Allowed designs can be done using Avaya One Source (A1S) Configurator without the need for a password.

Size: px
Start display at page:

Download "Allowed designs can be done using Avaya One Source (A1S) Configurator without the need for a password."

Transcription

1 End of Sale Notice Notification Date: 05-October-2015 Revision Date: 17-January-2017 Effective Date: 01-January-2016 Subject: End of Sale Avaya Aura Workforce Optimization Release 12.x Theatre/Region: All Theaters/Regions Revision History Revision Date 05-October March April-2016 *17-January-2017 Reason for change First issue. Updated details and EOMS date changed to TBD. Clarified only latest minor release gets patched. Updated to extend AAWFO R12.1 End Of Manufacturing Support for adds/expansions only until 31 st December 2017 Summary Effective January 1, 2016 Avaya will no longer make commercially available the Avaya Aura Workforce Optimization (WFO) Release 12.x for new and upgrade solutions. New sales of Avaya Aura WFO R12.x (including R12.0 and R12.1) will no longer be available. Existing Avaya Aura WFO customers on R11 and earlier, Witness 7.x or earlier, and Nortel CRQM 6.x or earlier will no longer be able to upgrade to R12.x. Only like for like expansions to a customer s existing WFO product (e.g., adding Quality Monitoring seats to an existing QM system) and add on functionality within the same package (e.g., adding Tel Replay Package to an existing ACR system) will be allowed until End of Manufacturer Support (EOMS). Any expansion needs to consolidate to the existing WFO framework. Adding another WFO product to an existing ACR system (e.g., adding Quality Monitoring to an existing Contact Recording) is not allowed. This means that up buys from ACR to QM or ACR to WFO is not permitted. Adding another WFO product to an existing Quality Monitoring, Workforce Management or Workforce Optimization package is allowed as long as all information consolidate to the existing WFO framework. Allowed designs can be done using Avaya One Source (A1S) Configurator without the need for a password. To support expansion of customers existing WFO products, material codes for new/adds for Avaya Aura WFO Release 12.1 will remain in G status until the End of Manufacturer Support (EOMS) date (currently targeted for December 31, 2017). These expansion orders should include the after-market code (192156) and PAC codes (if applicable) as part of the order process.

2 While product quotes created prior to the EOS date are typically valid for 60 days, all orders that include products that have reached EOS must be placed and fulfilled by December 31, Any orders with EOS products placed after this date will not be shipped. There are very limited exceptions (subject to approval) starting on January 1, Discontinued Order Codes R12 All Codes Short Description WFO R12 CR IC INTG ENTL WFO R12 CR IC INTG UPG WFO R12 CR DIALER INTG ENTL WFO R12 CR DIALER INTG UPG Contact Recording / Compliance Recording WFO R12 CR PKG ENTL WFO R12 CR PKG UPG WFO R12 REDUN CR PKG ENTL WFO R12 REDUN CR PKG UPG WFO R12 ADV CR ENTL WFO R12 ADV CR UPG WFO R12 TEL REPLAY CR PKG ENTL WFO R12 TEL REPLAY CR PKG UPG WFO R12 CR QM ENCRYPTION ENTL WFO R12 CR QM ENCRYPTION UPG WFO R12 FULL TIME SCREEN RCDG ENTL WFO R12 FULL TIME SCREEN RCDG UPG Quality Monitoring WFO R12 QM PKG ENTL WFO R12 QM PKG UPG WFO R12 ADV QM PKG ENTL WFO R12 ADV QM PKG UPG WFO R12 DIALER ADPTR FOR QM WFO R12 DIALER ADPTR FOR QM ENTL WFO R12 DIALER ADPTR FOR QM UPG WFO R12 CONTENT PRODUCER ENTL WFO R12 CONTENT PRODUCER UPG WFO R12 STRATEGIC PLANNER ENTL WFO R12 STRATEGIC PLANNER UPG WFO R12 APPL ANLYS ENTL WFO R12 APPL ANLYS UPG Reporting WFO R12 AD-HOC RPT ADDL USER ENTL WFO R12 AD-HOC RPT ADDL USER UPG WFO R12 COGNOS RPT STUDIO ENTL WFO R12 COGNOS RPT STUDIO UPG Workforce Management WFO R12 WFM PKG ENTL WFO R12 WFM PKG UPG WFO R12 ADV WFM PKG ENTL

3 WFO R12 ADV WFM PKG UPG WFO R12 WFM TIME OFF MGR ENTL WFO R12 WFM TIME OFF MGR UPG WFO R12 WFM SHIFT BIDDING ENTL WFO R12 WFM SHIFT BIDDING UPG WFO R12 ADV SCORECARD ENTL WFO R12 ADV SCORECARD UPG WFO R12 KPI DESIGN ADAPTER ENTL WFO R12 KPI DESIGN ADAPTER UPG WFO R12 LESSON MGMT ENTL WFO R12 LESSON MGMT UPG WFO R12 COMP BASED LEARNING ENTL WFO R12 COMP BASED LEARNING UPG WFO R12 APPL LINK SRVR ENTL WFO R12 APPL LINK SRVR UPG WFO R12 ADV ADHERENCE ENTL WFO R12 ADV ADHERENCE UPG Workforce Optimization Package (CR + QM + WFM) WFO R12 WFO PKG ENTL WFO R12 WFO PKG UPG WFO R12 ADV WFO PKG ENTL WFO R12 ADV WFO PKG UPG Desktop and Process Analytics WFO R12 DPA TRACKER ENTL WFO R12 DPA TRACKER UPG WFO R12 ADV DPA ENTL WFO R12 ADV DPA UPG WFO R12 STR DPA ENTL WFO R12 STR DPA UPG WFO R12 DPP GUIDANCE ENTL WFO R12 DPP GUIDANCE UPG Speech Analytics WFO R12 SPH ESSENTIALS WFO R12 SPH ESSENTIALS ENTL WFO R12 SPH ESSENTIALS UPG WFO R12 SPH ADV ENTL WFO R12 SPH ADV UPG WFO R12 INTERCT DATA EXP MGR ENTL WFO R12 INTERCT DATA EXP MGR UPG WFO R12 SPH ANLYTCS ADDL LANG ENTL WFO R12 SPH ANLYTCS ADDL LANG UPG Customer Feedback WFO R12 CUSTMR FDBCK ADV ENTL WFO R12 CUSTMR FDBCK ADV UPG Base Package Up-Buys WFO R12 CR TO QM PKG UP-BUY WFO R12 CR TO ADV QM PKG UP-BUY WFO R12 CR TO WFO PKG UP-BUY WFO R12 CR TO ADV WFO UP-BUY WFO R12 ADV CR TO ADV QM PKG UP-BUY WFO R12 ADV CR TO ADV WFO PKG UP-BUY WFO R12 WFM TO WFO UP-BUY

4 WFO R12 WFM TO ADV WFO UP-BUY WFO R12 ADV WFM TO ADV WFO UP-BUY WFO R12 WFO TO ADV WFO UP-BUY Lab/Trial WFO R12 CR PKG CUST LAB WFO R12 SCRN RCDG CUST LAB WFO R12 ADV QM PKG CUST LAB WFO R12 ADV WFM PKG CUST LAB WFO R12 ADV WFO PKG PTNR LAB WFO R12 ADV WFO PKG CUST LAB Additional Features WFO R12 DATA CTR REDUND ENTL WFO R12 DATA CTR REDUND UPG WFO R12 INTRADAY PERFORM MGMT WFO R12 CALL AVOIDANCE ADD ON WFO R12 SERVICE RCVRY ADD ON WFO R12 COST TO SERVE ADD ON WFO R12 AACC Midsize Bundle (ACR included in the AACC-M bundle) WFO R12 CR MIDSIZE ENTPRS ENTL WFO R12 CR MIDSIZE ENTPRS UPG WFO R12 SMB Elite Bundle (Midmarket WFO offer) WFO R12 MIDMKT CR ENTL WFO R12 MIDMKT CR UPG WFO R12 MIDMKT CR QM BNDL ENTL WFO R12 MIDMKT CR QM BNDL UPG WFO R12 MIDMKT WFM ENTL WFO R12 MIDMKT WFM UPG WFO R12 MIDMKT CR QM WFM BNDL ENTL WFO R12 MIDMKT CR QM WFM BNDL UPG WFO R12 Elite Midsize Bundle (ACR included in the Elite-M bundle) WFO R12 CR FOR ELITE-M BNDLS ENTL WFO R12 CR FOR ELITE-M BNDLS UPG System Expansion post-end of Sale All sales of new systems and upgrades, and any sales of new feature add-ons using the discontinued codes listed above will end on the date indicated. However, the capacity of installed systems may be increased. Only like for like expansions to a customer s existing WFO product (e.g., adding Quality Monitoring seats to an existing QM system) and add on functionality within the same package (e.g., adding Tel Replay Package to an existing ACR system) will be allowed until End of Manufacturer Support (EOMS). Any expansion needs to consolidate to the existing WFO framework. Adding another WFO product to an existing ACR system (e.g., adding Quality Monitoring to an existing Contact Recording) is not allowed. This means that up buys from ACR to QM or ACR to WFO is not permitted. Adding another WFO product to an existing Quality Monitoring, Workforce Management or Workforce Optimization package is allowed as long as all information consolidate to the existing WFO framework.

5 Codes Still Available for System Expansions only R12 All Codes Short Description WFO R12 ADDITIONAL MEDIA WFO R12.1 CR FOR CM LX OS DVD WFO R12.1 CR CM CS WNDWS OS DVD WFO R12 ENCRYPT MGR DVD WFO R12 WFO DOC DVDS WFO R12 DSKTP DVD WFO R12 CUSTMR FEEDBACK DVD WFO R12 WFO CORE DVDS WFO R12 CR IC INTG WFO R12 CR DIALER INTG Contact Recording / Compliance Recording WFO R12 CR PKG WFO R12 REDUN CR PKG WFO R12 TEL REPLAY PT WFO R12 CNTRL REPLAY SRVR SFTW WFO R12 TEL REPLAY CR PKG WFO R12 CR QM ENCRYPTION WFO R12 FULL TIME SCREEN RCDG Quality Monitoring WFO R12 QM PKG WFO R12 ADV QM PKG WFO R12 UNIFY EWARE VIEWER WFO R12 CONTENT PRODUCER WFO R12 STRATEGIC PLANNER WFO R12 APPL ANLYS Reporting WFO R12 AD-HOC RPT ADDL USER WFO R12 COGNOS RPT STUDIO Workforce Management WFO R12 WFM PKG WFO R12 ADV WFM PKG WFO R12 WFM TIME OFF MGR WFO R12 WFM SHIFT BIDDING WFO R12 WFM MULTISITE MGMT WFO R12 ADV SCORECARD WFO R12 BASIC TO ADV SCORECARD UPBUY WFO R12 KPI DESIGN ADAPTER WFO R12 LESSON MGMT WFO R12 COMP BASED LEARNING WFO R12 LESS MGMT TO CBL UP-BUY WFO R12 APPL LINK SRVR WFO R12 ADV ADHERENCE Workforce Optimization Package (CR + QM + WFM) WFO R12 WFO PKG WFO R12 ADV WFO PKG Desktop and Process Analytics WFO R12 DPA TRACKER WFO R12 ADV DPA WFO R12 STR DPA

6 WFO R12 ADV DPA TO STR DPA UP-BUY WFO R12 SPH ESSENT TO SPH ADV UP-BUY WFO R12 AET TO STR DPA UP-BUY WFO R12 APP ANLYS STR DPA UP-BUY WFO R12 DPP GUIDANCE Speech Analytics WFO R12 SPH ADV WFO R12 INTERCT DATA EXP MGR WFO R12 SPH ANLYTCS ADDL LANG WFO R12 ANLYTCS DRIVEN QUALITY Customer Feedback WFO R12 CUSTMR FDBCK ADV Base Package Up-Buys WFO R12 QM TO ADV QM PKG UP-BUY WFO R12 QM TO WFO UP-BUY WFO R12 QM TO ADV WFO UP-BUY WFO R12 ADV QM TO ADV WFO UP-BUY WFO R12 WFM TO ADV WFM PKG UP-BUY Lab/Trial WFO R12 AV INT LAB Additional Features WFO R12 SDK FOR QM AND WFM WFO R12 DATA CTR REDUN WFO R12 DSKTP GADGETS WFO R12 BLENDED MEDIA SCHEDULING WFO R12 OUTBND WFO R12 PROJECTS WFO R12 TIME BANKING WFO R12 SCRN POP-UP ALERTS WFO R12 QUEUE HOPPING WFO R12 FORECAST AND SCHEDULE SRVR SIDE WFO R12 CAMPAIGN POOLING WFO R12 USER DEFINED FIELDS WFO R12 CR LIVE MNTR WFO R12 CALL AVOIDANCE WFO R12 SERVICE RCVRY WFO R12 COST TO SERVE WFO R12 CR SELECTIVE RCDG WFO R12 CR SEARCH AND REPLAY WFO R12 MOBILE APPL WFO R12 AACC Midsize Bundle (ACR included in the AACC-M bundle) WFO R12 CR MIDSIZE ENTPRS WFO R12 SMB Elite Bundle (Midmarket WFO offer) WFO R12 MIDMKT CR WFO R12 MIDMKT CR QM BNDL WFO R12 MIDMKT WFM WFO R12 MIDMKT CR QM WFM BNDL WFO R12 Elite Midsize Bundle (ACR included in the Elite-M bundle WFO R12 CR FOR ELITE-M BNDLS

7 Migration Strategy Avaya Aura WFO Release 15.1 is the alternative solution, providing a stronger value proposition for the customer, supporting Avaya and NES heritage infrastructure environments. Customers with Avaya Aura WFO Release 12.x, 11.0, 10.x, Avaya CSCM/Witness/Verint Release 7.x and/or Quality Monitoring 5.x, and NES CRQM 6.x / 7.0 under a current Avaya maintenance agreement (utility or Support Advantage with Upgrade Advantage) will be entitled to like-for-like Avaya Aura WFO 15.1 upgrade software at no additional cost. All implementation charges required by Avaya Professional Services (APS) will apply. Customers will be able to retain their existing maintenance contract until expiration and then will require recast to Support Advantage for the WFO R15.1 like for like upgrade. Please note that per Avaya product lifecycle policy, when a major release is still under manufacturer support, only the latest minor release of that major release will receive patches. For example, as long as ACR 12.x is still under manufacturer support, and the latest minor release is 12.1, only ACR 12.1 will receive patch support. ACR 12.0 will no longer receive patches. Schedule End of Sale Date 31-December-2015 (last day to order new systems, upgrades, new features) End of Manufacturer Support for SOFTWARE * 31-December-2017 End of Manufacturer Support for HARDWARE * Not applicable Last day to purchase system expansions 31 - December 2017 Last day to purchase a new Avaya services contract * Required at Point of Sale Targeted End of Services Support** 31-December 2021 * Per Avaya Product Lifecycle Policy **Avaya Services may revise the Target End of Services Support date based on the availability of quality repair parts and/or technical support expertise. Avaya WFO is only available for up to 3 year contracts, any requests beyond 3 years of maintenance support requires special bid approval. Customers should always consult any available product Services Support Notices for final information on product supportability.

8 Service and Warranty Avaya will continue to honor previously executed enhanced warranty, post-warranty and service contracts in accordance with the terms of those agreements. Avaya is not responsible for any support or maintenance commitments made by Business Partners or other service providers. Additional information concerning Avaya Services can be found on the Services Offer Information Web site. Renewals of existing Avaya service contracts covering this product will be allowed per the dates provided in this notice, unless otherwise published. Additional Information Avaya website: Avaya End-of-Sale Notices: Avaya Product Lifecycle Policy: or >> More Resources >> More >> Avaya Product Lifecycle Policy

Existing SAP quotes can be converted into orders for a period of 90 days after end of sale (until May 2, 2009)**.

Existing SAP quotes can be converted into orders for a period of 90 days after end of sale (until May 2, 2009)**. End of Sale Announcement for: Avaya Communication Manager Release 4.x 1 Avaya SIP Enablement Services Release 4.x Avaya IA770 Release 4.x Avaya Integrated Management Release 4.x Avaya Communication Manager

More information

Avaya will discontinue the sale of licenses for the Avaya Call Center Release 4.x, including all minor and update releases.

Avaya will discontinue the sale of licenses for the Avaya Call Center Release 4.x, including all minor and update releases. End of Sale for Avaya Call Center Release 4.x Notification Date: October 6, 2008 Avaya will discontinue the sale of licenses for the Avaya Call Center Release 4.x, including all minor and update releases.

More information

Title: End of Sale for Modular Messaging R4.0 with one-x Speech for the Avaya Message Storage Server (MSS)

Title: End of Sale for Modular Messaging R4.0 with one-x Speech for the Avaya Message Storage Server (MSS) Title: End of Sale for Modular Messaging R4.0 with one-x Speech for the Avaya Message Storage Server (MSS) Notification Date: November 15, 2008 With the General Availability (GA) of Modular Messaging Release

More information

Handling Instructions

Handling Instructions Handling Instructions CLS - Licensing of integration product (feature) OpenScape Contact Center Enterprise V8 History of Changes Ver. Released RDB# Changes 1.0 2010-03-01 3028 Initial Creation 1.1 2010-04-12

More information

Title: End of Sales Announcement for the Lucent PSAX Product Family

Title: End of Sales Announcement for the Lucent PSAX Product Family Title: End of Sales Announcement for the Lucent PSAX Product Family Notification Date: August 5 th, 2006 Avaya is announcing the End of Sales for the entire Lucent PSAX product family. These products are

More information

ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE

ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE In this Section: Overview Evaluation of Initial Requests Rollover Request Competing Request Competing Examples 1.0 OVERVIEW Pursuant to Section 2.2

More information

From: Tito R. Nagrampa Jr, P.E. Approved by: /s/ General Manager Juan M. Ulloa, P.E. Engineering Supervisor

From: Tito R. Nagrampa Jr, P.E. Approved by: /s/ General Manager Juan M. Ulloa, P.E. Engineering Supervisor AGENDA ITEM NO: 4.I.1 MEETING DATE: 12/10/2012 ADMINISTRATIVE REPORT NO.: 2013-28 To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations From: Tito R. Nagrampa

More information

LIST OF OPEN TRAINING TRAINING PLANNER 2016/2017 Course location: Lagos, Abuja, Port Harcourt.

LIST OF OPEN TRAINING TRAINING PLANNER 2016/2017 Course location: Lagos, Abuja, Port Harcourt. JANUARY 2016 Credit Management and Collection of 4-6 11-15 14-27 Abuja/Lagos/PH 150,000 220,000 320,000 Receivables Developing Executive Management 4-6 11-15 14-27 Abuja/Lagos/PH 150,000 220,000 320,000

More information

Notice to Registered Entities of SPP RE 2015 Reporting Requirements Schedule

Notice to Registered Entities of SPP RE 2015 Reporting Requirements Schedule Notice to Registered Entities of SPP RE 2015 Reporting Requirements Schedule For Periodic Data Submittals, Self-certification, and NERC Facility Rating Alert Revised November 18, 2015 SPP RE Table of Contents

More information

Assessment of Smart Grid Applications for the City of Palo Alto. City of Alameda Public Utilities Board September 19, 2011

Assessment of Smart Grid Applications for the City of Palo Alto. City of Alameda Public Utilities Board September 19, 2011 Assessment of Smart Grid Applications for the City of Palo Alto City of Alameda Public Utilities Board September 19, 2011 1 Introduction Shiva Swaminathan Sr. Resource Planner City of Palo Alto Utilities

More information

Welcome to the NSTA Library

Welcome to the NSTA Library Welcome to the NSTA Library This is the Keyword Index of the National School Transportation Association s Library of Written Comments, Position Papers, Position Letters, Member Bulletins, Testimony, and

More information

Advancing the TWV Fleet 10 May 2016

Advancing the TWV Fleet 10 May 2016 U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Advancing the TWV Fleet 10 May 2016 Mr. Magid Athnasios, SES TARDEC Executive Director Systems Integration and Engineering Mission

More information

About KPIT Sparkle 2018

About KPIT Sparkle 2018 www.kpit.com About KPIT Sparkle 2018 KPIT Technologies Ltd 31 offices across 16 countries 60 Patents filed FY2017 revenues $494 Million Development Centers located in India, US, Germany, China, and Brazil

More information

ELD Final Rule. What are the next steps to be compliant? Learn about the ELD mandate and how you can meet compliance standards now and in the future

ELD Final Rule. What are the next steps to be compliant? Learn about the ELD mandate and how you can meet compliance standards now and in the future ELD Final Rule What are the next steps to be compliant? Learn about the ELD mandate and how you can meet compliance standards now and in the future Fleetmatics Introductions Paul Kelly Senior Account Manager

More information

Legal Aid Reform: what is supposed to happen when?

Legal Aid Reform: what is supposed to happen when? : what is supposed to happen when? Updated 9.2.07 The table below sets out various statements made by the DCA/LSC about the timing of the proposed changes in relation to non-family civil matters. Since

More information

Welcome to the NSTA Library

Welcome to the NSTA Library Welcome to the NSTA Library This is the Keyword Index of the National School Transportation Association s Library of Written Comments, Position Papers, Position Letters, Member Bulletins, Testimony, and

More information

Milestones for the implementation of SMART TACHOGRAPHS according Reg.EU 165/2014 and 799/2016

Milestones for the implementation of SMART TACHOGRAPHS according Reg.EU 165/2014 and 799/2016 Milestones for the implementation of SMART TACHOGRAPHS according Reg.EU 165/2014 and 799/2016 1 Regulation (EU) No 165/2014 New Technical Annex From current Digital Tachograph GEN 1 To Smart Tachographs

More information

ZT Disk Drive Replacement Solutions

ZT Disk Drive Replacement Solutions ZT Disk Drive Replacement Solutions ZT Technology Solutions 1 Bethany Road Suite 56 Hazlet, NJ 07730 Phone: 732-217-3081 Email: info@zttechsol.com www.zttechsol.com Why Upgrade your Legacy Mechanical HDD

More information

Dallas Integrated Corridor Management System Lessons Learned. June 2, 2014

Dallas Integrated Corridor Management System Lessons Learned. June 2, 2014 Dallas Integrated Corridor Management System Lessons Learned June 2, 2014 US 75 Corridor Networks Freeway with continous Frontage Roads Managed HOV lanes Dallas North Tollway 167 Miles of Arterials DART

More information

Equipment Management Department. Council Budget Presentation

Equipment Management Department. Council Budget Presentation Equipment Management Department Council Budget Presentation Presented: March 15, 2012 Council Inquiries 1. Please provide a brief summary of shifts in your department s operating budget and staffing levels

More information

MONTHLY NEW RESIDENTIAL SALES, SEPTEMBER 2018

MONTHLY NEW RESIDENTIAL SALES, SEPTEMBER 2018 FOR RELEASE AT 10:00 AM EDT, WEDNESDAY, OCTOBER 24, MONTHLY NEW RESIDENTIAL SALES, SEPTEMBER Release Number: CB18 160 October 24, The U.S. Census Bureau and the U.S. Department of Housing and Urban Development

More information

4-6 October 2016 The NEC, Birmingham, UK. cleanenergylive.co.uk

4-6 October 2016 The NEC, Birmingham, UK. cleanenergylive.co.uk 4-6 October 2016 The NEC, Birmingham, UK cleanenergylive.co.uk #celive #seuk @CleanEnergyLive cleanenergylive.co.uk #celive #seuk @CleanEnergyLive UK Energy storage policy A defining issue Clean Energy

More information

The Rollover Request customer accepts a reservation term for the rollover at least as long as that offered by any competing customer.

The Rollover Request customer accepts a reservation term for the rollover at least as long as that offered by any competing customer. XX.X xx.xx ROLLOVER RIGHTS FOR LONG TERM FIRM SERVICE Overview Pursuant to Section 2.2 of the Tariff, long term firm transmission service customers (Network Integration Transmission Service ( NITS ) customers

More information

George Carter III Dept. of Enterprise Services Olympia Washington

George Carter III Dept. of Enterprise Services Olympia Washington George Carter III Dept. of Enterprise Services Olympia Washington george.carter@des.wa.gov 360-664-9213 Agency Background 4,300 vehicles Electric vehicles in fleet since 2014 Central service provider to

More information

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development Raemeka Mayo or Stephen Cooper Economic Indicators Division (01) 76-5160 FOR IMMEDIATE RELEASE FRIDAY, JUNE 17, 016 AT 8:0 A.M. EDT NEW RESIDENTIAL CONSTRUCTION IN MAY 016 The U.S. Census Bureau and the

More information

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development Raemeka Mayo or Stephen Cooper Economic Indicators Division (01) 76-5160 FOR IMMEDIATE RELEASE WEDNESDAY, MARCH 16, 016 AT 8:0 A.M. EDT NEW RESIDENTIAL CONSTRUCTION IN FEBRUARY 016 The U.S. Census Bureau

More information

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company California Independent System Operator Corporation December 4, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Fleet Safety Initiative Status Summary

Fleet Safety Initiative Status Summary Fleet Safety Initiative Status Summary Deborah Majeski DTE Energy Company October 7, 2008 DTE Energy s Primary Subsidiaries are Gas and Electric Utilities 2 Non-Utility Energy Related Businesses 3 Impact

More information

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Operation Name: ROAD INFRASTRUCTURE

More information

EASA Update. ARSA Symposium, Washington DC. 20 March Karl SPECHT

EASA Update. ARSA Symposium, Washington DC. 20 March Karl SPECHT EASA Update ARSA Symposium, Washington DC 20 March 2014 Karl SPECHT EASA News Since September 2013 EASA s new Executive Director: Mr Patrick KY 20/03/2014 ARSA Symposium 2014 2 US-EU Bilateral Update JMCB

More information

Electrovaya Provides Business Update

Electrovaya Provides Business Update News for Immediate Release Electrovaya Provides Business Update Toronto, Ontario November 8, 2016 Electrovaya Inc. (TSX: EFL) (OTCQX:EFLVF) is providing the following update on business developments previously

More information

Commuter Rail Performance. October

Commuter Rail Performance. October Commuter Rail Performance October 31 2016 1 Background - overall performance Year To Date: 89.67% YTD 125,629 trains North: 90.79% YTD 48,426 trains South: 89.07% YTD 77,203 trains 2 Background - overall

More information

MCS. Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors. Last Updated: 25 th September 2017

MCS. Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors. Last Updated: 25 th September 2017 MCS Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors Last Updated: 25 th September 2017 1. Publication of MCS 012 Issue 2.1 on 5 th April 2016 Please

More information

PRODUCT DESCRIPTIONS AND METRICS

PRODUCT DESCRIPTIONS AND METRICS PRODUCT DESCRIPTIONS AND METRICS Adobe PDM - AEM 5.6.1 Subscription OnPremise (2013v3) The Products and Services described in this PDM are subject to the applicable Sales Order, the terms of this PDM,

More information

DTN Biodiesel Documentation

DTN Biodiesel Documentation DTN Biodiesel Documentation Table of Contents Biodiesel edition Download Instructions...1 Launching ProphetX and the BioDiesel Workbook...3 The BioDiesel Workbook...5 CBOT and NYMEX...5 Soybean Cash Prices

More information

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 October 17, 2017 Re: California

More information

Jiri Prochazka (BASF) & Jim Luffman (ABB), April 25, 2012 Session 12 APW C551I BASF Windsor - Harmony system evolution success to System 800xA

Jiri Prochazka (BASF) & Jim Luffman (ABB), April 25, 2012 Session 12 APW C551I BASF Windsor - Harmony system evolution success to System 800xA Jiri Prochazka (BASF) & Jim Luffman (ABB), April 25, 2012 Session 12 APW C551I BASF Windsor - Harmony system evolution success to System 800xA April 25, 2012 Slide 1 C551I BASF Windsor - Harmony system

More information

JANUARY 2018 MON TUE WED THU FRI SAT SUN

JANUARY 2018 MON TUE WED THU FRI SAT SUN WHO IS EDGAR AGENTS? Edgar Agents LLC is a full service SEC filing agency providing regulatory filing, news distribution and financial printing services for public companies, private equity firms, attorneys

More information

ABB Wind Care Service Offering

ABB Wind Care Service Offering ABB Wind Care Service Offering ABB Wind Care Service Offering ABB is the largest supplier of electrical components, systems, and services to the wind power industry. With continued investment and expansion

More information

Transportation of Hazardous Commodities HM 216B Update. Jay Grove (for Karl Alexy) GATX

Transportation of Hazardous Commodities HM 216B Update. Jay Grove (for Karl Alexy) GATX Transportation of Hazardous Commodities HM 216B Update Jay Grove (for Karl Alexy) GATX Overview Review the implications that HM216B has on tank car owners and lessees Rule overview Compliance with requirements

More information

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016 California Energy Storage Policies Carla Peterman Commissioner, California Public Utilities Commission December 2016 California Storage Law and Policy l California has supported energy storage through

More information

Retrofitting unlocks potential

Retrofitting unlocks potential 54 ABB REVIEW SERVICE AND RELIABILITY SERVICE AND RELIABILITY Retrofitting unlocks potential A modern approach to life cycle optimization for ABB s drives delivers immediate performance improvement and

More information

SAIREC Panel Discussion

SAIREC Panel Discussion Text SAIREC Panel Discussion Cape Town 04-Oct-2015 Unlocking Grid Capacity for the Energy Mix Proposed in the IRP Cape Town International Convention Centre Sunday, 04 October 2015, 11:30 for 13:00 Highlights

More information

Department of the Environment. Moving Away From Stage II Vapor Recovery

Department of the Environment. Moving Away From Stage II Vapor Recovery Department of the Environment Moving Away From Stage II Vapor Recovery 2013 Stage II Regulations Stakeholder Meeting November 12, 2013 Topics Covered Background The technical analyses What does it tell

More information

NYSERDA Alternative Fuel Vehicle Programs. Patrick Bolton and Adam Ruder NYSERDA April 24, 2013

NYSERDA Alternative Fuel Vehicle Programs. Patrick Bolton and Adam Ruder NYSERDA April 24, 2013 NYSERDA Alternative Fuel Vehicle Programs Patrick Bolton and Adam Ruder NYSERDA April 24, 2013 About NYSERDA Basic Facts About NYSERDA Established in 1975 by State Legislature Executive level organization

More information

(Text with EEA relevance)

(Text with EEA relevance) L 150/10 COMMISSION REGULATION (EU) 2015/924 of 8 June 2015 amending Regulation (EU) No 321/2013 concerning the technical specification for interoperability relating to the rolling stock freight wagons

More information

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL PRIOR PRINTER'S NO. PRINTER'S NO. THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 0 INTRODUCED BY M. QUINN, TAYLOR, BRIGGS, V. BROWN, HARPER, HENNESSEY, W. KELLER, KIM, KORTZ, MARSICO, MATZIE,

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of November 18, 2017 DATE: November 7, 2017 SUBJECT: Six-Month Extension of car2go Demonstration Study Agreement C. M. RECOMMENDATIONS: 1. Authorize

More information

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 March 14, 2017 Re: California

More information

Gateshead Care Call. Gateshead Council, Regent Street Gateshead NE8 1HH Tel: How are we doing? April March 2013

Gateshead Care Call. Gateshead Council, Regent Street Gateshead NE8 1HH Tel: How are we doing? April March 2013 Gateshead Care Call Gateshead Council, Regent Street Gateshead NE8 1HH Tel: 0191 478 7666 Gateshead Care Call How are we doing? April 2012 - March 2013 October 2013 Contents Welcome Welcome 3 Care Call

More information

JTAC TECHNICAL BULLETIN

JTAC TECHNICAL BULLETIN JTAC TECHNICAL BULLETIN SUBJECT: BULLETIN NUMBER: BULLETIN TYPE: AFFECTED PRODUCTS: ISSUE DATE: March 15, 2013 REVISION: 1.1 Hardware End of Life Announcement M/T-Series IQ PICs PSN-2013-03-892 Product

More information

Future mobility in a dynamic environment. Dr. Rolf Bulander

Future mobility in a dynamic environment. Dr. Rolf Bulander Future mobility in a dynamic environment Dr. Rolf Bulander 02.03.2017 Bosch results 2016 Highlights of the business year 2 What s new in the Bosch world? International highlights 3 Global growth Not much

More information

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL PRINTER'S NO. 11 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 01 INTRODUCED BY M. QUINN, TAYLOR, BRIGGS, V. BROWN, HARPER, HENNESSEY, W. KELLER, KIM, KORTZ, MARSICO, MATZIE, NEILSON,

More information

Final Report. Hollywood Street Services Yard CNG Fueling Station. City of Los Angeles Department of General Services

Final Report. Hollywood Street Services Yard CNG Fueling Station. City of Los Angeles Department of General Services Final Report Hollywood Street Services Yard CNG Fueling Station Contract No. ML-07028 City of Los Angeles Department of General Services December 15, 2011 Prepared for the Mobile Source Air Pollution Review

More information

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Yukon s Independent Power Production Policy

Yukon s Independent Power Production Policy Yukon s Independent Power Production Policy Updated October 2018 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy priorities,

More information

Keynote Address. DPPS A Petrobras DP Safety Program

Keynote Address. DPPS A Petrobras DP Safety Program Keynote Address DPPS A Petrobras DP Safety Program Afonso André Pallaoro Petrobras/E&P Service 1 Return to Session Directory DPC DYNAMIC POSITIONING CONFERENCE DPPS A Petrobras Dynamic Positioning Safety

More information

Recharge Kick-off Meeting Recharge Activity Review Process for

Recharge Kick-off Meeting Recharge Activity Review Process for Recharge Kick-off Meeting Debra Fry Executive Director, Operating Budget and Recharge Review Gabriella Hato Manager, Recharge Review Sarah Hislen Analyst, Recharge Review Charet Wynn Analyst, Recharge

More information

Certification Memorandum. Approved Model List Changes

Certification Memorandum. Approved Model List Changes Certification Memorandum Approved Model List Changes EASA CM No.: CM 21.A-E Issue 01 issued 15 August 2018 Regulatory requirement(s): 21.A.57, 21.A.61, 21.A.62, 21.A.91, 21.A.93, 21.A.97, 21.A.114, 21.A.117,

More information

Cisco Nexus 7700 Switches Environment

Cisco Nexus 7700 Switches Environment Data Sheet Cisco Nexus 7700 Switches Environment Data Sheet Product Overview The Cisco Nexus 7700 platform is the latest extension to the modular Cisco Nexus 7000 Series Switches. Capable of 83 terabits

More information

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2015 THROUGH QUARTER 4 (JULY 2014 THROUGH JUNE 2015)

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2015 THROUGH QUARTER 4 (JULY 2014 THROUGH JUNE 2015) STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR THROUGH QUARTER 4 (JULY THROUGH JUNE ) CONTENTS BALANCED SCORECARD OF KEY PERFORMANCE INDICATORS SAFETY & SECURITY SLIDE VEHICLE, PASSENGER

More information

PRODUCT PORTFOLIO. Electric Vehicle Infrastructure ABB Ability Connected Services

PRODUCT PORTFOLIO. Electric Vehicle Infrastructure ABB Ability Connected Services PRODUCT PORTFOLIO Electric Vehicle Infrastructure ABB Ability Connected Services 2 ABB ABILITY CONNECTED SERVICES FOR EV INFRASTRUCTURE PRODUCT PORTFOLIO To successfully run a commercial charging network

More information

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2015, QUARTER 1 (JULY THROUGH SEPTEMBER 2014)

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2015, QUARTER 1 (JULY THROUGH SEPTEMBER 2014) STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 215, QUARTER 1 (JULY THROUGH SEPTEMBER ) CONTENTS BALANCED SCORECARD OF KEY PERFORMANCE INDICATORS SAFETY & SECURITY SLIDE VEHICLE, PASSENGER

More information

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Evolution and life cycle management. for OCS Systems. Philippe Landre ABB Automation Technologies Sweden. ABB Inc

Evolution and life cycle management. for OCS Systems. Philippe Landre ABB Automation Technologies Sweden. ABB Inc Philippe Landre ABB Automation Technologies Sweden Evolution and life cycle management for OCS Systems ABB Inc. - 1 - Introduction Mature Automation Landscape Automation systems are entering a period of

More information

ABB Drive Services Your choice, your future

ABB Drive Services Your choice, your future ABB Drive Services Your choice, your future Your choice, your future The future of your drives depends on the service you choose. Whatever you choose, it should be a well-informed decision. No guesswork.

More information

Mississauga Transit 2009 Budget

Mississauga Transit 2009 Budget Mississauga Transit 2009 Budget Budget Committee Presentation December 2, 2008 Revenue Ridership Forecasted 2008 Total Rides Including transfers 11% growth in the last 24 months Transit Service Area Business

More information

2019 New Transit Service Plan

2019 New Transit Service Plan Agenda Item 7.2 2019 New Transit Service Plan Draft Proposal VTA Board of Directors January 2019 Background: Next Network Plan and Today s Plan Early 2016 Transit Choices report and the ridership-coverage

More information

Technological Viability Evaluation. Results from the SWOT Analysis Diego Salzillo Arriaga, Siemens

Technological Viability Evaluation. Results from the SWOT Analysis Diego Salzillo Arriaga, Siemens Technological Viability Evaluation Results from the SWOT Analysis Diego Salzillo Arriaga, Siemens 26.04.2018 Agenda Study Objectives and Scope SWOT Analysis Methodology Cluster 4 Results Cross-Cluster

More information

LIGHT RAIL VEHICLE PROCUREMENT PHASE 2 Replacement Fleet Upgrades, February 2019

LIGHT RAIL VEHICLE PROCUREMENT PHASE 2 Replacement Fleet Upgrades, February 2019 LIGHT RAIL VEHICLE PROCUREMENT PHASE 2 Replacement Fleet Upgrades, February 2019 Background Summer 2014 SFMTA awarded a contract to Siemens January 2017 First vehicle delivered to SFMTA property Fall 2017

More information

Catalogue. products & services

Catalogue. products & services Catalogue products & services NewMotion Europe s Largest Electric Charging Partner No matter your lifestyle, business, car or budget, we are committed to making electric driving as simple and convenient

More information

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 4th Revised SHEET NO. 88 CANCELLING MO.P.S.C. SCHEDULE NO. 6 3rd Revised SHEET NO. 88 PURPOSE SOLAR REBATE The purpose of this Rider SR is to implement the solar rebate established

More information

Monthly Metric Report (MMR) Phases and Lifecycle

Monthly Metric Report (MMR) Phases and Lifecycle Monthly Metric Report (MMR) Phases and Lifecycle Updated August 24, 17 Life Cycle of the MMR Initiation BCIP Set Goals Upload into ebuilder Design Phase Refresh information and load into ebuilder at SD,

More information

Renewable and Low Carbon Fuel Requirements Regulation Summary:

Renewable and Low Carbon Fuel Requirements Regulation Summary: Summary: 2010-2017 British Columbia s (Regulation) resulted in the avoidance of over 1.36 million tonnes of greenhouse gas emissions globally in 2017, and a total of 7.73 million tonnes between 2010 and

More information

ABB life cycle services Uninterruptible power supplies

ABB life cycle services Uninterruptible power supplies ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you

More information

Session 1: Implementing SDG 7 and Achieving Target 7.1 CAMBODIA CHHE LIDIN

Session 1: Implementing SDG 7 and Achieving Target 7.1 CAMBODIA CHHE LIDIN Session 1: Implementing SDG 7 and Achieving Target 7.1 CAMBODIA Seminar on Supporting Sustainable Development Goal 7, Target 7.1 By 2030 ensure universal access to affordable, reliable and modern energy

More information

Type Acceptance Report

Type Acceptance Report TAR 17/21B/20 SAFRAN ARRIUS 2 Aircraft Certification Unit TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1. INTRODUCTION 1 2. PRODUCT CERTIFICATION DETAILS 2 3. APPLICATION DETAILS AND BACKGROUND INFORMATION 3

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

Welcome Performance and Registration Information Systems Management (PRISM)

Welcome Performance and Registration Information Systems Management (PRISM) Welcome Performance and Registration Information Systems Management (PRISM) IRP Annual Meeting May 15, 2014 Monique Riddick, PRISM Program Technical Manager Federal Motor Carrier Safety Administration

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

ERDF in the Heart of the South West: Where to find out more

ERDF in the Heart of the South West: Where to find out more ERDF in the Heart of the South West: Where to find out more I want an overview of the 2014-2020 European Structural and Investment Funds (ESIF) Growth Programme for England Overview of the ESIF Growth

More information

AUDI SUSTAINABILITY PROGRAM

AUDI SUSTAINABILITY PROGRAM Audi Sustainability Report 2017 1 AUDI SUSTAINABILITY PROGRAM The Audi Sustainability Program combines strategic goals in the area of sustainability with concrete measures. It is divided into the four

More information

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics. Massachusetts RPS Solar Carve-Out: Overview & Program Basics November 2, 2011 Outline Learn how the solar PV market has grown in MA since 2007 Understand the policy design of the MA RPS Solar Carve-Out

More information

National Grid New Energy Solutions (NES)

National Grid New Energy Solutions (NES) National Grid New Energy Solutions (NES) March 1, 2017 National Grid US 3.3 m electric and 3.6 m gas customers 13,672 employees ~$9B rate base +$2B capital invest. 2 New Energy Solutions Add an image here

More information

BERNSTEIN STRATEGIC DECISIONS CONFERENCE 2018

BERNSTEIN STRATEGIC DECISIONS CONFERENCE 2018 ABB LTD, NEW YORK CITY, USA, 31 MAY 2018 Positioned for profitable growth BERNSTEIN STRATEGIC DECISIONS CONFERENCE 2018 Ulrich Spiesshofer, CEO Important notice This presentation includes forward-looking

More information

Implementation of AASHTO s Manual for Assessing Safety Hardware (MASH) 2016

Implementation of AASHTO s Manual for Assessing Safety Hardware (MASH) 2016 Implementation of AASHTO s Manual for Assessing Safety Hardware (MASH) 2016 Update from the Technical Committee on Roadside Safety Keith Cota, New Hampshire DOT MASH 2016 Overview Background Ballot Results/Dates

More information

Inventory of Best Practices for Learning Support Centers in Higher Education

Inventory of Best Practices for Learning Support Centers in Higher Education Inventory of Best Practices for Learning Support Centers in Higher Education 1. The LSC has a mission statement congruent with its department and institutional mission GENERAL Agree Disagree N/A Blank

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 August 15, 2017 Re: California

More information

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp.

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 October 1, 2018 Re: California

More information

Frequently Asked Questions: EMC Captiva 7.5

Frequently Asked Questions: EMC Captiva 7.5 Frequently Asked Questions: EMC Captiva 7.5 Table of Contents What s New? Captiva Web Client Capture REST Services Migration/Upgrades Deprecated Modules Other Changes More Information What s New? Question:

More information

GAS GAUGE FIRMWARE UPDATE PROCEDURE

GAS GAUGE FIRMWARE UPDATE PROCEDURE GAS GAUGE FIRMWARE UPDATE PROCEDURE RevC GAS GAUGE FIRMWRAE UPDATE PROCEDURE Revision History Version and Date Rev A, September 2014 Rev B, November 2014, November 2014 Description of Changes Initial Release

More information

ClearRoute Training Courses

ClearRoute Training Courses ClearRoute Training Courses Balfour Beatty Rail offers a wide range of courses designed to benefit all levels of users of its market leading clearance software, ClearRoute. See inside for full details

More information

Overview of California AB32 Regulations

Overview of California AB32 Regulations Overview of California AB32 Regulations Business Council for Sustainable Energy Seminar Washington, DC Scott Tomashefsky Northern California Power Agency January 6, 2011 NCPA Overview California Joint

More information

Department of Market Quality and Renewable Integration November 2016

Department of Market Quality and Renewable Integration November 2016 Energy Imbalance Market March 23 June 3, 216 Available Balancing Capacity Report November 1, 216 California ISO Department of Market Quality and Renewable Integration California ISO i TABLE OF CONTENTS

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

Type Acceptance Report

Type Acceptance Report TAR 13/21B/2 Revision 1 WILLIAMS INTERNATIONAL FJ44 Series Aircraft Certification Unit TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1. INTRODUCTION 1 2. ICAO TYPE CERTIFICATE DETAILS 1 3. TYPE ACCEPTANCE DETAILS

More information

Notification of a Proposal to issue a Certification Memorandum. Approved Model List Changes

Notification of a Proposal to issue a Certification Memorandum. Approved Model List Changes Notification of a Proposal to issue a Certification Memorandum Approved Model List Changes EASA Proposed CM No.: Proposed CM 21.A-E Issue 01 issued 02 October 2017 Regulatory requirement(s): 21.A.57, 21.A.61,

More information

ETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series) EN 301 783-2 V1.2.1 (2010-07) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Commercially available amateur

More information