Standard Chemical Pump

Size: px
Start display at page:

Download "Standard Chemical Pump"

Transcription

1 Standard Chemical Pump Operating instructions MPC-B series Version BA Print-No. 01 VM-No. EN Munsch Chemie-Pumpen GmbH Im Staudchen Ransbach-Baumbach Germany Phone: +49 (0) Fax: +49 (0) Internet: We reserve the right to make technical changes.

2 Table of contents Table of contents 1 About this document Target groups Other applicable documents Warnings and symbols Technical terms Security Intended use General safety instructions Product safety Operator's obligations Duties of the operating staff Special hazards Potentially explosive areas Hazardous pumped liquids Magnetic field Layout and function Labels Type plate ATEX plate Pump type code Layout Transport, storage and disposal Transport Unpacking and inspection on delivery Lifting Preservation Storage Disposal Setup and connection Preparing the installation Checking the ambient conditions Preparing the installation site Preparing the foundation and setup surface Preparing the pump Installing the heat insulation Setup with foundation Setting the pump group down on the foundation Fastening the pump group Setup without foundation Planning the pipes Avoid impurities in the pipes Laying out supports andflange connections Specifying nominal diameters Determining pipe lengths Optimising cross-section and direction changes Providing safety and monitoring devices (recommended) Connecting the pipes Installing auxiliary pipes Installing the suction pipe Installing the pressure pipe Checking that the pipe connections are stress-free Connecting the electrical system Connecting the motor Checking the direction of rotation Operation Preparations for the initial start-up Identifying the pump version Checking downtimes Preparing auxiliary operating systems Filling and bleeding Checking the direction of rotation Putting the pump into service Switching on the pump Switching off the pump Shut-down Restoring the pump to service Operating the stand-by pump Maintenance Inspections Maintenance Dismounting Returning the pump to the manufacturer Preparing the dismounting Undoing connections (if available) Pulling off the volute casing Dismounting the impeller, plain bearing bracket and pump rotor Dismounting the drive rotor Installing Preparing the installation Installing the drive rotor Installing the plain bearing bracket Fitting the pump in the installation Ordering spare parts Disturbance recovery Appendix Sectional drawing Part numbers and designations Overview sectional drawing Variants Technical specifications Ambient conditions Noise pressure level Tightening torques MPC-B series BA EN 01

3 Table of contents Cleaning agents Socket loads according to ISO Spare parts for two years of continuous operation according to DIN List of figures Fig. 1 Type plate (example)... 8 Fig. 2 ATEX plate (example)... 8 Fig. 3 Pump type code (example)... 8 Fig. 4 MPC-B layout... 9 Fig. 5 Fastening the lifting gear to the pump group Fig. 6 Fastening the lifting gear to the pump Fig. 8 Setup without foundation Fig. 9 Straight pipe lengths in front of and behind the pump (recommended) Fig. 10 Undoing the flushing connector Fig. 11 Pulling off the volute casing Fig. 12 Undoing the impeller screw Fig. 15 Dismounting the drive rotor Fig. 16 Installing the plain bearing bracket Fig. 17 MPC-B overview sectional drawing Fig. 18 MPC-B housing foot Fig. 19 Emptying (optional) Fig. 20 Fluid connection (optional) Fig. 21 Socket loads at the pump List of tables Tab. 1 Target groups and their duties... 4 Tab. 2 Other applicable documents and their purpose... 4 Tab. 3 Warnings and consequences of non-observance... 5 Tab. 4 Symbols and their meaning... 5 Tab. 5 Technical terms and their meaning... 5 Tab. 6 Measures after long storage times/ downtimes Tab. 7 Measures to be taken if operation is interrupted Tab. 8 Measures to be taken, depending on the pumped liquid behaviour Tab. 9 Measures for return Tab. 10 Fault/number assignment Tab. 11 Troubleshooting table Tab. 12 Designation of components according to part numbers Tab. 13 Ambient conditions Tab. 14 Noise pressure level Tab. 15 Steel/cast pairings Tab. 16 Socket head cap screw steel/steel pairing Tab. 17 Cleaning agents Tab. 18 Socket loads Tab. 19 Socket loads torques Tab. 20 Spare parts for two years of continuous operation EN 01 BA MPC-B series 3

4 About this document 1 About this document This manual Ispartofthepump Applies to all of the afore-mentioned series Describes safe and appropriate operation during all operating phases 1.1 Target groups Target group Operating company Qualified staff, fitter Duty Keep this manual available where the installation is used, including for later use. Make sure the staff read and follow these instructions and the other applicable documents, especially all safety instructions and warnings. Observe any additional rules and regulations referring to the installation. Read, observe and follow these instructions and the other applicable documents, especially all safety instructions and warnings. Tab. 1 Target groups and their duties 1.2 Other applicable documents Document ATEX additional instructions Order data sheet Setup drawing Technical description Sectional drawing Supplier documentation Spare parts list Document of compliance Purpose Operation in potentially explosive areas Technical specifications, operating conditions Setup dimensions, connection dimensions etc. Technical specifications, operating limits Sectional drawing, part numbers, component designations Technical documentation for supplier parts Ordering spare parts Returning the pump to the manufacturer Declaration of conformity Tab. 2 Other applicable documents and their purpose Legal confirmation that the pump meets all requirements of the applicable EG guideline(s) 4 MPC-B series BA EN 01

5 About this document 1.3 Warnings and symbols Warning Risk level Consequences of non-observance WARNING CAUTION CAUTION Immediate acute risk Potential acute risk Potentially hazardous situation Potentially hazardous situation Fatal or serious injury Fatal or serious injury Minor bodily harm Material damage Tab. 3 Symbol Warnings and consequences of non-observance Meaning Safety warning sign Observe all information indicated by the safety warning sign to avoid injury or death. Instruction 1., 2.,... Multiple step instructions Requirement Cross reference Information, note Tab. 4 Symbols and their meaning 1.4 Technical terms Term Flushing medium Auxiliary operating systems Tab. 5 Technical terms and their meaning Meaning Medium for flushing the pump plain bearing surfaces Systems for operating the pump EN 01 BA MPC-B series 5

6 Security 2 Security The manufacturer does not accept any liability for damage resulting from non-observance of the entire documentation. 2.1 Intended use Only use the pump to pump the agreed pumped liquid ( order data sheet). Adhere to the operating limits and size-dependent minimum flow rate. Avoid dry running: Initial damage, such as destruction of plain bearings and plastic parts, within a few seconds. Make sure the pump is never put into operation or operated without pumped liquid. Avoid cavitation: Fully open the suction-side fitting; do not use the fitting to adjust the flow rate. Do not open the pressure-side fitting beyond the agreed operating point. Avoid overheating: Do not operate the pump while the pressure-side fitting is closed. Observe the minimum flow rate ( order data sheet). To avoid damage to the motor: Do not open the pressure-side fitting beyond the agreed operating point. Observe the number of permitted motor start-ups per hour ( manufacturer's specifications). Consult the manufacturer about any other use of the pump. 2.2 General safety instructions Take note of the following instructions before carrying out any work Product safety The pump has been constructed according to the latest technology and established technical safety rules. Nevertheless, a potential risk to life and limb of the operator or to other persons or damage to the pump and other property cannot be entirely excluded. Only operate the pump if it is in perfect technical condition; only use it as intended, staying aware of safety and risks, and adhering to the instructions in this manual. Keep this manual and all other applicable documents complete, legible and accessible to staff at all times. Refrain from any procedures that would endanger staff or third parties. If a safety-relevant fault occurs, shut down the pump immediately and have the fault corrected by appropriate staff. In addition to the entire documentation for the product, always comply with statutory or other safety and accidentprevention regulations as well as with the applicable standards and guidelines in the country where the pump is operated. Avoiding common types of misuse (examples) Observe the operating limits of the pump regarding operating temperature, pressure, flow rate and speed ( order data sheet). The power uptake of the pump increases with increasing density of the pumped liquid. To avoid any overload for the pump and motor, do not exceed the permissible density ( order data sheet). A lower density is allowed. Adapt the auxiliary systems accordingly. Adhere to the limits for solids content and grit size when pumping solids-carrying fluids ( order data sheet, technical description). When using auxiliary operating systems: Ensure the flushing medium is compatible with the product medium. Ensure there is a permanent supply of the respective flushing medium. 6 MPC-B series BA EN 01

7 Security Operator's obligations Safety-conscious operation Only operate the pump if it is in perfect technical condition; only use it as intended, staying aware of safety and risks, and adhering to the instructions in this manual. Ensure the following are observed and monitored: Adherence to intended use, Statutory or other safety and accident-prevention regulations Safety regulations governing the handling of hazardous substances Applicable standards and guidelines in the country where the pump is operated Make protective equipment available. Staff qualifications Make sure all staff assigned with work on the pump have read and understood this manual and all other applicable documents, especially the safety, maintenance and repair instructions, before beginning with work. Organise responsibilities, who is in charge of any specific duty and how staff is supervised. Makesureallworkiscarriedout by specialist technicians only: Fitting, repair and maintenance work Work on the electrical system Make sure trainee staff only work on the pump under supervision of specialist technicians. Persons with implanted heart pacemakers Should stay away from the pump with magnetic coupling and parts of the magnetic coupling Should not be allowed to perform any work with or on magnetic parts Safety devices Provide the following safety devices and verify their integrity: For hot, cold and moving parts: contact protection of the pump provided by the customer If electrostatic charging is possible: fit appropriate earthing. Warranty Obtain the manufacturer's approval prior to carrying out any modifications, repairs or alterations during the warranty period. Only use original parts or parts that have been approved by the manufacturer Duties of the operating staff Observe and keep legible all directions on the pump, e.g. the arrow indicating the direction of rotation and the indication of fluid connections. Do not remove the protection against accidental contact for hot, cold and moving parts during operation. Use protective equipment if necessary. Carry out work on the pump only while the pump is not running. Isolate the motor from its supply voltage and keep it locked in that state while carrying out any fitting or maintenance work. Reinstall the safety devices on the pump according to regulations after completing any work on the pump. Persons with implanted heart pacemaker: Should keep a minimum distance of 1 m away from the pump with magnetic coupling or parts of the magnetic coupling. Should not be allowed to perform any work with or on magnetic parts 2.3 Special hazards Potentially explosive areas ( ATEX additional instructions) Hazardous pumped liquids Observe the safety regulations for handling hazardous substances when working with hazardous pumped liquids (e.g. hot, flammable, explosive, poisonous or potentially harmful). Use protective equipment when carrying out any work on the pump Magnetic field The magnetic field of the magnetic coupling can destroy magnetically sensitive products, including: Heart pacemakers ID cards with magnetic strips Credit cards and cheque cards Electrical, electronic or fine mechanical equipment (e. g. mechanical and digital watches, pocket calculators, hard drives) EN 01 BA MPC-B series 7

8 Layout and function 3 Layout and function 3.1 Labels Pump type code Type plate MPC Typ type W.-Nr. serial-no. Lfrd. impeller Q P n MUNSCH Chemie-Pumpen GmbH D Ransbach-Baumbach 3 m /h kw min -1 Baujahr year Fig. 1 Type plate (example) 1 Pump type 2 Serial number 3 Year of construction 4 Pump head 5 Density 6 Torque 7 Speed 8 Power consumption 9 Flow rate 10 Impeller diameter ATEX plate H M m kg/dm Nm Fig. 3 Pump type code (example) 1 Series 2 Suction branch DN [mm] 3 Pressure joint DN [mm] 4 Nominal impeller diameter [mm] 1 2 Fig. 2 ATEX plate (example) 1 Explosion protection mark 2 Reference to ATEX additional instructions 8 MPC-B series BA EN 01

9 Layout and function 3.2 Layout Fig. 4 MPC-B layout 1 Impeller 2 Housing armour 3 Volute casing 4 Motor 5 Drive shaft 6 Drive rotor 7 Pump rotor 8 Plain bearing bracket EN 01 BA MPC-B series 9

10 Transport, storage and disposal 4 Transport, storage and disposal 4.1 Transport Lifting Weight specifications ( individual order documentation) Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. Death or crushed limbs caused by falling loads! Use lifting gear appropriate for the total weight to be lifted. Fasten the lifting gear as shown in the illustrations below. Do not stand under suspended loads Unpacking and inspection on delivery 1. Unpack the pump/group on delivery and check it for transport damage. 2. Report any transport damage to the manufacturer without delay. 3. Dispose of packaging material according to local regulations. Fig. 5 Fastening the lifting gear to the pump group Fig. 6 Fastening the lifting gear to the pump Lift the pump/group properly. 10 MPC-B series BA EN 01

11 Transport, storage and disposal 4.2 Preservation No preservation required. Do not preserve the pump. 4.3 Storage Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Make sure no parts of the magnetic coupling are able to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. CAUTION Material damage due to inappropriate storage! Store the pump properly. 1. Seal all openings with blank flanges, blind plugs or plastic covers. 2. Make certain that the storage room meets the following conditions: Dry Frost-free Vibration-free 3. Turn the motor shaft once a month. 4. Make sure the shaft and the bearing change their rotational position in the process. 4.4 Disposal Plastic parts can be contaminated by poisonous or radioactive pumped liquids to such an extent that cleaning is insufficient. Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Make sure no parts of the magnetic coupling are able to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. WARNING Risk of poisoning and environmental damage caused by pumped liquid or oil! Use protective equipment when carrying out any work on the pump. Prior to the disposal of the pump: Collect any pumped liquid and oil or grease running out and dispose of them separately according to local regulations. Neutralise residues of pumped liquid in the pump. Dismount plastic parts and dispose of them according to local regulations. Dispose of the pump according to local regulations. EN 01 BA MPC-B series 11

12 Setup and connection 5 Setup and connection For pumps in potentially explosive areas ( ATEX additional instructions) CAUTION Material damage caused by dirt! Do not remove the transport protection until immediately before installing the pump. Do not remove covers and transport and sealing covers until just before connecting the pipes to the pump. 5.1 Preparing the installation Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling Checking the ambient conditions 1. Make sure the required ambient conditions are met ( Ambient conditions, Page 33). 2. For installation sites > 1000 m above sea level, consult the manufacturer Preparing the installation site Make sure the installation site meets the following conditions: Pump freely accessible from all sides Sufficient space for installation/removal of the pipes and for maintenance and repair work, especially for the removal and installation of the pump and motor Pump not exposed to external vibrations (damage to bearings) Frost protection Preparing the foundation and setup surface Setup options: With concrete foundation With steel foundation frame Without foundation Make sure the foundation and setup surface meet the following conditions: Level Clean (no oil, dust or other impurities) Capable of bearing the weight of the pump group and all operating forces Stability of the pump group ensured With concrete foundation: standard concrete of strength class B Preparing the pump Take the following measures after long storage times / downtimes. Storage time/ Downtime Measure > 2 years Replace the motor bearing if necessary ( operating instructions of the motor manufacturer). Replace the elastomer seals (O-rings, shaft seal rings). Tab. 6 Measures after long storage times/downtimes Installing the heat insulation Only necessary to maintain the temperature of the pumped liquid CAUTION Damage caused by overheating! Install the heat insulation only on the volute casing. Install the heat insulation properly. 12 MPC-B series BA EN 01

13 Setup and connection 5.2 Setup with foundation Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Make sure no parts of the magnetic coupling are able to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling Setting the pump group down on the foundation Implements, tools and materials: Foundation bolts ( setup drawing) Steel washers Mortar grout, non-shrinking Spirit level 1. Lift the pump group ( 4.1 Transport, Page 10). 2. Hang the foundation bolts in the fixation holes of the base plate from below. Observe the specifications of the manufacturer when using chemical anchors. 3. Set the pump group down on the foundation, sinking the foundation bolts into the prepared anchoring holes. CAUTION Material damage due to base plate distortion! Place the base plate on the foundation and fasten it as described in the following Fig. 7 Setup with foundation 4. Use steel washers to align the pump group to the height and system dimensions as described in the following: Position one steel washer (2) to the left and right of each foundation bolt (1). If the distance between the anchoring holes is greater than 750 mm, position additional steel washer (3) at the centre of each side of the base plate. 5. Make sure the base plate and steel washers are in full surface contact. 6. Use a machine spirit level to check the permissible height deviation (1 mm/m) lengthwise and crosswise. 7. Repeat the procedure until the base plate is aligned correctly Fastening the pump group The damping behaviour is improved by filling out the base plate with mortar grout. 1. Fill the anchoring holes with mortar grout. 2. Once the mortar grout has set, screw the base plate tight at three points with the specified tightening torque ( Tightening torques, Page 34). 3. Before tightening the remaining screws, compensate any unevenness of the fixation surface with metal shims next to each screw. 4. Make sure the base plate is not distorted. EN 01 BA MPC-B series 13

14 Setup and connection 5.3 Setup without foundation Implements, tools and materials: Wrench Spirit level Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. 5.4 Planning the pipes Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling Avoid impurities in the pipes CAUTION Damage due to impurities in the pump! Ensure no impurities enter the pump Clean all pipe sections and fittings prior to assembly. 2. Ensure no flange gaskets are protruding inwards. 3. Remove any blank flanges, plugs, protective films and/or protective paint from the flanges Laying out supports and flange connections CAUTION Material damage due to excessive forces and torques of the pipes on the pump! Do not exceed the permissible limits ( Socket loads according to ISO 5199, Page 34). Fig. 8 Setup without foundation 1. Lift the pump group ( Lifting, Page 10). 2. Mount the four levelling feet (1) as illustrated. 3. Set down the pump group on the setup surface. 4. Adjust the height of the base plate with the levelling feet (1) as illustrated above: Use the wrench to hold the hexagon head on the levelling foot (4). Undo the hexagon nut (2). Adjust the height by turning the hexagon nut (3). Tighten the hexagon nut (2) ( Tightening torques, Page 34). Use a machine spirit level to check the permissible height deviation (1 mm/m) lengthwise and crosswise. Repeat the procedure until the base plate is aligned correctly. 1. Calculate the pipe forces and take into account all operating conditions: Cold/warm Empty/full Unpressurised/pressurised Position shifts of flanges 2. Ensure the pipe can slide freely in the supports and does not seize up due to corrosion Specifying nominal diameters Keep the flow resistance in the pipes as low as possible. 1. Specify suction pipe nominal width suction flange nominal width. 2. Specify pressure pipe nominal width pressure joint nominal width. 14 MPC-B series BA EN 01

15 Setup and connection Determining pipe lengths Providing safety and monitoring devices (recommended) Avoid impurities 1. Install a filter in the suction pipe. 2. To monitor the level of dirt, install a differential manometer with a contact manometer. D Avoiding reverse operation C 1. Install a non return valve between the pressure joint and stop valve to ensure the medium does not flow back after thepumpisswitchedoff. 2. To allow bleeding, provide a bleeding connection between the pressure joint and non return valve. A B Make provisions for isolating and shutting off the pipes For maintenance and repair work Fig. 9 Straight pipe lengths in front of and behind the pump (recommended) Fit stop valves in the suction pipe and pressure pipe. A B C D > 5x DNs DNs DNd > 5x DNd Observe the recommended minimum values when installing the pump. Enable measurements of the operating conditions 1. For pressure measurements, fit manometers in the suction pipe and pressure pipe. 2. Provide for motor torque measurements. 3. Provide for pump temperature measurements. Suction side: shorter pipes are allowed but can restrict the hydraulic performance data. Pressure side: shorter pipes are allowed but can result in increased operating noises Optimising cross-section and direction changes 1. Avoid bends with radii smaller than 1.5 times the pipe diameter. 2. Avoid abrupt changes of cross-sections in the pipes. 5.5 Connecting the pipes Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Make sure no parts of the magnetic coupling are able to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling Installing auxiliary pipes Follow the manufacturers' specifications if any auxiliary operating systems are available. 1. Install auxiliary pipes on auxiliary unions, ensuring stressfree and sealed connections ( setup drawing). 2. To avoid air enclosures, install the pipes so that they ascend to the pump. EN 01 BA MPC-B series 15

16 Setup and connection Installing the suction pipe 1. Remove the transport and sealing covers from the pump. 2. To avoid air enclosures, install the pipes so that they ascend to the pump. 3. Ensure no gaskets protrude inwards. 4. For suction operation: install a foot valve in the suction pipe to prevent the pump and suction pipe from running empty during downtimes Installing the pressure pipe 1. Remove the transport and sealing covers from the pump. 2. Fit the pressure pipe. 3. Ensure no gaskets protrude inwards Checking that the pipe connections are stress-free Pipe installed and cooled down 1. Separate the connecting flange of the pipes from the pump. 2. Check whether the pipes are freely moveable in all directions within the range of expected expansions: Nominal width < 150 mm: by hand Nominal width > 150 mm: with a small lever 3. Make sure the flange surfaces are parallel. 4. Reconnect the connection flange of the pipes to the pump. 5.6 Connecting the electrical system Risk of fatal injury due to electric shock! Have all electrical work carried out by qualified electricians only. Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. Risk of fatal injury due to rotating parts! When carrying out any fitting or maintenance work, isolate the motor from its supply voltage and keep it locked in that state Connecting the motor Observe the specifications of the motor manufacturer. 1. Connect the motor according to the circuit diagram. 2. Ensure the electrical power does not pose any risks. 3. Install an EMERGENCY STOP switch Checking the direction of rotation Only possible when putting the pump into service ( 6.2 Putting the pump into service, Page 18). 16 MPC-B series BA EN 01

17 Operation 6 Operation For pumps in potentially explosive areas ( ATEX additional instructions) Filling and bleeding Auxiliary operating systems ready for operation, if available 6.1 Preparations for the initial start-up Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Make sure no parts of the magnetic coupling are able to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling Identifying the pump version Identify the pump version ( order data sheet). Pump versions are for example the type of shaft seal or auxiliary operating systems Checking downtimes After a downtime of more than one year: ( Table 6 Measures after long storage times/downtimes, Page 12) Preparing auxiliary operating systems The manufacturer does not accept any liability for any damage resulting from the installation or use of a third-party or unapproved auxiliary operating system. Prepare the auxiliary operating systems, if available. WARNING Risk of injury and poisoning due to hazardous pumped liquids! Safely collect any leaking pumped liquid and dispose of it in accordance with environmental rules and requirements. CAUTION Damage caused by dry running! Make sure the pump is filled properly. 1. Fillthepumpandsuctionpipewithpumpedliquid. 2. Open the suction-side fitting. 3. Open the pressure-side fitting. 4. If any auxiliary operating systems are available, open them and check the flow rate. 5. Verify that all pipe connections are tight Checking the direction of rotation Risk of fatal injury due to rotating parts! Use protective equipment when carrying out any work on the pump. Keep a sufficient distance to rotating parts. CAUTION Material damage due to incorrect direction of rotation! Make sure the motor's direction of rotation corresponds to thearrowindicatingthedirectionofrotationofthepump. 1. Switch the motor on and immediately off again. 2. Check whether the motor's direction of rotation corresponds to the arrow indicating the direction of rotation of the pump. Risk of fatal injury due to electric shock! Have all electrical work carried out by qualified electricians only. 3. If the direction of rotation is different, replace two phases. 4. Reconnect the pump to the electrical power supply EN 01 BA MPC-B series 17

18 Operation 6.2 Putting the pump into service Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling Switching on the pump Pump installed properly and connected All connections stress-free and leak-free Auxiliary operating systems ready for operation, if available All safety devices fitted and tested for integrity The pump prepared, filled and bled properly Risk of injury due to running pump! Do not touch the running pump. Do not carry out any work on the running pump. Allow the pump to cool down completely before starting any work. Risk of injury and poisoning due to pumped liquid spraying out! Use protective equipment when carrying out any work on the pump. CAUTION Damage caused by dry running! Make sure the pump is filled properly. CAUTION Risk of cavitation when throttling the suction flow rate! Fully open the suction-side fitting; do not use the fitting to adjust the flow rate. Do not open the pressure-side fitting beyond the operating point. CAUTION Damage caused by overheating! Do not operate the pump while the pressure-side fitting is closed. Observe the minimum flow rate ( order data sheet). 1. Open the suction-side fitting. 2. Close the pressure-side fitting. 3. Switch on the motor and check that it is running smoothly. 4. As soon as the motor is running at nominal speed, open the pressure-side fitting slowly until the operating point is reached. 5. After the initial stress caused by pressure and operating temperature, check whether the pump is not leaking. 18 MPC-B series BA EN 01

19 Operation Switching off the pump Take the following measures if operation is interrupted: Pressure-side fitting closed (recommended) Pump is Measure WARNING Risk of injury due to hot pump components! Use protective equipment when carrying out any work on the pump. 1. Switch off the motor. 2. Check all connecting screws and tighten them if necessary. 6.3 Shut-down Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Make sure no parts of the magnetic coupling are able to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. WARNING Risk of injury and poisoning due to hazardous pumped liquids! Safely collect any leaking pumped liquid and dispose of it in accordance with environmental rules and requirements. shut down for a prolonged period emptied dismounted put into storage Tab. 7 Behaviour of pumped liquid Solids sedimenting Solidifying/ freezing, non-corrosive Solidifying/ freezing, corrosive Remains liquid, non-corrosive Remains liquid, corrosive Tab. 8 Take measures according to the pumped liquid ( Table 8 Measures to be taken, depending on the pumped liquid behaviour, Page 19). Close the suction-side and pressure-side fittings. Isolate the motor and secure it against being switched on by unauthorised persons. Follow the storage instructions ( 4.3 Storage, Page 11). Measures to be taken if operation is interrupted Duration of the interruption to service (depending on process) Short Long Flush the pump. Heat up or empty the pump and containers. Heat up or empty the pump and containers. Flush the pump. Empty the pump and containers. Empty the pump and containers. Preserve the pump and containers. Empty the pump and containers. Preserve the pump and containers. Measures to be taken, depending on the pumped liquid behaviour EN 01 BA MPC-B series 19

20 Operation 6.4 Restoring the pump to service Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. 1. Intheeventofadowntimeofmorethanayear: ( Table 6 Measures after long storage times/downtimes, Page 12). 2. Carry out all steps as for the initial start-up ( 6.2 Putting the pump into service, Page 18). 6.5 Operating the stand-by pump Stand-by pump filled and bled Operate the stand-by pump at least once a week. 1. Open the suction-side fitting completely. 2. Open the pressure-side fittingtosuchanextentthatthe stand-by pump reaches its operating temperature and the heat is evenly distributed ( Switching on the pump, Page 18). 20 MPC-B series BA EN 01

21 Maintenance 7 Maintenance For pumps in potentially explosive areas ( ATEX additional instructions) Trained service technicians are available for fitting and repair work. Present a pumped material certificate (DIN safety data sheet or document of compliance) upon request. 7.1 Inspections 2. For trouble-free operation, ensure the following: No dry running No leaks No cavitation Suction-side gate valves open Unobstructed and clean filters Sufficient supply pressure No unusual running noises and vibrations No impermissible leaks at the shaft seal Proper functioning of the auxiliary operating systems The inspection intervals depend on the load placed on the pump. Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Make sure no parts of the magnetic coupling are able to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. Risk of injury due to running pump! Do not touch the running pump. Do not carry out any work on the running pump. WARNING Risk of injury and poisoning due to hazardous pumped liquids! Use protective equipment when carrying out any work on the pump. 1. Check at appropriate intervals: Compliance with minimum flow rate Roller bearing temperature < 70 C Normal operating conditions unchanged EN 01 BA MPC-B series 21

22 Maintenance 7.2 Maintenance Service life of the antifriction bearings for operation within the permissible operating range: > 2 years Intermittent operation, high temperatures, low viscosity and aggressive ambient and process conditions reduce the service life of antifriction bearings ( operating instructions of the motor manufacturer). Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. Risk of injury due to running pump! Do not touch the running pump. Do not carry out any work on the running pump. When carrying out any fitting or maintenance work, isolate the motor from its supply voltage and keep it locked in that state. Risk of fatal injury due to electric shock! Have all electrical work carried out by qualified electricians only. WARNING Risk of injury and poisoning due to hazardous or hot pumped liquids! Use protective equipment when carrying out any work on the pump. Allow the pump to cool down completely before performing any work. Make sure the pump is unpressurised. Empty the pump, safely collect the pumped liquid and dispose of it in accordance with environmental rules and requirements. For maintenance work ( operating instructions of the motor manufacturer) 22 MPC-B series BA EN 01

23 Maintenance 7.3 Dismounting Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Make sure no parts of the magnetic coupling are able to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling. Risk of injury due to running pump! Do not touch the running pump. Do not carry out any work on the running pump. When carrying out any fitting or maintenance work, isolate the motor from its supply voltage and keep it locked in that state. Risk of fatal injury due to electric shock! Have all electrical work carried out by qualified electricians only. WARNING Risk of injury and poisoning due to hazardous or hot pumped liquids! Use protective equipment when carrying out any work on the pump. Allow the pump to cool down completely before performing any work. Make sure the pump is unpressurised. Empty the pump, safely collect the pumped liquid and dispose of it in accordance with environmental rules and requirements Returning the pump to the manufacturer Pump unpressurised Pump completely empty Electrical connections disconnected and motor secured against being switched on again Pump cooled down Auxiliary operating systems shut down, unpressurised and emptied Manometer lines, manometer and fixtures removed 1. Enclose a truthfully completed declaration of compliance when returning pumps or components to the manufacturer. Order a document of compliance from the manufacturer if necessary. 2. Take necessary measures, depending on the required repair work as specified in the table below, when returning thepumptothemanufacturer. Repairs At the customer's premises At the manufacturer's premises At the manufacturer's premises for warranty repairs Tab. 9 Measures for return Measure for return Return the defective component to the manufacturer. Flush the pump and decontaminate it if has been used for hazardous pumped liquids. Return the complete pump group (not disassembled) to the manufacturer. Only with hazardous pumped liquids: flush and decontaminate the pump. Return the complete pump group (not disassembled) to the manufacturer. EN 01 BA MPC-B series 23

24 Maintenance Preparing the dismounting Pulling off the volute casing Pump unpressurised Pump completely empty, flushed and decontaminated Electrical connections disconnected and motor secured against being switched on again Pump cooled down Auxiliary operating systems shut down, unpressurised and emptied Manometer lines, manometer and fixtures removed The pumps are constructed in process design as standard. The plug-in unit can be removed without removing the volute casing and pipes Observe the following for dismounting: Precisely mark the installation orientation and position of all components prior to dismounting. Dismount the components concentrically without canting. Dismount the pump ( sectional drawing). 2. Undo the fixation bolts on the housing feet Lift the pump out of the installation ( Lifting, Page 10) Undoing connections (if available) Flushing connector Fig. 11 Pulling off the volute casing Undo the housing nuts. 2. Undo and pull off the housing armour 155 and volute casing 102 by screwing in the two jackscrews Dismounting the impeller, plain bearing bracket and pump rotor Fig. 10 Undoing the flushing connector 1. Undo the lock nut Undo and unscrew the fluid connection Remove the O-rings from the fluid connection Fig. 12 Undoing the impeller screw Undo the impeller screw 906 and O-ring with the circlip pliers and unscrew it. 24 MPC-B series BA EN 01

25 Maintenance / / Fig. 13 Lifting the plain bearing out of the intermediate lantern 2. Screw the eye bolt in the tap hole for the impeller screw 906 andthreadinthecranecable. 3. Plain bearing bracket 339 Lift it with the impeller 230 and pump rotor 859 out of the intermediate lantern 146 with a crane. Set it down with the pump rotor downwards. 4. Unscrew the eye bolt again. Fig. 14 Dismounting the impeller, plain bearing bracket and pump rotor 5. Unscrew the socket head cap screw with Schnorr spring washer Pull off the impeller 230 with thrust bearing 314. Use an M12 jackscrew if necessary. 7. Remove and replace the O-ring Raise the plain bearing bracket 339. Take out and replace the gaskets , or O-rings 412.1, Press the bearing bush 545 with bearing seats 380 out of the plain bearing bracket Pull the bearing sleeve and thrust bearing 314 off the pump rotor Replace the O-ring Remove the can 820 and can insert 830. EN 01 BA MPC-B series 25

26 Maintenance Dismounting the drive rotor 7.4 Installing Fig. 15 Dismounting the drive rotor Unscrew the hexagon screw Take out the spring ring Pull the hollow top shaft 216 with drive rotor 858 off the motor shaft. The drive rotor 858 and hollow top shaft 216 must be balanced as a unit. CAUTION Material damage due to unbalance in the pump rotor! Onlyundo thesockethead capscrew to replace the drive rotor 858 or hollow top shaft If the drive rotor 858 or hollow top shaft 216 is to be replaced: Undo the socket head cap screws Remove the drive rotor 858. Risk of fatal injury and material damage due to magnetic field! Make sure no-one with a heart pacemaker performs any work on the pump. Secure the workplace and cordon it off if necessary: Ensure staff with heart pacemakers keep a minimum distance of 1 m. Make sure no magnetisable metal parts are able to be attracted by the magnetic coupling of the pump. Makesurenopartsofthemagneticcouplingareable to be attracted by magnetisable metal parts. Keep magnetically sensitive objects at least 150 mm away from the magnetic coupling Preparing the installation 1. Observe the following for the installation: Replace worn out parts with original spare parts. Replace gaskets, inserting them in such a way that they cannot rotate. Observe the specified tightening torques ( Tightening torques, Page 34). Refit components concentrically without canting according to the applied marks. 2. Clean all components ( Cleaning agents, Page 34). but do not remove the applied marks. 3. Install the pump ( sectional drawing). Thepumpisinstalledinthereverseorderofthedismounting. The following sections show particular aspects to be observed when installing the product Installing the drive rotor Drive shaft 213 installed 1. Place the spring ring on the hollow top shaft 216. The drive rotor 858 and hollow top shaft 216 must be balanced as a unit. CAUTION Material damage due to unbalance in the pump rotor! Only install the drive rotor 858 and hollow top shaft 216 if they have been balanced as a unit. Do not change the initial position of the components during the installation. 2. If the drive rotor 858 or hollow top shaft 216 have been replaced: Place the drive rotor 858 on the hollow top shaft. Screw the socket head cap screws tight. 3. Place the hollow top shaft 216 with drive rotor 858 on the motor shaft. 4. Screw the hexagon screw tight. 26 MPC-B series BA EN 01

27 Maintenance Installing the plain bearing bracket Drive rotor installed Impeller installed Ordering spare parts For trouble-free replacement in case of a fault, we recommend keeping complete plug-in units or spare pumps available on site. The application guidelines according to DIN recommend keeping a supply for two years of continuous use ( 9.3 Spare parts for two years of continuous operation according to DIN 24296, Page 35). Have the following information ready to hand when ordering spare parts ( type plate): Short designation of the pump Serial number Year of construction Part number Designation Quantity Fig. 16 Installing the plain bearing bracket 1. Insert the bearing bush 545 in the bearing seat Press the bearing seat 380 with bearing bush 545 in the plain bearing bracket 339. Make sure one of the grooves of the bearing bush points towards the location hole for the pin Insert the gaskets , or O-rings 412.1, Insert the pin and O-ring inthepumprotor Push the bearing sleeve onto the pump rotor 859. Make sure the pin snapsintoplaceinthegrooveof the bearing sleeve. 6. Push the plain bearing bracket 339 slowly onto the pump rotor Push the impeller 230 onto the pump rotor Apply one drop of LOCTITE 243 onto the socket head cap screw Screw the impeller 230 tight onto the pump rotor 859 with the socket head cap screw and Schnorr spring washer Insert the can 820 and can insert 830 in the intermediate lantern Screw the eye bolt in the tap hole for the impeller screw 906 andthreadinthecranecable. 12. Insert the plain bearing bracket 339 with impeller and pump rotor 859 in the intermediate lantern 146 with the crane. Make sure the plain bearing bracket 339 snaps into place on the pin Unscrew the eye bolt again. 14. Screw the impeller screw 906 and O-ring tight with the circlip pliers Fitting the pump in the installation ( 5 Setup and connection, Page 12). EN 01 BA MPC-B series 27

Pressure relief valve

Pressure relief valve Pressure relief valve Operating manual Series DHV 712 Version BA-2015.10.20 EN Print-No. 300 510 TR MA DE Rev001 ASV Stübbe GmbH & Co. KG Hollwieser Straße 5 32602 Vlotho Germany Phone: +49 (0) 5733-799-0

More information

Internal Gear Pump / Drive QT, QX, QXV, QXM series. Operating manual. Bucher Hydraulics GmbH Industriestrasse 1 D Klettgau

Internal Gear Pump / Drive QT, QX, QXV, QXM series. Operating manual. Bucher Hydraulics GmbH Industriestrasse 1 D Klettgau Internal Gear Pump / Drive QT, QX, QXV, QXM series Operating manual Bucher Hydraulics GmbH Industriestrasse 1 D-79771 Klettgau 410.10.00.00 / VPZ / 07.2005 Operating manuel 100-I-000014-E-00 Observe protection

More information

Centrifugal Pump with Volute Casing

Centrifugal Pump with Volute Casing Centrifugal Pump with Volute Casing Original Operating Manual NIM / NAM series Version BA-2014.09 ID-No. 550 018 VM-No. 467.0001 GB ALLWEILER GmbH Postfach 1140 Allweilerstr. 1 78301 Radolfzell Germany

More information

Screw Pump. Version BA ID-No VM-No GB

Screw Pump. Version BA ID-No VM-No GB Screw Pump Original Operating Manual SNC, SNG, SNFG Series Version BA-2014.01 ID-No. 550 159 VM-No. 655.0003 GB ALLWEILER GmbH Postfach 1140 Allweilerstraße 1 78301 Radolfzell Germany Phone: +49 (0) 7732-86-0

More information

Screw Pump. Version BA ID-No VM-No GB. We reserve the right to make technical changes.

Screw Pump. Version BA ID-No VM-No GB. We reserve the right to make technical changes. Screw Pump Original Operating Manual ALLFUEL Series Version BA-2010.12 ID-No. 550 833 VM-No. 626.0007 GB ALLWEILER AG Radolfzell plant Postfach 1140 Allweilerstraße 1 78301 Radolfzell Germany Phone: +49

More information

Gear pump with magnetic coupling

Gear pump with magnetic coupling Gear pump with magnetic coupling Original Operating Manual Verder Gear Process PFA P1...P7 series Version BA-2013.09 Print-No. 09/13 Verder Deutschland GmbH & Co. KG Retsch-Allee 1 5 42781 Haan Germany

More information

Operating Instructions

Operating Instructions Operating Instructions BE2700 Brinkmann Immersions pumps of the series TA/STA/TAL/SAL901... 1303 Contents 1 General...1 2 Safety...2 3 Transport and storage...2 4 Description of product and accessories...2

More information

Instruction Manual. Sewage lifting station compli 300

Instruction Manual. Sewage lifting station compli 300 Instruction Manual Sewage lifting station compli 300 Safety instructions Areas of application Electrical connection Installation Servicing Technical data Appendix JUNG PUMPEN GmbH Industriestr. 4-6 33803

More information

Original Operating Manual SKT Volute-Casing Centrifugal Pump

Original Operating Manual SKT Volute-Casing Centrifugal Pump Original Operating Manual SKT Volute-Casing Centrifugal Pump OSNA-Pumpen GmbH Brückenstrasse 3 49090 Osnabrück, Germany Phone: +49 541 1211-0 Fax: +49 541 1211-220 Internet: http://www.osna.de E-mail:

More information

Peristaltic Industrial Tube Pump

Peristaltic Industrial Tube Pump Peristaltic Industrial Tube Pump Operating Manual Rapide Version 1.0v-05/2013 Print No. 01 Version 1.0v-05/2013 Print-No. 01 Rapide The information in this document is essential for the safe operation

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Type 5282 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating instructions contain

More information

Swing Piston Compressors and Vacuum Pumps

Swing Piston Compressors and Vacuum Pumps Swing Piston Compressors and Vacuum Pumps NPK 018 AC Pressure NPK 018 DC Pressure NPK 018 AC Vacuum NPK 018 DC Vacuum Operating and Installation Instructions Read and observe these Operating and Installation

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Type 5282 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation Contents 1 Operating Instructions... 2 2 Authorized use...

More information

Original Operating Manual CVP High-Pressure Centrifugal Pump

Original Operating Manual CVP High-Pressure Centrifugal Pump Original Operating Manual CVP High-Pressure Centrifugal Pump OSNA-Pumpen GmbH Brückenstrasse 3 49090 Osnabrück, Germany Phone: +49 541 1211-0 Fax: +49 541 1211-220 Internet: http://www.osna.de E-mail:

More information

Operating Instruction for Liquid-Ring Vacuum Pumps

Operating Instruction for Liquid-Ring Vacuum Pumps Operating Instruction for Liquid-Ring Vacuum Pumps Serial No Type EDUR-Pumpenfabrik Eduard Redlien GmbH & Co. KG Postfach 1949 D-24018 Kiel Tel. (+431) 689868 Fax (+431) 6898800 E-mail: info@edur.de http://www.edur.de

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Industrial Process Installation, Operation, and Maintenance Manual Series PBV Plastic Lined Ball Valve Table of Contents Table of Contents Introduction and Safety...2 Safety message levels...2 User health

More information

Original Operating Manual NMH/NMV High-Pressure Centrifugal Pump

Original Operating Manual NMH/NMV High-Pressure Centrifugal Pump Original Operating Manual NMH/NMV High-Pressure Centrifugal Pump OSNA-Pumpen GmbH Brückenstrasse 3 49090 Osnabrück, Germany Phone: +49 541 1211-0 Fax: +49 541 1211-220 Internet: http://www.osna.de E-mail:

More information

Volute Casing Centrifugal Pumps in High Temperature Design with Magnetic Drive. Series CNH-ML

Volute Casing Centrifugal Pumps in High Temperature Design with Magnetic Drive. Series CNH-ML Volute Casing Centrifugal Pumps in High Temperature Design with Magnetic Drive Series CNH-ML Usage For pumping toxic, volatile, explosive or other fluids harmful to the environment which call for service

More information

Rio-Therm N. Installation/Operating Manual

Rio-Therm N. Installation/Operating Manual Hot Water Service Pump Rio-Therm N Rio-Therm N 25-30 to 80-80 Installation/Operating Manual Legal information/copyright Installation/Operating Manual Rio-Therm N Original operating manual KSB Aktiengesellschaft

More information

FLENDER ZAPEX couplings. Type ZWT. Operating instructions BA 3505 EN 10/2011. FLENDER couplings

FLENDER ZAPEX couplings. Type ZWT. Operating instructions BA 3505 EN 10/2011. FLENDER couplings FLENDER ZAPEX couplings Type ZWT Operating instructions FLENDER couplings FLENDER ZAPEX couplings Type ZWT Operating instructions Translation of the original operating instructions Technical data Notes

More information

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS Contents Section 1. General Observations... 2 2. Operation... 4 3. Control During Operation... 5 4. Trouble Shooting... 6 5. Maintenance... 7 Please

More information

Type 6213 EV, 6281 EV

Type 6213 EV, 6281 EV Type 6213 EV, 6281 EV 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating instructions

More information

DIAPHRAGM LIQUID PUMP NF 1.30

DIAPHRAGM LIQUID PUMP NF 1.30 DIAPHRAGM LIQUID PUMP NF 1.30 NF 1.30 KT DCG 12V Supply voltage [Ch. 4] DCG KT / TT [Ch. 4] 1.30 NF - / PMLxxxx / PLxxxx [Ch. 1] Operating and Installation Instructions Read and observe these Operating

More information

Drive Unit e-drive1. Installation instructions 04/2014. English translation of the original German installation instructions

Drive Unit e-drive1. Installation instructions 04/2014. English translation of the original German installation instructions Drive Unit e-drive1 Installation instructions 04/2014 English translation of the original German installation instructions Contents Foreword... 3 Availability... 3 Structural features in the text... 3

More information

Assembly and Maintenance Manual Type RSBW

Assembly and Maintenance Manual Type RSBW Assembly and Maintenance Manual Type RSBW Hatschekstr. 36 69126 Heidelberg Germany Tel +49(0)6221 30470 Tel +49(0)6221 304731 info@stieber.de www.stieber.de Stieber Clutch Date of issue: 16/03/2017 GB

More information

Micro Diaphragm Gas Sampling Pumps

Micro Diaphragm Gas Sampling Pumps Operating and Installation Instructions Micro Diaphragm Gas Sampling Pumps Type range: NMP 03 KP DC-B1 NMP 03 KP DC-S NMP 03 KP DC-B3 NMP 03 KP DC-M NMP 03 KP DC-L You have selected a high-quality KNF

More information

Volute Casing Centrifugal Pumps in In-line Design with Magnetic Drive. Series CNI-M

Volute Casing Centrifugal Pumps in In-line Design with Magnetic Drive. Series CNI-M Volute Casing Centrifugal Pumps in In-line Design with Magnetic Drive Series CNI-M Usage For pumping toxic, volatile, explosive or other fluids harmful to the environment which call for service of hermetically

More information

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors Type range: UN813.3ANI UN813.4ANI UN813.3ANDCB UN813.4ANDCB UN813.5ANI Fig. 1: UN813.3ANI Fig. 2: UN813.4ANI You have selected

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Type 5404 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation Contents 1 Operating instructions...2 2 Intended use...3 3

More information

DIAPHRAGM LIQUID PUMP NF 2.35

DIAPHRAGM LIQUID PUMP NF 2.35 DIAPHRAGM LIQUID PUMP NF 2.35 NF 2.35 XP DC 24V Supply voltage [Ch. 4] DCB-A XP / XT [Ch. 4] 2.35 NF - / PMLxxxx / PLxxxx [Ch. 1] Operating and Installation Instructions Read and observe these Operating

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Industrial Process Installation, Operation, and Maintenance Manual Series PBFV Plastic Lined Butterfly Valve - Lug and Wafer Style Table of Contents Table of Contents Introduction and Safety...2 Safety

More information

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA 5.52.714.00.1.0 Edition 03.2004 GB Operating and Maintenance Manual for HADEF overhead crane as jointed crane TA Subject to changes. 1 HADEF Table of Contents 1 General Page 3 2 Product description Page

More information

Assembly and Maintenance Manual Type ASNU

Assembly and Maintenance Manual Type ASNU Assembly and Maintenance Manual Type ASNU Hatschekstr.36 69126 Heidelberg Germany Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 30.05.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\_ASNU.docx

More information

Type 3320, Service Manual. Serviceanleitung Service Manuel

Type 3320, Service Manual. Serviceanleitung Service Manuel Electromotive 2/2-way valve Elektromotorisches 2/2-Wege-Ventil Vanne électromotorisée à 2/2 voies Service Manual Serviceanleitung Service Manuel We reserve the right to make technical changes without notice.

More information

A408 GB. Pneumatic oil and diesel pumps 1:1

A408 GB. Pneumatic oil and diesel pumps 1:1 03 594 A408 GB Pneumatic oil and diesel pumps 1:1 G Operating instructions for Pneumatic oil and diesel pump 1:1 Contents 1. General details 2 1.1 Intended use 2 1.2 Design and functional description 2

More information

Installation and Operating Instructions

Installation and Operating Instructions Original Installation and Operating Instructions Hawle E2 Valve with Flange Outlet, System 2000 or PE Spigot Ends Table of Contents A) General...... 2 A1 Symbols..... 2 A2 Intended use... 2 A3 Labeling...

More information

Storage, operating and maintenance instructions for AZ plug valves and Standard valves

Storage, operating and maintenance instructions for AZ plug valves and Standard valves ARMATUREN Plug - Valves metallic with PTFE Sleeve 2-7 way Storage, operating and maintenance instructions for AZ plug valves and Standard valves Plug - Valves FEP/PFA - lined, 2-3 way Butterfly - Valves

More information

Volute Casing Centrifugal Pumps according to EN 22858, ISO 2858 with Magnetic Drive. Series CNH-M

Volute Casing Centrifugal Pumps according to EN 22858, ISO 2858 with Magnetic Drive. Series CNH-M Volute Casing Centrifugal Pumps according to EN 22858, ISO 2858 with Magnetic Drive Series CNH-M Usage For pumping toxic, volatile, explosive or other fluids harmful to the environment which call for service

More information

BUTTERFLY VALVE WITH WELDED ENDS INSTALLATION AND MAINTENANCE MANUAL

BUTTERFLY VALVE WITH WELDED ENDS INSTALLATION AND MAINTENANCE MANUAL BUTTERFLY VALVE 31300 SERIES INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE 1. Overview Read these instructions carefully before starting the valve installation and start-up work. Safe keep the instructions

More information

Operating manual. original operating manual. HDA eco Box 12/24V DC Automatic Dispenser. Translation of the. Item No.:

Operating manual. original operating manual. HDA eco Box 12/24V DC Automatic Dispenser. Translation of the. Item No.: Operating manual HDA eco Box 12/24V DC Automatic Dispenser Item No.: 110 500 900 Translation of the original operating manual Important! Copyright The operating manual is always to be read before commissioning

More information

Swing Piston Compressors and Vacuum Pumps

Swing Piston Compressors and Vacuum Pumps Swing Piston Compressors and Vacuum Pumps NPK 050 NPK 0100 Operating and Installation Instructions Read and observe these Operating and Installation Instructions! KNF Neuberger GmbH Alter Weg 3 D-79112

More information

Installation and Operating Manual for Tank and Equipment Cleaning Nozzles Series 5TM

Installation and Operating Manual for Tank and Equipment Cleaning Nozzles Series 5TM Installation and Operating Manual for Tank and Equipment Cleaning Nozzles Series 5TM 150 150 150 This instruction manual contains proprietary information which is protected by copyright laws. No part of

More information

Type 5411, Operating Instructions. Bedienungsanleitung Manuel d utilisation

Type 5411, Operating Instructions. Bedienungsanleitung Manuel d utilisation Type 5411, 5413 3/2 or 4/2 way solenoid valve 3/2 oder 4/2-Wege-Magnetventil Électrovanne 3/2 ou 4/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 THE OPERATING INSTRUCTIONS The

More information

Enelion Vertica. Installation manual. 22 kw. for the specialists

Enelion Vertica. Installation manual. 22 kw. for the specialists Enelion Vertica kw Installation manual for the specialists ver..6 Enelion 05.07 Enelion VERTICA General notes At various points in this manual you will see notes and precautionary warnings regarding possible

More information

Planar surface gantry EXCM-30. Instructions. Mechanical installation b [ ]

Planar surface gantry EXCM-30. Instructions. Mechanical installation b [ ] Planar surface gantry EXCM-30 Instructions Mechanical installation 804447 605b [8044434] EXCM-30 Translation of the original instructions LOCTITE is a registered trademark of its respective trademark holder

More information

Operating manual. Custom made gearboxes

Operating manual. Custom made gearboxes Operating manual Custom made gearboxes DSS-Nr. 100389549 DSS-Rev. 001 Datum 16.01.2018 Contents Contents 1 General information 3 1.1 Using the operating manual 3 1.2 Warnings in this operating manual 4

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation Type 0131 2/2- or 3/2-way solenoid valve 2/2- oder 3/2-Wege-Magnetventil Électrovanne 2/2 ou 3/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating

More information

Assembly and Maintenance Manual Type AS

Assembly and Maintenance Manual Type AS Assembly and Maintenance Manual Type AS Hatschekstr.36 69126 Heidelberg Germany Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 30.05.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\_AS.docx

More information

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600 Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600 Installation Guide WBP-Box-IEN103320 IMEN-WBP-BOX Version 2.0 EN SMA Solar Technology AG Table of Contents Table of Contents

More information

EN Operating manual. Motorised zone valve. Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3

EN Operating manual. Motorised zone valve. Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3 EN Operating manual Motorised zone valve Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3 This manual ensures safe and efficient use of the 3PV2 or 3PV8 force-actuated three-way valve with spring-loaded return

More information

Installation and Operating Instructions Magnetic Vibrator MR 1

Installation and Operating Instructions Magnetic Vibrator MR 1 Installation and Operating Instructions Magnetic Vibrator MR 1 (Translation of the Original Instruction Manual) Würges Vibrationstechnik GmbH Daimlerstraße 9 D-86356 Neusäß Telephone +49 821 999824-00

More information

GATE VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1

GATE VALVES. Type P (Standard: Plug) Type S (Soft Seal) Contents. (1) Be sure to read the following warranty clauses of our product 1 Serial No. H-V011-E-12 GATE VALVES Type P (Standard: Plug) Type S (Soft Seal) Contents (1) Be sure to read the following warranty clauses of our product 1 User s Manual (2) General operating instructions

More information

These installation and maintenance instructions must be read in full and completely understood before the installation!

These installation and maintenance instructions must be read in full and completely understood before the installation! These installation and maintenance instructions must be read in full and completely understood before the installation! 1. General information on the installation and maintenance instructions These instructions

More information

Operating and Installation Instructions Swing Piston Compressors and Vacuum Pumps

Operating and Installation Instructions Swing Piston Compressors and Vacuum Pumps Operating and Installation Instructions Swing Piston Compressors and Vacuum Pumps UNPK04DC Pressure UNPK04DCB Pressure UNPK04DC Vacuum UNPK04DCB Vacuum KNF Neuberger, Inc 2 Black Forest Rd Trenton, NJ

More information

These operating instructions apply for: NCX 380 NCZ 300 NCX 480 NCZ 370 NCX 580 L NCZ 480 NCX 660 K NCZ 560 NCZ 660 NCZ 800

These operating instructions apply for: NCX 380 NCZ 300 NCX 480 NCZ 370 NCX 580 L NCZ 480 NCX 660 K NCZ 560 NCZ 660 NCZ 800 Original instructions Operating Instructions for May 2010 Electric Internal Vibrators BA No. 1092E Series NCX and NCZ These operating instructions apply for: NCX 380 NCZ 300 NCX 480 NCZ 370 NCX 580 L NCZ

More information

NEOTECHA NTB-NTC BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

NEOTECHA NTB-NTC BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood 2 SAFETY Please also read through these notes carefully. 2.1 General potential danger due to: a. Failure to observe the instructions

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Industrial Process Installation, Operation, and Maintenance Manual Cam-Tite Ball Valve Table of Contents Table of Contents Introduction and Safety...2 Safety message levels...2 User health and safety...2

More information

Turbocharger / VTR..0, VTR..1 Original assembly instructions English

Turbocharger / VTR..0, VTR..1 Original assembly instructions English Assembly Instructions Turbocharger / VTR..0, VTR..1 Original assembly instructions English This document is valid for the VTR..0/..1 series: VTR160, VTR200, VTR250, VTR320, VTR400 VTR161, VTR201, VTR251,

More information

Diaphragm Vacuum Pumps and Compressors

Diaphragm Vacuum Pumps and Compressors Operating Instructions Read and observe these Operating Instructions! Diaphragm Vacuum Pumps and Compressors N022 AN.18 N022 AT.18 N022 AV.18 N026.1.2 AN.18 N026.1.2 AT.18 N026.1.2 AV.18 N026.3 AN.18 N026.3

More information

SERIES PC INSTRUCTION AND OPERATION MANUAL

SERIES PC INSTRUCTION AND OPERATION MANUAL MEGGA SERIES PC INSTRUCTION AND OPERATION MANUAL Models PCT and PCF Close-coupled and frame-mounted single-stage horizontal end-suction pumps. WARNING: Read this manual before installing or operating this

More information

original operating manual Operating manual Translation of the Item-No.: ,

original operating manual Operating manual Translation of the Item-No.: , Translation of the original operating manual Operating manual Item-No.: 015 431 551, 015 431 581 Important! Copyright The operating manual is always to be read before commissioning the equipment. No warranty

More information

D58 Series Brake Instructions

D58 Series Brake Instructions D58 Series Brake Instructions 4740 W. Electric Avenue Milwaukee, WI 53219 414/672-7830 FAX 414/672-5354 www. dingsbrakes.com Safety information 2 Safety information 2.1 Persons responsible for the safety

More information

KeContact P20. User manual

KeContact P20. User manual KeContact P20 User manual Comments to this manual In this manual you will find warnings against possible dangerous situations. The used symbols apply to the following meanings:!! WARNING! Indicates a potentially

More information

Operating Instructions

Operating Instructions Translation of the original instructions ONF 16 S / ONF 25 S Oil Mist Filter Operating Instructions PD 0057 BEN/C (1301) EN Table of contents Table of contents 1 About this manual...............................................

More information

Air Operated Diaphragm Pumps Operating and Maintenance Instructions

Air Operated Diaphragm Pumps Operating and Maintenance Instructions Product & Chemical Disclaimer The user must take responsibility in the selection of the products materials of construction. Empire Pumps Ltd will act in an advisory role and offer recommendations; however,

More information

Installation and Operational Instructions for ROBATIC -clutch Types _.0 and _.0 Sizes 3 7

Installation and Operational Instructions for ROBATIC -clutch Types _.0 and _.0 Sizes 3 7 Please read these Installation and Operational Instructions carefully and follow them accordingly! Ignoring these Instructions may lead to malfunction or to clutch failure, resulting in damage to other

More information

Installation and Operational Instructions for EAS -Compact overload clutch, Type 49_. 4._ Sizes 4 and 5

Installation and Operational Instructions for EAS -Compact overload clutch, Type 49_. 4._ Sizes 4 and 5 Please read these Operational Instructions carefully and follow them accordingly! Ignoring these Instructions may lead to malfunctions or to clutch failure, resulting in damage to other parts. Contents:

More information

Angle seat valve with piston actuator VZXA-...-K

Angle seat valve with piston actuator VZXA-...-K Angle seat valve with piston actuator VZXA-...-K Festo AG & Co. KG Postfach 73726 Esslingen Germany +49 711 347-0 www.festo.com 3 Further information Accessories www.festo.com/catalogue Spare parts www.festo.com/spareparts

More information

Butterfly Valve Type 57P

Butterfly Valve Type 57P Butterfly Valve Type 57P Contents Lever Type: 50-200 mm (2-8 ) Body Material: CPVC Gear Type: 50-200mm (2-8 ) Body Material: CPVC (1) Be sure to read the following warranty clauses of our product 1 (2)

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Type 6027 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating instructions contain

More information

Diaphragm Vacuum Pump

Diaphragm Vacuum Pump Diaphragm Vacuum Pump with Diaphragm Stabilization System Operating Instructions Read and observe these Operating Instructions! N 920 AP.18 N 920 AP.29.18 N 920 KT.29.18 KNF Neuberger GmbH Alter Weg 3

More information

Instruction manual

Instruction manual Instruction manual 3.30.13 Wey Sluice Gate Valve 4 weyvalve.com Installation and Instruction Manual Wey Sluice Gate Valves 4 Original documentation in the sense of 2006/42/EG 1. GENERAL 1.1 - Safety 1.2

More information

Chemical Pumps. With mechanical seal. Non-Metallic Standardized Chemical Pump Type NP. In PP / PE-UHMW / PVDF Dimensions to EN / ISO 2858

Chemical Pumps. With mechanical seal. Non-Metallic Standardized Chemical Pump Type NP. In PP / PE-UHMW / PVDF Dimensions to EN / ISO 2858 Chemical Pumps With mechanical seal Non-Metallic Standardized Chemical Pump Type NP In PP / PE-UHMW / PVDF Dimensions to EN 22 / ISO 2 Applications Type NP standardized chemical pumps are the solution

More information

Original Operating Instructions

Original Operating Instructions Edition: 2.8.2013 BA 887-EN Original Operating Instructions C-DLR 301 Compressor C-Serie C-Series Klaue Claw Table of contents Table of contents 1 Foreword...................................................................

More information

Installation manual portable distributors

Installation manual portable distributors EN Installation manual portable distributors EN 60003206 Issue 11.2016 15/11/2016 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal words used 4 2 Intended

More information

Mounting and Operating Instructions EB EN. Type 3372 Electropneumatic Actuator. Actuator area: 120 and 350 cm² With Type 3725 Positioner

Mounting and Operating Instructions EB EN. Type 3372 Electropneumatic Actuator. Actuator area: 120 and 350 cm² With Type 3725 Positioner Type 3372 Electropneumatic Actuator Actuator area: 120 and 350 cm² With Type 3725 Positioner Translation of original instructions Type 3372 with 120 cm² actuator area Type 3372 with 350 cm² actuator area

More information

Diaphragm Vacuum Pumps and Compressors

Diaphragm Vacuum Pumps and Compressors Operating Instructions Read and observe these Operating Instructions! Diaphragm Vacuum Pumps and Compressors N145 AN.18 N145 AT.18 N145 AV.18 N145.1.2 AN.18 N145.1.2 AT.18 N145.1.2 AV.18 KNF Neuberger

More information

Sealless Chemical Magnetic Drive Pump Close-coupled design

Sealless Chemical Magnetic Drive Pump Close-coupled design INSTALLATION AND OPERATING MANUAL Translation of the original manual Serie MDK-B Sealless Chemical Magnetic Drive Pump Close-coupled design Keep for future use! This operating manual must be strictly observed

More information

Type 3360, Service Manual. Serviceanleitung Service Manuel

Type 3360, Service Manual. Serviceanleitung Service Manuel Electromotive control valve Elektromotorisches Regelventil Vanne de régulation électromotorisée Service Manual Serviceanleitung Service Manuel We reserve the right to make technical changes without notice.

More information

Diaphragm-Gas Sampling Pumps

Diaphragm-Gas Sampling Pumps Diaphragm-Gas Sampling Pumps N 143 ANE N 143 ATE Operating and Installation Instructions Read and observe these Operating and Installation Instructions! N 186.1.2 ANE N 186.1.2 ATE KNF Neuberger GmbH Alter

More information

Installation and Operation Manual

Installation and Operation Manual Industrial Process Installation and Operation Manual Advantage Actuator 2.0 Table of Contents Table of Contents Introduction and Safety...2 Safety message levels...2 User health and safety...2 Transportation

More information

DIAPHRAGM LIQUID PUMP NF 1.25

DIAPHRAGM LIQUID PUMP NF 1.25 DIAPHRAGM LIQUID PUMP NF 1.25 NF 1.25 RP DC 12V Supply voltage [Ch. 4] DC / DCB-4A RP / RT [Ch. 4] 1.25 NF / UNF - / PMLxxxx / PLxxxx [Ch. 1] Operating and Installation Instructions Read and observe these

More information

Operating and installation instructions

Operating and installation instructions Strainer PN6-160 1.0 General information on operating instructions...2-2 2.0 Notes on possible dangers...2-2 2.1 Significance of symbols... 2-2 2.2 Explanatory notes on safety information... 2-2 3.0 Storage

More information

Chemical Pumps. With mechanical seal. Non-Metallic Close-Coupled Chemical Pump Type NP-B

Chemical Pumps. With mechanical seal. Non-Metallic Close-Coupled Chemical Pump Type NP-B Chemical Pumps With mechanical seal Non-Metallic Close-Coupled Chemical Pump Type NP-B In PP / PE-UHMW / PVDF Casing dimensions to EN 2288 / ISO 288 Applications Type NP-B chemical pumps are the solution

More information

Micro diaphragm liquid pump NF 25 NFB 25

Micro diaphragm liquid pump NF 25 NFB 25 Micro diaphragm liquid pump NF 25 NFB 25 NF 25 KP DC-M 12V Supply voltage [Ch. 4] DC-M / DC-L / DCB-4 / DCB-4A KP / KT / TT [Ch. 4] 25 NF / NFB - / PMLxxxx / PLxxxx [Ch. 1] Operating and Installation Instructions

More information

General operating manual for assembly, commissioning and maintenance of valves and hydraulic manifolds

General operating manual for assembly, commissioning and maintenance of valves and hydraulic manifolds for assembly, commissioning and maintenance of valves and hydraulic manifolds 110210_general_operating_manual 07.2018 Table of contents Contents Page Important information 2 Important safety instructions

More information

FLENDER ARPEX Plate packs with close-fitting bolt connection. ARW-4 Sizes to Assembly instructions An 4239 en 12/2015.

FLENDER ARPEX Plate packs with close-fitting bolt connection. ARW-4 Sizes to Assembly instructions An 4239 en 12/2015. FLENDER ARPEX Plate packs with close-fitting bolt connection ARW-4 Sizes 101-4 to 292-4 Assembly instructions FLENDER couplings FLENDER ARPEX Plate packs with close-fitting bolt connection ARW-4 Sizes

More information

Constant Flow Valves ASAHI AV VALVES H-V019-E-6. Contents. Serial No. User s Manual

Constant Flow Valves ASAHI AV VALVES H-V019-E-6. Contents. Serial No. User s Manual Serial No. H-V019-E-6 Constant Flow Valves User s Manual Contents (1) Be sure to read the following warranty clauses of our product 1 (2) General operating instructions 2 (3) General instructions for transportation

More information

Electropneumatic Converters i/p Converters Type 6111 Mounting and Operating Instructions EB 6111 EN

Electropneumatic Converters i/p Converters Type 6111 Mounting and Operating Instructions EB 6111 EN Electropneumatic Converters i/p Converters Type 6111 Fig. 1 Type 6111 in standard version Fig. Type 6111 mounted on a supply air manifold Fig. 3 Type 6111 in field enclosure Mounting and Operating Instructions

More information

JUNG PUMPEN BAUFIX 200. Instruction Manual

JUNG PUMPEN BAUFIX 200. Instruction Manual JUNG PUMPEN BAUFIX 200 EN Instruction Manual B 48216-10-1705 www.jung-pumpen.de Baufix 200-32 2 3 Qualification and training of personnel All personnel involved with the operation, servicing, inspection

More information

VERTICAL MULTI-STAGES CENTRIFUGAL PUMPS

VERTICAL MULTI-STAGES CENTRIFUGAL PUMPS Installation and Operating Instructions VERTICAL MULTI-STAGES CENTRIFUGAL PUMPS Models 1, 3, 5, 10, 15, 20, 32, 45, 64, 90, 120, 150 1. Model numbering and nameplate format 1.1 Model numbering Example:

More information

Operating & Maintenance Manual For Steam Conditioning Valve

Operating & Maintenance Manual For Steam Conditioning Valve For Steam Conditioning Valve 1 Table of Contents 1.0 Introduction 3 2.0 Product description 3 3.0 Safety Instruction 4 4.0 Installation and Commissioning 5 5.0 Valve Disassembly 6 6.0 Maintenance 6 7.0

More information

Dry installed pump type LANDY BTP.

Dry installed pump type LANDY BTP. OPERATION & MAINTENANCE MANUAL Dry installed pump type LANDY BTP. Landustrie Sneek BV Pieter Zeemanstraat 6 Tel. 0031 515-486888 P.O. BOX 199 Fax. 0031 515-412398 NL-8600 AD Sneek info@landustrie.nl The

More information

Installation Operation & Maintenance Manual. Oil-Free (Dry) Rotary Vane Vacuum Pump Systems

Installation Operation & Maintenance Manual. Oil-Free (Dry) Rotary Vane Vacuum Pump Systems Installation Operation & Maintenance Manual Oil-Free (Dry) Rotary Vane Vacuum Pump Systems Part No. 9983-0000-S07 / November 2018 OIL-FREE (DRY) ROTARY VANE VACUUM PUMP SYSTEMS TABLE OF CONTENTS CUSTOMER

More information

Operating Guide SBFV (PN16/25) ENGLISH Steel butterfly valve SBFV Page 2. Danfoss VI.IX.A1.02 1

Operating Guide SBFV (PN16/25) ENGLISH Steel butterfly valve SBFV   Page 2. Danfoss VI.IX.A1.02 1 Operating Guide SBFV (PN16/25) ENGLISH Steel butterfly valve SBFV www.danfoss.com Page 2 Danfoss 2016.06 VI.IX.A1.02 1 Table of Contents: 1. OVERVIEW... 3 2. GENERAL... 3 2.1 Safety...3 2.2 Proper use...4

More information

Installation, Operating & Maintenance Instructions. HV gate valve with pneumatic actuator. Series 110 DN mm (I. D.

Installation, Operating & Maintenance Instructions. HV gate valve with pneumatic actuator. Series 110 DN mm (I. D. Installation, Operating & Maintenance Instructions HV gate valve with pneumatic actuator Series 110 DN 250 320 mm (I. D. 10" 12") This manual is valid for the following product ordering numbers: 11048-.

More information

Turbocharger / A100-L Original assembly instructions English

Turbocharger / A100-L Original assembly instructions English Assembly Instructions Turbocharger / A100-L Original assembly instructions English This document is valid for the A100-L series: A165-L, A170-L, A175-L, A180-L, A185-L, A190-L Purpose The assembly instructions

More information

Installation manual wall-mounted distributor

Installation manual wall-mounted distributor EN Installation manual wall-mounted distributor EN 60003233 Issue 11.2016 2016-14-11 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal words used 4 2

More information

Swing Check Valve ASAHI AV VALVES. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1

Swing Check Valve ASAHI AV VALVES. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1 Serial No. H-V013-E-13 Swing Check Valve User s Manual Contents (1) Be sure to read the following warranty clauses of our product 1 (2) General operating instructions 2 (3) General instructions for transportation,

More information

Operating manual Separator

Operating manual Separator Operating manual Separator Sheet no. AS/4.1.141.1.1 issue 20.08.2014 Contents Section Title Page 0 Introduction... 1 1 Intended use......1 2 Marking of the fitting... 1 3 Safety instructions... 2 4 Transport

More information