1 Consulting Engineers Collingwood Bracebridge Orillia Barrie Ottawa 115 Sandford Fleming Drive, Suite 200 Collingwood, Ontario 19Y 5A6 Tel: (705) Fax: (705) Web: December 22, 2016 via CCTA File Zsolt Katzirz Corridor Management Planner MTO - West Region, London 659 Exeter Road London, ON N6E 1L3 Re: Violet Hill Gravel Pit, Town of Mono Site Access Options Dear Zsolt: Further to our site meeting of October 20, 2016 and in consideration of your letter to the MNRF of November 14, 2016, we are writing to review the potential means of site access for the proposed Violet Hill pit. Given the configuration of the proposed site, which includes frontage on 3 rd Line, 4 th Line and Highway 89, access to each has been considered and previously discussed with MTO. Key points of discussion pertaining to each are noted below. Option 1: Access via 3 rd Line Good sight lines are provided in both directions along Highway 89 at its intersection with 3 rd Line (see Figure 1), albeit there are some minor restrictions to the east due to the combined horizontal and vertical alignment of the highway. The prevailing grade on Highway 89 in the area of 3 rd Line is uphill to the east and thus trucks entering the highway at this location travelling east (which is expected to be the primary direction of travel given the market areas) will be negatively impacted by the grade (ie. it will take the trucks a longer distance to attain highway speeds, thus increasing the potential for impacts to vehicles approaching from behind). While the proposed pit has frontage along the 3 rd Line, the abutting lands are constrained due to topography and are considered sensitive lands. Lands to the west of 3 rd Line are within the Niagara Escarpment Commission (NEC) jurisdiction and are classified as either Escarpment Natural Area or Escarpment Rural Area. n this regard, it is anticipated that any use of the 3 rd Line for access to the pit would not be favourable to the NEC, given that alternative means of access, which are not adjacent to NEC designated lands, are available. Professional Onrario engineers Au1horized by the Association of Professional Engineers of Ontario to offer Professional engineering services. aconsulting Engineers of Ontario

2 The hamlet of Violet Hill is located along the 3 rd Line north of Highway 89, and thus significant opposition from the area residents would be expected. n consideration of this, we do not believe this option for access would be supported by the Town of Mono. Option 2: Access via 4 th Line Access to the 4 th Line from the site is readily available and would have minimal impacts to area residents given the limited number of such along 4 th Line. Sight lines to/from the west along Highway 89 are acceptable (see Figure 2), and thus for trucks departing the site to travel east, or those approaching the site from the west, there is no concern. The sight lines to/from the east are limited due to the combined horizontal and vertical curves (see Figure 2). The provision of a WB left turn lane on Highway 89 at 4 th Line would address issues relating to trucks arriving from the east in that they would be removed from the through stream of traffic (and thus WB vehicles approaching from behind would not be impacted by a slowing, turning truck). However, trucks departing from the site destined to the west would continue to have limited sight lines for approaching WB vehicles. While a WB acceleration lane could be provided, such would still require the truck to pull out onto Highway 89 under restricted sight line conditions. The notion of utilizing a centre lane for truck acceleration was discussed. However, this is not a standard configuration and thus there is concern with the resulting operations (it is common practice for slower moving vehicles to stay in the right lane, whereas under this scenario, they would be promoted to use the left lane). Highway 89 could also be widened to provide 2 WB lanes through the intersection (to provide shared left-through and through-right lanes), which could accommodate truck movements from the east and to the west. However, this would not resolve the restricted sight lines and associated impacts with truck operations in that passenger vehicles would be permitted to travel in both lanes. To address the restricted sight lines to/from the east, it would be necessary to remove the embankment on the north side of Highway 89, thus extending the plane of vision. However, such is not readily achievable given the existing right-of-way. Furthermore, it is understood that MTO has no mechanism by which the required lands could be secured (and likewise, neither does our client). While reconstruction of the highway would also serve to improve sightlines, it would require additional lands and would result in significant costs. Option 3: Direct Access to Highway 89 The proposed site access is located direct to Highway 89, approximately 380 metres west of 4 th Line (on the west side of the existing residential property). Sight lines to/from the east are appropriate; those to/from the west may be limited due to the vertical alignment of Highway 89 (refer to Figure 3). To address the latter, an EB acceleration lane could be provided, which would allow trucks to exit the site and proceed easterly without interfering with oncoming EB traffic. There appears to be opportunity to undertaken a minor widening of Highway 89 to accommodate this. However, it is unlikely that both an EB acceleration lane and a WB left turn lane could be accommodated should MTO require such, given the limited opportunity Zsolt Katzirz MTO - West Region, London Page 2 of 4 December 22, 2016

3 for widening on the north side (due to prevailing grades and the existing pond) and similar restrictions on the south side (to the existing residential property). As summarized above, each of the access options have limitations in one respect or another. As documented in the traffic review of June 15, 2015, the preferred option is the direct access to Highway 89. However, we understand that this option does not satisfy the MTO access management requirements and thus cannot be supported by MTO at this time. n consideration of this, and as discussed at our site meeting, Option 4 was devised, which involves the realignment of 4 th Line to effectively eliminate the sight line concerns at its current location. Site access would then be provided direct to the realigned Option 4. Key points of this option are noted below. Option 4: Access via Realigned 4 th Line The existing south leg of the 4 th Line would be realigned upon approach to Highway 89, resulting in a shift of approximately 170 metres to the west. A 30 metre buffer would be provided to the abutting residential property (thus providing a 40 metre offset to the centre of the road, assuming it would be located in a 20 metre right-of-way). Figure 4 provides a concept plan of the realignment. A detailed sight line investigation was undertaken at the realigned intersection location, based on Highway 89 engineering plans as provided by the MTO. As illustrated in the attached PP-1 drawing (refer to the profile showing truck sight lines), the following sight lines are realized (also refer to Figure 5): a truck stopped on the realigned 4 th Line waiting to enter Highway 89 can see approaching vehicles from a distance of 495 metres to the west and 325 metres to the east (corresponds to entering sight distance ); and a truck slowing or stopped on Highway 89 to turn onto 4 th Line can be seen from 465 metres to the west and 295 metres to the east (corresponds to stopping sight distance ). For a posted speed of 80 km/h, the MTO Highway Access Management Guideline requires a stopping sight distance of 185 metres and an entering sight distance of 320 metres for a public road or commercial access to a 2-lane road. The realigned 4 th Line provides sight lines in excess of the noted requirements. n this regard, the MTO requirements are satisfied and thus it would not be necessary to construct a left turn lane or an acceleration lane on the highway to address restricted sight lines (the intent of which was to separate car traffic from truck traffic, recognizing that the entering sight distance requirements were not otherwise deemed appropriate). While adequate sight lines would be provided at the realigned 4 th Line location, further enhancements could be implemented through a lowering of the Highway 89 profile through its intersection with the north leg of 4 th Line. There is a hydro sub-station on the existing south leg of the 4 th Line, which would require an extension to its driveway under the realignment. There are no other driveways that would be impacted (while there is a residence at the corner with Highway 89, its driveway access is provided to the highway). Zsolt Katzirz MTO - West Region, London Page 3 of 4 December 22, 2016

4 Any lands required to accommodate the realignment can be conveyed to the MTO and/or Town of Mono at no cost (in that they are currently part of the Violet Hill pit land holdings). Summary Through our discussions and site meeting, and further investigations pertaining to sight lines, we believe the realignment of the 4 th Line is a viable solution and would satisfy the requirements of MTO. Furthermore, given the constraints and limited sight lines at the existing intersection of 4 th Line with Highway 89, we believe that the realignment will be advantageous to the Town and prove beneficial to the area residents and motorists. Further to your review of the above, and provided you concur with the noted statements, we would ask that you provide a letter to MNRF indicating your support in principle for Option 4: Access via Realigned 4 th Line such that our client can continue through the application process with the Town (at present, the Town has deemed the application incomplete in that an appropriate access strategy has yet to be resolved with the MTO). Should you have any questions or comments on the above, please do not hesitate to contact us. Otherwise, we look forward to a favourable response. Yours truly, C.C. Tatham & Associates Ltd. Michael Cullip, P.Eng Director, Manager Municipal & Transportation Engineering MJC:mjc copy: Sam Greenwood, Greenwood Construction (sam@greenwoodconst.ca) :\2014 Projects\ Violet Hill, Mono Twp\Documents\Correspondence\L - MTO - Site Access Options.doc Zsolt Katzirz MTO - West Region, London Page 4 of 4 December 22, 2016

5 looking west on Highway 89 from 3 rd Line looking east on Highway 89 from 3 rd Line Consulting Engi_" Violet Hill Gravel Pit Sight Lines on Highway 89 at 3 rd Line 1 Figure

6 looking west on Highway 89 from 4 th Line looking east on Highway 89 from 4 th Line Consulting Engi_" Violet Hill Gravel Pit Sight Lines on Highway 89 at 4 th Line Figure 2

7 looking west on Highway 89 from proposed direct access to Highway 89 looking east on Highway 89 from proposed direct access to Highway 89 Consulting Engi_" Violet Hill Gravel Pit Sight Lines on Highway 89 at Direct Highway Access Figure 3

8 Alternate Entrance Sketch -ro 1:4,000 i5asl" ~..3$"v~ (VJ~ cf." 4 30m 170m 20m <, Consulting Engineers Violet Hill Gravel Pit Figure Realignment of 4th Line Concept Plan 4

9 looking west on Highway 89 from proposed realigned 4 th Line intersection looking east on Highway 89 from proposed realigned 4 th Line intersection Consulting Engi_" Violet Hill Gravel Pit Sight Lines on Highway 89 at Realigned 4 th Line Figure 5

10 450 4~+-"-t--l-~ - "+'--+.-" i!"-"-~--r-"+--r"-"r"~:--+--r-+-+--f--r-t-r--"~'". _ji +_"+"_+"+_" "+""""+_~",,!,... 1 ' r!""i_"+-+'_-r"~""_+_+_+"""---"-+'_"'+[-+~ ~-"~~-~--~--""~~"+-~'f-'"~- "!--~-"-~---'-"+~ ~-+~"-"":--+[" ""+-+"-i--+'f-""""-"41"-4! "-"----+-""~--1'""""+""--i-"'+""-+"---f--il--+-""+-+-"'t'--"-"4""~'"-"+' : i :,"! 1 1!.. #6-1-"i--t-+~i-+"-T~-"r--t-+-t ~f-t-r-r"+--+~; "-'-~-~-"+-"+-+-!-t~"-~ r~-~-+-t--r"+" -ti-i--r~j +_+ +_~_~_F;~+"".~_~_~~t:_-1-~_~_=~f~.~'+~_~f~~""~+'~~+li_~_t-:_=;j1_~+i"~""~~~+r~'~"'~~~"~rl"~+":~_++~~.~~-'~rl-"l---+-~-~-"+"~;r~-",.:+"-+,--"i,-++-~-r-r-+"~--r-l-"+-~-+,--~+-t"-f-+- #4 t--t-if-t-+i-f:--t-+"+-t-t-r-i-f--j--++-f:-f-t, -+1 "+,-++-t-t-i-"1--+-i--f !- -+"!~!: il ' 'i',: ' 1= !-"+=i= ' + 1_-+' -+-+"-+--+-" H-" i -,11- #2f:t:t=i'~1~i~i~=l=t=~~t1=1:t:t~~':t:t~=r~t=t=t=t1=r=t=t=t1=~t=tJ=1=t~~1t1'=t~~1t~~t:t1~~~=t~±=t=-t; Jt±=t=t=tj=i=t=E=Ei=~t:~:i=t=tj:j:~~~~~;t:t~J[t=tl ii ' ii' ii, :, i..1 i ' j't1~=t=t=tjt1=t=t=rj=1=l=t'=t1=l'=t=t= 440 i' 1..,. J_T-H--+t ++-+-i-+-, ,-i--j-- V"'" ' :.1 r-!'.., :.,... _;...! ' "'. ~,,! :..' 1 i 1 -+" "--+""+'-+- '111! " --j ' "+-+-.."l'--i=""i-..d.'-."-+: j-+" +" il -!-+.. vi-" 1 '... ' i " r"+--r--+' ~-"r-"",.k::l-""---t t-"-j-"+-----~~---tl-t /' ' ' i : '!~"!---. ;; L , i ~~ r:--,...! 434 Y..--V iii :..,,:.. ; '~~_'" ~-r"~"-+-"+--f-"---+"-+-r "'+-_+"+_-+--+" +... "_r-...! -t_""+r:--!"* l!~"-+;_+ 432 L---t-j"-r t---t-t"-t--+-r"-"-+'--+-t +-t--i-"""r--t-ii-il--+ 1 i,... "+"+-"+ ++_+'_, ' -1'-, + "-+-+-+'- " '-1-' --+"-+--~-f4-"+-~ ""-----t--"t l--+---l--+-!--"+-"-i--~-+---l--i-"~! t --+--l-"t-"-i'-+-"--+--l--l f-!j"~,, f, -+--["--t--+-1,--" [--+ ill -+--], -f--[---t------t--+~-t--~-1:r-~"'i,..,.j-- ' r ,! ' f' iii 1 r--!--r-1"-:o:- -- -r----- t -f--r-;- -~' "- -" ----r - r--"--l-"t=r:::t-tr- "-"" --l--l-rl-r-r-l----'"ti-""" -- ""-T--r]-i--T"-r-"T""~-T-T-r--T"T---1! _j 1! L. f--j --t-i---~--r-' ! -"- --j---l" ;--+- f-- -"---t-t-r--~-t- -1--"f-" ti---i +"-"-f---" "-~"--+-l-'-"=1"-"f t i t--t-~"~--t-"i---i--j-"-t- --"ii"-"--ii-1-t-l-r-+"- -l+r-+ -'--i---r--r- - "- ~- -T--"" r-+a - ---j--~--.-"t-"l-- -t-t-+..tr- i ~-+-t--'+"+= sf -H- -rr-,-'+= - "1--1",-1- -l"t-r--+ - t~! - r+-1-~1--f-- 1-"". i t-t"i -1-- "-"-i-l"-t""+-f-r---t"- --- "+"-----+~t!i~+-t-t-t-+"i-'t r-wt~-ttl-f--j-. --t-i ---,-.~ -1- ', f-- "--t- ----~--t-t- -" - -i - -"~--r--l-tl-+- lor- t- -+--t t±~-:w-~-f--f--- - ""i-- - "11 "-j~-7-r t+-"t--lwt-r--t-r--j--tl- --"t--t-, r----- "t T --- ; i 1 +- t--' ; "-!--L! [" _1" LL i '. '-t- i r. -L,_ e! O!_l- 1. i+--! _J--L.' i! iii! r i rt D, iii 1!',-- -t! ", f:+! -l,j!,+, i i 1 ~~ +rt i [ i-r- rj-"---r-,-rt--~i--~---j-+-t-- -i+t ii-, j j!!! --r-r -,Tt---ff 1, T ,1- i-,r --t- - H-- -1-'--~-t--,i_,- t,- - '-j-- -+,,-1- -t-i! f-h t -n--~-t-+-r-t-t-- +--!-t,-,-1, r -1,,t t- : i ' " -j 1 ~ 1f-' -:::t ,_J--<-+ L ~-tf" -l +!:--r-r: tt:g.;:1 ++ f ~1- =>:.f-:t-l-r4~t~-~i ±t-rl ~ ~ - ±+r4-t-,- ±w-r in,=tj ';.~_L[~,' +_. _! Li.,. _! i t :! i..' iii!,.. -_LJ i i-t"j.ll _!i!jj~ ++~. +--joll. L t"! --t-l+-t-- "-l i-f-~, 8:! 1 1 ' T, " "! '!"! i. ': "1 :r-r i -: t ii', t,-,-"tl.;v "",-- ---f-"tt---r- -"t j-t---~--t ""--t-j---t ""-- --i-i- j-- -+" "" :- llt -----"". L t '-~ lll-n +t-+,-j t1 --t--l--i--- i---l-- "-"---+"-r,l-"+t--i--~"--j-" '-"." -i"-+--~--- ++: " " - i til ill, iii i 11'1 r r --""---"--l-r-r,-j-"""-/"-, -,--ll""-t--,"--"i-t--"-"-"t---"-"---r-t--t--1--~--r--t----"i!~t-it-r---r---"-"---,-----r-\ -"T-l-frt+:tl--"-"r-r-i f S 8 ~ +., p 1&38-77"-"".!'.../' ~ r: P_1~-770.,. JMC[ D....!1f&----- _- _-,. G?'j- e ~ ~or~1.796 ~ J '. [ - g 6;....."",-_"~.-.,.."... ;-,171 - _ O' ~ iif;:::!!t , " 441~59.4.r., -7" _------p::;iii 17._.)\... ~.. O' Q ~ ""'" O'. ~ ~~~..._.. _ ~) Hie 2,._, ,.t _;;.~ _ --- '" ~ Q Olg i'": _...,,... j.e [.;;, ] _...",_~_===;;::;;-._,03&-71C,""l_ ~l._ r"1,rt~._,03&-17 '" \ _ ~ ~ ~ --=~;:-...,!tor... :::'-.'1'_ -!.." _ '" ''' /-~ 'i:f ~ HO ' H...,..--a;,r--- om..,m.089mul - ""-sr ~ _". P-''''-j_f._~ "',;-..!t"" -= rtWl'_ 2J)n :...,:_.".: ~ - O' it_, _---- _-_-- fj'_ ""..._ HOT '9+4~5~ 4TH UNE EHS.A, 076 it - HOT ' !.'" ~or7'... _,.,,-11"' --; 4:ft!-?' ==---:ip:; ",,--: /'.. SM \ ~ ~: " ~1. LOT 32 ~,.. - _ ::- _,,,;< "'.O' <?~ lop orrb '0 CON 4.1,-1,5. "' _ -~'!,~-~- Lf- i ~ ~lli LOT 32 CON 5.1' ~UL _ H01 '9+5'0.;: 4TH UNE E, -... SM ~ lop or'",, LOT 32 CON 4.1'1.5. J J, C.C.Tatham & Associates Ltd. Consulting Engineers Collingwood Bracebridge Orillia Banie Ottawa

Proposed Violet Hill Gravel Pit

Proposed Violet Hill Gravel Pit April 30, 2018 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Violet Hill Gravel Pit, Town of Mono Proposed Road Improvements

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN 2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

DEPUTATION TO THE COMMITTEE OF THE WHOLE of the TOWN OF THE BLUE MOUNTAINS. ANDREA MACECEK AND GLENN BIER for the RESIDENTS OF WOODLAND PARK ROAD

DEPUTATION TO THE COMMITTEE OF THE WHOLE of the TOWN OF THE BLUE MOUNTAINS. ANDREA MACECEK AND GLENN BIER for the RESIDENTS OF WOODLAND PARK ROAD DEPUTATION TO THE COMMITTEE OF THE WHOLE of the TOWN OF THE BLUE MOUNTAINS ANDREA MACECEK AND GLENN BIER for the RESIDENTS OF WOODLAND PARK ROAD MAY 15, 2017 Woodland Park Road residents and the Board

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph) Prepared By: 332 Lorne Avenue East Stratford ON N5A 6S4 Prepared for: Paul Kemper, President

More information

Driveway Entrance Policy for Residential Properties - District 3 - All Wards

Driveway Entrance Policy for Residential Properties - District 3 - All Wards Driveway Entrance Policy for Residential Properties - District 3 - All Wards (City Council on August 1, 2, 3 and 4, 2000, adopted this Clause, without amendment.) The North York Community Council recommends

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits CITY CLERK Clause embodied in Report No. 9 of the, as adopted by the Council of the City of Toronto at its Special Meeting held on July 30, 31 and August 1, 2002. 10 Warrants for All-Way Stop Sign Control

More information

5 SPEED LIMIT REVISIONS ON REGIONAL ROADS JANUARY UPDATE

5 SPEED LIMIT REVISIONS ON REGIONAL ROADS JANUARY UPDATE Clause No. 5 in Report No. 1 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on January 23, 2014. 5 SPEED LIMIT REVISIONS

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Director of Building and Deputy Chief Building Official. 1. North York Community Council approve the request for sign variance at 515 Drewry Avenue.

Director of Building and Deputy Chief Building Official. 1. North York Community Council approve the request for sign variance at 515 Drewry Avenue. STAFF REPORT ACTION REQUIRED Sign Variance 515 Drewry Avenue (New Application & Report) Date: October 19, 2009 To: From: Wards: Reference Number: North York Community Council Director of Building and Deputy

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

PROPOSED TRAFFIC RESOLUTION

PROPOSED TRAFFIC RESOLUTION Reference Number: TR 50-18 Location:, Brooklyn Bus Hub - Brooklyn Proposal: Information: To provide new bus stops to create a Bus hub location on Cleveland Street, Brooklyn, as part of Wellington s new

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

4 SPEED LIMIT REVISIONS ON REGIONAL ROADS

4 SPEED LIMIT REVISIONS ON REGIONAL ROADS Report No. 4 of the Transportation Services Committee Regional Council Meeting of April 19, 2012 4 SPEED LIMIT REVISIONS ON REGIONAL ROADS The Transportation Services Committee recommends the adoption

More information

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial

More information

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview

Re: Sainte-Geneviève Elementary School (2198 Arch Street) Transportation Overview 2 March 2015 OUR REF: TO3205TOB00 Conseil des écoles catholiques du Centre-Est (CECCE) 4000 rue Labelle Ottawa, Ontario K1J 1A1 Attention: Maguy Eustache Dear Maguy: Re: Sainte-Geneviève Elementary School

More information

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5Ã)Ã Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5) 52$'6,'()$&,/,7,(6 7$%/(2)&217(176 Section Subject Page Number Page Date F.1 VEHICLE INSPECTION STATIONS... F-3 April

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON

TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON TRAFFIC IMPACT STUDY 3171 LAKESHORE ROAD WEST RESIDENTIAL DEVELOPMENT TOWN OF OAKVILLE, REGIONAL MUNICIPALITY OF HALTON PREPARED FOR: VOGUE WYCLIFFE (OAKVILLE) LIMITED PREPARED BY: C.F. CROZIER & ASSOCIATES

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

THE CORPORATION OF THE DISTRICT OF SUMMERLAND BYLAW NUMBER

THE CORPORATION OF THE DISTRICT OF SUMMERLAND BYLAW NUMBER THE CORPORATION OF THE DISTRICT OF SUMMERLAND BYLAW NUMBER 92-47 A BYLAW OF THE CORPORATION OF THE DISTRICT OF SUMMERLAND TO ESTABLISH REGULATIONS FOR THE CONSTRUCTION OF DRIVEWAYS AND ACCESSES TO AND

More information

This letter summarizes our observations, anticipated traffic changes, and conclusions.

This letter summarizes our observations, anticipated traffic changes, and conclusions. Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the

More information

MUNICIPAL CLASS EA PROCESS 1

MUNICIPAL CLASS EA PROCESS 1 PHASE 1 PROBLEM OR OPPORTUNITY PHASE 2 PHASE 3 PHASE 4 PHASE 5 ALTERNATIVE SOLUTIONS ALTERNATIVE DESIGN CONCEPTS FOR PREFERRED SOLUTION ENVIRONMENTAL STUDY REPORT IMPLEMENTATION 1. Identify problem or

More information

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS 161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for

More information

Proposed Dounreay - Mybster 275 kv / 132 kv

Proposed Dounreay - Mybster 275 kv / 132 kv Background Scottish Hydro-Electric Transmission Ltd (SHETL) is proposing a new 275 kilovolt (kv) (1 kilovolt = 1000volts) double circuit overhead line (OHL) between the Dounreay sub station and the new

More information

Please Read Carefully

Please Read Carefully Please Read Carefully Name Address Address Address ANNE BRERETON DIRECTOR FOR PLACES Central Depot, Moat Lane Solihull West Midlands B91 2LW Tel: 0121 704 6103 Fax:0121 704 8162 Email: jwilkins@solihull.gov.uk

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1): 2709 McGraw Drive Bloomington, Illinois 61704 p 309.663.8435 f 309.663.1571 www.f-w.com www.greennavigation.com November 4, 2016 Mr. Kevin Kothe, PE City Engineer City of Bloomington Public Works Department

More information

Appendix F-1 Description of the Long-Term Alternatives

Appendix F-1 Description of the Long-Term Alternatives Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace

More information

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study 19 May 2015 BY EMAIL: asaggarwal@gmail.com Manor Park Management 231 Brittany Drive, Suite D Ottawa, ON K1K 0R8 Attention: Mr. Anand Aggarwal RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic

More information

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card) County of Wellington Engineering Services Department Roads Division 74 Woolwich Street Guelph, Ontario N1H 3T9 Phone: (519) 837-2601 Fax: (519) 837-8138 Email: roadsinfo@wellington.ca ENTRANCE PERMIT OWNER/APPLICANT

More information

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers August 24, 2015 File: 115-622 Mr. R. Baumann, President The RGB Group 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 RE: RESIDENTIAL DEVELOPMENT

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN 12 September 2017 Iain McManus Civitas Planning Consultants PO Box 47020 Ponsonby AUCKLAND 1144 Dear Iain, TRAFFIC ENGINEERING ASSESSMENT 43-45 45 MOUNT EDEN ROAD, MOUNT EDEN As requested, we have prepared

More information

Prepared for: Ontario Inc. CHICKADEE GROVE COMMUNITY PROPOSED RESIDENTIAL DEVELOPMENT TOWN OF CALEDON TRANSPORTATION OPINION LETTER

Prepared for: Ontario Inc. CHICKADEE GROVE COMMUNITY PROPOSED RESIDENTIAL DEVELOPMENT TOWN OF CALEDON TRANSPORTATION OPINION LETTER Prepared for: 2414176 Ontario Inc. CHICKADEE GROVE COMMUNITY PROPOSED RESIDENTIAL DEVELOPMENT TOWN OF CALEDON TRANSPORTATION OPINION LETTER 1616095-001-T01 October 2016 October 06, 2016 16-16095-001 Mr.

More information

Traffic Generation November 28, Mr. Todd Baker Baker Properties, LLC 953 Islington Street Suite 23D Portsmouth, NH 03801

Traffic Generation November 28, Mr. Todd Baker Baker Properties, LLC 953 Islington Street Suite 23D Portsmouth, NH 03801 28-1932-03 November 28, 2016 Mr. Todd Baker Baker Properties, LLC 953 Islington Street Suite 23D Portsmouth, NH 03801 Re: Traffic Impact Evaluation The Rose Farm Residential Development Exeter, New Hampshire

More information

PROPOSED BROILER FARMS

PROPOSED BROILER FARMS PROPOSED BROILER FARMS BARINGHUP WEST Traffic Engineering Assessment Prepared for PAVILION PARTNERS MARCH, 2014 OUR REFERENCE: 16853R9457 PROPOSED BROILER FARMS BARINGHUP WEST Traffic Engineering Assessment

More information

ORIGINAL AND REVISED DEVELOPMENT CONCEPTS

ORIGINAL AND REVISED DEVELOPMENT CONCEPTS Reference No.: 141-24579 Mr. Tyson Simms, MCIP, LPP Planner II Rural Policy and Applications Current Planning Planning and Development P.O. Box 1749 Halifax, NS B3J 3A5 Re: : (WSP Canada Inc, March 2015)

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

District of Maple Ridge

District of Maple Ridge District of Maple Ridge TO: His Worship Mayor Ernie Daykin MEETING DATE: March 17, 2014 and Members of Council FILE NO: 2013-096-RZ FROM: Chief Administrative Officer MEETING: COW SUBJECT: Tandem Parking

More information

The Re:Queen and Sparks Traffic Brief - Addendum #2

The Re:Queen and Sparks Traffic Brief - Addendum #2 June 11, 2015 Ashcroft Homes 18 Antares Drive Ottawa, ON K2E 1A9 EMAIL: mpham@ashcrofthomes.com Attention: May Pham Development Planner Dear May, Re: The Re:Queen and Sparks Traffic Brief - Addendum #2

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development

144&176 John St. and 200 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development Solmar Development Corp. 144&176 John St. and 2 John St. & 588 Charlotte St. Hotel and Residential Subdivision Development TRANSPORTATION IMPACT STUDY 18145 November 217 LEA Consulting Ltd. Consulting

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

Airport Road Improvements

Airport Road Improvements Airport Road Improvements October 2015 ENVIRONMENTAL STUDY REPORT Airport Road from 1.0 km north of Mayfield to 0.6 km north of King Street Town of Caledon D TRAFFIC STUDY & ROUNDABOUT EVALUATIONS Airport

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

GTA West Corridor Planning and EA Study Stage 1

GTA West Corridor Planning and EA Study Stage 1 GTA West Corridor Planning and EA Study Stage 1 Draft Development Strategy Presentation to Peel Goods Movement Task Force April 8 2011 Study Areas 2 Unique Approach Unprecedented two-stage EA process:

More information

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS 5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS The Transportation Services Committee recommends the adoption of the recommendations contained in the following report

More information

and Members of Municipal Council City of Niagara Falls, Ontario Mewburn Road Speed Control Review

and Members of Municipal Council City of Niagara Falls, Ontario Mewburn Road Speed Control Review TS-2018-10 May 8, 2018 REPORT TO: SUBMITTED BY: SUBJECT: Mayor James M. Diodati and Members of Municipal Council City of Niagara Falls, Ontario Transportation Services Department TS-2018-10 Mewburn Road

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: March 21, 2017 REPORT NO. PW2017-022 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Capability City of Mississauga Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga,

More information

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy A. GENERAL Speed humps are an effective and appropriate device for safely reducing vehicle speeds on certain types of streets when installed accordance with the provisions of this policy. In order for

More information

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe,

12 April Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC Attention: Joseph Nasr. Dear Joe, Our Ref: Contact: CG120569:VG Valentine Gnanakone Leakes Pty Ltd 211 Waverley Road EAST MALVERN VIC 3145 Attention: Joseph Nasr Dear Joe, 690 DERRIMUT ROAD PROPOSED RESIDENTIAL SUBDIVISION Further to our

More information

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit S REGION OF WATERLOO TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: FILE CODE: A02-30/PW SUBJECT: NORTHFIELD DRIVE AT

More information

Dixie Transportation Planning Office

Dixie Transportation Planning Office A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS MCHENRY COUNTY DIVISION OF TRANSPORTATION 16111 NELSON ROAD WOODSTOCK, IL 60098

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Environmental Assessment Derry Road and Argentia Road Intersection

Environmental Assessment Derry Road and Argentia Road Intersection Air and Noise Study Environmental Assessment Derry Road and Argentia Road Intersection Project 11-4295 City of Mississauga, Region of Peel October 17, 2014 1 Region of Peel Environmental Assessment for

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Mississauga Bus Rapid Transit Preliminary Design Project

Mississauga Bus Rapid Transit Preliminary Design Project Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE OCTOBER 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre.

More information

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council:

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council: Corporate NO: R279 Report COUNCIL DATE: DECEMBER 18, 2006 REGULAR COUNCIL TO: Mayor & Council DATE: December 15, 2006 FROM: General Manager, Engineering FILE: 8710-20 (Heritage) SUBJECT: Update on Community

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars. Sound Transit Phase 2 South Corridor LRT Design Report: SR 99 and I-5 Alignment Scenarios (S 200 th Street to Tacoma Dome Station) Tacoma Link Extension to West Tacoma Prepared for: Sound Transit Prepared

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information