1 Section 15: Cranes, Hoists and Rigging OVERVIEW The University of California owns many cranes and hoists, with associated rigging, ranging from fractional-ton chain-falls, come-a-longs and chain-hoists, to multi-ton overhead cranes. All kinds of lift-equipment are regulated by CalOSHA / FedOSHA and other regulatory agencies. There are many specific safety-program-requirements and documented inspections required by law and regulated by these agencies. Departments that own/operate this equipment must be able to demonstrate safe-equipment and workpractices are incorporated into their personnel s work areas, regardless of affiliation with the University. Users of cranes, hoists and rigging must be trained, qualified and then authorized to use specific lift-equipment in specific locations for specific purposes before users are allowed to proceed to use such equipment without direct and knowledgeable supervision by UCqualified staff. Shop Managers must assure their shop cranes, hoists and rigging are load-tested with supporting documentation of load testing available for regulatory-agency review. In addition, equipment must be routinely inspected for deficiencies and removed from service and repaired or replaced as needed before any unsafe-use. WHAT IS A CRANE? A crane is machine for lifting or lowering a load and moving it horizontally, in which the hoisting mechanism is an integral part of the machine. It may be driven manually or be powered and may be a fixed or a mobile machine, but does not include stackers, industrial lift trucks, power shovels, backhoes or excavators. WHAT IS A HOIST? A hoist is an apparatus for raising or lowering a load by the application of a pulling force, but does not include any type of horizontal moving device. A hoist is an integral part of any crane but also may be used alone and not as part of a crane. HOW ARE CRANES / HOISTS / RIGGING RATED? Cranes, hoists and rigging are generally classified by how much weight they are designed to safely lift and move. In the United States, the lift-capacity is usually noted as tonnage. A small crane may have a ¼-ton rating (500 lbs.) while a larger crane may have a 5-ton Section 15 Cranes Hoists and Rigging Safety Page 1 All rights Reserved

2 rating (10,000lbs.), while extremely large cranes may be designed to lift more than 100 tons (200,000 lbs.). WHAT LIFT-EQUIPMENT DOES THIS APPLY TO? This shop reference manual section applies to any overhead lifting device / crane / hoist / and associated rigging that is attached to any building, research facility or equipment owned or operated by the University of California. It outlines CalOSHA-required load testing, maintenance, inspections and operator training for all types of cranes, hoists and associated rigging/lift-gear. There are two classes of cranes/hoists defined according to rated load capacities: Three Tons and Under ( 3Ton) and Over Three Tons (>3Ton). The larger cranes are subject to more-stringent inspections, load tests and scheduled maintenance. Smaller cranes / hoists must have initial load tests and documented inspections leading to routine maintenance. This section applies to any shop-work, research, construction, and maintenance activities that utilize such lift equipment. WHAT ARE LOAD TESTS AND WHEN ARE THEY REQUIRED? Load tests are a physical challenge to the fixed lifting equipment that loads the lift equipment beyond its design-load-capacity (110%-125% of rated capacity) in a controlled / safe manner to ensure the lift equipment operates as designed / installed up to its rated load capacity. Load tests must be conducted by a CalOSHA-approved Certificating Agency. There are no University of California organizations qualified to conduct load testing. Therefore this service must be contracted by your campus with an outside Certificating Agency. The load-testing agency will come to your campus and load-test your cranes, hoists and rigging. Equipment greater than 3-ton capacity may include maintenance service with a revolving load-test completed every 4 years. For equipment 3- tons or less, this may be a one-time load-test to ensure legal compliance and safe-function of the equipment. Contact your EH&S Department to learn more about load testing, and arrange review your lift equipment in preparation for contracting with a Certificating Agency for load-testing. Cranes rated above three tons require documented quadrennial (every 4-years) load testing and annual inspection by a CalOSHA Certificating Agency. Cranes rated 3-tons and less require a one-time load testing/certifying upon installation, or upon efforts to become code-compliant by crane/hoist owner departments. Cranes may have their load-rating reduced through a documented derating process. The requirements of this process are outlined further below. Section 15 Cranes Hoists and Rigging Safety Page 2 All rights Reserved

3 WHAT ARE THE SPECIFIC LOAD TEST REQUIREMENTS? Upon program inception, initial equipment installation, or when conducting quadrennial load tests, the crane / hoist owner-department must: 1. Assure that all crane and hoist components and their attachments to a structure are engineered to support 125% of maximum load capacity of the equipment component with the lowest load rating. The design of attachment to structure may require a stamp by a Structural Professional Engineer. 2. Arrange for an initial load test of 125% rated capacity and performed by a Certificating Agency (Your campus EH&S can help you with this.). 3. Arrange for initial testing of rigging at 110% - 125% maximum load capacity (to be determined by the Certificating Agency based upon type and use of crane). 4. Ensure rigging is tagged or otherwise marked with load capacities (unless it is an alloy chain when tabulated data may be used). WHAT KINDS OF CRANES / HOISTS / LIFT EQUIPMENT ARE THERE? Bridge Crane A crane that lifts objects by a hoist hanging from a trolley that moves horizontally on overhead rails riding on top of support beams, all located well above a floor and a permanent part of a building s structure. Section 15 Cranes Hoists and Rigging Safety Page 3 All rights Reserved

4 Gantry Crane A crane that lifts objects by a hoist hanging from a trolley and can move horizontally on a rail or pair of rails fitted under a beam. Unlike Bridge Cranes, Gantry Cranes have legs and rollers integral to the support structure and are supported on a flat surface or may roll on rails embedded into the surface upon which the crane sets. Floor Mounted Jib Crane/Boom Crane Jib Cranes have a horizontal load-supporting boom, that is attached to a pivoting vertical column. The column is either free-standing or building-mounted. They enable lifting and lowering of a load within a fixed arc of rotation. Wall Mounted Jib Crane/Boom Crane A Jib crane permanently mounted to a structure. (See detailed definition above) Section 15 Cranes Hoists and Rigging Safety Page 4 All rights Reserved

5 Monorail Crane A crane that travels on a single runway beam permanently attached to a structure. Anchor Plate (in ceiling) An anchor plate is a fixed plate in a ceiling / support structure that a crane / hoist hangs from and allow safe vertical movement only. It is not intended to be used for any kind of horizontal movement. Rail, Track or Beam The horizontal structure attached to a building or framework that is designed / mated specifically to a trolley. The levelinstallation and cross-section-geometry of a rail / track / beam is critical to safe trolley movement / use. Always use mated rail / track / beam and trolleys to ensure the safest long-term use. Section 15 Cranes Hoists and Rigging Safety Page 5 All rights Reserved

6 Trolley The wheeled carriage that a crane / hoist hangs from that s used to provide horizontal movement to the lift-equipment. Always use trolleys that are designed mated with the geometry of a rail / track / beam. WHAT KIND OF HOISTS ARE THERE? Electric-powered Hoist Air-powered Hoist Section 15 Cranes Hoists and Rigging Safety Page 6 All rights Reserved

7 Manual-powered Hoist (Also known as a Chain-fall or Chain Hoist ) Ratchet Hoist Come-Along Hoist Section 15 Cranes Hoists and Rigging Safety Page 7 All rights Reserved

8 WHAT KINDS OF RIGGING ARE THERE? Slings (May be constructed of chain, nylon webbing, mesh steel webbing, wire ropes, other types of ropes and braided materials.) Structural and Mechanical Lifting Devices Section 15 Cranes Hoists and Rigging Safety Page 8 All rights Reserved

9 WHAT MUST WE DO TO COMPLY WITH CRANE/HOIST REGULATIONS? 1. Conduct an initial inventory of all crane and hoist equipment under your Department ownership. 2. Determine which equipment stays in use and which is to be permanently locked out by EH&S and/or disposed of. 3. Arrange for EH&S to permanently lock out unused crane/lift equipment or remove to Overstock and Surplus on your campus. 4. Determine what program requirements apply to each piece of functioning equipment based upon lift capacity ( 3Ton or >3Ton). 5. Schedule with EH&S and contract with a Certificating Agency an initial Inspection/Maintenance/Load Testing of your department s equipment and rigging. 6. Identify Qualified Operators and Stand-by Persons within Department for training. 7. Schedule training of Qualified Operators with EH&S. 8. Document Operator Qualifications and successful completion of training and insert into personnel file with copies sent to EH&S. 9. Destroy and dispose of unwanted or damaged-beyond-repair lift equipment and rigging. 10. Set up and maintain Records of all Crane / Hoist Safety Program activities. 11. For all Cranes/Hoists - Conduct quarterly documented inspections and annual documented inspections per guidance in the program. 12. For Cranes Over 3 Ton Capacity - Arrange for documented annual inspections and quadrennial load testing, and required maintenance which must be completed by a CalOSHA approved Certificating Agency. WHAT DO WE HAVE TO DO FOR OUR CRANE RATED MORE THAN 3 TONS? 1. Schedule an initial load test performed by a Certificating Agency. 2. Perform daily (or before use) inspections. 3. Perform and document thorough quarterly in-house inspections. 4. Arrange for annual inspection by a Certificating Agency (This can serve as one of the quarterly inspections and documentation if provided by the Certificating Agency). 5. Arrange for quadrennial load tests by a Certificating Agency. (This can serve as one of the quarterly and annual inspections and documentation is provided by the Certificating Agency). 6. Remove deficient cranes and/or lift gear from service until they are repaired. 7. Identify Owner-Department person(s) who are Qualified Operators to inspect and operate cranes. 8. Assure Qualified Operators are properly trained on crane safe-work practices and procedures according to your campus training requirements. Document this training as part of your Qualifying and Authorizing process. Section 15 Cranes Hoists and Rigging Safety Page 9 All rights Reserved

10 9. Maintain records of program activities relating to each Department-Owned crane. 10. Contact your campus EH&S department for help with any of the above requirements. WHAT DO WE HAVE TO DO FOR OUR CRANE RATED 3 TONS OR LESS? 1. Arrange for an initial load test performed by a Certificating Agency. 2. Perform daily (or before use) inspections following an Operator checklist. 3. Perform and keep on file documented quarterly in-house inspections using. 4. Remove deficient cranes from service until they are repaired. 5. Identify Owner-Department person(s) who are Qualified Operators to inspect and operate cranes. 6. Assure Qualified Operators are properly trained on crane safe-work practices and procedures according to your campus training requirements. Document this training as part of your Qualifying and Authorizing process. 7. Maintain records relating to each Department-Owned crane. 8. Contact your campus EH&S department for help with any of the above requirements. WHAT DO WE HAVE TO DO IF WE ONLY HAVE A HOIST? 1. Perform daily inspections each day the hoist is used following an Operator Checklist (see Safety Management Tool Kit). 2. Perform and keep on file documented quarterly in-house inspections using an Operator Checklist (see Safety Management Tool Kit). 3. Remove deficient hoists from service until they are repaired. 4. Identify Owner-Department person(s) who are Qualified Operators to inspect and operate hoists. 5. Assure Qualified Operators are properly trained on crane safe-work practices and procedures according to your campus training requirements. Document this training as part of your Qualifying and Authorizing process. 6. Maintain records relating to each Department-Owned crane. 7. Contact your campus EH&S department for help with any of the above requirements. CAN WE CHANGE THE LOAD-RATING OF A CRANE/HOIST? Any crane or hoist may be derated to a lesser load rating, but deration must be done by a Certificating Agency with appropriate documentation kept on file. The derated load-rating Section 15 Cranes Hoists and Rigging Safety Page 10 All rights Reserved

11 must be plainly posted on the lifting-device with permanent signage that covers the original load-rating signage. If the load rating is to be increased beyond the manufactured load rating, such a system must be engineered by structural and mechanical engineers who sign-off and stamp the higher load-rating for the lifting-device. The re-engineered system must be load-tested by a Certificating Agency with appropriate documentation kept on file. The higher-rated loadrating must be plainly posted on the lifting-device with permanent signage. Significant cost in engineering/rebuilding the crane or hoist and its support structure are likely to be incurred to re-rate a crane/hoist system to a higher load capacity than originally designed. WHAT DO WE HAVE TO DO CONCERNING RIGGING AND LIFT GEAR? Below-the-Hook rigging must have documented annually by owner departments: 1. Pre-use visual inspections by trained Qualified Operators, 2. Be included in a documented inventory of all owned lift gear / rigging, and 3. A manufacturer s load rating label attached to each piece of lift gear / rigging. For unique, specialty or homemade lift gear and structural lifting devices, such devices must be inspected and stamped by a Professional Structural or Mechanical Engineer, with their permanent stamp / label attached and prominent load rating displayed on each piece of individual specialty lift equipment. WHO MUST BE TRAINED, HOW IS IT DONE, AND WHO PROVIDES IT? Qualified Crane Operators and Stand-by Persons have specific roles and responsibilities when using crane / hoist equipment. They must be trained on the safe use and inspection of the crane/hoist(s) they work with through a documented training process. As an option, a person may be designated Qualified Operator by their supervisor, PI, or Department Manager who have the qualifications and experience themselves to understand the hazards associated with the lift equipment, and the Qualified Operator s skills/knowledge to safely work around those hazards. Regardless of which way qualification occurs, a Qualified Operator must be done through a documented process with records kept in the person s file and the crane log book. For shops where crane operators who are not shop-employees but who do have need to use lift-equipment, a two-step Qualifying and Authorizing process must be completed. This process is outlined in detail in Section 2 Safety Training of this reference manual. It includes the Crane / Hoist Operator and/or Stand-by Person being Qualified by their Supervisor / PI / Department Manager to use a shop crane/hoist, and then the Shop Manager going through their process to train and Authorize the Crane / Hoist Operator and/or Stand-by Person to use the specific shop crane / hoist for specific lift activities only. Section 15 Cranes Hoists and Rigging Safety Page 11 All rights Reserved

12 Operator Training can be conducted by a Qualified Shop Manager, your campus EH&S department, or an outside contractor. WHAT S REQUIRED TO QUALIFY A CRANE OPERATOR? In order to be considered a Qualified and Authorized crane operator, a person: 1. Must be an employee of the University, or working under the direct supervision of a Qualified employee of the University. 2. Must be trained on the safe-work practices and inspections of crane and hoist equipment as it applies to their specific work activities. 3. Must be Qualified by their Supervisor through a documented process, and Authorized by a shop manager who s responsibility includes maintenance and safeoperation of specific crane / hoist / rigging. 4. Must follow the safe-lifting procedures every time a lift is prepared and conducted, or follow specific equipment checklists during inspection and maintenance activities. 5. Must stop all lifting work and bring to the attention of the shop manager any deficiencies, broken equipment or rigging needing repair/replacement and never use any deficient equipment. 6. Must inform EH&S of any crane or hoist that is being permanently locked out due to equipment hazards, when the use of the crane is no longer needed, or due to lack of qualified personnel to operate the crane. 7. May be responsible for procuring equipment or repair services as a department may deem appropriate. 8. May be required to Lock out and Tag out any deficient equipment according to the procedures outlined in Section 8 Energy Isolation Lock out Tag out of this manual to assure no unsafe condition. WHAT S REQUIRED OF A STAND-BY/LOAD POSITIONING PERSON? In order to be considered Qualified and Authorized crane Stand-by / Load Positioning Person must: Be an employee of the University, or working under the direct supervision of a Qualified employee of the University. Work under the direction of, and in constant communication with, the Qualified Crane Operator. Section 15 Cranes Hoists and Rigging Safety Page 12 All rights Reserved

13 WHAT ARE THE CRANE OPERATOR S SAFE- WORK PROCEDURES? Only employees who have been Qualified and Authorized by their Supervisor, PI and/or Shop Manager through a documented training, qualifying and authorizing process may conduct the following work procedures: For Work Practices, Hazard Evaluation and Control Perform daily, or prior to each use, visual safety inspections of the crane / hoist equipment following a checklist. If a crane / hoist has sat idle for more than one week, or the operator does not know when the crane / hoist was last used, document the pre-use inspection. Document quarterly inspections and keep these inspections on file. Do not use deficient cranes or hoists and report deficiencies to designated person(s) within the crane / hoist Owner-Department. Operate cranes safely. Do not proceed with lifting operations until all known hazards have been eliminated or controlled. Plan the lift, calculate the crane or hoist load capacity, and ensure that the crane or hoist is used within its limits. Monitor for rigging deficiencies during each lift. Stop and do not proceed with lifting operations until newly identified hazards have been eliminated. May train a Stand-by / Load Positioning Person for a specific and designated lift. Coordinate the lift with the Stand-by/Load Positioning Person with a pre-lift planning discussion. Stay in view of the Stand-by/Load Positioning Person at all times during the lift. Assure clear communication method(s) with Stand-by/Load Positioning Person. NEVER travel on or stand under a suspended load. For Rigging and Other Below-the-Hook Devices Perform daily or pre-use visual inspections and document these inspections annually using the checklists. Protect rigging from damage while in use. Properly store rigging to prevent deterioration and damage. Render unusable and then dispose of deficient rigging. Ensure Housekeeping and Restricted Areas Assure the floor space is kept clear of obstacles and slippery surfaces for the operators, riggers, and load positioning personnel. Set up Restricted Areas that include the locations of, and adjacent to, the lift/travel path. Section 15 Cranes Hoists and Rigging Safety Page 13 All rights Reserved

14 Ensure the lift/travel path of the load is marked by orange cones, yellow tape or other means, to alert persons not aware of the hazards to keep away. Ensure that no one is allowed under a suspended load EVER! WHAT ARE THE STANDBY / LOAD-POSITIONING PERSON S SAFE-WORK PROCEDURES? Follow the direction of the crane operator. Warn persons nearby to stay out of Restricted Areas. Assure clear communication method(s) with crane or hoist operator. Alert the Crane Operator immediately of any hazards when identified. Do not interfere with the lifting operation unless the operator permits it. Stay in view of the operator. NEVER travel on or put any part of your body under a suspended load. May guide the load during lift through rigging rope tied to the load or push bars; use gloves and do not wrap the rope around the hand or arm. NEVER come in direct contact with the load during a lift. WHAT ARE RIGGING INSPECTIONS, AND WHO CAN DO THEM? All lift gear / rigging must be periodically inspected by a qualified person, at least quarterly. As the details of inspection requirements are very technical and based upon the many different kinds of rigging gear, equipment inspections are part of the detailed training for a Crane Operator when they become Qualified and Authorized. It s beyond the scope of this reference manual to go deeply into the inspection requirements. However, the Shop Manager s Safety Management Tool Kit has full inspection checklists for every type of lift gear, as well as the detailed technical criteria listed by CalOSHA codes that must be visually inspected for during lift-gear / rigging inspections. See your shop manager if you have further questions about equipment inspections, or suspect a piece of lift gear / rigging you want to use is deficient or unsafe. HOW DO I SELECT LOAD RATINGS, AND CALCULATE LOAD STRESSES ON RIGGING? Unless you are a licensed structural or mechanical engineer, you likely do not have the qualifications to design and construct your own specialty lift-gear and rigging. If you must design / build your own specialty below-the-hook lift gear, have your designs reviewed and stamped by a PE (Professional Engineer), and the completed structure reviewed / stamped by a PE and/or a Nationally Recognized Testing Laboratory (NRTL) such as Underwriters Lab (UL). Do not use homemade lift gear without doing this. If something Section 15 Cranes Hoists and Rigging Safety Page 14 All rights Reserved

15 were to fail or go wrong with your lift gear, you would likely be held personally liable for injury or property loss. Don t take this risk! If you are using slings that are fabricated by a reputable lift-gear manufacturer, look for a stamp of certification from an NRTL, or that the slings are manufactured to applicable ANSI code requirements. This is your assurance you are using lift-gear with a safety margin of strength built-into the lift gear. When selecting the strength of slings, you need to plan the lift by knowing the following: Approximate load weight, Approximate center of gravity of the load, Approximate angles the slings will drape over the lift-hook when under load, The attachment method of the slings to the hook (will they end at the hook, or loopthrough it and reconnect to the load?). Once you know the above, you can calculate the tensile forces the sling will be subjected to based upon the geometry of the lift. As a rule of thumb, try and keep your sling-lift-angle as small as possible from vertical to limit the internal stresses on the lift-gear / slings. Using longer slings, lifting closer to the center of gravity, and using multiple slings anchored to multiple lift-locations near the center-of-gravity on the object, etc. are all ways to reduce the sling-lift-angle and reduce the stresses internal to the sling(s). In addition, using multiple slings attached individually at the hook and at the anchor on the object will reduce the internal stresses on a sling. Using a single-sling that loops through a hook and connects two anchor points on the object increases the lift-stress on the sling, in fact doubling it where the sling passes through the hook. To ensure your safety, use two or more individual slings attached to the hook and the anchors on the load. Only use a single-sling-two-anchor rigging method when lifting very light loads with lift-gear with strength well in excess of the load capacities needed for a safe lift. And, NEVER wrap a hook with a sling, or tie a sling into a knot around a hook or a liftanchor. Always use the eye loop, shackles, etc. that are part of the sling to capture the hook, capture the anchor, or create the mechanical connection needed to conduct a safelift. This will also allow easy removal of the slings from the hook and anchors when the lift is complete. Look at the three simple diagrams below, and use the tables and equations below them, to figure out the load stress on your sling. If your angles are in-between those angles shown in the tables, you can approximate the multiplier or figure out the cosine on your calculator to determine the Sling-Working-Load (SWL). Remember, Only select and use slings that have a higher-working-load-rating than your calculated maximum Sling-Working-Load stress. Section 15 Cranes Hoists and Rigging Safety Page 15 All rights Reserved

16 SLING-WORKING-LOAD (SWL) TENSILE-STRESS CALCULATIONS SINGLE SLING SINGLE ANCHOR LIFT TWO SLING TWO ANCHOR LIFT SINGLE SLING TWO ANCHOR LIFT The sling-working-load (SWL) equals the total load lifted. Whatever the weight of the load is, that will be the tensile load lifted by the sling. It s a one-to-one ratio. Or.., Load = Sling Working Load [Below are cosine values for Sling Angles (in degrees).] As two slings are used and discretely attached to the lift hook, the sling-working-load on each sling is ½ the total load divided by the cosine of the sling angle. Or.., (Load) / 2 x Cos(Sling Angle) = Sling Working Load (SWL) As one sling is used and looped through the lift-hook, the load on the sling actually doubles when passing through the hook. So, the sling-working-load is the total Load divided by the cosine of the lift angle. Or, (Load) / Cos(Sling Angle) = Sling Working Load (SWL) Cos (10) = 0.98 SWL = Load / (2 x 0.98) SWL = Load / (0.98) Cos (20) = 0.94 SWL = Load / (2 x 0.94) SWL = Load / (0.94) Cos (30) = 0.86 SWL = Load / (2 x 0.86) SWL = Load / (0.86) Cos (40) = 0.77 SWL = Load / (2 x 0.77) SWL = Load / (0.77) Cos (45) = 0.7 SWL = Load / (2 x 0.70) SWL = Load / (0.70) Cos (50) = 0.64 SWL = Load / (2 x 0.64) SWL = Load / (0.64) Cos (60) = 0.5 SWL = Load / (2 x 0.50) SWL = Load / (0.50) DON T USE A SLING ANGLE HIGHER THAN 60 DEGREES FROM VERTICAL Section 15 Cranes Hoists and Rigging Safety Page 16 All rights Reserved

17 WHAT REFERENCES ARE AVAILABLE? There are numerous places online available for further information and learning about crane / hoist safety. Your EH&S department can also provide technical support and training for your crane / hoist / rigging safety efforts. The primary regulatory drivers of crane safety in California include the CalOSHA Subchapter 7. General Industry Safety Orders, Group 13. Cranes and Other Hoisting Equipment: WHAT RECORDS, DOCUMENTATION AND RESOURCES ARE AVAILABLE TO OPERATORS AND SHOP MANAGERS? In the Shop Manager s Safety Management Tool Kit, the companion to this reference manual for shop managers, there are detailed checklists, signage, load-calculation, rigging selection / inspection guides, etc. to fully implement and manage a Crane / Hoist Safety Program. As far as who maintains records and for how long, the Shop Manager should. Training Retain Qualifications and Training records for Operators and Stand-by Persons at least ten years after they have retired or left University employment. Equipment Inspections Retain any written evidence of daily/pre-use inspections for the last year. Retain Quarterly Inspections for the last three years. For Crane/Hoist and rigging, initial load tests for less than three ton rated cranes, and quadrennial load tests for over three ton rated cranes, tests for all cranes and job-made rigging, retain records for the life of the crane or hoist. As a reference for the casual learner, the following two pages are samples of forms / templates available to Operators and Shop Managers for documenting the Qualifying and Authorizing process for Crane Operators, and a quarterly inspection form that can be used to document a safety inspection of a crane / hoist. Section 15 Cranes Hoists and Rigging Safety Page 17 All rights Reserved

18 [THIS PAGE INTENTIONALLY LEFT BLANK FOR DUPLEX PRINTING PURPOSES.] Section 15 Cranes Hoists and Rigging Safety Page 18 All rights Reserved

19 Crane Operator Qualification Documentation To: Personnel File for: (Print Employee name) From: Date: (Print Supervisor name) This document confirms the Qualification of the above named employee to perform: (Check all that apply) Maintenance or repair on the following crane/hoist equipment within their department (T8CCR 3328) (Attach an additional page if more space is needed) Operate/inspect overhead cranes and hoists within their department (T8CCR 5006, 5031) Inspect rigging and rig loads to be suspended within their department (T8CCR 5043) Other: This designation is based on evidence of safe performance of all duties related to crane/hoist operation and verification by another Qualified Person through: (Check all that apply) Training Appropriate training records 1 (including any skill checks or tests) are attached. Experience This employee has been safely performing and has demonstrated skill in crane/hoist operation for years (minimum of five years). Instruction This employee has received on the job instruction from me or another employee who is qualified, has observed this employee s work while performing this operation, and confirms that the employee has the knowledge to perform crane/hoist work safely. If, for any reason, as their supervisor, I think that this employee is not performing this operation safely, this qualification will be revoked. Below are signature(s) of responsible person(s) verifying training, experience and/or providing instruction: Supervisor Signature: Date: Qualifying Person (if not supervisor): Date: Employee Signature Date: cc: EH&S; Supervisor file; Employee and their Personnel File 1 If training is part of the evidence used to qualify this employee, attach records relevant to this qualification. Section 15 Cranes Hoists and Rigging Safety Page 19 All rights Reserved

20 [THIS PAGE INTENTIONALLY LEFT BLANK FOR DUPLEX PRINTING PURPOSES.] Section 15 Cranes Hoists and Rigging Safety Page 20 All rights Reserved

21 Daily / Pre-use Checklist and Quarterly Inspection CRANE/HOIST ID: LOAD RATING OPERATOR/INSPECTOR DEPT./OWNER: DATE/TIME DESCRIBE TASK/PLANNED LIFT: Crane/Hoist Operator s Daily / Pre-use Checklist (Check off as appropriate) YES NO N/A Has the crane/hoist and rigging been visually inspected and found to be safe for use prior to the beginning of any lifting work? Are all electrically operated cranes effectively grounded? Is the load chart clearly visible to the operator? Is the rated capacity visibly marked on the crane? Has the load been calculated and verified to be below the limits of the hoist and rigging? Are operating controls clearly identified? Is sufficient illumination provided for the operator to perform the work safely? Has a lift-plan of action been agreed to by the personnel involved? Is the path of the operator and stand-by/load positioning person been cleared of slip, trip, and fall obstacles? Has the lift/travel path been secured or visually marked to prevent entry by anyone? Quarterly Inspection or when idle more than one month. (In addition to Daily/Pre Use Inspection) Functional operating mechanisms have been checked for excessive wear. Readily accessible ropes, brakes, friction clutches, chain drives, and other parts subject to wear have been inspected. Wire rope that has been idle for a period of a month or more due to shut-down or storage of a crane is given a thorough inspection before it is placed in service. This inspection is for all types of deterioration and is performed by a qualified person whose approval is required for use of the crane. Pass Fail Section 15 Cranes Hoists and Rigging Safety Page 21 All rights Reserved

22 [THIS PAGE INTENTIONALLY LEFT BLANK FOR DUPLEX PRINTING PURPOSES.] Section 15 Cranes Hoists and Rigging Safety Page 22 All rights Reserved

23 QUIZ CRANES, HOISTS AND RIGGING 1. Which of the following are hazards of cranes, hoists and rigging? a. Being hit from dropped items / overhead work b. Equipment malfunction or breaking c. Damage to loads and/or structures, loads shift or operator miscalculations d. Load instability / rigging failure / structural toppling / failure e. All of the above 2. True or False? Cranes / hoists must have access control at all times. When cranes / hoists are not in use, they re controls and power-supply should be either locked out, or secured behind a locked door, or preferably both. 3. The primary parts of a bridge or jib crane are: a. The horizontal movement carriage / trolley b. The monorail beam or boom, and their structural supports c. The hoist d. The electric controls e. A, B and C f. All the above 4. True or False? Anyone can operate a crane / hoist as long as they have received documented training, have been qualified by their supervisor / PI / manager, and have received training and authorization from a shop manager if the crane / hoist is in a shop. 5. True or False? When a crane Operator has been Qualified and Authorized to conduct specific work tasks using a specific crane in a shop, this allows them to use the crane for any purpose and at any time. 6. You are lifting a load using one sling looped through the hook, and attached to two anchors on the load at either-end of the sling. You estimate the sling-angle to be the maximum allowed of 60 degrees. If the load is 1000 lbs., what will be the Sling-Working-Load (SWL)? (Hint: Use the table on page 16 of this section to figure this out.) a. 500 lbs. b. 750 lbs. c lbs. d lbs. e lbs. f. Another amount not listed above. Section 15 Cranes Hoists and Rigging Safety Page 23 All rights Reserved

24 ** Quiz Answers: 1. E 2. True 3. E - There are many jib cranes and some smaller bridge cranes that are completely manual and have no electric controls. 4. False Only UC employees can operate a crane / hoist without supervision. If students or other personnel must operate a crane / hoist owned by UC, then they must do so under the supervision of a UC employee who is Qualified and Authorized to use that specific crane / hoist for the specific tasks being undertaken. 5. False The Shop Manager has the exclusive control over authorizing crane-use in their shop. They may Authorize a Crane Operator for carte-blanche use of the crane, or they may limit the crane use to very specific activities and/or limited duration / time. 6. E 2000 lbs. Use the equation in the most- lower-right-hand-corner of the table on page 16 to figure out this problem. Section 15 Cranes Hoists and Rigging Safety Page 24 All rights Reserved

UC DAVIS CRANE, HOIST, AND SLING SAFETY PROGRAM

UC DAVIS CRANE, HOIST, AND SLING SAFETY PROGRAM UC DAVIS CRANE, HOIST, AND SLING SAFETY PROGRAM Crane, Hoist and Rigging Safety University of California, Davis Environmental Health and Safety Revision History Version: 1.0 Approved by: EH&S Safety &

More information

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012 PAGE 1 OF 5 PURPOSE: OVERHEAD CRANES AND LIFTS PROCEDURE The purpose of this procedure is to define the safety and training requirements for use of overhead cranes and lifts. Procedure: Definitions Designated

More information

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS Title: Cranes - Inspection and Maintenance PROCEDURE Procedure No: P314.422 Issue: 1 Revision: 0 Operative Date: 22/12/2016 Department: HSEC Sect./Classification: Safety / Gear & Equipment Author: D Steel

More information

UC Santa Barbara Crane Safety Program

UC Santa Barbara Crane Safety Program UC Santa Barbara Crane Safety Program Lead: John M. Seaman Phone: (805) 893-5288 E-mail: john.seaman@ehs.ucsb.edu Team: General Safety Click here to go to Table of Contents Click here to go to FAQ Fact

More information

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM Purpose & Scope CLIMATE ENGINEERS, INC. (CE) is dedicated to the protection of our employees from occupational injuries and illnesses. The purpose of this program is to provide procedures to be followed

More information

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists University Facilities Internal Procedure: July 1, 2013 Effective date: July 1, 2013 Last Modified: April 2013 Approved by: Bob

More information

CRANE & HOIST SAFETY PROGRAM

CRANE & HOIST SAFETY PROGRAM CRANE & HOIST SAFETY PROGRAM 1.0 PURPOSE The purpose of the Crane and Hoist Safety Program is to: 1.1 Ensure a safe work environment for employees who operate, maintain, or work around cranes and hoists

More information

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

Guidelines for Safety Training of Overhead Crane Operators and Supervisors Guidelines for Safety Training of Overhead Crane Operators and Supervisors Purpose These guidelines present minimum recommended safety requirements for ensuring the safe and efficient operation of overhead

More information

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES... Reed College 3203 Southeast Woodstock Blvd. Portland Oregon 97202-8199 Crane Safety Policy Effective Date: Revision Dates: February 9, 2011, June 25, 2012, July 2016 Review Dates: I. PURPOSE... 1 II. SCOPE...

More information

PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...

PRESENTER'S GUIDE CRANE SAFETY Part of the SAFETY MEETING KIT Series Quality Safety and Health Products, for Today... PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS OUTLINE OF MAJOR PROGRAM POINTS The

More information

CRANE, HOIST AND SLING SAFETY PROGRAM

CRANE, HOIST AND SLING SAFETY PROGRAM CRANE, HOIST AND SLING SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.179 and 184 ANSI - B30.2 and 30.9 Crane Manufacturers Association of America 61 BASIS: The Occupational Safety and Health Administration

More information

OVERHEAD & GANTRY CRANE / RIGGING

OVERHEAD & GANTRY CRANE / RIGGING Overhead & Gantry Crane / Rigging OVERHEAD & GANTRY CRANE / RIGGING Overhead and gantry cranes - 1910.179 Crawler locomotive and truck cranes. - 1910.180 Slings. 1910.184 Cranes, like all pieces of heavy

More information

Crane & Hoist Safety Guidelines

Crane & Hoist Safety Guidelines Purpose Crane & Hoist Safety Guidelines Many types of cranes, hoists, and rigging devices are used at [COMPANY] for lifting and moving materials. [COMPANY]'s policy is to maintain a safe workplace for

More information

UNIVERSITY OF TOLEDO

UNIVERSITY OF TOLEDO UNIVERSITY OF TOLEDO SUBJECT: CRANE AND HOIST SAFETY PROGRAM Procedure No: S-08-024 PROCEDURE STATEMENT All crane and hoists operated on UT campuses must be adequately maintained and inspected as prescribed

More information

CRANE OPERATION INSTRUCTION AND GUIDELINES

CRANE OPERATION INSTRUCTION AND GUIDELINES CRANE OPERATION INSTRUCTION AND GUIDELINES Qualifications Crane operation, to be safe and efficient, requires skill, the exercise of extreme care and good judgment, alertness and concentration, and a rigid

More information

Crane Safety Resource Guide P AGE 1

Crane Safety Resource Guide P AGE 1 Crane Safety Resource Guide P AGE 1 As a Home Builder, we do not self-perform any work. This section is a resource guide only and is not intended to put any requirements on the company. All subcontractors,

More information

OVERHEAD CRANE SAFETY:

OVERHEAD CRANE SAFETY: ERI Safety Videos DVDs, Digital Media & Custom Production 1313 OVERHEAD CRANE SAFETY: Safety Is In Your Hands Leader s Guide Safety Source Productions OVERHEAD CRANE SAFETY: Safety Is In Your Hands This

More information

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks Mobile Crane - Onshore MOBILE CRANES Cranes and derricks. - 1926.550 Cranes, like all pieces of heavy equipment, if not properly operated, inspected and maintained have a potential for causing major bodily

More information

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session Crane, Derrick, and ling afety 5145A OHA A R N I G N I PAR 1: PRPARING FOR H ION 1. raining Booklet here is no training booklet that goes along with this ession. rainers should review other written material

More information

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and Crane Safety Fact Sheet In This Document MODULE DESCRIPTION This module provides information on the safety concerns and Introduction necessary precautions you will need to be aware of when working Crane

More information

Slinger/signaller Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Slinger/signaller Note: It is recommended that you read the Supporting Information page before you read this factsheet. Slinger/signaller Note: It is recommended that you read the Supporting Information page before you read this factsheet. Preparation and completing work (Preparation) The role of the slinger/signaller is

More information

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements Notice Overhead Crane Safety and Inspection Requirements It is the responsibility of the Owner/User to install, inspect, test, maintain, and operate a crane or associated lifting equipment in accordance

More information

"CRANE SAFETY IN CONSTRUCTION ENVIRONMENTS"

CRANE SAFETY IN CONSTRUCTION ENVIRONMENTS PRESENTER'S GUIDE "CRANE SAFETY IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS OUTLINE

More information

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes Newport News Shipbuilding Page 1 CRANES 1. Hazard and Reference The use of cranes at NNS presents a serious

More information

Cranes. OSHA Office of Training & Education 1

Cranes. OSHA Office of Training & Education 1 Cranes OSHA Office of Training & Education 1 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures OSHA Office of Training & Education 2 How Do Accidents Occur? Instability

More information

Notice to all Users of the Weigh Northland Gantries

Notice to all Users of the Weigh Northland Gantries Notice to all Users of the Weigh Northland Gantries Purpose of the Gantry Compliance Process September 2017 Gantry Compliance Safe lifting equipment and competent operators are essential for minimising

More information

Powered Industrial Truck Safety Program

Powered Industrial Truck Safety Program Powered Industrial Truck Safety Program 0 TABLE OF CONTENTS Forklift Safety Program 1.0 Overview.. 2 2.0 Purpose....2 3.0 Procedures..2 4.0 Responsibilities. 4 5.0 Training Requirements......5 Appendix

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

Responsible Unit: Facilities Management

Responsible Unit: Facilities Management Policy Sponsor: Assistant Vice President Approval Date: January 2010 Mobile Overhead Cranes Safe Work Instructions Responsible Unit: Revisions: Service: Trade Services Shop: Mechanical & Welding Hazards

More information

NRCT NATIONAL RIGGING & CRANE TRAINING LLC. Contact : CONSTRUCTION-INDUSTRIAL-SAFETY SERVICES

NRCT NATIONAL RIGGING & CRANE TRAINING LLC. Contact : CONSTRUCTION-INDUSTRIAL-SAFETY SERVICES NRCT NATIONAL RIGGING & CRANE TRAINING LLC CONSTRUCTION-INDUSTRIAL-SAFETY SERVICES Contact : 716-818-4720 Peter.Cooke@nrctpro.com www.nrctpro.com About US Why Choose NRCT? NRCT is owned and operated by

More information

Ryko Solutions, Inc. Crane and Jib Safety Program

Ryko Solutions, Inc. Crane and Jib Safety Program Ryko Solutions, Inc. Crane and Jib Safety Program CONTENTS PURPOSE...3 POLICY...3 SCOPE...3 RESPONSIBILITIES...3 FITNESS FOR DUTY...4 INSPECTIONS...4 FREQUENT INSPECTION...4 PERIODIC INSPECTIONS...5 RATED

More information

Cranes and Derricks. Objectives. Construction Safety Lecture 18

Cranes and Derricks. Objectives. Construction Safety Lecture 18 North Carolina State University Department of Civil, Construction, and Environmental Engineering Construction Safety Lecture 18 North Carolina State University Cranes and Derricks Subpart N Cranes and

More information

Operation of Fork Lift Trucks

Operation of Fork Lift Trucks Operation of Fork Lift Trucks 1. PURPOSE The purpose of this Procedure is to define the rules for the safe operation of Forklift trucks within the University. 2. SCOPE These rules apply to all rider-type

More information

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE Crane Operator - Offshore CRANE OPERATOR - OFFSHORE Cranes, like all pieces of heavy equipment, if not properly operated, inspected and maintained have a potential for causing major bodily injury or property

More information

Hoist: An apparatus for raising or lowering a load, but does not include a car or platform riding in guides or horizontal motion.

Hoist: An apparatus for raising or lowering a load, but does not include a car or platform riding in guides or horizontal motion. Cranes and Hoists University of Tennessee Safety Guide GS-140 Document Contact: EHS-General Safety Date effective: March 1, 2015 Revision Date: March 1, 2015 Purpose Purpose: Many types of cranes, hoists,

More information

Technical test - Theory. No. Question Answers Max. Mark

Technical test - Theory. No. Question Answers Max. Mark Technical test - Theory Crane/Lifting Operations- Supervisor A6 Questions Only MSLO pack No. Question Answers Max. Mark a) When and b) why are axle or suspension locks fitted to most mobile cranes? List

More information

Planning Advisory Notice

Planning Advisory Notice Capstan hoists, often referred to as catheads, make back-breaking work faster, easier and more productive. They are used for many applications in multiple industries including telecommunications, electric

More information

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes Clearheart Construction Co., Inc. Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes Cranes, like all pieces of heavy equipment, if not properly operated, inspected

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3027 MOBILE CRANE / OVERHEAD AND GANTRY CRANE / RIGGING Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

Position Paper. Telehandler Use: Lifting Suspended Loads

Position Paper. Telehandler Use: Lifting Suspended Loads Position Paper Telehandler Use: Lifting Suspended Loads The following paper reflects the considered opinion on the Crane Association of New Zealand (Inc.) This document has been prepared by the Technical

More information

MOBILE CRANES ONSHORE PROGRAM

MOBILE CRANES ONSHORE PROGRAM Page: Page 1 of 10 Purpose Overhead cranes, hoists, and rigging equipment are used by SHECO Services employees for lifting and moving materials. In order to maintain a safe workplace for its employees,

More information

Presenter s Notes SLIDE 1. Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic:

Presenter s Notes SLIDE 1. Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic: Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic: Today s training session focuses on working safely around overhead and underground electric power

More information

WORKING WITH CRANES SAFELY

WORKING WITH CRANES SAFELY ERI Safety Videos Videos for Safety Meetings 2948 WORKING WITH CRANES SAFELY Leader s Guide Marcom Group Ltd. INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented

More information

PROCEDURE. Revision: 1. Author: D Steel CONTENTS

PROCEDURE. Revision: 1. Author: D Steel CONTENTS PROCEDURE Title: Cranes - Safe Use Procedure No: P314.423 Issue: 1 Revision: 1 Operative Date: 22/09/2017 Department: HSEC Sect./Classification: Safety/Gear & Equipment Author: D Steel Approver Role: Manager

More information

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

Note: under no circumstances will a carbon tetrachloride extinguisher be used. Clearheart Construction Co., Inc. Mobile Crane / Overhead & Gantry Crane / Rigging CRANES & RIGGING Overhead and gantry cranes - 1910.179 Crawler locomotive and truck cranes 1910.180 Cranes and derricks.

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT

LOS ANGELES UNIFIED SCHOOL DISTRICT LOS ANGELES UNIFIED SCHOOL DISTRICT THE SCHOOL REPAIR AND CONSTRUCTION PROGRAM The Safety Sheet January 27, 2004 This edition of the Safety Sheet addresses Crane Safety Awareness, and is intended to provide

More information

University of Hartford Golf Cart/Utility Vehicle Policy & Procedures. Revised

University of Hartford Golf Cart/Utility Vehicle Policy & Procedures. Revised University of Hartford Golf Cart/Utility Vehicle Policy & Procedures Revised Purpose: To establish standards for the safe use and operations of a Golf Cart/Utility Vehicle at the University of Hartford.

More information

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased: Pushed & Geared Trolleys OPERATION MANUAL This operation manual is intended as an instruction manual for trained personnel who are in charge of installation, maintenance, repair etc. Before equipment use,

More information

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

GUIDANCE IN-SERVICE INSPECTION PROCEDURES GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: MLCC 03 Prepared by: MACHINERY LIFTS AND CRANE COMMITTEE Status: Issue 07 Date: 23/06/15 Reference: Health, Safety and Welfare at Work (General Application)

More information

Safety. Chapter 13 SAFETY PROGRAM GENERAL SAFETY RULES

Safety. Chapter 13 SAFETY PROGRAM GENERAL SAFETY RULES Chapter Safety Supervisors are responsible for ensuring that personnel follow safety standards. Time is usually the controlling factor in construction operations in the theater of operations. The necessity

More information

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program INITIATOR: Desirée Villarreal REVISION DATE: 10/17/2014 1. Program Description 2. Scope 3. Definitions

More information

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT lifting EQUIPMENT Tongs HBTF Bar Tong Fixed... Page 62 TONGS HBTA Bar Tong Adjustable... Page 63 lifting EQUIPMENT HBTF BAR TONG FIXED FEATURES This style of

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING Doc : SOP-44 Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 12 Purpose Overhead cranes, hoists, and rigging equipment are used by RELIANT HOLDINGS LTD AND ITS AFFILIATES employees

More information

Guidelines for the Safe Use of Mobile Electric Patient Lifting Hoists

Guidelines for the Safe Use of Mobile Electric Patient Lifting Hoists Guidelines for the Safe Use of Mobile Electric Patient Lifting Hoists Responsible person: Tina Sore, Clinical Skills Lead Reviewed by: Tina Sore, Clinical Skills Lead and Anita Mobley, Manual Handling

More information

Owner s Manual Gantry Cranes

Owner s Manual Gantry Cranes Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman Equipment, Inc. 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushman.com

More information

Electrical Safety Slide Show Presenter s Notes

Electrical Safety Slide Show Presenter s Notes Contractor Beware Electrical Safety Slide Show Presenter s Notes Slide 1 Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic: Today s training session

More information

Washington State s New Construction Crane Rule (Phase 1)

Washington State s New Construction Crane Rule (Phase 1) Washington State s New Construction Crane Rule (Phase 1) The New Construction Crane Rule The rule is divided into two parts; The first part deals with Crane Certification and Crane Certifiers; Also included

More information

Title: Lifting Operations Involving Crane or Gantry Offshore

Title: Lifting Operations Involving Crane or Gantry Offshore PTW CHECKLIST - NO. 30 Title: Lifting Operations Involving Crane or Gantry Offshore Owner: Capability Coordinator Approver: Capability Coordinator Permit No.: Max Validity Period: 5 yrs Date: Latest Rev

More information

Safe Operating Practices & Maintenance Manual

Safe Operating Practices & Maintenance Manual tcamerican.com sales@tcamerican.com 763-479-7000 11110 Industrial Circle NW, Suite A, Elk River, MN 55330 Safe Operating Practices & Maintenance Manual Section Subject Page A. General 2 B. Operator Qualifications

More information

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification CANADIAN PETROLEUM CONTRACTORS ASSOCIATION Petroleum Mechanic Training & Certification TRADE EXPERIENCE LOG BOOK PM1 - Service & Maintenance PM2 - Underground Installation PM3 - Aboveground Installation

More information

Forklift Safety Plan Contents: Forklift Safety Plan

Forklift Safety Plan Contents: Forklift Safety Plan Forklift Safety Plan Contents: Forklift Safety Plan Introduction... ii Plan Cover Sheet... 1 Purpose... 2 Supervisory Responsibilities... 2 Maintenance, Fueling, and Repair... 3 General Rules for Operator

More information

RELIANT HOLDINGS LTD AND ITS AFFILIATES Safety Management System. Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5

RELIANT HOLDINGS LTD AND ITS AFFILIATES Safety Management System. Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5 Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5 Purpose This program is written to be in compliance with local regulatory requirements and provide directives to managers,

More information

Chapter 22 Mobile Cranes

Chapter 22 Mobile Cranes Chapter 22 Mobile Cranes Chapter 22 Mobile Cranes Purpose Overhead cranes, hoists, and rigging equipment are used by Hayward Electric employees for lifting and moving materials. In order to maintain a

More information

The Sanford Underground Research Facility Revised: (07/31/2018) CRANES AND HOISTS Supersedes: (03/23/11)

The Sanford Underground Research Facility Revised: (07/31/2018) CRANES AND HOISTS Supersedes: (03/23/11) ENVIRONMENT, HEALTH, AND SAFETY CRANES AND HOISTS Document- 73405 Version 3 Date 07/31/2018 i Version Control Responsible Person Document Control Number Document Version Publication Date Description of

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD Filed with the secretary of state on These rules take effect immediately upon filing with the secretary

More information

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes ICSA N003 International Crane Stakeholder Assembly - Guidance - Lifting of Persons with Mobile Cranes Members are: Association of Equipment Manufacturers [AEM] The Crane Industry Council of Australia [CICA]

More information

Chicago Crane Operator Examination Study Guide

Chicago Crane Operator Examination Study Guide Chicago Crane Operator Examination Study Guide This candidate guide should help you prepare for the Chicago Crane Operators licensure examinations. Part I contains general information about testing procedures.

More information

1/2-TON MANUAL CHAIN HOIST

1/2-TON MANUAL CHAIN HOIST 1/2-TON MANUAL CHAIN HOIST Owner s Manual WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions

More information

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS 1. Scope: This policy and procedure applies to the design, construction testing, use, and maintenance or personnel platforms and hosting of personnel platforms

More information

Transporation Policies and Procedures CO 400.7:

Transporation Policies and Procedures CO 400.7: Transporation Policies and Procedures CO 400.7: Purpose To provide a framework of Transportation policies and procedures that can be implemented at Morehouse College under the direction of the Physical

More information

Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations 1998 Regulation 9

Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations 1998 Regulation 9 GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: MLCC 03 Prepared by: MACHINERY LIFTS AND CRANE COMMITTEE Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations

More information

PORTABLE LADDER SAFETY PROGRAM

PORTABLE LADDER SAFETY PROGRAM PORTABLE LADDER SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.25 Portable Wood Ladders* - 29 CFR 1910.26 Portable Metal Ladders* - 29 CFR 1926.1050-1060* *The above standards are intended to prescribe

More information

Presenter s Notes SLIDE 1

Presenter s Notes SLIDE 1 Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic: Today s training session focuses on working safely around overhead and underground electric power

More information

Abu Dhabi Department of Transport Application Form Non Objection Certificate (NOC)

Abu Dhabi Department of Transport Application Form Non Objection Certificate (NOC) Abu Dhabi Department of Transport Application Form Non Objection Certificate (NOC) for a Commercial Licence to Operate Goods Vehicles with an Unladen Weight of over 2.5 tonnes Does this Application Apply

More information

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation OSH5063EP(PRS3607) Workplace and Work Equipment Hazard Session 10 Lifting Operation 1 Lifting equipment Lifting equipment covers any equipment used in the process of lifting loads or people and includes

More information

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal TABLE OF CONTENTS SECTION TITLE PAGE 1.0 DATE AND TIME OF INCIDENT 4 2.0 NAME & ADDRESS OF PRINCIPAL PARTIES 4 2.1 Employer

More information

Crane, Hoist, and Sling Safety Program October 24, 2017

Crane, Hoist, and Sling Safety Program October 24, 2017 1. INTRODUCTION Crane, Hoist, and Sling Safety Program October 24, 2017 1.1. Purpose Indiana University has developed the Crane, Hoist, and Sling Safety Program to protect employees against the hazards

More information

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist Lincoln Hoist Web Hoist Operating Manual Lincoln Hoist Mfg. by Lincoln Precision Machining Company 121 Creeper Hill Road, P.O. Box 458, North Grafton, MA 01536 USA Toll Free (888) 306-7222 Phone (774)

More information

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT

BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT BELOW-THE-HOOK & MATERIAL HANDLING EQUIPMENT lifting EQUIPMENT HRLB ROLL LIFTING BEAM...Page 44 HMRL MOTORIZED ROLL LIFTER...Page 45 HRGT ROLL GRIPPING TONGS...Page 46 HRLCH ROLL LIFTING C-HOOK...Page

More information

INSPECTIONS TESTING TRAINING & REPAIRS

INSPECTIONS TESTING TRAINING & REPAIRS 11 INSPECTIONS - TESTING - TRAINING - REPAIRS LIFTING EQUIPMENT INSPECTIONS... 222-223 ANCHOR POINT INSTALLATIONS...223 REPAIRS & SERVICE...224 HEIGHT SAFETY TRAINING...224 CRANE INSTALLATIONS...225 CRANE

More information

LIFTING DEVICES AND LIFTING EQUIPMENT - USE AT INOVYN

LIFTING DEVICES AND LIFTING EQUIPMENT - USE AT INOVYN INSTRUCTIONS 1(9) LIFTING DEVICES AND LIFTING EQUIPMENT - USE AT INOVYN Table of contents 1. Lifting devices and lifting equipment - General - Inspection and risk assessment - Equipment requirements -

More information

Revision #: 14.4 Document #: Page: 1 of 5 Title: Mobile Aerial Work Platforms

Revision #: 14.4 Document #: Page: 1 of 5 Title: Mobile Aerial Work Platforms Revision #: 14.4 Document #: 12.06 Page: 1 of 5 1. PURPOSE The purpose of this procedure is to provide guidance on the safe use of mobile aerial work platforms. 2. SCOPE This procedure applies to all employees

More information

TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT

TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT Golden Rule 6 Mechanical Lifting Do not operate any lifting equipment unless It has been approved for use The lift has been assessed by a competent person

More information

PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels

PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels PFI Quality Assurance/Quality Control (QA/QC) Program for Residential/Commercial Densified Fuels Scope: This program must be utilized by participating pellet fuel manufacturers to assure consistent quality

More information

FREE STANDING WORK STATION JIB CRANE

FREE STANDING WORK STATION JIB CRANE SECTION 14661 FREE STANDING WORK STATION JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

Health, Safety, Security and Environment

Health, Safety, Security and Environment Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no

More information

Safelift Overhead Runway Beams & Rolling Beam Cranes

Safelift Overhead Runway Beams & Rolling Beam Cranes Operation & Maintenance Instructions Instructions for Safe Use Safelift Overhead Runway Beams & Rolling Beam Cranes Certification Safelift overhead runway beams and rolling beam cranes are lifting appliances

More information

SAFETY GUIDANCE MATERIAL

SAFETY GUIDANCE MATERIAL SAFETY GUIDANCE MATERIAL SAFETY OPERATIONS GUIDANCE MONDAY MARCH 23, 2015 This safety resource was written for the scrap industry by the scrap industry and was developed to assist you in making your scrap

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS (By authority conferred on the general industry safety standards commission by sections 16 and 21 of Act

More information

Installation and Maintenance Manual for SPANCO A Series Aluminum Gantry Cranes

Installation and Maintenance Manual for SPANCO A Series Aluminum Gantry Cranes Manual No. 103-0008 REV. 6/11 Installation and Maintenance Manual for SPANCO A Series Aluminum Gantry Cranes ISO 9001 REGISTERED SPANCO, Inc. 2 TABLE OF CONTENTS Warnings... 3 Installation... 4 Maintenance...

More information

How to Prepare for a DOT Audit

How to Prepare for a DOT Audit How to Prepare for a DOT Audit The DOT has just informed you that your transportation operation will be audited. Are you prepared? Do you know what records will be reviewed? Do you comply with the regulations?

More information

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY Policy on the Safe Operation of Electric Carts/Cushmans 7/17/17 - Last Revision

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY Policy on the Safe Operation of Electric Carts/Cushmans 7/17/17 - Last Revision FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY Policy on the Safe Operation of Electric Carts/Cushmans 7/17/17 - Last Revision INTENT This policy establishes the requirements and safety

More information

East Lake Tarpon Special Fire Control District

East Lake Tarpon Special Fire Control District East Lake Tarpon Special Fire Control District Implementation Date: 11/2000 Forms or Attachments: None SOP 803 Vehicle Safety Revision Date(s): 07/2004 Reviewed Date(s): A. All operators of Departmental

More information

MG12K24T60V4 Mechanical Grapple

MG12K24T60V4 Mechanical Grapple 170 State Route 271 Attachment Solutions MG12K24T60V4 Mechanical Grapple Operators Manual KENCO Mechanical Grapple Operation Manual 1 TABLE OF CONTENTS 170 State Route 271 Section I. General Information....

More information

Spare Parts, Instruction and Maintenance Manual for SPANCO Model 301 Jib Cranes

Spare Parts, Instruction and Maintenance Manual for SPANCO Model 301 Jib Cranes Manual No. 103-0007 REV. 6/10 Spare Parts, Instruction and Maintenance Manual for SPANCO Model 301 Jib Cranes ISO 9001 REGISTERED SPANCO, Inc. 2 TABLE OF CONTENTS Forward... 4 Installation... 4-6 Maintenance...

More information

EROAD Ehubo Installation Guide

EROAD Ehubo Installation Guide EROAD Ehubo Installation Guide 2 1 Congratulations on purchasing your EROAD Ehubo IMPORTANT: Do not install or use the Ehubo until you have read this Installation Guide thoroughly. EROAD recommends the

More information

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1. Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.3, 5/16/18 1.0 Scope This document is currently limited in scope to inverter interfaced PV installations

More information

Automatic Vehicular Gate Operating Systems: Guidelines for Specifiers, Designers, Dealers, Installers and End Users

Automatic Vehicular Gate Operating Systems: Guidelines for Specifiers, Designers, Dealers, Installers and End Users #352 Automatic Vehicular Gate Operating Systems: Guidelines for Specifiers, Designers, Dealers, Installers and End Users Overview Automatic vehicular gate operating systems provide convenience and security

More information