1 Rehabilitation Techniques to Improve Long-term Performance of Highway-Railway At-Grade Crossings Dr. Jerry G. Rose, P.E. Professor of Civil Engineering 261 Raymond Building University of Kentucky Proceedings of the ASME/ASCE/IEEE Joint Rail Conference (JRC2011) Pueblo, Colorado, USA March 16-18, 2011

2 Purpose Smooth Surface Safe Passage of Rubber-Tired Vehicles Across the Railroad

3 $100 + $300 $100 $100 + $100

4 Ideal Stay Smooth and Stable for Long Period of Time Reduce Costly Interruptions to Rail and Highway Traffic Improve Operating Performance

5 Ideal Rapidly Install/Renew One Day (RR 4 hrs/hwy 8-12 hrs) Layered Support Premium Materials

6 Procedure Complete Rebuild Support Layer Pre-Compacted Ballast New Track Panel New Crossing Surface

7 Ideal Cooperative Effort Local Hwy agency and RR Company Reduce Costs/Improve Quality/Minimize Disruption

8 Procedures/Case Studies Pressure Measurements On Surfaces within Layers Long-Term Settlements

9 Low Ride Quality R-O-U-G-H Deteriorate

10 Typical Granular Crossings Excessive Deflections ¼ inch (6mm) Structurally Dissimilar

11 Permanent Settlement Impact Loadings Low Spot Impaired Drainage Deterioration Rehabilitated

12 Ideal Adequate Strength and Support Minimize Deflections Reduce Permanent Deformations Waterproof Long-Life, Smooth Crossing

13 Consensus Goals -- Ideal Crossing Renewal Management Program Quality, Safe, Cost Effective, Stable, Smooth, Serviceable Minimum of Disruption 4 hr. train/8-12 hr. Highway closures Cooperative, Cost-Sharing, Minimum Expense

14 Planning Meeting Railroad Company and Governmental/Highway Agency Select Date Rail Volume/Schedule Highway Volume/Critical/Detours

15 Assign Responsibilities Highway Closure and Traffic Control Public Announcements/Notifications Railroad Curfew Temporary Crossing/Detour Track/Surface Remove and Replace Highway Paving

16 Share Cost Removal and Installation of Track and Crossing (Materials, Labor and Equipment) Traffic Control, Public Announcement, Highway Paving

17 FAST-TRACK CASE STUDIES COSTS AND ECONOMICS TESTS AND PERFORMANCE MEASURES

18

19

20

21

22

23 Waller Avenue #2 # T&S 2002 T&S 2007 S 2003 T&S 2006

24 Rosemont Garden #2 # T&S 2002 T&S 2007 S 2003 T&S 2006

25 KY 303 Condition prior to rebuild Removing old crossing 08:30 Began excavating Excavating trackbed and checking grade

26 Dumping asphalt 10:15 Spreading asphalt Compacting asphalt and dumping ballast Dumping and spreading ballast

27 Compacting ballast Positioning new panel Spreading cribbing rock 11:30 Tamping ballast

28 Regulating ballast 12:40 Compacting hand-spread approaches Finished compacting asphalt approaches 16:50 3 weeks later

29

30 Costs and Economics Asphalt=$60/ton delivered ½ ton/tk ft (6 in. thick, 12 ft. wide) $30/tk ft X 80 ft = $2,400 Underlayment Crossing Renewal $10,000 $40,000

31 TESTS AND PERFORMANCE MEASURES Trackbed Pressure Surface Pressure Long-Term Settlement

32 Pressure Cell Geokon Model in. Diameter Strain Gage Snap-Master Thermistor Cell Placement on Asphalt

33

34 Cell Location at Richmond

35 Pressure (psi) Pressure (psi) Loaded Coal Train at Richmond 30 P-Cell 819 Beneath Rail in Crib 30 P-Cell 820 Beneath Rail and Tie Axle Locomotives Initial 2 Cars Axle Locomotives Initial 2 Cars Time (s) P-Cell 821 C/L Track in Crib 2 6-Axle Locomotives Initial 2 Cars Pressure (psi) Pressure (psi) Time (s) P-Cell 822 C/L Track and Tie Axle Locomotives Initial 2 Cars Time (s) Time (s)

36 Pressure (psi) Pressure (psi) Loaded Auto Train at Richmond Axle Loco Axle Loco P-Cell 819 Beneath Rail in Crib 1 4-Axle Loco 1 4-Axle Loco Time (s) Initial 2 Cars P-Cell 821 C/L Track in Crib Initial 2 Cars Pressure (psi) Pressure (psi) Axle Loco Initial 2 Cars Axle Loco P-Cell 820 Beneath Rail and Tie 1 4-Axle Loco P-Cell 822 C/L Track and Tie 1 4-Axle Loco Time (s) Initial 2 Cars Time (s) Time (s)

37 Pressure (psi) Loaded Concrete Truck at Richmond 8 P-Cell 820 Beneath Rail and Tie Time (s)

38 Cell Location at Lackey Low Rail High Rail

39 Pressure (psi) Pressure (psi) Loaded Coal Train at Lackey 30 P-Cell 510 Beneath High Rail and Tie 30 P-Cell 511 Beneath High Rail and Tie 2 6-Axle Locomotives Initial 2 Cars Time (s) P-Cell 806 C/L Track and Tie 2 6-Axle Locomotives Initial 2 Cars Pressure (psi) Pressure (psi) Axle Locomotives Time (s) Initial 2 Cars P-Cell 207 Beneath Low Rail and Tie Time (s) Time (s)

40 Pressure (psi) Pressure (psi) Empty Coal Train at Lackey 30 P-Cell 510 Beneath High Rail and Tie 30 P-Cell 511 Beneath High Rail and Tie Axle Locomotives Time (s) Initial 2 Cars P-Cell 806 C/L Track and Tie 2 6-Axle Locomotives Initial 2 Cars Pressure (psi) Pressure (psi) Axle Locomotives Initial 2 Cars Time (s) P-Cell 207 Beneath Low Rail and Tie 2 6-Axle Locomotives Initial 2 Cars Time (s) Time (s)

41 Pressure (psi) Flat Wheel on an Empty Coal Train at Lackey P-Cell 511 Beneath Rail and Tie Axle Locomotives 95 Empty Cars Time (s)

42 Pressure (psi) Loaded Coal Truck at Lackey P-Cell 510 Beneath High Rail and Tie Time (s)

43 Matrix-based array of force sensitive cells Silver conductive electrodes Pressure sensitive ink Conductivity varies Crossing of ink strain gauge View of Tekscan Sensors Tekscan Measurement Configuration

44

45 Rear Tires of Tractor of a 151,000 lb Loaded Coal Truck on Concrete Crossing of Kentucky Coal Terminal, Mile Post 6.6. May 25, lb 135 psi in^2

46

47 Front Tire of a CSXT Suburban on Asphalt Parking Lot in Ashland Oil Company. May 25, lb 75 PSI in^2

48 Rear Tire of a CSXT Suburban on Asphalt Parking Lot in Ashland Oil Company. May 25, lb 81 PSI in^2

49 286,000 lb Typical Pressures on Asphalt 62,000 lb 180 lb 150,000 lb psi 2-4 psi 6 psi 125+ psi Loaded Empty Actual Loaded

50 Long-Term Trackbed Settlement

51

52 Flag Spring

53 Elevation (ft) Top of Rail Elevations for Flagspring NO ASPHALT 100 5/13/02 7/25/02 6/09/03 2/10/04 2/2/2005 3/14/2006 WB Installed 5/13/2002 EB Station

54 Settlement (in.) Average Asphalt/Approach Settlement for Flag Spring (no underlayment) 2 Approaches Crossing Installed 5/13/ Time (Months)

55 KY Coal Terminal

56

57 Elevation (ft) Top of Rail Elevations for KY Coal Terminal # 2 Track Installed 11/14/02 11/14/02 11/21/02 1/13/04 5/25/2004 4/13/ /20/2005 WB 99.5 EB Station

58 Settlement (in.) Average Asphalt/Approach Settlement for KY Coal Terminal # Approaches Crossing Installed 11/14/ Time (Months)

59 No name, KY 7

60 Elevation (ft) Average top of Rail Elevations for KY 7 - No Name Note: -Installed 10/14/2005 -South Approach Surfaced 10/18/2005 -New Rail West side Stations 1-6, 21-26, 5/7/07 10/17/ /7/ /19/2005 5/3/ /18/2006 5/3/ SB Asphalt Underlayment stations 8-21 (Bold Lines) NB Station

61 Settlement (in.) Average Asphalt/Approach Settlement for No Name Approaches Crossing Installed 10/14/ Time (months)

62 Stanley

63 Elevation (ft.) Average Top of Rail Elevations for US 60 Stanley Installed 5/16/ /16/2002 6/13/2002 8/28/2003 1/20/2004 7/12/2004 6/10/2005 2/13/ /16/ Station

64 Settlement (in.) Average Asphalt/Approach Settlement for US 60 Stanley Approaches Crossing Installed 5/16/ Time (Months)

65 Settlement Asphalt Crossings was 41% of non- Asphalt Crossings Settlement Asphalt Crossings was 44% of Abutting Approaches Settlement of Non-Asphalt Crossings & Approaches Similar

66 References AREMA (2002) Annual Conference TRB (2009) Annual Meeting KTC (2009) Reports F F F

67 Closure Current Practices Not All-Encompassing Typical Activities

Rehabilitating Crossing Surfaces Effect of Sub-Structure Design on Long-Term Performances of Highway-Railway At-Grade Crossings

Rehabilitating Crossing Surfaces Effect of Sub-Structure Design on Long-Term Performances of Highway-Railway At-Grade Crossings Rehabilitating Crossing Surfaces Effect of Sub-Structure Design on Long-Term Performances of Highway-Railway At-Grade Crossings by Jerry G. Rose, Ph.D.,P.E. Professor of Civil Engineering University of

More information

D R A F T REHABILITATION TECHNIQUES TO IMPROVE LONG-TERM PERFORMANCES OF HIGHWAY-RAILWAY AT-GRADE CROSSINGS

D R A F T REHABILITATION TECHNIQUES TO IMPROVE LONG-TERM PERFORMANCES OF HIGHWAY-RAILWAY AT-GRADE CROSSINGS JRC2011-56015.docx D R A F T Proceedings of the ASME/ASCE/IEEE 2011 Joint Rail Conference JRC2011 March 16-18, 2011 Pueblo, Colorado, USA JRC 2011-56015 REHABILITATION TECHNIQUES TO IMPROVE LONG-TERM PERFORMANCES

More information

Optimizing Sub-Structure Designs and Installation Practices to Improve Long-Term Performances of Highway-Railway At-Grade Crossings

Optimizing Sub-Structure Designs and Installation Practices to Improve Long-Term Performances of Highway-Railway At-Grade Crossings Optimizing Sub-Structure Designs and Installation Practices to Improve Long-Term Performances of Highway-Railway At-Grade Crossings Jerry G. Rose, PE Professor of Civil Engineering 261 OH Raymond Building

More information

Rose & Tucker 1 QUICK-FIX, FAST-TRACK ROAD CROSSING RENEWALS USING PANELIZED ASPHALT UNDERLAYMENT SYSTEM

Rose & Tucker 1 QUICK-FIX, FAST-TRACK ROAD CROSSING RENEWALS USING PANELIZED ASPHALT UNDERLAYMENT SYSTEM Rose & Tucker 1 QUICK-FIX, FAST-TRACK ROAD CROSSING RENEWALS USING PANELIZED ASPHALT UNDERLAYMENT SYSTEM by Jerry G. Rose, Ph.D., PE Professor of Civil Engineering 161 OH Raymond Building University of

More information

KENTUCKY TRANSPORTATION CENTER

KENTUCKY TRANSPORTATION CENTER Research Report KTC-09-05/FR136-04-2F KENTUCKY TRANSPORTATION CENTER HIGHWAY-RAILWAY AT-GRADE CROSSING STRUCTURES: TRACKBED AND SURFACE PRESSURE MEASUREMENTS AND ASSESSMENTS OUR MISSION We provide services

More information

EXPERI MENTAL PROJECTS

EXPERI MENTAL PROJECTS EXPERI MENTAL PROJECTS PROVIDING SMOOTH RAILROAD GRADE CR"OSSINGS USING ASPHALT CONCRETE PAVEMENT Report Numbe r: DEPARTMENTAL I NFORMAT JON EXCHANGE STAT E AND D EPA RTM ENT P UB L IC OF HIGHWAYS T R

More information

North America s leader in Track, Transit and Systems construction & maintenance services

North America s leader in Track, Transit and Systems construction & maintenance services Your Track Investment Maintaining Your Track. It s a Smart Investment. You wouldn t think of operating your vehicle without oil. Why risk a safety hazard, costly repair bill or compromising the value of

More information

Erol Tutumluer, Yu Qian, Youssef Y.M.A. Hashash, and Jamshid Ghaboussi

Erol Tutumluer, Yu Qian, Youssef Y.M.A. Hashash, and Jamshid Ghaboussi Field Validated Discrete Element Model for Railroad Ballast Erol Tutumluer, Yu Qian, Youssef Y.M.A. Hashash, and Jamshid Ghaboussi University of Illinois at Urbana-Champaign (UIUC) David D. Davis Transportation

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Shoulder Ballast Cleaning Effectiveness

Shoulder Ballast Cleaning Effectiveness Shoulder Ballast Cleaning Effectiveness Word count: 3539 ABSTRACT AREMA 2015 Annual Conference 4 October 7 October 2015 Minneapolis, MN Scott Diercks Loram Maintenance of Way, Inc. 3900 Arrowhead Drive

More information

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer Non-Destructive Pavement Testing at IDOT LaDonna R. Rowden, P.E. Pavement Technology Engineer Bureau of Materials and Physical Research Physical Research Section Bridge Investigations Unit Pavement Technology

More information

Shoulder Ballast Cleaning Effectiveness

Shoulder Ballast Cleaning Effectiveness Shoulder Ballast Cleaning Effectiveness AREMA 2015 Annual Conference 4 October 7 October 2015 Minneapolis, MN Scott Diercks Loram Maintenance of Way, Inc. 3900 Arrowhead Drive Hamel, MN 55340 763-478-2622

More information

Development of long life structural asphalt

Development of long life structural asphalt Build something great Development of long life structural asphalt Trevor Distin Sustainability opportunities for the asphalt industry Reusing RAP Preservation of raw materials bitumen & aggregates However

More information

Effect of Hand Tamping on Transition Zone Behavior

Effect of Hand Tamping on Transition Zone Behavior Effect of Hand Tamping on Transition Zone Behavior Timothy D. Stark Professor of Civil and Environmental Engineering University of Illinois at Urbana-Champaign 205 N Mathews Ave Urbana, IL 61801 Office:

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

TITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING

TITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING TITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING AREMA CONFERENCE- SEPTEMBER 23, 2009 INTRODUCTION Most of the heavy

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair 1. Objective: 1.1. To repair the sewer main in a timely and efficient manner, minimizing disruption

More information

Low-Impact Special Trackwork Research at Transportation Technology Center, Inc.

Low-Impact Special Trackwork Research at Transportation Technology Center, Inc. Low-Impact Special Trackwork Research at Transportation Technology Center, Inc. David D. Davis Transportation Technology Center, Inc 2009 TRB Annual Meeting - 1 Transportation Technology Center, Inc.,

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair 1. Objective: 1.1. To repair the sanitary sewer connection in a timely and efficient

More information

Track Transitions and the Effects of Track Stiffness

Track Transitions and the Effects of Track Stiffness Track Transitions and the Effects of Track Stiffness D. Plotkin, D.D. Davis, S. Gurule and S.M. Chrismer AREMA 2006 IJ presentation - 1 Transportation Technology Center, Inc., a subsidiary of the Association

More information

Structural Considerations in Moving Mega Loads on Idaho Highways

Structural Considerations in Moving Mega Loads on Idaho Highways 51 st Annual Idaho Asphalt Conference October 27, 2011 Structural Considerations in Moving Mega Loads on Idaho Highways By: Harold L. Von Quintus, P.E. Focus: Overview mechanistic-empirical procedures

More information

A Guide to Key Railroad Terminology for the Northeast Corridor

A Guide to Key Railroad Terminology for the Northeast Corridor A Guide to Key Railroad Terminology for the Northeast Corridor Index of terms Approach signal, 8 Diverging route, 5 Ladder, 6 Section break, 12, 13 Tie replacement, 7 Ballast, 3, 4, 7 Double slip switch,

More information

Advanced Emission Reduction Technologies for Locomotives: Fuels & Lubes

Advanced Emission Reduction Technologies for Locomotives: Fuels & Lubes Advanced Emission Reduction Technologies for Locomotives: Fuels & Lubes by Steven G. Fritz, P.E. Southwest Research Institute 210-522-3645 sfritz@swri.org Railroad Energy Consumption * 1999 Class I Railroads:»20,254

More information

Impact of Environment-Friendly Tires on Pavement Damage

Impact of Environment-Friendly Tires on Pavement Damage Impact of Environment-Friendly Tires on Pavement Damage Hao Wang, PhD Assistant Professor, Dept. of CEE Rutgers, the State University of New Jersey The 14th Annual NJDOT Research Showcase 10/18/2012 Acknowledgement

More information

MOBILE ON BOTH RAILS AND PAVEMENT. Versatility and mobility, on both rails and roads, pays off for municipal transit systems and railways

MOBILE ON BOTH RAILS AND PAVEMENT. Versatility and mobility, on both rails and roads, pays off for municipal transit systems and railways Versatility and mobility, on both rails and roads, pays off for municipal transit systems and railways Gradall railway maintenance machines represent a unique combination of mobility and versatility, able

More information

Smart Rivers Conference September 15, 2011 New Orleans, Louisiana

Smart Rivers Conference September 15, 2011 New Orleans, Louisiana Status of Inland Waterways Infrastructure Funding Smart Rivers Conference September 15, 2011 New Orleans, Louisiana 1 The national public policy organization advocating a modern and well-maintained system

More information

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E.

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E. TTI TRAFFIC SAFETY CONFERENCE John A. Barton, P.E. Introduction TxDOT Mission Work with others to provide safe and reliable transportation solutions for Texas. 2 Mission Zero Is a Journey toward: Zero

More information

District 5 Gering job openings 7/11/2018 Highway Maintenance Worker Senior EEO/Veteran s Preference Employer

District 5 Gering job openings 7/11/2018 Highway Maintenance Worker Senior EEO/Veteran s Preference Employer 1 District 5 Gering job openings 7/11/2018 SALARY: Highway Maintenance Worker Senior $15.18 Hourly OPENING DATE: 07/03/18 07/17/18 11:59 PM Bridgeport Successful applicant will be trained to operate various

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011 I-405 Sepulveda Pass Improvements Project Community Advisory Committee July 28, 2011 1 Wilshire Segment 2 Wilshire Segment (National to Waterford) Ramp and Wall Construction at Sepulveda/Wilshire Intersection

More information

8 Crucial Tactics for Asphalt Pavement Protection. Since 1941 // WolfPaving.com

8 Crucial Tactics for Asphalt Pavement Protection. Since 1941 // WolfPaving.com 8 Crucial Tactics for Asphalt Pavement Protection Since 1941 // WolfPaving.com Your asphalt pavement protection plan: How, Why, and When of asphalt pavement care. You ve invested in a new asphalt parking

More information

GEOWEB GEOCELL SYSTEM PRESTO PRODUCTS GEOSYSTEMS PERFORMANCE TESTING REINFORCED RAIL BALLAST & SMARTROCK

GEOWEB GEOCELL SYSTEM PRESTO PRODUCTS GEOSYSTEMS PERFORMANCE TESTING REINFORCED RAIL BALLAST & SMARTROCK GEOWEB GEOCELL SYSTEM PRESTO PRODUCTS GEOSYSTEMS PERFORMANCE TESTING REINFORCED RAIL BALLAST & SMARTROCK Summary of University of Kansas Research: GEOWEB geocell confinement is a three-dimensional geosynthetic

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

District 5 Gering job openings 9/16/2016

District 5 Gering job openings 9/16/2016 1 District 5 Gering job openings 9/16/2016 SALARY: Temporary Highway Maintenance Worker - Winter Operations $13.07 /Hour OPENING DATE: 09/08/16 Winter positions, temporary, until March 31, 2017. Hours

More information

Montour No. 10 (Bob Ciminel 2012)

Montour No. 10 (Bob Ciminel 2012) Montour No. 10 (Bob Ciminel 2012) As we continue eastward from Montour No. 4, we reach Library Junction at Mile post 35.08. The west leg of the wye takes us onto the Library Branch. After crossing Library

More information

PROJECTS $500K AND OVER FOR 2012

PROJECTS $500K AND OVER FOR 2012 EB-0-0 Page of PROJECTS $00K AND OVER FOR 0 EXTERNALLY INITIATED PLANT RELOCATIONS PORTFOLIO Table : Externally Initiated Plant Relocations Projects Estimate Estimated Cost Project Title Number ($ Millions)

More information

JRC EFFECTS OF BALLAST DEGRADATION ON PERMANENT DEFORMATION BEHAVIOR FROM LARGE-SCALE TRIAXIAL TESTS

JRC EFFECTS OF BALLAST DEGRADATION ON PERMANENT DEFORMATION BEHAVIOR FROM LARGE-SCALE TRIAXIAL TESTS Proceedings of the 214 Joint Rail Conference JRC214 April 2-4, 214, Colorado Springs, CO, USA JRC214-386 EFFECTS OF BALLAST DEGRADATION ON PERMANENT DEFORMATION BEHAVIOR FROM LARGE-SCALE TRIAXIAL TESTS

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030

Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030 Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030 Kentucky Fatality Assessment and Control Evaluation Program Kentucky Injury Prevention and Research Center

More information

Vertical Loads from North American Rolling Stock for Bridge Design and Rating

Vertical Loads from North American Rolling Stock for Bridge Design and Rating Vertical Loads from North American Rolling Stock for Bridge Design and Rating By Duane Otter, Ph.D., P.E., and MaryClara Jones Transportation Technology Center, Inc., Pueblo, Colorado Abstract As a part

More information

Pavement Thickness Design Parameter Impacts

Pavement Thickness Design Parameter Impacts Pavement Thickness Design Parameter Impacts 2012 Municipal Streets Seminar November 14, 2012 Paul D. Wiegand, P.E. How do cities decide how thick to build their pavements? A data-based analysis Use same

More information

The Effect of Wheel Loading on a Railway Bridge: A Case Study on Minnamurra Railway Bridge

The Effect of Wheel Loading on a Railway Bridge: A Case Study on Minnamurra Railway Bridge The Effect of Wheel Loading on a Railway Bridge: A Case Study on Minnamurra Railway Bridge Presented Dr. Olivia Mirza Dr. MD Kamrul Hassan, Emile Assaf, Thy Pham and Guy Stanshall Western Sydney University

More information

Sustainable Rail Strategy The Value of Quality

Sustainable Rail Strategy The Value of Quality Graz University of Technology Institute of Railway Engineering and Transport Economics Sustainable Rail Strategy The Value of Quality Peter Veit June 30 th, 2015 www.ebw.tugraz.at Challenge Graz, Austria

More information

Safety Barrier System Conditions

Safety Barrier System Conditions Safety Barrier System Conditions MOBILE BARRIERS MBT-1 Steel Safety Barrier - Temporary The conditions for use of the MOBILE BARRIERS MBT-1 Steel Safety Barrier Temporary on the New South Wales classified

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project 26, 2012 Click to edit Master title January style Community Advisory Committee 1 Community Meeting Schedule for 2012 26-Jan CAC, Final Meeting Feb 22-Mar Community

More information

Use of Ballast Inspection Technology for the Prioritization, Planning and Management of Ballast Delivery and Placement

Use of Ballast Inspection Technology for the Prioritization, Planning and Management of Ballast Delivery and Placement Use of Ballast Inspection Technology for the Prioritization, Planning and Management of Ballast Delivery and Placement Dr. Allan M. Zarembski, PE, Hon. Mbr. AREMA, FASME Research Professor University of

More information

30-Day Look Ahead Summary August 2011

30-Day Look Ahead Summary August 2011 Wilshire Segment 30-Day Look Ahead Summary August 2011 DWP and SCE Utility Relocation Sepulveda reduced to one lane in each direction, Constitution to Ohio, 9pm to 6am Westbound Wilshire reduced to one

More information

FMVSS 121 Brake Performance and Stability Testing

FMVSS 121 Brake Performance and Stability Testing FMVSS 121 Brake Performance and Stability Testing FINAL REPORT - Revision A SwRI Project No. 03-05190 Prepared for Mr. Bill Washington Air Brake Systems 4356 E. Valley Road Mount Pleasant, MI 48804-0293

More information

Stifel Transportation and Logistics Conference. Marta R. Stewart Executive Vice President Chief Financial Officer February 11, 2014

Stifel Transportation and Logistics Conference. Marta R. Stewart Executive Vice President Chief Financial Officer February 11, 2014 Stifel Transportation and Logistics Conference Marta R. Stewart Executive Vice President Chief Financial Officer February 11, 2014 1 Norfolk Southern Update 2013 Overview First Quarter Update Business

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

FALL 2017 ADVERTISING SCHEDULE

FALL 2017 ADVERTISING SCHEDULE INFRASTRUCTURE FALL 2017 ADVERTISING SCHEDULE CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure Contract Services Branch 1630 215 Garry Street Winnipeg, MB R3C 3P3 204 945 3637 The Construction

More information

Click to edit Master text styles

Click to edit Master text styles I-405 Sepulveda Pass Improvements Project Quarterly Community Meeting November 17, 2011 1 Wilshire Segment 2 Quarterly Community Meetings 2012 Month Meeting(s) February 16 May 17 Quarterly Quarterly August

More information

District 5 Gering job openings 8/1/2018 Highway Maintenance Worker/Senior EEO/Veteran s Preference Employer

District 5 Gering job openings 8/1/2018 Highway Maintenance Worker/Senior EEO/Veteran s Preference Employer 1 District 5 Gering job openings 8/1/2018 SALARY: Highway Maintenance Worker/Senior $15.18 Hourly OPENING DATE: 07/27/18 08/13/18 11:59 PM Gering Successful applicant will be trained to operate various

More information

The Highways Agency is working to improve the M3 between junctions 2 to 4a.

The Highways Agency is working to improve the M3 between junctions 2 to 4a. Welcome The Highways Agency is working to improve the M3 between junctions 2 to 4a. The M3 Junctions 2 to 4a is part of a major strategic road network connecting people, communities and businesses, carrying

More information

The $600 Million Rebirth of San Diego Trolley

The $600 Million Rebirth of San Diego Trolley The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and

More information

HURON COUNTY ENGINEER S OFFICE

HURON COUNTY ENGINEER S OFFICE HURON COUNTY ENGINEER S OFFICE 2017 ENGINEER S ANNUAL REPORT The Ohio Revised Code requires that each Ohio County Engineer publish an annual report to the commissioners outlining the general condition

More information

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016 Elected Officials Briefing North Metro Rail Line Update November 10, 2016 Dave Genova, RTD General Manager and CEO Five lines opening in 2016 Flatiron Flyer, Jan. 3 University of Colorado A Line, April

More information

District 5 Gering job openings 7/6/2016

District 5 Gering job openings 7/6/2016 1 District 5 Gering job openings 7/6/2016 Engineer-Field Training Program $23.74 /Hour OPENING DATE: 07/01/16 See job description Come be a part of the Nebraska Department of Roads team and participate

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

Scale Model Replicas 14+ DiecastMasters.com

Scale Model Replicas 14+ DiecastMasters.com Diecast Masters was established in mid-2015 through the purchase of the Cat scale model businesses of both Norscot and Tonkin Replicas. Though new as a licensee, Diecast Masters draws on a legacy with

More information

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA LSU Research Team Sherif Ishak Hak-Chul Shin Bharath K Sridhar OUTLINE BACKGROUND AND

More information

CONFEDERATION LINE EAST SEGMENT

CONFEDERATION LINE EAST SEGMENT The O-Train Confederation Line project is the first stage in Ottawa s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit

More information

RB72-3 HD Flush Mounted Directional Traffic Spikes Installation and Operating Precautions

RB72-3 HD Flush Mounted Directional Traffic Spikes Installation and Operating Precautions RB723 HD Flush Mounted Directional Traffic Spikes Installation and Operating Precautions 1. Install the Directional Traffic Controller perpendicular to the flow of traffic. If vehicles cross the controller

More information

Occupational MVCs as a Leading Indicator of Workers Safety in Kentucky. Svetla S. Slavova Terry L. Bunn

Occupational MVCs as a Leading Indicator of Workers Safety in Kentucky. Svetla S. Slavova Terry L. Bunn Occupational MVCs as a Leading Indicator of Workers Safety in Kentucky Svetla S. Slavova Terry L. Bunn 5,703 fatal occupational injuries in the U.S. in 2004 (CFOI) 1,374 (24%) of them due to highway incidents

More information

Work Zone Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

Work Zone Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems Providing Excellence in Regulatory Compliance Management Systems Table of Contents General Safety for Asphalt Paving...- 3 - Maintenance and Service Safety for Asphalt Paving...- 5 - Operational Safety

More information

Minnesota s Truck Weight Education Program

Minnesota s Truck Weight Education Program 2018 Minnesota s Truck Weight Education Program Greg A. Hayes - Director Tom J. Nelson - Coordinator A Minnesota educational project to safeguard public roadways through voluntary vehicle Greg Hayes All

More information

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014 THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014 1 BNSF is a Leading U.S. Railroad A Berkshire Hathaway company 32,500 route miles in 28 states and two Canadian

More information

RAILWAY OCCURRENCE REPORT

RAILWAY OCCURRENCE REPORT RAILWAY OCCURRENCE REPORT DERAILMENT CANADIAN AMERICAN RAILROAD COMPANY TRAIN NO. 291-23 MILE 65.97, CP SHERBROOKE SUBDIVISION LENNOXVILLE, QUEBEC 24 JUNE 1995 REPORT NUMBER R95Q0045 The Transportation

More information

2017 Industrial Rail and Transportation Study. Becker, Minnesota

2017 Industrial Rail and Transportation Study. Becker, Minnesota 2017 Industrial Rail and Transportation Study Becker, Minnesota BECKR 140932 August 2, 2017 2017 Industrial Rail and Transportation Study Becker, Minnesota SEH No. BECKR 140932 August 2, 2017 I hereby

More information

Heavier traffic, in car, truck and train form, ON THE LEVEL

Heavier traffic, in car, truck and train form, ON THE LEVEL ON THE LEVEL BY MISCHA WANEK-LIBMAN, Engineering Editor Grade crossing surfaces are being built to withstand heavy road and rail traffic, as well as lessen required maintenance. Heavier traffic, in car,

More information

Highway Maintenance Worker Senior EEO/Veteran s Preference Employer

Highway Maintenance Worker Senior EEO/Veteran s Preference Employer District 5 Gering job openings 10/10/2018 SALARY: 1 OPENING DATE: 10/09/18 10/23/18 11:59 PM Kimball Join our team of over 2000 professionals, currently offering expert training and career growth, paid

More information

Performance Tests of Asphalt Mixtures

Performance Tests of Asphalt Mixtures Performance Tests of Asphalt Mixtures Louay N. Mohammad, Ph.D. Department of Civil and Environmental Engineering LA Transportation Research Center Louisiana State University 42 nd Annual Rocky Mountain

More information

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION

More information

Characterization of LTPP Pavements using Falling Weight Deflectometer

Characterization of LTPP Pavements using Falling Weight Deflectometer Characterization of LTPP Pavements using Falling Weight Deflectometer Author Chai, Gary, Kelly, Greg Published 28 Conference Title The 6th International Conference on Road and Airfield Pavement Technology

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I Purple Line Extension, Section 2 Southern California Edison, Phase I 1 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work: 10am-6pm Left

More information

New Weight Limits on Roads

New Weight Limits on Roads New Weight Limits on Roads Minnesota s Truck Weight 2018 Education Program Minnesota Assn. of Townships Greg Hayes / Tom Nelson A Minnesota educational project to safeguard public roadways through voluntary

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

METHODOLOGY FOR THE SELECTION OF SECOND HAND (RELAY) RAIL

METHODOLOGY FOR THE SELECTION OF SECOND HAND (RELAY) RAIL METHODOLOGY FOR THE SELECTION OF SECOND HAND (RELAY) RAIL The G-Index and Wear Rates. Written By Michael R. Garcia, P.E. Chief, Rail Engineering Bureau of Railroads Room 302 Illinois Department of Transportation

More information

Transportation Engineering II UNIT - I

Transportation Engineering II UNIT - I Transportation Engineering II UNIT - I I. Components of a Permanent Way: A. Rails: Rails are the I-section members of a track laid in two parallel lines to provide a level surface for the movement of trains.

More information

Construction Emissions Estimates ICTF Modernization Project Long Beach, California

Construction Emissions Estimates ICTF Modernization Project Long Beach, California Construction Emissions Estimates ICTF Modernization Project Long Beach, California prepared for: Union Pacific Railroad Company October 2007 prepared by: Sierra Research, Inc. 1801 J Street Sacramento,

More information

AVAILABLE Island Ford Road, Madisonville, KY. Industrial Building

AVAILABLE Island Ford Road, Madisonville, KY. Industrial Building AVAILABLE 1000 Island Ford Road, Madisonville, KY Industrial Building For Lease:$1.50 PSF/YR NNN For Sale: $5,175,000 ($15 psf) 345,000 SF AVAILABLE Divisible Industrial Facility on 39.04 AC Great Loading

More information

(2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP

(2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP S-xx (2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP2014-54.2 The Veda Software and Digital Test Rolling forms are available on the MnDOT Advanced

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work:

More information

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Southern Windsor County 2016 Traffic Count Program Summary April 2017 Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern

More information

BB&T Capital Markets Transportation Conference. Marta R. Stewart Executive Vice President Chief Financial Officer February 12, 2014

BB&T Capital Markets Transportation Conference. Marta R. Stewart Executive Vice President Chief Financial Officer February 12, 2014 BB&T Capital Markets Transportation Conference Marta R. Stewart Executive Vice President Chief Financial Officer February 12, 2014 1 Norfolk Southern Update 2013 Overview First Quarter Update Business

More information

Neighborhood Traffic Calming Options

Neighborhood Traffic Calming Options 2017 Neighborhood Traffic Calming Options F.Q. Story Neighborhood Carl Langford Traffic Engineering Supervisor City of Phoenix Street Transportation Department Traffic Services 1 Division Meeting Agenda

More information

Installation of Flange. Bearing Crossing Diamond. Shelby Flange Bearing Diamond

Installation of Flange. Bearing Crossing Diamond. Shelby Flange Bearing Diamond Installation of Flange Bearing Crossing Diamond Shelby Flange Bearing Diamond David C. Clark, P.E. CSX Transportation James E. Beyerl, P.E. CSX Transportation David D. Davis, P.E. Transportation Technology

More information

Construction Noise Memorandum

Construction Noise Memorandum Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551

More information

Information Meeting Transfer Station Options. September 30, 2014

Information Meeting Transfer Station Options. September 30, 2014 Information Meeting Transfer Station Options September 30, 2014 Outline of Presentation Why we are looking at changes Background on current Transfer Station Options that were considered need, function

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

Revision 2 Purchasing Agent: Phillip Geurtz Phone: (801)

Revision 2 Purchasing Agent: Phillip Geurtz   Phone: (801) STATE OF UTAH CONTRACT NUMBER: MA1623 January 28, 2014 Page 1 of 9 Revision 2 Purchasing Agent: Phillip Geurtz Email: pgeurtz@utah.gov Phone: (801) 538-3254 Item: Equipment Rental Without Operator and

More information

I-225 Rail Line Iliff and Florida Stations Information Meeting

I-225 Rail Line Iliff and Florida Stations Information Meeting I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

UPDATE OF TTCI S RESEARCH IN TRACK CONDITION TESTING AND INSPECTION. Dingqing Li, Randy Thompson, and Semih Kalay

UPDATE OF TTCI S RESEARCH IN TRACK CONDITION TESTING AND INSPECTION. Dingqing Li, Randy Thompson, and Semih Kalay Dingqing Li 1 UPDATE OF TTCI S RESEARCH IN TRACK CONDITION TESTING AND INSPECTION Dingqing Li, Randy Thompson, and Semih Kalay Transportation Technology Center, Inc. Pueblo, CO 81001 Phone: (719) 584-0740,

More information

Birkie Trail Run. Ultra Marathon Course Description. General Description of the Trails and Terrain Type Trail Names Description

Birkie Trail Run. Ultra Marathon Course Description. General Description of the Trails and Terrain Type Trail Names Description Birkie Trail Run Ultra Marathon Course Description General Description of the Trails and Terrain Type Trail Names Description Ski Trails Birkie Ridge, Birkie Skate, This ski trail sections of the course

More information

7. Protection System Testing

7. Protection System Testing MANUAL FOR INSTALLATION AND MONITORING OF UNDERGROUND STORAGE TANKS WITH FACTORY INSTALLED ANODES 1. SCOPE Manufactured by: Granby Industries 1020 André-Liné Granby, Québec, Canada, J2J 1J9. Telephone:

More information

7/28/2017. Community Resiliency and Sustainability. David Kang. Vice Chancellor. Infrastructure and Safety PERCEPTION. Photo citation:

7/28/2017. Community Resiliency and Sustainability. David Kang. Vice Chancellor. Infrastructure and Safety PERCEPTION. Photo citation: Community Resiliency and Sustainability David Kang Vice Chancellor Infrastructure and Safety July 21, 2017 1 PERCEPTION Photo citation: www.bing.com 1 Strategic Initiatives Sustainability Our commitment

More information

MASSLOAD TECHNOLOGIES

MASSLOAD TECHNOLOGIES MASSLOAD TECHNOLOGIES M2000 MASTER WEIGH PAD OPERATING INSTRUCTIONS PLACEMENT: Place the weigh pad on a hard flat surface such as asphalt or concrete and in front of the tire to be weighed. This surface

More information

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS Graduate of Polytechnic School of Tunisia, 200. Completed a master degree in 200 in applied math to computer

More information

Installation and Maintenance Instructions for GUARDIAN Manual In-Ground Traffic Spike System

Installation and Maintenance Instructions for GUARDIAN Manual In-Ground Traffic Spike System Installation and Maintenance Instructions for GUARDIAN Manual In-Ground Traffic Spike System Thank you for your purchase of Guardian Traffic System Controllers the finest and best-engineered traffic controllers

More information