1 1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer
2 2 Northern Line Extension Battersea part of the wider Northern Line story
3 3 Contents Project Background Design constraints Tunnels, Shafts and Station Design Railway Systems Current Status & Progress Questions
4 4 Background
5 5 Vauxhall, Nine Elms, Battersea VNEB An Opportunity area in SW London 195 hectares 3 km of Thames river frontage 18,000 new homes 5 hectares of public open space 24,000 new jobs 1 billion of infrastructure Local Transport improvements New schools / healthcare / community space
6 6 Battersea Power Station Opened 1933 Dormant from 1980s Poor transport links Many development proposals
7 7 TfL Transport Studies Transport studies in 2009 / 10 considered a number of options: Bus routes and segregation Light Rail London Underground extensions. Victoria Line (Vauxhall), Bakerloo Line (Elephant & Castle), District Line (Sloane Square), Northern Line (Kennington) Conclusion Level of development is such that a high level of public transport capacity is required best delivered through an extension of the tube. Extension of Northern Line Charing Cross branch reduces pressure on Vauxhall station and provide relief to the Victoria line and the existing Northern line south of Kennington
8 8 Key Programme Requirements Capability of up to 30 trains per hour Efficient, safe and reliable service Minimise environmental impacts Minimal impact on the existing railway Fully integrated with the urban design Fully integrated with other transport operators
9 9 Project Overview
10 10 Design Constraints
11 11 Local Geology Made ground Alluvium River Terrace Deposit London Clay Formation Lambeth Group River terrace deposit London Clay Lambeth Group
12 12 Challenges Tunnels Thames Water assets Power assets Victoria line Network Rail assets Existing Northern line including Oval station Existing properties Interfacing developments Encirclement at Kennington loop Battersea Dogs and Cats Home National Grid site Kennington Station New Cross passages within existing platforms Deep excavations Station boxes Noise & Vibration Schools Listed properties Local residents
13 13 Constraints Thames Water Ring Main Sewers Victoria Line EDF Cable Tunnel Kennington Loop Northern Line
14 14 Alignment
15 15 Tunnel Alignment Constrained by TWAO Limits of Deviation Minimise journey time Minimise ground borne noise and vibration Safety Quality of ride London Underground standards Curves - min radius 300m Concession from 400m. Gradients - max 2.00%, min 0.250%, level stations Cant - max 125mm, Speed - Vmax. 90km/h.
16 16 P&C and Junctions Kennington Step Plate Junctions Northbound Cv9.25 NLE 245m rad / NL (Loop) straight Southbound Cv9.25 equal split NLE 490m rad / NL (Loop) 490m rad
17 17 P&C and Junctions Battersea scissors crossover, - 4 Standard Straight Cv9.25, with large radius curves between turnouts, scissors crossover is slightly tapered, being wider at platform end. Crossover is level throughout.
18 18 Tunnel Design
19 19 Overview of Tunnelling Main TBM drives approx. 5.2km total TBM could not junction with the loop Shafts located 70m and 200m from junctions - SCL Difficult to mechanise excavation around existing tunnel - SGI
20 20 Tunnel Section Bolted RC Segmental Lining 5.2 Diameter I/D
21 21 EPBM Tunnelling 2 x TBMs (Amy & Helen) Reduces risks with ground conditions Reduced settlement - Predicted 0.5% vol. loss
22 22 Muck Removal
23 23 Muck Removal
24 24 Step Plate Junctions Interfaces with operational railway Interdependencies with various systems and disciplines Installation of new CMS Re-routing and relocation of services providing continuity. Removal of existing cast iron tunnel segments and support structure over weekend possessions Installation of new track and power assets Commissioning of new railway during a 10 day blockade
25 25 Step Plate Junctions
26 26 Step Plate Junctions
27 27 Tunnel and Station Cross Passages Three cross passages between the bored running tunnels were constructed to facilitate operational evacuation as agreed with LFB. Constructed in the London Clay and Lambeth Group using timber headings and SGI Segments Four new cross passages in Kennington Station between the existing platforms to facilitate congestion relief and station evacuation. Constructed in the London Clay and using timber headings and SGI Segments
28 28 Kennington Ventilation Shaft Designs
29 29 Kennington Shaft Structures Secant Piled Wall Construction SCL Shaft for tunnel interface Complex integration with multidiscipline services Kennington Green Kennington Park Two Permanent ventilations shafts at Kennington Green and Kennington Park to allow air in and out of the underground tunnels to help cool the Tube. It is also required to enable emergency intervention and evacuation from the tunnels.
30 30 Stations Design
31 31 Nine Elms Station
32 32 Nine Elms Station West End Entrance
33 33 Ticket Hall Level
34 34 Platform Concourse
35 35 Nine Elms Station Longitudinal Section
36 36 Battersea Power Station
37 37 Street Level Entrance
38 38 Ticket Hall Level
39 39 Platform Level
40 40 Battersea Power Station -Longitudinal Section
41 41 Railway Systems
42 42 Track Form The new track being installed is flat bottom rail 4800m of Sonneville LVT Block track form for the Tunnels First substantial use on Tube network Delkor RF167 base plates for 4NO. Platform safety pit areas in Battersea and Nine Elms
43 43 Plain Line Track Methodology LVT Blocks and rail delivered into tunnel Rail Installed onto Blocks and set on alignment jigs
44 44 Plain Line Track Methodology Stage 2 Concrete Pour Final alignment adjustment and clean
45 45 Plain Line Track Methodology Track Jigs removed and made good Thermit welding
46 46 Delivery of 91m Length Rail 7/10/18
47 47 Delivery of 91m Length Rail 7/10/18
48 48 Current Status
49 49 Status Overview All tunnelling work complete as of mid September 2018 Track installation has commenced. Works between the Step plate junction and shafts, plain line between Battersea Launch tunnels and Nine Elms box and platform areas to Battersea Power Station are all complete Excavation works to both Kennington Shafts are ongoing with construction of secondary structures. Nine Elms and Battersea Power stations secondary structures works are ongoing Design works for Signals and Systems ongoing with Thales (PFI Contract) Fit Out works have commenced - NLE due for completion 2020
50 50 Current Status - Photographs Battersea Power Station
51 51 Current Status - Photographs Battersea Power Station
52 52 Current Status - Photographs Nine Elms Station
53 53 Current Status - Photographs Nine Elms Station
54 54 Current Status - Photographs Kennington Shafts
55 55 Questions
NORTHERN LINE HEADING FOR A SPLIT
NORTHERN LINE HEADING FOR A SPLIT by John Hawkins After over 80 years together, separation looks increasingly likely for the Northern Line s branches, a long held idea whose time may now have come. With
More informationSmart Infrastructure and Construction. Kenichi Soga
Smart Infrastructure and Construction Kenichi Soga London Bridge Station 200,000-250,000 passengers/day 55 million passengers per year Oldest station in London First built in 1836 Five Year Improvement
More informationDelivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD
Delivering the North West Rail Link Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD November 26, 2013 The starting point Project overview $8.3 billion budget Open
More informationModernising the Great Western railway
Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western
More informationConverting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada
Converting BRT to LRT in the Nation s Capital Ottawa, Canada John Manconi City of Ottawa Ottawa, Canada 1 The Challenge *Mackenzie King Bridge Ottawa, AM peak period 2 The Challenge Ottawa s population
More informationPowering Sydney s Future
Powering Sydney s Future Frequently Asked Questions December 2017 Project background Q: Why is this project needed? A: Inner Sydney is one of the most critical parts of the NSW electricity network. However,
More informationDallas CBD Second Light Rail Alignment (D2)
Dallas CBD Second Light Rail Alignment (D2) Subway Project Refinement Stakeholder Meeting December 7, 2016 Discussion Items Background Schedule Public/Stakeholder Involvement Comments/Questions from Audience
More informationSpadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment
Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment APPENDIX Q SUBWAY OPERATIONS REPORT Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment
More informationTHE UK RAIL MARKET 2015
THE UK RAIL MARKET 2015 image: Ken Harris B R O O K S M A R K E T I N T E L L I G E N C E R E P O R T S THE UK RAIL MARKET 2015 Brooks Events Ltd 2015. All rights reserved. A Brooks Reports Publication
More informationVery Light Rail (VLR) as a means of delivering low-cost railways
Very Light Rail (VLR) as a means of delivering low-cost railways Dr Nick Mallinson Programme Manager, WMG Centre High Value Manufacturing Catapult LCV2018 Event Sponsor: Very Light Rail (VLR) as a means
More information02 BUILDING ACCESSIBILITY STATEMENT
01 02 BUILDING ACCESSIBILITY STATEMENT Prince Philip House, 3 Carlton House Terrace is a Grade 1, 1800s Regency Building designed by John Nash. The building is an outstanding venue for events boasting
More informationBUS SERVICES IN CHAMBERLAYNE ROAD NW10
INTRODUCTION BUS SERVICES IN CHAMBERLAYNE ROAD NW10 1 LONDON BUSES 1. This note reviews the issues in Chamberlayne Road, Kensal Rise. It covers the range of bus routes in the area, their characteristics
More informationCTA Capital Construction Update May 17, 2007
Block 37 Signals Project Brown Line Howard CTA Capital Construction Update May 17, 2007 1 Capital Construction Update Agenda Howard Station Reconstruction Brown Line Capacity Expansion Project Block 37
More informationAppendix 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes
Appendix 4 HS2 Route Capacity and Reliability Prepared by Christopher Stokes 4 HS2 ROUTE CAPACITY AND RELIABILITY Prepared by Christopher Stokes Introduction 4.1 This appendix considers the planned utilisation
More informationHigh Speed S&C Design and Maintenance
High Speed S&C Design and Maintenance Dr Sin Sin Hsu Head of Track Engineering, NRHS 1 st March 2018 What is a High Speed Turnout? Three main parts: Switch Geometry, profile, components Intermediate Part
More informationLocation Concept Plan Amendment Recommendation Approved 2011 Concept Plan
Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West
More informationMulti Mode TBMs. OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling
OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling Multi Mode TBMs Shawn Hourtovenko Herrenknecht Tunnelling Systems Canada, Inc. October 5 th, 2015 Tunnelling
More information4. Good Practice Example: Automatic light metro system (Brescia, Italy)
4. Good Practice Example: Automatic light metro system (Brescia, Italy) Keywords Sustainable mobility, automatic light metro system Name and location Automatic light metro system, Brescia, Italy Brescia
More informationChapter 3 Route Window C2 Paddington station. Transport for London
Chapter 3 Route Window C2 Paddington station PADDINGTON STATION 3 Route Window C2 Paddington station Red Star Deck worksite Eastbourne Terrace worksite Circle Line Link worksite The Red Star Parcel site
More informationASHPRINGTON ROAD Part 1
MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD Part 1 By Graham Plowman Photographed by Paul Plowman 2 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD A 00 layout based on the Western Region Main Line between Exeter
More informationChapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes
Chapter 4 HS2 Route Capacity and Reliability Prepared by Christopher Stokes 4 HS2 ROUTE CAPACITY AND RELIABILITY Prepared by Christopher Stokes 4.1 This chapter relates to the following questions listed
More informationCTA Capital Construction Update December 12, 2006
Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction
More informationSUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018
SUBMISSION TO METROLINK PUBLIC CONSULTATION From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018 Suggested Route Map including stations Rathmines, Terenure, Rathfarnham INTRODUCTION
More informationPhotography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS
BARKING GOSPEL OAK RAIL USER GROUP F O U N D E D 1 9 6 4 Chair: Graham Larkbey Secretary: Glenn Wallis (020) 8529 2361; 07789 791224 www.barking-gospeloak.org.uk info@barking-gospeloak.org.uk @RidingtheGoblin
More informationChairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015
Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 SPEED LIMIT CHANGE ON KĀPITI ROAD PURPOSE OF REPORT Meeting Status: Public Purpose of Report: For Decision 1 The purpose
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationProgram Overview. February 2018
Program Overview February 2018 Nashville is growing 2 and traffic is getting worse 5 Nashville spoke; we listened Transit Improvement Program Frequent Transit Bus AccessRide and Mobility on Demand Neighborhood
More informationBi-County Transitway/ Bethesda Station Access Demand Analysis
Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction
More informationLegislative Council Panel on Transport Subcommittee on Matters Relating to Railways
Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Retrofitting of Automatic Platform Gates along the East Rail Line and Ma On Shan Line CB(1)308/13-14(03) Purpose 1. This
More informationHigh Speed 2- engineering, benefits & challenges. Prof Roderick A Smith
South Yorkshire I Mech E, Sheffield, 3 October 2013 High Speed 2- engineering, benefits & challenges Prof Roderick A Smith Chief Scientific Advisor Department for Transport & Imperial College London Lecture
More informationTECHNICAL MEMORANDUM
California High-Speed Train Project TECHNICAL MEMORANDUM TM 1.1.0 Prepared by: Mike Hawkins, PE Checked by: Christian Schang Approved by: Signed document on file 16 Mar 07_ Ken Jong, PE, Engineering Manager
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationChapter 11 Route Window NE10 Gidea Park station. Transport for London
Chapter 11 Route Window NE10 Gidea Park station Transport GIDEA PARK STATION 11 Route Window NE10 Gidea Park station Transport Introduction 11.1 The construction activities in this route window are associated
More informationBRAYBROOK STREET SHAFT
the Capital, Connecting the UK BRAYBROOK STREET SHAFT CROSSRAIL PROPOSALS Old Oak School Wulfstan Braybrook Wormwood Scrubs Park Braybrook Shaft HM Prison Wormwood Scrubs Intermediate shafts are required
More informationEpping to Chatswood Railway Temporary Transport Plan
Transport for NSW Epping to Chatswood Railway Temporary Transport Plan 10 October 2014 Contents Page number Glossary and acronyms Executive summary ix x 1. Introduction 1 1.1 Background 1 1.2 Project
More informationNORTH RINGROAD OF VALENCIA (CV30) BENIMAMET TO CIUTAT FALLERA AND CONNECTIONS TO BURJASSOT, BENIMAMET, CV30 AND THE FUTURE NORTH PARK ROAD CIT-01
CIT-01 NORTH RINGROAD OF VALENCIA (CV30) BENIMAMET TO CIUTAT FALLERA AND CONNECTIONS TO BURJASSOT, BENIMAMET, CV30 AND THE FUTURE NORTH PARK ROAD ADMINISTRATIVE DATA MANAGEMENT DATA PROCUREMENT PROJECT
More informationpresented by Y. C. Lam & Tim Leung 21 May 2005
Ground Investigation by Horizontal Directional Drilling presented by Y. C. Lam & Tim Leung 21 May 2005 2 Horizontal Directional Drilling (HDD) Working Principle Construction Procedure Recent Application
More information70 YEARS OF 1938 TUBE STOCK
70 YEARS OF 1938 TUE STOCK Thursday 30 June 1938 was the date that the first train of 1938 Tube Stock ran in service on the orthern Line 70 years ago. To mark the event, the London Transport Museum s 1938
More informationDeviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7)
Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7) Deviation Number: 14/078/DEV 1. Start and End Date: From 26/06/2014 to 22/10/2018 2. Details
More informationINTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation.
Brescia Subway INTRODUCTION The origin of the project Metro Brescia comes from a decision of Brescia city council in 1987, when in accordance with the technical and economic examination of the various
More informationThis corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.
Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be
More informationIarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland. 17 th November
Iarnród Éireann Dublin Integrated Rail Plan Presentation to Institution of Engineers of Ireland 17 th November 2004 www.irishrail.ie Contents Overview of current suburban rail network Projects underway
More informationCentral London Plan Update
Central London Plan Update 2017 1 Background to the Central London Plan Introduction to the Central London network and our plans for it over the coming years. PAGE 4 Increasing capacity Our plans to increase
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay
More informationGreen Line LRT: Beltline Segment Update April 19, 2017
Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street
More informationWest Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017
West Santa Ana Branch Transit Corridor Informational Briefing Gateway Cities Service Council April 13, 2017 Project Study Area 98 square miles 20 individual cities plus unincorporated LA County 1.2 million
More informationASSESSMENT OF THE UPPERLEVELLOOP ALTERNATIVE FORTHE MANHATTANPORTION OF THEEASTSIDE ACCESSPROJECT
ASSESSMENT OF THE UPPERLEVELLOOP ALTERNATIVE FORTHE MANHATTANPORTION OF THEEASTSIDE ACCESSPROJECT Preparedfor: Institute for Rational Urban Mobility, Inc. New York Preparedby: Delcan Corporation Toronto,Canada
More information1. How has traffic congestion changed in London in recent years? Are there differences in the amount, time, type and/or location of congestion?
16 September 2016 Georgina Wells London Assembly City Hall The Queen s Walk London SE1 2AA Submitted electronically to: georgina.wells@london.gov.uk Institution of Civil Engineers One Great George Street
More informationEGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN
WELCOME TO OUR PUBLIC OPEN HOUSE EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) Preliminary Planning for a Transit Project Assessment June 15, 17, 18, 23, 24 and 25, 2009 PLEASE SIGN IN Members of the Project
More informationDomain Station? A smart alternative.
Melbourne Metro Rail Domain Station? A smart alternative. By William McIntosh B.E. (Hons), M.Sc, MAusIMM(CP) The Background Domain Station is proposed to be built via a 'cut and cover' method, with the
More informationPresentation of the Baltimore Metro System
Presentation of the Baltimore Metro System Presenter: Michael S. Davis Deputy Administrator, Transit Operations Division March 2, 2010 Topics Early Planning for Rapid Rail Transit System Overview Section
More informationProposed Dounreay - Mybster 275 kv / 132 kv
Background Scottish Hydro-Electric Transmission Ltd (SHETL) is proposing a new 275 kilovolt (kv) (1 kilovolt = 1000volts) double circuit overhead line (OHL) between the Dounreay sub station and the new
More informationGreen Line LRT: Beltline Recommendation Frequently Asked Questions
Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria
More informationConfederation Line West Queensway Terrace North. May 27, 2017
Confederation Line West Queensway Terrace North May 27, 2017 Agenda Background Lincoln Fields Station Concept LRT alignment, southwest of Lincoln Fields to Queensway, including: Pedestrian bridge replacement
More informationT-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)
A: 2014 SFMTA TRANSIT SERVICE INFORMATION B: SFMTA TRAFFIC COUNT DATA C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS) E: LAND USE AND VALUE
More informationHow our experience could serve your ambitions Lessons learnt
London Sept 11, 2014 How our experience could serve your ambitions Lessons learnt Pierre-Etienne Gautier, VP Innovation, SYSTRA 1. hs2 Challenges HS2 project sets ambitious targets V360 70 M.ton/year in
More informationAPPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL
APPENDIX 7.1 Annex E South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL Ref: 402-03640-00006 March 2013 VATTENFALL i Ref: 402.03640.00006 CONTENTS 1.0 INTRODUCTION... 2 1.1 Proposed
More informationCPG is pleased to report the following accomplishments this quarter:
MEMORANDUM To: From: Metrolinx Board of Directors Matthew Clark Chief Capital Officer (A), Capital Projects Group Date: February 7, 2019 Re: Capital Projects Group Quarterly Report Recommendation That
More informationBLOTTMATTHEWS 2016/17 COMPETITION: AIRPORT TO AIRPORT (A2A)
BLOTTMATTHEWS 2016/17 COMPETITION: AIRPORT TO AIRPORT (A2A) Competition Submission from Therfield School, Leatherhead Iain Cheverton Elizabeth Cole Fred Donlan Elliot Skey Ross Turner Table of Contents
More informationJRC. Beyond the Elephant. Extending the Bakerloo. Jonathan Roberts, JRC At Lewisham Council Sustainable Development Select Committee 15 March 2012
Beyond the Elephant Extending the Bakerloo Jonathan Roberts, At Lewisham Council Sustainable Development Select Committee 15 March 2012 Beyond the Elephant June 1949 tube map Topics in report Sept 2010
More informationIsland Smart Grid Model in Hawaii Incorporating EVs
Hitachi Review Vol. 63 (214), No. 8 471 Featured Articles Island Smart Grid Model in Hawaii Incorporating EVs Koichi Hiraoka Sunao Masunaga Yutaka Matsunobu Naoya Wajima OVERVIEW: Having set a target of
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
&+$37(5Ã)Ã Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5) 52$'6,'()$&,/,7,(6 7$%/(2)&217(176 Section Subject Page Number Page Date F.1 VEHICLE INSPECTION STATIONS... F-3 April
More informationCIGEO Preparing for construction
CIGEO Preparing for construction EDRAM WINTER MEETING, NOV. 19 TH, 2013 Marie-Claude DUPUIS & Gérald Ouzounian XXX.YY.AZZZ.AA.NNNN Presentation and organisation of the CIGEO project Ramp zone Shaft zone
More informationAlconbury Weald: the story so far
Alconbury Weald: the story so far The development of Alconbury Weald is a 20 year project, which will be rolled out with a series of phased investments in new infrastructure on site and across the local
More informationAttachment E3 Vibration Technical Memorandum
Attachment E3 Technical Memorandum 77 South Bedford Street Burlington, MA 01803 T 781.229.0707 F 781.229.7939 E jross@hmmh.com W www.hmmh.com TECHNICAL MEMORANDUM To: Alisa Swank, CH2M HILL Jodi Ketelsen,
More informationACEforward. Livermore Valley Chamber of Commerce Business Alliance Meeting. September 6, 2017
ACEforward Livermore Valley Chamber of Commerce Business Alliance Meeting September 6, 2017 Current ACE Connectivity Map WESTBOUND TRAINS ACE 1 ACE 3 ACE 5 ACE 7 Stockton 4:20AM 5:35AM 6:40AM 7:05AM Tracy
More informationLow Impact Light Rail Update
Low Impact Light Rail Update Forward plan: All contracts to be signed up by end of August 2014. All feasibility to be completed by end of 2014/14 financial year. Down selection to those projects to be
More informationIH 35 FEASIBILITY STUDY
IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE
More informationLight rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.
Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form. THE PROBLEM LIGHT RAIL THE SOLUTION? INTRODUCTION Light rail transit (LRT) provides the opportunity
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS
More informationThree ULTra Case Studies examples of the performance of the system in three different environments
Three ULTra Case Studies examples of the performance of the system in three different environments airport application: London Heathrow : linking business and staff car parks through the access tunnel
More informationSubmission to Greater Cambridge City Deal
What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a
More informationElected Officials Briefing North Metro Rail Line Update. November 10, 2016
Elected Officials Briefing North Metro Rail Line Update November 10, 2016 Dave Genova, RTD General Manager and CEO Five lines opening in 2016 Flatiron Flyer, Jan. 3 University of Colorado A Line, April
More informationPublic Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development
Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationHSR Vancouver WA to Camas Commuter Des, by R.N.
This plan will show the new route for the Portland-Vancouver Junction Railroad. Remove the existing Portland-Vancouver Junction Railroad leg from the Northeast Hazel Dell Avenue curve to the Burlington
More informationThe Picton/Mittagong line was opened in March 1867 as part of the Main South line.
Read below as Bob Newham, Loco Division Passenger Organiser, explores some of the incredible history behind rail in New South Wales. As you will discover, the month of March has many stories to tell March
More informationSOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009
DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road
More informationTransportation Engineering II UNIT - I
Transportation Engineering II UNIT - I I. Components of a Permanent Way: A. Rails: Rails are the I-section members of a track laid in two parallel lines to provide a level surface for the movement of trains.
More informationTER WP2 Transport Challenges and Global Crisis. Dr. Klaus Schierhackl, CFO Bad Gastein,
TER WP2 Transport Challenges and Global Crisis Dr. Klaus Schierhackl, CFO Bad Gastein, 23.4.2009 1 ASFINAG Group is the 3rd largest concessionaire in Europe responsible for a network of more than 2.100
More informationUNION STATION MASTER PLAN STUDY
UNION STATION MASTER PLAN STUDY The Chicago Department of Transportation has begun a comprehensive study of issues related to Chicago s Union Station, the Union Station Master Plan. Opened in 1925, Union
More informationJune WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington
DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June
More informationEnhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center
Enhancement and Utilization of Multipurpose Integrated Highly-Advanced Railway Applications (MIHARA) Test Center 11 Operation & Maintenance Business Department, Land Transportation Systems & Components
More informationPresentation to the Portfolio Committee on Transport Gautrain Update. Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009
Presentation to the Portfolio Committee on Transport Gautrain Update Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009 Gautrain in a nutshell Scope Currently the largest Greenfields
More informationBART Wheel Profile Change
BART Wheel Profile Change Cylindrical to Modified Tapered Ben Holland, P.E., Manager Vehicle Systems Engineering Rolling Stock & Shops Gregory Shivy Principal Track Engineer Maintenance & Engineering 1
More informationConfederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018
Confederation Line Stage 1 and 2 Our Lady of Fatima Church May 10 th, 2018 Agenda Confederation Line Stage 1 Overview project, consortium, vehicles Confederation Line Stage 2 Overview project, benefits
More informationSOUTH TEXAS COMMISSION MEETING
SOUTH TEXAS COMMISSION MEETING September 26, 2013 Pharr District Commission Meeting Pharr District: Overview The Pharr District plans, designs, builds, operates and maintains the state transportation system
More informationIMPROVEMENT CONCEPTS
IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic
More informationProduct Data SingleVario 2061
inglevario 206 50 50 50 Cutting through Grounding 4 teel pillar base 6 520 (for vehicle up to 5.00 m = 6 4 long)»540 (for vehicle up to 5.20 m long)«garage with door in front of the car parking system
More informationSALE PROPOSAL ROBBINS TBM UG1B-JAIPUR
SALE PROPOSAL ROBBINS TBM UG1B-JAIPUR INDEX Sl No Description Remarks 1 Index 2 Specification of TBM- Robbins 3 List of Rolling Stock attached to TBM & Other Equipments SPECIFICATION OF TBM ROBBINS f 6550
More informationHinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety
Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety 1 Where are we? Hinkley Point 2 EDF Energy s Nuclear New Build Projects February 2018 EDF Energy plc. All rights Reserved
More informationCREATING CONNECTIONS IN THE CITY OF KITCHENER
CREATING CONNECTIONS IN THE CITY OF KITCHENER GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS KITCHENER CITY COUNCIL SEPTEMBER 25, 2017 CONGESTION
More informationPUBLIC INFRASTRUCTURE PROJECTS
PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING
More informationTRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION
TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,
More informationCREATING HIGH-SPEED RAILWAYS. Track, Overhead Catenary and Substations. A MAJOR RAIL INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE COMPANY
CREATING HIGH-SPEED RAILWAYS Track, Overhead Catenary and Substations. East-European high-speed line A MAJOR RAIL INFRASTRUCTURE CONSTRUCTION AND MAINTENANCE COMPANY EXPERIENCE MAKES THE DIFFERENCE Colas
More informationAppendix E: Basis for Comparative Cost Analysis
DRAFT Technical Report RAILYARD ALIGNMENT AND BENEFITS STUDY Appendix E: Basis for Comparative Cost Analysis Estimated Probable Construction Costs DTX Future with Surface Rail (2026) Pennsylvania Avenue
More informationNOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA
NOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA Who we are? Eskom Uganda Limited is a whole owned subsidiary of Eskom Enterprises South Africa. Took over the operations of the complex on
More informationThe $600 Million Rebirth of San Diego Trolley
The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and
More informationThe Confederation Line Ottawa LRT Project
The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development Canada Dragados Canada Project Stakeholders Sponsors Project Co Equity Developers Design Build
More information