Certifikat och provningsprotokoll för art. 4512, 4513, 4514 och 4515

Size: px
Start display at page:

Download "Certifikat och provningsprotokoll för art. 4512, 4513, 4514 och 4515"

Transcription

1 Certifikat och provningsprotokoll för art. 4512, 4513, 4514 och 4515 Innehållsförteckning: Declaration of conformity... sid 2 SINTEF Produktdokumentation... sid 3 Efectis Nederland BV Brandtestunderlag... sid 7 Efectis Nederland BV Testrapport...sid 22 NEMKO Rapport av Sveriges Provnings- och forskningsinstituts tester av ljudisolering i gipsvägg med olika dosor...sid 25 ELKO AB E-post: info@elko.se Hemsida: VAT/Org.nr: SE Huvudkontor Bryggvägen 16 Box Stockholm Tele Tel: +46 (0) Fax: +46 (0)

2

3

4

5

6

7 Efectis Nederland BV Return address: P.O. Box 1090, 2280 CB Rijswijk, The Netherlands Environmental Seals Ltd Envirograf House Attn: Mr. P. Ackerman-Mond Barfrestone DOVER Kent CT15 7JG UNITED KINGDOM Efectis Nederland BV Centre for Fire Safety Lange Kleiweg 5 P.O. Box CB Rijswijk T F Subject Preliminary test of Norwegian Elko sockets and Envirograf, product type 30 in a partition wall Efectis Nederland 1 report Dear Mr Ackerman-Mond, On behalf of your firm we have performed a preliminary test on a unloaded partition wall provided with several sockets. The test is based on the European standard EN :1999 and performed on January 23, The partition wall is as in practice provided with Norwegian Elko sockets and switches fitted with intumescent gaskets of Envirograf, product type 30, which expand during a fire. For this test a partition wall was prepared with Fire Line Plasterboard and only two sockets on each side. The construction is assembled at our laboratory on January 22, This report is issued by the TNO company Efectis Nederland BV (previously TNO Centre for Fire Research). TNO decided, in response to international developments and requests by customers, to collaborate with two European Egolf partners, both highly experienced in fire safety: the Norwegian Sintef/NBL and the French CTICM. Thus, through scaling up, a more comprehensive service of high quality and a wider range of facilities can be offered. In order to achieve this, the fire safety related activities of the partners involved have been privatised in this collaboration. With respect to TNO this has lead to the privatisation on the 1 st of July of the activities of the TNO Centre for Fire Research via the establishment of the company Efectis Nederland BV. Date arjo.lock@efectis.com Direct dialling (015) Direct fax (015) Project number Efectis Nederland BV: a TNO Company The Standard Conditions for Research Instructions given to Efectis, as filed at he Registry of the District Court and the Chamber of Commerce in The Hague shall apply to all instructions given to TNO; the Standard Conditions will be sent on request.

8 Date Construction details: The construction consisted of a frame with wooden studs, dimensions 100 x 50 mm with a spacing of 475 mm in the middle and 240 mm near the edges, fixed together with 100 mm screws no. 8 (see figure 1). Two layers of Fire Line Plasterboards, thickness 2 x 15 mm, on both sides, secured with galvanised clout nails, dimensions 50 x 3 mm. The construction was applied with two vertical joints at 240 mm from the edges. The dimensions of the total construction were 1450 x 1440 x 140 mm (see figure 2). 2/15 For the wall construction the following type of Norwegian Elko fitting materials were submitted: S57/100 stender hoy ring Code No 4040 S57/100 stender Code No 3012 S57/ stender Code No 4045 S57/Dobbel 4 loop stender Code No 3011 All models were provided with gaskets of Envirograf, type 30 at the bottom of the socket see photo 4. Selection of socket models From this series, two models were chosen which should present the complete series of this type of sockets. This were model S57/100 stender hoy ring and S57/Dobbel 4 loop stender The model S57/100 stender is almost the same as the S57/100 stender hoy ring with the difference that the last one is a higher model due to an extra ring to create more volume. The gasket in both models has the same surface and thickness (45 x 45 x 2.5 mm). The model S57/Dobbel 4 loop stender and the S57/ stender are both wider models with respectively 2 gaskets (45 x 45 x 2.5 mm) and 1 gasket (45 x 60 x 2.5 mm). The capacity/surface ratio of the tested models is more unfavourable than the not tested models (worse case models), see also additional letter report 2008-Efectis- R0???. At each side of the wall construction two sockets of each model where situated. The sockets were mounted onto the wooden studs and covered with the Fire Line Plasterboards. At the position of the socket a hole was drilled which was only covered with the armature cover (name???), see photo 7. Fire test: The construction was placed in front of our preliminary furnace which was equipped with three temperature sensors and a pressure device. The partition wall was applied with ten surface thermocouples at the positions showed in figure C1. The construction fulfilled the criteria for integrity and thermal insulation during the complete 90 minutes of the test.

9 The thermal insulation limits were not exceeded, all the surface temperatures stayed below 100 C. Observations during the fire test N= Non-fire side Date 3/15 Time Side Observation [min] 0 Start heating 5 N Fluctuations in furnace pressure 22 N Smoke coming from the top side of the specimen 30 N More smoke coming from the specimen 45 N Moisture visible coming out of socket B 60 N Photo of specimen after 60 minutes 63 N More moisture coming out of socket B 90 N Photo of specimen after 90 minutes 92 End of heating Assessment: A partition wall constructed of timber and covered with two layers of plasterboard and provided with Norwegian Elko sockets and switches from the tested range will have a fire resistance according to NEN 6069: 2005 of at least 90 minutes under the conditions: the timber frame has the same dimensions; Fire Line Plasterboard is used, with two layers of 15 mm at each side; the fitting materials are used mentioned in this letter report; the sockets are provided with Envirograf product 30, intumescent gaskets. At the next pages the drawings, the graphs of the test results and some photographs made during the assembly and the fire test are enclosed. Yours faithfully, A.J. Lock Dr. Ir. G. van den Berg This document has the status of a Efectis Nederland report and is known at Efectis as Efectis Nederland.-report no CVB- R0106. No part of this publication may be reproduced and/or published by print, photoprint, microfilm or any other means without the previous written consent of Efectis. In case this report was drafted on instructions, the rights and obligations of contracting parties are subject to either the Standard Conditions for Research Instructions given to TNO, or the relevant agreement concluded between the contracting parties. Submitting the report for inspection to parties who have a direct interest is permitted.

10 Date Sponsor: Environmental Seals Ltd. Project number: /15 Figure 1

11 Sponsor: Environmental Seals Ltd. Project number: Date 5/15 Figure 2

12 Sponsor: Environmental Seals Ltd. Project number: Furnace conditions Centre for Fire Safety Date: 23/01/2007 Furnace temperatures Date 6/15 Project : Wall sockets and switches Projectnbr : ISOmax ISOmin TPL1 TPL2 TPL3 Temperature [ C] ===> Time [min] ===> Graph : B1 Centre for Fire Safety Date: 23/01/2007 Deviation of the fire curve Project : Wall sockets and switches Projectnbr : ISO+ ISOdev_ISO Deviation fire curve [%] ===> Time [min] ===> Graph : B2

13 Sponsor: Environmental Seals Ltd. Project number: Centre for Fire Safety Date: 23/01/2007 Overpressure in the furnace Date 7/15 Project : Wall sockets and switches Projectnbr : Overpressure [Pa] ===> Time [min] ===> Graph : B3 Figure C1: Positions of thermocouples

14 Date Sponsor: Environmental Seals Ltd. Project number: Graphs of test results Centre for Fire Safety Date: 23/01/2007 Surfacetemperatures of the wall (part 1) 8/15 Project : Wall sockets and switches Projectnbr : Temperature [ C] ===> TC1 TC2 TC3 TC4 TC Time [min] ===> Graph : C2 Centre for Fire Safety Date: 23/01/2007 Surfacetemperatures of the wall (part 2) Project : Wall sockets and switches Projectnbr : Temperature [ C] ===> TC6 TC7 TC8 TC9 TC10 TC11 TC Time [min] ===> Graph : C3

15 Sponsor: Environmental Seals Ltd. Project number: Centre for Fire Safety Date: 23/01/2007 Ambienttemperature Date 9/15 Project : Wall sockets and switches Projectnbr : Temperature [ C] ===> Time [min] ===> Graph : C4

16 Sponsor: Environmental Seals Ltd. Project number: Photos Date 10/15 Photo 1: Assembly of sockets against wooden studs. Photo 2: Both models at fire and non-fire side.

17 Date 11/15 Photo 3: Model S57/100 stender hoy ring Photo 4: Model S57/Dobbel 4 loop stender.

18 Sponsor: Environmental Seals Ltd. Project number: Date 12/15 Photo 5: Specimen in front of furnace. Photo 6: Specimen after 60 minutes.

19 Sponsor: Environmental Seals Ltd. Project number: Date 13/15 Photo 7: Detail of socket A during test, after 60 minutes. Photo 8: Detail of socket B during test, after 60 minutes.

20 Sponsor: Environmental Seals Ltd. Project number: Date 14/15 Photo 9: Specimen after 90 minutes. Photo10: Fire side of specimen after the test.

21 Sponsor: Environmental Seals Ltd. Project number: Date 15/15 Photo 11: Detail of completely filled hole of socket A after the test. Photo 12: Detail of completely filled hole of socket B after the test.

22 Efectis Nederland BV Return address: P.O. Box 1090, 2280 CB Rijswijk, The Netherlands Environmental Seals Ltd Envirograf House Attn: Mr. D.A. Ward Barfrestone DOVER Kent CT15 7JG United Kingdom Subject Additional letter report for, product type 30 of Envirograf Efectis Nederland report R0??? 1 Dear Mr Ward, On behalf of your firm we have performed a preliminary test on an unloaded partition wall provided with two socket models as described in test report R0106/LKA/TNL. The test is based on the European standard EN :1999 and assessed according to the Dutch standard NEN 6069: To achieve information about the fire resistance aspects of the complete range of this product two models of this type of sockets were chosen and tested on January 23, The partition wall construction as described below was provided with the two models, one of each at the fire side and also at the non-fire side. 1 1 This report is issued by the TNO company Efectis Nederland BV (previously TNO Centre for Fire Research). Centre for Fire Safety Lange Kleiweg 5 P.O. Box CB Rijswijk T F Date February 26, Efectis-R0???/LKA arjo.lock@efectis.com Direct dialling (015) Direct fax (015) Project number /2008??? Efectis Nederland BV: a TNO Company The Standard Conditions for Research Instructions given to Efectis, as filed at he Registry of the District Court and the Chamber of Commerce in The Hague shall apply to all instructions given to TNO; the Standard Conditions will be sent on request. TNO decided, in response to international developments and requests by customers, to collaborate with two European Egolf partners, both highly experienced in fire safety: the Norwegian Sintef/NBL and the French CTICM. Thus, through scaling up, a more comprehensive service of high quality and a wider range of facilities can be offered. In order to achieve this, the fire safety related activities of the partners involved have been privatised in this collaboration. With respect to TNO this has lead to the privatisation on the 1 st of July 2006 of the activities of the TNO Centre for Fire Research via the establishment of the company Efectis Nederland BV.

23 Date Construction details of partition wall The wall construction consisted of a frame with wooden studs, dimensions 100 x 50 mm with a spacing of 475 mm in the middle and 240 mm near the edges, fixed together with 100 mm screws no. 8. Two layers of Fire Line Plasterboards, thickness 2 x 15 mm, on both sides, secured with galvanised clout nails, dimensions 50 x 3 mm. The construction was applied with two vertical joints at 240 mm from the edges. The dimensions of the total construction was 1450 x 1440 x 140 mm (see also the mentioned preliminary letter report) Efectis-R0???/LKA 2/2 Construction details of sockets and gaskets: All the sockets were provided with the same type of gasket. The models are used with one or with two gaskets with the following dimensions: 45 x 45 mm and 45 x 60 mm. The at the front side red coloured gasket were glued to the bottom of the socket and had a thickness of approx. 2.5 mm. The capacity of the socket models (without adapter) and the surface of the gaskets are determined and are shown in the table below. Table: 1 Norwegian socket models with Envirograf gaskets product 30 Model Code Socket surface Ratio capacity in [cm 3 ] [cm 2 ] S57/100 stender hoy ring No S57/100 stender No S57/ stender No S57/Dobbel 4 loop stender No Capacity/surface relation The determined capacity of the sockets and the surface of the gaskets show that the increase of the socket capacity is less than the surface increase of the used gasket (ratio). With thes mentioned amount of material each model of this type of sockets should be filled completely in case of a fire. Aim of the test The aim of the test set-up was to check two aspects. The sockets mounted at the nonfire and at the fire side in the mentioned type of wall and the influence of the different gaskets in the sockets. The constructions fulfill the requirements during this test.

24 Date Additional assessment * : The models of the complete range of above described Norwegian Elko fitting materials implemented in a partition wall constructed of timber and covered with two layers of plasterboard will have a fire resistance according to NEN 6069: 2005 of at least 90 minutes under the conditions: 2008-Efectis-R0???/LKA 3/3 the timber frame has the same dimensions; Fire Line Plasterboard is used, with two layers of 15 mm at each side; the fitting materials are used from this range of products; the sockets are enclosed with Envirograf product 30, intumescent gaskets with a sufficient amount of material to fill the sockets. Remark: * The construction is assessed according to the Dutch standard because only a preliminary test is performed and not a full scale test according to EN The Dutch Standard is similar with the European standard. Since 2005 the Dutch Standard refers for this type of constructions to the European standard EN Yours faithfully, A.J. Lock Dr. Ir. G. van den Berg Centre for Fire Safety This document has the status of a Efectis Nederland report and is known at Efectis as Efectis-report no Efectis-R0???. No part of this publication may be reproduced and/or published by print, photoprint, microfilm or any other means without the previous written consent of Efectis In case this report was drafted on instructions, the rights and obligations of contracting parties are subject to either the Standard Conditions for Research Instructions given to TNO, or the relevant agreement concluded between the contracting parties. Submitting the report for inspection to parties who have a direct interest is permitted.

25

26

27

28

Godkjennelsesdokumenter for art. 4509, 4511

Godkjennelsesdokumenter for art. 4509, 4511 Godkjennelsesdokumenter for art. 4509, 4511 Innholdsliste: Samsvarserklæring side 2 SINTEF Produktdokumentasjon 050-0204 side 3 Efectis Nederland BV branntestunderlag side 8 Efectis Nederland BV testrapport

More information

TNO report. Centre for Fire Research Van Mourik Broekmanweg 6 P.O. Box AA Delft. T F

TNO report. Centre for Fire Research Van Mourik Broekmanweg 6 P.O. Box AA Delft.   T F ederlandse Organisatie voor toegepast-natuurwetenschappelijk onderzoek / etherlands Organisation for Applied Scientific Research TO report E 13823:22 "Single Burning Item" and E 11925-2:22 "Ignitability"

More information

On-road emission measurements with PEMS on a MERCEDES-BENZ ATEGO Euro VI N2 heavy-duty truck

On-road emission measurements with PEMS on a MERCEDES-BENZ ATEGO Euro VI N2 heavy-duty truck TNO report TNO 2018 R10053 On-road emission measurements with PEMS on a MERCEDES-BENZ ATEGO Euro VI N2 heavy-duty truck Anna van Buerenplein 1 2595 DA Den Haag P.O. Box 96800 2509 JE The Hague The Netherlands

More information

Report Number BTC 12024F

Report Number BTC 12024F Report Number BTC F A FIRE RESISTANCE TEST ON A GYPROC GYPWALL PARTITION INCORPORATING A DOUBLE LAYER OF mm SOUNDBLOC EACH SIDE OF S STUDS, CONDUCTED IN ACCORDANCE WITH BS EN 4:999. Test Date: 9 th June

More information

Report Number BTC 12261F

Report Number BTC 12261F Report Number BTC 6F A FIRE RESISTANCE TEST ON A 5m HIGH X m WIDE GYPROC SHAFTWALL SYSTEM INCORPORATING A 6mm METAL STUD FRAMEWORK CLAD WITH A DOUBLE LAYER OF 5mm GYPROC FIRELINE, EXPOSED TO THE FIRE FROM

More information

InnoBYG small scale demonstration tests - Part 2

InnoBYG small scale demonstration tests - Part 2 Test report InnoBYG small scale demonstration tests - Part 2 File Serial No.: 2 Ref.: TDJ/AND Pages: 17 Enclosures: 31 2014-03-18 Date: 2014-07-09 Jernholmen 12, DK-2650 Hvidovre Phone: +45 36 34 90 00,

More information

TÜV NEDERLAND P.O. Box AC Best - The Netherlands De Waal 21C PH Best - The Netherlands +31 (0) (0)

TÜV NEDERLAND P.O. Box AC Best - The Netherlands De Waal 21C PH Best - The Netherlands +31 (0) (0) TÜV NEDERLAND P.O. Box 120-5680 AC Best - The Netherlands De Waal 21C - 5684 PH Best - The Netherlands +31 (0)499-339500 - +31 (0)499-339539 Pendulum impact testing on double bar gate type DG-950 (UDG-37)

More information

Title: WF Report No: Prepared for: Simonswerk UK Ltd. Burcott Works, Spring Street, Tipton, West Midlands, DY4 8TF. Date: 20 th April 2012

Title: WF Report No: Prepared for: Simonswerk UK Ltd. Burcott Works, Spring Street, Tipton, West Midlands, DY4 8TF. Date: 20 th April 2012 Exova Warringtonfire Holmesfield Road Warrington WA1 2DS United Kingdom T : +44 (0) 1925 655 116 F : +44 (0) 1925 655 419 E : warrington@exova.com W: www.exova.com Title: The fire resistance performance

More information

InnoBYG small scale demonstration tests - Part 1

InnoBYG small scale demonstration tests - Part 1 Test report InnoBYG small scale demonstration tests - Part 1 File FUN0001 Serial No.: 1 Ref.: TDJ/AND Pages: 18 2013-12-11 Date: 2014-01-20 Jernholmen 12, DK-2650 Hvidovre Phone: +45 36 34 90 00, Fax:

More information

Title: Fire resistance test in accordance with BS EN : 2008 on an uninsulated, face fixed rolling shutter doorset. Report No: Prepared for:

Title: Fire resistance test in accordance with BS EN : 2008 on an uninsulated, face fixed rolling shutter doorset. Report No: Prepared for: Exova Warringtonfire Holmesfield Road Warrington WA1 2DS United Kingdom T : +44 (0) 1925 655 116 F : +44 (0) 1925 655 419 E : warrington@exova.com W: www.exova.com Title: Fire resistance test in accordance

More information

CertRom. BUCHAREST, S5 Calea 13 Septembrie 231A; Ph: , Fax: ;

CertRom. BUCHAREST, S5 Calea 13 Septembrie 231A; Ph: , Fax: ; Promoting use of biofuels and bioliquids in Romania - the legal framework - Ministry of Economy and Trade and of Business Environment The 2003/30/CE Directive has been transposed into Government Decision

More information

Photograph 1, Current feed to connector test loop

Photograph 1, Current feed to connector test loop Photograph 1, Current feed to connector test loop Photograph 2, control conductor and instrument leads outside test chamber Page 3 of 6 Photograph 3 Salt Fog Chamber with Connector Loop Photograph 4, Connector

More information

Test report No

Test report No Exova Warringtonfire, Frankfurt Industriepark Höchst, C369 Frankfurt am Main D-65926 Germany T : +49 (0) 69 305 3476 F : +49 (0) 69 305 17071 E : EBH@exova.com W: www.exova.com Test report No. 2015-1661

More information

Testing of Baier Plasterboard to AS/NZS (Electronic copy (PDF format) original signed by author) Materials Scientist.

Testing of Baier Plasterboard to AS/NZS (Electronic copy (PDF format) original signed by author) Materials Scientist. DC1333 Testing of aier Plasterboard to AS/NZS 2588 (Electronic copy (PDF format) original signed by author) Author: Neil Lee Materials Scientist Reviewer: ryan Keen Senior Technician Contact: RANZ Limited

More information

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E 1. Scope 1.1 The general process is described in the implementation procedure for design approvals of aircraft, engine and propeller from CIS and in the implementation procedure for design approvals of

More information

Tyre noise limits of EC/661/2009 and ECE R117: Evaluation based on sold tyres in the Netherlands

Tyre noise limits of EC/661/2009 and ECE R117: Evaluation based on sold tyres in the Netherlands Transmitted by the expert from the Netherlands Informal document GRB-60-08 (60th GRB, 1-3 September 2014, agenda item 9) M+P MBBM group People with solutions MEMORANDUM www.mplusp.eu To Attn. Ministry

More information

Germany B1 Fire Rating. kraft paper products. molo design, ltd Venables Street Vancouver, B.C. Canada V5L 2G7

Germany B1 Fire Rating. kraft paper products. molo design, ltd Venables Street Vancouver, B.C. Canada V5L 2G7 Germany B1 Fire Rating kraft paper products molo design, ltd 1470 Venables Street Vancouver, B.C. Canada V5L 2G7 t +1 604 696 2501 f +1 604 685 0342 info@molodesign.com www.molodesign.com molo kraft paper

More information

OPW Fluid Transfer Group Europe BV

OPW Fluid Transfer Group Europe BV Manual OPW Fluid Transfer Group Europe BV Tank Truck Tester 1397E & 1398E Disclaimer With this document an user manual is presented of the OPW tank-truck-tester 1397E & 1398E and is designed to use in

More information

Our firm only processes the data that is required for the preparation, implementation and completion of the case in question.

Our firm only processes the data that is required for the preparation, implementation and completion of the case in question. Privacy statement version of 25 May 2018 The privacy statement below implements the duty of disclosure (set out in the General Data Protection Regulation ( GDPR )) to the data subject or data subjects

More information

New: PREMIUM fireplaces with elevating door. Welcome to Spartherm. Why Spartherm? Models. Chamotte interior, colours

New: PREMIUM fireplaces with elevating door. Welcome to Spartherm. Why Spartherm? Models. Chamotte interior, colours fireplaces Welcome to Spartherm The extremely high German standard of quality has helped Spartherm to evolve into the European market leader in wood-fired, elevating door fires. With more than of 55,000

More information

TEST REPORT IEC Luminaires Part 2: Particular requirements: Section Two Recessed luminaires

TEST REPORT IEC Luminaires Part 2: Particular requirements: Section Two Recessed luminaires Test Report issued under the responsibility of www.nemko.com Report Reference No.... : 220130 Date of issue... : 2012-09-13 Total number of pages... 6 TEST REPORT IEC 60598-2-2 Luminaires Part 2: Particular

More information

Title: Fire Resistance Test In Accordance With BS EN : 1999 On A Glazed Screen Assembly. WF Report No: , Issue 2. Prepared for: Date:

Title: Fire Resistance Test In Accordance With BS EN : 1999 On A Glazed Screen Assembly. WF Report No: , Issue 2. Prepared for: Date: Title: Fire Resistance Test In Accordance With BS EN 1364-1: 1999 On A Glazed Screen Assembly WF Report No: 164311, Prepared for: AGC Flat Glass Europe. Chaussee de la Hulpe 166 1170 Brussels. Date: 19

More information

Test Report No.: SDHGR FM Date: Jun.08, 2012 Page 1 of 3

Test Report No.: SDHGR FM Date: Jun.08, 2012 Page 1 of 3 Test Report No.: SDHGR120501002FM Date: Jun.08, 2012 Page 1 of 3 HONGGE (GUANGZHOU) PAPER CO., LTD BUILDING 1, HE TAI INDUSTRY ZONE, HE TAI ROAD NO.2, HE BIAN, JIA HE TOWN, BAI YUN DISTRICT, GUANGZHOU.

More information

ISO :2015/DAM 1

ISO :2015/DAM 1 DRAFT AMENDMENT ISO 19973-2:2015/DAM 1 ISO/TC 131 Voting begins on: 2018-01-15 Secretariat: ANSI Voting terminates on: 2018-04-09 Pneumatic fluid power Assessment of component reliability by testing Part

More information

European B1 Fire Rating. soft collection softwall + softblock Fire Retardant (FR) Treated textile products. molo design, ltd

European B1 Fire Rating. soft collection softwall + softblock Fire Retardant (FR) Treated textile products. molo design, ltd European B1 Fire Rating soft collection softwall + softblock Fire Retardant (FR) Treated textile products molo design, ltd 1470 Venables Street Vancouver, B.C. Canada V5L 2G7 t +1 604 696 2501 f +1 604

More information

your and attach spreadsheet of 23 December 2003; and

your  and attach spreadsheet of 23 December 2003; and s Science and Engineering 14 Julius Avenue, Riverside Corporate Park North Ryde NSW 2113 PO Box 310, North Ryde NSW 2113, Australia Telephone: (02) 9490 5444 Facsimile: (02) 9490 5555 ABN 41 687 119 230

More information

Test report no

Test report no Exova Warringtonfire, Frankfurt Industriepark Höchst, C369 Frankfurt am Main D-65926 Germany T : +49 (0) 69 305 3476 F : +49 (0) 69 305 17071 E : EBH@exova.com W: www.exova.com Test report no. 2014-1452-2

More information

COMMISSION REGULATION (EC)

COMMISSION REGULATION (EC) L 191/26 Official Journal of the European Union 23.7.2009 COMMISSION REGULATION (EC) No 640/2009 of 22 July 2009 implementing Directive 2005/32/EC of the European Parliament and of the Council with regard

More information

How to get started. with. Kongsberg XP Auto systems. Serial number: Please Read This First

How to get started. with. Kongsberg XP Auto systems. Serial number: Please Read This First How to get started with Kongsberg XP Auto systems Serial number: Please Read This First Note We remind you that only the Esko staff, or persons having received appropriate training, are allowed to handle,

More information

Status of the Informal Working Group on ACSF

Status of the Informal Working Group on ACSF Submitted by the IWG on ACSF Informal document GRRF-86-20-Rev.1 86 th GRRF session, 12-16 February 2018, Agenda item 9(b) Status of the Informal Working Group on ACSF Summary ACSF IWG Meeting 16th Session

More information

Introduction. Our Ref: Chilt/IF12041 AR1. 24 th June Astra Door Controls Ltd Unit 10 Astra Business Centre Roman Way Preston PR2 5AP

Introduction. Our Ref: Chilt/IF12041 AR1. 24 th June Astra Door Controls Ltd Unit 10 Astra Business Centre Roman Way Preston PR2 5AP Chiltern House Stocking Lane Hughenden Valley High Wycombe Buckinghamshire HP14 4ND UK t +44 (0) 1494 569 800 f +44 (0) 1494 564895 e cif@chilternfire.co.uk w www.chilternfire.co.uk Our 24 th June 2012

More information

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE TACHOGRAPH FORUM

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE TACHOGRAPH FORUM EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Directorate D - Logistics, maritime & land transport and passenger rights D.3 Road Transport Brussels, 29 January 2016 ARES (2015) 6558037

More information

Enigma. Pocket sliding door systems. Wall construction preparation guide

Enigma. Pocket sliding door systems. Wall construction preparation guide Enigma Pocket sliding door systems 1 2 Wall construction preparation guide 3 Wall construction preparation The Enigma system can be fitted to timber or steel studwork partitions. Prior to commencing construction

More information

Controlling the Speed of Tilting Trains Through Curves

Controlling the Speed of Tilting Trains Through Curves Controlling the Speed of Tilting Trains Through Curves Synopsis This document mandates the means by which Tilting Trains may be operated at higher speeds than nontilting trains around curves. Signatures

More information

LIIKENNEVIRTA LTD GENERAL TERMS AND CONDITIONS FOR THE CHARGING SERVICE

LIIKENNEVIRTA LTD GENERAL TERMS AND CONDITIONS FOR THE CHARGING SERVICE 1 (7) LIIKENNEVIRTA LTD GENERAL TERMS AND CONDITIONS FOR THE CHARGING SERVICE 1 Scope of application and definitions 1.1 These General Terms and Conditions pertaining to the delivery of the Charging Service

More information

Certification Scheme

Certification Scheme Certification Scheme Water-based surface-embedded heating and cooling systems in accordance with DIN EN 1264 (Version: November 2009) DIN CERTCO Alboinstraße 56 12103 Berlin Tel: +49 30 7562-1131 Fax:

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 10924-1 Second edition 2016-04-01 Road vehicles Circuit breakers Part 1: Definitions and general test requirements Véhicules routiers Coupe-circuits Partie 1: Définitions et

More information

11-Feb-14. VCA job number: CSP Date: 11 February Dear Sirs,

11-Feb-14. VCA job number: CSP Date: 11 February Dear Sirs, VCA job number: CSP286503 Date: 11 February 2014 Dear Sirs, 1. The vehicle type / component described on the attached approval(s) has been tested and meets the requirements of the ECE Regulation / EEC

More information

Fire/combustion gas damper EKO-JBG

Fire/combustion gas damper EKO-JBG Fire/combustion EKO-JBG Description The EKO-JBG fire/combustion is a typeapproved damper intended for fire isolation or as protection against the spread of flame and fire gases in ventilation ducting.

More information

Sound-absorbing spacer Sorp10

Sound-absorbing spacer Sorp10 Sponsor: Reference number: 7.3 / 27080 This document is only a translated version; not legally attested Max Frank GmbH & Co. KG Mitterweg 1 94339 Leiblfing Federal Institute for Materials Research and

More information

Electric Vehicles and the Environment (EVE IWG)

Electric Vehicles and the Environment (EVE IWG) Submitted by the EVE informal working group Electric Vehicles and the Environment () 1 Informal document GRPE-78-30-Rev.1 78 th GRPE, 10-11 January 2018 Agenda item 9 REPORT TO GRPE 78 TH SESSION Original

More information

specifying the applications each has before the AER and the AER licences and approvals such licensee or approval holder holds.

specifying the applications each has before the AER and the AER licences and approvals such licensee or approval holder holds. DECLARATION NAMING ALEXANDER JUSTIN VON GRAMATZKI, FORMERLY KNOWN AS ALEXANDER JUSTIN HANNE, PURSUANT TO SECTION 106(1) OF THE OIL AND GAS CONSERVATION ACT For the reasons set out in the accompanying letter,

More information

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998 WELLINGTON, NEW ZEALAND PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998 I, Gerry Brownlee, Minister of Transport, HEREBY make the following ordinary Rule: Land Transport

More information

Test report No

Test report No Exova Warringtonfire, Frankfurt Industriepark Höchst, C369 Frankfurt am Main D-65926 Germany T : +49 (0) 69 305 3476 F : +49 (0) 69 305 17071 E : EBH@exova.com W: www.exova.com Test report No. 2016-1390

More information

Fire/combustion gas damper EKO-JBL

Fire/combustion gas damper EKO-JBL Fire/combustion Description The fire/combustion is a typeapproved damper intended for fire isolation or as protection against the spread of flame and fire gases in ventilation ducting. The damper is designed

More information

Test report No

Test report No Exova Warringtonfire, Frankfurt Industriepark Höchst, C369 Frankfurt am Main D-65926 Germany T : +49 (0) 69 305 3476 F : +49 (0) 69 305 17071 E : EBH@exova.com W: www.exova.com Test report No. 2014-1940

More information

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1 30 August 2011 Agreement Concerning the adoption of uniform technical prescriptions for wheeled vehicles, equipment and parts which can be fitted and/or be used on wheeled vehicles and the conditions for

More information

New EU Regulation on General Safety. Implementation of Tyre Aspects

New EU Regulation on General Safety. Implementation of Tyre Aspects New EU Regulation on General Safety Working Paper No. STD-01-03 1st STD meeting, 23 July 2009, agenda item 2 Implementation of Tyre Aspects Presentation to joint GRB/GRRF meeting. Overview Background.

More information

FIRE TEST REPORT FH 5154

FIRE TEST REPORT FH 5154 1222 Moonshine Road Judgeford RD1 Porirua 5381 New Zealand T +64 4 237 1170 F +64 4 237 1171 branz@branz.co.nz www.branz.co.nz FIRE TEST REPORT FH 5154 CONE CALORIMETER TEST AND NCC SPECIFICATION C1.10

More information

Kondenserade petroleumgaser Metod för provtagning (ISO 4257:2001) Liquefied petroleum gases Method of sampling (ISO 4257:2001)

Kondenserade petroleumgaser Metod för provtagning (ISO 4257:2001) Liquefied petroleum gases Method of sampling (ISO 4257:2001) SVENSK STANDARD SS-EN ISO 4257 Fastställd 2001-09-14 Utgåva 2 Kondenserade petroleumgaser Metod för provtagning (ISO 4257:2001) Liquefied petroleum gases Method of sampling (ISO 4257:2001) ICS 75.160.30

More information

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-23R Extension number: 00

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-23R Extension number: 00 Vehicle Technology Division THE NETHERLANDS (N E D E R L A N D) COMMUNICATION Concerning (1) : - approval granted - approval extended - approval refused - approval withdrawn - production definitely discontinued

More information

ROV shackles. your reliable partner

ROV shackles. your reliable partner ROV shackles your reliable partner Dear Customer, For over 90 years the production of high tensile shackles has been our core business and competence. The designs and quality standards of our wire rope-

More information

1ZSE en, Rev. 9. Transformer bushings, type GOB Technical guide

1ZSE en, Rev. 9. Transformer bushings, type GOB Technical guide 1ZSE 2750-102 en, Rev. 9 Transformer bushings, type GOB Technical guide Original instruction The information provided in this document is intended to be general and does not cover all possible applications.

More information

Certificate 1474/87. Pilkington Pyrodur Fire Protection Glass

Certificate 1474/87. Pilkington Pyrodur Fire Protection Glass Certificate 1474/87 The product described below and production control has been found to comply with Building Regulations of the National Board of Housing Building and Planning (BBR) with reference to

More information

Version / Status V 2.0 Date Author. Wagon Markings

Version / Status V 2.0 Date Author. Wagon Markings 1. Introduction Wagon Markings Article 4, para 4 of the Safety Directive (2004/49/EG amended by 2008/110/EC) stipulates the responsibility of each manufacturer, maintenance supplier, wagon keeper, service

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62391-2 First edition 2006-04 Fixed electric double-layer capacitors for use in electronic equipment Part 2: Sectional specification Electric double-layer capacitors for power

More information

AIRBUS EASA AD activities AD implementation

AIRBUS EASA AD activities AD implementation E. BLANCANEAUX A318/19/20/30 HO continued airworthiness A. PANNIER A330/A340 Cont airworthiness manager Presented by: AIRBUS EASA AD activities AD implementation 10 th EASA 3th workshop - Airbus Airbus-

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 10.1.2019 L 8 I/1 II (Non-legislative acts) REGULATIONS REGULATION (EU) 2019/26 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 8 January 2019 complementing Union type-approval legislation with regard to

More information

TEST REPORT CONCERNING THE COMPLIANCE OF A VOTING MACHINE FOR USE AT ELECTIONS IN IRELAND, BRAND NEDAP, MODEL P.R.U

TEST REPORT CONCERNING THE COMPLIANCE OF A VOTING MACHINE FOR USE AT ELECTIONS IN IRELAND, BRAND NEDAP, MODEL P.R.U Testing and certification of electric, electronic and radio equipment/installations including telecommunication systems TEST REPORT CONCERNING THE COMPLIANCE OF A VOTING MACHINE FOR USE AT ELECTIONS IN

More information

PRINTING OF BMI WHEELS

PRINTING OF BMI WHEELS REQUEST FOR QUOTATIONS PRINTING OF BMI WHEELS Food and Nutrition Technical Assistance Project III (FANTA) Issue date: June 20, 2016 To: Response Deadline: June 28, 2016 Submit Questions by: June 27, 2016

More information

Declaration naming Richard J. Nixon and Dale Brand under section 106 of the Oil and Gas Conservation Act

Declaration naming Richard J. Nixon and Dale Brand under section 106 of the Oil and Gas Conservation Act November 30, 2017 By email and registered mail To: Richard J. Nixon Dale Brand Declaration naming Richard J. Nixon and Dale Brand under section 106 of the Oil and Gas Conservation Act Dear Messrs. Nixon

More information

Chemical indicators and test devices Benchmarking sterilisation processes.

Chemical indicators and test devices Benchmarking sterilisation processes. Chemical indicators and test devices Benchmarking sterilisation processes www.stericlin.com Regulatory landscape National Law Directive / Regulation Guidelines Standards 2 Directive Regulation Law Guideline

More information

Proposal for a new UNECE regulation on recyclability of motor vehicles

Proposal for a new UNECE regulation on recyclability of motor vehicles Transmitted by OICA Informal document No. GRPE-65-39 (65 th GRPE, 15-18 January 2013, agenda item 15) Proposal for a new UNECE regulation on recyclability of motor vehicles Informal Document GRPE-65-21

More information

No. Pr FIRE RESISTANCE TEST REPORT. Issued on: AUTHORIZED BODY AO 216. Project No: (Z )

No. Pr FIRE RESISTANCE TEST REPORT. Issued on: AUTHORIZED BODY AO 216. Project No: (Z ) Project No: 1 04 177 (Z210040305) AUTHORIZED BODY AO 216 TEST LABORATORY IN VESELÍ NAD LUŽNICÍ Accredited Test Laboratory - accreditation issued by the Czech Institute for Accreditation, o. p. s. Registered

More information

Demonstration with optical fibres by Smart Fibres Ltd. Task 15

Demonstration with optical fibres by Smart Fibres Ltd. Task 15 Demonstration with optical fibres by Smart Fibres Ltd. Task 15 Dutch Offshore Wind Energy Converter project DOWEC 10021 rev1 Name: Signature: Date: Written by: J.F. Kooij (LMGH) 30-09-03 version Date No

More information

Test report no

Test report no Exova Warringtonfire, Frankfurt Industriepark Höchst, C369 Frankfurt am Main D-65926 Germany T : +49 (0) 69 305 3476 F : +49 (0) 69 305 17071 E : EBH@exova.com W: www.exova.com Test report no. 2015-1339

More information

} Rev.1/Add.52/Rev.2/Amend.2

} Rev.1/Add.52/Rev.2/Amend.2 19 February 2010 AGREEMENT CONCERNING THE ADOPTION OF UNIFORM TECHNICAL PRESCRIPTIONS FOR WHEELED VEHICLES, EQUIPMENT AND PARTS WHICH CAN BE FITTED AND/OR BE USED ON WHEELED VEHICLES AND THE CONDITIONS

More information

Test report No

Test report No Exova Warringtonfire, Frankfurt Industriepark Höchst, C369 Frankfurt am Main D-65926 Germany T : +49 (0) 69 305 3476 F : +49 (0) 69 305 17071 E : EBH@exova.com W: www.exova.com Test report No. 2014-1031

More information

E/ECE/324/Rev.1/Add.54/Rev.2/Amend.1 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2/Amend.1

E/ECE/324/Rev.1/Add.54/Rev.2/Amend.1 E/ECE/TRANS/505/Rev.1/Add.54/Rev.2/Amend.1 28 October 2016 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions

More information

Assembly instructions PRORUNNER mk1 2

Assembly instructions PRORUNNER mk1 2 Assembly instructions PRORUNNER mk1 Version 0.1 / 01-JUN-2013 Copyright Qimarox B.V. All rights reserved. No part of this document may be copied, stored in a database and/or published by means of printing,

More information

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 T 229 MI 914 V 837 AGRI 596 PREP-BXT 58 CODEC 2164 LEGISLATIVE ACTS AND OTHER INSTRUMTS

More information

Cavity Stop Socks & TCBs

Cavity Stop Socks & TCBs MANAGEMENT V3 27.04.2015 Cavity Stop Socks & TCBs Key Features Up to four hours fire integrity Specified in semi-detached, apartments and major projects Complies to Robust Detail Part E and Building Regulations

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 3320 Third edition 2013-12-01 Fluid power systems and components Cylinder bores and piston rod diameters and area ratios Metric series Transmissions et composants hydrauliques

More information

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE Copyright SFA - InterNoise 2000 1 inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering 27-30 August 2000, Nice, FRANCE I-INCE Classification: 1.3 CURVE SQUEAL OF

More information

Overhead transmission lines Spacers

Overhead transmission lines Spacers = SVENSKA KRAFTNÄT SWEDISH NATIONAL GRID UNIT, BUSINESS AREA AEL, Asset Management Lines OUR REFERENCE TR05-08E DATE 2016-06-09 CONSU12TATIONS TECHNICAL GUIDELINE REVISION 3 APPROVED Overhead transmission

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 8178-4 Second edition 2007-12-15 Reciprocating internal combustion engines Exhaust emission measurement Part 4: Steady-state test cycles for different engine applications Moteurs

More information

10-Feb-14. VCA job number: CSP Date: 10 February Dear Sirs,

10-Feb-14. VCA job number: CSP Date: 10 February Dear Sirs, VCA job number: CSP286498 Date: 10 February 2014 Dear Sirs, 1. The vehicle type / component described on the attached approval(s) has been tested and meets the requirements of the ECE Regulation / EEC

More information

Airworthiness Directive

Airworthiness Directive Airworthiness Directive AD No.: 2011-0135R3 Issued: 27 July 2017 EASA AD No.: 2011-0135R3 Note: This Airworthiness Directive (AD) is issued by EASA, acting in accordance with Regulation (EC) 216/2008 on

More information

Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form ) and Declarations (Form ).

Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form ) and Declarations (Form ). May 11, 2001 ADVICE 2316-G/2116-E (Pacific Gas and Electric Company ID U 39 M) Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form 79-716) and Declarations (Form 62-0980). Public

More information

IQL Helios Area-/Streetlight. User Manual

IQL Helios Area-/Streetlight. User Manual Contents 1. Safety... 3 2. Warranty... 3 2.1 General... 3 2.2 Life span... 3 3. Type plate... 4 4. Product Description... 5 5. Specifications... 6 5.1 General... 6 5.2 Dimensions... 6 6. Installation...

More information

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001 Train Safety Systems Synopsis This document defines the requirements for train safety systems to enable safe operation of trains on Railtrack controlled infrastructure. Signatures removed from electronic

More information

A SHORT HISTORY SINCE DIESELGATE. Richard Smokers

A SHORT HISTORY SINCE DIESELGATE. Richard Smokers A SHORT HISTORY SINCE DIESELGATE Richard Smokers Symposium Vehicle Emissions November 3, 2016 TEST PROGRAMMES AT TNO Since 1986 in a sequence of projects for the Dutch Ministry of Infrastructure and the

More information

ISO INTERNATIONAL STANDARD. Gas turbines Procurement Part 3: Design requirements

ISO INTERNATIONAL STANDARD. Gas turbines Procurement Part 3: Design requirements INTERNATIONAL STANDARD ISO 3977-3 Second edition 2004-08-15 Gas turbines Procurement Part 3: Design requirements Turbines à gaz Spécifications pour l'acquisition Partie 3: Exigences de conception Reference

More information

Electric Vehicles and the Environment (EVE IWG)

Electric Vehicles and the Environment (EVE IWG) Submitted by the EVE informal working group Electric Vehicles and the Environment () 1 Informal document GRPE-77-28 77 th GRPE, 6-8 June 2018 Agenda item 9 REPORT TO GRPE 77 TH SESSION Current Mandate

More information

Translation of the Original operating instructions Lifting device Z 70 /...

Translation of the Original operating instructions Lifting device Z 70 /... Translation of the Original operating instructions Lifting device Z 70 /... Content 1. Lifting device / Correct use according to regulations 2. Basic principles 3. General information 4. Special remarks

More information

SPEEDROLLER SERVICE MANUAL CE DECLARATIONS LOG BOOK USER MANUAL. Edition : May 2011

SPEEDROLLER SERVICE MANUAL CE DECLARATIONS LOG BOOK USER MANUAL. Edition : May 2011 SERVICE MANUAL CE DECLARATIONS LOG BOOK USER MANUAL SPEEDROLLER Edition : May 2011 1 8 2 3 4 Main components 1 drive 2 wind roller with hood (optional) 3 door panel 4 aluminium hinge profile 5 window section

More information

TEST REPORT IEC Low-voltage switchgear and control gear Part 7-4: Ancillary equipment PCB terminal blocks for copper conductors

TEST REPORT IEC Low-voltage switchgear and control gear Part 7-4: Ancillary equipment PCB terminal blocks for copper conductors r Test Report issued under the responsibility of: TEST REORT Low-voltage switchgear and control gear art 7-4: Ancillary equipment CB terminal blocks for copper s Report Number.... : 2169331.75 Date of

More information

Fire & Gas Dampers. Fire & Gas Dampers are used in ventilation systems to prevent the spread of flame and/or smoke between divisions.

Fire & Gas Dampers. Fire & Gas Dampers are used in ventilation systems to prevent the spread of flame and/or smoke between divisions. Fire & Gas Introduction Fire & Gas are used in ventilation systems to prevent the spread of flame and/or smoke between divisions. Authority/Certification Wozair manufacture three types of Fire & Gas Damper

More information

Thorsten Wege. 4th ISCC Global Sustainability Conference in Brussels on 5th February 2014

Thorsten Wege. 4th ISCC Global Sustainability Conference in Brussels on 5th February 2014 Thorsten Wege 4th ISCC Global Sustainability Conference in Brussels on 5th February 2014 6 Februar 2014 Thorsten Wege - Biofuel policy coordinator (head of a small unit) - Chair of int. working group biofuels

More information

ILED Dorado. User Manual

ILED Dorado. User Manual 10NM U-code Medium Intensity Obstruction Light Helideck Status Light 15NM U-code Contents 1. Safety... 3 2. Warranty... 3 2.1 General... 3 2.2 Life span... 3 3. Type plate... 4 4. Product Description...

More information

THE UNITED KINGDOM TYPE APPROVAL AUTHORITY

THE UNITED KINGDOM TYPE APPROVAL AUTHORITY THE UNITED KINGDOM TYPE APPROVAL AUTHORITY Dear Sir / Madam. Date: 19 January 2015 1. The vehicle component / type described on the attached approval(s) has been tested and meets the requirements of the

More information

ADADFAATTFDTFFDADDTFAAATFDTTTFFAATTTDTFTATADAAFAFDDDFTAFFDFTTTTTT

ADADFAATTFDTFFDADDTFAAATFDTTTFFAATTTDTFTATADAAFAFDDDFTAFFDFTTTTTT OFFICIAL TOWN BUSINESS Town of Berlin c/o Verde Energy USA 101 Merritt Seven Corporate Park Second Floor Norwalk, CT 06851 MAILED FROM ZIP CODE 68025 FIRST-CLASS MAIL U.S. POSTAGE PAID FREMONT, NE PERMIT

More information

Title: The fire resistance performance of a specimen of single-acting single-leaf doorset in accordance with BS EN : Report No: A

Title: The fire resistance performance of a specimen of single-acting single-leaf doorset in accordance with BS EN : Report No: A Title: The fire resistance performance of a specimen of single-acting single-leaf doorset in accordance with BS EN 1634-1: 2000 Report No: 163712 A Prepared for: Novoferm GmbH Haldern Isselburger Str.

More information

QUESTION / CLARIFICATION

QUESTION / CLARIFICATION QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-RST-020 Issue 02 Date:

More information

Pneumatik Snabbkopplingar för rör av termoplast (ISO 14743:2004, IDT)

Pneumatik Snabbkopplingar för rör av termoplast (ISO 14743:2004, IDT) SVENSK STANDARD Fastställd 2004-05-28 Utgåva 1 Pneumatik Snabbkopplingar för rör av termoplast (ISO 14743:2004, IDT) Pneumatic fluid power Push-in connectors for thermoplastic tubes (ISO 14743:2004, IDT)

More information

BRL-K636/ Evaluation Guideline Kiwa product certificate for Overfill prevention devices for storage tanks for liquid petroleum fuels

BRL-K636/ Evaluation Guideline Kiwa product certificate for Overfill prevention devices for storage tanks for liquid petroleum fuels BRL-K636/03 2007-12-07 Evaluation Guideline Kiwa product certificate for Overfill prevention devices for storage tanks for liquid petroleum fuels BRL-K636/03 2007-12-07 Evaluation Guideline Kiwa product

More information

Title: WF Report No:

Title: WF Report No: Exova Warringtonfire Holmesfield Road Warrington WA1 2DS United Kingdom T : +44 (0) 1925 655 116 F : +44 (0) 1925 655 419 E : warrington@exova.com W: www.exova.com Title: The Fire Resistance Performance

More information

Product brochure Generator circuit-breaker HVS-63S System type GCB with innovative built-in monitoring

Product brochure Generator circuit-breaker HVS-63S System type GCB with innovative built-in monitoring Product brochure Generator circuit-breaker HVS-63S System type GCB with innovative built-in monitoring ABB is a leader in power and automation technologies that enable utility and industry customers to

More information

KOMO product certificate K4389/11

KOMO product certificate K4389/11 318/170301 KOMO product certificate K4389/11 Issued 2017-03-15 Replaces K4389/10 Valid until indefinite Dated 2015-01-01 page 1 of 6 Theodor Cordes GmbH & Co. KG STATEMENT BY KIWA This product certificate

More information

THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY

THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY THE UNITED KINGDOM VEHICLE APPROVAL AUTHORITY COMMUNICATION CONCERNING THE APPROVAL GRANTED (1) TO A COMPONENT TYPE- APPROVAL CERTIFICATE IN RESPECT OF A NON-ORIGINAL EXHAUST SYSTEM FOR A TYPE OF MOTORCYCLE

More information