & NB Johnson INDOT I- 65 Small Structure Pipe Lining on I65.36 mile N Bridge IM, NHPP $0.00 ($5,409.61) $0.00 of the Johnson/Shelby County Line Johnson INDOT I- 65 Small Structure Pipe Lining on I65 Bridge NHPP $0.00 ($16.59) ($1,062.20) Marion INDOT I- 465 Small Structure Pipe Lining on I miles E of SR 267 Bridge IM, NHPP $0.00 ($99,433.49) $0.00 Marion INDOT US 36 Box Culvert Replacement on US miles Bridge NHPP, STBG $0.00 $164, ($32,699.20) E of I-465 Hancock INDOT SR 234 Small Structure Replacement with Bridge on Bridge STBG $0.00 $368, ($350,610.00) SR miles E of SR 9 Morgan INDOT SR 135 Small Structure Replacement on SR Bridge STBG $0.00 $30, $0.00 miles N of SR-45 on SR-135 Marion INDOT I- 65 Bridge Deck Overlay on I mile N I-465 Bridge FREIGHT $0.00 ($47,661.45) $0.00 Hanna Ave Marion INDOT I- 65 Replace Superstructure on I65 and CD over CSX RR & Ohio Street 1.10 miles N of I-70 Bridge NHPP $5,076, $3, $0.00 Johnson Johnson Local Bridge Replacement on CR 200 N approx 0.10 Bridge STBG $874, $874, $0.00 mi E of CR 75 W Marion INDOT I- 65 Br Repl Comp.Cont.Pres.Conc.Bulb T-Beam Bridge IM, NHPP $0.00 $295, $0.00 on I miles S of I-70 Marion INDOT US 52 Br Repl Comp.Cont.Pres.Conc. I-Beam on Bridge NHPP $0.00 $34, $0.00 US miles E of I-465 (Grassy Creek) Hancock INDOT I- 70 Bridge Deck Overlay on I70 WB over Bridge NHPP $0.00 $7, $0.00 Brandywine Creek 0.3 miles E of SR-9 Hancock INDOT I- 70 Replace Superstructure on I70 EB over Six Bridge IM $0.00 $40, $0.00 Mile Creek 2.64 mile W of SR 109 Hancock INDOT I- 70 Replace Superstructure on I70 WB over Six Bridge IM, NHPP $0.00 $25, $0.00 Mile Creek 2.64 mile W of SR 109 Marion INDOT I- 65 Br Repl Comp.Cont.Pres.Conc.Bulb T-Beam Bridge IM, NHPP $0.00 $60, $0.00 on I miles S of I-70 Hamilton INDOT SR 37 Small Structure Replacement on SR Bridge NHPP $0.00 $17, $0.00 miles N of I-69 Marion INDOT I- 65 Br Repl Comp.Cont.Pres.Conc.Bulb T-Beam Bridge IM, NHPP $0.00 $182, $0.00 on I miles S of I-70 Marion INDOT I- 65 Br Repl Comp.Cont.Pres.Conc.Bulb T-Beam on I miles S of I-70 Bridge NHPP $0.00 $56, $0.00 Johnson INDOT I- 65 Bridge Deck Overlay on I65 Greensburg Road Bridge NHPP $0.00 $14, $0.00 over I miles south of SR-44 Hamilton INDOT US 31 NEW BRIDGE, EAST STREET OVER NORTH Bridge NHPP $0.00 ($7,669.27) ($81,894.59) COOL CREEK Various INDOT N/A Bridge Inspections Bridge NHPP, STBG $0.00 $45, $0.00 Various INDOT N/A Bridge Inspections on Statewide Bridges and Bridge STBG $0.00 $10, $0.00 Emergency Inspection in Various Counties Marion INDOT I- 70 Small Structure Pipe Lining on I miles E of EB split with I-65 N of Michigan Street Bridge NHPP $449, $0.00 $164,
10 BRIDGE PROJECTS Boone INDOT I- 865 Small Structure Pipe Lining on I mile Bridge NHPP, STBG $325, $114, $0.00 E of I-65 Boone INDOT I- 865 Small Structure Pipe Lining on I mile Bridge NHPP $315, $125, $0.00 E of I-65 Marion INDOT I- 65 Replace Superstructure on I65 NB over Lick Creek 0.16 mile N of I-465 Bridge NHPP $0.00 $918, ($785,019.68) Marion INDOT I- 65 Replace Superstructure on I65 at SB over Lick Bridge NHPP $0.00 $16, $0.00 Creek 0.16 mile N of I-465 Hancock INDOT I- 70 Bridge Replacement Concrete at 1.30 mile W Bridge NHPP $1,800, $1,124, $0.00 of SR 9 Fortville Pike over I-70 Marion INDOT I- 465 Br Repl Comp.Cont.Pres.Conc.Bulb T-Beam at Bridge IM $0.00 $10, $0.00 Ditch Road over I mile W of US 31 Shelby INDOT I- 74 Install New Cable Rail Barriers on I74 From I- Bridge HSIP $3,160, $2,030, $42, to District Line Marion INDOT I- 65 Bridge Deck Overlay SB mainline (upper Bridge NHPP $1,256, $69, $516, bridge) over bridge (I-65 Ramp) 3.61 mile N of I-70 Marion INDOT I- 65 Bridge Deck Overlay on I65 ent./exit ramp (lower bridge) over Ramp I-S-N (I-65 NB Ramp) 3.61 mi N of I-70 Bridge NHPP $956, $0.00 $291, Marion INDOT I- 65 Bridge Deck Overlay on I65 NB mainline over Bridge NHPP $1,067, $0.00 $302, Ramp I-S-N (I-65 NB entrance) at 3.65 mile N of I-70 Hendricks INDOT US 36 Small Structure Replacement with Bridge on US36.58 mi W of SR 39 W jct Bridge NHPP, STBG $20, $45, $0.00 Hendricks INDOT US 36 Small Structure Pipe Lining on US mi E Bridge NHPP, NHS $0.00 $6, $153, of Avon Ave (Old SR 267) Morgan INDOT SR 67 Small Structure Pipe Lining on SR67 Approximately 4.5 miles N of SR 39 Bridge STBG $117, $0.00 $97, Boone INDOT SR 39 Small Structure Replacement on SR mi Bridge BONUS, STBG $0.00 $1, $163, S of I-65 Marion Indianapolis Local Bridge Rehabilitation Or Repair on Central Bridge STBG $150, $150, $0.00 Avenue Bridge over Fall Creek Marion INDOT I- 70 Pavement Replacement on I65 From S of Bridge NHPP $0.00 ($224,525.38) $0.00 Raymond Street to N of Fletcher Street Marion INDOT I-65 Bridge Rehabilitation Or Repair on I65 WB Bridge IM $0.00 ($106,810.04) $0.00 Virginia Avenue over I-65 Marion INDOT I- 70 Bridge Maintenance And Repair over Bridge NHPP $0.00 ($3,131.72) $0.00 Meridian Street 0.88 miles west of I-65 Marion INDOT I-70 EAST STREET BRIDGE SUPERSTRUCTURE Bridge IM, NHPP $0.00 ($199,722.65) $0.00 REPLACEMENT AND RAISING Marion Indianapolis Local Replace Superstructure on 30th St or 0.15 Bridge STBG $67, $67, $0.00 miles W of Lafayette Road over Little Eagle Creek Marion Indianapolis Local Bridge Rehabilitation Or Repair on Capitol Bridge STBG $269, $269, $0.00 Ave Bridge over Fall Creek Marion Indianapolis Local Bridge Rehabilitation Or Repair 0.01 miles N of Fox Hill Dr. Grandview Dr. over Crooked Ck Bridge STBG $117, $117, $0.00 Marion Indianapolis Local Bridge Rehabilitation Or Repair on 0.02 miles N. of Kentucky Ave over White River Marion Indianapolis Local Bridge Rehabilitation Or Repair on 0.15 miles NW of Kentucky Ave over White River Morgan INDOT SR 67 Replace Superstructure on SR mile S of SR 144 over Little White Lick Creek NBL Bridge STBG $1,866, $1,866, $0.00 Bridge STBG $2,897, $2,897, $0.00 Bridge NHPP, NHS $100, $181, $0.00 Hancock INDOT US 52 Br Repl Comp. Cont. Conc. Construction on Bridge NHPP, STBG $40, $78, $0.00 US miles W SR 9 over West Little Boone, INDOT I- 465 Br Repl Comp. Cont. Conc. Construction on Bridge IM, NHPP, STBG $18, $1,195, $0.00 Marion I465 EB over W 96th Street 1.22 miles W US 421 Marion INDOT I- 70 Br Repl Comp. Cont. Conc. Construction on Bridge NHPP $198, $94, $0.00 I miles E I-465 German Church Road over I-70 Hendricks INDOT SR 236 Small Structure Replacement on SR Bridge STBG $115, $63, $0.00 mi W of SR 39 Boone INDOT I- 65 Bridge Deck Overlay 0.48 miles S I-865 Bridge NHPP $0.00 ($9,964.71) $0.00 Boone INDOT I- 65 Bridge Deck Overlay 0.48 miles S I-865 Bridge NHPP $0.00 ($4,140.90) $0.00 Hamilton INDOT SR 38 Repair Or Replace Joints 1.15 miles W SR 32 Bridge NHPP $0.00 ($89.60) $0.00 Johnson INDOT US 31 Bridge Thin Deck Overlay on US mile S Bridge NHPP $0.00 ($8,560.20) $0.00 of SR 252 over Big Blue River NBL Johnson INDOT US 31 Bridge Thin Deck Overlay on US mile S Bridge NHPP $0.00 ($11,263.40) $0.00 of SR 252 over Big Blue River SBL 9
11 BRIDGE PROJECTS Johnson INDOT SR 44 Bridge Thin Deck Overlay 0.11 mile W of SR 135 over S Prong Stotts Creek Bridge BONUS, STBG $0.00 ($3,788.16) $0.00 Johnson INDOT SR 252 Bridge Thin Deck Overlay on SR mile Bridge BONUS, STBG $0.00 ($16,785.08) $0.00 E of US 31 over Big Blue River Marion INDOT I- 70 Repair Or Replace Joints on Mitthoefer Road - Bridge STBG $0.00 ($0.41) $0.00 I miles E I-465 Marion INDOT I- 74 REPAIR OR REPLACE JOINTS, FISHER ROAD - I74, 0.52 MILES E I-465 Bridge STBG $0.00 ($0.40) $0.00 Marion INDOT I- 74 Repair Or Replace Joints on Vandergriff Road - Bridge STBG $0.00 ($9.21) $0.00 I miles E I-465 Boone INDOT I- 465 Repair Or Replace Joints on I miles W Bridge NHPP $0.00 ($1,533.15) $0.00 US 421 Marion INDOT I- 465 Repair Or Replace Joints on I miles W Bridge NHPP $0.00 ($972.45) $0.00 US-31 Marion INDOT I- 465 Repair Or Replace Joints on I miles W Bridge NHPP $0.00 ($638.55) $0.00 US-31 Marion Indianapolis Local Bridge Rehabilitation Or Repair on College Ave. Bridge over Fall Creek Bridge STBG $0.00 $369, ($369,159.20) Marion INDOT I- 65 Repair Or Replace Joints on I miles N I- Bridge NHPP $0.00 $3, $ Marion INDOT I- 65 Repair Or Replace Joints on I65 6 miles N I-70 Bridge IM $0.00 ($3,417.75) $0.00 Marion INDOT I- 65 Repair Or Replace Joints 5.05 miles S I-465 Bridge NHPP $0.00 ($972.09) $0.00 Marion INDOT I- 65 Repair Or Replace Joints 5.05 miles S I-465 Bridge NHPP $0.00 ($0.09) $0.00 Marion INDOT I- 65 Repair Or Replace Joints on 38th Street EB - I Bridge NHPP $0.00 ($8.88) $ miles S I-465 Boone INDOT I- 865 Install New Cable Rail Barriers between I-65 Bridge HSIP $0.00 ($35,483.08) $0.00 and I-465 Shelby INDOT I- 74 Repair Or Replace Joints on I74 WB over W Bridge NHPP $0.00 ($0.09) $0.00 Little Sugar Creek; 8.32 miles E I-465 Shelby INDOT I- 74 Repair Or Replace Joints on I74 EB over W Little Sugar Creek; 8.32 miles E I-465 Bridge NHPP $0.00 ($0.09) $0.00 Marion INDOT I- 70 Bridge Thin Deck Overlay Over Harding Street Bridge IM, NHPP $0.00 ($578,006.32) $0.00 and CSX RR; 2.36 miles W of I-65 Marion INDOT I- 70 Bridge Thin Deck Overlay Ramp I-465 SB-I-70 Bridge NHPP $0.00 ($45,550.36) $0.00 EB over I-70; 0.13 miles W of I-465 Marion INDOT I- 465 Bridge Thin Deck Overlay Ramp I-70 EB-I-465 Bridge NHPP $0.00 ($13,927.77) $0.00 NB over I-465 NB/SB; 0.12 miles S of I 70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over I- 465 SB to I-70 EB Ramp; 0.07 miles S I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over I- 465 SB TO I-70 EB ramp; 0.07 miles S I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 Ramp I-70 EB-I-465 NB over I-70; 0.14 miles E I-465 Bridge NHPP $0.00 ($5,031.17) $0.00 Bridge NHPP $0.00 ($5,826.24) $0.00 Bridge NHPP $0.00 ($53,129.98) $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over CSX RR; 0.77 miles N I-70 Bridge NHPP $0.00 ($29,229.77) $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over CSX Bridge NHPP $0.00 ($24,776.78) $0.00 RR; 0.77 miles N I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over E Bridge NHPP $0.00 ($29,450.97) $ th Street; 0.89 miles N I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over E Bridge NHPP $0.00 ($53,037.48) $ th Street; 0.89 miles N I-70 Hendricks INDOT SR 240 Bridge Thin Deck Overlay over McHaffie Bridge BONUS, STBG $0.00 $4, $0.00 Branch 0.05 mi W of SR 75 Various INDOT SR 32 Bridge Maintenance And Repair Bridge BONUS, STBG $0.00 ($20,030.99) $0.00 Hendricks INDOT US 136 Small Structure Replacement on US Bridge NHS $254, $4, $0.00 mi E of SR 267 Johnson Johnson Local Bridge Inspections Bridge STBG $98, $144, $0.00 Boone Boone Co. Local Bridge Inspections Bridge STBG $250, $250, $0.00 Various Hendricks Local Countywide Bridge Inspection and Inventory Bridge STBG $144, $50, $0.00 Program Hancock Hancock Co. Local Bridge Inspections Bridge STBG $85, $148, $0.00 Marion Indianapolis Local Bridge Inspection and Inventory Program Bridge STBG $680, $300, $0.00 Shelby Shelby Co. Local Countywide Bridge Inspection and Inventory Program Hamilton INDOT I- 465 Bridge Deck Overlay on I miles W of US 31 EB over Spring Mill Run Hamilton INDOT I- 465 Bridge Deck Overlay on I miles W of US 31 WB over Spring Mill Run Hendricks INDOT I- 70 Small Structure Pipe Lining on I mi W of SR 39 Bridge STBG $185, $185, $0.00 Bridge IM, NHPP $621, $3, $365, Bridge IM, NHPP $621, $3, $344, Bridge NHPP $585, $0.00 $186,
12 BRIDGE PROJECTS Marion INDOT I- 70 Bridge Painting EB C-D over Shadeland Ave and Rd; 0.57 miles W I-465 Bridge IM, NHPP, STBG $223, $101, ($219,852.99) Shelby INDOT I- 74 Bridge Painting over West Little Sugar Creek; Bridge NHPP $48, $0.00 $28, miles E I-465 Marion INDOT I- 65 Bridge Deck Overlay Over White River IWC Bridge IM, NHPP $0.00 ($248,760.00) $0.00 Canal White River Parkway E & W; 5.94 miles S of I-465 Marion INDOT I- 70 Bridge Deck Overlay Over CSX WYE TRACKS; Bridge NHPP $9, ($184,322.80) $ Miles E I-465 Hamilton INDOT I- 465 Bridge Deck Overlay EB Over US 31 N. jct. Bridge IM, NHPP $557, $2, $415, Hamilton INDOT I- 465 Bridge Deck Overlay WB Over US 31 N. jct Bridge IM, NHPP $557, $2, $421, Marion INDOT I- 465 Small Structure Paved Invert mi. N. of Bridge NHPP $103, $134, $0.00 I65 Marion INDOT I- 65 Bridge Painting NB over I-70 WB Ramp Bridge NHPP $0.00 ($1,758.60) $0.00 Hendricks INDOT I- 70 Bridge Thin Deck Overlay EB over East Fork of Bridge IM, NHPP $17, $1,221, ($1,192,926.19) White Lick Creek 4.26 miles W of I-465 Hendricks INDOT I- 70 Bridge Thin Deck Overlay WB over East Fork of White Lick Creek 4.26 miles W. of I-465 Bridge NHPP $0.00 $286, ($286,407.92) Hendricks INDOT I- 70 Bridge Thin Deck Overlay EB exit ramp over Bridge NHPP $0.00 $90, ($90,693.49) the East Fork White Lick Creek 4.26 miles W of I-465 Hendricks INDOT I- 70 Bridge Thin Deck Overlay EB exit ramp over East Fork White Lick Creek miles W of I- 465 Bridge NHPP $0.00 $73, ($73,900.47) Hendricks INDOT I- 70 Bridge Thin Deck Overlay on I70 WB on Ramp Bridge NHPP $0.00 $111, ($111,745.10) over East Fork White Lick Creek 4.09 miles W of I-465 Hendricks INDOT I- 70 Bridge Thin Deck Overlay on I70 Six Points Bridge EARMARK $0.00 $110, ($110,351.26) Road NB over East Fork White Lick Creek 4.08 miles W of I-465 Hendricks INDOT I- 70 Bridge Thin Deck Overlay on I70 Six Points Bridge EARMARK $0.00 $90, ($90,813.39) Road SB over East Fork White Lick Creek 4.08 miles W of I-465 Hendricks INDOT I- 70 Bridge Thin Deck Overlay on I70 Six Points Bridge EARMARK $0.00 $293, ($293,477.15) Road SB over I-70 Ramps 4.07 miles W of I- 465 Hendricks INDOT I- 70 Bridge Thin Deck Overlay on I70 Six Points Bridge EARMARK $0.00 $202, ($202,609.47) Road over Future NB-Fly Ramp miles W of I-465 Hendricks INDOT I- 70 Bridge Thin Deck Overlay on I70 Six Points Bridge EARMARK $0.00 $289, ($289,781.72) Road NB over I-70 Ramps 4.06 miles W of I- 465 Hendricks INDOT I- 70 Bridge Thin Deck Overlay on I70 Six Points Road over future SB Fly Ramp 4.05 miles W of I-465 Bridge EARMARK $0.00 $146, ($146,494.34) Marion INDOT I- 70 Bridge Thin Deck Overlay on I70 WB on Ramp Bridge NHPP $0.00 $127, ($127,229.41) over I-70 WB C-D Ramps 3.27 miles W of I- 465 Marion INDOT I- 70 Bridge Thin Deck Overlay EB Off Ramp over I- Bridge IM, NHPP $0.00 $580, ($580,057.58) 70 I-70 CD's 3.26 miles W of I-465 Marion INDOT I- 74 Bridge Painting on I74 EB over Buck Creek Bridge NHPP $82, $7, ($22,758.04) 6.12 miles E of I-465 Marion INDOT I-74 Bridge Painting WB over Buck Creek 6.12 miles E of I-465 Bridge NHPP $0.00 $0.00 ($22,758.19) Boone INDOT SR 75 Replace Superstructure over I mi N of Bridge STBG $0.00 $136, $0.00 SR 234 Hendricks INDOT I- 74 Bridge Thin Deck Overlay on I74 West Fork of Bridge STBG $117, $101, $0.00 White Lick Creek W SR 267 Hendricks INDOT I- 74 Bridge Thin Deck Overlay West Fork of White Bridge STBG $110, $74, $0.00 Lick Creek W SR 267 WBL Hendricks INDOT I- 74 Bridge Thin Deck Overlay on I74 Big White Bridge STBG $126, $80, $0.00 Lick Creek W SR 267 Hendricks INDOT I- 74 Bridge Thin Deck Overlay on I74 Big White Lick Creek WBL W SR 267 Bridge STBG $118, $74, $0.00 Hamilton INDOT I- 465 Bridge Deck Overlay on I465 Spring Mill Road Bridge NHPP $30, $23, $0.00 over I miles W of US 31 Hamilton INDOT I- 465 Bridge Deck Overlay on I465 EB over Williams Bridge IM, NHPP $616, $1, $331, Creek 0.72 miles W of US 31 Hamilton INDOT I- 465 Bridge Deck Overlay on I465 WB over Bridge IM, NHPP $616, $1, $326, Williams Creek 0.72 miles W of US 31 Marion INDOT I- 65 Bridge Painting on I65 Over Central Avenue Bridge NHPP $23, $26, $ miles N of I-70 Marion INDOT I- 65 Bridge Deck Overlay on I65 Over 16th Street 3.88 miles N of I-70 Bridge NHPP $1,621, $0.00 $413,
13 BRIDGE PROJECTS Marion INDOT I- 65 Bridge Painting on I65 Over 21st Street 4.16 miles N of I-70 Bridge NHPP $23, $26, $0.00 Marion INDOT I- 65 Bridge Painting on I65 Over DR. ML King Drive Bridge NHPP $23, $26, $ miles N of I-70 Marion INDOT I- 65 Bridge Painting on I65 Over White River Canal Bridge NHPP $23, $26, $0.00 PKWYS 5.94 miles S of I-465 Marion INDOT I- 70 Bridge Thin Deck Overlay on I70 High School Bridge NHPP $0.00 $221, ($221,837.36) Road over I-70 CE and CW Marion INDOT I- 70 Bridge Thin Deck Overlay on I70 EB over Bridge NHPP $0.00 $210, $0.00 Roosevelt Av. and COMM Ave. Marion INDOT I- 74 Bridge Deck Overlay on I74 Post Road over I- Bridge NHPP $34, $24, $ Shelby INDOT I-74 Bridge Painting on I74 WB over West Little Sugar Creek 8.32 miles E of I-465 Bridge NHPP $0.00 $0.00 $119, Boone INDOT I- 865 Bridge Deck Overlay on I865 EB over Fishback Bridge IM $54, $10, $0.00 Creek Boone INDOT I- 865 Bridge Deck Overlay on I865 WB over Fishback Creek Bridge IM $54, $10, $0.00 Boone INDOT I- 865 Bridge Deck Overlay on I865 EB over Irishman Bridge IM $45, $10, $0.00 Run Boone INDOT I- 865 Bridge Deck Overlay on I865 WB over Irishman Run Bridge IM $45, $10, $0.00 Hamilton INDOT SR 37 Bridge Deck Overlay on SR miles S of SR Bridge STBG $998, $305, $13, over White River Hamilton INDOT SR 32 Bridge Replacement Concrete Over Stony Bridge STBG $187, ($163,863.38) $226, Creek 1.69 miles E of SR 38(E. Jct.) Hamilton INDOT SR 32 Bridge Replacement Concrete Over Stony Creek 5.37 miles E of SR 38 (E. Jct.) Bridge STBG $697, $71, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay EB over White River Bridge NHPP $551, $0.00 $294, Hiking Trail 3.88 miles E of US 31 Marion INDOT I- 465 Bridge Thin Deck Overlay WB over White Bridge NHPP $634, $0.00 $326, River Hiking Trail 3.88 miles E of US 31 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 EB over Bridge NHPP $216, $0.00 $147, Carmel Creek 3.54 miles E of US 31 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 WB over Bridge NHPP $162, $0.00 $108, Carmel Creek 3.54 miles E of US 31 Marion INDOT I- 465 Bridge Thin Deck Overlay EB over Keystone Ave 2 Ramps 2.60 miles E of US 31 Bridge NHPP $446, $0.00 $258, Marion INDOT I- 465 Bridge Thin Deck Overlay WB over Keystone Ave. 2 Ramps 2.60 miles E of US 31 Bridge NHPP $414, $0.00 $248, Hamilton INDOT I- 465 Bridge Thin Deck Overlay EB over College Bridge NHPP $203, $0.00 $138, Ave miles E of US 31 Hamilton INDOT I- 465 Bridge Thin Deck Overlay on I465 WB over College Ave miles E of US 31 Bridge NHPP $153, $0.00 $113, Johnson INDOT SR 37 Bridge Thin Deck Overlay on SR mile S Bridge STBG $64, $0.00 $29, of SR 144 at Bluff Creek SBL Johnson INDOT SR 37 Bridge Thin Deck Overlay on SR miles S of SR 144 at Bluff Creek NBL Bridge STBG $86, $0.00 $26, Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 I-74 WB to I- Bridge NHPP $0.00 $39, $ SB over I-465 US 421X Ramp Marion INDOT I- 465 Bridge Thin Deck Overlay on I74 I-465 SB to I- Bridge NHPP $0.00 $274, ($274,114.77) 74 EB over I-465 US 421X Ramp Marion INDOT I- 465 Bridge Painting on I465 NB over CSX RR 0.23 Bridge NHPP $9, $9, $0.00 miles N of US 36/SR 67 Marion INDOT I- 465 Bridge Painting on I465 SB over CSX RR 0.23 Bridge NHPP, STBG $9, $9, $0.00 miles N of US 36/SR 67 Hendricks INDOT US 36 Bridge Replacement Other Construction on US36 Bridge over White Lick Creek 0.96 mi W Bridge NHPP, NHS $40, $138, $0.00 Marion INDOT I- 465 Bridge Maintenance And Repair on I70 Ramp Bridge NHPP $119, $80, $0.00 I-465 SB-I-70 EB over I-70 WB CD Various INDOT N/A Bridge Maintenance And Repair Bridge BONUS, STBG $0.00 ($61,945.38) $0.00 Various INDOT N/A Bridge Maintenance And Repair Bridge STBG $0.00 $952, ($570,000.00) Marion INDOT I- 70 Bridge Rehabilitation Or Repair on I70 Over Bridge IM, NHPP $495, $788, ($549,743.49) White River 1.72 miles W of I-65 Marion INDOT I- 70 Bridge Rehabilitation Or Repair on I70 Over Bridge IM, NHPP $450, $783, ($500,685.21) ramp 8E-Nat Madison Ave LI RR 0.65 miles W of I-65 Hamilton Fishers Local Bridge Rehabilitation Or Repair 0.06 miles N of intersection of 126th St & Allisonville Rd Bridge HSIP $0.00 $0.00 $940, Boone INDOT SR 32 Bridge Thin Deck Overlay on SR32 Bridge over Bridge STBG $40, $15, $0.00 Mounts Run 2.26 mi W of US 421 Morgan INDOT SR 67 Bridge Thin Deck Overlay NB Bridge over Silon Creek (Moons Branch) 1.70 mi N of SR 144 Bridge NHPP $40, $19, $
14 BRIDGE PROJECTS Morgan INDOT SR 42 Bridge Thin Deck Overlay over Little White Bridge NHPP $40, $16, $0.00 Lick Creek 0.07 mi W of SR 67 Hendricks INDOT SR 267 Bridge Thin Deck Overlay CR 725 E Bridge Bridge IM $30, $16, $0.00 over I-70 EB/WB 1.44 mi W of SR 267 Hendricks INDOT US 36 Bridge Thin Deck Overlay EB Bridge over Bridge NHS $40, $21, $0.00 Abner Creek 2.39 mi W of SR 267 Hendricks INDOT SR 267 Bridge Thin Deck Overlay over White Lick Bridge STBG $40, $16, $0.00 Creek 2.05 mi N of I-74 Hendricks INDOT I- 74 Bridge Thin Deck Overlay on Ronald Reagan Parkway over I-74 EB/WB 2.38 mi E of SR 267 Bridge NHPP $45, $16, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 EB over E Bridge NHPP $130, $73, $0.00 Hanna Avenue W I-74 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 WB over E Bridge NHPP $6, $3, $0.00 Hanna Avenue W I-74 Marion INDOT I- 70 Bridge Painting WB C-D over Shadeland Ave & Shadeland Rd W I-465 Bridge IM, NHPP $157, $100, ($128,677.53) Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 EB over CSX Bridge NHPP $6, $3, $0.00 RR W I-74 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 WB over Bridge NHPP $6, $3, $0.00 CSX RR W I-74 Marion INDOT I- 465 Bridge Thin Deck Overlay NB over US 52 Bridge NHPP $6, $3, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay SB over US 52 Bridge NHPP $6, $3, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over CSX RR N US 52 Bridge NHPP $6, $3, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over CSX Bridge NHPP $6, $3, $0.00 RR N US 52 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over E Bridge NHPP $6, $3, $0.00 Tenth Street N US 40 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over E Bridge NHPP $6, $3, $0.00 Tenth Street N US 40 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over E Bridge NHPP $6, $3, $ st Street S I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over E Bridge NHPP $6, $3, $ st Street S I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over I- 70 WB ramp Bridge NHPP $6, $3, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over I-70 Bridge NHPP $6, $3, $0.00 WB ramp Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB ramp Bridge NHPP $8, $5, $0.00 over I-74 WB ramp to I-465 NB Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB ramp over I S US 52 Bridge NHPP $8, $5, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 DRE - ramp Bridge NHPP $8, $5, $0.00 over E 21st Street S I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 DRW - ramp Bridge NHPP $8, $5, $0.00 over E 21st street S I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on US31 Over I-465 Bridge NHPP $8, $5, $0.00 EB/WB Lick Cr Marion INDOT I- 465 Bridge Thin Deck Overlay on US31 Over Buck Bridge NHPP $8, $5, $0.00 Creek S I-465 Marion INDOT I- 465 Bridge Thin Deck Overlay Carson Avenue over Bridge NHPP $8, $5, $0.00 I-465 Lick Creek E US 31 Marion INDOT US 40 Bridge Thin Deck Overlay on US40 EB over Bridge NHPP $6, $3, $0.00 Grassy Creek E I-465 Marion INDOT US 40 Bridge Thin Deck Overlay on US40 WB over Bridge NHPP $6, $3, $0.00 Grassy Creek E I-465 Marion INDOT I- 465 Bridge Thin Deck Overlay Emerson Avenue Bridge NHPP $8, $5, $0.00 over I-465 EB/WB E I-65 Marion INDOT I- 65 Bridge Deck Overlay SB over I-65 NB Bridge NHPP $691, $0.00 $240, connector; 0.26 mile N I-465 Marion INDOT I- 65 Bridge Thin Deck Overlay SB over Little Eagle Creek 3.49 mi. S of I-465 N. Jct. Bridge NHPP $29, $33, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB & ramp Bridge NHPP $18, $7, $0.00 over US 40 EB/WB (W. Jct.) Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over US Bridge NHPP $18, $7, $ EB/WB (W. Jct.) Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over CSX RR S US 36 Bridge NHPP $9, $7, $4, Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB over CSX Bridge NHPP $9, $7, $4, RR S US 36 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB over Bridge NHPP $9, $7, $4, CSX RR S US 40 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB OVER Bridge NHPP $13, $7, $4, CSX RR S US 40 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 NB OVER MINNESOTA STREET S US 40 Bridge NHPP $9, $7, $
15 BRIDGE PROJECTS Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 SB OVER Bridge NHPP $9, $7, $0.00 MINNESOTA STREET S US 40 Marion INDOT I- 65 Bridge Thin Deck Overlay on I65 SB over Bridge NHPP $29, $33, $0.00 Lafayette Road S I-465 Marion INDOT I- 74 Bridge Thin Deck Overlay EB OVER I E Bridge NHPP $14, $7, $0.00 LEG Marion INDOT I- 74 Bridge Thin Deck Overlay on I74 WB OVER I- Bridge NHPP $14, $7, $ E. LEG Marion INDOT US 36 Bridge Thin Deck Overlay OVER INDIAN Bridge STBG $10, $7, $0.00 CREEK W SR 234 Marion INDOT I- 465 Bridge Thin Deck Overlay SHADELAND AVE Bridge NHPP $5, $7, $0.00 NB OVER I-465 NB ON RAMP N US 36/SR 67 Marion INDOT I- 465 Bridge Thin Deck Overlay W 10TH STREET Bridge NHPP $23, $7, $0.00 OVER I-465 NB/SB RAMP N US 36 Marion INDOT I- 65 Bridge Thin Deck Overlay KESSLER Bridge NHPP $29, $33, $0.00 BOULEVARD OVER I-65 NB/SB 38TH STR E/W S I-465 Marion INDOT I- 465 Bridge Thin Deck Overlay US 36/ROCKVILLE RD OVER I-465 SB/NB RAMP Bridge IM $24, $7, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 E 16TH Bridge NHPP $10, $7, $0.00 STREET OVER I N US 40 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 E 46TH Bridge NHPP $9, $7, $0.00 STREET OVER I N US 36 / SR 67 Marion INDOT I- 465 Bridge Thin Deck Overlay SHADELAND AVE Bridge IM $9, $7, $0.00 NB OVER I N US 36/SR 67 Marion INDOT I- 465 Bridge Thin Deck Overlay WEST HANNA Bridge NHPP $9, $7, $0.00 AVENUE OVER I-465 NB/SB S I-70 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 W 34TH Bridge NHPP $9, $7, $0.00 STREET OVER I-465 NB/SB N I-74 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 W 46TH STREET OVER I-465 NB/SB S I-65 Bridge NHPP $9, $7, $0.00 Marion INDOT I- 465 Bridge Thin Deck Overlay on US40 Over Little Bridge NHPP $6, $7, $0.00 White Lick Creek W I-465 Marion INDOT I- 65 Bridge Thin Deck Overlay on I65 Cold Spring Road over I S I-465 Bridge NHPP $29, $33, $0.00 Shelby INDOT I- 74 Bridge Thin Deck Overlay on I74 London Road Bridge NHPP $9, $7, $0.00 over I E I-465 Marion INDOT I- 465 Bridge Thin Deck Overlay SOUTHEASTERN AVE OVER I S I-74 Bridge NHPP $9, $7, $0.00 Marion INDOT I- 65 Bridge Thin Deck Overlay on I65 W 52ND Bridge NHPP $29, $33, $0.00 STREET OVER I S I-465 Hamilton INDOT SR 32 Bridge Thin Deck Overlay on SR38 Over Sly Bridge NHPP $19, $10, $0.00 Run W SR 32 Marion INDOT I- 465 Bridge Thin Deck Overlay on I465 RAMP TO I- Bridge NHPP $4, $7, $ SB OVER BIKE PATH N I-65 Hancock INDOT US 40 Bridge Maintenance And Repair on US40 Bridge NHPP $4, $52, $0.00 Over Brandywine Creek E SR 9 Hancock INDOT US 52 Bridge Deck Overlay on US52 Over Sugar Bridge NHPP $21, $49, $0.00 Creek W SR 9 Johnson INDOT SR 44 Bridge Deck Overlay on SR mile W of SR 44 over Youngs Creek Bridge NHPP $72, $68, $0.00 Johnson INDOT SR 252 Bridge Deck Overlay on SR mile W of Bridge STBG $81, $73, $0.00 US 31 over Youngs Creek Johnson INDOT US 31 Replace Superstructure on US mile N Bridge NHPP $40, $72, $0.00 of SR 252 at Amity Ditch NBL Johnson INDOT US 31 Replace Superstructure on US mile N Bridge NHPP $40, $72, $0.00 of SR 252 at Amity Ditch SBL Hendricks INDOT I- 70 Small Structure Pipe Lining on I70 Over Bridge IM $82, $ $0.00 Unnamed Ditch/Creek Marion INDOT I- 65 Bridge Deck Patching Ramp 5W-S over Washington St./Old US mi. N of I- 70(S. Jct.) Bridge NHPP $29, $29, $492, Marion INDOT I- 65 Bridge Maintenance And Repair CD over New Bridge NHPP $37, $36, $172, York Street 1.19 miles N of I-70 (S. Jct.) Marion INDOT I- 65 Bridge Maintenance And Repair on I65 NB over Michigan Street 1.39 miles N of I-70 (S. Jct.) Marion INDOT I- 65 Bridge Maintenance And Repair on I65 SB CD over Michigan Street 1.39 miles N of I-70 (S. jct.) Marion INDOT I- 65 Bridge Deck Overlay on I65 over Central Avenue 2.52 miles N of I-70(S. Jct.) Marion INDOT I- 65 Bridge Deck Patching on I65 NB I-70 EB over 10th Street Bridge NHPP $36, $36, $36, Bridge NHPP $36, $36, $60, Bridge NHPP $29, $29, $175, Bridge NHPP $29, $29, $109,
SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000
SFY 2022-2023 Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 DES NUM LPA PROJECT TITLE TYPE TOTAL SCORE FUND TYPE SFY FEDERAL COST LOCAL COST
More informationAnnual Listing of Federally Obligated Projects
Indianapolis Metropolitan Planning Organization Annual Listing of Federally Obligated Projects State Fiscal Year 2016 (July 1, 2015 June 30, 2016) 200 East Washington Street, Suite 1922, City-County Building,
More informationINDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM
INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM TO: FROM: Indianapolis Regional Transportation Council Policy Committee Anna M.
More informationLocal Public Agency Obligated Projects SFY 2018
Local Public Agency Obligated Projects SFY 2018 DES # Project Description/Location Sponsor County Project Type Funding Type Federal Programmed Previously Obligated (Prior to SFY 2018) SFY 2018 Obligated
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationPublic Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)
Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement
More information2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018
Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, FFY Section 2A State Prioritized Reliability s Bridge Program/On-System (NHS) Increase the Cost of Holyoke (600936)
More informationLocal Public Agency Obligated Projects SFY 2015
Local Public Agency Obligated Projects SFY 2015 Des# Project Description/Location Sponsor Project Type Funding Type Previously Obligated (Prior to SFY 2015) SFY 2015 Obligated Total Obligation Unobligated
More informationDecember 12, Dear Secretary Foxx:
Chair Pete White City Councilmember Vice-Chair Jay Adams Mustang Mayor Secretary/Treasurer Matt Dukes Midwest City Mayor association of central oklahoma governments Executive Director John G. Johnson December
More informationWMS Directions To Opposing Schools AVON MS NORTH: AVON MS SOUTH: BELZER MS: BROWNSBURG EAST MS:
WMS Directions To Opposing Schools AVON MS NORTH: 1251 N Dan Jones Rd, Avon (317) 544-5500 Take 465 West to US 136 W/Crawfordsville Rd (Exit 16 A-B) Turn right onto US 136 W/Crawfordsville Rd Turn left
More informationKentucky Highway District 6
Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationBINGHAMTON METROPOLITAN TRANSPORTATION STUDY
BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments
More informationIndianapolis Metropolitan Planning Area Air Quality Conformity Determination Report
Indianapolis Metropolitan Planning Area Air Quality Conformity Determination Report 2035 Long-Range Transportation Plan: 2012 Amendment & 2012-2015 Indianapolis Regional Transportation Improvement Program
More informationINDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS
INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: March 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD DESIGN BUILD CONTRACTS Sealed proposals for certain highway
More information2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016
2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)
More informationTransportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1
Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network
More informationRichmond Area MPO Regional Priority Transportation Projects
Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia
More informationFY Regional Surface Transportation Program (RSTP) Allocations *
FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected
More informationRural Planning. Highway Projects - CULLMAN COUNTY
4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION
More informationWilliamson County Projects
Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin
More informationRevised Evaluation Scores. System Preservation
Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationCITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN
Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add
More informationMajor Widening/New Roadway
Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information
More informationCall for Projects Congestion Mitigation and Air Quality (CMAQ) Emissions Formulas Technical Advisory Committee
Call for Projects Congestion Mitigation and Air Quality (CMAQ) Emissions Formulas Technical Advisory Committee July 18, 2018 Formula Coordination DRCOG under review, considering FHWA toolkit RAQC Argonne
More informationRichmond Area MPO Regional Priority Transportation Projects
Regional Priority Transportation Projects October 12, 2006 Town of Ashland Counties of Charles City Chesterfield Goochland Hanover Henrico New Kent Powhatan City of Richmond Richmond Regional Planning
More informationKentucky Highway District 1
Kentucky Highway District 1 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS FEBRUARY 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationRocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More information2040 Metropolitan Transportation Plan -- Table XVII-1
C:\7. \Projects\ 2040MTP Project List_Nov16-16.xlsx ID # NAME LIMITS DESCRIPTION COST () AGENCY PROJECT TYPE* 2017 1 B Dr S and Capital Ave SW B Dr S from 3.5 Mile Rd eastward to M-66 (1.7 mi); Capital
More informationPopulation Trends. US 12 Corridor Performance
Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,
More informationPlainfield, Indiana Speed Limit Study
March 21 st, 2017 Prepared on behalf of: Town of Plainfield Building and Engineering Department 206 W. Main Street Plainfield, IN 46168 (317) 839-2561 Prepared by: Thomas S. Vandenberg, PE, PTOE Matthew
More informationITEM 13 - NOTICE May 20, 2009
ITEM 13 - NOTICE May 20, 2009 Notice of Proposed Amendment to the 2009 CLRP and FY 2010-2015 TIP to include the Closure of the I-395 Southbound Exit Ramp to 3rd Street NW, the Reconfiguration of the Southbound
More informationWICHITA AREA METROPOLITAN PLANNING ORGANIZATION
WICHITA AREA METROPOLITAN PLANNING ORGANIZATION March 18, Stephanie Watts Bureau of Transportation Planning Kansas Department of Transportation 700 S.W. Harrison Street Topeka, KS 66603 3754 Dear Ms. Watts:
More informationBusiness Advisory Committee. November 3, 2015
Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal
More informationSECONDARY ROAD CONSTRUCTION PROGRAM
Iowa Department of Transportation SECONDARY ROAD CONSTRUCTION PROGRAM County: Linn County Fiscal : 2014 Version: Original COUNTY CERTIFICATION The detailed construction program for the secondary road system
More informationCY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build
1 2013 Planned s System Route UPC Category Locality Project Description 395 98836 Bridge Arlington Clean/Re-Paint 7 Bridges I-395 Corridor Arlington/Alexandria 4/9/2013 $ 3.45 HOT Lanes Bicycle/Pedestrian
More informationState Avenue Corridor Bus Rapid Transit (BRT)
State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!
More informationHistorical count data from Page 7-14
Project Background The annual Lawrence count data was collected following the National Bicycle & Pedestrian Documentation Project (NBPDP) methodology (http://bikepeddocumentation.org). The project aims
More informationCity of University Place
City of University Place City Engineering Department Six Year Transportation Improvement Plan Amended November 10, 2008 Resolution No. 604 City of University Place, Washington SIX-YEAR TRANSPORTATION PLAN
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationDRAFT INDOT ITS Strategic Plan
DRAFT INDOT ITS Strategic Plan Steven Wuertz Traffic Management Planning Coordinator ITS = Intelligent Transportation Systems 1 ITS = Intelligent Transportation Systems Expensive and increasingly difficult
More informationFFY 2019 Williamsport TIP 1 / 6
FFY 2019 Williamsport TIP 1 / 6 Lycoming 106219 FFY 19 WATS RPM Contract C SAMI 581 30,000 30,000 06/18/2019 E Lycoming 108942 I-180, SR 147, & SR 220 Ram +C SAMI shsip 290,000 290,000 07/12/2018 E Lycoming
More informationCapital Improvement Plan Review
City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding
More informationMaryland Gets to Work
I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast
More informationCurrent Corridor Characteristics. MN 62 Corridor Performance
Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationNASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER
WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air
More information# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC
DISTRICT/ATP 6 Data Input Worksheet STIP 2014 2017 Needed for 10 yr workplan Needed for 10 yr workplan YEAR # of Projects STIP Total Other FHWA Target FHWA Total FHWA FTA State TH DIST C TH Total TH Bond
More informationDraft Results and Recommendations
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System
More informationDraft Results and Open House
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior
More informationAnderson Area Transportation Study ANATS Transportation Improvement Plan FY
Anderson Area Transportation Study ANATS Transportation Improvement Plan FY 2017-2022 www.cityofandersonsc.com Table of Contents Introduction 1 Process 2 Products 3 Funding 4 Certification 6 Financial
More informationLACEY CITY COUNCIL MEETING July 09, 2015
LACEY CITY COUNCIL MEETING July 09, 2015 SUBJECT: 2016-2021 Six-Year Transportation Improvement Plan and Mitigation List RECOMMENDATION: Adopt Resolution approving the proposed 2016-2021 Six- Year Transportation
More information2002 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Special Locality Report 129
Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Special Locality Report 129 Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration
More informationBrigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction
Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will
More informationDISTRICT/ATP 6 Data Input Worksheet Final STIP
DISTRICT/ATP 6 Data Input Worksheet Final STIP 2015 2018 STIP FTA State TH DIST C TH TH Bond Other 2015 232,801,042 2,296,420 87,853,654 1,461,075 91,611,149 18,781,608 18,781,608 12,800,880 12,800,880
More informationTRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015 Overview Transportation Alternatives Program (TAP) overview MPO TAP Scoring
More informationMUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1
MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb
More informationBusiness Advisory Committee. July 7, 2015
Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS
More informationHouse Committee on Transportation Policy Public Hearing HB April 5, 2017
REPRESENTATIVE RICH VIAL OREGON HOUSE OF REPRESENTATIVES HOUSE DISTRICT 26 House Committee on Transportation Policy Public Hearing HB 3231 April 5, 2017 Background House District 26 Wilsonville Sherwood
More informationUtilizing GIS Models in Prioritizing and Selecting Transportation Projects
Utilizing GIS Models in Prioritizing and Selecting Transportation Projects GIS-T Conference Raleigh, NC April 7, 2016 Tyler Meyer, AICP Tram Truong, GISP Outline Case Studies: 1. MPO project selection
More informationFFY2013 Obligated or Grant Projects
CAPITOL 10 0053-0181 CON CMAQ Main St GLASTONBURY SIGNAL SYSTEM - PUTNAM BLVD TO 2,583 2,514 0 68 WELLES ST (6) 10 0053-0187 PE CMAQ Griswold St GLASTONBURY INT. IMPR. @ HARRIS ST & HOUSE ST 150 120 30
More informationWaco Rapid Transit Corridor (RTC) Feasibility Study
Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM
More informationThe Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit
The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,
More informationFINAL DESIGN TRAFFIC OPERATIONS REPORT
IndyGo Red Line Rapid Transit Project Phase 1 FINAL DESIGN TRAFFIC OPERATIONS REPORT IndyGo April, 2016 Table of Contents Section 1 Introduction... 1-1 1.1 Project Description... 1-1 1.2 Existing Conditions...
More informationPUBLIC TRANSPORTATION
PUBLIC TRANSPORTATION PROJECT TITLE U-MED DISTRICT MULTI-MODAL IMPROVEMENTS- PHASE II Transit Vehicles and Upgrades MUNICIPALITY OF ANCHORAGE Capital Improvement Program PROJECT LIST BY DEPARTMENT Public
More informationTransportation Committee Revised Project Scope and Cost Estimate. November 23, 2015
Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project
More informationRTID Travel Demand Modeling: Assumptions and Method of Analysis
RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationWILMAPCO Annual Listing of Obligated Projects, FY 2013
WILMAPCO Annual Listing of Obligated Projects, FY 2013 The Annual Listing of Obligated Projects includes all projects listed in the Transportation Improvement Program (TIP) for which federal funds were
More informationRecommended Transportation. Capital Improvement Program
Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number
More informationFFY Transportation Improvement Program (TIP) Development
FFY 2016-2019 Transportation Improvement Program (TIP) Development MAY 18, 2015 CAPE COD METROPOLITAN PLANNING ORGANIZATION Highway Funding Regional s Year STP HSIP CMAQ FFY 2016 2019 TOTAL Regional with
More informationDixie Transportation Planning Office
A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation
More informationCAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS
9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000
More informationArterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014
Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Agreement to Purchase Compressed Natural Gas Articulated Buses. Staff Report
ORANGE COUNTY TRANSPORTATION AUTHORITY Agreement to Purchase Compressed Natural Gas Articulated Staff Report November 8, 2012 To: From: Subject: Transit Committee Will Kempton, Chief Executive Officer
More informationThe Case for. Business. investment. in Public Transportation
The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationDraft STIP as of 3/20/2015. Draft Statewide Transportation Improvement Program FY
Draft STIP as of 3/20/2015 Draft Statewide Transportation Improvement FY2016-2019 INTRODUCTION The Statewide Transportation Improvement (STIP) is a four year planning document that lists all projects expected
More informationSouth Dakota Transportation Improvement Program Economic Stimulus Package ( AND STIPs) Report Date 09/26/2011
South Dakota Transportation Improvement Program Economic Stimulus Package (2009-2013 AND 2010-2014 STIPs) Report Date 09/26/2011 Item 1.00 ES 0903(78)142 000M Jackson 32.2 I90E EBL, Fm E of the SD73 N
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION
DVRPC FY 2014 Authorized Projects (obligation plan funds only $ millions) Burlington Route 38, Route 30/130 to Lenola Road (CR 608) (DB #11334) NHPP CON $15.400 $15.400 $15.322 $0.078 Route 38, Route 30/130
More informationMIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS
TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express
More informationOverview of Transit Funding and Planning in the PACTS Region
Overview of Transit Funding and Planning in the PACTS Region Presentation to PACTS Transit Committee and Federal Transit Administration Representatives February 8, 2018 Transit Agencies Agency Communities
More informationCommittee Report. Transportation Committee. Business Item No
Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope
More informationDelaware County Engineer s Office
Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying
More informationCEDAR AVENUE TRANSITWAY Implementation Plan Update
CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,
More informationMetro Highway Program
Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon
More informationChicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015
Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015 1 History: Chicago-St. Louis Corridor» IDOT has actively developed the Chicago to St. Louis corridor since the mid 1980 s» In
More information1 2 3 TONS/YEAR TONS/YEAR TONS/DAY TONS/DAY Estimated NOx Emissions EPA Budget Estimated VOC Emissions EPA Budget 60 50 40 30 20 10 0 2015 2020 2025 2030 2035 2040 2045 YEAR 30 25 20 15 10 5 0 2015 2020
More informationFiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)
Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement s Awarded in Fiscal Year 2016 (July 2015 - June 2016) Region 1 STA 0703-426 20510 I-70:WB EJMT to MM 218 SMA PG 76-28 11930 N/A N/A ER 0703-424 20351
More informationCity of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt
Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year
More informationTransNet Dollars Keep San Diego Moving
TransNet Dollars Keep San Diego Moving In 1987, San Diego region voters approved the TransNet program a half-cent sales tax to fund a variety of important transportation projects throughout the region.
More informationChapter 7: Corridor Visions
Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United
More informationBuilding our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013
Building our future, together Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Vision In 2030, the City of Tyler will be nationally known for its commitment to community,
More informationNew Jersey Department of Transportation
Prepared by: New Jersey Department of Transportation September 2013 TABLE OF CONTENTS Page CURRENT STATUS OF STATE HIGHWAY SYSTEM... 1 Description of System... 1 Figure 1: NJ Roadway System, Breakdown
More informationImproving Accessibility of Regional Bus Stops and Pathways
Customer Service and Operations Committee Board Information Item III-A March 13, 2014 Improving Accessibility of Regional Bus Stops and Pathways Page 3 of 17 Washington Metropolitan Area Transit Authority
More informationTransportation Improvement Program
FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION CITY OF FLAGSTAFF COCONINO COUNTY ARIZONA DOT Office: 100 West Birch Avenue Flagstaff, Arizona 86001 Mail: 211 West Aspen Avenue Flagstaff, Arizona 86001 Phone:
More informationNorth Front Range Regional Commuter Rail Concept Discussion North Front Range MPO Technical Advisory Committee. Windsor, CO June 20, 2018
North Front Range Regional Commuter Rail Concept Discussion North Front Range MPO Technical Advisory Committee Windsor, CO June 20, 2018 At a glance Background 2 SW Chief and Fr. Range Passenger Rail Commission
More informationUS 10 Corridor Performance
Corridor Context The corridor runs northwest 18 miles from I-35W to the edge of Anoka County. The corridor connects the cities of Ramsey, Anoka,, Mounds View, and Blaine. Current Corridor Characteristics
More informationMiddle Georgia Transportation Executive Committee. September 27, 2017
Middle Georgia Transportation Executive Committee September 27, 2017 Project Discussions MACON BIBB, CRAWFORD, MONROE Project List Development Process to Date Cities, Counties and MPOs submitted projects