METER INSTALLATIONS

Size: px
Start display at page:

Download "METER INSTALLATIONS"

Transcription

1 TALE OF CONTENTS Sheet 1 of 2 SECTION INDEX OUTDOOR POLE MOUNTED PRIAMRY METERING STRUCTURE CUSTOMER OWNED UNMETERED D/D LIGHT INSTALLATION PRIMARY METERING 2400 VOLTS SINGLE PHASE MO ONLY PRIMARY METERING 2400 VOLTS SINGLE PHASE WITH CUSTOMER STREET LIGHTING SUSTATION MO ONLY PRIMARY METERING FOR CUSTOMER UG 3 PHASE, 3 & 4 WIRE, 2400/4160 VOLTS, SM 5 FUSING MO ONLY ** PRIMARY METERING, 3 PHASE 3 & 4 WIRE, 2400/4160 VOLTS, SM 5 FUS ING MO ONLY ** PRIMARY METERING 7200 VOLTS SINGLE PHASE MO ONLY ** PRIMARY METERING FOR CUSTOMER UG, 3 PHASE 3 & 4 WIRE, 4 OR 12kV MO ONLY ** PRIMARY METERING FOR CUSTOMER UG, 3 PHASE 4 WIRE, 12KV MO ONLY PRIMARY METERING, 3 PHASE 3 & 4 WIRE, 4 OR 12kV MO ONLY ** PRIMARY METERING FOR CUSTOMER UG, 3 PHASE, 3 WIRE, 4 OR 12kV IL ONLY ** PRIMARY METERING, 3 PHASE, 4 WREI, 4 OR 12Kv IL ONLY ** PRIMARY METERING, FOR CUSTOMER UG, 3 PHASE, 4 WIRE, 4 OR 12kV IL ONLY ** PRIMARY METERING FOR CUSTOMER UG 3 PHASE 4 WIRE, 25kV MO ONLY PRIMARY METERING, 3 PHASE, 3 WIRE, 34.5kV MO ONLY PRIMARY METERING, 3 PHASE, 4 WIRE, 34.5kV MO ONLY PRIMARY METERING, 3 PHASE, 3 WIRE, 34.5kV IL ONLY PRIMARY METERING, 3 PHASE, 4 WIRE, 34.5kV IL ONLY PRIMARY METERING, 3 PHASE, 3 WIRE, 69kV MO ONLY PRIMARY METERING, 3 PHASE, 3 WIRE, 69kV IL ONLY PRIMARY METERING, 3 PHASE, 4 WIRE, 69kV IL ONLY AMI/AMR INSTALLATION GENERAL INFORMATION CLEARANCE REQUIRE MENTS AMI/AMR INSTALLATION ROUTER AND WOOD POLE MOUNTING RACKET AMI/AMR INSTALLATION ROUTER WOOD POLE MOUNTING WITH SEC ONDARY ONLY REV. DATE: 10/02/17

2 Sheet 2 of 2 AMI/AMR INSTALLATION ROUTER WOOD POLE WITH TRANS FORMER AND SECONDARY AMI/AMR INSTALLATION COLLECTOR AND WOOD POLE MOUNTING RACKET AMI/AMR INSTALLATION COLLECTOR WOOD POLE MOUNTING WITH SECONDARY ONLY AMI/AMR INSTALLATION COLLECTOR WOOD POLE MOUNTING WITH TRANSFORMER AMI/AMR INSTALLATION COLLECTOR SINGLE POLE-TOP AN TENNA WOOD POLE AMI/AMR INSTALLATION COLLECTOR FOUR POLE-TOP ANTEN NAS WOOD POLE AMI/AMR INSTALLATION FUSED DISCONNECT SWITCH FOR ROUTER INSTALLATIONS AMI/AMR INSTALLATION FUSED DISCONNECT SWITCH FOR COLLECTOR INSTALLATIONS AMI/AMR INSTALLATION POLE-TOP ANTENNA ARRESTER CONNECTIONS REV. DATE: 10/02/17

3 Outdoor Pole Mounted Sheet 1 of 1 GENERAL Standard installations of secondary and primary pole mounted metering installations are specified in this section. 1. Secondary Installations Secondary pole mounted metering installations are normally customer owned. This type of installation is particularly applicable to farm distribution centers. 2. Primary Installations Primary pole mounted metering installations may be either Company owned or customer owned. These installations are generally applicable to large light and power loads. A. Company Owned If the station being primary metered is to be owned by Ameren, all necessary equipment will be furnished and installed by Ameren.. Customer Owned (For Missouri) 1. If the station being primary metered is to be owned by the customer, the customer must furnish and install the following equipment. This equipment shall be installed in accordance with appropriate Ameren Primary Metering Standards. a. Pole. b. Pole framing and steps. c. Switches. d. Lightning arresters. e. All primary wiring including fiber conduit when required, except that Ameren will connect the customer s primary leads to the supply conductors and to the current and potential transformers. The customer must leave sufficient lengths of wire for making these connections. f. Secondary wiring when required; Ameren will make connections to Secondary Supply. The customer must leave sufficient lengths of wire for making these connections. 2. Ameren will furnish and install the following equipment, and will complete metering connections. a. Primary or secondary supply conductors with deadend devices. b. Devices to connect customer s primary or secondary leads to the supply conductors. c. Current, potential transformers, and bracket. d. Devices to connect customer s primary wiring to current and potential transformers. e. Meter enclosure, meter, and mounting framework. f. All metering wiring including conduit to connect current and potential transformers to the meter. C. Ameren s Meter Department must be notified of job as early as possible to insure availability of equipment to be provided; includes metering enclosures and transformers cluster mounts or units, are shop wired. REV. NO: 2 REV. DATE: 09/22/11

4 Customer Owned Unmetered D/D Light Installation Sheet 1 of 2 AMEREN SERVICE WIRES SEE DIST. STD FOR MINIMUM HEIGHT OF WIRE AOVE GROUND AT THE POINT OF GREATEST SAG. 8 ALLOW 15 OF SERVICE CALE FOR CONN. M LOCATE 15 FROM TOP OF POLE & 5 TO SIDE OF CENTER LINE OF RACKET. P GROUND WIRE TO E PROTECTED IF REQ D. Y AUTHORITIES. NOTES: 1. Customer to notify company of location of service pole, size of lighting load, and if overhead conductor, size of wire and length of span to next pole. Company will then determine pole size and guying requirements and notify customer. Guying to be avoided by using self sustained poles where possible. If guying is required, customer will supply guy and anchor in traffic free location. 2. Customer to provide a fused disconnect switch in a suitable watertight enclosure. This device shall meet all requirements of the National Electrical Code and National Electrical Safety Code and be approved by local inspection authorities. The enclosure is to be provided with a provision for locking. The enclosure shall be grounded. 3. All construction to comply with the National Electrical Code or National Electrical Safety Code as applicable. 4. If customer installs a light on this pole, such light shall clear Ameren service wires by not less than 24 inches. REV. NO: 2 REV. DATE: 12/06/99 REAFFIRMED DATE: 10/21/10

5 Customer Owned Unmetered D/D Light Installation Sheet 2 of 2 MATERIAL PROVIDED IN PLACE AND OWNED Y AMEREN Stnd. / Stk. No. Description A Secondary Clevis 1 MATERIAL PROVIDED IN PLACE AND OWNED Y CUSTOMER Stnd. / Stk. No. Description 1 D Pole 1 E Grounding Lug 1 F Secondary Clevis 6 G Distribution Wire H Solderless Connector 6 J Metallic Conduit K Service Entrance Cable L Conduit Straps M Entrance Caps 2 N Connectors (Water Tight) 2 P Ground Wire Q Staples 2 R Fused Disconnect SW. Raintight 1 S Ground Rod 1 T Ground Rod Lug 1 1 U ** ** Guy & Anchor (If Req d.) 1 REV. NO: 2 REV. DATE: 12/06/99 REAFFIRMED DATE: 10/21/10

6 Primary Metering 2400 Volts Single Phase Sheet 1 of 2 MISSOURI ONLY Fused Switch O Supply N L.A. To Customer 5 A HH F Load 12 OO C Source L H1 X1 CT H2 X2 H G F M 36 AA D Green lue H1 X1 PT H2 X2 White Yellow (C.T. s Above P.T. s) * * II 24 LL,MM,NN K 48 JJ 18 MIN. CC, FF DD EE,KK 3 MIN. 5 6 MAX. DD 12 MAX. 8 MIN. E Meter Socket Wiring Diagram * White Dot Polarity Mark REV. NO: 8 REV. DATE: 09/23/11

7 Primary Metering 2400 Volts Single Phase Sheet 2 of 2 MISSOURI ONLY NOTES: 1. Ground instrument transformer cases. 2. Metering equipment should be within reach of a 29 extension ladder. 3. If metered primary exceeds 2 spans, additional arresters must be installed on first pole beyond meter pole. 4. When meter pole is on customer property, a disconnect switch shall be provided one span before. 5. Secondary wire lead on meter cluster is 15ft. standard length. For taller poles, special order meter cluster with longer lead to meet max. height requirement for connection box. NORMALLY FURNISHED Y CUSTOMER Stnd. / Stk. No. Description A Double D.E. on Pole Switch Ass y (Fuse size by Engr.) 1 C Arrester 3kV 1 D *** Pole 1 E Grounding Unit 1 F Wire, #2 Cu Covered, S.D. (Ft.) 20 G Conduit 2 8 H Iron Hanger (ft.) 5 J Staple 8 K Clevis, Secondary 2 L Cover Cutout 1 M Wire, #6 Cu., are S.D. 35 NORMALLY FURNISHED Y AMEREN Stnd. / Stk. No. Description AA Metering Ass y Meter Socket 1 CC Conduit 1, Flex 20 DD Staple, 1 1/2 3 EE Fitting Wire #12 Cu. 600V Type TW lue 30 FF Wire #12 Cu. 600V Type TW Green Wire #12 Cu. 600V Type TW Yellow Wire #12 Cu. 600V Type TW White 30 GG 285 Inst Primary Metering HH DEC*W Clamp Deadend 2 II ox, Secondary connection 1 JJ Screw, Hex Head Cap, 3/8 x2 2 KK Screw, Wood, #14, 3, Rnd. 4 LL Cord Hrd Srv 14/2 Cu 600V 20 MM Conduit PVC Split 2 x10 1 NN Iron, Hanger, Galv., 3/4 wide 2 OO PG* Clamp, P.G. (Std ) 4 REV. NO: 8 REV. DATE: 09/23/11

8 Primary Metering 2400 Volt Single Phase With Customer Street Lighting Substation Sheet 1 of 3 MISSOURI ONLY N K Z O1 L P O O1 PHASE N1 20 L1 20 #4 ACSR ARE 6 #4ACSR POLY. 36 O Fused Switch W 12 Supply N L.A. To Customer Q (P.T. s Above C.T. S) M1 48 H1 H2 S R 24 X1 PT X2 AA,,CC M G V C, F 5 MIN. H Green lue H1 H2 X1 X2 CT White Yellow X Y T D 12 0 MAX. E A I 8 0 MIN. 3 0 MIN. 5 6 MAX. * White Dot Polarity Mark U Meter Socket Wiring Diagram REV. NO: 6 REV. DATE: 05/01/12

9 Primary Metering 2400 Volt Single Phase With Customer Street Lighting Substation Sheet 2 of 3 MISSOURI ONLY NOTES: 1. This standard shows the typical equipment arrangement for a pole mounted streetlighting substation. For installations where this arrangement cannot be used, the following requirements must be considered in arranging the equipment in order that adequate climbing space is provided for Ameren Personnel who must make attachments and operate switch on the substation poles. a. One side of the pole must be clear of equipment, conduit, and cables. b. olts extending thru the pole into the climbing space should be cut off so that they are not a hazard in climbing the pole. c. Pole steps should be installed as outlined in Ameren Distribution Std , Sheets 1 & Ground instrument transformer cases. 3. Ameren shall install a fused switch on take off pole for sectionalizing or disconnecting. This switch will be left open until customer requests Ameren to close it. 4. Ameren shall connect customer s transformer primary neutral lead to common neutral. Ameren shall also connect customer s driven ground to common neutral. 5. Fuse sized by Ameren Engineer. NORMALLY FURNISHED Y AMEREN Stnd. / Stk. No. Description A Meter Enclosure Metering Cluster Ass y. 1 C Conduit 1, Flex. 20 D Staple, 1 1/2 3 E Fitting Wire, #12 Cu. 600V Type TW lue 30 F Wire, #12 Cu. 600V Type TW Green Wire, #12 Cu. 600V Type TW Yellow Wire, #12 Cu. 600V Type TW White 30 G ox, Secondary connection K DEC*W Clamp Deadend Install Pri. Metering 1 H Screw, Hex Head Cap, 3/8 x2 2 I Screw, Wood, #14, 3, Rnd. 4 AA Cord, Hrd Srv, 14/2 Cu, 600V Conduit, PVC Split 1 CC Iron Hanger, Galv., 3/4 wide (ft.) 2 REV. NO: 6 REV. DATE: 05/01/12

10 Primary Metering 2400 Volt Single Phase With Customer Street Lighting Substation Sheet 3 of 3 MISSOURI ONLY NORMALLY FURNISHED Y CUSTOMER Stnd. / Stk. No. Description L Clevis, Sec., Insulator 2 M Mounting Unit, Transf. C 1 N Double Deadend on Pole 1 5 O Switch, Fused, 15kV, 100A 1 P Lightning Arrester, 3kV 1 Q P.E. Cell Control Unit, KW 1 R Primary Oil Switch 1 S Transformer 1 T Control Cabinet 1 U Street Light Cable (Ft.) V Pole Step 9 X Grounding Unit 1 Y Pole 1 Z rkt., Sgl. Ext., w/clevis 1 L Cover Cutout 1 M Guard Clam shell Wildlife 1 N Wire, #2 Cu., Covered S.D. 35 O Wire, #6 Cu., are S.D. 35 REV. NO: 6 REV. DATE: 05/01/12

11 Primary Metering For Customer U.G., 3 Phase 3W & 4W 2400 / 4160 V, SM 5 FUSING ** Sheet 1 of 3 MISSOURI ONLY WIRE WIRE Z L, O MM X M C F,G H1 W J LL 4 MIN. 6 MAX. D 20 QQ V A I E SWITCH ROD GROUND QQ J,K U /2 (P.T.S AOVE C.T.S) Y 15 o AA NN,OO,PP L CONDUIT J,K H M S SEE RACKET DETAIL J,K 4 R CC EE 18 MIN. DD,FF GG P C OF METER 12 MAX. 8 MIN. HH,II T TO SWITCH GROUND RACKET DETAIL 5 6 MAX. 3 MIN. REV. NO: 13 REV. DATE: 09/23/11

12 Primary Metering For Customer U.G., 3 Phase 3W & 4W 2400 / 4160 V, SM 5 FUSING ** Sheet 2 of 3 NOTE: MISSOURI ONLY 1. When meter pole is on customer property, switch shall be provided one span before. 2. Secondary wire lead on meter cluster is 15ft. standard length. For tall poles, special order meter cluster with longer lead to meet max. height requirement for connection box. 3. Terminator mounting bracket is either Aluma Form (T EM 1 6 PA 35 UE) or Hubbell (CT EM 1 6PS 35 UE). It is no longer stocked by Ameren. NORMALLY PROVIDED Y CUSTOMER Stnd. / Stk. No. Description ** A Switch, 15 kv, Group Operated Wire, 4/0 Cu, Covered S.D. (ft.) C PG* Clamp, Parallel Groove ( See Std ) 3 3 D Crossarm, E Mounting, Fuse, 400 A 3 3 F Lug, Compression, 4/0 Cu. 6 6 G olt, Everdur, 1/2 x 2 1/ H racket, Mounting, Terminator 1 1 I olt, Machine, 1/2 x J olt, Machine, 5/8 x K Washer, Square 7 7 L Arrester, Lightning, 3 kv, Riser Pole 6 6 M Clamp, Hot LIne 6 6 N Conduit, Sch. 80, O racket, Crossarm Mounting 3 3 P racket, Cable 3 3 Q end 5, 36 Rad. 1 1 R Cable, 15 kv, 750 Al. (ft.) S Terminator, 15 kv, 750 Al. 3 3 T Grounding Unit 1 1 U Refill (Sized by Engineering) 3 3 V Connector, 2 olt, 4/0 3 3 W Crossarm, 8, Double 1 1 X Deadend, 12 kv 4 3 Y ILW*W Wire, 5 kv Z 02 Pole 1 1 A Conduit, Sch. 40, Iron Hanger (ft.) 6 6 C racket Standoff, D olt Double Arming, 5/8 x E Nut 5/8 Jam 4 4 F Washer Curved, 3/4 8 8 G Strap Conduit, H Wire, #6 Cu., are S.D. (ft.) REV. NO: 13 REV. DATE: 09/23/11

13 Primary Metering For Customer U.G., 3 Phase 3W & 4W 2400 / 4160 V, SM 5 FUSING ** Sheet 3 of 3 MISSOURI ONLY NORMALLY PROVIDED Y AMEREN Stnd. / Stk. No. Description ** AA Mounting, Primary Metering ox, Secondary Connection 1 1 CC Screw, Cap, 3/8 x DD Conduit, Flex EE Staple 3 3 FF MTR SHOP Wire Pack of 10 # 12, Color Coded (ft.) GG Fitting 2 2 HH Socket, Meter, 600 V, 3 Phase, 4 wire Socket, Meter, 600 V, 3 Phase, 3 wire 1 II Screw, Wood #14, 3, Rnd 4 LL DEC*W Clamp, D.E. 4 MM PG* Clamp, P.G. (Neutral) ( See Std ) 1 NN Cord, Hrd Srv, 14/2; 600V. Cu OO Conduit, PVC Split, 2 x PP Iron Hanger, Galv., 3/4 wide (ft.) 2 2 QQ Guard, Clam shell, Wildlife Install Primary Metering 1 1 SOURCE A C SOURCE A C N PT 1 PT 2 PT 1 PT 2 PT 3 CT 1 CT 2 A C LOAD CT 1 CT 2 CT 3 A C N LOAD 3 WIRE 4 WIRE REV. NO: 13 REV. DATE: 09/23/11

14 Primary Metering, 3 Phase 3 W & 4 W 2400 / 4160 V, SM 5 FUSING MISSOURI ONLY ** Sheet 1 of MM 6 S CUSTOMER PRIMARY C T L, O AMEREN PRIMARY M C F,G U A J U 4 MIN. 6 MAX. 12 D QQ 12 Q R 12 E I QQ J,K P /2 ( C.T.S AOVE P.T.S ) AA NN J,K 4 WIRE WIRE CC DD,FF EE 15 o SWITCH ROD 18 MIN. 12 MAX. 8 MIN. GG HH, II CONDUIT GROUND C OF WINDOW 3 0 MIN. 5 6 MAX. N REV. NO: 11 REV. DATE: 05/01/12

15 Primary Metering, 3 Phase 3 W & 4 W 2400 / 4160 V, SM 5 FUSING ** Sheet 2 of 3 MISSOURI ONLY NOTE : 1. When meter pole is on customer property, switch shall be provided one span before. 2. Secondary wire lead on meter cluster is 15 ft. standard length. For tall poles, special order meter cluster with longer lead to meet maximum height requirement for connection box. NORMALLY PROVIDED Y CUSTOMER Stnd. / Stk. No. Description ** A Switch, 15 kv, Group Operated Wire, #2 Cu, Covered S.D. (ft.) C PG* Clamp, Parallel Groove ( See Std ) 6 6 D Crossarm, E Mounting, Fuse, 400 A 3 3 F Lug, Compression, 4/0 Cu. 6 6 G olt, Everdur, 1/2 x 2 1/ I olt, Machine, 1/2 x J olt, Machine, 5/8 x K Washer, Square 5 5 L Arrester, Lightning, 3 kv 3 3 M Clamp, Hot LIne 3 3 N Grounding Unit 1 1 O racket, Crossarm Mounting 3 3 P Refill (Sized by Engineering) 3 3 Q Arm, Training, Fiberglass, R Connector, 2 olt, 4/0 3 2 S Crossarm, 10 Double 1 1 T Deadend, 12 kv, Double 8 6 U Wire, #6 Cu are S.D. (ft.) Pole 1 1 REV. NO: 11 REV. DATE: 05/01/12

16 Primary Metering, 3 Phase 3 W & 4 W 2400 / 4160 V, SM 5 FUSING ** Sheet 3 of 3 NORMALLY PROVIDED Y AMEREN Stnd. / Stk. No. Description ** AA Mounting, Primary Metering ox, Secondary Connection 1 1 CC Screw, Cap, 3/8 x DD Conduit, Flex, EE Staple 3 3 FF MTR SHOP Wire Pack of 10 # 12, Color Coded (ft.) GG Fitting 2 2 HH Socket, Meter, 600V, 3 Phase, 4 Wire Socket, Meter, 600V, 3 Phase, 3 Wire 1 II Screw, Wood, # 14, 3, Rnd. 4 LL DEC*W Clamp, D.E. 8 MM PG* Clamp, P.G. (Neutral) ( See Std ) 1 NN Cord, Hrd Srv, 14/2 Cu, 600V OO Conduit, PVC Split 1 1 PP Iron Hanger, Galv., 3/4 wide (ft.) 2 2 QQ Guard, Clam shell, Wildlife Install Primary Metering 1 1 MISSOURI ONLY SOURCE C A SOURCE C A PT 1 CT 1 PT 1 CT 1 POLARITY MARK PT 2 CT 2 PT 2 CT 2 PT 3 CT 3 CA LOAD LOAD 3 WIRE WIRE REV. NO: 11 REV. DATE: 05/01/12

17 Primary Metering 7200 Volt Single Phase ** Sheet 1 of 2 MISSOURI ONLY Fused Switch (5) O Supply N L.A. To Customer (P.T. s Above C.T. S) F Q 5 AA (4) LOAD 12 D VV 36 E A AA SOURCE P H1 H2 X1 X2 PT H1 H2 WHITE DOT POLARITYMARK HH NN PP QQ RR UU FF GG EE 18 C 24 C K G,(6) JJ O II WW 48 Green lue X1 X2 CT White Yellow CC L OO,SS KK,LL MM J, M 12 MAX 8 MIN 18 MIN. (8) H, M Meter Socket Wiring Diagram DD,TT (5) 3 MIN 5 6 MAX Double Deadend Single Deadend NOTES: 1. Ground all instrument transformers. 2. If metered primary exceeds two spans, additional pole arresters must be installed on first pole beyond meter pole. 3. Ground clearance 4. arriers shall be installed for protection against vehicular traffic if necessary. 4. Overhead service shown by broken line. 5. Rotate G & DD to give best clearance and climbing space. 6. When meter pole is located on customer property, disconnect switches shall be provided one span before. 7. Secondary wire lead on meter cluster is 15ft. standard length. For tall poles, special order meter cluster with longer lead to meet max. height requirement for connection box. 8. Primary connections shall be 18ft. min. above the ground. REV. NO: 8 REV. DATE: 05/01/12

18 Primary Metering 7200 Volt Single Phase ** Sheet 2 of 2 Stnd. / Stk. No. Description ** NORMALLY FURNISHED Y CUST. A Double D.E. on Pole D.E. on Pole SW, Ass y., (Fuse Sized y Engr.) 1 1 C Wire, #2 Cu Covered, SD, (ft.) D Lightning Arr., 9kV 1 1 E Ins., Standoff, F 02 Pole 1 1 G Grounding Unit 1 1 H Conduit, 2 Pl., Slotted 20 J Guard, 3 Metal Cable 1 K Termination, 15kV 1 L Cable, 15kV #2 CN., Ft. 30 M Iron, Hanger 10 O Insulator, Clevis 1 1 P Cover Cutout 1 1 Q Wire, #6 Cu are S.D. (ft.) NORMALLY FURNISHED Y AA DEC*W Clamp Deadend Conduit PVC, Split 2 x CC Iron Hanger, Galv., 3/4 wide (ft.) 2 2 DD Meter Enclosure 1 EE Transformer, Current 1 FF Transformer, Potential 1 1 GG racket, Trfrmr. Mtg. 1 1 HH Connector, Cable #8 2 II SDEA*W Clamp Secondary Deadend Automatic 1 1 JJ Washer, 3 Curved (Nested) 4 4 KK Conduit 1, Flex LL Staple, 1 1/2 3 3 MM Fitting 2 2 NN Wire #12 Cu 600V Type TW lue OO ox, Secondary connection 1 1 PP Wire #12 Cu 600V Type TW Green QQ Wire #12 Cu 600V Type TW Yellow RR Wire #12 Cu 600V Type TW White SS Screw, Hex Head Cap, 3/8 x2 2 2 TT Screw, Wood, #14, 3, Rnd, 4 4 UU Cord Hrd Srv 14/2 Cu 600V 20 VV PG* Clamp, P.G. (Std ) 2 WW PG* Clamp, P.G., Neutral (Std ) Install Pri. Metering 1 1 REV. NO: 8 REV. DATE: 05/01/12

19 Primary Metering For Customer U.G., 3 Phase 3W & 4W 4 or 12 kv ** Sheet 1 of 3 MISSOURI ONLY 6 L, O WIRE A A Y W M C F,G MM I1 V 3 WIRE A A J LL 4 MIN. 6 MAX. A D 20 6 J,K 2 H1 U M (P.T.S AOVE C.T.S) QQ SWITCH ROD QQ E, O 5 Z 15 o AA NN,OO,PP J,K 5 L CONDUITS GROUND H M S SEE RACKET DETAIL J,K 4 R T CC EE DD, FF GG HH,II TO SWITCH GROUND P RACKET DETAIL 12 MAX. 8 MIN. C OF WINDOW 3 MIN. 5 6 MAX. 18 MIN. ENG:WYW REV. NO: 15 REV. DATE: 11/21/16

20 Primary Metering For Customer U.G., 3 Phase 3W & 4W 4 or 12 kv ** Sheet 2 of 3 NOTES: MISSOURI ONLY 1. When meter pole is on customer property, switch shall be provided one span before. 2. Secondary wire lead on meter cluster is 15ft. standard length. For tall poles, special order meter cluster with longer lead to meet max. height requirement for connection box. 3. Terminator mounting bracket is either Aluma Form (T EM 1 6 PA 35 UE) or Hubbell (CT EM 1 6 PA 35 UE). It is no longer stocked by Ameren. NORMALLY PROVIDED Y CUSTOMER 3 Stnd. / Stk. No. Description ** A Switch, 15 kv, Group Operated Wire, #2 Cu, Covered, S.D. (ft.) C HLC*W Clamp, Hot line PG* Clamp, Parallel Groove ( See Std ) D Crossarm, E Switch, 15 kv, 100A Switch, 15 kv, 200A 3 3 F Lug, Compression, # 2 Cu G olt, Everdur, 1/2 x 2 1/ H racket, Mounting, Terminator J olt, Machine, 5/8 x K Washer, Square L Arrester, Lightning, ( 3 or 10 kv ) M Clamp, Hot Line N Conduit, Sch 80, O racket, Crossarm Mounting P racket, Cable Q Conduit, Sch 40, R Cable, 15 kv # Cable, 15 kv 4/ S Terminator, 15 kv, # Terminator, 15 kv, 4/0 3 3 T Grounding Unit U Connector, Split olt, # 2 Cu V Crossarm, Double W Deadend, 12kV Y 02 Pole Z Connector, Cable to Flat, #6 2/ A end 4, 36 Rad Iron Hanger (Ft.) C racket Standoff, D olt Double Arming, 5/8 x E Nut 5/8 Jam F Washer Curved, 3/ G Strap Conduit, H Cover Cutout I Wire, #6 Cu are, S.D. (ft) ENG:WYW REV. NO: 15 REV. DATE: 11/21/16

21 Primary Metering For Customer U.G., 3 Phase 3W & 4W 4 or 12 kv ** Sheet 3 of 3 MISSOURI ONLY NORMALLY PROVIDED Y AMEREN Stnd. / Stk. No. Description ** AA Mounting, Primary Metering ox, Secondary Connection CC Screw, Cap, 3/8 x DD Conduit, Flex, EE Staple FF MTR SHOP Wire Pack of 10 # 12, Color Coded (ft.) GG Fitting HH Socket, Meter, 600V, 3 Phase, 4 Wire Socket, Meter, 600V, 3 Phase, 3 Wire 1 1 II Screw, Wood, # 14, 3, Rnd LL DEC*W Clamp D.E MM PG* Clamp, P. G. (Neutral) ( See Std ) Install Primary Metering NN Cord, Hrd Srv, 14/2; 600V. Cu OO Conduit, PVC Split, 2 x PP Iron Hanger, Galv., 3/4 wide (ft.) QQ Guard, Clam Shell, Wildlife SOURCE A C SOURCE A C N PT 1 PT 2 PT 1 PT 2 PT 3 CT 1 CT 2 A C LOAD CT 1 CT 2 CT 3 A C N LOAD 3 WIRE 4 WIRE ENG:WYW REV. NO: 15 REV. DATE: 11/21/16

22 Primary Metering For Customer U.G., 3 Phase 4W 4 or 12 kv, SM 5 Fusing, 400 Amp Sheet 1 of 4 MISSOURI ONLY 10 6 M 6 J L F F A F 4 MIN. 6 MAX. F N,O,G,H V,W,X N 2 K,P,U,C,D C,D G 20 1/2 E HH,UU,S 5 R V,W,X GG PTs Above CTs Q GG,Q PP,QQ,RR F 5 1 Y 1 V,W,X L1 J1 Z E1,F1,H1,I1,J1,K1 DD 12 Max 8 Min JJ 18 MIN MM,NN 3 Min 5 6 Max D1,G1 A1 REV. NO: NEW REV. DATE: 03/10/16

23 Primary Metering For Customer U.G., 3 Phase 4W 4 or 12 kv, SM 5 Fusing, 400 Amp Sheet 2 of 4 MISSOURI ONLY NOTES: 1. When meter pole is on customer property, switch shall be provided one span before. 2. Secondary wire lead on meter cluster is 15ft. standard length. For tall poles, special order meter cluster with longer lead to meet max. height requirement for connection box. 3. Terminator mounting bracket is either Aluma Form (T EM 1 6 PA 35 UE) or Hubbell (CT EM 1 6 PA 35 UE). It is no longer stocked by Ameren. 4. Fuse sized by Ameren Engineer. 5. Ground all instrument transformers, arresters, and mounting assembly to the grounding unit. 6. Install barriers for protection against vehicular traffic where necessary. 7. Maintain a minimum of 15 clearance between 15kV phases or phase to ground. 8. Maintain minimum of 5 clearance between the aluminum mounting platform and the crossarm. 9. Maintain a minimum of 40 between the energized conductors and the pole on climbing side of the pole; maintain a minimum of 19 between the energized lateral and vertical conductors and the pole on non climbing side of the pole. Reference from NESC, Rule 239E. 10. Maintain a minimum of 40 between any part of the aluminum mounting platform and conductors of 4 or 12 kv underbuild. 11. For wire color coding on PT and CT secondaries, refer to system meter drawings. 12. If metering structure is located within a substation, the metering and L.A. ground wires must be connected to the substation ground mat. 13. To enhance the protection of the metering equipment ensure that the tap for the phase conductor to the arrester is as short as possible in distance. REV. NO: NEW REV. DATE: 03/10/16

24 Primary Metering For Customer U.G., 3 Phase 4W 4 or 12 kv, SM 5 Fusing, 400 Amp Sheet 3 of 4 NORMALLY PROVIDED Y CUSTOMER Stnd. / Stk. No. Description A 02 Pole Switch, 15kV, Group Operated 1 C Switch, 15kV, SM 5 Fuse Mounting, 400A D Fuse Refill E Wire, #2 Cu, Covered, S.D. (ft.) 20 F Wire, 500 Cu, Covered, S.D. (ft) 30 G Wire, #4 Cu, Covered, S.D. (ft) 15 H Clamp, Hot line 500kCMIL Cu Main/#4 Cu Tap I PG* Clamp, Parallel Groove ( See Std ) 3 J Crossarm, Fiberglass, 10 1 K Crossarm, Dble Wood, 10, Vertically Mount 1 L Single Deadend on Pole, 12kV 1 M Deadend on F/G Arm, 10 1 N Arrester, Terminal Pole, 9kV 3 O NEMA racket Arrester 3 P olt, Everdur/ronze, ½ x 2 ½ 12 Q Lug, Compression, 500 Cu 18 R PG Connector, 2 olt Type, 500 Cu 3 S Connector, Cable to Flat, #8 Sol 2/0 Str, One Eyebolt Type, ronze T Connector, Split olt, #2 Cu 3 U olt, Machine, ½ x 5 12 V olt Machine, ¾ x 12 8 W Washer, ¾, SQ 8 X Washer, ¾ Double Coil 8 Y racket, Mounting, Terminator 1 Z Neutral Deadend 1 A Grounding Unit #2 Cu Terminator, 15kV, 750 Cu 3 C racket, Cable, 750 Cu 3 D Conduit, 5, Sch80 10 E Conduit, 5, Sch40 20 F racket, Standoff, 12 3 G end, 5, 36 Rad 1 H Iron Hanger (ft) 6 I olt, Dble Aiming, ⅝ x 18 3 J Nut Jam, ⅝ 3 K Strap, Conduit, 5 3 L Cable, UG, 15kV kcmil Cu 35 6 REV. NO: NEW REV. DATE: 03/10/16

25 Primary Metering For Customer U.G., 3 Phase 4W 4 or 12 kv, SM 5 Fusing, 400 Amp Sheet 4 of 4 NORMALLY PROVIDED Y AMEREN Stnd. / Stk. No. Description AA Mounting, Primary Metering ox, Secondary Connection 1 CC Screw, Cap, 3/8 x 2 2 DD Conduit, Flex, 1 20 EE Staple FF MTR SHOP Wire Pack of 10 # 12, Color Coded (ft.) GG MTR SHOP Instrument Current Transformer HH MTR SHOP Instrument Potential Transformer 3 II Fitting 2 JJ Socket, Meter, 600V, 3 Phase, 4 Wire 1 KK Screw, Wood, #14, 3, Rnd. 4 MM Connector, Split olt, ronze, #2 or #4Cu 1 NN Wire, #6 Cu Poly Covered 5 OO 286 Install Primary Metering 1 PP Cord, Hrd Srv, 14/2 Cu, 600V 20 QQ Conduit, PVC Split, 2 x10 1 RR Iron Hanger, Galv., 3/4 wide (ft.) 2 UU Guard, Clam Shell, Wildlife 3 SOURCE A C N PT 1 PT 2 PT 3 CT 1 CT 2 CT 3 A C N LOAD 4 WIRE REV. NO: NEW REV. DATE: 03/10/16

26 Primary Metering, 3 Phase 3W & 4W 4 or 12 kv ** Sheet 1 of 4 MISSOURI ONLY MM 6 CUSTOMER PRIMARY LL L, O H AMEREN PRIMARY F,G M C J U T S C 4 MIN. 6 MAX. D 20 A 6 J,K 2 QQ QQ Q E, O V 5 P (C.T.S AOVE P.T.S) AA R NN,OO,PP 4 WIRE A A J,K CC 3 WIRE A A DD 12 MAX. 8 MIN. 18 MIN. SWITCH ROD EE,FF 15 o 3 N GG HH, II CONDUIT GROUND C OF METER 3 MIN. 5 6 MAX. REV. NO: 12 REV. DATE: 09/23/11

27 Primary Metering, 3 Phase 3W & 4W 4 or 12 kv ** Sheet 2 of 4 MISSOURI ONLY 1. When meter pole is on customer property, switch shall be provided one span before. 2. Secondary wire lead on meter cluster is 15 ft. standard length. For tall poles, special order meter cluster with longer lead to meet maximum height requirement for connection box. 3. Switch is to be operated with rotating or reciprocating control rod accessible from ground level. Control rod to be furnished with insulating section above handle. NORMALLY PROVIDED Y CUSTOMER Stnd. /Stk. No. Description ** A Switch, 15 kv, Group Operated Wire, #2 Cu, Covered, S.D. (ft.) C PG* Clamp, Parallel Groove ( See Std ) D Crossarm, E Switch, 15 kv, 100A Fused Switch, 15 kv, 200 Amp. Fused 3 3 F Lug, Compression, # 2 Cu G olt, Everdur, 1/2 x 2 1/ H Clamp, Hot Line J olt, Machine, 5/8 x 12 Galv K Washer, Square Galv L Arrester, Lightning, (3kV or 10kV) M Wire, #6 Cu, are, S.D. (ft.) N Grounding Unit O racket, Crossarm Mounting P Connector, Split olt, # 2 Cu Q Arm, Training, Fiberglass R Connecter, Cable to Flat, #6 2/ S XXX Pole ( Size & Class T..D. ) T Deadend, Double, 12kV U Crossarm,10 Double V Cover, Cutout, 100 Amp Cover, Cutout, 200 Amp 3 3 REV. NO: 12 REV. DATE: 09/23/11

28 Primary Metering, 3 Phase 3W & 4W 4 or 12 kv ** Sheet 3 of 4 NORMALLY PROVIDED Y AMEREN Stnd. / Stk. No. Description ** AA Mounting, Primary Metering ox, Secondary Connection CC Screw, Cap, 3/8 x DD Conduit, Flex, EE Staple FF MTR SHOP Wire Pack of 10 # 12, Color Coded (ft.) GG Fitting HH Socket, Meter, 600V, 3 Phase, 4 Wire Socket, Meter, 600V, 3 Phase, 3 Wire 1 1 II Screw, Wood, #14, 3, Rnd LL DEC*W Clamp D.E MM PG* Clamp P.G. (Neutral) ( See Std ) 1 1 NN Cord Hrd Srv 14/2 Cu 600V OO Conduit PVC Split 2 x PP Iron, Hanger, Galv., 3/4 wide (ft) QQ Guard, Clam shell, Wildlife Install Primary Metering REV. NO: 12 REV. DATE: 09/23/11

29 Primary Metering, 3 Phase 3W & 4W 4 or 12 kv ** Sheet 4 of 4 SOURCE C A SOURCE C A PT 1 CT 1 PT 1 CT 1 POLARITY MARK PT 2 CT 2 PT 2 CT 2 PT 3 CT 3 CA LOAD LOAD 3 WIRE 4 WIRE REV. NO: 12 REV. DATE: 09/23/11

30 Primary Metering For Customer UG 3 Phase 3 Wire 4 thru 15 kv ** Sheet 1 of 4 ILLINOIS ONLY E T G Source KK HH O, P CC, CC, L 3 0 H SS AA, FF, NN S GG, TT C, D AAA M R, Q, U Q C.T , EEE 6 0 CCC QQ DDD, FFF,HHH, III F, I, J V, W, X, Y DDD, GGG S A Min 8 to Lowest racket MIN. 5 6 MAX. K Grounding DCS REV. NO: 7 REV. DATE: 12/15/15

31 Primary Metering For Customer UG 3 Phase 3 Wire 4 thru 15 kv ** Sheet 2 of 4 ILLINOIS ONLY NOTES: 1. Grounding all instrument transformers, arresters, and mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain a minimum of 40 between the energized conductors and the pole on climbing side of the pole as per DCS ; maintain a minimum of 19 between the energized lateral and vertical conductors and the pole on non climbing side of the pole as per DCS If disconnect switches are required, the switch may be installed on adjacent poles. 5. For wire color coding on PT and CT secondaries, refer to system metering drawings. 6. If metering structure is located within a substation, the metering and arresters ground wires must be connected to the substation ground mat. 7. To enhance the protection of the metering equipment ensure that the tap for the phase conductor to the arrester is as short as possible in distance. Install arresters to load side on the adjacent pole if multiple span exposure on the load side exists and arresters may be installed on adjacent poles. 8. Riser conduit cover is for 2 4 conduit. Stnd. / Stk. No. Description(Provided and Installed by Ameren IL) ** A Meter Socket, 600V, Pre wired 8 Terminal Instrument Rated Wire, #2 Cu, Covered, S.D C ox, Secondary Connection 1 1 D Screw, Cap, 3/8 x F Conduit, Flex, I Staple 3 3 J Fitting 2 2 K Ground Unit Ground Coil 1 1 E FG Dead Arm 1 1 G Dbl Deadend on Pole with FG Extension 1 1 H Dbl Deadend on FG Arm without FG Extension 2 2 L Single Wood Arm 10 with races 1 1 M Switch, 15kV, 100 Amp Switch, 15kV, 200 Amp O Arrester, Lightning 3kV/2.55kV MCOV Arrester, Lightning 9kV/7.65kV MCOV 3 3 P racket, DL Sided NEMA Crossarm Mounting, Arrester and Fuse Cutout 3 3 Q kV Vice Top Insulator 1 1 R Adapter Pin for Vice Top Insulator 1 1 U Mach olt 20 x ⅝ 1 1 S Split olt #6 & 7#10 CW 4 T 02 Pole 1 1 V Eyelet, ¾ 1 W SDEA*W Deadend, Automatic, Secondary, DCS X olt, Machine ¾ x Y Washer, SQ, ¾ 1 1 REV. NO: 7 REV. DATE: 12/15/15

32 Primary Metering For Customer UG 3 Phase 3 Wire 4 thru 15 kv ** Sheet 3 of 4 ILLINOIS ONLY Stnd. / Stk. No. Description (Provided and Installed by Ameren IL) ** AA Mounting, Primary Metering Wire, #6 Cu, Covered, S.D. ( Ft. ) CC Clamp, Hot Line 3 DD MTR SHOP Wire Pack of 10 #12, Color Coded ( Ft. ) 25 FF MTR SHOP Current Transformer, 4 kv or 12 kv 2 GG MTR SHOP Potential Transformer, 4 kv or 12 kv 2 HH PG* Clamp, Parallel Groove (See DCS ) 6 JJ PG* Clamp, Parallel Groove (Neutral) (See DCS ) 2 KK DEC*W Clamp, D.E. DCS MM Connector, Cable to Flat, #6 2/0 4 4 NN Lug, Compression, #2 Cu. 6 6 QQ Cover, riser Conduit for 2 to SS Cover Cutout, 100A Cover Cutout, 200A 3 TT Guard, Clam Shell, Wildlife 3 3 AAA racket, 36, Mounting Terminators &Lightning Arresters racket, Cable 3 3 CCC Cable, 15kV # Cable, 15kV 4/0 35 DDD racket, Conduit Standoff, EEE Terminator, 15kV, # Terminator. 15kV. 4/0 3 FFF Nut ⅝ Jam 3 3 GGG Conduit, 4 Sch 80 (ft) HHH Strap Conduit III olt, Double, Arming ⅝ x Install Primary Metering 1 1 REV. NO: 7 REV. DATE: 12/15/15

33 Primary Metering For Customer UG 3 Phase 3 Wire 4 thru 15 kv ** Sheet 4 of 4 SOURCE A C PT 1 PT A A CT 1 CT 2 A C LOAD 3 WIRE REV. NO: 7 REV. DATE: 12/15/15

34 Primary Metering, 3 Phase 4 Wire 4 thru 15 kv ** Sheet 1 of 3 E T 4 G 1 6 ILLINOIS ONLY Load H Source HH 1 0 O, P, CC R, Q, U TT AA, GG F, I, J FF L Q M Tape all ungrnd. primary potential transf. terminals C.T. JJ, OO, PP P.T. SS 18 Min C 18 Min Conduit J A 3 0 MIN. 5 6 MAX. K Grounding DCS Grounding all instrument transformers, arresters, and mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain a minimum of 40 between the energized conductors and the pole on climbing side of the pole as per DCS ; maintain a minimum of 19 between the energized lateral and vertical conductors and the pole on non climbing side of the pole as per DCS If disconnect switches are required, the switch may be installed on adjacent poles. 5. For wire color coding on PT and CT secondaries, refer to system metering drawings. 6. If metering structure is located within a substation, the metering and arresters ground wires must be connected to the substation ground mat. 7. To enhance the protection of the metering equipment ensure that the tap for the phase conductor to the arrester is as short as possible in distance. Install arresters to load side on the adjacent pole if multiple span exposure on the load side exists and arresters may be installed on adjacent poles. REV. NO: 7 REV. DATE: 12/15/15

35 Primary Metering, 3 Phase 4 Wire 4 thru 15 kv ** Sheet 2 of 3 Stnd. / Stk. No. ILLINOIS ONLY Description(Provided and Installed by Ameren IL) ** A Meter Socket, 600V, Pre wired 13 Terminal Instrument Rated Wire, #2 Cu, Covered, S.D C ox, Secondary Connection 1 1 D Screw, Cap, 3/8 x F Conduit, Flex, I Staple 3 3 J Fitting 2 2 K Ground Unit 1 1 E FG Dead Arm 1 1 G Dbl Deadend on Pole with FG Extension 1 1 H Dbl Deadend on FG Arm without FG Extension 2 2 L Single Wood Arm 10 with races 1 1 M Switch, 15kV, 100 Amp Switch, 15kV, 200 Amp 3 N PG* Clamp, Parallel Groove DCS O Arrester, Lightning 3kV/2.55kV MCOV Arrester, Lightning 10kV/8.4kV MCOV 3 3 P racket, DL Sided NEMA Crossarm Mounting, Arrester and Fuse Cutout 3 3 Q kV Vice Top Insulator 3 3 R Adapter Pin for Vice Top Insulator 3 3 U Mach olt 12 x ⅝ 3 T 02 Pole 1 1 REV. NO: 7 REV. DATE: 12/15/15

36 Primary Metering, 3 Phase 4 Wire 4 thru 15 kv ** Sheet 3 of 3 Stnd. / Stk. No. ILLINOIS ONLY Description (Provided and Installed by Ameren IL) ** AA Mounting, Primary Metering Wire, #6 Cu, Covered, S.D. ( Ft. ) CC Clamp, Hot Line 3 DD MTR SHOP Wire Pack of 10 #12, Color Coded ( Ft. ) 25 FF MTR SHOP Current Transformer, 4 kv or 12 kv 3 GG MTR SHOP Potential Transformer, 4 kv or 12 kv 3 HH PG* Clamp, Parallel Groove (See DCS ) 6 JJ PG* Clamp, Parallel Groove (Neutral) (See DCS ) 2 KK DEC*W Clamp, D.E. DCS LL Deadend, Preformed Sec. Spool 1 1 MM Connector, Cable to Flat, #6 2/0 6 6 NN Lug, Compression, #2 Cu. 6 6 OO Secondary PP ST** Performed Tie, Side Ties DCS SS Cover, Cutout, 100A Cover, Cutout, 200A 3 TT Guard, Clam Shell, Wildlife Install Primary Metering 1 1 SOURCE N CA PT 1 CT 1 PT 2 CT A A PT 3 CT 3 LOAD 4 WIRE REV. NO: 7 REV. DATE: 12/15/15

37 Primary Metering For Customer UG 3 Phase 4 Wire 4 thru 15 kv ** Sheet 1 of 4 E T ILLINOIS ONLY H G Source KK HH O, P AA, FF, NN, EEE L S, GG, TT C AAA M O O TT ÉÉ ÉÉ P.T. C.T. Load SS CC 9 CCC 8 QQ F CCC 6 0 DDD, FFF, HHH, III V DDD, GGG S A 3 0 MIN. 5 6 MAX. Min 8 to Lowest racket 6 RACKET LESS THAN 8 AOVE THE GROUND MUST E ONDED. K Grounding DCS REV. NO: 8 REV. DATE: 06/22/17

38 Primary Metering For Customer UG 3 Phase 4 Wire 4 thru 15 kv ** Sheet 2 of 4 ILLINOIS ONLY 1. Grounding all instrument transformers, arresters, and mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain a minimum of 40 between the energized conductors and the pole on climbing side of the pole as per DCS ; maintain a minimum of 19 between the energized lateral and vertical conductors and the pole on non climbing side of the pole as per DCS If disconnect switches are required, the switch may be installed on adjacent poles. 5. For wire color coding on PT and CT secondaries, refer to system metering drawings. 6. If metering structure is located within a substation, the metering and arresters ground wires must be connected to the substation ground mat. 7. To enhance the protection of the metering equipment ensure that the tap for the phase conductor to the arrester is as short as possible in distance. Install arresters to load side on the adjacent pole if multiple span exposure on the load side exists and arresters may be installed on adjacent poles. 8. If water entering the duct becomes a problem, the top of duct can be sealed with polyurethane expanding form, stock # Expanding form requires a dispensing gun, stock # Material is provided by customer. Stnd. / Stk. No. Description(Provided and Installed by Ameren IL) ** A Meter Socket, 600V, Pre wired 13 Terminal Instrument Rated Wire, #2 Cu, Covered, S.D C ox, Secondary Connection 1 1 D Screw, Cap, 3/8 x F Conduit, Flex, I Staple 3 3 J Fitting 2 2 K Ground Unit, 7#10 CW, Ground Coil 1 1 E FG Dead Arm 1 1 G Deadend on Pole with FG Extension 1 1 H Deadend without FG Extension on FG Arm 2 2 L Single Wood Arm 10 with races 1 1 M Switch, 15kV, 100 Amp Switch, 15kV, 200 Amp O Arrester, Lightning 3kV/2.55kV MCOV Arrester, Lightning 9kV/7.65kV MCOV 3 3 P racket, DL Sided NEMA Crossarm Mounting, Arrester and Fuse Cutout 3 3 S Split olt 4 T 02 Pole 1 V Neutral Deadend 1 1 REV. NO: 8 REV. DATE: 06/22/17

39 Primary Metering For Customer UG 3 Phase 4 Wire 4 thru 15 kv ** Sheet 3 of 4 Stnd. / Stk. No. ILLINOIS ONLY Description (Provided and Installed by Ameren IL) ** AA Mounting, Primary Metering Wire, #6 Cu, Covered, S.D. ( Ft. ) CC Clamp, Hot Line 3 DD MTR SHOP Wire Pack of 10 #12, Color Coded ( Ft. ) EE Connector, Split olt, #2 Cu 2 FF MTR SHOP Current Transformer, 4 kv or 12 kv 3 GG MTR SHOP Potential Transformer, 4 kv or 12 kv 3 HH PG* Clamp, Parallel Groove (See DCS ) 6 JJ PG* Clamp, Parallel Groove (Neutral) (See DCS ) 2 KK DEC*W Clamp, D.E. DCS MM Connector, Cable to Flat, #6 2/0 6 6 NN Lug, Compression, #2 Cu. 6 6 OO Secondary Clevis 1 PP ST** Performed Tie, Side Ties DCS QQ Coupling, ell End, SS Cover, Cutout, 100A Cover, Cutout, 200A 3 TT Guard, Clam Shell, Wildlife 6 6 AAA racket, 36, Mounting Terminators &Lightning Arresters racket, Cable 3 3 CCC UG Cable, Provided by Customer per NEC 35 UG Cable, Provided by Customer per NEC 35 DDD racket, Conduit Standoff, EEE Terminator, Provided and installed by Customer 3 Terminator. Provided and installed by Customer 3 FFF Nut ⅝ Jam 3 3 GGG Conduit, 4 Sch 80 (ft) HHH Strap Conduit III olt, Double, Arming ⅝ x Install Primary Metering 1 1 REV. NO: 8 REV. DATE: 06/22/17

40 Primary Metering For Customer UG 3 Phase 4 Wire 4 thru 15 kv ** Sheet 4 of 4 SOURCE N CA PT 1 CT 1 PT 2 CT A A PT 3 CT 3 LOAD 4 WIRE REV. NO: 8 REV. DATE: 06/22/17

41 Primary Metering for Customer U.G. 3 Phase 4 Wire 25kV Sheet 1 of MISSOURI ONLY G KK KK LL,MM U T W HH OO X PP 4 0 RACKET DETAIL C,AA,GG C,CC,C DD MM,WW TT,UU 3 0 QQ VV SWITCH ROD G A1 G 7 0 G EEE TTT CONDUITS GROUND TTT SECTION XX 36 0 MAX. RR,C SSS,RRR,QQQ GGG DO NOT GROUND RACKETS G,C III,JJJ RR,C 4 12 MAX 8 MIN. 22 MAX H 7 0 #6 CU. WIRE CONNECT TO GROUND WIRE JJ WASHERS O GUARD NUTSQ DETAIL OF GUARD ONDING H OLT HEAD ON CALE SIDE OF GUARD A K P X MMM,LLL D RR,C,F III X NNN H CL OF WINDOW 3 0 MIN. 5 6 MAX. E,N,O J II,OOO,PPP TO SWITCH GROUND AAA,,CCC ENG:WYW REV. NO: 1 REV. DATE: 09/23/11

42 Primary Metering for Customer U.G. 3 Phase 4 Wire 25kV Sheet 2 of 4 NOTES: 1. When meter pole is on customer property, a group operate switch shall be provided one span before. 2. Secondary wire lead on meter cluster is 15ft. standard length. For tall poles, special order meter cluster with longer lead to meet max. height requirement for connection box. 3. Terminator mounting bracket is Aluma Form (T3CA 60 CHL). NORMALLY PROVIDED Y CUSTOMER Stnd. / Stk. No. Materials Description A Termination, 35kV, 1/0 750 kcmil olt, Machine 5/8 x 20 3 C Washer, Square, 5/8 x 2 1/4 23 D Arrester, Lightning, 27 kv 3 E Screw, Lag 3/8 x 3 6 F racket, Terminator 1 G Wire, Cu. #2., Covered S.D. (ft) 50 H Clamp, Hot Line, # I olt, Machine, 3/8 x 1 1/2 1 J Grounding Unit 1 K racket, Cable Support 3 L Strap, Poly., 2 x 36 1 M Iron Hanger 8 N Conduit, Plastic, 5 Split 30 O Guard, Conduit 5 1 P Cable, 35 kv, 3 1/0 AL 35 Q Nut, Hex, 3/8 2 R 277 Install Cable Up Pole 1 S Switch, 35 kv, 3 1/0 AL 1 T Insulator, Line Post 3 U Crossarm, 4 x 6 x W Eyelet 5/8 2 X race, Wood Heel, Y olt, Machine, 5/8 x 2 2 Z Washer, Lock, 5/8 2 AA olt, Machine, 5/8 x olt, Machine, 5/8 x 10 1 CC olt, Spacer, 5/8 x 20 2 DD Eyenut, 5/8 3 FF Eyenut, 3/4 3 GG Plate, Heel race, 13 3/8 to 19 2 HH Insulator, Susp., 34 kv 3 ENG:WYW REV. NO: 1 REV. DATE: 09/23/11

43 Primary Metering for Customer U.G. 3 Phase 4 Wire 25kV Sheet 3 of 4 Stnd./Stk. No. Materials Description JJ Washer, 3/8 Galv. 2 KK Lug, Comp., 1/0 Cu. 12 LL olt, Machine, 1/2 x 8 12 MM Washer, Round, 1/2 14 NN Kit 1 OO DEC*W Deadend 3 PP Crossarm, 3 1/2 x 4 1/2 x QQ race, 60 V 1 RR olt, Machine, 5/8 x 14 6 TT olt, Machine, 1/2 x 6 2 UU Washer, Round, 1/2 1 VV olt, Machine, 5/8 x 12 1 WW olt, Machine, 1/2 x 5 12 XX Mounting, Fuse, 30A, SM 5 3 YY SM 5 Refill (Sized by Engr.) 3 ZZ end, 5, 36 Rad. 1 A Wire, #6 Cu., are S.D. (ft.) 40 NORMALLY PROVIDED Y AMEREN Stnd./Stk. No. Materials Description AAA Step, Pole 5/8 x Tube, Concrete 14 Dia. CCC Concrete, 4SK EEE Connector, Split olt #4 4/0 Str. 3 FFF Clamp, Hot Line 6 GGG Connecctor, Cable to Flat, #6 2/0 6 HHH Mounting, 25 kv Pri Metering Cluster 1 III ox, Secondary Connection 1 JJJ Screw, Cap, 3/8 x 2 2 KKK Staple 3 LLL MTR SHOP Wire Pack of 10 #12, Color Coded (ft.) 25 MMM Conduit, Flex, 1 20 NNN Fitting 2 OOO Socket, Meter, 600V, 3 Phase, 4 Wire 1 PPP Screw, Wood, #14, 3, Rnd 4 QQQ Cord, Hrd Srv, 14/2 Cu, 600V 20 RRR Conduit, PVC Split 1 SSS Iron Hanger, Galv., 3/4 wide (ft.) 2 ENG:WYW REV. NO: 1 REV. DATE: 09/23/11

44 Primary Metering for Customer U.G. 3 Phase 4 Wire 25kV Sheet 4 of 4 * TTT Guard, Clam shell, Wildlife Install Primary Metering 1 SOURCE A C N PT 1 PT 2 PT 3 CT 1 CT 2 CT 3 A C N LOAD 4 WIRE ENG:WYW REV. NO: 1 REV. DATE: 09/23/11

45 Primary Metering 34.5kV, 3 Phase, 3 Wire Missouri Only Sheet 1 of 3 6 LOAD STATIC C D SOURCE VV D VV E D EE ZZ A LL ZZ 6 4 F J H I 2 0 VV EE H 1 TT H 2 H 1 XX LL TT VV H 2 H1 H 2 H 1 EE JJ H WW, AAA D G TT JJ H2 VV H1 EE G ZZ YY KK MM,NN,QQ,PP,FF YY KK AA,,CC,DD GG HH OO,SS LOAD SIDE A C C L OF WINDOW II RR H2 H 1 H 2 H 2 H 1 H2 CT 2 H1 PT 1 PT 2 H1 3 0 MIN. 5 6 MAX. M SOURCE SIDE L METERING TRANSFORMER PRIMARY CONNECTIONS REV. NO: 01 REV. DATE: 11/07/16

46 Primary Metering 34.5kV, 3 Phase, 3 Wire Missouri Only Sheet 2 of 3 LOAD SIDE H 2 H 2 H 2 H 2 H H 1 1 H 1 H 1 NOTES: SOURCE SIDE 1. Ground all instrument transformers, arresters, and aluminum mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain a minimum of 23 clearance between 34kV phases or phase to ground. 4. Maintain minimum of 4 clearances between the aluminum mounting platform and the crossarm. 5. Maintain a minimum of 40 between the energized conductors and the pole on climbing side of the pole; maintain a minimum of 30 between the energized lateral and vertical conductors and the pole on non climbing side of the pole. Reference from NESC, rule 239E. 6. Maintain a minimum of 40 between any part of the aluminum mounting platform and conductors of 4 or 12kV underbuilds. 7. If disconnect switches are required, the switches may be installed on adjacent poles. 8. For wire color coding on PT and CT secondary s, refer to system meter drawings. 9. If metering structure is located within a substation, the metering and LA ground wires must be connected to the substation ground mat. 10. To enhance the protection of the metering equipment ensure that the tap from the phase conductor to the arrester is as short as possible in distance and use only intermediate class lightning arresters. In stall arresters to load side if multiple span exposure on the load side exists and the arresters may be installed on adjacent poles. REV. NO: 01 REV. DATE: 11/07/16

47 Primary Metering 34.5kV, 3 Phase, 3 Wire Missouri Only Sheet 3 of 3 Stnd. / Stk. No. Description Provided and Installed y Customer Qty. A Pole Static Wire Attachment C Clamp, Guy Wire, ½ (used with 12/7 ACSR Static) Clamp, Parallel Groove (used with 1/0 AAAC Static) D DEC*W Clamp, Deadend DCS E Double Deadend Loop 34kV Top Phase F TCA*W Clamp, Trunnion DCS G PG** Clamp, Parallel Grove DCS H Double Deadend Loop 34kV on Fiberglass Arm 2 I Crossarm, Deadend, F/G 10 1 J kV Horizontal Line Post, Polymer, Double Insulators K olt, DA, ¾ x olt, DA, ¾ x 18 2 L Grounding Unit New Pole 1 M Clamp, PG, #6 1/0 to #6 1/0 2 Stnd. / Stk. No. Description Provided and Installed by Ameren Missouri Qty. AA Arrester, 24.4kv MCOV, 30kV Duty Cycle, Intermediate, ase Mount olt Mach ½ Dia x 2 ½ L 9 CC Washer RD ½ 18 DD Washer, Lock DL Coil, ½ 9 EE STC*W Clamp, Stirrup DCS FF olt/rd Washer/Lock Washer/Nuts Set ⅝ x 3 Stainless 16 GG Junction ox 1 HH Conduit, Flex, 1, Non Metallic ft 20 II Connector, 1 Conduit 2 JJ Connector, 2 olt, 2AWG Sol 350 MCM Str. ronze 8 KK Wire, #6 Cu Covered SD ft 20 LL Wire #2 Cu Covered (ft) 20 MM Mounting Assembly for 2CT s & 2PT s 1 NN olt, Mach, ¾ x 26 OO Clamp, Conduit, 1 Two Hole Steel Strap PP Washer Curved ¾ QQ Washer Lock DL Coil ¾ RR Meter Socket, Pre Wired 8 Terminal, Instrument Rated, Missouri SS Screw, Lag, ¼ x 2 Galv. 10 TT PLW*W Lead Wire, PH (ft) DCS UU Meter Shop Wire Pack of 10 ea. #12 Solid Cu Wires of Individual VV PG** Clamp, Parallel Grove Std WW Current Transformer, 34kV XX Potential Transformer, 34kV 2 YY Clamp, PG, #6 1/0 to #6 1/0 2 ZZ Wire, #4 Cu Covered (ft) 12 AAA Wildlife Cover for Ritz 34kV CT Install Primary Metering 1 REV. NO: 01 REV. DATE: 11/07/16

48 Primary Metering 34.5kV, 3 Phase, 4 Wire Missouri Only (Limited Use) Sheet 1 of 3 6 SOURCE C RAKE D LOAD A 6 0 D STATIC E D H M 6 4 G K,F EE EE 2 0 E,F 4 0 M G O N EE O G 2 0 I O O H HH HH 1 H H 1 H 2 2 H 1 H GG H1 H 2 CC, KK DD I,F GG P,Q,R,S,T II W U CL OF WINDOW 3 0 MIN. 5 6 MAX. X,JJ V Z AA LOAD SIDE A C PT 1 PT 2 PT3 H2 H2 H2 H1 H1 H1 H1 H1 H1 CT 1 CT2 CT 3 SOURCE SIDE N METERING TRANSFORMER PRIMARY CONNECTIONS ENG:WYW REV. NO: 01 REV. DATE: 11/07/16

49 Primary Metering 34.5kV, 3 Phase, 4 Wire Missouri Only (Limited Use) Sheet 2 of 3 LOAD SIDE NOTES: SOURCE SIDE METERING TRANSFORMER PRIMARY CONNECTIONS 1. Ground all instrument transformers, arrestors, and aluminum mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain a minimum of 23 clearance between 34kV phases or phase to ground. 4. Maintain minimum of 4 clearance between the aluminum mounting platform and the crossarm. 5. Maintain a minimum of 40 between the energized conductors and the pole on climbing side of the pole; maintain a minimum of 19 between the energized lateral and vertical conductors and the pole on non climbing side of the pole. Reference from NESC, Rule 239E. 6. Maintain a minimum of 40 between any part of the aluminum mounting platform and conductors of 4 or 12 kv underbuild. 7. If disconnect switches are required, they may be installed on adjacent poles. 8. For wire color coding on PT and CT secondaries, refer to system meter drawings. 9. If metering structure is located within a substation, the metering and L.A. ground wires must be connected to the substation ground mat. 10. To enhance the protection of the metering equipment ensure that the tap for the phase conductor to the arrester is as short as possible in distance and use only intermediate class lightning arresters. Install arresters to load side on the adjacent pole if multiple span exposure on the load side exists and arresters may be installed on adjacent poles. ENG:WYW REV. NO: 01 REV. DATE: 11/07/16

50 Primary Metering 34.5kV, 3 Phase, 4 Wire Missouri Only (Limited Use) Sheet 3 of 3 Stnd. / Stk. No. Description Installed and Provided y AmerenMissouri A Pole Static Wire Attachment C Clamp, Guy Wire, ½ (used with 12/7 ACSR Static) Clamp, Parallel Groove (used with 1/0 AAAC Static) D DEC*W Clamp, Deadend DCS E Double Deadend Loop 34kV Top Phase F TC*W Clamp, Trunnion DCS G PG** Clamp, Parallel Grove DCS H Double Deadend 34kV on Fiberglass Arm 2 I Horizontal Single Post Insulator,34kV J olt Mach ¾ x olt Mach ¾ x 16 2 K Horizontal Double Post Insulators,34kV L olt Mach ¾ x olt Mach ¾ x 18 2 M Crossarm, Deadend, F/G 10, 2 N Arrester, 24.4kV MCOV, 30kV Duty Cycle, NEMA racket Mount O STC*W Clamp, Stirrup DCS P Mounting Assembly, 3CT s & 3 PT s 1 Q olt, Mach, ¾ x 26 5 R Washer Curved ¾ 10 S Washer Lock DL, Coil, ¾ 5 T olt/rd Washer/Lock Washer/Nuts Set ⅝ x 3 Stainless 24 U Junction ox 1 V Connector, 1 Conduit 2 W Conduit, Flex, 1 Non Metallic (ft) 20 X Clamp, Conduit, 1 Two Hole Steel Strap Y Meter Shop Wire Pack of 10 ea. #12 Solid Cu Wires of Individual Colors Z Meter Socket, 600V, Pre Wired 13 Terminal, Instrument Rated, Missouri AA Grounding Unit New Pole Clamp, PG, #6 1/0 to #6 1/0 CC Current Transformer 69kV DD Potential Transformer 69kV EE PLW*W Lead Wire, PH (ft) DCS GG Connector, 2 olt, 2 Awg SD 350 MCM Str. ronze 9 HH Wire #2 Cu Covered (ft) 30 II Wire #6 Cu Covered (ft) 15 JJ Screw, lag, ¼ x 2 Galv. 10 KK Wildlife Cover for Ritz 34kV CT Install Primary Metering ENG:WYW REV. NO: 01 REV. DATE: 11/07/16

51 Primary Metering 34.5kV, 3 Phase, 3 Wire Illinois Only Sheet 1 of 3 6 C D LOAD SOURCE A STATIC 6 0 K E D V 4 QQ 6 4 OO F L QQ F I N 2 0 D OO I M 2 0 K V H 1 MM H 2 LL OO NN K OO K V H 1 KK LL H MM JJ K LL K H2 H2 LL H1 H1 V K K QQ Q W,X,Y,Z,AA II PP II Q,S,T,U DD EE,RR LOAD SIDE A C CC C L OF WINDOW GG H2 H 1 H 2 H 2 H 1 H2 CT 2 H1 PT 1 PT 2 H1 3 0 MIN. 5 6 MAX. II HH SOURCE SIDE METERING TRANSFORMER PRIMARY CONNECTIONS HH REV. NO: NEW REV. DATE: 08/14/14

52 Primary Metering 34.5kV, 3 Phase, 3 Wire Illinois Only Sheet 2 of 3 LOAD SIDE H 2 H 2 H 2 H 2 H H 1 1 H 1 H 1 NOTES: SOURCE SIDE 1. Ground all instrument transformers, arresters, and mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain a minimum of 23 clearance between 34kV phases or phase to ground. 4. Maintain minimum of 6 clearance between the aluminum mounting platform and the crossarm. 5. Maintain a minimum of 40 between the energized conductors and the pole on climbing side of the pole; maintain a minimum of 30 between the energized lateral and vertical conductors and the pole on non climbing side of the pole. Reference from NESC, Rule 239E. 6. Maintain a minimum of 40 between any part of the aluminum mounting platform and conductors of 4 or 12 kv underbuilt. 7. If disconnect switches are required, they may be installed on adjacent poles. 8. For wire color coding on PT and CT secondaries, refer to system meter drawings. 9. If metering structure is located within a substation, the metering and L.A. ground wires must be connected to the substation ground mat. 10. To enhance the protection of the metering equipment ensure that the tap for the phase conductor to the arrester is as short as possible in distance and use only intermediate class lightning arresters. Install arresters to load side on the adjacent pole if multiple span exposure on the load side exists and arresters may be installed on adjacent poles. REV. NO: NEW REV. DATE: 08/14/14

53 Primary Metering 34.5kV, 3 Phase, 3 Wire Illinois Only Sheet 3 of 3 Stnd. / Stk. No. Description Provided and Installed y AmerenIllinois A Pole Static, Wire Attachment C Clamp, Guy Wire, ½ (used with 12/7 ACSR Static) Clamp, Parallel Groove (used with 1/0 AAAC Static) D DEC*W Clamp, Deadend DCS E Double Deadend Loop 34kV Top Phase F TCA*W Clamp, Trunnion 3 I Double Deadend Loop 34kV on Fiberglass Arm K PG** Clamp, Parallel Grove DCS N Crossarm, Deadend, F/G 10 1 L kV Horizontal Line Post, Polymer, Double Insulator M olt, DA, ¾ x olt, DA, ¾ x 18 2 Q Arrester, 24.4kv MCOV, 30kV Duty Cycle, Intermediate, ase Mount S olt Mach ½ Dia x 2 ½ L 9 T Washer RD ½ 18 U Washer, Lock DL Coil, ½ V STC*W Clamp, Stirrup DCS W Mounting Assembly, 2CT s & 2PT s 1 X olt, Mach, ¾ x 26 5 Y Washer Curved ¾ 10 Z Washer Lock DL, Coil, ¾ 5 AA olt/rd Washer/Lock Washer/Nuts Set ⅝ x 3 Stainless Junction ox 1 CC Connector, 1 Conduit 2 DD Conduit, Flex, 1 Non Metallic (ft) 20 EE Clamp, Conduit, 1 Two Hole Steel Strap FF Meter Shop Wire Pack of 10 ea. #12 Solid Cu Wires of Individual Colors Contact Metering Department GG Meter Socket, Pre Wired, 8 Terminal, Instrument Rated, Illinois 1 HH Grounding Unit New Pole 1 II Clamp, PG, #6 1/0 to #6 1/0 JJ Current Transformer 34kV Contact Metering Dept. KK Potential Transformer 34kV Contact Metering Dept. LL PLW*W Lead Wire, PH (ft) DCS MM CL*W Lug, Connector 4 Hole DCS NN Connector, 2 olt, 2 Awg SD 350 MCM Str. ronze 4 OO Wire #2 Cu Covered (ft) 20 PP Wire #6 Cu Covered (ft) 20 QQ Wire, #4 Cu Covered (ft) 12 RR Screw, lag, ¼ x 2 Galv Install Primary Metering 1 3 REV. NO: NEW REV. DATE: 08/14/14

54 Primary Metering 34.5kV, 3 Phase, 4 Wire Illinois Only Sheet 1 of 3 C RAKE A SOURCE LOAD 6 STATIC 6 0 D E D H M G D L K F D EE 2 0 J M 4 0 EE N 6 6 EE EE O 2 0 O II O G G G O HH H 1 H 2 G HH H1 H 2 H1 G H H H 1 2 H 2 GG DD CC E,F FF I,F G EE P,Q,R,S,T X,JJ V U LOAD SIDE A C C L OF WINDOW 3 0 MIN. 5 6 MAX. W Z AA H2 H1 CT 1 PT 1 PT 2 H2 H1 H1 H1 CT2 H2 SOURCE SIDE H1 H1 CT 3 METERING TRANSFORMER PRIMARY CONNECTIONS PT3 N NOTE: The standards is limited to 3 phase, 4 wire, wye system. ENG:WYW REV. NEW REV. DATE: 08/14/14

55 Primary Metering 34.5kV, 3 Phase, 4 Wire Illinois Only Sheet 2 of 3 LOAD SIDE SOURCE SIDE METERING TRANSFORMER PRIMARY CONNECTIONS NOTES: 1. Ground all instrument transformers, arresters, and mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain a minimum of 23 clearance between 34kV phases or phase to ground. 4. Maintain minimum of 6 clearance between the aluminum mounting platform and the crossarm. 5. Maintain a minimum of 40 between the energized conductors and the pole on climbing side of the pole; maintain a minimum of 19 between the energized lateral and vertical conductors and the pole on non climbing side of the pole. Reference from NESC, Rule 239E. 6. Maintain a minimum of 40 between any part of the aluminum mounting platform and conductors of 4 or 12 kv underbuild. 7. If disconnect switches are required, they may be installed on adjacent poles. 8. For wire color coding on PT and CT secondaries, refer to system meter drawings. 9. If metering structure is located within a substation, the metering and L.A. ground wires must be connected to the substation ground mat. 10. To enhance the protection of the metering equipment ensure that the tap for the phase conductor to the arrester is as short as possible in distance and use only intermediate class lightning arresters. Install arresters to load side on the adjacent pole if multiple span exposure on the load side exists and arresters may be installed on adjacent poles. ENG:WYW REV. NEW REV. DATE: 08/14/14

56 Primary Metering 34.5kV, 3 Phase, 4 Wire Illinois Only Sheet 3 of 3 Stnd. / Stk. No. Description Provided and Install y AmerenIllinois A Pole Static Wire Attachment C Clamp, Guy Wire, ½ (used with 12/7 ACSR Static) Clamp, Parallel Groove (used with 1/0 AAAC Static) D DEC*W Clamp, Deadend DCS E Double Deadend Loop 34kV Top Phase F TC*W Clamp, Trunnion DCS G PG** Clamp, Parallel Grove DCS H Double Deadend 34kV on Fiberglass Arm 2 I Horizontal Single Post Insulator,34kV J olt Mach ¾ x olt Mach ¾ x 16 2 K Horizontal Double Post Insulators,34kV L olt Mach ¾ x olt Mach ¾ x 18 2 M Crossarm, Deadend, F/G 10, 2 N Arrester, 24.4kV MCOV, 30kV Duty Cycle, NEMA racket Mount O STC*W Clamp, Stirrup DCS P Mounting Assembly, 3CT s & 3 PT s 1 Q olt, Mach, ¾ x 26 5 R Washer Curved ¾ 10 S Washer Lock DL, Coil, ¾ 5 T olt/rd Washer/Lock Washer/Nuts Set ⅝ x 3 Stainless 24 U Junction ox 1 V Connector, 1 Conduit 2 W Conduit, Flex, 1 Non Metallic (ft) 20 X Clamp, Conduit, 1 Two Hole Steel Strap Y Meter Shop Wire Pack of 10 ea. #12 Solid Cu Wires of Individual Colors Z Meter Socket, 600V, Pre Wired 13 Terminal, Instrument Rated, Illinois AA Grounding Unit New Pole Clamp, PG, #6 1/0 to #6 1/0 CC Current Transformer 69kV DD Potential Transformer 69kV EE PLW*W Lead Wire, PH (ft) DCS FF CL*W Lug, Connector 4 Hole DCS GG Connector, 2 olt, 2 Awg SD 350 MCM Str. ronze 3 HH Wire #2 Cu Covered (ft) 30 II Wire #6 Cu Covered (ft) 15 JJ Screw, lag, ¼ x 2 Galv Install Primary Metering ENG:WYW REV. NEW REV. DATE: 08/14/14

57 Primary Metering 69kV, 3 Phase, 3 Wire (Missouri Only) Sheet 1 of 4 6 C A D LOAD STATIC SOURCE 6 F 6 0 D H EE 6 4 E F,J G I 2 0 D 2 0 EE VV H 1 TT TT VV AAA EE H 2 LL H 2 VV 9 0 H TT SS H 2 LL H 1 AAA WW H 1 H1 WW JJ,XX H 2 H 1 AA,, CC,DD MM,NN,PP,QQ,FF YY KK GG HH OO, ZZ II LOAD SIDE A C C L OF WINDOW RR CT 1 H2 H 1 H 2 H 2 H 1 H2 CT2 H1 PT 1 PT 2 H1 3 0 MIN. 5 6 MAX. M L SOURCE SIDE METERING TRANSFORMER PRIMARY CONNECTIONS REV. NO: NEW REV. DATE: 08/14/14

58 Primary Metering 69kV, 3 Phase, 3 Wire (Missouri Only) Sheet 2 of 4 LOAD SIDE H2 H2 H2 H2 H1 H1 H1 H1 SOURCE SIDE NOTES: 1. Ground all instrument transformers, arresters, and aluminum mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain a minimum of 38 clearance between 69kV phases or phase to ground. 4. Maintain minimum of 7 ½' clearance between the aluminum mounting platform and the crossarm. 5. Maintain a minimum of 54 between the energized conductors and the pole on climbing side of the pole; maintain a minimum of 18 between the energized conductors and the pole on non climbing side of the pole. Reference from NESC, rule 239E. 6. Maintain a minimum of 40 between any part of the aluminum mounting platform and conductors of 4 or 12kV underbuilds. 7. If disconnect switches are required, the switches may be installed on adjacent poles. 8. For wire color coding on PT and CT secondary s, refer to system meter drawings. 9. If metering structure is located with a substation, the metering and LA ground wires must be connected to the substation ground mat. 10. To enhance the protection of the metering equipment ensure that the tap from the phase conductor to the arrester is as short as possible in distance and use only intermediate class lightning arresters. Install arresters to load side if multiple span exposure on the load side exists and the arresters may be installed on adjacent poles. REV. NO: NEW REV. DATE: 08/14/14

59 Primary Metering 69kV, 3 Phase, 3 Wire (Missouri Only) Sheet 3 of 4 Stnd. / Stk. No. Description Normally Provided and Installed y A Pole Static, Wire Attachment C Clamp, Guy Wire, ½ (used with 12/7 ACSR Static) Clamp, Parallel Groove (used with 1/0 AAAC Static) D DEC*W Clamp, Deadend DCS E Double Deadend Loop 69kV Top Phase F TCA*W Clamp, Trunnion DCS G Double Deadend Loop 69kV on Fiberglass Arm H PG** Clamp, Parallel Grove DCS I Crossarm, Deadend, F/G 10 1 J kV Horizontal Line Post, Polymer, Double Insulators K olt, DA, ¾ x olt, DA, ¾ x 18 2 L Grounding Unit New Pole 1 M Clamp, PG, #6 1/0 to #6 1/0 2 Qty. Stnd. / Stk. No. Description Provided and Installed y Ameren Qty. AA Arrester, 48kV MCOV, 60kV Duty Cycle, Intermediate, ase Mount olt Mach ½ Dia x 2 ½ L w/nut 9 CC Washer RD ½ 18 DD Washer, Lock DL Coil, ½ EE STC*W Clamp, Stirrup DCS FF olt/rd Washer/Lock Washer/Nuts Set ⅝ x 3 Stainless GG Junction ox 1 HH Conduit, Flex, 1, Non Metallic (Ft) 20 II Connector, 1 Conduit 2 JJ Connector, 2 olt, 2AWG Sol 350 MCM Str. ronze 4 KK Wire, #6 Cu Covered SD (Ft) 20 LL Wire #2 Cu Covered (Ft) 20 AAA Wire #4 Cu Covered SD (Ft) 12 MM Mounting Assembly for 2CT s & 2PT s 1 NN olt, Mach, ¾ x 26 5 OO Clamp, Conduit, 1 Two Hole Steel Strap 5 ZZ Screw, Lag, ¼ x 2 Galv. 10 PP Washer Curved ¾ 10 QQ Washer Lock DL Coil ¾ 5 RR Meter Socket, Pre Wired 8 Terminal, Instrument Rated, SS CL*W Lug, Connector 4 Hole Std REV. NO: NEW REV. DATE: 08/14/14

60 Primary Metering 69kV, 3 Phase, 3 Wire (Missouri Only) Sheet 4 of TT PLW*W Lead Wire, PH (Ft) DCS UU Meter Shop Wire Pack of 10 ea. #12 Solid Cu Wires of Individual VV PG** Clamp, Parallel Grove See Std WW Current Transformer, 69kV XX Potential Transformer, 69kV 2 YY Clamp, PG, #6 1/0 to #6 1/ Install Primary Metering REV. NO: NEW REV. DATE: 08/14/14

61 Primary Metering 69kV, 3 Phase, 3 Wire (Illinois Only) Sheet 1 of 3 A 6 C LOAD STATIC D SOURCE E F 6 0 K K D L,F M V I 2 0 N I D K LL V K LL V PP OO OO H 2 H 2 PP H 1 KK H 2 H 1 H 2 K H1 H 1 JJ 9 0 K OO K NN V H 2 H 1 H 2 H 1 K MM QQ Q W,X,Y,Z,AA S,T,U CL OF WINDOW 3 0 MIN. 5 6 MAX. DD EE,RR CC GG II HH LOAD SIDE A C H2 H 1 H 2 H 2 H 1 H2 CT 1 CT 2 H1 PT 1 PT 2 H1 SOURCE SIDE METERING TRANSFORMER PRIMARY CONNECTIONS REV. NO: 2 REV. DATE: 09/29/17

62 Primary Metering 69kV, 3 Phase, 3 Wire (Illinois Only) Sheet 2 of 3 LOAD SIDE H2 H2 H2 H2 H1 H1 H1 H1 SOURCE SIDE NOTES: 1. Ground all instrument transformers, arrestors, and aluminum mounting assembly to the grounding unit. 2. Install barriers for protection against vehicular traffic where necessary. 3. Maintain minimum of 38 clearance between 69kV phases or phase to ground. 4. Maintain minimum of 7 ½ clearance between the aluminum mounting platform and the crossarm. 5. Maintain a minimum of 54 between the energized conductors and the pole on climbing side of the pole; maintain a minimum of 18 between the energized conductors and the pole on non climbing side of the pole. Reference from NESC, Rule 239E. 6. Maintain minimum of 40 clearance from any part of aluminum mounting unit to conductors of 12kV or 4kV underbuilds. 7. If there is any problem maintaining clearances between transformer leads and static wire ground, omit static wire ground at this pole. 8. Due to variations in 34kV configurations each primary metering installation should be individually designed. ut this standard will serve as a general guide. 9. If disconnect switches are required, they may be installed on an adjacent pole. 10. For wire color coding on PT and CT secondaries refer to system meter drawings. Stnd. / Stk. No. Description Provided and Installed y Ameren A Pole Static, Wire Attachment C Clamp, Guy Wire, ½ (used with 12/7 ACSR Static) Clamp, Parallel Groove (used with 1/0 AAAC Static) D DEC*W Clamp, Deadend DCS E Double Deadend Loop 69kV Top Phase F TCA*W Clamp, Trunnion 3 REV. NO: 2 REV. DATE: 09/29/17

63 Primary Metering 69kV, 3 Phase, 3 Wire (Illinois Only) Sheet 3 of 3 I Double Deadend Loop 69kV on Fiberglass Arm K PG** Clamp, Parallel Grove DCS N Crossarm, Deadend, F/G 10 1 L kV Horizontal Line Post, Polymer, Double Insulator M olt, DA, ¾ x olt, DA, ¾ x 18 Q Arrester, 48kV MCOV, 60kV Duty Cycle, Interm (Grd WYE System) Arrester, 57kV MCOV, 72kV Duty Cycle, Interm (Delta System) 3 S olt Mach ½ Dia x 2 ½ L 9 T Washer RD ½ 18 U Washer, Lock DL Coil, ½ V STC*W Clamp, Stirrup DCS W Mounting Assembly, 2CT s & 2PT s 1 X olt, Mach, ¾ x 26 5 Y Washer Curved ¾ 10 Z Washer Lock DL, Coil, ¾ 5 AA olt/rd Washer/Lock Washer/Nuts Set ⅝ x 3 Stainless Junction ox 1 CC Connector, 1 Conduit 2 DD Conduit, Flex, 1 Non Metallic (ft) 20 EE Clamp, Conduit, 1 Two Hole Steel Strap 5 RR Screw, Lag, ¼ x 2 Galv. FF Meter Shop Wire Pack of 10 ea. #12 Solid Cu Wires of Individual Colors Contact Metering Department GG Meter Socket, Pre Wired, 8 Terminal, Instrument Rated, Illinois HH Grounding Unit Ground Coil Grounding Unit Ground Rod 1 II Clamp, PG, #6 1/0 to #6 1/0 JJ Current Transformer 69kV Contact Metering Dept. KK Potential Transformer 69kV Contact Metering Dept. LL PLW*W Lead Wire, PH (ft) DCS MM CL*W Lug, Connector 4 Hole DCS NN Connector, 2 olt, 2 Awg SD 350 MCM Str. ronze 4 OO Wire #2 Cu Covered (ft) 20 PP Wire #6 Cu Covered (ft) 20 QQ Wire #4 Cu Covered (ft) Install Primary Metering 1 REV. NO: 2 REV. DATE: 09/29/17

64 Primary Metering 69kV, 3 Phase, 4 Wire (Illinois Only) Sheet 1 of 3 C RAKE D A SOURCE LOAD 6 STATIC 6 0 E D I LL G PP H H2 N G G N II H OO LL H L,M 6 4 F H 6 Q LL 5 0 H G H 2 H MM 1 H 2 H 1 H 1 H H OO NN JJ KK N H 1 H I 2 0 D N,O,P,R,S,T,U H LL H 2 W,X,Y,Z,AA PP EE,QQ DD LOAD SIDE A C PT 1 PT 2 PT3 CL OF WINDOW CC GG II H2 H1 CT 1 H1 H2 H1 CT2 H1 H2 H1 CT 3 H1 3 0 MIN. 5 6 MAX. HH SOURCE SIDE METERING TRANSFORMER PRIMARY CONNECTIONS N NOTE: The standards is limited to 3 phase, 4 wire, wye system. ENG:WYW REV. NEW REV. DATE: 08/14/14

CABLE TERMINALS

CABLE TERMINALS 14 00 00 01 Sheet 1 of 1 TABLE OF CONTENTS LOCATION & PLACEMENT OF RISERS ON JOINT USE POLES STANDOFF BRACKET PLACEMENT AND GROUNDING ONE RISER WITH U GUARD, 2, 3, 4, & 5 SPLIT CONDUIT OR SCHEDULE 40 0

More information

Poles - General Unguyed Single Phase Composite Poles Poles - General Unguyed Three Phase Composite Poles

Poles - General Unguyed Single Phase Composite Poles Poles - General Unguyed Three Phase Composite Poles Standard Description 2 4 2 Poles - General Unguyed Single Phase Composite Poles 2 4 3 Poles - General Unguyed Three Phase Composite Poles 3 3 Structural Elements - Design Limits 3 1 1 Configurations -

More information

Guying - Insulator Dimensional Requirements ** Lightning Protection & Grounding - Grounds

Guying - Insulator Dimensional Requirements ** Lightning Protection & Grounding - Grounds Standard Description 03 12 01 ** Configurations - Single Phase, 4 to 15kV 03 12 05 ** Configurations - Two or Three Phase Tangent or Angle on Wood Crossarm, 4 to 15 kv 03 12 07 ** Configurations - Two

More information

SYSTEM PROTECTION - PLATING

SYSTEM PROTECTION - PLATING INTRODUCTION 1. Plates F1 thru F10 supply only the material required for one-phase. Therefore, for threephase construction, you will be required to call for the specified plate three times at that station.

More information

WILDLIFE PROTECTION

WILDLIFE PROTECTION 05 00 00 01 TABLE OF CONTENTS GENERAL INFORMATION INSTALLATION OF CRITTER LINE GUARDS INSTALLATION OF TANK MOUNTED LIGHTNING ARRESTER BRACKET GUARDS 25KV & BELOW EXISTING STRUCTURE MODIFICATION 05 00 00

More information

SECTION 3 - PRIMARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS

SECTION 3 - PRIMARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS 03.00 GENERAL CONSTRUCTION NOTES PRIMARY CONSTRUCTION PRIMARY CONSTRUCTION PIN INSULATOR INSTALLATION 03.00-02 03.00-04 03.00-20 03.02 CONNECTORS AUTOMATIC SPLICE INSTALLATION 03.02-01 INSTALLATION GUIDE

More information

SECTION 8 - SWITCHES AND PROTECTIVE DEVICES TABLE OF CONTENTS

SECTION 8 - SWITCHES AND PROTECTIVE DEVICES TABLE OF CONTENTS 08.00 GENERAL DISTRIBUTION SURGE ARRESTERS 08.00-0 CUTOUTS AND ARRESTERS GENERAL 08.00-03 08.0 CUTOUTS AND ARRESTERS METAL OXIDE ARRESTERS WITH POLYMER HOUSINGS 08.0-0 APPLICATION OF DIRECT CONNECTED ARRESTERS

More information

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial

More information

OUTDOOR LIGHTING

OUTDOOR LIGHTING 15 00 00 01 Sheet 1 of 1 TABLE OF CONTENTS GENERAL INFORMATION HID LAMPS PHOTOCONTROLS LUMINAIRE COMPONENTS HID NEMA HEAD LUMINAIRE COMPONENTS HID HORIZONTAL LUMINAIRE COMPONENTS LED BRACKET MOUNT LUMINAIRES

More information

TABLE OF CONTENTS GUY PLACEMENT PERPENDICULAR TO LINE PARALLEL TO LINE GUYING INSULATOR DIMENSIONAL REQUIREMENTS MINIMUM CLEARANCES GUY TO CONDUCTOR

TABLE OF CONTENTS GUY PLACEMENT PERPENDICULAR TO LINE PARALLEL TO LINE GUYING INSULATOR DIMENSIONAL REQUIREMENTS MINIMUM CLEARANCES GUY TO CONDUCTOR 11 00 00 01 TALE OF ONTENTS Sheet 1 of 1 GENERAL GUY PLAEMENT PERPENDIULAR TO LINE PARALLEL TO LINE GUYING INSULATOR DIMENSIONAL REQUIREMENTS MINIMUM LEARANES GUY TO ONDUTOR HART FOR SELETION OF GUY STRAND

More information

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes Engineering Service Specifications Commercial Single-Phase Current Transformer Metering Schemes Specifications for Commercial Underground Current Transformer Metering Requirements for a Single-Phase Customer

More information

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4. METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4.-4 4. SELF-CONTAINED METERING, SINGE-PHASE INSTALLATION DETAILS /4 VOLT SINGLE-PHASE UNDERGROUND RESIDENTIAL SERVICE AND METER

More information

Analog RF Proof of Performance Testing Methodology

Analog RF Proof of Performance Testing Methodology Analog RF Proof of Performance Testing Methodology System Description: Dickey Rural Networks CATV network is a fiber to the home (FTTH) system with an RF overlay. The headend is based in Oakes, ND. This

More information

TECHNICAL SUPPORT MANUAL Fan Coils FSM4X6000AT

TECHNICAL SUPPORT MANUAL Fan Coils FSM4X6000AT Fan Coils FSM4X60 DANGER, WARNING, CAUTION, and NOTE The signal words DANGER, WARNING, CAU- TION, and NOTE are used to identify levels of hazard seriousness. The signal word DANGER is only used on product

More information

LABOR OPERATIONS

LABOR OPERATIONS 17 00 00 01 TABLE OF CONTENTS RECONDUCTORING 4KV LOOPOVER AND SWITCH POLE RECONDUCTORING CROSSARM OR ARMLESS 1, 2, AND 3 PHASE RECONDUCTORING ANGLE OR DEADEND RECONDUCTORING FLOATING ANGLE RECONDUCTORING

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING Obtain acceptance and specific details from the local Company office. 1. Service entrance duct (see Note 1). Company

More information

For mounting. cutouts, power fuses, arresters, capacitors, terminations, conduit EQUIPMENT MOUNTS

For mounting. cutouts, power fuses, arresters, capacitors, terminations, conduit EQUIPMENT MOUNTS For mounting cutouts, power fuses, arresters, capacitors, terminations, conduit EQUIPMENT Index Introduction.... 1 Typical Installation.... 2 Aluminum Three Phase Cutout & Arrester Mounts.... 3 Aluminum

More information

10 Commercial, Industrial, Agricultural Services

10 Commercial, Industrial, Agricultural Services 10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three

More information

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS REMOTE START SYSTEM

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS REMOTE START SYSTEM Vehicle Remote Start System Owner's Manual TM Featuring PowerCode Technology TM For the Ultimate in Comfort, Convenience and Security 5X 2 sec. 30 sec. 2 sec. To reduce the risk of serious Injury or death,

More information

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

9. Non-Residential Services (Commercial, Industrial, and Agricultural) Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect

More information

Index. Aluma Form, ALUMA-FORMEQUIPMENT MOUNTS Inc. WORLD S MOST COMPLETE LINE

Index. Aluma Form, ALUMA-FORMEQUIPMENT MOUNTS Inc. WORLD S MOST COMPLETE LINE Aluma Form, Index ALUMA-FORMEQUIPMENT MOUNTS Inc. Introduction.............................. 3 Typical Installation......................... 4 Aluminum Three Phase Cutout & Arrester Mounts..........................

More information

CONFIGURATIONS TABLE OF CONTENTS PHASE LOCATIONS (PREFERRED LOCATIONS) STRUCTURAL ELEMENTS DESIGN LIMITS

CONFIGURATIONS TABLE OF CONTENTS PHASE LOCATIONS (PREFERRED LOCATIONS) STRUCTURAL ELEMENTS DESIGN LIMITS 3 1 Sheet 1 of TLE OF CONTENTS NEUTRL LOCTIONS PHSE LOCTIONS PHSE LOCTIONS (PREFERRED LOCTIONS) STRUCTURL ELEMENTS DESIGN LIMITS NEUTRL 3 1 3 1 1 3 1 3 3 3 1 1 ** NEUTRL TP CONNECTION TO SUTRNSMISSION

More information

WESTERN-CULLEN-HAYES, INC. 120 VOLT ELDO ELECTRIC LOCK DERAIL OPERATOR INSTALLATION INSTRUCTIONS

WESTERN-CULLEN-HAYES, INC. 120 VOLT ELDO ELECTRIC LOCK DERAIL OPERATOR INSTALLATION INSTRUCTIONS WESTERN-CULLEN-HAYES, INC. 0 VOLT ELDO ELECTRIC LOCK DERAIL OPERATOR INSTALLATION INSTRUCTIONS THIS MANUAL COVERS THE INSTALLATION OF: PART NUMBER 46-00-00 ELDO FOR FAR RAIL APPLICATON AND PART NUMBER

More information

BRACKETS, MOUNTS & HARDWARE

BRACKETS, MOUNTS & HARDWARE HIGH VOLTAGE SWITCHGEAR & AUTOMATION EQUIPMENT SECTION 6 Brackets, Mounts & Misc. Hardware CAT. NO: 040930G May, 2008 INERTIA Engineering & Machine Works, INC. Fax: (209) 931-8186 6665 Hardaway Road, Stockton,

More information

Index Section 103 Joint Use. General Requirements for Installation of Attachments on Oncor Poles

Index Section 103 Joint Use. General Requirements for Installation of Attachments on Oncor Poles 103 09-17 103 Index Section 103 Joint Use Title Date Number General Requirements for Installation of Attachments on Oncor Poles... 103-100 Supply and Communication Space... 103-105 Communication Lines

More information

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This

More information

Environmental Management Chapter

Environmental Management Chapter Environmental Management Chapter 335-3-10 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION AIR POLLUTION CONTROL PROGRAM ADMINISTRATIVE CODE CHAPTER 335-3-10 STANDARDS OF PERFORMANCE FOR NEW

More information

ALUMA FORM LIGHT WEIGHT MOUNTS FOR TRANSFORMERS

ALUMA FORM LIGHT WEIGHT MOUNTS FOR TRANSFORMERS PRIMARY METERING MOUNT CATALOG ALUMA FORM LIGHT WEIGHT MOUNTS FOR TRANSFORMERS ALUMA-FORMprimary metering mounts All aluminum, light weight construction for mounting current and potential transformers

More information

Customer Requirements Downtown Secondary Network Service

Customer Requirements Downtown Secondary Network Service Application This standard describes the limitations and requirements for receiving service from the Tacoma Power secondary network system within the City of Tacoma downtown core area. In This Standard

More information

Job Estimate Face Sheet (E) - 10/01/16 08:41

Job Estimate Face Sheet (E) - 10/01/16 08:41 Project Name: Bay Rd East Palo Alto R20A Notification: 107830311 Address: BAY RD EAST PALO ALTO Order Type: E070 City/County: EAST PALO ALTO/Santa Clara PM Order Number: 31059780 Contact Name: SCOTT GARVEY

More information

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016 DISTRIBUTED GENERATION CHAPTER 5 500. SCOPE This chapter includes distributed or customer-owned generation connected in parallel and operating with Alliant Energy s electric distribution system. For all

More information

SERVICE MANUAL (INTERNATIONAL)

SERVICE MANUAL (INTERNATIONAL) SERVICE MANUAL (INTERNATIONAL) IMPINGER CONVEYOR OVENS MODEL 1421-000-E, 1454, 1455 WITH PUSH BUTTON CONTROLS Lincoln Foodservice Products, LLC 1111 North Hadley Road Fort Wayne, Indiana 46804 United States

More information

Light Weight Mounts for Transformers PRIMARY METERING MOUNTS

Light Weight Mounts for Transformers PRIMARY METERING MOUNTS Light Weight Mounts for Transformers PRIMARY All aluminum, light weight construction for mounting current and potential transformers for primary metering hookups. Mount comes as shown ready to be made

More information

Approved Contractor Construction e-guide Residential Commercial

Approved Contractor Construction e-guide Residential Commercial Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13

More information

Model 5-025, 5-050, &

Model 5-025, 5-050, & Model 5-025, 5-050, 5-075 & 5-150 7 Model 5-025, 5-050, 5-075 & 5-150 8 Eductor Block Exploded View Model 5-025, 5-050, 5-075 & 5-150 9 Figure 1 Item Part Name Model Model Model Model 5-025 5-050 5-075

More information

SINGLE PHASE WIRING SPECIFICATIONS

SINGLE PHASE WIRING SPECIFICATIONS SINGLE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425

More information

THREE PHASE WIRING SPECIFICATIONS

THREE PHASE WIRING SPECIFICATIONS THREE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425

More information

PRONE LEG CURL OWNER'S MANUAL

PRONE LEG CURL OWNER'S MANUAL TM TM 97 105 19 1 1 73 PRONE LEG CURL OWNER'S MANUAL REVISED: May 15,1998 119 51 SERIAL NO.'S through Contents Parts Manual 1 3 4 5 6 7 8 SEAT FRAME ASSEMBLY WORKBOX & CROSSMEMBER ASSEMBLY MOVEMENT ARM

More information

LEG EXTENSION OWNER'S MANUAL

LEG EXTENSION OWNER'S MANUAL TM LEG EXTENSION OWNER'S MANUAL REVISED: Sept. 2,1998 90 98 19 10 P 110 9 50,52A 150 SERIAL NO.'S through 109 1 2 5 6 8 Contents Parts Manual SEAT FRAME / CROSSMEMBER ASSEMBLY SEAT FRAME ASSEMBLY WORKBOX

More information

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev.

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev. Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY ANCHOR, DROP-IN FOR 1/2" BOLT 18564-7 A-11.00 11/2/2016 ANCHOR, DROP-IN FOR 3/9" BOLT 18549-3 A-11.00 11/2/2016 ANCHOR, NO-WRENCH: 10" X 96" 01558-6 A-5.00

More information

TECHNICAL SUPPORT MANUAL Fan Coils

TECHNICAL SUPPORT MANUAL Fan Coils Fan Coils FEM4X, WAHM**4, WAHT**4 DANGER, WARNING, CAUTION, and NOTE The signal words DANGER, WARNING, CAUTION, and NOTE are used to identify levels of hazard seriousness. The signal word DANGER is only

More information

CT Metering. CT Metering. Meter Mounting Equipment

CT Metering. CT Metering. Meter Mounting Equipment Single Meter Sockets, Without Bypass - CT Rated.................................. 67-68 Single Meter Sockets, CT Rated With Test Switch Bypass Provision............. 69-70 Meter Socket / Enclosure Combination

More information

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877 CAT-1 Series 3 Installation Guide The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877 (203) 431-0262 (203) 431-0296 FAX tvg@cat-1.com Installation of Load Cells for CAT-1 Systems

More information

Model 10 Crossing Signal

Model 10 Crossing Signal 1-39 Model Crossing Signal 1-40 Model Gate Crossing Signal For use with Cantilever Flashing Light Structures, or as a Sidewalk Gate 1-41 Mechanism Support for Model Gate Signals Cast Mechanism Support

More information

Meter Installation. -and- Padmount Transformer Guide

Meter Installation. -and- Padmount Transformer Guide Meter Installation -and- Padmount Transformer Guide Feb. 2016 METERING REQUIREMENTS The following information shall be used as a guide for installing metering equipment. A self-contained meter has all

More information

MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS. Larry Vogt. Manager, Rates

MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS. Larry Vogt. Manager, Rates MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS Larry Vogt Manager, Rates Minimum Distribution System What is MDS? MDS is an analysis module of the cost-of-service study in which distribution investment

More information

Please read these instructions completely before proceeding with installation. Read all maintenance guidelines on page 7 before operating the vehicle.

Please read these instructions completely before proceeding with installation. Read all maintenance guidelines on page 7 before operating the vehicle. MN-643 (02511) ECR 5461 Kit No. 39205 Please read these instructions completely before proceeding with installation Item P/N Description Quantity A 26391 Driver-Side Beam Assembly 1 B 26414 Passenger-Side

More information

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016 UTILITY/CATV SERVICES CHAPTER 9 900. GENERAL A. Alliant Energy receives many requests for electric service from other utilities; telephone, telecommunications companies, cable television, the Department

More information

UG FEEDING OH UG FEEDING OH. Electric Distribution Standards I. INTRODUCTION

UG FEEDING OH UG FEEDING OH. Electric Distribution Standards I. INTRODUCTION I. INTRODUCTION Electric Distribution Standards Design, Construction & Material Standards formed a special committee to establish some basic design guidelines for construction alternatives to be used for

More information

BRAKE WINCHES B1200B B1200G B2500 B2500G B3500 B1500 B1500G B1500

BRAKE WINCHES B1200B B1200G B2500 B2500G B3500 B1500 B1500G B1500 BRAKE WINCHES B1500 B1200B B1200G B1500 B1500G B2500 B2500G B3500 B1200B, B1200G B1500, B1500G B2500, B2500G B3500 X 6 650 lb/295 kg 1 1200 lb/545 kg 6 728 lb/330 kg 1 1500 lb/680 kg 3 1554 lb/705 kg 1

More information

Customer Requirements Pole Attachment Requirements for Telecommunications (non-rf)

Customer Requirements Pole Attachment Requirements for Telecommunications (non-rf) Application This standard establishes the attachment requirements to utility pole structures owned and operated by Tacoma Power and communication facilities owned and operated by others. This standard

More information

1100 OVERHEAD TRANSFORMERS

1100 OVERHEAD TRANSFORMERS 00 OVEHEAD TANSFOMES //00 ~ F Pole Type - Transformer Fuse Schedule ~ T Transformer Field Stenciling Code ~ TA Transformer Coding for Material Mgmt System C T,TH Pole Mounted Transformer and Cutout on

More information

MCM CABLE 3/15/2010

MCM CABLE 3/15/2010 00 000 MCM CABLE //00 C UEE Elbow Enclosure - Deadend C UEE Elbow Enclosure - Feed-Through C UP 000 MCM Cable iser ~ UP 000MCM Power Cable iser Grounding Detail N UP 000 MCM Cable iser with Ø Switch N

More information

OVERHEAD SERVICE. Items to consider

OVERHEAD SERVICE. Items to consider OVERHEAD SERVICE Items to consider The maximum length of the service wire from the ComEd pole to the point of attachment on your residence is 150 feet, if practical. Your service wire installation must

More information

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev.

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev. Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY ANCHOR, DROP-IN FOR 1/2" BOLT 18564-7 A-11.00 9/12/2011 ANCHOR, DROP-IN FOR 3/9" BOLT 18549-3 A-11.00 9/12/2011 ANCHOR, NO-WRENCH: 10" X 96" 01558-6 A-5.00

More information

Catalog 14A January 2013

Catalog 14A January 2013 Catalog 14A January 2013 Page 1 January 2013 Type AR (Automation-Ready) Switch 14.4kV, 25kV or 34.5kV 900 Amperes Continuous/Interrupt Description The Hubbell unitized Type AR switch is a distribution-level,

More information

CABINET - CURRENT TRANSFORMER Indoor - Outdoor 240 Volts Amperes Maximum

CABINET - CURRENT TRANSFORMER Indoor - Outdoor 240 Volts Amperes Maximum PAGE 1 OF 5 USE: 1. For commercial and industrial installations purchased and installed by the Customer. 2. For use on the following services: 1 phase 3 wire 240 volts, 3 phase 3 wire 240 volts, 3 phase

More information

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION Page 1 of 11 R1 ****This Standard Supercedes CE Macros MPR1S, MUR1S, MPR3S & MUR3S and portions of BECo Standards CS2.7-1.1, CS2.7-1.5 & CS2.7-1.7**** PRIMARY URD RISER CONSTRUCTION TABLE OF CONTENTS Page

More information

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS CABLE AND CONDUIT ENTRANCE SINGLE-PHASE PAD-MOUNTED TRANSFORMER INSTALLATION 100 KVA AND LARGER (CONCRETE PADS ONLY) 27.05-01 CABLE AND CONDUIT ENTRANCE SINGLE-PHASE PAD-MOUNTED TRANSFORMER INSTALLATION

More information

7 Single Family Service

7 Single Family Service 7 Single Family Service 7. General The location of the service entrance on the Customer s premises is an important consideration. For clearance and location information see section 5 (Clearances). Consult

More information

TOYOTA SIENNA TRAILER WIRE HARNESS Preparation

TOYOTA SIENNA TRAILER WIRE HARNESS Preparation Preparation Part Number: PT791-08150 (non-se) PT791-08102 (SE only) Kit Contents Item # Quantity Reqd. Description 1 1 Trailer Module Harness 2 1 4-Flat Harness 3 1 Battery Power Wire Harness 4 1 Mounting

More information

Metering and Service Installation:

Metering and Service Installation: Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...

More information

Determination of Arrester Energy Handling Capability - Testing Investigation Surge Protective Devices Committee Spring 2005 Meeting

Determination of Arrester Energy Handling Capability - Testing Investigation Surge Protective Devices Committee Spring 2005 Meeting Determination of Arrester Energy Handling Capability - Testing Investigation Surge Protective Devices Committee Spring 2005 Meeting Raymond C. Hill, PE Introduction Conflicting opinions exist concerning

More information

Fiberglass Construction Products

Fiberglass Construction Products 12 Fiberglass Construction Products Catalog 12 Page 12-1 Fiberglass Construction Products Standoff Brackets With over 50 years of experience in manufacturing Chance Fiberglass Rod polymer insulation products,

More information

PEC FLY OWNER'S MANUAL SERIAL NO.'S. through. Parts Manual. Maintenance Manual Follows page REVISED: Nov. 07,1998.

PEC FLY OWNER'S MANUAL SERIAL NO.'S. through. Parts Manual. Maintenance Manual Follows page REVISED: Nov. 07,1998. TM TM 15,22 16,23 157,159A 28 PEC FLY OWNER'S MANUAL 17,24 30 REVISED: Nov. 07,1998 29 SERIAL NO.'S through 33 33 Contents Parts Manual 1 2 3 4 5 6 7 8 9 FRAME & PAD ASSEMBLY WORKBOX TO FRAME ASSEMBLY

More information

Bulletin 1494V Variable Depth Disconnect Switch Installation Instructions (Cat 1494V-DS400; -DSX400 - Series D)

Bulletin 1494V Variable Depth Disconnect Switch Installation Instructions (Cat 1494V-DS400; -DSX400 - Series D) Bulletin 494V Variable Depth Disconnect Switch Installation Instructions (Cat 494V-DS400; -DSX400 - Series D) ATTENTION: To prevent electrical shock, disconnect from power source before installing or servicing.

More information

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.

More information

Customer Requirements Clearance Requirements for Overhead Joint Utility Construction

Customer Requirements Clearance Requirements for Overhead Joint Utility Construction Application This standard establishes the clearances that are required on utility pole structures between electrical supply facilities owned and operated by Tacoma Power and communication facilities owned

More information

PART NUMBER POLE DIAMETER RANGE CARTON QTY " to 5" " to 6 3 4" " to 7 3 4" " to 8 3 4" 10

PART NUMBER POLE DIAMETER RANGE CARTON QTY  to 5  to 6 3 4  to 7 3 4  to 8 3 4 10 PH1 Offset Pole Band Bands Single Double Offset Pole Bands are used for dead-ending, guying, and mounting secondary racks on metal poles, pipe masts, or conduit. Each Pole Band Assembly contains two 1

More information

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company

More information

PROPOSED COST SCHEDULE OF MATERIALS FOR CONSUMER JOB AND OTHER JOBS

PROPOSED COST SCHEDULE OF MATERIALS FOR CONSUMER JOB AND OTHER JOBS PROPOSED COST SCHEDULE OF MATERIALS FOR CONSUMER JOB AND OTHER JOBS Sl. 1 260200003A STEEL TUBULAR POLE SWAGED 11 MTR. LONG WITH BASE 7651.62 8034.20 8435.91 PLATE & CAP (IS2713/1980) BTM: 165.1X4.5MM-5.6MTR,

More information

Four Shaft Linear Thrusters

Four Shaft Linear Thrusters Four Shaft Linear Thrusters FOUR SHAFT THRUSTERS Three Models with bores from 2 to 4 Twice the load capacity of comparable two shaft units Reduced deflection and bearing play Compact, light weight robust

More information

Air Commander Part No , with air Part No , without air

Air Commander Part No , with air Part No , without air EASYSTREET Air Commander Part No. 27325, with air Part No. 27332, without air www.airliftcompany.com Please read these instructions completely before proceeding with installation. The oil level in the

More information

For Conduit Inspections

For Conduit Inspections Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit

More information

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service. UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later

More information

Revised: April 2018 ¹ SERVICE TO WIRELESS DEVICE ANTENNA ATTACHMENTS ON CUSTOMER SERVICE POLES (SHEET 1) CUSTOMER: 1. An overcurrent protective device including a disconnect switch shall

More information

Wisconsin Public Utility Institute. June 28, Minimum Distribution Charges. Larry Vogt. Director, Rates Mississippi Power

Wisconsin Public Utility Institute. June 28, Minimum Distribution Charges. Larry Vogt. Director, Rates Mississippi Power Wisconsin Public Utility Institute June 28, 2017 Minimum Distribution Charges Larry Vogt Director, Rates Mississippi Power 1 Costs of Service vs. Cost Recovery Residential Service Example Assuming that

More information

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES CONTENTS BY CHAPTER Chapter 1: GENERAL INFORMATION Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES Chapter 3: SERVICE ENTRANCES Chapter 4: METERING INSTALLATION Chapter 5: CUSTOMER-INSTALLED SERVICE

More information

CABINET - CURRENT TRANSFORMER Indoor - Outdoor 240 Volts Amperes Maximum

CABINET - CURRENT TRANSFORMER Indoor - Outdoor 240 Volts Amperes Maximum PAGE 1 OF 5 USE: 1. For commercial and industrial installations, purchased and installed by customer. 2. For use on the following services: 1 phase 3 wire 240 volts, 3 phase 3 wire 240 volts, 3 phase 4

More information

When power interruptions happen.

When power interruptions happen. When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage

More information

GE 8000-Line Motor Control Centers

GE 8000-Line Motor Control Centers GE 8000-Line -1 ENCLOSURE TYPES TYPE 1 General Purpose, Indoor Intended for use indoors, primarily to prevent accidental contact of personnel with the enclosed equipment, in areas where unusual service

More information

Models. Save This Manual For Future Reference. International Comfort Products Corporation (USA) Lewisburg, TN USA LP1 5/16/

Models. Save This Manual For Future Reference. International Comfort Products Corporation (USA) Lewisburg, TN USA LP1 5/16/ Models NTC7050BFG / GNL050NG NTC7075BFG / GNL075NG NTC700BHG / GNL00N6G NTC75BKG / GNL5N0G NDC7050BFG / GDL050NG NDC7075BFG / GDL075NG NDC700BHG / GDL00N6G NDC75BKG / GDL5N0G Manufactured by: International

More information

CON EDISON EQUIPMENT

CON EDISON EQUIPMENT CON EDISON EQUIPMENT Con Ed Navtech Size Volts Amps List Spec. Cat. No Description Price 205 N-205 10x10x5 100 $72.00 205 RTN-205 10x10x5 100 190.00 215 N-215 24x12x8 200 144.00 215 RTN-215 24x12x8 200

More information

WPS SERVICE MANUAL. Section 7 Clearances. 7-1 Basic Electric Clearances - Services Miscellaneous Clearances Antenna Clearances...

WPS SERVICE MANUAL. Section 7 Clearances. 7-1 Basic Electric Clearances - Services Miscellaneous Clearances Antenna Clearances... Revised 03/2016 Section 7 CLEARANCES Page 1 of 9 Section 7 Clearances 7-1 Basic Electric Clearances - Services... 2 7-2 Miscellaneous Clearances... 7 7-3 Antenna Clearances... 9 Revised 03/2016 Section

More information

Please confirm that all parts are present before beginning the factory exhaust system removal and db Performance Exhaust system installation.

Please confirm that all parts are present before beginning the factory exhaust system removal and db Performance Exhaust system installation. Please take time to read and understand these installation instructions. We recommend that the installation of this system be performed by a qualified service center or professional muffler installer who

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

GENERAL INFORMATION POLE MOUNT TRANSFORMER SINGLE PHASE PAD MOUNT TRANSFORMER SINGLE PHASE POLE MOUNT TRANSFORMER THREE PHASE 17

GENERAL INFORMATION POLE MOUNT TRANSFORMER SINGLE PHASE PAD MOUNT TRANSFORMER SINGLE PHASE POLE MOUNT TRANSFORMER THREE PHASE 17 GENERAL INFORMATION SECTION GUIDE SECTION 10 PAGE 1 DESCRIPTION SECTION NUMBER GENERAL INFORMATION... 10 POLE MOUNT TRANSFORMER SINGLE PHASE... 15 PAD MOUNT TRANSFORMER SINGLE PHASE..... 16 POLE MOUNT

More information

The Product Range. Technical Data

The Product Range. Technical Data The Product Range Section 3.1 - Basic Cylinder Bore sizes (mm): 10, 16, 25, 32, 40, 50 The basic cylinder series satisfies the support and guidance requirements of a great diversity of applications. Various

More information

Commercial Electric Policy

Commercial Electric Policy Commercial Electric Policy 7/19/16 1 Table of Contents General Information..3 Construction.3 Ownership.4 Multi-Unit/Multi-Service Buildings....4 Secondary Termination Enclosures.4 Meter Bases.5 Temporary

More information

Customer Requirements Meter Socket Configurations

Customer Requirements Meter Socket Configurations Application Information on meter socket configurations available from Tacoma Power. For enclosed meter pedestals, see standard C-MR-0020 Customer Requirements, Enclosed Meter Pedestal. General Requirements

More information

PERFORMANCE DATA. The lightweight, durable, low-profile ROD CYLINDER SLIDES

PERFORMANCE DATA. The lightweight, durable, low-profile ROD CYLINDER SLIDES The lightweight, durable, low-profile H-Block design is the most versatile of our rod cylinder slides. It also has one of the highest ratings of load weight vs extension for its kind in the industry. The

More information

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5 PAGE 1 OF 5 USE: Requirements for entrance equipment. PREVIOUS REVISION 07-01-98 ORIGINATED 03-94 PREVIOUS NUMBER ER 100 (12-01-81) LATEST REVISION: Updated meter socket labeling specification and instrument

More information

Bulletin 1494V Variable Depth, Flange Operated Disconnect Switch Kits for 400 and 600 Amperes (Series A) Switches

Bulletin 1494V Variable Depth, Flange Operated Disconnect Switch Kits for 400 and 600 Amperes (Series A) Switches Bulletin 494V Variable Depth, Flange Operated Disconnect Switch Kits for and Amperes (Series A) Switches ATTENTION: To prevent electrical shock, disconnect from power source before installing or servicing.

More information

Approved Meter Sockets and Cabinets

Approved Meter Sockets and Cabinets Single Unit Residential Guide 1 PHASE, 120/240 VOLT SERVICES SERVICE CAPACITY OWNED METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to

More information

Indianapolis Power & Light Company

Indianapolis Power & Light Company Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis

More information

MK IV OVERHEAD DOOR REPLACEMENT PARTS BOOK

MK IV OVERHEAD DOOR REPLACEMENT PARTS BOOK MK IV OVERHEAD DOOR REPLACEMENT PARTS BOOK JAMISON DOOR COMPANY P.O. BOX 70 HAGERSTOWN, MARYLAND 21740 1-800-532-3667 301-733-3100 INTERNET: http://www.jamisondoor.com E-MAIL: contact@jamisondoor.com ECN

More information

COMMERCIAL QUICK REFERENCE

COMMERCIAL QUICK REFERENCE COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR

More information

METERING REQUIREMENTS

METERING REQUIREMENTS METERING REQUIREMENTS KUA will not accept a non-securable service trough entrance. That is, all enclosed conductors prior to the meter (line side) will be securable by and accessible to KUA personnel only.

More information