1 SASGI Meeting: NRS 097-series / Grid Code Discussion: Gerhard Botha Research, Testing and Development 2014/04/16

2 Overview Introduction What is NRS 097? What do we have? What do we want? Comparison of international documents Proposed amendments Conclusions 2014/05/06 2

3 Introduction Requests from residential (municipal) customers to install PV Key drivers: personal, local, regional or national objectives to increase the renewable energy component of electricity utilized; a whole range of drivers including sustainability, climate change, future fossil price volatility risk aversion, utility energy shortages, etc.; changing dynamics of electricity generation costs, with embedded generation close to the source of consumption becoming economically or financially viable; and in particular contexts where embedded generation may help alleviate localized network capacity constraints or improve power reliability to key circuits on the customer premises (particularly if it can be dispatched or coupled with energy storage). 2014/05/06 3

4 Introduction Why do we (utilities) require standards? Key drivers: Safety Safety Safety 2014/05/06 4

5 Introduction Key drivers: LV networks designed for power flow downstream; Incorrect interfacing can affect network performance and quality of supply; Overvoltages, voltage dips and spikes, interruptions, harmonics, etc; Safety: Equipment incorrectly rated both utility and customer; Equipment damaged due to SSEG not meeting requirements; Utility network energised Maintenance personnel; Customer network energised Reclosing operations; Emergency personnel, e.g. fire brigade. 2014/05/06 5

6 What is NRS 097-1? Does not exist yet Planned to be based on Eskom Standard for Interconnection of Embedded Generators Complements the SA Grid Code (RPP, NC) Protection details Anti-islanding details SCADA details Metering details Applicable to units connected to MV and higher voltages 2014/05/06 6

7 What is NRS 097-1? 3 REQUIREMENTS 3.1 General Requirements 3.2 Legal And Regulatory Requirements 3.3 Operational Safety 3.4 Generator Capabilities And Operation 3.5 Requirements For The Utility Network Interface 3.6 Requirements At The PUC And PGC 3.7 Metering 2014/05/06 7

8 What is NRS 097-1? 4 SUPERVISORY CONTROL AND DATA ACQUISITION 4.1 Gateway Equipment 4.2 Protocols For Information Exchange 4.3 Telecommunication Interface Requirements 4.4 Minimum Data Exchange Requirements 5 TESTS 5.1 Pre-commissioning And Commissioning Tests 5.2 Maintenance Tests 2014/05/06 8

9 What is NRS 097-2? Set of industry standards that define technical requirements: the utility interface, generator requirements and utility implementation guidelines for the interconnection of small scale embedded generators to LV distribution networks of a utility. The standards cover: Utility interface requirements (NRS published, being reviewed) Embedded generator requirements (NRS draft) Utility framework (NRS being published) Procedures for implementation and application (NRS ) 2014/05/06 9

10 What is NRS 097-2? Reviewed international documents: EA ER G83/1-1: Recommendation for the connection of SSEG (<16 A per phase) in parallel with the public LV networks. IEC , Electrical installations of buildings Requirements for special installations or locations Solar PV power supply systems. IEC 61727, PV systems Characteristics of the utility interface. IEC 62116, Test procedure of islanding prevention measures for utilityinterconnected photovoltaic inverters. NRS 048-2, Electricity supply Quality of supply Part 2: Voltage characteristics, compatibility levels, limits and assessment methods. SANS , The wiring of premises Part 1: LV installations. SANS /IEC , Low-voltage switchgear and controlgear Part 2: Circuit-breakers. 2014/05/06 10

11 What is NRS 097-2? WG requirements/decisions: Generic document (i.e. generation source/device independent) < 1 000kVA (vs. 100kVA) > 4.6kVA must be balanced units > 13.8kVA must be three-phase units (vs. 10kVA) Safety requirements (including redundancy) Anti-islanding, disconnection for abnormal network conditions Metering (examples) NOTE: not for tariffs, but technical requirements 2014/05/06 11

12 What do we have? NRS : Published December 2010 Standard Conditions for Small Scale (less than 100kW) Embedded Generation within Municipal Boundaries; 22 September 2011; Municipalities need to keep proper records and report to NERSA, what, where, how much etc.; Comply with requirements from NRS ; Update proposed to NERSA by AMEU/ESKOM; Grid code Renewable Power Plants version 2.6 published Nov 2012; 2014/05/06 12

13 What do we want? NRS (Type Testing) draft: Review international standards again International exposure No single document that will fulfil the requirements for SSEG connection and type testing for LV networks in South Africa Specific comparison for utility interface: VDE 4105 EN IEC 61727, series, other ER G83/1-1 and G59/2 IEEE 1547 / UL 1741 Align with international best practices! 2014/05/06 13

14 Document Comparisons NRS X: <100kW, LV only, 50Hz connection requirements IEEE 1547: <10MVA, Typically MV, 60Hz type testing IEEE ER G83/1-1: <3.66kW per phase per installation (3ph : 11kW), LV only, 50Hz connection requirements and type testing ER G59/2 applies to everything else. VDE 4105: <100kVA on LV network, 4.6kVA per phase per installation (3ph : 13.8kVA), LV only, 50Hz connection requirements and type testing UL1741: relaxed requirements in some instances for <30kW detailed testing 2014/05/06 14

15 Document Comparisons IEC 61727: <10kVA, PV only connection requirements IEC 62116: No size indications specific mention of 61727, PV only anti-islanding testing IEC : No size indications, building installations, PV only wiring standard IEC 62446: No size indications, seems to be aimed more at house installations, PV only documentation, commissioning tests and inspection requirements wiring verification 2014/05/06 15

16 Comparisons (Basic Requirements) Description NRS :2010 IEC VDE-AR-N-4105 UK (ER G83/1-1) EN Purpose Utility interface Utility interface Utility interface / type approval Utility interface Utility interface Technologies All PV All All All Frequency [Hz] 50 N/A Size (A/phase) Separate limits for <16A, <75A, > 75A Size (kw/kva) <11kW, <52kW, > 52kW Voltage levels 400 LV LV Power Factor Standard curve: lagging at >50% power output >20% output power Lagging >0.9 (0.98/ new) (<13.8kW), 0.9 (>13.8kW) (<13.8kW), Leading (0.98/ new) (>13.8kW) % (units 10% (units Max step sizes >100kW) >100kW) 1% of rated current 1% of rated DC current injection (0.5%) current Not provided 20mA 0 (Not allowed) Inform and Fit allowed Yes Various Max short-circuit current Not defined Not defined Synchronous generators 8 Asynchronous generators 6 Inverters 1 Times rated current Not defined Not defined 2014/05/06 16

17 VDE 4105 Standard power factor characteristic curve 2014/05/06 17

18 Comparisons (Protection) Description NRS :2010 IEC VDE-AR-N-4105 UK (ER G83/1-1) EN Protection Islanding No No Not defined If required Disconnect time <2.0s <2.0s <5s <0.5s Not defined Abnormal voltage Range 1 V < 0.5pu V < 0.5pu V < 0.8pu V < 0.9pu < 0.85pu Disconnect time <0.2s <0.1s <0.2s <1.5s <1.5s Range 2 0.5pu-0.85pu 0.5pu-0.85pu Disconnect time <2.0s <2.0s Range pu-1.1pu 0.85pu-1.1pu 0.8pu-1.1pu Disconnect time Continuous Continuous Continuous Range 4 1.1pu-1.2pu 1.1pu-1.35pu >1.1pu Disconnect time <2.0s <2.0s <0.2s Range 5 >1.2pu >1.35pu >1.15pu >114.7pu >1.15pu Disconnect time <0.16s <0.05s <0.2s <1.5s <0.2s Abnormal frequency Range 1 <47.5Hz 50Hz±1Hz <47.5Hz <47Hz <47Hz Disconnect time <0.5s <0.2s <1s / <0.2s <0.5s <0.5s Range Hz<f<52Hz (new) 50.2Hz<f<51.5Hz Disconnect time 50% P_M per Hz (new) 40% P_M per Hz Range 3 >52Hz >51.5Hz >50.5Hz >51Hz Disconnect time <0.5s <1s / <0.2s <0.5s <0.5s 2014/05/06 18

19 VDE 4105 Power curtailment Included in RPP Grid Code 2014/05/06 19

20 Comparisons (Protection) Description NRS :2010 IEC VDE-AR-N-4105 UK (ER G83/1-1) EN Reconnection time Ramp rate 60s 10% of power (new) 20s to 5min (system dependent) 5s for short disturbances 10min of stable power 10% of power 3min Disconnection time can be increased to 5s if generator can withstand network reconnection at 180 out of phase 3 min for mech, 20s for inverters 2014/05/06 20

21 Comparisons (Synchronising) Description NRS :2010 IEC VDE-AR-N-4105 UK (ER G83/1-1) EN Synchronising parameters Automatic Angle 20 ±10 Frequency 0.3 Hz ±500mHz Voltage 5% / 11.5V ±10% Earthing According to SANS According to BS 7671 According to Short-circuit protection According to According to Isolation and switching According to SANS According to /05/06 21

22 Comparisons (Quality of Supply) Description NRS :2010 IEC VDE-AR-N-4105 UK (ER G83/1-1) EN QOS Measured POC POC/PCC POC/PCC Seems to be POC Seems to be POC Flicker NRS (combined effect) 0.5 max due to all generation is in conflict with IEC /11 IEC IEC Pst NRS (new) Plt NRS (new) RVC NRS (new) 3% 4.00% 3.30% 6kW - 10kW Unbalance (4.6kVA - new) Desirable <4.6kVA ER P29 Commutation notches 5% (new) 5% Current distortion (per harmonic) IEC (IEEE519) IEC /12 + listed IEC , class A IEC , class A 2014/05/06 22

23 Comparisons (Quality of Supply) Table 1 Current distortion limit as a function of harmonics (Source: IEC 61727:2004/IEEE519) Odd harmonics Distortion limit 3 rd through 9 th Less than 4,0 % 11 th through 15 th Less than 2,0 % 17 th through 21 st Less than 1,5 % 23 rd through 33 rd Less than 0,6 % Even harmonics Distortion limit 2 nd through 8 th Less than 1,0 % 10 th through 32 nd Less than 0,5 % Interharmonics? 2014/05/06 23

24 Key decisions: NRS Review Revision of NRS : Applicable up to 1MVA connected on LV Additional requirements for larger units, e.g.: Must be balanced multi-phase units Must be able to receive generation inhibit signals Incorporate VDE 4105 where appropriate, e.g. Overfrequency curtailment requirements, Power factor requirements. 2014/05/06 24

25 NRS : Type Testing This was where the fun started Various documents: Basic descriptions and requirements, to UL 1741 Traceability Testing environment descriptions Testing monitoring and accuracy Repetitions of tests Test certificates 2014/05/06 25

26 NRS : Type Testing The following type tests are required: Anti-islanding / Loss of mains; Synchronising to grid; Short-circuit protection; Short-circuit / fault current contribution; Tripping requirements for abnormal voltage and frequency; DC current injection; Power factor; Reconnection after trip; QOS emissions; Step size/ramp rate adjustments (if included in requirements); Different tests from different documents 2014/05/06 26

27 NRS : Type Testing Environment Basic Test requirements: Test result accuracy as per main doc and manufacturer spec Testing environment as per manufacturer spec Measurement accuracy and calibration of the testing equipment suitable accuracy to confirm conformance and traceable calibration Product information manufacturer to provide all requirements for correct installation as well as specified performance Test reports ensure repeatability Simulated utility detail, e.g. THD < 2.5%, system impedance etc. Measurement system requirements uncertainty <50% of EUT accuracy and capable to confirm manufacturer s stated performance 2014/05/06 27

28 NRS : Simplified Connection In line with international practices and CIGRE recommendations; Simplified connection decision tree: Less than 25% of NMD (ADMD); Dedicated connections; Less than 75% of upstream transformer size; Less than 15% of MV feeder peak load; Size vs. distance limitations. 2014/05/06 28

29 NRS : Simplified Connection 2014/04/16 29

30 NRS : Simplified Connection 2014/04/16 30

31 NRS : Simplified Connection Research: UCT similar analysis to Herman-Beta Method for LV network design; 6 case studies; Voltage rise considered; Indications are that the simplified requirements are appropriate until further investigation; QOS impact not considered. 2014/05/06 31

32 NRS : Policies and Procedures Eskom draft documents: General matters that require attention to facilitate EG Metering will need to be upgraded All staff working on LV feeders will need to be trained Networks may need suitable notification Short-term policy for LV Connected EG: Safety of line men and contractors Performance of the system Single Customer To Single Transformer Connection Lockable isolator Multiple Customers Connected To a LV Feeder Not allowed at present 2014/05/06 32

33 NRS : Policies and Procedures SANS section 7.12: NOTE 2 This part of SANS does not cover the supply to an installation that functions in parallel with the main supply (co-generation). Amdt 6 Aspects not covered by SANS is not not allowed. It is just outside of the jurisdiction of SANS and the authority of a registered person. Other bodies such as Professional Engineers and Professional Technicians operate in this space that is not explicitly defined by the Electrical Regulations or SANS Standards. The UK wiring code is explicit in the meaning around not covering embedded generators, it state that it has to be done with the approval of the grid provider. The SANS does not state this explicit but discussions with the drafters of the text indicate that it is the intent of the code to allow the grid provider and the embedded-generator owner to come to an agreement on the matter. 2014/05/06 33

34 NRS : Policies and Procedures List of basic technical requirements: Compliance to NRS Compliance to NRS or equivalent Utility accessible lockable isolation switch to prevent the embedded generator feeding back onto the utility installation. Suitable notification at the Eskom point of supply and metering installation Basic tests to verify the normal safety function of the installation with the embedded generator installed. The balance of the customer installation carries a valid COC Sign-off by suitably qualified person, i.e. Professional Engineers or Professional Technicians 2014/05/06 34

35 Wiring Code SANS : Parallel connection not covered; SANS : Does not conflict or supersede SANS ; Only cover from the generator terminals to the customer DB; DC requirements in SANS to be upgraded; SABS discussion on adoption of international documents/wording. 2014/05/06 35

36 PLEASE NOTE SAFETY!!! Anti-islanding extremely important for utility personnel as well as public Australia rumours of several PV installations that caused fires at residential homes; Also safety of emergency personnel, e.g. fire brigade Firemans switch (over and above current definition) Potential conflict identified in SANS series Insurance implications Make sure your unit complies with all relevant specifications! 2014/05/06 36

37 Conclusions We have come a far way since 2007: NRS is being updated in line with international documents, based on international experience NRS is being drafted in line with international documents NRS being published We still have a lot to do Policy aspects, e.g. tariffs, application processes, incentives, licensing vs. registration, data requirements etc. Type testing of generators no SA laboratory equipped to do so. Wiring requirements: SANS in beginning stages. 2014/05/06 37

38 Thank you

Technical Requirements for Renewable Energy Power System

Technical Requirements for Renewable Energy Power System Hotline: 2843 3228 Email address: RE@hkelectric.com Issued on 20 Nov 2018 1. Introduction 1.1. This document aims to provide the technical requirements for renewable energy power system (the REPS) connected

More information

Compliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa

Compliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa Compliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa Content Introduction Overview of Categories for Grid Connection of

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW) Connection Applicant (Embedded Generating Unit Owner/Proponent) Business name: ABN: Contact name: Address: Telephone number: E-mail address: Connection Applicant acting and working on behalf of the above

More information

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase PAGE 1 OF 7 USE: Requirements and guidelines for interconnection of single phase customer owned, (DR) Distributed Resource generation source, to NIPSCO s electric system, configured for. LATEST REVISION:

More information

GRID CONNECTION ISSUES FOR DISTRIBUTED GENERATION REVIEW & STANDARDS

GRID CONNECTION ISSUES FOR DISTRIBUTED GENERATION REVIEW & STANDARDS GRID CONNECTION ISSUES FOR DISTRIBUTED GENERATION REVIEW & STANDARDS Prof. Suryanarayana Doolla Department of Energy Science and Engineering Indian Institute of Technology Bombay OUTLINE Intoduction Grid

More information

APPLICATION ELECTRICITY SERVICES. APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1

APPLICATION ELECTRICITY SERVICES. APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1 APPENDIX 2B APPLICATION ELECTRICITY SERVICES APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1 This application form for the connection of small scale embedded generation is for

More information

GUIDELINES FOR THE INSTALLATION OF EMBEDDED GENERATION

GUIDELINES FOR THE INSTALLATION OF EMBEDDED GENERATION GUIDELINES FOR THE INSTALLATION OF EMBEDDED GENERATION Table of Contents Table of Contents... 1 Foreword... 2 Glossary... 2 Abbreviations... 5 Important Notices... 6 1. Introduction... 6 2. Defining small-scale

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1. Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.3, 5/16/18 1.0 Scope This document is currently limited in scope to inverter interfaced PV installations

More information

Small Electrical Systems (Microgrids)

Small Electrical Systems (Microgrids) ELG4126: Microgrids Small Electrical Systems (Microgrids) A microgrid is a localized, scalable, and sustainable power grid consisting of an aggregation of electrical and thermal loads and corresponding

More information

GUIDELINES FOR EMBEDDED GENERATION. Application process to become an embedded generator in the City of Cape Town

GUIDELINES FOR EMBEDDED GENERATION. Application process to become an embedded generator in the City of Cape Town GUIDELINES FOR EMBEDDED GENERATION Application process to become an embedded generator in the City of Cape Town Table of Contents Table of Contents... 2 Foreword... 4 Glossary... 5 Abbreviations... 8 Temporary

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018 Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018 Outlined below are the engineering documents and their associated minimum detail requirements for a Distributed Energy Resource (DER)

More information

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management Southern Company Interconnection Process Dexter Lewis Research Engineer Research and Technology Management Southern Company Outline Southern Company GPC Solar Interconnection Process Application requirements

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd Embedded Generation - Technical Access Standards Embedded Generation - 5 MW or Greater ELE SP 0003 Public 1 October 2014 TABLE OF CONTENTS TABLE OF CONTENTS Abbreviations...

More information

Inverter Advancements in UL1741 and UL 62109

Inverter Advancements in UL1741 and UL 62109 Inverter Advancements in UL1741 and UL 62109 2015 UL LLC Scott Picco Staff Engineer Distributed Energy Resources Equipment UL LLC Renewable Energy Standards for safety of Power Conversion Equipment USA

More information

Appendix A2: Technical Requirements for Distributed Generators > 10 kw to be Connected to Kitchener-Wilmot Hydro Inc. s Distribution System

Appendix A2: Technical Requirements for Distributed Generators > 10 kw to be Connected to Kitchener-Wilmot Hydro Inc. s Distribution System Appendix A2: Technical Requirements for Distributed Generators > 10 kw to be Connected to Kitchener-Wilmot Hydro Inc. s Distribution System A. INTRODUCTION This document outlines the technical requirements

More information

STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS

STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS Foreword 2 1. Introduction 3 2. References 6 3. Types of Interconnections 7 4. Interconnection Issues and Technical

More information

NRS :2010 Edition 1

NRS :2010 Edition 1 ISB 978-0-626-25101-7 RS 097-2-1:2010 Edition 1 GRID ITERCOECTIO OF EMBEDDED GEERATIO Part 2: Small-scale embedded generation Section 1: Utility interface This document does not have the status of a South

More information

Copyright 2003 Advanced Power Technologies, Inc.

Copyright 2003 Advanced Power Technologies, Inc. Overview of the Standard for Interconnecting Distributed Resources with Electric Power Systems, IEEE 1547 and it s potential impact on operation of the Distributed Generation (DG) systems and on the design

More information

LV Embedded Generation. Technical Considerations. and Standards. Dr Hendri Geldenhuys. Eskom Holdings SOC Ltd

LV Embedded Generation. Technical Considerations. and Standards. Dr Hendri Geldenhuys. Eskom Holdings SOC Ltd LV Embedded Generation Technical Considerations and Standards Dr Hendri Geldenhuys Eskom Holdings SOC Ltd LV Technical Considerations Safety of Maintenance Staff LV Network Performance (Focus on PV rooftop

More information

Definitions. Scope. Customer Generation Interconnection Requirements

Definitions. Scope. Customer Generation Interconnection Requirements Updated 02/1 Page 1 Scope The purpose of this document is to describe Idaho Power s requirements for the installation and testing of Customer Generation acilities that are interconnected with Idaho Power

More information

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM Page 1 of 19 Table of Contents 1.0 SCOPE...4 2.0 PURPOSE...4 3.0 LIMITATIONS...5 4.0 GENERAL INTERCONNECTION

More information

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems Ben Huckaba, P.E. President & Principal Engineer 317-273-9841 benh@alphaeng.us Indiana University Bloomington,

More information

AS/NZS AS/NZS

AS/NZS AS/NZS TEST REORT AS/NZS 4777.2 AS/NZS 4777.3 Grid connection of energy systems via inverters Grid protection requirements Report reference number... : 13TH0287-AS/NZS 4777_0 Date of issue......: 2014-01-22 Total

More information

Adopted: September 24, 2015 Version: Version 1.0

Adopted: September 24, 2015 Version: Version 1.0 Interconnection Standards for Parallel Installation and Operation of Customer Owned Renewable Electric Generating Facilities for Coon Rapids Municipal Utilities Adopted: September 24, 2015 Version: Version

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

Integrating Embedded Generation into distribution networks. Mobolaji Bello and Dr Clinton Carter-Brown Eskom Holdings Limited South Africa

Integrating Embedded Generation into distribution networks. Mobolaji Bello and Dr Clinton Carter-Brown Eskom Holdings Limited South Africa Integrating Embedded Generation into distribution networks Mobolaji Bello and Dr Clinton Carter-Brown Eskom Holdings Limited South Africa Context of Embedded Generation (EG) in South Africa Outline Technical

More information

White Paper. P13008 Net-metering concept for Small Scale Embedded Generation in South Africa. prepared for

White Paper. P13008 Net-metering concept for Small Scale Embedded Generation in South Africa. prepared for White Paper P13008 Net-metering concept for Small Scale Embedded Generation in South Africa prepared for Gesellschaft für international Zusammenarbeit (GIZ) GmbH Moeller & Poeller Engineering (M.P.E.)

More information

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017 Document Requirements for Engineering Review PV Systems v1.0 6/9/2017 Outlined below are the documents and associated minimum details required for Engineering Review of Distributed Energy Resources Interconnection

More information

Guideline on Energy Storage

Guideline on Energy Storage Purpose Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs DEPARTMENT OF ENERGY RESOURCES SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) GUIDELINE Guideline

More information

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1 Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1 A Guide for Iowa s Municipal Electric Utilities On the How the IEEE 1547 Distributed Generation Interconnection Standard Affects Solar

More information

ENGINEERING SPECIFICATION

ENGINEERING SPECIFICATION December 206 ENGINEERING SPECIFICATION No. of 6 DATE: 2-9-6 CATEGORY SUBJECT TABLE OF CONTENTS. Overview... 2 2. General Requirements for Service... 3 3. Definitions... 3 4. Abbreviations... 5 5. References

More information

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program As part of our commitment to support renewable energy, Kissimmee Utility Authority

More information

Standards, Procedures and Policies for Grid Connection

Standards, Procedures and Policies for Grid Connection Standards, Procedures and Policies for Grid Connection CONTENTS 1 INTRODUCTION 1 2 EMBEDDED GENERATION 1 2.1.1 OUTLINE OF EMBEDDED GENERATION 1 2.1.2 CHANGES IN EMBEDDED GENERATION 1 2.1.3 ASPECTS OF EMBEDDED

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System This document is intended to be a general overview of PG&E s current technical

More information

SA Power Networks Commissioning Witnessing Checklist

SA Power Networks Commissioning Witnessing Checklist SA Power Networks Commissioning Witnessing Checklist CUSTOMER NAME: SOLAR PV APPROVED CAPACITY: BATTERY APPROVED CAPACITY: kw (AC) kw (AC) OPERATING PHILOSOPHY: MAXIMUM EXPORT: Non-Export/Export kw (AC)

More information

Regenerative Utility Simulator for Grid-Tied Inverters

Regenerative Utility Simulator for Grid-Tied Inverters Regenerative Utility Simulator for Grid-Tied Inverters AMETEK s RS & MX Series with the SNK Option provides the solution Testing of grid-tied inverters used in solar energy systems is emerging as a major

More information

Residential PV-the City of Cape Town s experience Brian Jones Head: Green Energy/Electricity Services City of Cape Town South Africa

Residential PV-the City of Cape Town s experience Brian Jones Head: Green Energy/Electricity Services City of Cape Town South Africa Residential PV-the City of Cape Town s experience Brian Jones Head: Green Energy/Electricity Services City of Cape Town South Africa Signing of First SSEG Contract 23 September 2014 Black River Offices

More information

Presentation to the PJM NEMSTF Interconnection Issues. Interconnecting Solar Projects on the PSE&G Distribution System

Presentation to the PJM NEMSTF Interconnection Issues. Interconnecting Solar Projects on the PSE&G Distribution System Interconnecting Solar Projects on the PSE&G Distribution System This presentation is intended to be a brief discussion of the effects of interconnecting of large amounts of solar generation on the distribution

More information

TANZANIA BUREAU OF STANDARDS

TANZANIA BUREAU OF STANDARDS EDC 5 (5235) P3 Mini-Grid Systems DRAFT TANZANIA STANDARD (Draft for comments only) Part 2: Application of Inverters TANZANIA BUREAU OF STANDARDS TBS 2017 First Edition 2017 T able of content 1 2 3 4 5

More information

Micro Embedded Generating Units (0-30 kva)

Micro Embedded Generating Units (0-30 kva) Connection Standard Micro Embedded Generating Units (0-30 kva) These standards ensure that Ergon Energy s and Energex s requirements are met. If this standard is a printed version then the Ergon Energy

More information

Basic tariff guiding principles

Basic tariff guiding principles Basic tariff guiding principles Small-scale Embedded Generation (SSEG) tariffs This brief outlines the basic guiding principles in tariff design for municipalities, to support and adapt to a changing electricity

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV

ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV September 2017 1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Andreas Falk, Ancillary services

More information

Large Embedded Generation User Guide A

Large Embedded Generation User Guide A Large Embedded Generation User Guide A For Generating Systems AS4777 compliant and up to 200kW January 2013 SA Power Networks www.sapowernetworks.com.au Table of Contents 1. Introduction... 3 1.1 Embedded

More information

DAKOTA ELECTRIC ASSOCIATION DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS

DAKOTA ELECTRIC ASSOCIATION DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS DAKOTA ELECTRIC ASSOCIATION DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS Foreword 2 1. Introduction 3 2. References 6 3. Types of Interconnections 7 4. Interconnection Issues and

More information

Renewable sources of electricity a brief overview

Renewable sources of electricity a brief overview Micro generation 11 Renewable sources of electricity a brief overview THE SCOPE of the 17th Edition is wider and contains many new requirements, including additional requirements to ensure the safe connection

More information

GUIDELINES FOR OPERATING, METERING AND PROTECTIVE RELAYING FOR. NET METERED SYSTEMS UP TO 50 kw AND BELOW 750 VOLTS

GUIDELINES FOR OPERATING, METERING AND PROTECTIVE RELAYING FOR. NET METERED SYSTEMS UP TO 50 kw AND BELOW 750 VOLTS GUIDELINES FOR OPERATING, METERING AND PROTECTIVE RELAYING FOR NET METERED SYSTEMS UP TO 50 kw AND BELOW 750 VOLTS 1. INTRODUCTION... 3 1.1 POLICY ON CUSTOMER GENERATION.... 3 1.2 GENERATION SOURCES AND

More information

ACTION FORM. EXHIBIT #1 Regular Council Meeting of 11/27/2006

ACTION FORM. EXHIBIT #1 Regular Council Meeting of 11/27/2006 EHIBIT #1 Regular Council Meeting of 11/27/2006 PROCEEDING: Utility Committee ACTION FORM AGENDA ITEM NO.: 11/13/06 1A DEPARTMENT OF ORIGIN: Public Utilities - Electric DATE SUBMITTED: 10-26-06 PREPARED

More information

Net Metering Interconnection Requirements

Net Metering Interconnection Requirements Net Metering Interconnection Requirements Customer Generation Capacity Not Exceeding 100 kw Date: 2017-07-01 Version: 1 Revision History Date Rev. Description July 1, 2017 1 Initial Release Newfoundland

More information

Improving DER Interconnection with Updated Standards and Codes, Smart Inverters, and Distribution System Design

Improving DER Interconnection with Updated Standards and Codes, Smart Inverters, and Distribution System Design Power Systems Engineering Center Improving DER Interconnection with Updated Standards and Codes, Smart Inverters, and Distribution System Design Michael Coddington, Principal Engineer National Renewable

More information

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW) City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems

More information

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff. JERSEY CENTRAL POWER & LIGHT UNIFORM TECHNICAL AND PROCEDURAL INTERCONNECTION REQUIREMENTS FOR NET METERING FACILITIES FOR INVERTER BASED WIND AND PHOTOVOLTAIC SYSTEMS OF 100 kw OR SMALLER for Atlantic

More information

Net Metering Interconnection Requirements. Customer Generation Capacity Not Exceeding 100 kw. Date: Version: 1

Net Metering Interconnection Requirements. Customer Generation Capacity Not Exceeding 100 kw. Date: Version: 1 Net Metering Interconnection Requirements Customer Generation Capacity Not Exceeding 100 kw Date: 2017-07-01 Version: 1 Revision History Date Rev. Description July 01, 2017 1 Initial release Newfoundland

More information

NET METER REQUEST FORM

NET METER REQUEST FORM Form No. 3651 02/17 NET METER REQUEST FORM In order to receive a Net Meter, please provide the information requested below, sign and return only this coversheet by mail to the address below. NorthWestern

More information

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008 NB Power Customer Service and Distribution June 2008 Prepared by: Steven Wilcox Revised by: Steven Wilcox TABLE OF CONTENTS 1.0 Introduction 4 2.0 NB Power Policy on Independent Power Production 4 3.0

More information

SCHEDULE NO. ACG33 NET METERING SERVICE

SCHEDULE NO. ACG33 NET METERING SERVICE Approved by Decision No.: 75408 Effective: January 19, 2016 Applicability Applicable to "Net Metering Facility" as defined below, or applicable Arizona Corporation Commission ("Cmnn1ission") Decision,

More information

Enquiry Form for Micro and Small Generators 5MW and Less

Enquiry Form for Micro and Small Generators 5MW and Less Enquiry form Enquiry Form for Micro and Small Generators 5MW and Less Connect an embedded generator (incl. solar, wind & micro-hydro) to the TasNetworks Distribution Network Please print and complete relevant

More information

IEEE* American National Standards

IEEE* American National Standards IEEE* American National Standards T. Basso, NREL** and IEEE SCC21 Secretary; M. Coddington, NREL; P. McNutt, NREL; and R. DeBlasio, NREL and IEEE SCC 21 Chair and IEEE Smart Grid POC Solar America Board

More information

Enabling Smart Grid Interoperability: A System of Systems Approach via IEEE P2030 TM and IEEE 1547 TM

Enabling Smart Grid Interoperability: A System of Systems Approach via IEEE P2030 TM and IEEE 1547 TM Enabling Smart Grid Interoperability: A System of Systems Approach via IEEE P2030 TM and IEEE 1547 TM Standards presented May 2010 by Tom Basso Electricity, Resources and Building Systems Integration Center

More information

Solar Power Switchgear & Energy Storage Renewable Energy Systems

Solar Power Switchgear & Energy Storage Renewable Energy Systems 7 Solar Power Switchgear & Energy Storage Renewable Energy Systems - Solution Brochure www.apt-power.com 433 N. 36 th Street PROVIDING A COMPREHENSIVE Lafayette, IN 47905 www.apt-power.com 433 APPROACH

More information

G83/2 Engineering Recommendation

G83/2 Engineering Recommendation G83/2 Engineering Recommendation Certificate Number: TR002007 001 Type Approval and manufacturer/supplier declaration of compliance with the requirements of Engineering Recommendation G83/2. Type reference

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

Frequently Asked Questions & Answers

Frequently Asked Questions & Answers Grid Access Unit for IPPs and generators Small and Micro Generation Framework Frequently Asked Questions & Answers 22 October 2014 1 # Question/Issue or concern Answers 1 2 3 4 Can a residential customer

More information

Large Scale Solar Integration

Large Scale Solar Integration Large Scale Solar Integration Experiences and Coming Changes in Distributed Energy Resource Interconnections October 26 th, 2017 Overview Background on Xcel Energy Expansion of Solar in Minnesota Changes

More information

E-15 Uninterruptible Power Systems (UPS)

E-15 Uninterruptible Power Systems (UPS) Guideline No.E-15 (201510) E-15 Uninterruptible Power Systems (UPS) Issued date:20 October, 2015 China Classification Society Foreword This Guide is a part of CCS Rules, which contains technical requirements,

More information

Form C Renewable Energy Micro-Generation Connection Application Distribution System

Form C Renewable Energy Micro-Generation Connection Application Distribution System Form C Renewable Energy Micro-Generation Connection Application Distribution System (Micro-Generation Facilities 10 kw total nameplate capacity) This form is applicable to single or multiple generating

More information

NERSA CONSULTATION PAPER PROCESS. Moefi Moroeng Specialist: Wholesale Electricity Trading

NERSA CONSULTATION PAPER PROCESS. Moefi Moroeng Specialist: Wholesale Electricity Trading NERSA CONSULTATION PAPER PROCESS Moefi Moroeng Specialist: Wholesale Electricity Trading 1 AGENDA Energy Regulator Overview Regulation of the Electricity Supply Industry Current Structure of the Electricity

More information

Louisville Gas and Electric Company

Louisville Gas and Electric Company P.S.C. Electric No. 11, Original Sheet No. 57 APPLICABLE In all territory served. AVAILABILITY OF SERVICE Available to any customer-generator who owns and operates a generating facility located on Customer

More information

GUIDE TO BACK UP POWER

GUIDE TO BACK UP POWER GUIDE TO BACK UP POWER Considerations for Energy Storage Assets CHIP PALOMBINI cpalombini@dynapower.com Power Outages Cost the United States Tens of Billions of Dollars Each Year C & I bears 98% of the

More information

Guidelines for the Design of Residential and Community Level Storage Systems Combined with Photovoltaics (PV)

Guidelines for the Design of Residential and Community Level Storage Systems Combined with Photovoltaics (PV) Guidelines for the Design of Residential and Community Level Storage Systems Combined with Photovoltaics (PV) Stavros Afxentis PV Technology Laboratory Outline Introduction Sizing of Battery Storage Systems

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

Electric Networks/Ina Lehto Updated Original 12/2011

Electric Networks/Ina Lehto Updated Original 12/2011 1 TECHNICAL APPENDIX 2 TO THE GUIDELINES CONNECTING AN ELECTRICITY GENERATION INSTALLATION TO THE DISTRIBUTION NETWORK CONNECTING AN INSTALLATION WITH A NOMINAL RATED CAPACITY OF OVER 100 These instructions

More information

PV Grid Integration Research in the U.S.

PV Grid Integration Research in the U.S. PV Grid Integration Research in the U.S. Barry Mather Ph.D. NREL- Power Systems Engineering Center HEPIA IEA PVPS Task 14 Utility Workshop Geneva, Switzerland March 31 st, 2014 NREL is a national laboratory

More information

Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances

Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances 29 Juli 2014 Page 1 Characteristics of the Project Parameter Detail

More information

Micro-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw

Micro-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw This form is applicable to individual or multiple generating units at the Customer s facility with total nameplate rating of 10 kw or less. Your generation facility must generate electricity from a renewable

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

NS194B Guidelines for Rotating Machines Connected to the Ausgrid Network. October 2014

NS194B Guidelines for Rotating Machines Connected to the Ausgrid Network. October 2014 Guidelines for Rotating Machines Connected to the Ausgrid Network October 2014 SUMMARY Network Standard outlines the requirements other than control and protection that a rotating machine should fulfil

More information

Renewable Grid Integration Research in the U.S.

Renewable Grid Integration Research in the U.S. Renewable Grid Integration Research in the U.S. Barry Mather Ph.D. NREL- Distributed Energy Systems Integration Group UNSW IEA PVPS Task 14 Workshop Sydney, AU November 26 th, 2013 NREL is a national laboratory

More information

Residential Energy Storage System SH5K PV ESS

Residential Energy Storage System SH5K PV ESS www.sungrowpower.com Residential Energy Storage System SH5K PV ESS Why You Need the PV ESS (Energy Storage System)? In many countries, with the rising popularity of solar energy and its essential PV systems,

More information

Product Overview. 1.0 About VRB-ESS. 2.0 System Description. MW-Class VRB-ESS

Product Overview. 1.0 About VRB-ESS. 2.0 System Description. MW-Class VRB-ESS 1.0 About VRB-ESS Pu Neng s VRB-ESS is an electrical energy storage system based on the patented vanadium redox battery (VRB ) that converts chemical to electrical energy. Energy is stored chemically in

More information

S C ELECTRIC EUROPE LTD. Excellence Through Innovation. Harnessing the Wind. November 2011 Descriptive Bulletin E

S C ELECTRIC EUROPE LTD. Excellence Through Innovation. Harnessing the Wind. November 2011 Descriptive Bulletin E S C ELECTRIC EUROPE LTD. Excellence Through Innovation Harnessing the Wind November 2011 Descriptive Bulletin 2000-42E Introduction Founded in 1911, S&C Electric Company is a global provider of equipment

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION IEC/TS 62257-7-3 TECHNICAL SPECIFICATION Edition 1.0 2008-04 Recommendations for small renewable energy and hybrid systems for rural electrification Part 7-3: Generator set Selection of generator sets

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

Certificate of Conformity self-generation unit

Certificate of Conformity self-generation unit Seite 1 von 7 Certificate of Conformity self-generation unit Manufacturer / applicant: SMA Solar Technology AG Sonnenallee1 34266 Niestetal Germany Type of power generation unit: Active power (nominal

More information

Solar Development in New Jersey, and PV Impacts on the Distribution System Carnegie Mellon Conference on the Electricity Industry - March 9, 2011

Solar Development in New Jersey, and PV Impacts on the Distribution System Carnegie Mellon Conference on the Electricity Industry - March 9, 2011 Solar Development in New Jersey, and PV Impacts on the Distribution System Carnegie Mellon Conference on the Electricity Industry - March 9, 2011 Jim Calore Public Service Electric & Gas Co. Overview This

More information

Interconnection Requirements for Generation Systems

Interconnection Requirements for Generation Systems Interconnection Requirements for Generation Systems I. Foreword...1 II. Introduction...2 III. Definitions...2 IV. Interconnection Requirements Goals...4 V. Protection...4 VI. Nodak System Modifications...4

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 62257-9-2 First edition 2006-10 Recommendations for small renewable energy and hybrid systems for rural electrification Part 9-2: Microgrids IEC 2006 Copyright - all rights

More information

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 2nd Revised 170 6 1st Revised 170 FROM QUALIFYING FACILITIES 1. *STANDARD RATES FOR PURCHASE The standard rates for purchase from a customer with a design capacity of 100 kw or

More information

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board Policy Description: In an effort to ensure fair treatment of all of its customers,

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Designing and Maintaining a Pollution-Resilient Electric Power System. Managing Pollution Issues

Designing and Maintaining a Pollution-Resilient Electric Power System. Managing Pollution Issues Designing and Maintaining a Pollution-Resilient Electric Power System Tom McDermott IEEE/PES T&D Conference April 21-24, 2008 Chicago, IL Managing Pollution Issues Define the metrics, and measure them

More information

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDG 50 kw FOREWARD Requirements for Parallel Operations for Customers with Generation Not Exceeding 50 kw is intended to be used

More information

SolarMax S series (United Kingdom) Maximising solar plant yields can be so easy.

SolarMax S series (United Kingdom) Maximising solar plant yields can be so easy. SolarMax S series (United Kingdom) Maximising solar plant yields can be so easy. The convincing solution. We have been developing and producing transformerless inverters for over 20 years. Our engineers

More information