INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund)

Size: px
Start display at page:

Download "INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund)"

Transcription

1 Technical Assistance Consultant s Report Project Number: (Technical Assistance No. 4998) March 2009 INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund) Prepared by Scott Wilson Railways Ltd, United Kingdom During the period of engagement from 27 March 2008 to 7 November 2008 For Ministry of Railways Rail Vikas Nigam Ltd This consultant s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project s design.

2 Asian Development Bank Railway Investment Programme Pune to Guntakal Electrification TA , INDIA Project Reports October 2008 Draft Final 01 SW Job Number A012931

3 Railway Investment programme Pune - Guntakal Electrification For Asian Development Bank 4 San Martin Marg Chanakyapuri New Delhi Report Verification Name Position Signature Date Prepared by: David Dennis Principal Engineer Checked by: Jim Hunter Principal Engineer Approved by: Derek Holden International Director Register of Document Holders Name Location No. of Copies Mr Tzadashi Kondo Asian Development Bank, New Delhi 5 Mr Ranjan Kumar Jain Rail Vikas Nigam Limited, New Delhi 10 Mr N Madhusudana Rao Ministry of Railways, New Delhi 10 Revision Schedule Revision Date Details of Revision Issued by

4 Derek Holden International Director Scott Wilson Railways Tricentre-3 Newbridge-Square Swindon SY11BY-UK Tel: +44 (0) Fax: +44 (0) This document has been prepared in accordance with the scope of Scott Wilson's appointment with its client and is subject to the terms of that appointment. It is addressed to and for the sole use and reliance of Scott Wilson's client. Scott Wilson accepts no liability for any use of this document other than by its client and only for the purposes, stated in the document, for which it was prepared and provided. No person other than the client may copy (in whole or in part) use or rely on the contents of this document, without the prior written permission of the Company Secretary of Scott Wilson Ltd. Any advice, opinions, or recommendations within this document should be read and relied upon only in the context of the document as a whole. The contents of this document are not to be construed as providing legal, business or tax advice or opinion. Scott Wilson Group PLC 2008

5 Asian Development Bank Railway Investment Program Table of Contents SUMMARY TABLE INTRODUCTION General OPERATIONS AND TRAFFIC Operations Traffic Goods Traffic Constraints ENGINEERING Electrical Engineering c. Level of Illumination d. Modification of Power Line Crossings Signalling FINANCIAL Introduction Operating Costs Pune Guntakal Electrification Traffic Forecasts Cost of Construction Working Expenses Project Benefits Financial Rate of Return Sensitivity Analysis Combined Scheme Operating Costs Traffic Forecasts Cost of Construction Rolling Stock Requirement & Costs A Page 4 August 2008

6 Asian Development Bank Railway Investment Program 4.14 Working Expenses Project Benefits - Combined Scheme Financial Rate of Return ECONOMICS Background Parameters for the Economic Analysis Project Economic Evaluation SOCIAL IMPACT Background Poverty Profile of Project Areas Gender Analysis Indigenous People Analysis: Child Labour HIV/AIDS IMPLIMENTATION General Risks Contract Packages Pune Guntakal Electrification/Track Doubling Combined CONCLUSIONS AND RECOMMENDATIONS General Recommendations A Page 5 August 2008

7 Asian Development Bank Railway Investment program Acronyms AADT Annual Average Daily traffic ACP Average Commodity Price ADB Asian Development Bank ANM Auxiliary Nurse Midwife AIDS Acquired Immunodeficiency Syndrome B/C Benefit / Cost ratio BG Broad Gauge CAGR Compound Annual Growth rate CDI Child Development Index DRUCC Divisional Railway Users Consultative Committee DWCRA Development Women and Children in Rural Areas EIRR Economic Internal Rate of Return EGS Employment Guarantee Scheme FDI Foreign Direct Investment FIRR Financial Internal Rate of Return GDP Gross Domestic product GTKM Gross Tonne Kilometres GDI Gender Disparity Index HDM4 Highway Development Model 4 HDI Human Development Index HDR Human Development Report HIV Human Immunodeficiency Virus HPI Human Poverty Index IR Indian Railways ICDS Integrated Child Development Scheme INR Indian National Rupee IPDP Indigenous People Development Plan IRDP Integrated Rural Development Project JFM Joint Forest Management LT Low tension LSG Local Self-Government MACL Multi Aspect Colour Light MFF Multi Tranche Financing Facility MOR Ministry of Railways NG Narrow Gauge NH National Highway NPV Net Present Value A Page 6 October 2008

8 Asian Development Bank Railway Investment program NTKM NACO NCLP NFP NGO NTFP O/D OHE P Way PCE PPP PWC PCNDDP PDF PESA PFR PRIs PRS RIP Rs RTKM RVNL SOR SPV SC SERP SHG SSA ST STD TA TEU ToR TRYSEM USD UEE VOC VSS Net tonne Kilometres National AIDS Control Organisation National Child Labour Programme National Forest Policy Non-Government Organisation Non-Timber Forest Produce Origin / Destination Over Head Equipment Permanent Way Passenger Carrying Equivalent Public Private Partnership Price Waterhouse Cooper Per Capita Net District Domestic Product Public Distribution System Panchayats (Extension to the Scheduled Areas) Act Property for Rent Panchayati Raj Institutions Passenger Reservation System Railways Investment Programme Rupees Revenue Tonne Kilometres Rail Vikas Nigam Ltd. Schedule of Rates Special Purpose Vehicle Scheduled Castes Society for Elimination of Rural Poverty Self-Help Group Sarva Siksha Abhiyan (Education for All) Scheduled Tribes Sexually Transmitted Disease Technical Assistance Tonne Equivalent Unit Terms of Reference Training of Rural Youth for Self-Employment United States Dollars Universal Elementary Education Vehicle Operating Cost Vana Surakhya Samiti A Page 7 October 2008

9 Asian Development Bank Railway Investment program SUMMARY TABLE Pune To Guntakal Electrification 641 Km Single Line Electrification Cost Estimate (2007/08 Prices) Total Cost Civil Engineering Signalling & Telecommunication Electrification FIRR 20.27% EIRR 13.22% Pune To Guntakal Electrification & Daund Gulbarga Track Doubling Combined 641 Km Double Track Electrification Km Track Doubling Cost Estimate (2007/08 Prices) Total Cost Civil Engineering Signalling & Telecommunication Electrification FIRR 12.30% EIRR 14.06% A Page 8 October 2008

10 Asian Development Bank Railway Investment program 1. INTRODUCTION 1.1 General The base scheme proposal is for the electrification of the Pune to Guntakal section of the Golden Quadrilateral. Whilst electrification will offer significant operational benefits and cost savings it can be expected to produce only a marginal increase in route capacity. As an alternative, the project in combination with the Daund to Gulbarga track doubling has been analysed. This is to establish whether there is a viable option offering the operational benefits of electrification with the route capacity improvements from track doubling. This section forms part of the Golden Quadrilateral connecting four major metropolitan cities of India, Mumbai, Chennai, Delhi and Kolkata on which the maximum traffic of Indian Railways flows. Except for this section (Pune Guntakal) all other sections in the Golden Quadrilateral are electrified. This section is partly double line with the remainder single line. The status of electrification on the adjoining sections is as under : Mumbai Pune Renigunta Nandlur Nandlur Guntakal Originally electrified on 1500V DC Traction, getting converted to 25kV AC Traction system. The work is anticipated to be completed progressively in 18 months to two years. In this section, one line is already electrified. The second line is being electrified along with track doubling. The work is anticipated to be completed in approximately one year. This section is being electrified along with track doubling. The work is anticipated to be completed in six to 12 months. The Pune Guntakal section is the only non electrified section in the Golden Quadrilateral. This section is 641km long with 78 stations. 56 Stations are electrified. The entire section passes through the Deccan Plateau with black cotton soil. The entire section is mostly plain with a ruling gradient of 1 in 100. The temperature varies from four degrees to 45 degrees centigrade. The soil consists of ordinary clay occasionally mixed with sandy clay. The important stations on this route are Daund, Kurduwadi, Hotgi, Solapur, Mohol, Wadi, Raichur and Guntakal. The current status of doubling is as under: Sl. No. Section Double line or Single line (DL/SL) RKM/TKM 1 Pune Bhigwan DL 103 Status of sanctioned works 2 Bhigwan Mohol SL 127 Under study 3 Mohol Solapur- Hotgi DL 48 A Page 9 October 2008

11 Asian Development Bank Railway Investment program Sl. No. Section Double line or Single line (DL/SL) RKM/TKM Status of sanctioned works 4 Hotgi - Gulbarga SL 98 Under study 5 Gulbarga - Wadi DL 37 6 Wadi Krishna DL 82 7 Krisna Yermaras SL 16 8 Yermaras - Matmari DL 26 9 Matmari Kosgi SL Kosgi Kupgal DL Kupgal Nacherla SL Nacherla Guntakal DL 9 Total DL 347 Studies carried out previously for this project Previously, the following studies were carried out: SL 294 Total 294 Doubling Works in progress Doubling Works in progress Doubling Works in progress i. Cost-cum feasibility study (CCFS) 1997 by CORE Allahabad which was updated in ii. Bankability study by Price Waterhouse Coopers Aug The study done by Price Waterhouse Coopers (PWC) is for Pune Guntakal Electrification Project and Daund Gulbarga Doubling Project combined, as well as individual projects. The estimates have therefore been reviewed accordingly. The current project requirements are to review, update and recommend improvements to the project proposal in preparation for funding by the Asian Development Bank in accordance with it s policies and guidelines. The engineering proposals have been examined and preliminary design reviews completed to establish materials quantities required. Using the latest available pricing data updated cost estimates for the works have been produced. An initial procurement schedule has been prepared including proposed contract packages. Data gathered from the field and information from Indian Railways records has been used to analyse the current traffic on the line. Commodity wise growth rates have been used to form projections for future traffic. Using this information and the updated cost estimates financial and economic analysis has been completed to establish the financial and economic viability of the project through the FIRR and EIRR for the project. A Page 10 October 2008

12 Asian Development Bank Railway Investment program 2. OPERATIONS AND TRAFFIC Pune Guntakal is a 641Km long segment of the Mumbai - Chennai leg of Indian Railway s Golden Quadrilateral. This segment accounts for 50% of the Mumbai - Chennai south-western leg of the Golden Quadrilateral of Indian Railways. Adjacent sections Pune Lonavala - Mumbai CST at Pune end already have electric traction and the Guntakal - Renigunta section is being electrified. There are 78 stations between Pune and Guntakal and twelve feeder sections which bring and take away traffic. At the Guntakal end, we have four feeder sections, namely; Guntakal - Bellary, Guntakal Renigunta, Guntakal Dharmavaram/Bangalore and Guntakal Nandyal and at Pune end there are two feeder sections Mumbai/Lonavala - Ghorpuri/Pune and Pune - Miraj. Six feeder sections namely Wadi - Secunderabad, Hotgi - Bijapur/Gadag, Kurduwadi-Pandharpur (PVR)/Miraj, Kurduwadi - Latur, Daund Baramati and Daund Ankia/Manmad join the project route at intermediate junction stations Wadi, Hotgi, Kurduwadi and Daund. Except Mumbai/Lonavala Ghorpuri and Guntakal - Renigunta, trains on all other sections are on diesel traction. Work of electrification of Wadi Secunderabad, an important feeder section is already sanctioned. Another important feeder section Daund - Ankia/Manmad is also under active consideration for electrification. Important goods terminals on the project route Pune - Guntakal are, Pune, Loni, Daund (DD), Bhigavan (BGVN), Kurduwadi (KWU), Solapur (SUR), Hotgi (HG), Gulbarga (GR), Raichur, Adoni and Wadi. The project route Pune - Guntakal section lays in three states, Maharashtra, Karnataka and Andhra Pradesh. Pune to Kulali (40Km) is in Maharashtra, Kulali to Martur in Karnataka and the balance is in Andhra Pradesh. Of the total 641km long project section, Wadi - Guntakal (228km) is being doubled. Already two-thirds of its length (148 route km) out of 228 km has been doubled. The remaining third is likely to be doubled before commencement of the electrification work. Between Pune and Wadi (413km), there are two single line stretches i) Bhigavan Mohol (127km.) and Hotgi Gulbarga (98km), the remaining portion (188km) is already double line. 2.1 Operations For the purpose of train operation and control, Pune - Guntakal section is distributed among three rail divisions and two Zonal Railways. Pune to Daund (76km) is in the jurisdiction of the Pune Division, Daund Solapur - Wadi (337km) falls in the jurisdiction of the Solapur Division (both on Central Railway) and Wadi - Guntakal (228km) is in the jurisdiction of the Guntakal Division of South Central Railway. Terrain traversed by the Pune Guntakal section is undulated. The section between Daund and Solapur has a ruling gradient of 1:145 and the Solapur Wadi Guntakal portion has a ruling gradient of 1:100. All loaded goods trains are hauled by two WDG 3/WDM 2 Diesel locomotives. Passenger carrying trains are hauled by a single Diesel locomotive. Train crews are based at Guntakal, Wadi, Solapur, Daund and Pune. There are four Diesel fuelling points for goods trains running across the Pune Guntakal project section, at Ghorpuri/Pune, Daund, Wadi and Guntakal. A Page 11 October 2008

13 Asian Development Bank Railway Investment program At present traction changes between Diesel and Electric take place at Pune/Ghorpuri and Nandalur/Renigunta. 2.2 Traffic The line capacity of various sub-sections on the Daund - Gulbarga/Wadi section and trains that run across these during are as under: Section S/L or D/L Length (km) With Trains Run during Maintenance Block Passenger Goods Deptt. Total %age Utilisation Pass. Gds. Ratio Pune Daund -D/L Daund Bhigwan - D/L Bhigwan Solapur - S/L Solapur/Hotgi - D/L Hotgi GR S/L GR Wadi D/L Wadi Raichur D-S/L Raichur Guntakal D- S/L@ Source: Line Capacity statement prepared by Central & South Central Railways. * Solapur-Mohol has recently been provided with second Partially Double track. A Page 12 October 2008

14 Asian Development Bank Railway Investment program Passenger trains consume the bulk of capacity, as the ratio between passenger and goods trains ranges between 1.12:1 and 3.6:1. Predominance of passenger trains on the route is clear as given in the Chart below: Passenger and Goods Trains Run across PUNE-GUNTAKAL No. of Trains Pune- Daund Daund- Bigwan Bigwan- Solapur Solapur- Hotgi Sections Hotgi-GR GR-Wadi Wadi- Raichur Raichur- Guntakal Passenger Goods During , the project section is estimated to have an output of 3528 Passenger Train kms as against 8778 Goods Train kms. Goods train kms account for less than 40% of output in terms of Train kms. The maximum permissible speed for passenger carrying trains is 105km per hour (KMPH) and 75KMPH for goods trains. For the purpose of this study Pune towards Guntakal is designated as the Down direction and Guntakal to Pune is designated as the Up direction. The bulk of goods traffic moving across the section is through traffic. 2.3 Goods Traffic The following commodities were transported across the Pune-Guntakal in the two directions during : A Page 13 October 2008

15 Asian Development Bank Railway Investment program Up Direction (Trains/Day and Tonnes/Day) Guntakal towards Pune Up Direction CMDT_GRP Goods Trains and Payload-Per Day Trains (No s) Pay Load Cement Coal Sugar FG Fertiliser IORE I & Steel POL Containers Misc Grand Total Down Direction CMDT_GRP (Trains/Day and Tonnes/Day) Guntakal towards Pune UP Direction Goods Trains and Payload-Per Day Trains (No s) Pay Load Cement Coal Sugar FG Fertiliser IORE I & Steel POL Containers Misc Grand Total It would be seen that loaded traffic in the Down direction is more (in Tonnes) than that moving in the Up direction. The commodity wise distribution of trains run per day in the two directions is depicted below: A Page 14 October 2008

16 Asian Development Bank Railway Investment program Commodity-wise No. of trains per day run across PA-GTL-UP Direction (in Trains/Day) POL, 0.68, 6% Containers, 0.02, 0% Misc, 0.64, 6% I & Steel, 0.83, 8% IORE, 0.61, 6% Fertiliser, 0.07, 1% FG, 0.34, 3% Cement, 5.54, 52% Sugar, 0.69, 7% Coal, 1.12, 11% Cement Coal Sugar FG Fertiliser IORE I & Steel POL Containers Misc Commodity-Wise number of trains run per day on PA-GTL 'Down' Direction IORE, 0.00, 0% POL, 0.44, 3% Containers, 0.02, 0% Misc, 1.41, 9% I & Steel, 0.00, 0% Fertiliser, 0.88, 6% Cement, 5.66, 39% FG, 0.97, 6% Sugar, 0.63, 4% Coal, 4.86, 33% Cement Coal Sugar FG Fertiliser IORE I & Steel POL Containers Misc About 72 % of goods trains run in the Down direction, comprise Cement and Coal trains, whereas in the Up direction, these account for 63% of the total trains. Other commodities moving in the Down direction are Food grains, Fertilisers, Sugar and POL. A Page 15 October 2008

17 Asian Development Bank Railway Investment program In the Up direction Sugar, Iron & steel, Iron Ore, POL and Fertilisers account for 30% of the total trains per day. A commodity-wise Origin-Destination matrix (in terms of route/section from route/section to) of traffic moving across the Pune - Guntakal section during has been produced and it can be observed that the bulk of the goods traffic across the project section Pune-Guntakal is of a through nature. Passenger Carrying Trains Notwithstanding the number of trains shown in line capacity statement, the following number and type of Passenger and Mail/Express trains were being run each way on the Daund Gulbarga/Wadi section during : Train Type Daund - Solapur Solapur Gulbarga/Wadi Wadi - Guntakal Passenger Trains (Stopping at all Stations) Mail/Express Trains (Stopping at limited number of stations) Daily Mail Express Trains (Stopping at limited number of Stations) Non-Daily (5/7)* 9 (23/7)* 10 (2/7)* Source: Working Time Table July 2007 *Number of train paths used per day by non-daily trains. Keeping in view the fact that all trains do not run across the complete section, for the purpose of preparing passenger train projections, an average number of trains calculated on the basis of distance travelled on the section (No. of trains x distance travelled on the section length of the section) are used. Such data is obtained from the Railway s annual report. For the Daund Wadi section during these trains are 16 trains each way on Daund-Solapur and 22 trains on Solapur Wadi. 2.4 Constraints Based on train running data during given in the Line capacity statement of Central and South Central Railways, constraints in capacity imposed by the two single line stretches between Daund and Wadi are indicated in the graph below: A Page 16 October 2008

18 Asian Development Bank Railway Investment program Charted Line Capacity vis a vis Trains Run and Capacity Utilisation Pune - Guntakal in No. of Trains % Utilisation Pune-Daund Daund-Bigwan Bigwan-Solapur Solapur-Hotgi Hotgi-GR GR-Wadi Wadi-Raichur Raichur- Guntakal Charted Cap. %-Utilisation Sections Trains Run 0.00 The line capacity utilisation on double line stretches ranges from 58 to88 %, but on the two single line stretches it is above 120%. However these single line stretches are being doubled. Besides the constraint of line capacity on single line stretches, there are terminal constraints at Pune Junction, with an insufficient number and capacity of platforms for handling longer passenger trains. Railways have initiated an action to remodel the station for the removal of these constraints so that the number of coaches on existing passenger trains can be increased for augmenting passenger carrying capacity per train. A Page 17 October 2008

19 Asian Development Bank Railway Investment program 3. ENGINEERING 3.1 Electrical Engineering Technical Review The technical review of the project reports was carried out with the following objectives in mind: i. Review of preliminary designs to ensure that these are in line with current instructions of Railway Ministry/RDSO. ii. iii. iv. Address any changes due to developments since preparation of the report. Update the Quantity and Cost estimates based upon current prices. Prepare phasing the works with a view to expedite construction and maximise disbursement of ADB loan. Methodology adopted Site visits: The team inspected the complete project site along with Railway officials and deliberated various issues with Railway officers at various levels including the General Manager, South Central Railway, Divisional Railway Managers, Divisional officers of concerned divisions. The following main points emerged out of these deliberations: i. There is a very heavy passenger demand for running suburban trains in the Pune - Daund section. ii. iii. Project Planning The volume of traffic on the entire route is increasing rapidly. Doubling along with Electrification on the Daund Gulbarga section is considered most appropriate by Railway officials. Khidki Traction substation being set up 7km from Pune will not be able to share much load on the Pune Daund section as the Pune Miraj section is also likely to be electrified in the near future. The electrification of the Pune Guntakal section has been reviewed with the following alternatives: i. Electrification of the existing section with the Bhigwan Mohol and Hotgi Gulbarga sections being single line. ii. Electrification of the Bhigwan Mohol and Hotgi Gulbarga sections along with track doubling between Daund and Gulbarga. Review of Preliminary Designs and Specifications The review has concluded that there are no major changes in the design and specifications required except for rationalisation of locations of Traction Substations and TRD Maintenance Depots. A Page 18 October 2008

20 Asian Development Bank Railway Investment program Power Supply Arrangements - Spacing of Traction substations (TSS) This section falls in the States of Maharashtra, Andhra Pradesh and Karnataka, which are served by MSEB, APTRANSCO and KSEB respectively. The spacing of TSS s proposed in the project report varies from 42 to 75km. While in the Pune Daund section, it will be desirable to keep the TSS spacing comparatively low (40-50km) due to heavy suburban traffic, the spacing in the remainder of the route should be 60-65km. Some rationalisation of the spacing and location of TSS s is therefore required. The proposed locations along with the proposed power supply point are tabulated in Annexure 3.EE.5. In the Pune Daund section it is proposed to provide one Traction Sub-station at Urli and another at Daund, which will later share some of the Daund Manmad section load. It is recommended that 11 substations are provided as indicated in Annexure 3.EE.5. The spacing of these has also been adjusted and made more uniform within acceptable limits. These TSS will be fed from the nearest Grid Sub-station of MSEB, APTRANSCO and KSEB. The tentative length of transmission line has however increased from 63km estimated in the PWC report to 135km due to the rationalisation of locations of TSS s. The cost estimates for provision of transmission lines/bays and other infrastructure are based upon the recent quote received by RVNL from APTRANSCO for providing power in the adjoining section (Nandlur Guntakal). The average cost of 132kV Double Circuit transmission line has been taken as Rs. 43 lakhs per km and that of bays, metering, switching station, development and station supply etc. as Rs. 470 lakhs per substation. Alternative Proposal: Availing Power from National Thermal Power Corporation (NTPC) In this section, there is no Generating Station of NTPC. Only one grid Sub-station is available at Solapur. In the past attempts have been made by Indian Railways to obtain power from grid substations at NTPC rates plus wheeling charges. However, power supply authorities have always been unwilling to undertake such an arrangement due to loss in their revenue. Additionally, the length of transmission lines required to connect to the NTPC are to be provided by Indian Railways which makes this option prohibitively expensive. Raichur thermal power house is managed by Karnataka State. It does not appear possible to obtain power at concession rates for Indian Railways (IR). In view of this the possibility of availing power from NTPC appears remote and it has not been considered in the estimate. Alternative Proposal: Electrification on 2 x 25kV Systems The payment to be made to Power Supply Authorities is substantial, representing between 15 to 18% of the project cost. In order to reduce this cost, it is necessary to reduce the number of power supply in-take points. Indian Railways completed two pilot projects for electrification on the 2 x 25kV system in since when the system has been working satisfactorily. With this system the number of substations is reduced by almost half and it also has the advantage that voltage drop is much less and the average power factor very high. Consequently specific energy consumption is less. A Page 19 October 2008

21 Asian Development Bank Railway Investment program The current international practice is to use the 2 x 25kV system for heavy freight traffic routes. IR may also consider the use of this system where justified, particularly in electrified sections where another line is being laid and the number of substations required is to be increased. However in the Bina Katni section, the cost of 2 x 25kV system was 32% higher compared to a conventional 25kV system. This was mainly due to the design of the system which was to cater for running 9000 tonne trains. The equipment ratings used were very high. Also much of the equipment was imported. In case the system is designed for present day traffic, it is possible to reduce the equipment rating permitting use of standard components in use on the 25kV system. Some of the equipment such as automatic fault locators can be eliminated. With the simplified system the cost of the 2 x 25kV system can be brought down substantially. Considering the heavy cost to be paid to power supply authorities, the use of the 2 x 25kV system may be financially beneficial particularly in long sections with a large number of power supply in-take points. Spacing of Switching Stations (SWS) The proposed spacing of SWS s listed in the project report varies from 5km to 24km. However, IR Standards recommend that the maximum spacing should not exceed 15-16km. This is in order to minimise the length of section to be isolated in the event of an occurrence of an OHE break down. The number of SWS has been rationalised and the proposed locations are shown at Annexure 3.EE.6. It is proposed to provide 11 SP and 30 SSPs. OHE Designs and Specifications The route to be electrified is 641km. However, the assessment of Track km to be wired as made in the PWC report is 1426 Km. This has since been updated by RVNL as 1626km considering the entire section as double line. We have adopted the above figures for the relevant estimates. The proposed preliminary design for OHE works is in line with standard practice. However, latest instructions of Railway Board with regard to implantation of masts and provision of Auxiliary transformers on independent masts have to be taken into account while developing detailed designs. The section is in the yellow zone of wind pressure, requiring the OHE to be designed with a corresponding wind pressure of 112.5kg per metre square for the purpose of estimation. Adoption of simple polygonal overhead equipment with a maximum span of 72m and a corresponding pre-sag of 100mm is proposed. Regulated polygonal OHE is proposed on main line and primary loops, and tramway type equipment on secondary lines and yards. The use of 9.5m long OHE structures and Booster Transformers (BT)/Return conductors (RC) requirement on the basis of 10-15% of the Route km as per guidelines issued by Railway Board in their letter No.92/RE/161/9 dated 25/3/94 is proposed. Supervisory Remote Control Arrangement A new Divisional Supervisory Remote Control Centre (RCC) is to be commissioned at Guntakal for controlling power supply of Renigunta - Nandalur - Guntakal (incl.) section A Page 20 October 2008

22 Asian Development Bank Railway Investment program falling in the Guntakal Division of the South Central Railway. This shall be augmented to cater for the requirement of the Wadi - Guntakal section. For control of Pune (excl.) - Daund section falling in Pune Division, a new RCC at Pune will be required (presently Switching Stations between Karjat - Pune are manned and not controlled from the RCC). Additionally a new RCC will be required at Solapur for controlling power supply installations in Daund (excl.) - Wadi section of Solapur division. Provision has been made in the estimate accordingly. Auxiliary Transformers 25kV/230V single phase 5kVA/10kVA auxiliary transformers connected to the OHE are proposed for giving L.T. Power supply to colour light signals, repeater stations, switching stations and mid section L-C gates. Two auxiliary transformers are proposed at each station for colour light signalling in double line sections, whereas only one auxiliary transformer is proposed at each station for colour light signalling in single line sections. Maintenance Depots The proposed locations of Traction Distribution (TRD) Maintenance Depots have been reviewed, one depot is required in Pune Division to attend OHE up to Daund (75km), and four depots will be required in Solapur Division for attending OHE between Daund and Wadi (338km). An Additional three depots are required in Guntakal Division for attending OHE between Wadi and Guntakal (228km). The maintenance depots have to be located at larger towns spaced 80 to 100km from each other preferably where TSS or other maintenance infrastructure is also being located. The proposed locations of OFHE/PSI Depots are as under: Sl. No. Division Location Distance from Pune (km) 8 Wheeler / 4 Wheeler Tower wagon 1 Pune Urli 28 8 wheeler 2 Solapur Bhigwan wheeler 3 -do- Kurduwadi wheeler 4 -do- Solapur wheeler 5 -do- Gulbarga wheeler 6 Guntakal Yadgir wheeler 7 -do- Mantralaya wheeler 8 -do- Guntakal wheeler A Page 21 October 2008

23 Asian Development Bank Railway Investment program The tower wagon sheds are proposed to be designed for accommodating eight-wheeler tower cars to avoid the necessity for modifications at a later date. It will also provide flexibility for the Division to relocate 8 wheeler tower wagons when required. Locomotive Shed About 100 locomotives will be required for the section. The PWC Report made a provision for only 25% of the cost of a Locomotive shed. Since 100 locomotives will require a fully fledged maintenance shed, it is considered that full provision is required in the estimate. The location will, however, depend upon the global view to be taken by the Ministry of Railways. The cost (Rs 36.7 crores) has been added in the estimate based upon the estimated cost of Khanalampura (Northern Railway) electric locomotive shed for stabling 100 locomotives included in Works, Machinery and Rolling Stock Programme for of Ministry of Railways. This cost is however charged to plan head Workshops and Sheds and not accounted for while working out financial returns. Electrical General Services works The following procedure has been followed (updating quantities and cost): i. Updating details of existing electrical installations after site visits and discussions with concerned officials. ii. Estimation of additional electrical installations required or augmentation/modifications needed. iii. iv. Estimation of augmentation of electrical power requirements. Updating unit estimates. v. Estimation of quantities and updating of cost. vi. Details of Existing Electrical Installations. The details of existing electrical installations at various stations are summarised at Annexure 3.EE.9. Scope of Electrical works The Electrical works comprise the following; a. Electrification of new platforms. b. Extension of existing platforms. c. Electrification of new/modified service buildings. d. Electrification of new quarters. e. Augmentation of pumping arrangements. f. Enhancement of load. g. Provision of substation where required. h. Electrification/modification of manned Level Crossings. i. Modification of Power Line Crossings. A Page 22 October 2008

24 Asian Development Bank Railway Investment program Additional Electrical Installations A summary of additional installations proposed to be provided station wise is given in Annexure 3.EE.10. The proposed augmentation of Electrical Power Supply installations is also shown in the same Annexure. Design Standards a. Preliminary Engineering Designs i. The Designs adopted have to take into account all the guidelines and instructions issued by Ministry of Railways and Research Designs and Standards Organisation (RDSO). The design should comply with Indian Electricity Act 2003, I.E. Rules & relevant Codes of Practice. ii. iii. The designs have to be based upon RVNL s standard Technical Specifications for General Electrical Works. National Building Code, I.E. Rules and Indian Standards prescribed for various items. A list of relevant instructions on the subject along with copies of letters is placed in Annexure 3.EE.81. b. Scale of Fittings The scale of fittings to be provided in residential quarters are based upon Railway Boards letter No. 99/ Elec (G)/136/1 dated In service buildings the scale of fittings has been fixed based upon work requirement. c. Level of Illumination The level of illumination will be in accordance with Rly. Board s Letter No. 2004/Elect (G)/109/1 of 14 th May L.T. Modification The LT distribution line at the 56 electrified stations needs modification to provide necessary safety and induction protection from 25kV AC traction lines. The modification generally involves replacement of overhead lines by underground cables. The cost of these works has been included in the estimate. d. Modification of Power Line Crossings The available data is not adequate to identify the number of crossings requiring modification. The revised estimate is therefore based upon 30 crossings as provided in the estimates of PWC report. e. Electrification of Station Buildings, other Service Buildings and Residential Buildings The cost of electrification of station buildings, other service buildings and residential buildings has been included in the estimate. A Page 23 October 2008

25 Asian Development Bank Railway Investment program Estimation and Updating of Quantities and Cost Estimates for Traction Works i. RVNL has circulated unit estimates for traction works in their letter No / Elec / Policy / 39 Dated 16 th August It has been learnt from RVNL that the latest rates obtained for OHE works in Nandlur Guntakal section are 16% above Schedule of Rates (SOR). ii. iii. iv. For TSS Works the latest accepted rates are from M/S Cobra for Venkatachalam Road Krishnapatnam section. These rates are 20% above SOR. The revised electrical cost based upon above rates is Rs. 717 crores for electric traction works to electrify the entire section as double line. This includes full provision of an Electric locomotive shed for stabling 100 locomotives. The revised estimates for traction works are placed in Annexure 3.EE.2 to 3.EE.4. The unit costs are given in Annexures 3.EE.11 to 3.EE.28. It may be noted that for the electrification of a single line section, the cost of power supply arrangements, SCADA, infrastructural facilities etc remain more or less same as for electrification of a double line section. In fact, from voltage drop considerations spacings between traction substations have had to be reduced resulting in an increase of one traction substation. Some modifications in OHE arrangements will become necessary if a second track is electrified later. Electrical General Services i. For cost estimation, different Zonal Railways follow their own practice. Northern Railway has standardised unit rates which are updated from regularly. These are however used for preparation of abstract estimates. Detailed estimation of quantities and costing is done while preparing the Detailed Design and BoQ. ii. iii. iv. For updating the cost, Northern Railway unit estimates duly updated based upon last accepted/current market rates have been adopted. The updated unit estimates are placed at Annexure 3.EE.29 to 3.EE.80. These rates are equally applicable in this section. The revised cost for General Electrical Works is Rs as per details given at Annexures 3.EE.7. The cost of Electrical works for various alternatives is summarised at Annexure 3.EE.1. The total cost is as under: A Page 24 October 2008

26 Asian Development Bank Railway Investment program Sl. No. Item Existing Section and Doubling of balance sections Existing Section Doubling of Existing Single line sections 1 Traction Works General Services Works 3 Electric Locomotive Shed Total Variation in Traction Estimate compared to RVNL revised estimates The variation in cost of major items as under: Item Revised cost RVNL revised estimate Variation Variation due to Escalation Variation due to Quantity Variation OHE + SWS TSS M&P/T&P Total Payment to SEB Electric Loco Shed Quantity Variation has been due to: i) AT S considered for all stations against 56. ii) iii) iv) No. of SSP increased by seven. Return conductor 111km against 100km. Length of Transmission line 135km against 60km. For Yadgir TSS, SC Railway advised the length of transmission line as 25km against 2km provided in the PWC Report. There is an increase in the length of transmission line due to the relocation of some substations which became necessary on voltage drop considerations. v) No. of TSS reduced by one. Cost Variation other than increase in quantity has been due to: i) Payment to State Electricity Authority is about Rs crores per substation based upon recent quote obtained by RVNL in the same area as against Rs. 2 crores considered by RVNL in their estimate. A Page 25 October 2008

27 Asian Development Bank Railway Investment program ii) Since requirement of Electric locomotives for this section will be about 100, it is considered that full provision should be made for an Electric Locomotive Shed in the estimate. iii) Average escalation in cost of OHE items has been 16% and TSS items 20% based upon latest accepted rates of RVNL. General Charges The provision of General charges made in the project report is not in line with current instructions of Railway Board (Board s letter No / ER / 4002 dt and According to which D&G Charges applicable to Electrical projects not requiring Traffic/Power block are 10.18%). These have been suitably incorporated in the unit estimates. Labour 8%, Freight 2% on stores are provided in unit estimates in addition to 1%. Variation in Cost of General Electrical works The reasons for variation in cost are as under: i. During the past few years, there have been significant increases in the prices of Copper and Steel. The rates of major items such as transformers, cables and conductors and other electrical appliances have almost doubled. ii. The cost of the following items was not considered in earlier estimates: a) Augmentation of substation capacity. b) Cost of pole mounted transformers to avail 11kV supply due to increase in load. c) Cost of electrification/shifting of Level Crossings. d) Augmentation of stand-by power supply arrangements at important stations. e) Augmentation of pumping arrangements. f) Augmentation/modification of LT Distribution to cater for additional station/service/residential buildings. g) Augmentation of yard lighting and passenger amenities like water coolers etc. h) Cost of temporary lighting arrangements required to be made during non interlocking period. The details of unit estimates are not available in the PWC report for verification. Issues Affecting Accuracy of Quantities and Cost Although great care has been taken in estimating quantities as accurately as possible it is pointed out that the estimates are only approximate. The exact quantities can only be specified after the Final location survey and detailed design engineering are completed. We expect a level of accuracy of +/-10 to 15%. For the present review, preliminary designs and specifications have been reviewed based upon which quantities and cost have also been updated. A Page 26 October 2008

28 Asian Development Bank Railway Investment program RVNL has now invited tenders for Final Location Survey and Detailed Design Engineering as detailed below: i. Detailed Design Engineering, Preparation of specifications/boq, estimation of quantity and costs for Pune Gulbarga and Gulbarga Guntakal sections for which tenders have already been opened. ii. FLS (Final location survey) for the Daund Gulbarga doubling project for which tenders have been already opened. The exact estimation of quantities can be made only when above works are completed which may take up to one year. For the present review, preliminary designs and specifications have been reviewed based upon which quantities and costs have also been updated. The study team circulated a Proforma in advance of the site visit for obtaining necessary information for updating the estimates. The Railway authorities provided most of the details. However, certain details like clearance of power lines over rail and distance of EHT substations of State Electricity Distribution authorities could not be made available. In such cases; we have assumed similar quantities as given in PWC Report. 3.2 Signalling Currently this entire section is provided with Colour light signals operated either from End cabins or from Central panel/route Relay Interlocking. Except for the doubling works which have been recently commissioned (four stations in Mohol Sholapur and two stations Krishna and Yadalapur) the signalling system requires modifications to suit railway electrification at all stations. Items which require modification for electrification are:- Track Circuits for berthing tracks, as the permitted length for track circuit in RE area is 350m. Additional track circuits are provided for berthing tracks. All DC track circuits are required to be provided with Chokes. All relays, including track relays which are connected with outside circuits to be AC immunised. Point Relays to be AC immunised. Since details of point operation methods are not known for all stations it has been assumed that separate cables would be required for each cross over to make them AC immunised. Cut in Relays have been provided for each OFF aspect of signal. Located more than 240m from the place of operation. Signalling cables as necessary to meet with above requirements. Block filters have been provided for block instruments. Immunisation of operation of siding. A Page 27 October 2008

29 Asian Development Bank Railway Investment program Immunisation of operation of Level crossing gates. Earthing of all apparatus cases and signals. Estimates i. Standard estimates have been prepared for three-line stations and four-line stations on single line sections, and multiple line stations on double line sections. The estimates are attached as Annexures 3.ST2 to 3.ST7. ii. iii. iv. The total estimate for signalling is at Annexure 3.STI. Each station estimate allows for one LC Gate and one siding. Cost of glued joints has been taken in these estimates although it forms part of Civil Engineering works. v. RRI s are already provided/under installation at Daund and Sholapur stations. The Modifications to suit RE have been prepared based on yard size after consulting the Railway division. vi. IR are currently electrifying Wadi station in connection with the Secundrabad - Wadi electrification. This item has been excluded form this estimate. vii. The doubling works being done by RVNL from Mohol to Sholapur and between Krishna and Yadalapur are not included in the estimate as these works have been executed to suit RE. Risk Factors The costs have been taken based on the RVNL s tender prices of A price escalation of 15% has been added to update costs to first quarter 2008 rates. One LC gate and one siding has been catered for in the estimate for each station. There may be variation for individual stations where there may be no LC gate or more than one LC gate and there may be no siding or more than one siding. These costs will have to be suitably adjusted based on the unit rates available. The modification estimates are prepared based on metal to Carbon relays. However there may be some stations provided with metal to metal relays which will require modification. The costs may undergo minor changes as a result. Telecommunications The entire section from Pune to Guntakal is provided with Optical Fibre Cable and 4 Quad telecommunication cables. Add Drop MUX is also provided at all stations to derive 30 voice channels. As per the railways requirement one station has been catered for Channel dropping station being new. Communication has been catered for new circuits required for RE. They are :- Traction Power Control (TPC) four; one for Pune and Guntakal divisions and two for Sholapur division. A Page 28 October 2008

30 Asian Development Bank Railway Investment program Traction Loco Control (TLC) - three; one for each division. One Telephone exchange of 1000 Lines expandable to 2000 lines has been catered for Solapur division. It is assumed that there is no requirement for any additional exchange at other locations. A new technology of Wi-Fi is included as a part of the telephone exchange. From the base station of the telephone exchange the exchange number can be extended to the subscriber on wireless. It will provide connectivity to the subscriber from the exchange within the range of covering of Wi-Fi, which is within 5-6 Kms from the base station. Two base stations have been provided and 50 Wi-Fi telephones are proposed. For new Traction Sub Stations (TSS) and Sub Station Posts (SSP) 52 Nos.; provision has been made for TPC control at all locations. Way station control equipment to cater for TPC & TLC has been provided for 160 locations (TPC-77, TSS/SSP-52, TLC-29, Spares - two). From the way station equipment, the circuits can be extended to subscribers with ordinary two wire telephone which has been provided for 250 locations (159 at field locations; 15, 30 and 20 respectively in Pune, Sholapur and Guntakal divisional offices; 27 spares). For extension of these services from existing 4 quad cables, provision has been made for 6 Quad cables, which has been standardised now in lieu of 4 quad cables. Emergency control already exists. 60 new connections (52 at TSS/SSP and 8 spares) have been catered for in the estimate. Modifications for Public Address and Platform Indication Boards by providing shielded wire have been catered for 40km (Daund, Sholapur, Kurduwadi, Gulburga and Loni stations). No modifications are required between Wadi - Guntakal stations as it is already fit for RE. There is no Talk Back arrangement existing at any of the stations in this section. Estimates Based on the above requirement, the estimate has been prepared and is attached at Annexure 3.ST.8. A Page 29 October 2008

31 Asian Development Bank Railway Investment program 4. FINANCIAL 4.1 Introduction Two alternative schemes have been analysed as follows: Base Scheme Financial Internal Rate of return (FIRR) for ELECTRIFICATION of the existing Pune Wadi Guntakal project Section. Combined Scheme Financial Internal Rate of return (FIRR) for ELECTRIFICATION of the existing Pune Wadi Guntakal project Section in combination with the DOUBLING of the Daund Gulbarga section. The projects have been evaluated to establish their viability in terms of their anticipated Financial Internal Rate of Return [FIRR] using the Discounted Cash Flow (DCF) technique. In order to adjudge the financial soundness as well as the down side risk of the project investment, a sensitivity analysis has been carried out by recalculating the FIRR with changes in the values of the critical parameters. 4.2 Operating Costs Pune Guntakal Electrification The direct costs and earnings attributable to the Project Section have been based on computation of the incremental traffic. The assumption made is that the traffic of the base year ( ) is already moving on the Project Section for which it is incurring costs and deriving corresponding benefits in terms of freight and passenger earnings. After the implementation of the proposed electrification, the base year traffic and any of the incremental traffic (barring some short lead traffic) will move on to the route taking advantage of any additional operational capacity. The working expenses have been arrived at by adopting the Passenger and Freight Services Unit Costs as applicable to all Indian Railways for electric/non-electric traction, duly escalated to the year Similarly, the freight and passenger revenues have been calculated in accordance with IR notified tariff rates applicable from Due to the higher average operating speed resulting from electric traction there will be a consequent savings in the rolling stock requirement and in the cost of Repair and Maintenance (R&M) resulting from this stock reduction. These benefits have been included in the cash flow analysis. All Cost and Revenue figures are based on price levels. The project appraisal period has been taken as 30 years, excluding a construction period of two years. The cost-benefit analysis for the electrification project is based on the savings as benefit, i.e. the benefit due to difference in uncommon cost, fuel/electricity, cost of R&M of locomotives/ohe and locomotive and Locomotive Shed cost compared to the same traffic moved by diesel traction. Traffic earnings are assumed to be the same in either case. A Page 30 October 2008

INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund)

INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund) Technical Assistance Consultant s Report Project Number: 36330-02 (Technical Assistance No. 4998) March 2009 INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund) Prepared by

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Delhi Mass Rapid Transport System Project Phase 2 (V) Loan Agreement: March 31, 2010 Loan Amount:

More information

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN TRANSPORT PROJECT 2A Loan No IN June 29, 2010 TO THE REPUBLIC OF INDIA

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN TRANSPORT PROJECT 2A Loan No IN June 29, 2010 TO THE REPUBLIC OF INDIA Public Disclosure Authorized Document of The World Bank Report No: 63374-IN Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN

More information

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India South Asia Transport Team Presented by Prodyut Dutt Asian Development

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE INDIA - Adoption of 3 Phase IGBT Technology in Indian Railways (IR) for EMUs (Electric Multiple Units) in Mumbai Suburban Area Leading to

More information

ECONOMIC SURVEY STATISTICAL APPENDIX

ECONOMIC SURVEY STATISTICAL APPENDIX ECONOMIC SURVEY 2017-18 STATISTICAL APPENDIX STATISTICAL APPENDIX : ECONOMIC SURVEY 2017-18 PAGE 1 National Income and Production 1.1 Gross National Income and Net National Income... A1-A2 1.2 Annual

More information

INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund)

INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund) Technical Assistance Consultant s Report Project Number: 36330-02 (Technical Assistance No. 4998) March 2009 INDIA: Railway Sector Investment Program (Financed by the Japan's Special Fund) Prepared by

More information

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 Integrated Road Investment Program (RRP SRI 47273) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 1. Sri Lanka s road network is dense and well laid out, providing basic access to the country

More information

SELECTION OF TRACTION SYSTEMS & ENERGY CONSERVATION IN METRO SYSTEMS. BY BRIJESH DIXIT MANAGING DIRECTOR Nagpur Metro Rail Corporation Ltd.

SELECTION OF TRACTION SYSTEMS & ENERGY CONSERVATION IN METRO SYSTEMS. BY BRIJESH DIXIT MANAGING DIRECTOR Nagpur Metro Rail Corporation Ltd. SELECTION OF TRACTION SYSTEMS & ENERGY CONSERVATION IN METRO SYSTEMS BY BRIJESH DIXIT MANAGING DIRECTOR Nagpur Metro Rail Corporation Ltd. ALTERNATIVES TRACTION SYSTEMS AC Traction DC Traction 25 KV 50

More information

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders Reasonableness Test: Salisbury Substation 11kV Feeders DISCLAIMER The purpose of this document is to inform customers, Interested Parties,

More information

Feasibility Study for Promotion of International Infrastructure Projects in FY2011

Feasibility Study for Promotion of International Infrastructure Projects in FY2011 Feasibility Study for Promotion of International Infrastructure Projects in FY2011 STUDY ON THE EXPANSION OF RAIL TRANSPORT CAPACITY FOR ROCK PHOSPHATE, THE KINGDOM OF MOROCCO FINAL REPORT SUMMARY November

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Second Jharkhand State Road Project (RRP IND 49125) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves capacity augmentation and rehabilitation of four state highway sections in the

More information

Modernising the Great Western railway

Modernising the Great Western railway Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project primarily aims at capacity

More information

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg :Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg Technical Branch (Per) TANGEDCO Proceedings. (FB) No.

More information

CHAPTER 6 POWER SUPPLY ARRANGEMENTS

CHAPTER 6 POWER SUPPLY ARRANGEMENTS 6.1 Power Requirements CHAPTER 6 Power supply is the lifeline of Metro System POWER SUPPLY ARRANGEMENTS Electricity is required for operation of Metro system for running of trains, station services (e.g.

More information

Standards and Practices Over Head Electric Equipments. by Y.P.Singh. Sr. Professor (Electrical Engg.)

Standards and Practices Over Head Electric Equipments. by Y.P.Singh. Sr. Professor (Electrical Engg.) Standards and Practices Over Head Electric Equipments by Y.P.Singh Sr. Professor (Electrical Engg.) ELECTRIFICATION SCENARIO AT A GLANCE 1 st Electric Train started on 3 rd February, 1925 on ex-great Indian

More information

Need Assessment Document (NAD) DDUGJY

Need Assessment Document (NAD) DDUGJY Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing

More information

1QFY2018 Financial Results. Quarter Ended 30 June 2017

1QFY2018 Financial Results. Quarter Ended 30 June 2017 1QFY2018 Financial Results Quarter Ended 30 June 2017 Disclaimer This presentation is not and does not constitute an offer, invitation, solicitation or recommendation to subscribe for, or purchase, any

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

17. INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: (i) Central, (ii) Eastern,

17. INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: (i) Central, (ii) Eastern, 17. INDIAN RAILWAY This section includes tables providing statistics of passenger and goods traffic, revenue and expenditure and general working of Indian Railways. The statistics are collected by the

More information

Federated States of Micronesia

Federated States of Micronesia IMF Country Report No. 13/17 Federated States of Micronesia 2012 ARTICLE IV CONSULTATION 2012 Statistical Appendix January 29, 2001 January 29, 2001 This Statistical Appendix paper for the Federated States

More information

CHAPTER 20 MOTOR VEHICLES

CHAPTER 20 MOTOR VEHICLES CHAPTER 20 MOTOR VEHICLES 20.1 In India the first car ran on roads in 1897. Prior to independence in the 1940s India had no automobile industry to speak of. Cars were brought into the country in a knocked

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Second Rural Connectivity Investment Program (RRP IND 48226-002) ECONOMIC AND FINANCIAL ANALYSIS 1. The Second Rural Connectivity Investment Program (the investment program) will build or upgrade about

More information

CHAPTER 20 MOTOR VEHICLES

CHAPTER 20 MOTOR VEHICLES CHAPTER 20 MOTOR VEHICLES 20.1 In India the first car ran on roads in 1897. Prior to independence in the 1940s India had no automobile industry to speak of. Cars were brought into the country in a knocked

More information

Study on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY.

Study on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY. Study on Economic Partnership Projects in Developing Countries in FY2010 Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY March 2011 第 1 章 第 2 章 The Ministry of Economy, Trade and Industry

More information

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims Research Brief Impact of higher 25kV fault currents Background Increasing the maximum fault levels at traction feeder stations has the potential to reduce the costs of electrification schemes. The potential

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

For personal use only

For personal use only AER ISSUES NETWORK REVENUES DRAFT DECISIONS FOR ACT AND NSW ENERGY CUSTOMERS The Australian Energy Regulator (AER) has issued draft decisions on the revenue proposals submitted by ACT and NSW distribution

More information

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy 1 SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL Estimation and Costing & Utilization of Electrical Energy Estimation and Costing & Utilization of electrical Energy Estimation

More information

Doing business with Petrobras - Procurement Strategies and Local Content. Policy.

Doing business with Petrobras - Procurement Strategies and Local Content. Policy. Doing business with Petrobras - Procurement Strategies and Local Content Ronaldo M. L. Martins, M.Sc. Market Development, Manager Procurement Department March/2015 Policy. Disclaimer FORWARD-LOOKING STATEMENTS

More information

3QFY2018 Financial Results. Quarter Ended 31 December 2017

3QFY2018 Financial Results. Quarter Ended 31 December 2017 3QFY2018 Financial Results Quarter Ended 31 December 2017 Disclaimer This presentation is not and does not constitute an offer, invitation, solicitation or recommendation to subscribe for, or purchase,

More information

24 July Fuel Quality Review Marsden Jacob. Dear Sir or Madam

24 July Fuel Quality Review Marsden Jacob. Dear Sir or Madam IOR ENERGY PTY LTD ABN: 60 010 504 444 39 Byron Street Bulimba Brisbane 4171 Australia Telephone: (61) 7 3895 4444 Facsimile: (61) 7 3395 7902 Email: mail@ior.com.au 24 July 2015 Fuel Quality Review Marsden

More information

INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: Besides above, the following 7 new Zones have also been set up

INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: Besides above, the following 7 new Zones have also been set up INDIAN RAILWAY This section includes tables providing statistics of passenger and goods traffic, revenue and expenditure and general working of Indian Railways. The statistics are collected by the Ministry

More information

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN SPN High Value Project PO Route RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN Document History Version Date Details Originator V0.1 20/06/2013 Initial version Chris Winch V0.2

More information

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

ROAD DEVELOPMENT PROJECTS IN KARANTAKA

ROAD DEVELOPMENT PROJECTS IN KARANTAKA ROAD DEVELOPMENT PROJECTS IN KARANTAKA August 2010 1 Road Development Projects in Karnataka Provide an integrated road network in the State with the following broad objectives: To make road connectivity

More information

Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers

Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers Prepared for Consumers Union September 7, 2016 AUTHORS Tyler Comings Avi Allison Frank Ackerman, PhD 485 Massachusetts

More information

Substation Lightning Protection. Document Number: 1-11-FR-11

Substation Lightning Protection. Document Number: 1-11-FR-11 Substation Lightning Protection Document Number: 1-11-FR-11 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-11 Substation Lightning Protection Asset

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

National Conference on Latest Trends in Design & Testing of Transmission Line Components

National Conference on Latest Trends in Design & Testing of Transmission Line Components Book-Post National Conference on Latest Trends in Design & Testing of Transmission Line Components 22-23 November 2010 To, Mr. M. Selvaraj Engineering Officer / Co-ordinator Mechanical Engineering Division

More information

Compatibility Between Electric Trains and Electrification Systems

Compatibility Between Electric Trains and Electrification Systems Compatibility Between Electric Trains and Electrification Systems Synopsis Process for managing change that affects the compatibility between electric trains and electrification systems Submitted by Signatures

More information

Estimation of electrical losses in Network Rail Electrification Systems

Estimation of electrical losses in Network Rail Electrification Systems Estimation of electrical losses in Network Rail Electrification Systems Page 1 of 16 Contents 1. BACKGROUND...3 2. PURPOSE...3 3. SCOPE...3 4. DEFINITIONS & ABBREVIATIONS...4 5. NETWORK RAIL INFRASTRUCTURE

More information

All these significant changes indicate that there will be an all round quality consciousness in the country in future.

All these significant changes indicate that there will be an all round quality consciousness in the country in future. PRACTICAL PROJECT EXECUTION KNOW-HOW REPORT ON ALLOY WHEELS MANUFACTURING PLANT (PRESENT and FUTURE Prospects, Market Size, Statistics, Trends, SWOT Analysis and Forecasts Upto 2020) Aluminum alloy wheels

More information

Indian engineering TRANSFORMING TRANSMISSION

Indian engineering TRANSFORMING TRANSMISSION Indian engineering TRANSFORMING TRANSMISSION A 2016 NASA photo of India s electrification. India to become the world s first country to use LEDs for all its lighting needs by 2019 (photograph courtesy

More information

Part C. Statistics Bank of Botswana

Part C. Statistics Bank of Botswana Part C Statistics 2017 Bank of Botswana Contents Part C Part C: Statistics 1. NATIONAL OUTPUT TABLE 1.1 Gross Domestic Product by Type of Expenditure (Current Prices) S6 TABLE 1.2 Gross Domestic Product

More information

Distribution lines Overload Control to Increase Reliability and Power Loss Reduction

Distribution lines Overload Control to Increase Reliability and Power Loss Reduction Distribution lines Overload Control to Increase Reliability and Power Loss Reduction SHRIRANG KARANDIKAR Vice President (Business Development) Kalpataru Power Transmission Ltd. Santacruz (East), Mumbai-400055

More information

Railways: Revenue Management. Prof. G Raghuram Indian Institute of Management Ahmedabad

Railways: Revenue Management. Prof. G Raghuram Indian Institute of Management Ahmedabad Railways: Revenue Management Prof. G Raghuram Indian Institute of Management Ahmedabad Canadian Pacific Railway CPR (Canadian Pacific Railway) uses a system called MultiRail for freight business. It helped

More information

Utility Operator Model

Utility Operator Model Mini-Grid Policy Toolkit- Case Study Country: KENYA Project: Rural electrification with governmentrun mini-grids Utility Operator Model Project Summary Site map of Kenyan mini-grid locations (red dots)

More information

Following are the growth rates of each sub segment of the auto sector over the last 5 years:

Following are the growth rates of each sub segment of the auto sector over the last 5 years: Sector Auto Components Industry Project Title Tyres Manufacturing Plant Project Description The Auto sector contributes 4.2% to India s GDP. The Indian automobile industry stood at 11 million vehicles

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

SUBSTATION DESIGN TRAINING

SUBSTATION DESIGN TRAINING 2017 SUBSTATION DESIGN TRAINING ADVANCE ELECTRICAL DESIGN & ENGINEERING INSITUTE (Registered under MSME& An ISO 9001:2008 CERTIFIED) Training Centre: Advance Group of Institutions C-1, Second Floor Near

More information

4 th April, 2018 I Industry Research

4 th April, 2018 I Industry Research April'17 May'17 June'17 July'17 August'17 September'17 October'17 November'17 December'17 January'18 February'18 March'18 A case for including Petrol and Diesel under GST? Contact: Madan Sabnavis Chief

More information

Laboratory worker at Goedgevonden Coal Mine

Laboratory worker at Goedgevonden Coal Mine 82 Laboratory worker at Goedgevonden Coal Mine Integrated Annual Report 2013 Operational review ARM Coal 83 ARM Coal F2013 F2012 % change ARM Coal attributable sales volumes (000t) Headline earnings Rm

More information

Automated and Electric Vehicles Bill

Automated and Electric Vehicles Bill Automated and Electric Vehicles Bill SECOND MARSHALLED LIST OF AMENDMENTS TO BE MOVED IN COMMITTEE OF THE WHOLE HOUSE Amendment No. [Amendments marked * are new or have been altered] Clause 8 37 Page 5,

More information

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Key DRAFT OPERATING CODE 2 LEGAL TEXT Key DRAFT OPERATING CODE 2 LEGAL TEXT 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From HVDC Code 5) Green From DCC (not used in this document)

More information

XXXXX. Kokish River Hydroelectric Project. Interconnection Facilities Study and Project Plan

XXXXX. Kokish River Hydroelectric Project. Interconnection Facilities Study and Project Plan XXXXX Kokish River Hydroelectric Project Interconnection Facilities Study and Project Plan March 16, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2010. All

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

TARIFF DECISION FOR SASOL OIL (PTY) LTD S SECUNDA TO NATREF INTEGRATED (SNI) PIPELINE

TARIFF DECISION FOR SASOL OIL (PTY) LTD S SECUNDA TO NATREF INTEGRATED (SNI) PIPELINE TARIFF DECISION FOR SASOL OIL (PTY) LTD S SECUNDA TO NATREF INTEGRATED (SNI) PIPELINE 10 MAY 2018 Page 1 of 19 TABLE OF CONTENTS Introduction... 6 Applicable Law... 6 The Methodology... 6 Decision-Making

More information

(1) Current State and Issues of the Electricity Sector in Indonesia

(1) Current State and Issues of the Electricity Sector in Indonesia Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Java-Sumatra Interconnection Transmission Line Project (I) Loan Agreement: April 30, 2010 Loan Amount:

More information

Analysis of Operating Results and Financial Status

Analysis of Operating Results and Financial Status 29 Analysis of Operating Results and Financial Status 1. Analysis of Operating Results of EGAT and Its Subsidiaries Operating results of EGAT and its subsidiaries including associated company and joint

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka

A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka A Forward March towards an Energy Empowered Nation Case Study in Sri Lanka Menaka Rajaguru Department of External Resources Ministry of National Policies and Economic Affairs Country Profile Country Profile

More information

Indian Railways Becoming Greener & Sustainable By Sudhir Garg Joint Secretary, Ministry of Small & Medium Enterprises(MSME)

Indian Railways Becoming Greener & Sustainable By Sudhir Garg Joint Secretary, Ministry of Small & Medium Enterprises(MSME) Indian Railways Becoming Greener & Sustainable By Sudhir Garg Joint Secretary, Ministry of Small & Medium Enterprises(MSME) Indian Railways Indian Railways 3rd largest network, 66,500 RKM, 8495 stations

More information

Three ULTra Case Studies examples of the performance of the system in three different environments

Three ULTra Case Studies examples of the performance of the system in three different environments Three ULTra Case Studies examples of the performance of the system in three different environments airport application: London Heathrow : linking business and staff car parks through the access tunnel

More information

Risk Management of Rail Vehicle Axle Bearings

Risk Management of Rail Vehicle Axle Bearings Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle

More information

ADOPTION OF NEW CONCEPTS IN MATERIAL HANDLING IN CEMENT AND OTHER MINERAL INDUSTRIES

ADOPTION OF NEW CONCEPTS IN MATERIAL HANDLING IN CEMENT AND OTHER MINERAL INDUSTRIES ADOPTION OF NEW CONCEPTS IN MATERIAL HANDLING IN CEMENT AND OTHER MINERAL INDUSTRIES By Jai P. Gupta, Chief General Manager and P K Mittal, Chief General Manager HOLTEC Consulting Private Limited 1. Introduction

More information

Ronnie van Eeden. Senior Mining Engineer. Overview

Ronnie van Eeden. Senior Mining Engineer. Overview Senior Mining Engineer Overview is a qualified Mining Engineer with other commercial qualifications. He has 46 years of experience in the coal industry working for mining houses, the smaller coal industry,

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

Item

Item Key Indicators for Asia and the Pacific 2010 POPULATION a Total population million; as of 1 July 18.17 18.55 18.93 19.33 19.73 20.14 20.56 20.99 21.42 21.87 22.32 22.79 23.30 23.82 24.36 24.91 25.47 26.04

More information

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

The Picton/Mittagong line was opened in March 1867 as part of the Main South line. Read below as Bob Newham, Loco Division Passenger Organiser, explores some of the incredible history behind rail in New South Wales. As you will discover, the month of March has many stories to tell March

More information

Aaren Healy, 20 September 2017 / 1

Aaren Healy, 20 September 2017 / 1 Network Rail s consultation on variable charges and station charges in CP6 Electricity charge for traction (EC4T) and the electrification asset usage charge (EAUC) Aaren Healy, 20 September 2017 / 1 Purpose

More information

Green Power Feasibility Study Econet Lesotho

Green Power Feasibility Study Econet Lesotho Green Power This document has been written to provide information to mobile operators who are considering or planning to deploy green renewable power resources for base station and transmission sites.

More information

Off-Grid Renewable Energy Program in Myanmar. Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank

Off-Grid Renewable Energy Program in Myanmar. Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank Off-Grid Renewable Energy Program in Myanmar Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank 1 ADB Off-grid Renewable Energy Program Phase 1: (October 2013 June 2014)

More information

Derivative Valuation and GASB 53 Compliance Report For the Period Ending September 30, 2015

Derivative Valuation and GASB 53 Compliance Report For the Period Ending September 30, 2015 Derivative Valuation and GASB 53 Compliance Report For the Period Ending September 30, 2015 Prepared On Behalf Of Broward County, Florida October 9, 2015 BLX Group LLC 777 S. Figueroa Street, Suite 3200

More information

Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd

Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd Power Systems Project and Consultancy Services (PCS) Ltd

More information

Item L.1 Voltages 1. The consumer voltage must be between +10% and -10% of the nominal national voltage (nnv.)

Item L.1 Voltages 1. The consumer voltage must be between +10% and -10% of the nominal national voltage (nnv.) Village Hydro Specifications Line Distribution Description of Requirement Item L.1 Voltages 1. The consumer voltage must be between +10% and -10% of the nominal national voltage (nnv.) Recommendation 2.

More information

The Present and the Future of the Stainless Steel Market in India. Ramesh R. Gopal General Manager Nickel Institute Executive Director I S S D A

The Present and the Future of the Stainless Steel Market in India. Ramesh R. Gopal General Manager Nickel Institute Executive Director I S S D A The Present and the Future of the Stainless Steel Market in India Ramesh R. Gopal General Manager Nickel Institute Executive Director I S S D A This Picture Says it All! India s end-use break-up (2007-08)

More information

Group Results 6 months ended 30th June. Net revenue 88,208 92,505 (5) Net income* 7,116 8,052 (12) Net earnings per share (12)

Group Results 6 months ended 30th June. Net revenue 88,208 92,505 (5) Net income* 7,116 8,052 (12) Net earnings per share (12) Page1 28th July 2016 PT ASTRA INTERNATIONAL TBK 2016 FIRST HALF FINANCIAL STATEMENTS PRESS RELEASE Highlights Net earnings per share down 12% at 176 Car unit sales up 4% and motorcycle unit sales up 1%

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2005-06 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012

CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012 CONFERENCE ON TRANSMISSION & DISTRIBUTON MR N C VENUGOPAL TRANSMISSION SECTOR GROWTH & CHALLENGES. DATE 2 ND NOVEMBER 2012 TRANSMISSION SECTOR GROWTH HIGHLIGHTS Source - POWERLINE Transmission line length

More information

COMMISSION REGULATION (EU) / of XXX

COMMISSION REGULATION (EU) / of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2018) XXX draft COMMISSION REGULATION (EU) / of XXX amending Regulation (EU) No 548/2014 of 21 May 2014 on implementing Directive 2009/125/EC of the European Parliament

More information

QUARTERLY REVIEW OF BUSINESS CONDITIONS: MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 4 TH QUARTER 2016

QUARTERLY REVIEW OF BUSINESS CONDITIONS: MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 4 TH QUARTER 2016 NATIONAL ASSOCIATION OF AUTOMOBILE MANUFACTURERS OF SOUTH AFRICA GROUND FLOOR, BUILDING F ALENTI OFFICE PARK 457 WITHERITE ROAD, THE WILLOWS, X82 PRETORIA PO BOX 40611, ARCADIA 0007 TELEPHONE: (012) 807-0152

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2012 (ADVANCE ESTIMATE)

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2012 (ADVANCE ESTIMATE) NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 Lisa Mataloni: (202) 606-5304 (GDP) gdpniwd@bea.gov Recorded message: (202) 606-5306 BEA 13-02 GROSS DOMESTIC PRODUCT:

More information

India s Policy and Practices for Energy Sustainability & Green Railways

India s Policy and Practices for Energy Sustainability & Green Railways India s Policy and Practices for Energy Sustainability & Green Railways Overview of Indian Railways Route Length: > 66000 route kms Broad, Meter and Narrow gauges 35% of routes Electrified Freight Traffic:

More information

Seremban Gemas Electrified Double Track Project, Malaysia

Seremban Gemas Electrified Double Track Project, Malaysia Seremban Gemas Electrified Double Track Project, Malaysia Electrification Works at a Glance Electrification, the need of time. The need for efficient, eco-friendly and well-integrated public transport

More information

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title High Voltage and 1500 System Earthing References and Definitions Reference Number PDS 02 (RIC Standard: EP 12 00 00 01 SP) Document Control

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

Name of Zone Head Quarter No. of Divisions

Name of Zone Head Quarter No. of Divisions An overview of Indian Railways Brief History: First passenger train ran in India on 16 th April 1853 between Boribunder and Thane, since then Indian Railways has been a continuous progressing. Following

More information

Government of Sierra Leone. Directions in. Energy. Opportunities for Investment and Partnerships

Government of Sierra Leone. Directions in. Energy. Opportunities for Investment and Partnerships Government of Sierra Leone Directions in Energy Opportunities for Investment and Partnerships Background to Energy Transmission and Distribution In 2011, as part of the reforms in the energy sector the

More information

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance Statistical tables Money and banking Page S South African Reserve Bank: Liabilities... 2 South African Reserve Bank: Assets... 3 Corporation for Public Deposits: Liabilities... 4 Corporation for Public

More information

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance Statistical tables Money and banking Page S South African Reserve Bank: Liabilities... 2 South African Reserve Bank: Assets... 3 Corporation for Public Deposits: Liabilities... 4 Corporation for Public

More information

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower, Nehru Place New Delhi 110 019 Cert Annex Drg Total 1 7 0 8 pgs Exhaust

More information

Details of concern person for future communication/clarification. Mobile No. Address

Details of concern person for future communication/clarification. Mobile No.  Address 114 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] GENERATION OF ELECTRICITY FORMAT-1 PERIODICITY-ANNUAL DATA OF YEAR 20 20. Submission by 30th June NAME AND ADDRESS OF UTILITY: Sl. No. (A) Name

More information

STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION

STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION A P P E N D I X B STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION C O N T E N T S NATIONAL INCOME OR EXPENDITURE Page B 1. Gross domestic product, 1960 2009... 328 B 2. Real gross domestic

More information