1 ELECTRICAL SAFETY INSPECTION REPORT ABSS HIGH TECH SWEATER LTD. Kalameshar, Board Bazar, Gazipur. Factory List: ABSS HIGH TECH SWEATER LTD. Inspected by Report Generated by : Hossain Shah Aarif : Mobassear Ul Islam Inspected on : May 10, 2016

2 SUMMARY The Factory was surveyed for electrical safety by Stichting Bangladesh Accord Foundation. The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. Electrical Safety Audit is a methodical approach to evaluate potential electrical hazards and to recommend suggestions for improvement. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which would be further dealt with as part of follow-up inspections. The findings and recommendations in this report are not intended to imply, guarantee, ensure or warrant compliance with any government regulations. Additionally, the results do not imply in any way that compliance with the findings or recommendations as stated in this report will eliminate all risks or exposures not referred to in this report do not exist. Compliance with the findings and recommendations stated in this report does not relieve the factory owner from obligation to comply with specific project requirements, industry standards, or the provisions of any local government regulations. ABSS High Tech Sweater Ltd. factory is established in its six 1 story buildings/sheds. Right at this moment ground floor is used as production floor, Office, store & utility purpose. Building is owned by factory; as reported by the Factory Management, the building was constructed in early 2007 and the production began in During the time of the Inspection, the factory accommodated a total of approx. 200 (one shift) workers working on regular basis. Page 2 of 18

3 1. FINDINGS AND RECOMMENDATIONS The table below summarizes the major electrical hazards identified during the walk through inspection. Recommendations have been provided to each finding. The implementation schedule shall be developed by the factory to remediate each of the findings. The specific timing of improvements, including any requested extensions due to design / installation constraints, shall be submitted to the Accord for an approval. FINDING E - 1 DOCUMENTATION Electrical Single Line Diagram (SLD) is unavailable. Draw as built electrical SLD & electrical layout drawing mentioning all required information and get it reviewed by Accord. FINDING E - 2 HOTSPOT Hot spots at terminations inside panel. Thermographic inspection record is unavailable. Arrange periodic inspection & thermal scan at least twice in a year to identify the overloading, loose connection, unbalanced load which may cause the excessive heatrise and take action accordingly. However, quickly correct such points. P1 Page 3 of 18

4 FINDING E - 3 EARTHING SYSTEM Earth Pit resistance record is unavailable. All earthling systems shall be tested for resistance on any dry day not less than once in every two years. A record of every earth test made and the result shall be kept for not less than two years and shall be available to the Inspector when required. FINDING E - 4 SAFETY TRAINING Electric safety training program is not initiated/conducted. Electrical safety training and awareness program for the electrical personal and workers must be initiated and recorded according to NFPA 70E. FINDING E - 5 TESTING & PERIODIC MAINTENANCE Insulation resistance test of electrical cables is not performed. Insulation resistant test of all the cables (Higher than 16rm) must be performed once every 2-year cycle and recorded (this must require a complete power shut off). Page 4 of 18

5 FINDING E - 6 TESTING & PERIODIC MAINTENANCE Transformer Oil Test report is unavailable. Check the transformer oil condition by performing oil test. Do it once in a year and keep the record. FINDING E - 7 WIRING SYSTEM Drop out fuse is replaced by wire. Install the drop out fuse. FINDING E - 8 GENERATOR ROOM (1) Generator output cables (laid on floor) are not protected and supported. (2) Panel base plates removed to allow cable entry. (1) If possible route all the power cable through overhead cable tray. Or ensure adequate protection for power cables arranging cable trench(ladder type) with checkered plate. Do not make any arrangement that obstacle personnel's movement within working clearance. (2) Panel base plates must be installed, at all time, and cables entering panel must be firmly fixed with cable gland. Page 5 of 18

6 FINDING E - 9 GENERATOR ROOM Inadequate sized earth cable connected to generator frame. Two separate and distinct earth connection must be provided over generator. Generator body must have earth connection with half of phase conductor/ follow manufacturer/ suppliers recommendation. FINDING E - 10 CABLE RACEWAY & TRENCH Power cable is covered by sand in the cable trench (or cable trench is filled with sand). If it is designed keeping Power cable under sand, it s OK; otherwise remove sand from cable trench avoiding physical damage. FINDING E - 11 TRANSFORMER ROOM Lint and dust deposited on transformer top Keep transformer top always neat and clean. Page 6 of 18

7 FINDING E - 12 TRANSFORMER ROOM Transformer Body earthling is inadequate. Two separate and distinct earth connection & one separate and distinct Neutral connection must be provided for Transformer. Transformer body must have earth connection with half of phase conductor/ follow manufacturer/suppliers recommendation. FINDING E - 13 TRANSFORMER ROOM Inadequate space around transformer for performing maintenance work. Ensure minimum 1.07m working space around the transformer (and related electrical installations). FINDING E - 14 CABLE & CABLE SUPPORTS Power cables entering to or exiting from Distribution board/panel are not properly fixed & supported. Power cables entering to or exiting from distribution board/panel must be fixed through Panel base/top plate using cable glands (metal/pvc). Use ladder type cable tray to support cables. Page 7 of 18

8 FINDING E - 15 EARTHING SYSTEM Panel door has no earth connection. All metal panel doors shall have earth connection with a 4 rm earth cable. FINDING E - 16 Distribution board/panel is filled with fluffs (lint/dust) (1) Keep always clean inside all the distribution boards/panels. Seal them properly and ensure adequate ventilation. FINDING E - 17 No/Inadequate rubber (insulation) mat on the working are of distribution board/panel. Put electrical insulation (rubber mat) on the working area of each electrical installation (Transformer/LT panel/mdb/db/sdb/ other manual operated machineries). Page 8 of 18

9 FINDING E - 18 WIRING SYSTEM Cables terminated at electrical bus bar/ MCCB without cable lugs. Terminate all the power/earth/neutral cable with proper sized cable lug. P1 FINDING E - 19 SUBSTATION ROOM Change Over Switch contacts smeared with bearing grease. Instead of bearing grease, thin layer of contact grease must be used for lubrication of Changeover-Switch contacts. FINDING E - 20 SAFETY INSTRUCTION No instruction for CPR (Cardiopulmonary Resuscitation)/Electrical shock restoration is absent at the panel boards. Hang this instruction(cpr) near all electrical equipment (LT panel, MDB, FDB, DB, SDB) on a visible location. Page 9 of 18

10 FINDING E - 21 WIRING SYSTEM Phases are imbalanced. In three phase outgoing circuits all the phases shall be balanced. Calculate each phase's load and redistribute loads to make phases balanced. FINDING E - 22 WIRING SYSTEM Cables in service are joined (splicing) between terminations. Joints of cable shall be avoided. For unavoidable cases, existing cables with joints must be spliced using butt splicing kits and then should be insulated with electrical tapes. Joints must be supported and protected. FINDING E - 23 EARTHING SYSTEM Dedicated neutral/ecc is not provide for each circuit. Provide dedicated neutral & ECC for each circuit. Page 10 of 18

11 FINDING E - 24 EARTHING SYSTEM Manually operated machines/motors have no earth connection. Connect and ensure all the manually operated machines/motors with earth P1 FINDING NO: E - 25 WIRING SYSTEM Cables are hanging without proper support. Use cable tray/ladder to support cables at anywhere to keep cable out of tension. FINDING E - 26 CABLE RACEWAY & TRENCH Cable duct is left open. Cover it with electrical graded materials, clean it at certain interval and keep records of cleaning. Page 11 of 18

12 FINDING E - 27 STORAGE LIGHT Light in store room / storage areas is uncovered. Lights in store room / storage areas shall be covered. P1 FINDING E - 28 INDICATOR LAMP Indicator light/electrical element is mounted without control device. Indicator light/electrical element should be connected with control device such as fuse or MCB. FINDING E - 29 BATTERY Battery terminals are left open. Use insulated rubber cap to cover all the battery terminals Page 12 of 18

13 FINDING E - 30 LIGHTNING PROTECTION SYSTEM Lightning Protection System(LPS) has not installed yet Design and Install LPS for your factory REMEDIATION TIME FRAME: 4 MONTHS FINDING E - 31 Multiple cables terminated at MCCB terminals/ Bus bar. Terminate each power cable at single terminal and use proper sized cable lug. P1 FINDING E - 32 Distribution Board's top/bottom/back is left open (typical issue) Seal each distribution board's top/bottom; and use cable glands holding/supporting cables. Also seal the unwanted gland holes. Page 13 of 18

14 FINDING E - 33 Loop connection has used powering multiple MCBs/MCCBs. Eliminate loop cables, use single cable for each MCBs/MCCBs. You may use bus bar to avoid multiple termination. P1 FINDING E - 34 Power bus bar/mccb are installed congested; and power cables touch opposite phased bus bar. Ensure that no power cable touches bare bus bar. Use insulated bus bar (just covering existing bus bar by heat shrink) FINDING E - 35 WOODEN SUPPORT Wooden support used for electrical installation/element. Replace wooden support and it is preferable to fix each electrical devices with noncombustible support. Page 14 of 18

15 FINDING E - 36 BOILER & CMPRESSOR Compressor is on wheels. Fix the device with floor/baseplate. FINDING E - 37 Panel/Distribution boxes are inaccessible or cannot be opened to perform any maintenance work. Take necessary initiative thus every panel/distribution board can be easily accessible FINDING E - 38 EARTHING SYSTEM Earth lead cable/earth Continuity Conductor size is inadequate/undersize Resize earth lead cable/ecc for LT panel/mdb/db; follow BNBC 2006 Part 8 chapter 2 section 2.8 for sizing your earthling cables (Usually ECC should be equal to the half of the respective phase cable). Page 15 of 18

16 FINDING E - 39 Oversized circuit breakers or Circuit breakers are not adjusted accordingly. Adjust or replace all the MCCBs/MCBs according to cable ampacity (connected load). Avoid using different sized cable at the terminals. P1 FINDING E - 40 CABLE & CABLE SUPPORTS HT cables laid on substation room floor. Use a cable tray to ensure adequate support. This must not be routed/supported through the equipment' working clearance area. FINDING E - 41 Circuit is drawn from bus bar without/bypassing Circuit breaker or any protective means. For distribution board, along with the main circuit breaker all outgoing circuits shall have individual outgoing circuit breaker. P1 Page 16 of 18

17 FINDING E - 42 Three phase MCCB connected to control two phases or less. Check and redesign the requirements to control the circuits. If three phase control is not required, then replace with suitable control devices. FINDING E - 43 No permanent identification found at the panel boards. All distribution boards shall be marked permanently, as the case may be, provided a unique ID number (e.g. MDB-1). FINDING NO: E - 44 EARTHING SYSTEM Neutral earthling is not separated from body earthling of the electrical system. Need to improve the earthling system for the whole electrical system so that Neutral earthling is separated from body earthling of the electrical system. Page 17 of 18

18 FINDING NO: E - 45 EARTHING SYSTEM Earth pits are not identifiable. Identify each earth pit and mark it for periodic maintenance purpose. FINDING NO: E - 46 DOCUMENTATION There is no programmed schedule for periodical inspection & testing of electrical equipment. Develop an electrical maintenance program that includes inspections and testing of the electrical systems (preventive, proactive and breakdown maintenance) Page 18 of 18

ELECTRICAL SAFETY INSPECTION REPORT WARN KNIT FASHION

ELECTRICAL SAFETY INSPECTION REPORT WARN KNIT FASHION ELECTRICAL SAFETY INSPECTION REPORT WARN KNIT FASHION Chanmari, Fatullah, Narayanganj- 1400 GPS Coordinate:23.634239,90.496801 Inspected by Report Generated by : Noman Saber Khan & Shaik Muhammed Wasi

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT APPLE KNITWEAR LTD. House 1, Road 1, Horinchala, Konabari, Gazipur GPS Coordinate:24.010091, 90.319184 Factory List: Apple knitwear Ltd. Inspected by Report Generated

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc. Chapter 3 TRANSMISSION SYSTEMS 1 Transmitting large amounts of electric energy over long distances is accomplished most efficiently by using high-voltages. Without transformers the widespread distribution

More information

Technical Specifications

Technical Specifications LT Distribution Box Technical Specifications 1. SCOPE 1.1 This specification covers design, manufacture, testing at manufacturer works before dispatch and supply of L.T. Distribution Cabinet suitable for

More information

33kV Connection up to 90MVA

33kV Connection up to 90MVA Electricity Specification 217 Issue 2 December 2007 33kV Connection up to 90MVA Contents 1 Scope 2 General 3 Connection Arrangements 4 Equipment Records 5 Documentation 6 Documents Referenced 7 Keywords

More information

Construction and Wiring Guidelines for Ergon Energy Substation Panels

Construction and Wiring Guidelines for Ergon Energy Substation Panels Construction and Wiring Guidelines for Ergon Energy Substation Panels Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 Panel Wiring...

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers

More information

Surface Regulations and Policies

Surface Regulations and Policies Surface Regulations and Policies COAL FATALITIES 1970-2002 350 300 250 200 150 100 50 0 1970 1973 1976 1979 1982 1985 1988 1991 1994 1997 2000 From January 1, 1970 through today, a total of 240 coal miners

More information

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES TSEWG TP-11: UFC 3-500-10N BEST PRACTICES UFC 3-500-10N was developed by NAVFAC and was used as the starting point for the tri-services development of UFC 3-500-10, Design: Electrical Engineering. UFC

More information

SECTION 300 OVERHEAD SERVICE

SECTION 300 OVERHEAD SERVICE SECTION 300 OVERHEAD SERVICE 300.01 General Company provides, installs, and maintains service drop to point of delivery approved by Company. Customer provides point of attachment which is acceptable to

More information

Chapter 5 FOUNDATION. 2010, The McGraw-Hill Companies, Inc. 2010, The McGraw-Hill Companies, Inc.

Chapter 5 FOUNDATION. 2010, The McGraw-Hill Companies, Inc. 2010, The McGraw-Hill Companies, Inc. Chapter 5 FOUNDATION 1 FOUNDATION - A rigid foundation is essential for minimum vibration and proper alignment between motor and load. Concrete makes the best foundation, particularly for large motors

More information

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types:

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types: SECTION 262913 600 VOLT ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification

More information

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES INFORMATION BULLETIN / PUBLIC - ELECTRICAL CODE REFERENCE NO.: LAMC 93.0230 Effective: 3-24-69 DOCUMENT NO. P/EC 2002-006 Revised: 11-17-00 Previously Issued As: RGA #7-69 TEMPORARY ELECTRIC WIRING FOR

More information

1. Division 26 Section "Elevator Shunt-Trip Fused Disconnect Switches".

1. Division 26 Section Elevator Shunt-Trip Fused Disconnect Switches. SECTION 26 28 16 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

31-SDMS-01 REV. 03 SPECIFICATIONS FOR

31-SDMS-01 REV. 03 SPECIFICATIONS FOR 31-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE DISTRIBUTION PANEL This specification is property of SEC and subject to change or modification without any notice CONTENTS Clauses: Page No. 1.0 SCOPE

More information

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?

Data Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT? Data Bulletin March 2002 Lexington, KY, USA Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT? Table 1: Insulation Type Figure 1: Figure 2: Ampacity of a 1/0

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES MINISTRY OF LABOUR, INDUSTRIAL RELATIONS AND EMPLOYMENT GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES Occupational Safety & Health Inspectorate These guidelines should be used with approved standards:

More information

CAL/OSHA ELECTRICAL LOW VOLTAGE

CAL/OSHA ELECTRICAL LOW VOLTAGE Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to electrical exposure to low voltage (less than or equal to

More information

SINGLE PHASE WIRING SPECIFICATIONS

SINGLE PHASE WIRING SPECIFICATIONS SINGLE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425

More information

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

56-SDMS-07 REV. 01 SPECIFICATIONS FOR 56-SDMS-07 REV. 01 SPECIFICATIONS FOR UNIT SUBSTATIONS UP TO 36 kv ALUMINUM TRANSFORMER ALUMINUM BUS BARS LVDP This specification is property of SEC and subject to change or modification without any notice

More information

Electrical Safety. Presented By- C S Chakraverty. L&T Construction ( MMH ) Head- E&I Operation

Electrical Safety. Presented By- C S Chakraverty. L&T Construction ( MMH ) Head- E&I Operation Electrical Safety Presented By- C S Chakraverty Head- E&I Operation L&T Construction ( MMH ) Objective of the session Create an awareness about importance of electrical safety in our day today activities,

More information

THREE PHASE WIRING SPECIFICATIONS

THREE PHASE WIRING SPECIFICATIONS THREE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425

More information

NEC REQUIREMENTS FOR GENERATORS

NEC REQUIREMENTS FOR GENERATORS PROFESSIONAL DEVELOPMENT SEMINAR SERIES NEC REQUIREMENTS FOR GENERATORS (Based on NEC 2005 with limited 2008 commentary) AIA certified Continuing Education Units (CEU) Available GPS-140 National Electric

More information

ACI Hoist & Crane. Festoon System. 689 S.W. 7th Terrace Dania, FL (954) Fax (954) Toll Free A-HOIST ( )

ACI Hoist & Crane. Festoon System. 689 S.W. 7th Terrace Dania, FL (954) Fax (954) Toll Free A-HOIST ( ) ACI Hoist & Crane Festoon System 689 S.W. 7th Terrace Dania, FL 33004 (954) 921-1171 Fax (954) 921-7117 Toll Free 1-888-4-A-HOIST (1-888-424-6478) www.acihoist.com 2 Standard Duty C-Track Index 1. General

More information

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT SECTION 16400 LOW VOLTAGE DISTRIBUTION EQUIPMENT A. General 1. The University does not accept Series-Rated equipment for power distribution switchboards, distribution panels and branch circuit panelboards.

More information

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

90.2 Scope. The installation of electrical conductors, equipment and raceways for: NEC Generator Primer Rules on the installation of generators and transfer switches 1 90.2 Scope The installation of electrical conductors, equipment and raceways for: public and private premises Conductors

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

TRANSMISSION SYSTEMS

TRANSMISSION SYSTEMS TRANSMISSION SYSTEMS Transmitting large amounts of electric energy over long distances is accomplished most efficiently by using high-voltages. Without transformers the widespread distribution of electric

More information

Guidance for Low Voltage Electrical Installations

Guidance for Low Voltage Electrical Installations Guidance for Low Voltage Electrical Synopsis This document provides information in support of GI/RT7007 Low Voltage Electrical. Signatures removed from electronic version Submitted by Anne E Blakeney Standards

More information

Generator Fire Safety: Generator assemblies should be located outside the building.

Generator Fire Safety: Generator assemblies should be located outside the building. SECTION 33 70 00 - ELECTRICAL DISTRIBUTION PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building. All fuel piping from the outside of the building

More information

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections One-Line / Riser Diagrams Drawings are not reviewed prior to submission. Because of

More information

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces.

1. The term withstand means the unit will remain in place without separation of any parts from the device when subjected to the seismic forces. SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fusible switches. 2. Nonfusible switches. 3. Receptacle switches. 4. Shunt trip switches. 5.

More information

INTERCONNECTION REQUIREMENTS INVERTER-BASED DISTRIBUTED GENERATION SOURCES FOR SINGLE-PHASE CUSTOMER SERVICES

INTERCONNECTION REQUIREMENTS INVERTER-BASED DISTRIBUTED GENERATION SOURCES FOR SINGLE-PHASE CUSTOMER SERVICES INTERCONNECTION REQUIREMENTS INVERTER-BASED DISTRIBUTED GENERATION SOURCES FOR SINGLE-PHASE CUSTOMER SERVICES 3. Definitions ( cont'd) Parallel System: A generating facility that is electrically interconnected

More information

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5 PAGE 1 OF 5 USE: Requirements for entrance equipment. PREVIOUS REVISION 07-01-98 ORIGINATED 03-94 PREVIOUS NUMBER ER 100 (12-01-81) LATEST REVISION: Updated meter socket labeling specification and instrument

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

SCHEDULE OF QUANTITY

SCHEDULE OF QUANTITY SCHEDULE OF QUANTITY ELECTRICAL WORKS PM PALEM BRANCH, VISAKHAPATNAM SL NO. DESCRIPTION OF ITEM / WORK UNIT Qty RATE AMOUNT PART - A : ELECTRICAL WORKS 1 Energy Meter Cubicle : 2 Emergency Off Box (Red

More information

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX Dr. Rajendra Prasad Road,Block-27,Neyveli-607807.Tamilnadu,India.

More information

Section 6 Electric Metering: Residential

Section 6 Electric Metering: Residential Section 6 Electric Metering: Residential 6.1. Scope This section provides specific information for residential metering that is not covered by the basic requirements in Section 5, Electric Metering: General.

More information

ACE Variable Frequency Drive System

ACE Variable Frequency Drive System ACE Variable Frequency Drive System Installation & Maintenance Information SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE IF 1690 BLOWER COOLING INTAKE SHROUDS BLOWER FUSE BLOCK TEMPERATURE CONTROLLER TRANSFORMER

More information

2006 Thermographic Inspection. Terrific Towers 1001 Sparks St Sydney. Vol. 9

2006 Thermographic Inspection. Terrific Towers 1001 Sparks St Sydney. Vol. 9 8/139 Woolooware Rd Burraneer NSW 2230 T. (02) 9544 3588 F. (02) 9544 3688 E. info@thermalimagingservices.com.au W. www.thermalimagingservices.com.au Accredited Thermographers 2006 Thermographic Inspection

More information

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY PURCHASE ENQUIRY Inquiry No : MDG/PUR/PKS/ENQ/Panels, Dated: Nov 3, 2014 Description Qty Specifications : Purchase Inquiry for Supply, installation and commissioning of Panels for PFP Expansion project.

More information

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS 013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS FOR OVERHEAD NETWOKS CEYLON ELECTRICITY BOARD SRI LANKA Specification for MOULDED CASE CIRCUIT BREAKERS FOR OVERHEAD NETWOKS CEB Specification

More information

Electric & Gas Service Requirements (Greenbook) Overview

Electric & Gas Service Requirements (Greenbook) Overview INTRODUCTION The Greenbook contents and standard documents are updated regularly to provide users with the most current information possible. In conjunction with this effort, the 2016 Greenbook was reviewed

More information

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016 No Description/ Specification Amendment 1 EDD 1 :2008 11/0.415 kv Distribution Transformer, Oil Filled - 2 ED 2 :1987 The Galvanization of Iron and Steel, Articles Other Than Steel Wire - 3 ED 3 :1979

More information

Metering and Service Installation:

Metering and Service Installation: Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...

More information

SUBSTATION DESIGN TRAINING

SUBSTATION DESIGN TRAINING 2017 SUBSTATION DESIGN TRAINING ADVANCE ELECTRICAL DESIGN & ENGINEERING INSITUTE (Registered under MSME& An ISO 9001:2008 CERTIFIED) Training Centre: Advance Group of Institutions C-1, Second Floor Near

More information

Section 02: Pre-Installation Procedures

Section 02: Pre-Installation Procedures Section 02: Pre-Installation Procedures Foundation! WARNING The MUST be placed on a surface that will support the combined weight of the, options, fixtures, and tooling, etc. (refer to the Specifications

More information

ICOMIA Global Conformity Guideline for ISO/ABYC Standards and Canadian TP 1332 requirements. Guideline Number 3 Electrical

ICOMIA Global Conformity Guideline for ISO/ABYC Standards and Canadian TP 1332 requirements. Guideline Number 3 Electrical ICOMIA Global Conformity Guideline for ISO/ABYC Standards and Canadian TP 1332 requirements 1. PURPOSE sponsored by ABYC, BMF, ICOMIA, IMCI, and NMMA Author: Wieger de Wit Guideline Number 3 Electrical

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16470 PANELBOARDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under

More information

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions WARNING HIGH VOLTAGE 115V 4 M AP Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions Important: For your protection and the safety of the

More information

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB) 020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB) CEYLON ELECTRICITY BOARD SRI LANKA Telephone: +94 11 232 0953 Fax: +94 11 232 3935 CONTENTS Page 1.0 Scope 3 2.0 System Parameters 3 3.0 Service

More information

THERMOGRAPHY REPORT ELECTRICAL

THERMOGRAPHY REPORT ELECTRICAL LAMBERT CONDITION MONITORING LTD. CERTIFIED THERMOGRAPHER A.I.R. #12-01-243 THERMOGRAPHY REPORT ELECTRICAL Thermographic inspection at: Sample site Inspected by: David Lambert date: 20170701 Customer Sample

More information

Outdoor Power Transmission & Distribution

Outdoor Power Transmission & Distribution Description: The purpose of the section is to highlight the current applicable UMCP Design Standards and requirements for Outdoor Power Transmission and Distribution, including but not limited to the following:

More information

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST Use & Identification of Grounded and Grounding Conductors YES NO N/A Grounded conductors are identifiable and distinguishable from all other conductors.

More information

Design Standards NEMA

Design Standards NEMA Design Standards Although several organizations are involved in establishing standards for the design, construction, and application of motor control centers, the primary standards are established by UL,

More information

TEMPORARY ELECTRICAL SERVICE

TEMPORARY ELECTRICAL SERVICE ENERGY SERVICES ENGINEERING 840 Northgate Drive Telephone (509) 942-7403 Fax (509) 942-7405 P.O. Box 190 Richland, WA 99352 www.ci.richland.wa.us/energyservices TEMPORARY ELECTRICAL SERVICE A. INTRODUCTION

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) (Corr.1 June 2018) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements

More information

SECTION 500 METERING AND ASSOCIATED EQUIPMENT

SECTION 500 METERING AND ASSOCIATED EQUIPMENT SECTION 500 METERING AND ASSOCIATED EQUIPMENT 500.0 General Meter sockets shall be provided, installed and maintained by Customer. When the ratings of meter sockets are exceeded, transockets shall be used.

More information

Supply-Side PV Connections

Supply-Side PV Connections Perspectives on PV Supply-Side PV Connections by John Wiles Plan reviewers and inspectors throughout the country are seeing increasing numbers of supply-side connected utility interactive photovoltaic

More information

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 REDUNDANT PROPULSION JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements... 4 Sec. 2 System

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS SPEC WRITE NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not

More information

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH IS NOT FOR "DO-IT-YOURSELF" INSTALLATION. It must be installed by

More information

E-12 Low-voltage Switchboard

E-12 Low-voltage Switchboard Guideline No.E-12 (201510) E-12 Low-voltage Switchboard Issued date: 20 October 2015 China Classification Society Foreword This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

III. Substation Bus Configurations & Substation Design Recommendations

III. Substation Bus Configurations & Substation Design Recommendations III. Substation Bus Configurations & Substation Design Recommendations 1.0 Introduction Pre-existing conditions, electrical arrangements or the criticality of the existing facility may limit this flexibility,

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 26 13 13 MEDIUM VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 26 28 16 ENCLOSED SWITCHES AND PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following individually mounted, enclosed switches and circuit breakers rated 600V AC and less: 1. Fusible switches.

More information

Electrical Safety. Introduction

Electrical Safety. Introduction Electrical Safety Introduction Electrical hazards 300 electrocutions every year in the U.S. Leading cause is insufficient training ALL were preventable What is Electricity? How Electricity Works Created

More information

Powered Industrial Vehicle Policy

Powered Industrial Vehicle Policy Powered Industrial Vehicle Policy Policy The Flight Department is committed to protecting employees from the hazards involved in the operation of powered industrial vehicles. This Policy is established

More information

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod Eaton Corporation Moon Twp, PA. U.S.A. 15108 1 INTRODUCTION READ AND UNDERSTAND

More information

A. Submit manufacturer's literature and technical data before starting work.

A. Submit manufacturer's literature and technical data before starting work. SECTION 16425 SWITCHBOARD PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 16450 - Grounding. 1.02 SUBMITTALS A. Submit manufacturer's literature and technical data before starting work. B. Submit Shop

More information

Allen-Bradley Parts. CENTERLINE 2500 Motor Control Centers Installing, Joining and Splicing Columns. Installation Instructions. Catalog Number 2500

Allen-Bradley Parts. CENTERLINE 2500 Motor Control Centers Installing, Joining and Splicing Columns. Installation Instructions. Catalog Number 2500 Installation Instructions CENTERLINE 2500 Motor Control Centers Installing, Joining and Splicing Columns Catalog Number 2500 Topic Page Important User Information 2 Location Planning 3 Environment 3 Removal

More information

Unrestricted. S.Mukhopadhyay

Unrestricted. S.Mukhopadhyay Unrestricted S.Mukhopadhyay 10.09.15 Electrical safety A report says that every year 5500 Indians die due to electric shock and 800 due to electric fire. 12% work place death due to electrocution ELECTRICAL

More information

Electrical Testing Company Pty Ltd / download at electricaltestingcompany.com.au / AS/NZS 3003:2011 Cardiac (Rev C)

Electrical Testing Company Pty Ltd / download at electricaltestingcompany.com.au / AS/NZS 3003:2011 Cardiac (Rev C) AS/NZS 3003:2011 Cardiac Protected Electrical Areas (shall comply with Section 2 and Section 4 of the standard) The following is a guide for electricians involved with electrical installations for patient

More information

Installing Power Components

Installing Power Components This chapter provides instructions on how to install and reinstall power components in the Cisco NCS 4016 chassis. It also covers connecting and disconnecting power and powering on the chassis. The Cisco

More information

Generator Termination Bus-bar Arrangement - Design requirements: Utility Perspective

Generator Termination Bus-bar Arrangement - Design requirements: Utility Perspective Generator Termination Bus-bar Arrangement - Design requirements: Utility Perspective D. K. Chaturvedi (NTPC) Harshvardhan Senghani (NTPC) K Venugopal (CS Electric) This paper appraise user on the termination

More information

model ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

model ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION MODEL: PS600 HZ: 60 A model ps600 installation and service manual for federal model ps600 FEDERAL SIGNAL CORPORATION POWER SUPPLY VOLTS: SERIES: 120VAC FEDERAL SIGNAL CORPORATION UNIVERSITY PARK, IL. U.S.A.

More information

U Series Installation Guide

U Series Installation Guide TINIUS OLSEN LTD U Series Installation Guide General Information for Installation Doc. Ref. 9 002 195 Issue C Unit 6 Perrywood Business Park, Honeycrock Lane, Salfords, Surrey, RH1 5DZ, England, UK Telephone:

More information

Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum.

Standards are finally approved by the Standards High Council of Iranian Ministry of Petroleum. FOREWORD This Standard is intended to be used within and for Iranian Ministry of Petroleum (N.I.O.C, N.I.G.C, N.P.C., N.I.O.R.D.C. and other affiliate organizations and companies) and has been prepared

More information

B kv T&D GAS INSULATED SWITCHGEAR

B kv T&D GAS INSULATED SWITCHGEAR GAS INSULATED SWITCHGEAR B 105 170 300 kv The increasing demand for electrical power in cities and industrial centers necessitates the installation of a compact and efficient distribution and transmission

More information

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY PURCHASE ENQUIRY Inquiry No : MDG/PUR/PKS/ENQ/Panels, Dated: Jan 30, 2015 Description Qty Specifications : Purchase Inquiry for Supply, installation and commissioning of Panels for PFP Expansion project.

More information

5300 Series Installation Guidelines

5300 Series Installation Guidelines 1-800-443-4859 5300 Series Installation Guidelines WARNING: RISK OF ELECTRICAL SHOCK OR BURNS. THIS CONVERTER ASSEMBLY SHOULD BE INSTALLED BY A QUALIFIED ELECTRICIAN OR CERTIFIED RV TECHNICIAN. IMPROPER

More information

Grounding Systems. Equipment Grounding & Grounded Conductors

Grounding Systems. Equipment Grounding & Grounded Conductors Grounding Systems Equipment Grounding & Grounded Conductors Definitions A Grounded or Earthed system is one that is connected to the earth Grounded Conductor is a conductor that normally carries current

More information

Electrical Awareness and Considerations

Electrical Awareness and Considerations Electrical Awareness and Considerations By David Taylor FIHE MIET IEng Objectives Awareness of specifications. Awareness of Distribution Network Operators (DNO) earthing arrangements. Awareness of basic

More information

Investigation into UK socket-outlets incorporating USB charging points

Investigation into UK socket-outlets incorporating USB charging points Investigation into UK socket-outlets incorporating USB charging points Electrical Safety First investigated a number of commercially available UK socket-outlets incorporating USB ports, as a repeat of

More information

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:

Electric Vehicle Charging Station Article California Electrical code (CEC) General Requirements: Checklist for Non-Residential Electric Vehicle Charging Station Article 625 2016 California Electrical code (CEC) General Requirements: Level 1 Charger: 110V dedicated 20 amp circuit No electrical plans

More information

CONVEYOR REGULATIONS. AA COUTINHO Director Mine Safety

CONVEYOR REGULATIONS. AA COUTINHO Director Mine Safety CONVEYOR REGULATIONS AA COUTINHO Director Mine Safety CONTENTS 1. Accident» Fatalities» Injuries 2. Conveyor regulations 3. Way forward INJURIES-Fatalities 12 10 8 6 4 2 0 2002 2003 2004 2005 2006 2007

More information

HI-POT/CONTINUITY TESTER Model PLEP01

HI-POT/CONTINUITY TESTER Model PLEP01 HI-POT/CONTINUITY TESTER Model PLEP01 Instruction Manual MITCHELL INSTRUMENT CO. Dear Customer: Congratulations! Mitchell Instrument Co. is please to present you with your Hipot/Continuity Tester. This

More information

Standby Power Systems

Standby Power Systems Source: Power Quality in Electrical Systems Chapter 13 Standby Power Systems The term standby power systems describes the equipment interposed between the utility power source and the electrical load to

More information

CHAPTER 10 ELECTRICAL. Notes:

CHAPTER 10 ELECTRICAL. Notes: CHAPTER 10 ELECTRICAL 1001.0 General Requirements. Electrical wiring and equipment shall comply with the requirements of NFPA 70, National Electrical Code (NEC), or local ordinances. 1002.0 Solar Photovoltaic

More information

Customer Requirements Downtown Secondary Network Service

Customer Requirements Downtown Secondary Network Service Application This standard describes the limitations and requirements for receiving service from the Tacoma Power secondary network system within the City of Tacoma downtown core area. In This Standard

More information

LV Capacitor CLMD03 Power Module Instruction manual

LV Capacitor CLMD03 Power Module Instruction manual LV Capacitor CLMD03 Power Module Instruction manual Table of Contents 1 Safety... 3 2 Upon reception... 3 2.1 Inspection on reception... 3 2.2 Storage- transportation handling... 3 3 Hardware Description...

More information

Electrical Wiring Practices

Electrical Wiring Practices Chapter 2 Electrical Wiring Practices and Diagrams MElec-Ch2-1 Overview Safety Standards Wiring Considerations Wire Terminations Coaxial Cable Wiring Installations Wiring Diagrams MElec-Ch2-2 Safety Lethal

More information

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001 CLP POWER HONG KONG LIMITED SUPPLY March 2001 ADVISORY SERVICE Advice concerning matters relating to the supply of electricity may be obtained free of charge from the Company. OTHER COMPANY PUBLICATIONS

More information

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 REDUNDANT PROPULSION JANUARY 2003 This booklet includes the relevant amendments and corrections

More information

Thermography Report. Inspection Site: Lucky Mining Co. Rocky Rd Smithville, NSW. Requested By: John Seemore. Date of Inspection:

Thermography Report. Inspection Site: Lucky Mining Co. Rocky Rd Smithville, NSW. Requested By: John Seemore. Date of Inspection: Thermography Report Inspection Site: Lucky Mining Co. Rocky Rd Smithville, NSW Requested By: John Seemore Date of Inspection: 27-10-2006 Reference Number: 2710061 Thermographer: John Crawford Thermal Imaging

More information

Chapter 5. Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI)

Chapter 5. Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI) Chapter 5 Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI) Imagine That Engineering Inc. has adopted this program for equipment

More information

Energy Australia Chamber Substation indoor switchgear. installation,operation and maintenance instructions version 1.

Energy Australia Chamber Substation indoor switchgear. installation,operation and maintenance instructions version 1. Energy Australia Chamber Substation indoor switchgear installation,operation and maintenance instructions version 1.6 / February 2009 1 Details of revision Version Comment Date 1.0 First Draft Issue May

More information