1 SECTION FUEL-OIL DISTRIBUTION (APPLIES TO FUEL TANKS FOR GENERATORS) 1.1 SUMMARY A. Storage tanks, fuel oil, tank accessories, piping, valves, and specialties for fuel-oil distribution inside and outside any building must meet all applicable codes. B. General note: Any contiguous facility that has tanks and/or other vessels that can hold 55 gallons or more of oil (including oil in equipment or cooking oils) in an aggregate amount equal to or exceeding 1,320 gallons must have a Spill Prevention Control and Countermeasures (SPCC) Plan. It is important to note that additional tanks or oil-filled equipment at a site currently not subject to the SPCC rule may cause a facility to be subject. This may necessitate possible upgrades of existing equipment to comply. It is a Best Management Practice to install all oil-filled equipment with oil spill prevention and containment, even if not currently subject to the rule, in order to avoid having to upgrade storage areas during a subsequent project and to avoid spills. All petroleum storage tanks at the Medical Center, LLE/COI, River Campus, CVRI, and Data Center are currently subject to the SPCC requirement. The site s SPCC Plan must be updated to reflect any changes in the handling of oil in containers, tanks or equipment capable of holding 55 gallons or more within 6 months of installation. Projects must anticipate a professional engineering fee to upgrade the plan. Contact the Environmental Compliance Manager at prior to tank or oil-filled equipment installation. Designers of tank and other oil-containing systems subject to the SPCC rules found in 40 CFR Part 112 must incorporate these requirements into the design in addition to any other state and federal requirements. 1.2 QUALITY ASSURANCE The designer and installer both are responsible to ensure tank installations meet the requirements: EPA and State and Local Authorities. These include, but may not be limited to: A. 6NYCRR Parts B. Standards: Petroleum Equipment Institute Publications P100 and RP300, NFPA 30, 30A, and 31, requirements of University Insurance carriers such as Factory Mutual. C. 40 CFR Part 112 will apply to a facility subject to the federal SPCC rule. Contact the Manager of Environmental Compliance for a determination of applicability of the SPCC rules before any particular installation. D. NYSDEC SPOTS Memos 10 & 17 E. NYSDEC Underground Non-metallic Piping Policy. F. Any UL requirements or any other applicable standard. 1.3 WARRANTY A. Structural and Corrosion Failure: 30 years. 1.4 UNDERGROUND TANKS A. Tank Markings: 1. Permanent stencil, label, or plate with the following information: Section Fuel-Oil Distribution Page 1 of 5
2 a. Manufacturer's statement that, This tank conforms with 6NYCRR Part 614. b. The standard of design by which tank was manufactured. c. Petroleum products and percentages of volume of petroleum additives which may be stored permanently and compatibility within tank or reference to a list available from the manufacturer identifying products compatible with all tank materials. d. Year tank manufactured. e. Unique identification number (UL number). f. Dimensions, design, and working capacity and model number of tank. g. Name of manufacturer. B. Fill Port: 1. Permanent stencil, label, or plate, installed conspicuously, visible to the carrier, and permanently affixed, with the following information: a. Manufacturer's statement that, This tank conforms with NYCRR Part 614. b. The standard of design by which tank was manufactured. c. Petroleum products and percentages of volume of petroleum additives which may be stored permanently and compatibility within tank or reference to a list available from the manufacturer identifying products compatible with all tank materials. d. Year tank manufactured. e. Unique identification number (as assigned by Environmental Compliance Manager). f. Dimensions, design, and working capacity (90% full) and model number of tank. g. Name of manufacturer. h. Date of installation. i. Any other requirement of Part 614.3(a) that the Commissioner may require. 2. Permanently color code all fill ports to identify product inside tank in a manner consistent with the color and symbol code of the American Petroleum Institute, as follows: a. Fuel Oil #1: Purple with yellow bar b. Fuel Oil #2: Green (note: this is oil used in external combustion boilers) c. Diesel fuel #2: Yellow (note that NYSDEC has determined that oil used to power internal combustion engines such as emergency generators is number 2 diesel). This coding is independent of whether the fuel is taxed or not. Generator tank fill ports are to be painted yellow. d. In addition, the marking must be hexagonal in shape for distillate fuels. As required in Part 613.3(3). C. Leak-detection and Monitoring Systems: 1. Must meet current regulatory and industry standards for monitoring the tank and recording leaks. 2. Must have self diagnostic capabilities. Section Fuel-Oil Distribution Page 2 of 5
3 3. Are to be connected to the DDC system. 4. Internal twenty-four (24) character printer for reports and alarm notification which include: a. Gallons of fuel b. Ullage c. Inches of fuel d. Time and date e. Tank identification f. Temperature g. Fuel identification h. Programmable automatic report times i. Programmable alarm limits to warn of: 1) Oil or water in interstice 2) Low level 3) High level 4) High water 5) Theft j. Automatic Inventory Increase (Delivery) report consisting of: 1) Delivery start time and date 2) Beginning inventory 3) Fuel temperature 4) Delivery end time and date 5) Ending inventory 6) Ending fuel temperature 7) Net and gross increase 5. High level enunciator in close proximity to each fill station with integral horn and flasher. Enunciator shall automatically silence in ten (10) seconds without the need to access the control panel. Provide warning sign adjacent to enunciator that reads Warning Tank Overfill Alarm DO NOT OVERFILL. The enunciator shall be equipped with a self-test button and indicator so that its efficacy can be checked on a monthly basis. D. Fill Port Spill Container: A 7 gallon integrally mounted fill port spill catchment basin with full drain, lockable hinged lid, and brass non-sparking padlock. E. Automatic delivery shut-off device capable of 100% delivery shut-off without human intervention if located within 500 feet of a storm drain. No ball-float shut-off valves located within delivery drop tube are to be specified for this purpose. Section Fuel-Oil Distribution Page 3 of 5
4 F. Vent/Vapor Systems Atmospheric Vent: Upward flow vent cap with flame retardant 40-mesh screen extending a minimum of twelve feet (12') above grade. New York Fire Code G. Fuel Oil: Diesel very low sulfur diesel (required by University air permit) if for an emergency generator. H. The fill-port area should be located in a poured concrete pad to both protect the fill ports should equipment be inadvertently driven over them and to help prevent fuel spills from entering the ground. The top of the concrete pad shall be sloped in such a way as to help direct water from accumulating in the fill port and other access ways to the tank. I. As-built drawings of the tank/piping installation reduced to no larger than legal paper size suitable for filing and written certification by the installer that the system has been installed in compliance with the New York Standards for New and Substantially Modified Petroleum Storage Facilities, 6NYCRR Part 614 shall be given to the Manager of Environmental Compliance at the point of time the tanks system is turned over to the University. J. In the case of underground tanks, each component must be inspected by the owner designated representative prior to its being buried. 1.5 ABOVE GROUND TANKS A. Above ground tank systems shall be constructed and installed per the specifications found in 6NYCRR Parts , NFPA as well as other applicable state and local regulations including 40 CFR Part 112. B. Color Code all fill ports to identify product inside tank in a manner consistent with the color and symbol code of the American Petroleum Institute, as follows: 1. Fuel Oil #1: Purple with yellow bar 2. Fuel Oil #2: Green (note: this is oil used in external combustion boilers) 3. Diesel Fuel #2: Yellow (note that NYSDEC has determined that oil used to power internal combustion engines such as emergency generators is number 2 diesel). This coding is independent of whether it is taxed or not. Generator tank fill ports are to be painted yellow. 4. In addition, the marking must be hexagonal in shape for distillate fuels. As required in Part 613.3(3). C. Signage near Fill Port: The tank must be clearly marked near the fill port with the following markings on either a permanent sign or stencil that is clearly visible to the delivery person: 1. Tank ID (assigned by UR as used to register with NYSDEC) 2. Fuel type (typically diesel) 3. Design Capacity of tank 4. Working Capacity of tank (typically 90% of design) D. Spill Prevention and Containment: Refer to NYSDEC SPOTS Memo's 10 &17 regarding the need for secondary containment. Note that most University storm drains discharge directly into the Genesee River. NYSDEC SPOTS Memo #10 determines that a tank located within 500 feet of a storm drain is presumptive evidence of the likelihood of a potential for a release into the waters of the state. All of the likely scenarios for a release in Spots 10 &17 must be addressed including secondary containment configuration of the tank, filling operations and plausible generator system failures that might cause a release such as a hose breaking. Section Fuel-Oil Distribution Page 4 of 5
5 Protection must not rely on an operator or other person's response. Automatic delivery shut-off devices, adequate dikes/beams or other approved means to prevent a release must be incorporated into the tank system's design. The best means is to avoid placing generator/tank systems nears storm drains or other potential routes to the waters of the state. E. Operating valve in place on every line with a gravity head. F. Security and Structural Protection: The tank must be protected and secured from traffic and other hazards including unauthorized tampering as required in both the applicable NYSDEC regulations and Part 112 federal SPCC regulations. G. All above ground tanks installed at the University shall be double walled tanks with interstitial monitors that have a self-test circuit. H. Fill Spill Container: A 7 gallon integrally mounted fill spill catchment basin with full drain, lockable hinged lid, and brass nonsparking padlock. I. Automatic Delivery Shut-off Device: Capable of 100% delivery shut-off without human intervention if located within 500 feet of a storm drain. No ball-float valves located within delivery drop tube are to be specified for this purpose. J. Vent/Vapor Systems Atmospheric Vent: Upward flow vent cap with flame retardant 40-mesh screen extending a minimum of twelve feet (12') above grade. New York Fire Code K. Fuel Oil: Diesel very low sulfur diesel (required by University air permit) if for an emergency generator. L. All above ground tank installations at the University shall be installed so that they can be inspected per Part M. Fire protection and signage required by State and local code must be supplied and installed. This includes a NO SMOKING sign. N. At the time a tank is turned over to the University the tank shall be inspected by a qualified third party selected by the University for independent verification that the tank has been installed per the applicable codes, regulations and University requirements. This may be by the same independent inspector that will update the SPCC. END OF SECTION Section Fuel-Oil Distribution Page 5 of 5
THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS
THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS Presented by: Joyce A. Rizzo President JD2 Environmental, Inc. 800 East Washington Street West Chester, PA 19380 www.jd2env.com
More information9.21 Tank Program Guide NYS Office of Mental Health Tank System Installation Guide
- Design Guides A. SITE PLANS: Provide existing condition, removal plan, and proposed installation site plans for all tanks. Plans must include the following: 1. Dimensions of tank and any structural pads.
More information1) Activity Description: Management of Petroleum Storage Tanks and Containers
ES-301-4.09 Management of Petroleum Storage Tanks and Containers Document Identification Number ES-301-4.09 Document Owner: John Hambright 1) Activity Description: Management of Petroleum Storage Tanks
More informationAST REGISTRATION PIPE INSPECTION PE REQUIREMENTS. David D. Bradeson, P.E. Chemung Contracting Corporation
AST REGISTRATION PIPE INSPECTION PE REQUIREMENTS David D. Bradeson, P.E. Chemung Contracting Corporation AST REGISTRATION REQUIRED 9 VAC 25-91-20 Part II individual tank of 660 gal. or greater or aggregate
More information(Please type or use black ink)
(Please type or use black ink) PNIPUG ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT NOTICE OF PROPOSED UST NEW INSTALLATION OR UPGRADE (Use a separate form for each separate place of operation) Date of
More informationFuel Storage Dec 2016
Fuel Storage Dec 2016 1 Table of Contents SECTION I. ABOVEGROUND SMALL TANKS (1,100 GALLONS OR LESS)...3 Siting a new aboveground tank or tanks...3 Understanding fuel tank types....3 Where to find the
More informationSafe Operating Procedure
Safe Operating Procedure (Revised 7/18) ABOVEGROUND PETROLEUM STORAGE TANKS INTRODUCTION Aboveground storage tanks (ASTs) are used to store petroleum products at several UNL locations. For example, ASTs
More informationJohn Benson David Hanny Barton & Loguidice, P.C.
John Benson David Hanny Barton & Loguidice, P.C. Environmental Regulations: An Alphabet Soup AAI UIC RCRA SPCC SPDES RMP CERCLA PBS CBS CAA CWA SPILLS DEC EPA OSHA Outline Regulatory Programs Lessons
More informationFACTS ABOUT: MARYLAND CONTAINMENT SUMP TESTING PROTOCOL WHO CAN PERFORM THE TEST
FACTS ABOUT: MARYLAND CONTAINMENT SUMP TESTING PROTOCOL On January 26, 2005, the Maryland Department of the Environment (the Department) implemented, in the Code of Maryland Regulations (COMAR) 26.10,
More informationES Fueling Aircraft, Vehicles, and Auxiliary Equipment Document Identification Number
ES-301-1.01 Fueling Aircraft, Vehicles, and Auxiliary Equipment Document Identification Number ES-301-1.01 Document Owner: John Hambright 1) Activity Description: Fueling Aircraft, Vehicles, and Auxiliary
More informationSyracuse University Petroleum Bulk Storage Tank Program Manual
Syracuse University Petroleum Bulk Storage Tank Program Manual August 23, 2017 Prepared by: Syracuse University Environmental Health & Safety Services Division of Campus Safety and Emergency Services 029
More informationPEI/RP Recommended Practices for Installation of Bulk Storage Plants
PEI/RP800-08 Recommended Practices for Installation of Bulk Storage Plants Recommended Practices for Installation of Bulk Storage Plants CONTENTS Foreword...iii. SECTIONS 1. Introduction Page 1.1 Background...1
More informationChanges to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective 1/11/2017
Changes to Chapter 62-761, Florida Administrative Code Underground Storage Tank Systems (USTs) Effective 1/11/2017 Rule Organization The rule sections are reorganized a bit with separate sections now for:
More informationUnderstanding the Colorado Annual Compliance Package. William Holman & Robert Schlegel Inspectors Division of Oil and Public Safety
Understanding the Colorado Annual Compliance Package William Holman & Robert Schlegel Inspectors Division of Oil and Public Safety Overview Required Documentation: UST / AST Annual Compliance Package Release
More informationLorri Grainawi Steel Tank Institute. PA NISTM April 25, 2013 Harrisburg, PA
Lorri Grainawi Steel Tank Institute PA NISTM April 25, 2013 Harrisburg, PA PEI/RP1200-12 ------------------------------------------------------ 1. Introduction 2. Definitions 3. Safety 4. Tank Secondary
More informationSpill Prevention, Control, and Countermeasure. Training Module
Spill Prevention, Control, and Countermeasure Training Module Topics to Cover Introduction Regulatory Background Piedmont/US Airways SPCC Plans Introduction What is SPCC? Spill: Refers to major and minor
More informationOperational Compliance Closure/Release Response/Corrective Action at Underground Storage Tank Facilities
Connecticut Department of Energy and Environmental Protection Operational Compliance Closure/Release Response/Corrective Action at Underground Storage Tank Facilities May 15, 2015 Peter Zack, Assistant
More informationNew UST Installation Inspection Checklist
Nebraska State Fire Marshal Fuels Division - FLST Section 246 South 14 TH Street - Lincoln, NE 68508-1804 (402) 471-9466 New UST Installation Inspection Checklist (Petroleum or Hazardous Substances) Inspection
More informationCode Requirements for ASTs at Motor Vehicle-Dispensing Stations
Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2015 edition of, to the 2015 International Fire Code (). Please note that
More informationElectrical Power Generator Use and Procurement Guidance
Electrical Power Generator Use and Procurement Guidance For compliance with applicable air emission control regulations December 2016 Prepared by: Syracuse University Environmental Health & Safety Services
More informationCode Requirements for ASTs at Motor Vehicle-Dispensing Stations
Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2008 edition of NFPA 30A, and the 2006 International Fire Code (IFC). Please
More informationFINAL UNDERGROUND STORAGE TANK RULE CHANGES. Heather Peters UST Compliance and Technology Unit
FINAL UNDERGROUND STORAGE TANK RULE CHANGES Heather Peters UST Compliance and Technology Unit Regulation Changes Federal Rule Based Changes Federal Regulations finalized in July 2015 Federal Rules effective
More informationNYSDEC PBS REGULATIONS Heating Oil Tanks
1 NYSDEC PBS REGULATIONS Heating Oil Tanks Central Office/Region 2 Division of Environmental Remediation Bulk Storage Compliance Program NISTM 2017 New York Storage Tank Conference Saint Francis College,
More informationTANK SYSTEM DESIGN ASSESSMENT REPORT FOR FAC POND 5 TANK T-9001
TANK SYSTEM DESIGN ASSESSMENT REPORT FOR FAC POND 5 TANK T-9001 [NOTE: To be added to the Permit in its entirety] Tank System Design and Assessment Report for Fac Pond 5 Tank T-9001 CWM Chemical Services,
More informationAIR QUALITY PERMIT. Kennesaw State University - Marietta Campus
AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted
More informationMark S. Morgan, Regulatory Counsel
SUBJECT: ISSUE: PMAA CONTACT: EPA UST Regulations Final UST Rules Mark S. Morgan, Regulatory Counsel mmorgan@pmaa.org DATE: November 16, 2015 U.S. EPA FINAL UNDERGROUND STORAGE TANK REQUIREMENTS: I. BACKGROUND
More informationLOADING OF ORGANIC LIQUID CARGO VESSELS. (Adopted 10/13/1992, revised 1/18/2001)
RULE 346. LOADING OF ORGANIC LIQUID CARGO VESSELS. (Adopted 10/13/1992, revised 1/18/2001) A. Applicability The provisions of this rule shall apply to the transfer of organic liquids into an organic liquid
More informationP.O. Box 435 Saratoga Springs, NY 12866
Petroleum Storage Equipment Design, Installation & Maintenance September 7, 2016 As a family- and employee-owned business that owns its real estate, Stewart s puts a tremendous investment into our high
More informationProvide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.
UNDERGROUND STORAGE TANK SYSTEM INSTALLATION/UPGRADE SUPPLEMENT For use by Unidocs Member Agencies or where approved by your Local Jurisdiction Authority Cited: California Fire (CFC); Chapter 6.7, Health
More informationCONTRACTOR S SELF-INSPECTION CHECKLIST for UST INSTALLATION REPLACEMENT UPGRADE RETROFIT REPAIR
Environmental Health - UST Program CONTRACTOR S SELF-INSPECTION CHECKLIST for UST INSTALLATION REPLACEMENT UPGRADE RETROFIT REPAIR As part of our inter-local contract with the Nevada Division of Environmental
More informationNYSDEC CBS Compliance Requirements
NYSDEC CBS Compliance Requirements Peter J. Petriccione, P.E. H2M - Water September 24, 2015 Introduction Definition of a Hazardous Substance and a Chemical Bulk Storage Facility Design Requirements of
More informationBUREAU OF UNDERGROUND STORAGE TANK REGULATIONS RELEASE PREVENTION SECTION
BUREAU OF UNDERGROUND STORAGE TANK REGULATIONS RELEASE PREVENTION SECTION Page 3 Federal law requires the Division of State Fire Marshal, Bureau of Underground Storage Tank Regulations (BUSTR) to inspect
More information401 KAR 42:020. UST systems: design, construction, installation, and registration.
401 KAR 42:020. UST systems: design, construction, installation, and registration. RELATES TO: KRS 224.01, 224.10, 224.60, Chapter 322, Chapter 322A, 40 C.F.R. Part 280 Subpart B 42 U.S.C. 6991c, 6991e,
More informationFuel Tank Management: PBS, USTs and the Energy Policy Act of 2005
Fuel Tank Management: PBS, USTs and the Energy Policy Act of 2005 Petroleum Bulk Storage 6NYCRR Part 612 614 EPA Underground Storage Tanks 40 CFR Part 280 PBS Program Overview PART 612 PART 613 PART 614
More informationNew UST Regulations. What follows are the changes to EPA s regulations that TMS believes impacts you, the owner/operator, the most.
New UST Regulations The long awaited UST regulations were released by the EPA on June 22, 2015 and soon will be published in the Federal Register. The new regulations will go into effect 90 days after
More informationANNUAL UST SYSTEM INSPECTION CHECKLIST
APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 1 ANNUAL UST SYSTEM INSPECTION CHECKLIST Facility ID# Facility Name/Address Qualified Technician Signature Date
More informationECM environmental compliance monitoring, inc. 1
Regulated Storage Tanks & Automobile Dealerships in New York State Presented for NYSADA April 13, 2010 New York State Automobile Dealers Association By Scott Hubbard, C.H.M.M. of ECM environmental compliance
More informationSPCC Marina Inspection Update Oklahoma Marina Association Inspector Tom McKay
SPCC Marina Inspection Update - 2018 Oklahoma Marina Association Inspector Tom McKay Recent Compliance Assistance Documents 40 CFR 112 Final & Most Recent Regulation (7/1/15) Latest SPCC Inspection Checklists
More informationCoordination with the Spill Prevention, Control, and Countermeasures Plan
1.0 Introduction Purpose of Plan This plan covers Petroleum Storage Tanks (PSTs) and Petroleum, Oil, & Lubricants (POL) storage, under the responsibility of Fort Gordon located in the City of Augusta,
More informationApplication for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information
Papillion/La Vista Fire Marshal s Office Fuels Division FLST Section 146 rth Adams Street Papillion, NE 68046 (402) 829-1398 Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous
More informationSPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN (SPCCP) FOR FUELING AT STATION 63
SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN (SPCCP) FOR FUELING AT STATION 63 The attached SPCC Plan contains introductory information, a description of facilities and practices employed to prevent
More informationSafe Operating Procedure
Safe Operating Procedure (Revised 8/12) ABOVEGROUND PETROLEUM STORAGE TANKS (For assistance, please contact EHS at (402) 472-4925, or visit our web site at http://ehs.unl.edu) INTRODUCTION Aboveground
More informationState of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-302-B
State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-302-B Standing Loss Control Vapor Recovery System for New Installations of Aboveground Storage Tanks WHEREAS, the California Air Resources Board
More information3) Storage at construction sites for refueling construction equipment; or. 4) Storage at airports as addressed in Section of this Part.
TITLE 41: FIRE PROTECTION CHAPTER I: OFFICE OF THE STATE FIRE MARSHAL PART 180 STORAGE, TRANSPORTATION, SALE AND USE OF GASOLINE AND VOLATILE OILS SECTION 180.20 ABOVEGROUND STORAGE DISPENSING Section
More informationA member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.
Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative
More informationStorage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations
Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations ESAM Lunch and Learn Dartmouth, NS October 12, 2016 Part 2 of 2 Outline of Presentation 1. Purpose of the Regulations
More informationCode Requirements on Aboveground Storage Tanks Dispensing Fuels At Motor Vehicle Fuel-Dispensing Stations
Code Requirements What follows is a detailed chart developed by Steel Tank Institute s executive vice president, Wayne Geyer, P.E. Fire codes play a prominent role in tank purchase decisions. As such,
More informationFire & Rescue District
Michael G. Irvan Commissioner/ Administrative Chief Shelley Young Sr. Administrative Assistant Margaret Dimmick Commissioner Jeff Ramey Commissioner Fire & Rescue District FLAMMABLE LIQUID TANK INSTALL
More informationOperating And Maintaining Underground Storage Tank Systems UPDATED Practical Help And Checklists. Printed on Recycled Paper
UPDATED 2016 Operating And Maintaining Underground Storage Tank Systems Practical Help And Checklists EPA 510-K-16-001 Printed on Recycled Paper EPA wrote this booklet for owners and operators of underground
More informationINTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY
INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application
More informationBUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3
BUREAU OF STANDARDS Effective Date: 8/19/2016 Section No. 4 Version: 1.2 Procedure No. 3 TITLE: LP Gas Bulk Plant Final Inspection PURPOSE: This document details the procedures used to conduct a Final
More informationWinning Bid US Petroleum Equipment Walts Petroleum Northwest Petroleum Petro-Chemical Systems Kimberly Green Bay Wausau Fond Du Lac
Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Larrabee Shop Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local permits
More informationSafe Operating Procedure
Safe Operating Procedure (Revised 3/14) UNDERGROUND STORAGE TANKS SUMMARY OF REGULATORY REQUIREMENTS Underground storage tanks (UST) are defined as tanks containing petroleum or other regulated substances
More informationFocus on the engineering & permitting requirements for installing a new fuel facility at the Port of Olympia;
Port of Olympia Marine Fueling Station Project Fuel Dock Design Overview KPFF Consulting Engineers April 8, 2015 Fueling Station ti Feasibility Analysis Focus on the engineering & permitting requirements
More information4.5 Fueling. Best Management Practices LEGAL REQUIREMENTS. Safe Practice FUELING
4.5 Fueling Fueling dock at Hewitt s Cove Marina. For many marinas, fueling boats is an essential service to boaters and an important revenue generator. Marinas with fueling services must evaluate all
More informationOverview of an Underground Storage Tank Inspection
Overview of an Underground Storage Tank Inspection PURPOSE OF INSPECTION Protect drinking water, lakes, streams, etc. Education. Protect property value. TECHNICAL ASSISTANCE INSPECTIONS Technical Assistance
More informationTo complete the process for a net metering interconnection, please follow the steps below:
We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system
More informationStorage Tank Risk Management Solutions Leak
Storage Tank Risk Management Solutions Leak Prevention and Tank Integrity Inspections for ASTs Brian Pine ATC Group Services NISTM 8th Annual Pennsylvania Storage Tank Conference 1 2 ATC GROUP SERVICES
More informationOhio s Used Oil Regulations for Generators
Ohio s Used Oil Regulations for Generators Dan Sowry Office of Compliance Assistance & Pollution Prevention January 29 th, 2013 What we will cover Definition Generator responsibilities On-site management
More informationADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for
ADDENDUM #1 The Plymouth Airport Commission is committed to fulfilling the New Fuel Farm Facility project within the scope of the permit, not exceeding our funding and to satisfy the time constraint associated
More informationChanges to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC
Changes to EPA s AST & UST Rules Mott-Smith Consulting Group, LLC Marshall T. Mott-Smith, President Mott-Smith Consulting Group, LLC 111 North Calhoun Street, Tallahassee, FL 32301 marshall@mott-smithconsulting.com
More informationNEIWPCC-Defender Spill Containment. Interstice Monitoring-Testing - Maintenance
NEIWPCC-Defender Spill Containment Interstice Monitoring-Testing - Maintenance DISCLAIMER Only certified contractors should perform maintenance on and/or install the products shown in this presentation.
More informationAPPLICATION for BUSINESS LICENSE Licensing & Permits City of Williston PO Box 1306, Williston, ND
APPLICATION for BUSINESS LICENSE Licensing & Permits City of Williston PO Box 1306, Williston, ND 58801 cityauditor@ci.williston.nd.us BULK STORAGE & HANDLING OF FLAMMABLE LIQUIDS & HAZARDOUS MATERIALS
More informationINSTALLATION AND OPERATING INSTRUCTIONS FOR FLOODED TUBULAR-HP AND TUBULAR-LM FAST CHARGE MOTIVE POWER BATTERIES
PLEASE READ THESE INSTRUCTIONS BEFORE PLACING BATTERIES INTO SERVICE. THESE INSTRUCTIONS MUST BE SHIPPED WITH THE BATTERY AND MUST BE DELIVERED TO THE USER. INSTALLATION AND OPERATING INSTRUCTIONS FOR
More informationMOTOR FUEL-DISPENSING FACILITIES AND REPAIR GARAGES
CHAPTER 23 MOTOR FUEL-DISPENSING FACILITIES AND REPAIR GARAGES SECTION 2301 GENERAL 2301.1 Scope. Automotive motor fuel-dispensing facilities, marine motor fuel-dispensing facilities, fleet vehicle motor
More informationYOUR SPCC PROGRAM: A CHECK UP
YOUR SPCC PROGRAM: A CHECK UP Avoid Common Issues Seen with SPCC Programs Amy M. Reed, P.E. SAFETY MOMENT PEDESTRIAN/RUNNER SAFETY Stay on the sidewalk where sidewalks are provided it s the law! If you
More informationNYS DEPARTMENT OF ENVIRONMENTAL CONSERVATION CLASS C OPERATOR TRAINING
NYS DEPARTMENT OF ENVIRONMENTAL CONSERVATION CLASS C OPERATOR TRAINING Presented by: The New York State Association of Service Stations and Repair Shops AT LEAST ONE TRAINED C OPERATOR MUST BE ON DUTY
More informationTank Filling Systems. for Petroleum Products
Tank Filling Systems for Petroleum Products Tank Filling Systems for Petroleum Products page 2 What Is It Used For? Generally used with aboveground storage tanks, although some underground uses as well.
More informationUmatilla Electric Cooperative Net Metering Rules
Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through
More informationNCDEQ Underground Storage Tank Section
NCDEQ Underground Storage Tank Section Operation And Maintenance Manual Revised 10/30/2015 i Table of Contents CHAPTER 1. INTRODUCTION... 1 A. Why an Operation and Maintenance Manual?... 1 B. Benefits
More informationTune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.
Tune-up Information National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ Who must conduct a tune-up
More informationPETROLEUM PRODUCT STORAGE TANK REGULATION SAFETY AND BUILDINGS DIVISION BUREAU OF PETROLEUM INSPECTION AND FIRE PROTECTION
PETROLEUM PRODUCT STORAGE TANK REGULATION SAFETY AND BUILDINGS DIVISION NOTE: THIS OUTLINE SHOULD NOT BE USED AS A DOCUMENT FOR DETERMINING AN OWNER'S SPECIFIC REQUIREMENTS FOR COMPLIANCE. THE FEDERAL
More informationEnvironment Canada (EC) Storage Tank System Identification Form
Environment Canada (EC) Storage Tank System Identification Form Identification of storage tank systems for the purpose of the Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations
More informationOperating And Maintaining Underground Storage Tank Systems. Practical Help And Checklists. Printed on Recycled Paper
Operating And Maintaining Underground Storage Tank Systems Practical Help And Checklists Printed on Recycled Paper Operating And Maintaining Underground Storage Tank Systems Practical Help And Checklists
More informationOperating And Maintaining Underground Storage Tank Systems. Practical Help And Checklists. Printed on Recycled Paper
Operating And Maintaining Underground Storage Tank Systems Practical Help And Checklists Printed on Recycled Paper Contents How to Use This Booklet...1 Section 1 Identifying The Equipment At Your UST Facility...3
More informationREVISOR CKIWru. t.tz 42, section 692L et seq.; or. A. system holding: (! a mixture of such hazardous waste and other regulated substances; {!
a-' 06119118 REVISOR CKIWru RD4360 1.1 1.2 1.3 1.4 Pollution Control Agency Proposed Permanent Rules Relating to Underground Storage Tanks 71.50.001.0 APPLICABILITY. [For text of subp I, see M.R.I 1.5
More informationTitle: Jet Engine Test Cell
Environmental Standard Operating Procedure Originating Office: Revision: Prepared By: Approved By: MCAS Miramar Environmental Original Environmental Management Department William Moog Management Department
More informationMOTOR FUEL-DISPENSING FACILITIES AND REPAIR GARAGES
CHAPTER 22 MOTOR FUEL-DISPENSING FACILITIES AND REPAIR GARAGES SECTION 2201 GENERAL 2201.1 Scope. Automotive motor fuel-dispensing facilities, marine motor fuel-dispensing facilities, fleet vehicle motor
More informationThese regulations are created pursuant to and of the Colorado Revised Statutes.
DEPARTMENT OF LABOR AND EMPLOYMENT Division of Oil and Public Safety RETAIL NATURAL GAS (CNG/LNG) REGULATIONS 7 CCR 1101-16 [Editor s Notes follow the text of the rules at the end of this CCR Document.]
More informationChanges to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC
Changes to EPA s AST & UST Rules Mott-Smith Consulting Group, LLC Marshall T. Mott-Smith, President Mott-Smith Consulting Group, LLC 111 North Calhoun Street, Tallahassee, FL 32301 marshall@mott-smithconsulting.com
More informationUnderground Storage Tank. City of Burbank UST Owners & Operators
Underground Storage Tank City of Burbank UST Owners & Operators Created by: Kern County Environmental Health CUPA, Edited by: Burbank Fire Department for the Burbank Fire Department s use Burbank Fire
More informationOKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF AST S AN OVERVIEW OF ABOVEGROUND STORAGE TANK REQUIREMENTS
OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF AST S AN OVERVIEW OF ABOVEGROUND STORAGE TANK REQUIREMENTS PO BOX 52000 OKC, OK 73152-2000 www.occeweb.com Created on 10/1/2008
More informationINTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY
INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,
More information6. Tanks - Leak Detection. NCDENR Division of Waste Management Underground Storage Tank Section
6. Tanks - Leak Detection NCDENR Division of Waste Management Underground Storage Tank Section Why conduct Leak Detection? Required for regulated systems: EXCEPTIONS: Temporarily closed tanks Emergency
More informationPURPOSE RESPONSIBILITY
PAGE 1 OF 6 PURPOSE This Standard Operating Procedure (SOP) provides guidance and methods for Underground Storage Tank (UST) inventory control at Massachusetts Department of Transportation, Highway Division
More informationAustralian Explosives Industry and Safety Group (AEISG) Code of Practice Mobile Processing Units 4 th edition. Compliance Checklist.
Australian Explosives Industry and Safety Group (AEISG) Code of Practice Mobile Processing Units 4 th edition Compliance Checklist Note: The requirements noted against the various sections in this checklist
More informationPENNSYLVANIA ABOVE GROUND STORAGE TANKS
PENNSYLVANIA ABOVE GROUND STORAGE TANKS GZA GeoEnvironmental Inc. by Jeffrey Knepper, LRS, CPG July 27, 2017 PA CODE Chapter 245. Administration of the Storage Tank & Spill Prevention Program AST Definition
More information540 CMR: REGISTRY OF MOTOR VEHICLES 540 CMR 22.00: MISCELLANEOUS MOTOR VEHICLE AND TRAILER EQUIPMENT AND OPERATIONS REQUIREMENTS
540 CMR 22.00: MISCELLANEOUS MOTOR VEHICLE AND TRAILER EQUIPMENT AND OPERATIONS REQUIREMENTS Section 22.01: Scope and Purpose 22.02: Display of Reflectorized License Plates 22.03: Minimum Standards for
More informationOn-Demand Mobile Fueling
2017 NFPA Conference & Expo On-Demand Mobile Fueling Andrew Henning Supervising Deputy State Fire Marshal CAL FIRE Andrew Klein Principal A S Klein Engineering Lynne Kilpatrick Fire Marshal Sunnyvale Public
More informationExecutive Order VR-205-B VST Phase II EVR System with Hirt Thermal Oxidizer. Exhibit 2 System Specifications
Executive Order VR-205-B VST Phase II EVR System with Hirt Thermal Oxidizer Exhibit 2 System Specifications This exhibit contains the installation, maintenance and compliance standards and specifications
More informationNew Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities
New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application
More informationDISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS
Prepared by: SXZO DISCONNECT SWITCH REQUIREENTS FOR DISTRIBUTED GENERATION CUSTOERS 060559 Department: Electric Distribution Section: Design and Construction Approved by: D.Jantz (DWJ7) Date: 8/15/17 Rev.
More informationINSTALLATION AND OPERATING INSTRUCTIONS FOR FLOODED TUBULAR-HP MOTIVE POWER BATTERIES
PLEASE READ BEFORE PLACING BATTERIES IN SERVICE THESE INSTRUCTIONS TO BE SHIPPED WITH BATTERY AND TO BE DELIVERED TO USER INSTALLATION AND OPERATING INSTRUCTIONS FOR FLOODED TUBULAR-HP MOTIVE POWER BATTERIES
More informationForm UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00
Massachusetts Department of Environmental Protection Underground Storage Tank Program Form UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00 Forward completed form to:
More informationOIL SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN. St. Lawrence University Canton, New York. January 2007
OIL SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN St. Lawrence University Canton, New York January 2007 Revised April 30, 2008 Revised December 1, 2008 Revised December 1, 2009 TABLE OF CONTENTS SECTION
More informationInformation Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program
Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program As part of our commitment to support renewable energy, Kissimmee Utility Authority
More informationEnvironmental Management System
POLICY REQUIREMENTS Page 1 of 7 All requirements under Dangerous Goods POLICY apply ALL tanks are to be constructed to an applicable, approved design standard and are to meet all legislative and policy
More informationNoble County Rural Electric Membership Corporation
Albion, Indiana Page 1 of 5 SCHEDULE NB-1 RESIDENTIAL NET BILLING I. AVAILABILITY This Net Billing Rate is available to any residential member in good standing of Noble REMC (Noble) who owns and operates
More informationMINIMUM REQUIREMENTS FOR PLACEMENT ON ROTATION
MANAGEMENT DIRECTIVE TOWING ROTATION LIST RULES Promulgated Pursuant to the Administrative Procedures Act Authority - Ark. Code Ann. 12-8-106(a)(2) Effective date - June 6, 2005 RULE 1: OWNER S PREFERENCE
More informationIndustrial Generator Set Accessories
Industrial Generator Set Accessories Sound Enclosure and Subbase Fuel Tank Package Applicable to the following models: KD800 - KD2500 (includes KD1250-A) Level 1 Sound Enclosure with Lift Base Sound Level
More information