Page Summary...xi. 1.0 Introduction Study Area Study Context Public Involvement...1-7

Size: px
Start display at page:

Download "Page Summary...xi. 1.0 Introduction Study Area Study Context Public Involvement...1-7"

Transcription

1 Table of Contents Page Summary...xi 1.0 Introduction Development of the I-495 Corridor Study Area Goals and Objectives Study Context Public Involvement Existing Conditions Introduction I-495 s Diverse Roles Existing Conditions Transportation I-495 and its Interchanges Traffic Volumes Travel Time Runs Traffic Operations Analysis Criteria Existing (2006) Peak Hour Traffic Operations Crashes Public Transportation Transportation Management Associations (TMAs) Park & Ride Lots Summary Evaluation of Existing Transit Conditions Regional Transit Travel Times Trends Intelligent Transportation Systems (ITS) I-495 Rest Areas Land Use Socio-Economics Population and Households Employment June 2008 i Table of Contents

2 Table of Contents Continued Page Natural Environment Wetlands, Floodplains and Surface Waterbodies Public Water Supplies Rare Species Habitat Historic Resources Summary of Existing Conditions/Issues Future No-Build Conditions Introduction Future No-Build Conditions Transportation Traffic Volumes Projected (2030) No-Build Peak Hour Traffic Operations Crashes Future Transportation/Transit Improvements Land Use Socio-Economics Summary of Key Future Traffic Issues Recommended Improvements Plan Introduction Non-Highway-Capacity-Enhancing Strategies Land Use/Trip Generation Public Transportation Improvements Park & Ride Lots Summary Potential Near-Term Improvements (Less Than 2 Years) Western Segment June 2008 ii Table of Contents

3 Table of Contents Continued Page Eastern Segment Potential Mid-Term Improvements (2 to 8 Years) Western Segment Eastern Segment Potential Long-Term Improvements (More Than 8 Years) I-495 Mainline Improved Operations I-495 Ramp Intersections with Local Street Improved Operations I-495 Merge and Diverge Improved Operations I-495 Weave Operations Western Segment Eastern Segment Crashes Intelligent Transportation System (ITS) Potential New I-495 Interchange at State Route 225 in Westford Summary of Improvement Costs Next Steps June 2008 iii Table of Contents

4 List of Appendices Appendix A Appendix B Appendix C Appendix D Public Participation Existing Conditions Levels of Services Levels of Service with Improvements Compact Disk Main Report Appendices A-D Technical Appendix: 2006 Existing Intersection Analysis 2006 Existing Traffic Counts 2030 No-Build Intersection Analysis Crashes CTPS Data and Info Improvement Costs Intersection Analysis with Improvements Known Developments Link Analysis Merge, Diverge, & Weave Analysis Truck Percentages June 2008 iv Table of Contents

5 List of Figures Figure Page 1-1 Study Area Traffic Volumes and Growth: Annual Average Daily Traffic Volume ( ) a ADTs from on I-495 in Chelmsford, South of Route b ADTs from on I-495 at Andover/Lawrence Municipal Line c ADTs from on I-495 at Amesbury/Merrimac Town Line Average Weekday Daily Traffic and 2006 AM and PM Peak Directional Volumes Western Segment Average Weekday Daily Traffic and 2006 AM and PM Peak Directional Volumes Eastern Segment AM Peak Hour Volumes Western Segment AM Peak Hour Volumes Eastern Segment PM Peak Hour Volumes Western Segment PM Peak Hour Volumes Eastern Segment CTPS Travel Time Runs ( ) Example of Weave, Merge and Diverge Operations AM Peak Hour LOS Intersection Operations Western Segment AM Peak Hour LOS Intersection Operations Eastern Segment PM Peak Hour LOS Intersection Operations Western Segment PM Peak Hour LOS Intersection Operations Eastern Segment AM Peak Hour Ramp Operations Western Segment AM Peak Hour Ramp Operations Eastern Segment PM Peak Hour Ramp Operations Western Segment PM Peak Hour Ramp Operations Eastern Segment Annual Crash Statistics by Interchange ( ) Bus Routes I-495 Corridor Transportation Study Area Average Weekday Daily Traffic and AM and PM Peak Directional Volumes Western Segment Average Weekday Daily Traffic and AM and PM Peak Directional Volumes Eastern Segment June 2008 v Table of Contents

6 List of Figures Continued Figure Page AM Peak Hour Turning Movement Volumes Western Segment AM Peak Hour Turning Movement Volumes Eastern Segment PM Peak Hour Turning Movement Volumes Western Segment PM Peak Hour Turning Movement Volumes Eastern Segment AM Peak Hour LOS Intersection Operations Western Segment AM Peak Hour LOS Intersection Operations Eastern Segment PM Peak Hour LOS Intersection Operations Western Segment PM Peak Hour LOS Intersection Operations Eastern Segment AM Peak Hour Ramp Operations Western Segment AM Peak Hour Ramp Operations Eastern Segment PM Peak Hour Ramp Operations Western Segment PM Peak Hour Ramp Operations Eastern Segment AM Peak Hour Link Operations Western Segment AM Peak Hour Link Operations Eastern Segment PM Peak Hour Link Operations Western Segment PM Peak Hour Link Operations Eastern Segment a Total Trips Generated by Corridor Communities b Total Trips on I-495 in the Study Area 2006 Three-Hour AM Peak Period c Total Trips Generated by Corridor Communities 2006 AM Three Hour Peak Period a Potential Park and Ride Lot at Tewksbury, Exit 39 at Route b Potential Park and Ride Lot at Haverhill, Exit 50 at Route 97 in Church Parking Lot Potential Park and Ride Lot in Haverhill at Exit 52 and Route Potential Intersection Improvements in Western Segment Potential Intersection Improvements in Eastern Segment Acceleration and Deceleration Lane Improvements in Western Segment Acceleration and Deceleration Lane Improvements in Eastern Segment June 2008 vi Table of Contents

7 List of Figures Continued Figure Page 4-8 Existing Condition and Proposed Improvement at Exit 33 NB and Route 4 in Chelmsford Existing Condition and Proposed Improvement at Exit 34 NB and Route 110 in Chelmsford Existing Condition and Proposed Improvement at Exit 34 SB and Route 110 in Chelmsford Existing Condition and Proposed Improvement at Exit 37 NB and Woburn Street in Lowell Existing Condition and Proposed Improvement at Exit 37 SB and Woburn Street in Lowell Existing Condition and Proposed Improvement at Exit 43 NB and Mass Ave in Lawrence Existing Condition and Proposed Improvement at Exit 43 SB and Loring Street in Lawrence a Limits of Proposed Improvement on Route 125 NB (Exit 51) in Haverhill b Existing Conditions on Route 125 NB (Exit 51) in Haverhill a Existing Conditions (continued) on Route 125 NB (Exit 51) in Haverhill b Existing Roadway Cross-Section on Route 125 NB (Exit 51) in Haverhill c Proposed Roadway Cross-Section on Route 125 NB (Exit 51) in Haverhill Existing Condition and Proposed Improvement at Exit 55 NB and Route 110 in Amesbury Limits of Western Segment Add-a-Lane Improvement Limits of Eastern Segment Add-a-Lane Improvement AM Build with Improvements Peak Hour LOS Intersection Operations Western Segment Build with Improvements AM Peak Hour LOS Intersection Operations Eastern Segment PM Build with Improvements Peak Hour LOS Intersection Operations Western Segment Build with Improvements PM Peak Hour LOS Intersection Operations Eastern Segment June 2008 vii Table of Contents

8 List of Figures Continued Figure Page Build with Improvements AM Peak Hour Ramp Operations Western Segment Build with Improvements AM Peak Hour Ramp Operations Eastern Segment Build with Improvements PM Peak Hour Ramp Operation Western Segment Build with Improvements PM Peak Hour Ramp Operations Eastern Segment Existing Condition and Proposed Improvement at Exit 32 NB and Boston Road in Westford Existing Condition and Proposed Improvement at Exit 49 NB and SB and Route 110/113 in Haverhill Existing Condition and Proposed Improvement at Exit 52 NB and Route 110 in Haverhill June 2008 viii Table of Contents

9 List of Tables Table Page 1-1 Public Involvement Percentages of Trucks in I-495 Study Area Peak Period Truck Percentages at Selected Locations on Major State Highways Intersection Level of Service Criteria I-495 AM and PM Peak Hour Level of Service for Selected Link Analysis Ranking of Corridor Interchanges by Crash Number and Types LRTA Bus Routes and Operational Characteristics Top LRTA Bus Routes Based on Daily Ridership MVRTA Routes and Service Characteristics Top MVRA Routes in Park & Ride Lots in the Study Area Regional Transit Travel Times Land Use Potential Additional Development within the I-495 Corridor Communities Existing and Projected Population Existing and Projected Households Existing and Projected Employment Preliminary Estimate of Construction Costs June 2008 ix Table of Contents

10 June 2008 x Table of Contents

11 Summary I. Introduction The examined existing and future transportation conditions on a 40-mile section of I-495 between Westford and Salisbury, Massachusetts. Within this distance, I-495 traverses 13 communities and 2 regional planning boundaries-the Northern Middlesex Council of Governments (NMCOG) in the corridor s Western Segment and the Merrimack Valley Planning Commission (MVPC) in the Eastern Segment. Between the study area s western and eastern termini, I-495 includes 25 interchanges, 3 of which are interchanges with limitedaccess highways. This summary outlines the study framework, findings, and recommendations for improvements. For more detailed information, please refer to the remainder of the report and the appendices. Based on analyses of 2006 and 2030 operating conditions as well as the public participation process, the study evaluates a range of potential solutions to identified problems. The possible solutions include expanded transit, managing trip generation from future development, carpooling from Park & Ride lots, Transportation System Management (TSM) actions, and, finally, roadway capacity increases. II. Study Goals and Objectives/Public Involvement As developed in coordination with the Study Advisory Group (SAG), which consisted of representatives from corridor communities, state and regional agencies, and legislators, the goal for this study was to provide improved safety and mobility on the I-495 mainline and at its interchanges. This goal focused study efforts on those points where drivers enter or exit the Interstate at the junction of its ramps with local streets and on operations of its travel lanes proper. During the course of this study, several meetings were held with the SAG and a newsletter was prepared. A project-specific web site was established for use by interested parties in reviewing study progress and through which they could offer their comments. Meetings were also held with the two regional planning agencies to discuss identified issues. Near the conclusion of the study, two public informational meetings were held to present study findings, conclusions, and a program of potential improvements. June 2008 xi Summary

12 III. Existing 2006 Conditions Existing conditions along the I-495 study corridor have been documented with regard to transportation, land use, socio-economic characteristics, and the environment. The study has examined existing daily and peak hour traffic volumes on I-495, level of service (LOS), a four-year vehicle crash history at the highway s interchanges, operational characteristics of existing public transportation services in the area, and the location of Park & Ride lots. Existing traffic volumes vary widely along the corridor. For example, at the far western end of the study corridor in Westford, average weekday daily traffic (AWDT) is 123,500 vehicles, while at the far eastern end of the corridor in Salisbury AWDT is only 45,000 vehicles. Similar variations were determined to occur during the AM and PM peak hours. A key emphasis of the examination of existing conditions was the determination of how well I-495 and its interchanges are currently operating. Using the concept of LOS, which is a measure of the efficiency of traffic operations, analyses were undertaken from three perspectives: (1) signalized and unsignalized intersections at locations where ramps to and from I-495 meet the local street system, (2) merge, diverge, and weave movements at points along I-495 such as on-ramps and off-ramps, and (3) key links on I-495 between interchanges. In all cases, analyses were performed for both the AM and PM weekday peak hours. In the Western Segment (Exits 32-40) of the I-495 study corridor, there are 6 signalized intersections, all of which were determined to be operating at overall levels of service (LOS A-D) during both the AM and PM peak hours, although a small number of individual movements (2 out of a total of 44, or 5 percent) within these intersections do experience congestion (LOS E or LOS F) during the AM peak hour. During the PM peak hour, 3 movements out of a total of 44, or 7 percent, experience congested operations. For the 15 unsignalized intersections in the Western Segment, LOS is determined only for individual conflicting movements within the intersections and not for the intersections as a whole. Analysis results showed that 20 (87 percent) of the 23 such movements operate without congestion during the AM peak hour, while 18 (78 percent) do so during the PM peak hour. With regard to the Eastern Segment (Exits 41-55) of the corridor, all five signalized intersections currently operate at overall acceptable LOS during both the AM and PM peak hours. No individual movements at signalized June 2008 xii Summary

13 intersections were determined to be operating unacceptably during the AM peak hour, with only 1 movement (3 percent out of a total of 34 movements) having congestion during the PM peak hour. The 15 unsignalized intersections in the Eastern Segment contain a total of 63 movements that were analyzed. During the AM peak hour, 59 movements (94 percent) operate at LOS D or better, while during the PM peak hour 54 movements (86 percent) operate at LOS D or better. In summary, all signalized intersections currently operate at LOS D or better overall during both the AM and PM peak hours. Only a small number of individual traffic movements within these intersections currently experience congested operations. For unsignalized intersections, the vast majority of individual traffic movements within these intersections currently operate at LOS D or better during both the AM and PM peak hours. In the Western Segment, the analysis of merges, diverges, and weaves determined that 34 locations (89 percent) out of a total of 38 that were examined currently operate at LOS D or better during the AM peak hour. During the PM peak hour, 32 locations (84 percent) currently operate uncongested at LOS D or better. In the Eastern Segment, a total of 65 merge, diverge, and weave locations was examined. For the AM peak hour, it was determined that 61 locations (94 percent) operate at LOS D or better. The corresponding figures for the PM peak hour in the Eastern Segment are 63 locations (97 percent) at LOS D or better. Also identified were deficiencies in the length of 24 acceleration lanes or deceleration lanes serving I-495 s on- and off-ramps, respectively. Key links between interchanges along the length of the I-495 study corridor were examined for their existing LOS. All were found to be operating at LOS D or better. Data on crashes was compiled for a four-year period from 2002 to Interchanges were subsequently ranked according to total number of crashes, crashes involving property damage, crashes involving personal injuries, and crashes involving fatalities. Public transportation in the study area consists largely of systems concentrated in the Lowell and Lawrence areas and of commuter rail service to and from Boston. Several transportation management agencies specializing in carpooling also operate in the area. June 2008 xiii Summary

14 IV. Projected 2030 Conditions Traffic volumes along I-495 are expected to grow into the future, but at a slower rate than they have been growing in the past. On the western end of the study corridor, AWDT on I-495 in Westford will grow from its existing volume of 123,500 vehicles in 2006 to 146,400 in At the eastern end of the study corridor in Salisbury, AWDT will grow from 45,000 vehicles in 2006 to 62,000 in The projected increases in traffic volumes by 2030 will be accompanied by increases in traffic congestion, both on the I-495 mainline and at many of its 25 interchanges within the study corridor. The effects of increased traffic volumes will be more profound with respect to some aspects of the roadway system than with others. For example, all six currently signalized intersections in the Western Segment of the study corridor will continue to operate at LOS D or better in 2030 during both the AM and PM peak hours, as they did in During the AM peak hour at these same intersections, the number of individual movements operating at LOS D or better will decrease from 42 out of 44 movements (95 percent) in 2006 to 40 movements (91 percent) by 2030, a relatively small change. Seven signalized intersections in the study corridor s Eastern Segment will operate at LOS D or better during the AM peak hour, but only six (86 percent) of the seven will do so during the PM peak hour. Further, it was determined that all (100 percent) highway links currently are operating at LOS D or better in 2006 during both the AM and PM peak hours. However, this is not projected to be the case in By that time, in the Western Segment of the study corridor during the AM peak hour, only 39 percent of the links will be operating at LOS D or better. During the PM peak hour, 56 percent of these same links will operate at LOD D or better. In the Eastern Segment, 22 links (74 percent) of 30 will operate at LOS D or better during the AM peak hour, while 23 links (77 percent) will do so during the PM peak hour. More details of future traffic conditions can be found in Chapter 3 and the appendices. V. Alternatives Analysis Various highway and non-highway alternatives were evaluated for their effectiveness in addressing capacity deficiencies. These types of alternatives included additional transit services, promotion of land uses that have lower trip generation rates, provision of more Park & Ride lots, intersection improvements, and merge and diverge improvements. June 2008 xiv Summary

15 VI. Improved 2030 Operating Conditions The recommended program of improvements, summarized below, addresses identified problems at signalized and unsignalized intersections; merge, diverge, and weave locations; and the I-495 mainline links and interchanges themselves. With the exception of several locations involving weaves, the program, if implemented, would restore all operations to LOS D or better. Several weave locations at interchanges where congested levels of service are projected to exist would require the involved interchange to be totally redesigned or relocated in order for the weaving problems to be solved. While these locations are identified, solutions for these particular problems are beyond the scope of this corridor study. VII. Recommended Improvements Plan Based on the results of the analyses of existing (2006) and future (2030) operating conditions as well as the public participation process, a set of recommended improvements was developed, and is shown in more detail in Chapter 4. These improvements were grouped according to the time periods during which they would be implemented. Near-term improvements are those requiring less than two years to implement and are all responses to existing problems. For this program, all recommended near-term improvements involve the retiming of certain traffic signal systems. Specifically, two signal systems are recommended to be retimed in the corridor s Western Segment and one in the Eastern Segment. No environmental impacts from these actions are anticipated. Mid-term improvements require from two to eight years for implementation, and are intended to solve existing problems. Included is the installation of traffic signal systems at five new locations in the Western Segment and at two new locations in the Eastern Segment. Also included is the lengthening, by means of pavement re-striping, of 8 existing acceleration or deceleration lanes in the Western Segment along with 16 acceleration or deceleration lanes in the Eastern Segment. This lengthening would bring these lanes up to standard and would also improve safety. Other recommended actions for the mid term would consist of the reconfiguration of the cross-section of a one-mile section of State Route 125 to the north of Exit 50 in Haverhill and the study of the feasibility of constructing new direct connections in Salisbury between I-495 NB and I-95 SB and between I-95 NB and I-495 SB. With the potential exceptions of traffic signal installation work at two locations and the reconfiguration of State Route 125, all mid-term projects are expected June 2008 xv Summary

16 to have little or no environmental impacts. The projects listed as exceptions may involve work in the buffer zones of protected resources and may require coordination with the conservation commissions of the affected communities. Long-term improvements are those recommended for implementation eight years or more into the future. They are responses to future identified problems. A key recommendation is the widening of I-495 by one travel lane in each direction between Exit 32 and Exit 40 in the Western Segment, exclusive of that portion of the highway between Exits 35 and 36, and the widening of I-495 by one travel lane in each direction to beyond Exit 49, with the exception of the highway segment from just before Exit 43 to just beyond Exit 45. In addition to increasing I-495 s mainline capacity, this widening will also improve conditions at many of the previously identified merge and diverge locations with poor LOS. The proposed widening of the I-495 mainline would very likely have substantial environmental impacts. Also part of the recommended long-term improvement program are the retiming of two existing traffic signal systems (one in the Western Segment and one in the Eastern Segment) and the installation of traffic signal systems at three new locations (all in the Eatern Segment). With regard to deficient weave operations that were identified, several interchanges would require further study for their complete redesign. Also, intersection capacity improvements at one interchange and traffic signal installation at another may involve work within the buffer of a protected resource which would require coordination with the conservation commissions of the communities where those projects are located. While the above recommendations relate to increasing the roadway system s capacity to accommodate the traffic demands on I-495, other actions aimed at reducing the demand itself (public transportation improvements, additional Park & Ride lots, land use changes) will not by themselves be able to negate the need for roadway capacity improvements. However, these actions should be encouraged wherever possible as components of a total package of strategies to manage traffic throughout the corridor, both now and in the future. Cost estimates for the recommended improvements plan have been developed in present day (2008) dollars. Summed over the near term, mid term, and long term, they are approximately $102 million for the Western Segment of the study corridor and approximately $77 million for the Eastern Segment, giving a grand total of approximately $179 million. June 2008 xvi Summary

17 The next steps for advancing these recommendations involve project initiation and development through coordination with MassHighway, with future steps involving programming of the mid-term projects in the Transportation Improvement Programs (TIP) of the two regional planning agencies. The long-term improvements would also need to be incorporated in the regional long-range transportation plans. June 2008 xvii Summary

18

19 1.0 Introduction The Massachusetts Executive Office of Transportation and Public Works (EOTPW), in consultation with the Merrimack Valley Metropolitan Planning Organization and the Northern Middlesex Metropolitan Planning Organization, recognized the need to evaluate and address transportation issues in the 40-mile-long section of Interstate 495 (I-495) between Westford and Salisbury. This study, officially called the Interstate 495 Corridor Transportation Study, was initiated by EOTPW to provide a forum for state and regional agencies, municipal officials, business leaders, legislators, transportation service providers, and the general public to collaboratively develop reasonable solutions to identified existing and expected future transportation problems in the study area. Over time, the role I-495 played in connecting corridor communities to a wider transportation system contributed to their growth and, in part, economic well being. However, following years of expansion in population and employment, the continuing travel demands now placed on I-495 by corridor communities, combined with demands for travel from outside this corridor, are stressing the capacity of I-495. The concept of this study is to understand the quality of travel afforded by I-495 today and how that quality of travel is likely to change by The study evaluates how travel limitations that exist now, and may exist in the future, can be resolved over time in a manner that reflects the level of complexity and cost for the needed improvements. Additionally, the roles of transit and, in a general sense, land use are also included in the evaluation of how to attain and maintain an acceptable quality of travel on I Development of the I-495 Corridor The concept of an outer loop highway for eastern Massachusetts was first announced by the Massachusetts Department of Public Works (MDPW), MassHighway s predecessor, in the late 1940s. This proposed outer loop was to be located at an approximate 30-mile radius from Boston and would supplement the Relocated Route 128, which was to be built to serve the towns in an inner ring at an approximate 15-mile radius from Boston. As conceived, the outer loop highway would be approximately 87 miles in length between Route 1 in Salisbury and Route 1 in Foxborough. Its purpose would be to provide an economic boost to the communities that it would serve by offering greatly improved access to all June Introduction

20 parts of the state and nation. This outer loop was initially referred to as Relocated Route 110 but was ultimately redesignated as I-495. Construction occurred in stages, with the first section completed between Exit 29 (Route 2) in Littleton and Exit 32 (Route 225) in Westford in The remaining sections of roadway in the Merrimack Valley followed in subsequent years. Specifically, the section of roadway between Exit 32 in Westford and Exit 36 (Route 3) in Chelmsford was completed in 1962, while the section between Exit 36 in Chelmsford and Exit 42 (Route 114) in North Andover was opened to traffic in Next to come on line, in 1964, was the roadway section between Exit 42 in North Andover and Exit 53 (Broad Street) in Merrimac. The final section in the valley, between Exit 53 in Merrimac and I-95 in Salisbury, opened in Numerous technology firms have established business locations along the I-495 corridor, mirroring the Route 128 experience. Traffic volumes in some sections of the corridor are now triple what they were in As presented in Figure 1-1, this project s study area extended from Westford east to Salisbury, a distance of approximately 40 miles. Concerns about transportation issues in this corridor resulted in state, regional, and local interest in exploring potential alternative solutions for alleviating existing and expected future traffic congestion, improving regional mobility, and improving safety. The study involved the development and evaluation of a full range of transportation improvement alternatives, including interchange, highway, and non-highway improvements, as well as multimodal options. A recommended plan of future transportation improvements for the near term (up to 2 years), mid term (2 to 8 years) and long term (more than 8 years) was a key study product. This report is also a major product of the study. It documents all phases of the work efforts completed, including input from the Working Group, the Study Advisory Group (SAG), and the general public. The following chapters comprise this report: Chapter 1 Introduction Chapter 2 Existing Conditions Chapter 3 Future No-Build Conditions Chapter 4 Recommended Improvements Plan June Introduction

21 1.2 Study Area The study area for this project was finalized during the initial stages, with input from the Working Group and the SAG. The area of the study, depicted in Figure 1-1, extended along the I-495 corridor from Westford in the west to Salisbury in the east. Growth in the study area and growing traffic congestion on I-495 and its interchanges prompted the need to study transportation improvements that would better serve existing and expected future corridor transportation needs. The study area included the following I-495 interchanges: Western Segment Exit 32: Boston Road in Westford Exit 33: State Route 4 (North Road) in Chelmsford Exit 34: State Route 110 (Chelmsford Street) in Chelmsford Exit 35: U.S. Route 3 at the Lowell city line in Chelmsford Exit 36: Lowell Connector in Lowell Exit 37: Woburn Street in Lowell Exit 38: State Route 38 (Main Street) in Tewksbury Exit 39: State Route 133 (Andover Street/Lowell Street) at the Tewksbury/Andover municipal line Exit 40: I-93 in Andover Eastern Segment Exit 41: State Route 28 (North Main Street and Union Street) in Andover Exit 42: State Route 114 (Winthrop Avenue) in Lawrence Exit 43: Massachusetts Avenue/Loring Street at the North Andover/Lawrence municipal line Exit 44: Merrimack Street/Sutton Street at Lawrence/North Andover municipal line Exit 45: Marston Street in Lawrence Exit 46: State Route 110 (Merrimack Street) in Methuen Exit 47: State Route 213 (Albert Slack Highway) in Methuen Exit 48: State Route 125 in Haverhill Exit 49: State Routes 110/113 (River Street) in Haverhill Exit 50: State Route 97 (Broadway) in Haverhill Exit 51: State Route 125 (Main Street) in Haverhill Exit 52: State Route 110 (Amesbury Road) in Haverhill Exit 53: Broad Street in Merrimac Exit 54: State Route 150 in Amesbury Exit 55: State Route 110 (Macy Street) in Amesbury Junction of I-495 with I-95 June Introduction

22 1.3 Goals and Objectives 1.4 Study Context Goals and objectives identify the purpose of the study and provide a mission statement for addressing a particular issue or set of issues. The defined goals and objectives shape the framework of the entire study. As established by the Working Group, this study s key objective was: To achieve improved mobility and safety on I-495 and at its interchanges. This goal was endorsed by the Study Advisory Group (SAG) at its initial meeting in By focusing study efforts on the I-495 mainline and its interchanges, a conscious decision was made to maximize the understanding of how I-495 operates as a corridor and as a series of locations where corridor residents transition between the local street system and the Interstate. It is recognized that as a corridor planning study, this report is an initial step toward the ultimate improvement of the transportation problems identified in the following chapters. As a first step, this study is intended to collect and explain a large amount of location-specific data, understand how locations operate individually and, where appropriate, to collectively define the user experience of traveling throughout this 40-mile-long corridor. Consequently, this study s intent is to describe existing and expected future operating conditions along 80 miles (40 miles in each direction) of limited access highway, including the operational and crash characteristics of 25 interchanges involving approximately 50 intersections of local streets with Interstate ramps. Then, based on analysis, the study identifies which of these locations exhibit operational or crash problems today or in With that knowledge, a range of improvement options for today and the future is evaluated. Finally, this study recommends potential improvements for appropriate locations. In this way, the study separates I-495 s roadway segments, interchanges, and intersections into two basic groups--those that have problems and those that do not. Consequently, this identification of problem and, equally important, non-problem locations is a major product of this corridor study. June Introduction

23 VT NEW HAMPSHIRE 95 3 NY 56 AMESBURY MERRIMAC SALISBURY 1A 53 NEWBURYPORT 495 CONNECTICUT WEST NEWBURY RI 50 HAVERHILL METHUEN GROVELAND 46 LAWRENCE GEORGETOWN DRACUT BOXFORD 41 NORTH ANDOVER TYNGSBOROUGH LOWELL ANDOVER WESTFORD A NEWBURY TEWKSBURY 36 INTERSTATE 225 CHELMSFORD BILLERICA 3 32 Source: Office of Geographic and Environmental Information (MassGIS), Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs ## Interchange Towns in Study Area 3 4 Miles Study Corridor MBTA Stations MBTA Lines I-495 Corridor Study Figure 1-1 Study Area

24

25 Without understanding where the problems exist, little progress can be made toward their resolution. While potential solutions are identified for problem locations, it is imperative to understand that this is the first step toward the eventual resolution of these identified problems. Later steps will introduce these potential improvements into the public transportation improvements review, approval, and funding process. It is within those later stages that advanced engineering design will occur that will ultimately result in plans upon which improvements will be constructed. 1.5 Public Involvement A key component of this study was the public involvement process. One of the first tasks of the work effort was to develop a Public Involvement Plan, the details of which can be found in Appendix A of this document along with meeting notes from all public meetings. The intent of the Public Involvement Plan was to establish a structure and forum for interested and affected parties to provide input and comment on the study process, to provide education and awareness about the project, and to engage key stakeholders in the process as well as to build agreement and support for implementation. Principles to which the public involvement process adhered were also developed at the same time. Included were commitments to create an environment in which decisions were based on an objective, transparent, and inclusive planning process; to ensure open, honest, and clear communications; and to facilitate two-way communications. The Public Involvement Plan called for the creation of both a Working Group and a SAG to participate with the EOTPW and the Consultant Team in the process. The roles of each of these Study Participants were specifically defined by the Public Involvement Plan to provide guidance to the involved parties. The Consultant Team s roles in the public participation process were to perform technical work, to prepare material and presentations for SAG meetings, and to prepare material and presentations for public informational meetings. The roles of the EOTPW, as the study s proponent, were to review the work of the Consultant Team, manage the project, review recommendations, and make final decisions. June Introduction

26 The Working Group consisted of the EOTPW, the Northern Middlesex Council of Governments (NMCOG); the Merrimack Valley Planning Commission (MVPC); and Fay, Spofford & Thorndike. The latter organization was the prime member of the Consultant Team while NMCOG and MVPC are the two regional planning agencies serving the communities along the I-495 corridor. Roles of the Working Group included providing input to the study process, reviewing and revising technical work, and providing input on the recommendations to the EOTPW. By far the largest group participating in the public involvement process was the SAG. Its membership comprised two members of Congress whose districts include the study area, State Representatives and State Senators from the study area, several chambers of commerce representing the business community, representatives from all of the cities and towns in the study area, and representatives from several providers of public transportation in the area. The purpose of the SAG was to provide input to the study process, assist with alternatives development, and provide input on the technical materials and alternatives. A complete listing of SAG members can be found in Appendix A of this document. Specific types of public participation activities that occurred throughout this study included stakeholder interviews, SAG meetings, regional planning agency briefings, public informational meetings, communication with SAG members, and distribution of study information and materials. Other means that were used to keep the public informed about the study included media releases at key points; the preparation of fact sheets for inclusion in newsletters, etc.; the preparation of articles about the project; and the establishment for use by the public of a project-specific web site ( While the I-495 Corridor Study was underway, the public had the opportunity to post any comments that they might have on the study website. A total of 27 comments was posted, and are available for viewing in Appendix A. They ranged from requests for improvements/changes at specific interchanges to comments about the highway s speed limit. Some of the suggestions for improvements made by the public in their comments are included in the potential improvements specifically discussed in Chapter 4. Examples include traffic signal installations at Exits 33 and 37 and the need to increase mainline capacity in the future by adding travel lanes. This study also recommends that the potential for a full interchange between I-495 and I-95 be examined. Comments regarding issues at the I-495/I-93 interchange have been noted, with June Introduction

27 further study being recommended. Other suggestions were out of the scope of this study, such as a request for pothole repairs. In any case, all of the comments posted by the public on the website were considered when developing the recommended improvements plan presented in Chapter 4. Table 1-1 lists the Working Group, SAG, agency, and public informational meetings that were held over the course of the Interstate 495 Corridor Transportation Study. Notes from these meetings can be found in Appendix A of this document. Table 1-1 Public Involvement Group Date Location Agenda Working Group April 21, 2005 State Transportation Building Study Advisory Group Study Advisory Group July 28, 2005 Methuen Traffic count program, study-area boundaries, SAG membership, goals and objectives Introduction to the study; scope, goals and objectives; evaluation criteria. Nov. 28, 2006 Tewksbury Overview of existing conditions. Working Group Dec, 20, 2006 NMCOG Traffic Counts Working Group June 14, 2007 Study Advisory Group Northern Middlesex COG Councilors Merrimack Valley Planning Commission Study Advisory Group Western Segment Public Informational Meeting Eastern Segment Public Informational Meeting Feb. 7, 2008 Mar. 19, 2008 State Transportation Building Haverhill Lowell Model results, seasonality, trucks Review of existing conditions; 2030 projections for traffic; and improvement ideas for the Corridor. Overview of key findings; review of proposed Westford interchange at Rte. 225 April 17, 2008 Haverhill Overview of key findings April 23, 2008 May 22, 2008 May 27, 2008 Tewksbury Lowell Haverhill Review of proposed non-highways improvements and refined highway improvements. Open-house-style meeting and detailed presentation to review the study, problems, and recommended improvements. Open-house-style meeting and detailed presentation to review the study, problems, and recommended improvements. June Introduction

28

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

The Engineering Department recommends Council receive this report for information.

The Engineering Department recommends Council receive this report for information. CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

GTA West Corridor Planning and EA Study Stage 1

GTA West Corridor Planning and EA Study Stage 1 GTA West Corridor Planning and EA Study Stage 1 Draft Development Strategy Presentation to Peel Goods Movement Task Force April 8 2011 Study Areas 2 Unique Approach Unprecedented two-stage EA process:

More information

Transportation Demand Management Element

Transportation Demand Management Element Transportation Demand Management Element Over the years, our reliance on the private automobile as our primary mode of transportation has grown substantially. Our dependence on the automobile is evidenced

More information

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Fitchburg Gas and Electric Light Company d/b/a Unitil ( Unitil or the Company ) indicated in the 2016-2018 Energy Efficiency

More information

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Collect and analyze data on motorcycle crashes, injuries, and fatalities;

Collect and analyze data on motorcycle crashes, injuries, and fatalities; November 2006 Highway Safety Program Guideline No. 3 Motorcycle Safety Each State, in cooperation with its political subdivisions and tribal governments and other parties as appropriate, should develop

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Shift: The City of London s Rapid Transit Proposal Shift: The City of London s Rapid Transit Proposal

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

The Preferred Alternative: a Vision for Growth on the Northeast Corridor A Long-Term Vision is Needed The Preferred Alternative: a Vision for Growth on the Northeast Corridor The Federal Railroad Administration (FRA) has released the Tier 1 Final Environmental Impact Statement

More information

state, and federal levels, complete reconstruction and expansion of I35 in the near future is not likely.

state, and federal levels, complete reconstruction and expansion of I35 in the near future is not likely. Project Summary Johnson County is an economic engine for the Kansas City metropolitan area and the State of Kansas. It s the fastest growing county in the state of Kansas and has the nation s third highest

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 PLANNING FOR OUR FUTURE Planners with the Mountainland Association of Governments (MAG) have evaluated

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Parking Management Element

Parking Management Element Parking Management Element The State Transportation Planning Rule, adopted in 1991, requires that the Metropolitan Planning Organization (MPO) area implement, through its member jurisdictions, a parking

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

KANSAS CITY STREETCAR

KANSAS CITY STREETCAR KANSAS CITY STREETCAR KAREN CLAWSON MID-AMERICA REGIONAL COUNCIL KANSAS CITY STREETCAR Regional Context Alternatives Analysis Kansas City Streetcar Project KANSAS CITY REGION KANSAS CITY REGION KANSAS

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Early Scoping Meeting for Alternatives Analysis (AA) May 17, 2011 Introduction Key players Local lead agency: Metro Federal lead agency:

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

Proposed Program of Interrelated Projects

Proposed Program of Interrelated Projects DALLAS AREA RAPID TRANSIT Proposed Program of Interrelated Projects Federal Transit Administration Capital Investment Program Summer 204 INTRODUCTION The current federal transportation bill, Moving Ahead

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan Date: Wednesday, June 24, 2014 Location: Ann Arbor District Library Attendees: 40 citizen attendees Ann Arbor Station Environmental Review Public Meeting Meeting Notes Meeting #2 The second public meeting

More information

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements Existing Conditions Belmont Circle Bourne, MA Speakers Pam Haznar, MassDOT Ed Hollingshead, Fay Spofford & Thorndike Heather Ostertog, Fay, Spofford & Thorndike Goals for Group Local Knowledge Work through

More information

Troost Corridor Transit Study

Troost Corridor Transit Study Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Bow-Concord Interstate 93 Transportation Planning Study

Bow-Concord Interstate 93 Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Presentation to: Greater Concord Chamber of Commerce and Concord 2020 June 21, 2006 Transportation in New Hampshire NH Transportation Business Plan

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

Mississauga Bus Rapid Transit Preliminary Design Project

Mississauga Bus Rapid Transit Preliminary Design Project Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE OCTOBER 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre.

More information

Scarborough Transit Planning

Scarborough Transit Planning Scarborough Transit Planning April 23, 2016 Transportation Planning Section City Planning Division Overview 1. Developing Toronto s Transit Network Plan 2. Scarborough Transit Planning 1. Minutes of last

More information

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside Los Angeles County Metropolitan Transportation Authority November 2012 Connecting the San Fernando Valley and the Westside Interstate 405 Sepulveda Pass THIS PAGE INTENTIONALLY LEFT BLANK Sepulveda Pass

More information

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis prepared for Kansas City, Missouri prepared by Burns & McDonnell

More information

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, 2006 SUBJECT: Scarborough Rt Strategic Plan RECOMMENDATIONS It is recommended that the Commission: 1. Endorse

More information

Executive Summary October 2013

Executive Summary October 2013 Executive Summary October 2013 Table of Contents Introduction... 1 Rider Transit and Regional Connectivity... 1 Plan Overview... 2 Network Overview... 2 Outreach... 3 Rider Performance... 4 Findings...

More information

ASSEMBLY RESOLUTION No. 57 STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION

ASSEMBLY RESOLUTION No. 57 STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION ASSEMBLY RESOLUTION No. STATE OF NEW JERSEY th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 0 SESSION Sponsored by: Assemblyman ROBERT D. CLIFTON District (Burlington, Middlesex, Monmouth and Ocean) Assemblywoman

More information

CLRP. Performance Analysis of The Draft 2014 CLRP. Long-Range Transportation Plan For the National Capital Region

CLRP. Performance Analysis of The Draft 2014 CLRP. Long-Range Transportation Plan For the National Capital Region NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD Item 12 CLRP Financially Constrained Long-Range Transportation Plan For the National Capital Region 2014 Performance Analysis of The Draft 2014 CLRP

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

Purpose and Need Report

Purpose and Need Report Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms

Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms Performance Measure Summary - Boston MA-NH-RI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project MOTION NO. M2014 64 Preferred Alternative for the Puyallup Station Access Improvement Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/14/14 8/28/14 Recommendation

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

Appendix B CTA Transit Data Supporting Documentation

Appendix B CTA Transit Data Supporting Documentation RED ED-PURPLE BYPASS PROJECT ENVIRONMENTAL ASSESSMENT AND SECTION 4(F) EVALUATION Appendix B CTA Transit Data Supporting Documentation 4( Memorandum Date: May 14, 2015 Subject: Chicago Transit Authority

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Mobility Investment Priorities Project Houston US 59 US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Current Conditions From IH 610 West to SH 288, US 59 operates with four or five lanes

More information

What We Heard Report - Metro Line NW LRT

What We Heard Report - Metro Line NW LRT What We Heard Report - Metro Line NW LRT by Metro Line NW LRT Project Team LRT Projects City of Edmonton April 11, 2018 Project / Initiative Background Name Date Location Metro Line Northwest Light Rail

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Project Working Group Meeting #5

Project Working Group Meeting #5 September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Annie Nam Southern California Association of Governments September 24, 2012 The Goods Movement

More information

City of Lake Oswego Transportation System Plan Update PLAN AND POLICY REVIEW, PART 1

City of Lake Oswego Transportation System Plan Update PLAN AND POLICY REVIEW, PART 1 City of Lake Oswego Transportation System Plan Update PLAN AND POLICY REVIEW, PART 1 Date: March 7, 2012 Project #: 11187 To: Cc: From: Project: Subject: Project Management Team Transportation System Plan

More information

Community Advisory Committee. October 5, 2015

Community Advisory Committee. October 5, 2015 Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information