1 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES/HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE 2010 NATIONAL REPORT ISSN:

2 MOTORWAY COMPANIES HAC Hrvatske autoceste d.o.o. Širolina 4 HR ZAGREB T: F: E: info@hac.hr WEB: ARZ Autocesta Rijeka-Zagreb d.d. Koturaška cesta 43 HR ZAGREB T: F E: arz@arz.hr WEB: Stjepko BOBAN President of the Managing Board Boris ORDULJ President of the Supervisory Board Miro ŠKRGATIĆ President of the Managing Board Bojan HLAČA President of the Supervisory Board BINA-ISTRA BINA-ISTRA d.d. Savska 106/4 HR ZAGREB T: F: E: bina-istra1@pu.t-com.hr WEB: David GABELICA General Manager Aleksa LADAVAC Deputy General Manager Charles PARADIS President of the Supervisory Board AZM Autocesta Zagreb-Macelj d.o.o. Garićgradska 18 HR ZAGREB T: F: E: office@azm.hr WEB: Wolfgang SOMMERBAUER President of the Managing Board Aleksandar ČAKLOVIĆ Member of the Managing Board Wolfgang ZECHMEISTER President of the Supervisory Board I M P R E S S U M Publisher: HUKA Editorial Board: Miro Škrgatić, Editor in Cheif; Brankica Bajić, Technical editor; Diana Benković, Technical editor assistant; Graphic design: Studio Domino dizajn, Hrvoje Vražić Photo on the cover: Ivan Vukušić Published: February 2011 ISSN: T: F: E: info@huka.hr brankica.bajic@huka.hr diana.benkovic@huka.hr Croatian association of toll motorways concessionaires KOTURAŠKA CESTA 43, HR ZAGREB Miro ŠKRGATIĆ President Aleksandar ČAKLOVIĆ Vice-President 2 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

3 C R O A T I A NATIONAL REPORT 2010 CURRENT STATE OF THE NETWORK As on 1 January 2011, the total length of the motorway network in the Republic of Croatia amounted to 1,240.7 km. Motorways situated in the Republic of Croatia are operated by 4 companies: Hrvatske autoceste d.o.o. (operates all toll motorways, i.e. A1, A3, A4, A5, A10, A11, A12 and A13, except for the ones under concession), and three concession companies, i.e. BINA-ISTRA d.d. Pula (it operates the so called Istrian Y - A8 and A9), Autocesta Rijeka - Zagreb d.d. (A6, A7, part of A1, and the Krk Bridge), and Autocesta Zagreb - Macelj d.o.o. (A2). MOTORWAY NETWORK Company 2009 Total network 2010 Total network Total network plan for HAC d.o.o ARZ d.d BINA-ISTRA d.d AZM d.d TOTAL: 1, , ,252.2 NETWORK OPENED TO TRAFFIC IN 2010 New motorways New semi motorways Upgrading to the full motorway profile The network (end 2010) 0.0 km 0.0 km km 1,240.7 km CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT

4 2010 NEW SECTIONS OPENED TO TRAFFIC IN 2010 Motorway 1. A9: Umag Pula Section Kanfanar Pula TOTAL: Km Description Upgrade to the full motorway profile A12 A13 A12 A13 Total in service on 01/01/ CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

5 SECTIONS UNDER CONSTRUCTION On 1 January 2011, new works were in progress on: 89 km of motorways, 67 km of widening to full motorway profile, 5.34 km Novigrad - Netretići link road, 6 km of (express) link road and Sv. Ilija Tunnel WORKS IN PROGRESS ON 01/01/2011 Motorway/semi motorway Section Km Description A1: Bosiljevo 2 Split Dubrovnik: Ravča - Ploče Interchange Novigrad Interchange Structures, pavement structure, road bed Construction of the Interchange Novigrad with Toll Station. A6 : Rijeka Zagreb Novigrad-Netretić Link Road 5.34 Approach roads - relocation of the National Road D6 (Netretić - Novigrad Interchange), 5.34 km in length) A8: Kanfanar Matulji Kanfanar Rogovići Widening to full motorway profile A9: Umag Pula Umag Kanfanar Widening to full motorway profile A11: Zagreb Sisak A12: Vrbovec 2 Križevci Koprivnica GP Gola (H) A13: Vrbovec 2 Bjelovar Virovitica GP Terezino Polje (H) Jakuševac - Velika Gorica South Buševec Lekenik Road bed Gradec Kloštar Vojakovački Structures Vrbovec 2 Bjelovar Structures Structures, pavement structure, road bed In 2011, road works will be completed on the total of: 11.5 km of new motorways 67 km of widening to the full motorway profile, and 5.34 km of link road NEW OPENINGS TO TRAFFIC PLANNED IN 2011 Motorway/semi motorway Section Km Description A1: Bosiljevo 2 Split Dubrovnik: Ravča Vrgorac Structures, route A6 : Rijeka Zagreb Novigrad Interchange Novigrad Netretić Link Road 5.34 New toll station and link roads A8: Kanfanar Matulji Kanfanar Rogovići Widening to full motorway profile A9: Umag Pula Umag Kanfanar Widening to full motorway profile A10: BIH border Interchange Metković Border BIH - connection Metković 1.50 Structures, route CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT

6 In addition to the continuation of work from the previous year, new road works will start in 2011 for: 10.5 km of motorways : BEGINNING OF CONSTRUCTION OF NEW SECTIONS IN 2011 Motorway/semi motorway Section Km Description A1: Bosiljevo 2 Split Dubrovnik: A3 : Bregana Zagreb Lipovac A5: Beli Manastir Osijek BIH border Ploče Interchange - Metković connection Ikea Interchange and relocation of Ivanja Reka TS Osijek - B. Manastir - Drava bridge only Sredanci Svilaj Design, land acquisition Design, land acquisition, relocation of utilities, construction Land acquisition, relocation of utilities, construction Design, land acquisition, relocation of utilities, construction A10: BIH border Interchange Metković BIH border - Metković interchange 1.50 Design, land acquisition, relocation of utilities, construction FINANCING AND INVESTMENTS The total of HRK 2, million (EUR million) was invested in the construction of new motorways in 2010, while HRK million (EUR million) was invested in sections under traffic. INVESTMENTS Company Investments in 2010 Plan for 2011 in new sections in completed sections in new sections in completed sections HAC* 1, (145.34) (39.22) 1, (247.55) (47.72) ARZ (14.86) 6.25 (0.84) (23.46) (9.28) BINA-ISTRA (129.15) (2.07) (77.52) (3.16) AZM 0.00 (0.00) (3.12) 0.00 (0.00) (3.01) TOTAL: 2, (289.36) (45.26) 2, (348.46) (63.15) TOTAL INVESTMENTS: 2, (334.62) 3, (411.61) * investment by HAC in new sections and completed sections according to temporary report in million of kn (million of EUR) (1EUR = 7.41 kuna) 6 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

7 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT

8 SOURCES OF FINANCING IN 2010 Source of financing % HAC ARZ BINA-ISTRA AZM Loan Toll revenues Revenues generated from the price of fuel (HRK 0.60 per litre) Reimbursable and non-reimbursable state funding TOTAL: TRAFFIC The total traffic of all vehicles registered on exit toll plazas of all motorways in 2010 decreased by 0,39 percent with respect to the previous year since all concessionaires, with the exception of BINA ISTRA, have registered a fall in traffic when compared to the previous year. NUMBER OF VEHICLES IN TOLL COLLECTION ZONES Company Passenger cars (IA + I + II) Trucks (III + IV) Passenger cars (IA + I + II) % (10/09) Trucks (III + IV) % (10/09) % TOTAL (10/09) HAC 29,466,095 3,865,812 28,655, ,751, ARZ 16,702,595 1,788,478 16,388, ,706, BINA-ISTRA 4,148, ,235 5,402,286 * , *29.04 AZM 5,768, ,794 5,569, , TOTAL: 56,085,261 6,733,319 56,015, ,558, TOTAL TRAFFIC: 62,818,580 62,573, * Due to the opening of the 30 km long Kanfanar - Pula Section in full motorway profile in June 2010 and migration from open to closed toll system traffic is counted differently. 8 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

9 TRAFFIC AND GDP GDP decrease in 2009 (%) Traffic increase in 2009 (%) GDP decrease in 2010 (%) Traffic decrease in 2010 (%) * * first estimate of GDP in as compared to the previous year The network did not increase in 2010 with respect to 2009, i.e. the new work consisted in widening to full motorway profile on 28 km. CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT

10 The motorway network is still under construction in Croatia and so both the closed and open toll collection TOLL RATES systems are now in use. However, once the network is completed, the closed toll collection system will be operated on all motorways with multiple entry and exit points. in million of kn (million of EUR) (1EUR = 7.41 kuna) TOLL COLLECTION SYSTEM Existing systems Light vehicles (Category I) HRK/km without VAT EUR/km without VAT Closed Open Relationship between categories I and IV in the closed system > 1 : 4.2 Existing systems Trucks (Category IV) HRK/km without VAT EUR/km without VAT Closed Open Relationship between categories I and IV in the open system > 1 : 4.6 Motorcycles (category IA) pay 60 % of the toll charged for category I vehicles. On all motorways, toll can be paid in cash (HRK and EUR), by credit and debit cards, by INA card, by SMART cards, and using the electronic toll collection (ETC) system. ETC is not available on AZM network (60 km). HRVATSKE AUTOCESTE d.o.o. (HAC) In 2010, HAC did not change the toll price, i.e. it kept the prices that are in use since 1 July 2004 for vehicle categories I, II and III, and since 1 March 2002 for the vehicle category IV Road users that pay toll in advance using the ETC system devices or SMART cards benefit from the 10 % discount through- out the year. By purchasing the seasonal ETC and SMART subscription, the users benefit from the 23.5 % discount in the period from 1 November of the current year to the 31 March of the following year, while the basic subscription with the 10 % percent discount is applied in the remaining periods of the year. The year round 20 % discount was introduced in September 2009 in the scope of permanent order arrangements for categories III and IV. Additional discounts were also introduced: these can be obtained throughout the year depending on the EURO emission categories: EURO 4 (3 %) and EURO 5 (5 %). This company did not raise the toll price in 2009 and it offers a whole array of discounts throughout the year. Bina-Istra subscribers can check, via Internet and SMS messages, their balance on the account and the subscription expiry information, and can also obtain the listing of passes through toll stations. In addition, they can BINA ISTRA d.d. replenish their accounts, and fill in and print invoices for payment via bank transfer. At Bina-Istra toll collection points, toll can be paid by all credit and debit cards, and also by INA card. The Bina-Istra ETC system was implemented in June The users who already have the ETC device can reregister devices already bought at HAC and ARZ with the BINA-ISTRA toll collection system, and become in this way Bina-Istra subscribers (this is valid for frequent users entitled to percent discount, depending on section used) or to register their credit cards for ETC device (applicable to nonfrequent users). 10 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

11 AUTOCESTA RIJEKA-ZAGREB d.d. (ARZ) On 10 September 2010, ARZ changed toll rates at Rupa TS for all vehicle categories. Toll can be paid by cash, and via credit and debit cards, SMART card, INA card and ETC. A 10 percent discount is granted throughout the year if toll is paid through subscription via SMART card. A seasonal discount of 23.5 percent is granted for seasonal Smart and seasonal ETC during the winter season, from 1 November to 31 March. A 10 percent discount is granted throughout the year if toll is paid through subscription to ETC device. At the discount sale that lasted from 13 December 2010 to 31 January 2011, the commercial ETC devices were sold for the category I vehicles at HRK 1 + VAT = HRK 1.23, subject to minimum toll prepayment of HRK 100 and user registration. The Donja Zdenčina toll station was opened to traffic on 21 November ETC packages can be purchased at FINA (67 offices), PETROL (30 billing stations), TIFON (15 filling stations), and EUROPETROL (19 filling stations). This project, facilitating purchase of ETC devices for category I users, has been undertaken to make the product more available to end users, and especially to tourists. In 2009, the year round 20 % discount was introduced in the scope of permanent order arrangements for categories III and IV. Additional discounts were also introduced: these can be obtained throughout the year depending on the EURO emission categories: EURO 4 (3 %) and EURO 5 (5 %). AUTOCESTA ZAGREB-MACELJ d.o.o. (AZM) AZM did not increase its toll rates in A 15 percent discount is granted to categories I and II for toll payment by subscription to SMART card. SMART card subscribers with vehicles belonging to categories III and IV enjoy the year round discount of 10 percent (for purchases in excess of HRK ). Other than with SMART card, toll can also be paid via debit and credit cards, and also via INA card. In 2010, the total toll revenues decreased by 0.90 percent when TOLL REVENUES compared to previous year. This is due to the global economic crisis and reduced commercial vehicle traffic. TOLL REVENUES (NOT INCLUDING VAT) Company 1 EUR = 7.41 kuna % (10/09) Kn EUR Kn EUR HAC 1,245,036, ,021,179 1,232,212, ,290, ARZ 463,997,303 62,617, ,200,934 60,351, BINA-ISTRA 123,850,726 16,713, ,020,590 18,221,402 *9.02 AZM 166,581,998 22,480, ,985,990 22,535, TOTAL: 1,999,466, ,833,599 1,981,419, ,398, * Increase in revenues is due to migration from open to closed toll system on one part of the network. CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT

12 12 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

13 TRAFFIC SAFETY The total of 2,691 traffic accidents, with 46 fatalities and 407 accidents with injuries, was registered in The total number of all traffic accidents registered in 2010 was reduced by 2.32 %, and the number of fatalities fell by %, when compared to the previous year. TRAFFIC SAFETY Number of accidents: HAC (858 km) ARZ (182 km) BINA- ISTRA (141 km) AZM (60 km) RH (1241 km) HAC (858 km) ARZ (182 km) BINA- ISTRA (141 km) AZM (60 km) RH (1241 km) fatal accidents accidents with injuries accidents with material damage Total number of accidents Total number of fatalities ,287 1, ,245 1, ,755 1, , CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT

14 SAFETY INDICATORS Ratio of accidents with injuries Ratio of accidents with fatalities Ratio of fatalities HAC (858 km) For 10 9 vehicles/km in 2010 Variation 2010/2009 in % ARZ (182 km) BINA- ISTRA (141 km) AZM (60 km) RH (1241 km) HAC ARZ BINA- ISTRA AZM RH 14 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

15 MEDIUM AND LONG TERM FORECASTS AND TENDENCIES According to the Public Roads Act, the construction and maintenance of motorways is planned: In the long term, Through The Public Road Development Strategy as adopted by the Croatian Parliament, In the medium term, through fouryear Public Road Construction and Maintenance Programmes passed by the Government of the Republic of Croatia based on the proposal of the Ministry of Sea, Transport and Infrastructure, Annually, through Construction and Maintenance Plans defined by individual companies. According to the Strategy of Transport Development in the Republic of Croatia, as adopted by Croatian Parliament in 1999, Croatia is to have 1,365 km of motorways by 2013, to be later increased by another 154 km, which amounts to the total of 1,519 km. The Government of the Republic of Croatia adopted three four-year Public Road Construction and Maintenance Programs, for the periods from 2001 to 2004, from 2005 to 2008, and from 2009 to According to the Strategy of Sustainable Development of the Republic of Croatia (Official Gazette No. 30/09), as adopted by Croatian Parliament in March 2009, a high level of motorway network development has so far been achieved in the Republic of Croatia. In the current four-year period ( ), all activities relating to construction and maintenance of motorways are limited by presenttime financing possibilities which are, due to global financial crisis and recession, less favourable when compared to previous fouryear periods. Following previous two four-year periods marked by speedy and intensive motorway construction in the Republic of Croatia, the priorities have been given in the current period, due to limited funding possibilities, to the completion of sections started in previous periods, and to maintenance and preservation of the existing motorway network, including quality improvements and construction of new roadside service facilities. The remaining motorway sections and facilities, as listed below, will be opened to traffic in keeping with the new Public Road Construction and Maintenance Programme ( ): A1 (HAC) Ravča - Vrgorac A2 connection to Macelj border crossing A5 Beli Manastir - Osijek A6 Novigrad interchange and Novigrad - Netretić approach roads A8 Kanfanar - Matulji (widening of existing sections to the full motorway profile) A9 Umag - Pula (widening of existing sections to the full motorway profile) A11 Jakuševec - Velika Gorica A12 i A13 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT

16 SIGNIFICANT ACTIVITIES STARTED OR COMPLETED IN 2010 AND PLANS FOR 2011 HRVATSKE AUTOCESTE d.o.o. (HAC) Activities related to traffic safety a) improvement of traffic statistics and analysis of traffic accidents in order to define dangerous spots, and propose improvements through appropriate measures and traffic engineering solutions, b) improvement of technical regulation of traffic, with an emphasis on determination of allowable speeds for motor vehicles, in keeping with actual traffic elements and road conditions on individual parts of the road, c) preparation of procedures for incidental situation ( driving in the wrong direction, animals in the road, etc.), d) several projects (traffic organisation plans) relating to emergency situations in which individual motorway sections must be closed to traffic (wind, fire, accident, bridges, tunnels, etc.), and plans relating to possibilities of access to road system by emergency services. Activities related to improvement of services rendered to motorway users a) provision of better real-time information about traffic situation and road condition on the oncoming road sections, and this through use of information displays, b) definition of technical and organisational measures for operation of traffic in emergency situations on existing motorways, and exploring possibilities for legal implementation of such measures. Activities related to toll collection Toll collection objectives for 2011 are related to the optimization of operating costs in future periods and, with that objective in mind, HAC is currently in the process of implementing the pilot project for the fully automated toll collection at the Komin TS on the Zagreb - Goričan Motorway A4. During testing in 2011, it will be shown whether the system is compliant with toll collection requirements set in the Republic of Croatia. In fact, the use of equipment for fully automated toll collection requires definition and development of a special hardware and software package, completely adjusted to HAC needs, based primarily on Croatian regulations relating to foreign-currency toll payment by non-residents, and exemption from toll payment based on regulations on traffic safety and use of motorways by vehicles owned by persons with physical disability. According to this pilot project, the automatic toll lane would ensure toll collection without toll attendant, using all payment methods via credit and smart cards, and ETC device, while cash payments would be limited to Croatian currency kuna and European currency euro. Upon successful implementation of this pilot project, HAC plans to open every new toll motorway section in such a way that toll stations with lower traffic density will be equipped with fully automated toll collection system, which will contribute to long term optimization of operating costs. AUTOCESTA RIJEKA - ZAGREB d.d. (ARZ) Long-term plans: Construction of the Novigrad - Lišnica link road; Construction of the third lane at the Zagreb - Karlovac Motorway; Construction of the Križišće - Žuta Lokva Motorway. Activities in 2010: A motel with the capacity of 20 beds, and with a self-service restaurant, was opened in April at the Draganić - North roadside service facility. 19 July - company marked thirtieth anniversary of the Krk Bridge 10 September - a new toll rate applied at the Rijeka - Rupa Motorway A7 9 October - Tuhobić - South roadside service facility opened to all users 21 November - Donja Zdenčina Interchange, with the toll station and overpass, opened to traffic Projects in 2011: Novigrad interchange with approach roads will be opened to traffic. 16 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

17 Long-term plans: Widening of the Istrian Y route to the full motorway profile (Phase 2A) is currently under way and the stopping lane is systematically being realized on all new sections. However, the stopping lane on the side with lay-bys will be built in Phase 2B, as specified in the written agreement signed between the Government of the Republic of Croatia and Bina- Istra. The second viaduct over the Limska Draga, as well as the Mirna bridge, will be built in Phase 2B. This phase also includes the second pavement at the Rogovići - Učka Tunnel - Matulji Section, 45 km in length, and construction of the second tube of the Učka Tunnel. BINA ISTRA d.d. In 2010, the company s activities were directed towards: widening of the Istrian Y route to the full motorway profile in the length of 100 km, on the section from Umag to Pula, and from Kanfanar to Rogovići, including the Pula - Pomer link rod, and the Umag - National Road D200. the completion of construction work was initially scheduled for Spring However it was subsequently agreed with the Concessionary and local authorities that the construction work should be accelerated and that the road sections should be opened one after another, as soon as each one is completed. Thus the Kanfanar - Pula Section, 28 km in length, was opened to traffic already in June 2010, i.e. 19 months ahead of schedule. novelties have also been introduced in the sphere of toll collection. This namely concerns introduction of the electronic toll collection (ETC) device, compatible with HAC and ARZ devices, which reduces the toll costs by up to 50 percent, and enables speedier passage through toll gates. In 2010, the company has set the following objectives: The Umag - Kanfanar Section will be opened to traffic, in full motorway section, by the summer of The Kanfanar - Rogovići Section is scheduled for completion in October The users will then be able to travel from Umag to Pula and from Kanfanar to Pazin using the full profile motorway 100 km in length. Once the new sections are opened to traffic in full motorway profile, the closed toll collection system will be introduced on the entire Istrian Y. In early 2011, the company is to implement the Occupational Health and Safety Management System, based on ISO AUTOCESTA ZAGREB-MACELJ d.o.o. (AZM) As the concession area has been set for the entire concession period, there is no room for extension of the network. The only planned development is the widening of the Krapina - Đurmanec sub-section, 3.8 km in length, to the full motorway profile. As to competition with railway traffic, AZM expects that the road traffic will steadily be increasing as the rail infrastructure in the zone around the concession area has been greatly neglected, and is currently negligible. The following activities were at the centre of interest in 2010: routine and periodic maintenance The following objectives have been set for 2011: routine and periodic maintenance, preparations for implementation of ETC, environmental protection and action plans for noise protection. CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT

18 KEY FIGURES 2010 CROATIA 2010 Total length of motorways network, in km, as per 31/12/2010 1, x 1 lane (not including the stopping lane) x 2 traka (not including the stopping lane) 1, x 3 traka (not including the stopping lane) x 4 traka (not including the stopping lane) 0.00 Number of km opened to traffic in 2010 Number of km under construction as on 01/01/2011 Planned opening of new sections in 2011, in km Motorways Semi-motorways Widening to the full motorway profile Motorways Semi-motorways Widening to the full motorway profile Motorways Semi-motorways Widening to the full motorway profile Annual revenues from toll collection in 2010, in mio EUR Full time employees 3,938 AADT LIGHT VEHICLES 10,879 AADT TRUCKS 1,524 AADT LV + T 12,404 Total number of accidents 2,691 Number of accidents with injuries 407 Number of fatalities 46 Number of kilometres travelled (10 6 x km) 5, Number of toll stations 80 Number of toll collection lanes 556 Number of ETC lanes *324 Number of ETC subscribers 127,225 Number of roadside rest areas (with filling stations) 75 Number of rest areas 124 Number of restaurants 17 Number of hotels 7 *The Autocesta Zagreb-Macelj d.o.o. has not as yet introduced the ETC 18 CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NATIONAL REPORT 2010

THE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES (HUKA) NATIONAL REPORT 2016 ON MOTORWAYS ISSN:

THE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES (HUKA) NATIONAL REPORT 2016 ON MOTORWAYS ISSN: THE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES (HUKA) NATIONAL REPORT 216 ON MOTORWAYS ISSN: 1848-233 Table of Contents 23 Current State of the Network 24 Motorways in the Republic of Croatia

More information

CROATIA NATIONAL REPORT 2008

CROATIA NATIONAL REPORT 2008 CROATIA NATIONAL REPORT 2008 I Current state of the network At the start of 2009, the total length of the motorway network in Croatia amounted to 1.198,7 km. The following new roadways were opened to traffic

More information

CROATIA NATIONAL REPORT 2007

CROATIA NATIONAL REPORT 2007 CROATIA NATIONAL REPORT 2007 I Network The total length of motorway network, as completed by the end of 2007 in Croatia, amounts to 1163.5 km. In 2007, 75,9 km of new motorways and 3,8 km of semi motorways

More information

2007. HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES.

2007. HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES. HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES National Report CROATIA NATIONAL REPORT 2007 NETWORK The total length of motorway network,

More information

CROATIA NATIONAL REPORT 2005

CROATIA NATIONAL REPORT 2005 CROATIA NATIONAL REPORT 2005 I Network The total length of motorways and expressways network of Croatia at the end of the year 2005 is 1020,5 km out of which 20,8 km are not tolled (Zagreb bypass). In

More information

EETS Domain (European Electronic Toll Service)

EETS Domain (European Electronic Toll Service) EETS Domain (European Electronic Toll Service) A.1 Toll Charger Information Sheet A.1.1 Toll Charger: BINA-ISTRA, public limited company for financing, construction, operation and maintenance of motorways

More information

Mr. Miro Škrgatić - new President of Autocesta Rijeka - Zagreb d.d. and new President of HUKA

Mr. Miro Škrgatić - new President of Autocesta Rijeka - Zagreb d.d. and new President of HUKA HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE / CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NEWSLETTER MARCH 2010 Mr. Miro Škrgatić - new President of Autocesta Rijeka - Zagreb

More information

HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES

HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES RIJEKA-ZAGREB MOTORWAY Financing agreement between the Autocesta Rijeka - Zagreb d.d.

More information

A6 Motorway, Rijeka Zagreb opened to traffic in full motorway profile

A6 Motorway, Rijeka Zagreb opened to traffic in full motorway profile HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE / CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NEWSLETTER NOVEMBER 2008 A6 Motorway, Rijeka Zagreb opened to traffic in full motorway

More information

NATIONAL REPORT: SPAIN. At 31/12/2015

NATIONAL REPORT: SPAIN. At 31/12/2015 NATIONAL REPORT: SPAIN At 31/12/2015 Network length Spain is the European country with the longer high capacity road network, reaching 16,705 km. Nevertheless, only 3,404 km out of the total are toll motorways

More information

TEMPLATE OF THE NATIONAL REPORT

TEMPLATE OF THE NATIONAL REPORT TEMPLATE OF THE NATIONAL REPORT TO BE PRESENTED BY EACH DELEGATION DURING THE ASECAP STUDY AND INFORMATION DAYS PARIS, 29-31 MAY 2017 Network length The total length of the Polish Motorways network as

More information

HUNGARY GENERAL REPORT 2017 ASECAP STUDY AND INFORMATION DAYS LJUBLJANA, 6-8 JUNE 2018

HUNGARY GENERAL REPORT 2017 ASECAP STUDY AND INFORMATION DAYS LJUBLJANA, 6-8 JUNE 2018 HUNGARY GENERAL REPORT 2017 ASECAP STUDY AND INFORMATION DAYS LJUBLJANA, 6-8 JUNE 2018 Network length The length of the tolled motorway network in Hungary as of 31 December 2016 is: 1.191 km, as of 31

More information

Autocesta Rijeka - Zagreb d.d.

Autocesta Rijeka - Zagreb d.d. ISSN: 1848-0683 HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE / CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES NEWSLETTER APRIL 2011 Autocesta Rijeka - Zagreb d.d. Autocesta Rijeka

More information

TEMPLATE OF THE NATIONAL REPORT

TEMPLATE OF THE NATIONAL REPORT TEMPLATE OF THE NATIONAL REPORT TO BE PRESENTED BY EACH DELEGATION DURING THE ASECAP STUDY AND INFORMATION DAYS LJUBLJANA, 6-8 JUNE 2018 Network length The total length of the Polish Motorways network

More information

TEMPLATE OF THE NATIONAL REPORT

TEMPLATE OF THE NATIONAL REPORT TEMPLATE OF THE NATIONAL REPORT TO BE PRESENTED BY EACH DELEGATION DURING THE ASECAP STUDY AND INFORMATION DAYS PARIS, 29-31 MAY 2017 Network length In 2017 the total length of the motorway and express

More information

! " # $ % # & " ' % ( ' ) "

!  # $ % # &  ' % ( ' ) "#!! $% ! " # $ % # " ' % ( ' ) ",-..*-/--0"-00"0**0 2 In agreement with the Terms of Reference, we have conducted an analysis of the road user charges (RUC) paid by the users of the road networks in the

More information

HUKA announces appointment of its new President and Vice President

HUKA announces appointment of its new President and Vice President HUKA announces appointment of its new President and Vice President Josip Sapunar, Ph.D., MBA, President During its regular Assembly session held on October 11 this year, HUKA appointed its new top officials

More information

HUKA/ASECAP ROUND TABLE

HUKA/ASECAP ROUND TABLE HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINE CROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES HUKA/ASECAP ROUND TABLE The round table, organized by HUKA in consultation with the

More information

GENERAL CONDITIONS FOR USING A2 MOTORWAY ZAGREB - MACELJ

GENERAL CONDITIONS FOR USING A2 MOTORWAY ZAGREB - MACELJ GENERAL CONDITIONS FOR USING A2 MOTORWAY ZAGREB - MACELJ AZM MOTORWAY REGULATIONS V.012.2014. GENERAL CONDITIONS FOR USING A2 MOTORWAY ZAGREB - MACELJ By the Decision of the Government of Republic of Croatia

More information

Satellite and mobile communications HGV tolls in Germany: innovative, environmentally friendly and fair

Satellite and mobile communications HGV tolls in Germany: innovative, environmentally friendly and fair Satellite and mobile communications HGV tolls in Germany: innovative, environmentally friendly and fair Bernd Törkel October 2005 Content Legal framework Facts and figures HGV tolls innovativ environmentally

More information

IMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS. Toronto Forum For Global Cities December 2008

IMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS. Toronto Forum For Global Cities December 2008 IMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS Toronto Forum For Global Cities December 2008 TORONTO S CHALLENGE GTA suffers from traffic congestion The average Torontonian spends seven hours a week

More information

The German Tolling Prospects

The German Tolling Prospects The German Tolling Prospects Christian Kohlhase First Secretary (Transport, Building and Urban Affairs) National Governors Association State Summit on Innovative Transportation Funding and Financing Washington,

More information

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE Title of the measure: SPA51-PIVE Efficient-Vehicle Incentive Programme General description PIVE Programme was approved in Cabinet Meeting of 27 September 2012 with an initial budget allocation of 75 million,

More information

ASECAP and IBTTA initiatives on users-financed transportation: Success Tolling Stories - AET in Portugal

ASECAP and IBTTA initiatives on users-financed transportation: Success Tolling Stories - AET in Portugal 43 RD ASECAP STUDY & INFORMATION DAYS 2015 ASECAP and IBTTA initiatives on users-financed transportation: Success Tolling Stories - AET in Portugal Epic Sana Hotel 27-29 May 2015 www.asecapdays.com Index

More information

TER WP2 Transport Challenges and Global Crisis. Dr. Klaus Schierhackl, CFO Bad Gastein,

TER WP2 Transport Challenges and Global Crisis. Dr. Klaus Schierhackl, CFO Bad Gastein, TER WP2 Transport Challenges and Global Crisis Dr. Klaus Schierhackl, CFO Bad Gastein, 23.4.2009 1 ASFINAG Group is the 3rd largest concessionaire in Europe responsible for a network of more than 2.100

More information

UNION FOR THE MEDITERRANEAN GTMO -CETMO 06 May 2014

UNION FOR THE MEDITERRANEAN GTMO -CETMO 06 May 2014 UNION FOR THE MEDITERRANEAN GTMO -CETMO 06 May 2014 The experience of VINCI Autoroutes Distance tolling and Interoperability Nicolas DEVILLER The experience of VINCI Autoroutes in France : Distance tolling

More information

Tolling on the Hungarian Motorway Network. Árpád G. SIPOSS Head of Toll Strategy Bureau

Tolling on the Hungarian Motorway Network. Árpád G. SIPOSS Head of Toll Strategy Bureau Tolling on the Hungarian Motorway Network Árpád G. SIPOSS Head of Toll Strategy Bureau Hungary H 93,000 km 2 10 m people 3 m vehicles GDP/capita 4,500 USD national roads 30.500 km road network 150.000

More information

The fact that SkyToll is able to deliver quality results has been proven by its successful projects.

The fact that SkyToll is able to deliver quality results has been proven by its successful projects. www.skytoll.com At present, an efficient and well-functioning transport sector and the quality of transport infrastructure itself are a prerequisite for the further growth of the economy and ensure the

More information

on Motorways and on Main Roads The German GNSS Toll System Hanns-Karsten Kirchmann CEO, Toll Collect GmbH

on Motorways and on Main Roads The German GNSS Toll System Hanns-Karsten Kirchmann CEO, Toll Collect GmbH Skatteudvalget SAU alm. del - Bilag 199 Offentligt The German GNSS Toll System on Motorways and on Main Roads Hanns-Karsten Kirchmann CEO, Toll Collect GmbH 20th of June 2007 The German Motorway Toll Act

More information

UPPER CUMBERLAND ELECTRIC MEMBERSHIP CORPORATION. RESIDENTIAL RATE--SCHEDULE RS (March 2019) Availability. Character of Service.

UPPER CUMBERLAND ELECTRIC MEMBERSHIP CORPORATION. RESIDENTIAL RATE--SCHEDULE RS (March 2019) Availability. Character of Service. UPPER CUMBERLAND ELECTRIC MEMBERSHIP CORPORATION RESIDENTIAL RATE--SCHEDULE RS () Availability This rate shall apply only to electric service to a single-family dwelling (including its appurtenances if

More information

Challenges and solutions for transport in Norway

Challenges and solutions for transport in Norway Challenges and solutions for transport in Norway Therese Ustvedt, adviser Director General s Staff Norwegian Public Roads Administration Transport Network Public roads, total 94 600 km - National roads

More information

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India South Asia Transport Team Presented by Prodyut Dutt Asian Development

More information

Curbing emissions and energy consumption in the transport sector how can we deal with it in Warsaw 2012 Annual POLIS Conference

Curbing emissions and energy consumption in the transport sector how can we deal with it in Warsaw 2012 Annual POLIS Conference Curbing emissions and energy consumption in the transport sector how can we deal with it in Warsaw 2012 Annual POLIS Conference Perugia, 29 30 November 2012 1 Covenant of Mayors (under the auspices of

More information

what you need to know FREEWAY IMPROVEMENT PROJECT (GFIP)

what you need to know FREEWAY IMPROVEMENT PROJECT (GFIP) what you need to know Road users are already experiencing the benefits of the upgraded Gauteng freeway network through reduced travel time, which means more time to engage in business and doing things

More information

Central London Congestion Charging Scheme. 17 March 2005 Impacts - 9 th Annual Conference. Michele Dix Director Congestion Charging Division

Central London Congestion Charging Scheme. 17 March 2005 Impacts - 9 th Annual Conference. Michele Dix Director Congestion Charging Division Central London Congestion Charging Scheme 17 March 2005 Impacts - 9 th Annual Conference Michele Dix Director Congestion Charging Division Contents 1. The Scheme 2. Impacts 3. Next Steps The Scheme Where

More information

Is there an alternative solution?

Is there an alternative solution? From Manned Toll Collection to All Electronic Tolling Is there an alternative solution? Alexis ZASS President of the managing board - GEA 1 Toll collection operations on bridges, tunnels, or for town access

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project primarily aims at capacity

More information

JANAF Oil Pipeline & Storage Company

JANAF Oil Pipeline & Storage Company JANAF Oil Pipeline & Storage Company JANAF IN EUROPEAN OIL PIPELINE NETWORK 2 JANAF pipeline has significant role in oil supply to refineries of SE & Central Europe 1979-2014 - 201 mil. tons, oil transport

More information

Fees and Commissions for the Erste EgySzámla Account Package

Fees and Commissions for the Erste EgySzámla Account Package Fees and Commissions for the Erste EgySzámla Account Package Published on: 15 February 2018 Effective from: 16 April 2018 Reason of the changes:price increase according to the change of Consumer Price

More information

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min Gas Advisory Board Draft Agenda Meeting No. 1 Location: Parmelia Hilton, Swan B Room 14 Mill Street, Perth WA 6000 Date: 20 December 2011 Time: 11:15am 12:15pm Item Subject Responsible Time 1. WELCOME

More information

Traffic Engineers' Report for Fiscal Year 2017

Traffic Engineers' Report for Fiscal Year 2017 Mid-Bay Bridge Authority Traffic Engineers' Report for Fiscal Year 2017 Mid-Bay Bridge Authority Contents Executive Summary... 1 1. Introduction... 2 2. Mid-Bay Bridge Authority System... 3 3. Mid-Bay

More information

Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management

Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management BDir Dipl Ing Manfred Silvanus Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management www.bmvi.de AGENDA - Federal Ministry of Transport and Digital

More information

Current Development of the Tariff Structure in the Electricity System of the Republic of Macedonia

Current Development of the Tariff Structure in the Electricity System of the Republic of Macedonia Current Development of the Tariff Structure in the Electricity System of the Republic of Macedonia Partnership Program ERC, Republic of Macedonia - PSB, Vermont Skopje, 25-29, October, 2004 1 Existing

More information

Priority Transport Projects in Republic of Armenia. 10th Eastern Partnership transport panel Brussels, 11 May 2016

Priority Transport Projects in Republic of Armenia. 10th Eastern Partnership transport panel Brussels, 11 May 2016 Priority Transport Projects in Republic of Armenia 10th Eastern Partnership transport panel Brussels, 11 May 2016 Brief Presentation of North-South Road Corridor Investment Project Estimated length of

More information

You are just TWO signatures away from savings on your fuel bill.

You are just TWO signatures away from savings on your fuel bill. Dear Sir/Madam, You are just TWO signatures away from savings on your fuel bill. We would like to take this opportunity to confirm, with thanks, the interest you have expressed in opening a Texaco Fastfuel

More information

Corporate Communications. Media Information 15 March 2011

Corporate Communications. Media Information 15 March 2011 15 March 2011 BMW Group aims to further increase earnings in 2011 EBIT margin of over 8% expected in Automobiles segment Sales volume of well in excess of 1.5 million vehicles targeted Margin of 8% to

More information

RSWGM meeting European Commission DG MOVE 3-4 April 2017

RSWGM meeting European Commission DG MOVE 3-4 April 2017 Podgorica RSWGM meeting European Commission DG MOVE 3-4 April 2017 Mobility and Transport 1 WHITE PAPER 2011: Towards a zero-vision on road safety POLICY ORIENTATIONS ON ROAD SAFETY 2011-2020 The -50%

More information

One City, One System: Integrating Public Urban Transportation in Coimbra

One City, One System: Integrating Public Urban Transportation in Coimbra One City, One System: Integrating Public Urban Transportation in Coimbra CIVITAS MODERN Study Tour Luis Santos, SMTUC Luis da Vinha, Municipality of Coimbra 8-9 November 2012 Coimbra Situation before CIVITAS

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Operation Name: ROAD INFRASTRUCTURE

More information

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS 1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS The Transit Committee recommends the adoption of the recommendations contained in the

More information

ROAD SAFETY ANNUAL REPORT 2018 LITHUANIA

ROAD SAFETY ANNUAL REPORT 2018 LITHUANIA ROAD SAFETY ANNUAL REPORT 2018 LITHUANIA LITHUANIA In 2017, 192 persons lost their lives in traffic crashes. Lithuania is one of the IRTAD countries that has achieved the strongest reduction in the number

More information

Annual General Shareholders Meeting of Grupa LOTOS S.A. convened for June 30, 2009

Annual General Shareholders Meeting of Grupa LOTOS S.A. convened for June 30, 2009 Annual General Shareholders Meeting of Grupa LOTOS S.A. convened for June 30, 2009 Information on matters submitted to the GSM Mariusz Machajewski, Vice president and CFO June 16, 2009 Agenda of the GSM

More information

GUIDE FOR VAN DRIVERS

GUIDE FOR VAN DRIVERS OPERATING LCVS IN LONDON GUIDE FOR VAN DRIVERS VAN LEASE CENTRE OF EXCELLENCE: OPERATING LCVS IN LONDON With increasing legislation, traffic management schemes and health and safety priorities, operating

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2012 (ADVANCE ESTIMATE)

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2012 (ADVANCE ESTIMATE) NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 Lisa Mataloni: (202) 606-5304 (GDP) gdpniwd@bea.gov Recorded message: (202) 606-5306 BEA 13-02 GROSS DOMESTIC PRODUCT:

More information

Pametno gospodarenje cestovnom infrastrukturom Smart Management of Road Infrastructure Christophe Nicodème, ERF

Pametno gospodarenje cestovnom infrastrukturom Smart Management of Road Infrastructure Christophe Nicodème, ERF Pametno gospodarenje cestovnom infrastrukturom Smart Management of Road Infrastructure Christophe Nicodème, ERF Međunarodni seminar ASFALTNI KOLNICI 2017 International seminar ASPHALT PAVEMENTS 2017 Opatija,

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after February 1, 2019. SEDC:60/7/8/9 SECTION 1. AVAILABILITY AND APPLICABILITY 1.1

More information

Poland drives e-mobility!

Poland drives e-mobility! Poland drives e-mobility! Maciej Mazur, Polish Alternative Fuels Association About Polish Alternative Fuels Association About us WE CREATE POLISH ECOSYSTEM OF E-MOBILITY Selected members Projects Projects

More information

TAUSSIG. Public Finance Public Private Partnerships Urban Economics. Newport Beach Riverside San Francisco Dallas ASSOCIATES, INC.

TAUSSIG. Public Finance Public Private Partnerships Urban Economics. Newport Beach Riverside San Francisco Dallas ASSOCIATES, INC. DAVID TAUSSIG & ASSOCIATES, INC. MONTECITO ESTATES PUBLIC IMPROVEMENT DISTRICT FISCAL YEAR 2015-2016 FINAL BUDGET JULY 27, 2015 Prepared on Behalf of: MONTECITO ESTATES PUBLIC IMPROVEMENT DISTRICT Department

More information

Honorable Mayor and Members of the City Council. Disabled Placard Parking Policy for City-Owned Garages

Honorable Mayor and Members of the City Council. Disabled Placard Parking Policy for City-Owned Garages Office of the City Manager CONSENT CALENDAR April 2, 2013 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Andrew Clough, Director, Public Works Subject:

More information

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 Integrated Road Investment Program (RRP SRI 47273) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 1. Sri Lanka s road network is dense and well laid out, providing basic access to the country

More information

DMB Proposed Toll Increase

DMB Proposed Toll Increase DMB Proposed Toll Increase December 2018 The Delaware River and Bay Authority Bi-state agency established in 1962 Provides Crossings between Delaware and New Jersey Economic development benefitting the

More information

CNG as a Transport Fuel - Economic Benefits 17 th November 2011

CNG as a Transport Fuel - Economic Benefits 17 th November 2011 CNG as a Transport Fuel - Economic Benefits 17 th November 2011 6 Grand Canal Wharf, South Dock Road, Ringsend, Dublin 4, Ireland. Tel: +353 1 6670372 Fax: +353 1 6144499 Web: www.dkm.ie Our scope of work

More information

Green Drive Nov 2020

Green Drive Nov 2020 Green Drive Nov 2020 Tariff terms and conditions About your tariff Green Drive Nov 2020 prices are fixed until 30 November 2020. You ll pay a daily standing charge and unit rate for each fuel. We ll also

More information

Case Study: City of San Diego

Case Study: City of San Diego Case Study: City of San Diego Approach to Sharing Economy in San Diego 2 Two primary approaches to the growing sharing economy within the City of San Diego: Compliance Corporate Sponsorships Compliance

More information

Agreement for Use of the Hokkaido Expressway Pass

Agreement for Use of the Hokkaido Expressway Pass Agreement for Use of the Hokkaido Expressway Pass (General principles) Article 1. This agreement applies to the Hokkaido Expressway Pass offered by East Nippon Expressway Co., Ltd. (hereinafter: NEXCO

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after January 1, 2014. SECTION 1. AVAILABILITY AND APPLICABILITY 1.1 This Rate Schedule

More information

NOTE FROM THE FRENCH AUTHORITIES. SUBJECT: Report assessing actions taken to promote biofuels in France in 2008.

NOTE FROM THE FRENCH AUTHORITIES. SUBJECT: Report assessing actions taken to promote biofuels in France in 2008. Important notice: this report has been submitted in the language of the Member State, which is the sole authentic version. Translation into the English language is being provided for information purposes

More information

Conference Call. Preliminary Key Figures Financial Year Bochum, February 7, GEA Group

Conference Call. Preliminary Key Figures Financial Year Bochum, February 7, GEA Group Conference Call Preliminary Key Figures Financial Year 2010 Bochum, February 7, 2011 GEA Group Disclaimer All figures for 2010 are preliminary and have therefore not yet been audited. The yearend financial

More information

Strong performance by the Bolloré Group s operating activities in 2018 Mr Cyrille Bolloré unanimously appointed Chairman and Chief Executive Officer

Strong performance by the Bolloré Group s operating activities in 2018 Mr Cyrille Bolloré unanimously appointed Chairman and Chief Executive Officer PRESS RELEASE 2018 results (1) March 14, 2019 Strong performance by the Bolloré Group s operating activities in 2018 Mr Cyrille Bolloré unanimously appointed Chairman and Chief Executive Officer Revenue:

More information

ANNEX 2 TO THE CONTRACT ON THE USE OF SPECIFIED ROAD SECTIONS GENERAL BUSINESS TERMS AND CONDITIONS OF THE TOLL COLLECTION ADMINISTRATOR

ANNEX 2 TO THE CONTRACT ON THE USE OF SPECIFIED ROAD SECTIONS GENERAL BUSINESS TERMS AND CONDITIONS OF THE TOLL COLLECTION ADMINISTRATOR ANNEX 2 TO THE CONTRACT ON THE USE OF SPECIFIED ROAD SECTIONS GENERAL BUSINESS TERMS AND CONDITIONS OF THE TOLL COLLECTION ADMINISTRATOR In force from 1 January 2010 The Toll Collection Administrator issues

More information

Rwanda Biofuels Limited. Powering Rwanda s Development

Rwanda Biofuels Limited. Powering Rwanda s Development Rwanda Biofuels Limited Powering Rwanda s Development 1. Global Bio-Fuel Industry Trans esterification of vegetable oil was conducted as early as 1853, many years prior to the first diesel engine. Trans

More information

Introduction of Electronic Tolling Collection system in Japan

Introduction of Electronic Tolling Collection system in Japan Introduction of Electronic Tolling Collection system in Japan November 2014 ICT SOLUTION HEADQUARTERS 2013 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 2014 MITSUBISHI HEAVY INDUSTRIES, LTD.

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

Oregon Withholding Tax Tables

Oregon Withholding Tax Tables Oregon Withholding Tax Tables Effective January 1, 2007 To: Oregon Employers The Oregon Withholding Tax Tables include: Things you need to know. The standard tax tables for all payroll periods. The computer

More information

GENERAL INSPECTORATE OF ROMANIAN POLICE TRAFFIC POLICE DIRECTORATE. Traffic surveillance in Romania: Challenges and opportunities

GENERAL INSPECTORATE OF ROMANIAN POLICE TRAFFIC POLICE DIRECTORATE. Traffic surveillance in Romania: Challenges and opportunities Traffic surveillance in Romania: Challenges and opportunities BUCHAREST - 03.02.2015 ROAD NETWORK TOTAL 198.658 km: ROMANIA Motorways National roads Country roads Communal roads 732 km; 15.934 km; 34.668

More information

Milano, from pollution charge to congestion charge

Milano, from pollution charge to congestion charge TRT TRASPORTI E TERRITORIO SRL Low emission zones for transport in the Benelux? BIVEC GIBET Leuven Faculty Club, 28 March 2012 Milano, from pollution charge to congestion charge Angelo Martino TRT Trasporti

More information

Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS

Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS Antigua Tables 2006 1 Main Indicators 03/11/2006 08:05 AM Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 a/ Annual growth rates b/ Gross domestic

More information

WORKSHOP ON ROAD TRANSPORT FACILITATION IN SOUTHERN ASIA ALONG THE ASIAN HIGHWAY CORRIDORS

WORKSHOP ON ROAD TRANSPORT FACILITATION IN SOUTHERN ASIA ALONG THE ASIAN HIGHWAY CORRIDORS WORKSHOP ON ROAD TRANSPORT FACILITATION IN SOUTHERN ASIA ALONG THE ASIAN HIGHWAY CORRIDORS 6 th February 2018, Bangkok REPUBLIC OF TURKEY Ministry of Transport, Maritime Affairs and Communications OVERVIEW

More information

Item

Item Key Indicators for Asia and the Pacific 2009 POPULATION Total population a thousand; as of 1 July 295 305 316 328 340 353 366 380 394 409 420 432 444 457 470 483 496 510 524 Population density persons

More information

The Role of the Infrastructure Investments in the New EU Road Mobility Package

The Role of the Infrastructure Investments in the New EU Road Mobility Package 45 46 TH ASECAP STUDY STUDY & INFORMATION & INFORMATION DAYS DAYS 2017 The Role of the Infrastructure Investments in the New EU Road Mobility Package Grand Hotel Union, Ljubljana, Slovenia 6-8 June 2018

More information

RIETI BBL Seminar Handout

RIETI BBL Seminar Handout Research Institute of Economy, Trade and Industry (RIETI) RIETI BBL Seminar Handout Autonomous Vehicles, Infrastructure Policy, and Economic Growth September 25, 2018 Speaker: Clifford Winston https://www.rieti.go.jp/jp/index.html

More information

Implementing Transport Demand Management Measures

Implementing Transport Demand Management Measures Implementing Transport Demand Management Measures Dominik Schmid, GIZ Transport Policy Advisory Services Urban Mobility India Conference, Delhi, December 2013 Page 1 Agenda Context: Why Transport Demand

More information

Enova's support to charging infrastructure in Norway

Enova's support to charging infrastructure in Norway Enova's support to charging infrastructure in Norway Konrad Pütz Program responsible transport Enova Nordic smart electric transport Oslo, November 2015 Overview Short introduction to Enova Enovas strategy

More information

10th Eastern Partnership Transpot Panel

10th Eastern Partnership Transpot Panel 10th Eastern Partnership Transpot Panel 11th May 2016 Maria Teresa SANZ VILLEGAS Road Safety Unit Directorate-General for Mobility and European Commission WHITE PAPER 2011: Towards a zero-vision on road

More information

DRIVING TOWARDS A CLEANER FUTURE

DRIVING TOWARDS A CLEANER FUTURE clean truck, bus, and trailer requirements visit us on the web at: www.arb.ca.gov/truckstop DRIVING TOWARDS A CLEANER FUTURE Important facts for owners and operators or email at: 8666diesel@arb.ca.gov

More information

Fiji Bus Industry: improving through greening

Fiji Bus Industry: improving through greening Fiji Bus Industry: improving through greening Paul Starkey and Dr Sion Haworth ADB Transport consultants Presentation outline Bus industry in Fiji: a few highlights Context of COP 23 and Fiji Presidency

More information

Expansion Projects Description

Expansion Projects Description Expansion Projects Description The Turnpike expansion program was authorized by the Florida Legislature in 1990 to meet the State s backlog of needed highway facilities. The Legislature set environmental

More information

BMW Group posts record earnings for 2010

BMW Group posts record earnings for 2010 10.03.2011 BMW Group posts record earnings for 2010 Profit before tax rises to euro 4,836 million Profit before financial result climbs to euro 5,094 million Automobiles segment reports EBIT of euro 4,355

More information

Financing Public Transport Projects by EBRD

Financing Public Transport Projects by EBRD SPUNIC Regional Conference 3 rd Working Group Meeting Financing Public Transport Projects by EBRD Guido Bruggeman Urban Transport Specialist former Employee European Bank for Reconstruction and Development

More information

Updated Jan ) They may then choose to continue to appeal or not. Appeals will only be accepted via the on-line system.

Updated Jan ) They may then choose to continue to appeal or not. Appeals will only be accepted via the on-line system. DUNDALK INSTITUTE OF TECHNOLOGY CAR PARKING POLICY. FREQUENTLY ASKED QUESTION SHEET (FAQ). Updated Jan 2016. Q 1: What should I do when I am clamped? A: Please follow the instructions for the release of

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, THURSDAY, JANUARY 30, 2014 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2013 (ADVANCE ESTIMATE)

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, THURSDAY, JANUARY 30, 2014 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2013 (ADVANCE ESTIMATE) NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, THURSDAY, JANUARY 30, 2014 BEA 14-03 Lisa Mataloni: (202) 606-5304 (GDP) gdpniwd@bea.gov Recorded message: (202) 606-5306 GROSS DOMESTIC PRODUCT:

More information

Empresa Municipal de Transportes de Madrid. BiciMAD, Madrid Bike Sharing System Mannheim, September 2017 Sergio Fernández Balaguer

Empresa Municipal de Transportes de Madrid. BiciMAD, Madrid Bike Sharing System Mannheim, September 2017 Sergio Fernández Balaguer 02 03 17 Mannheim, September 2017 Sergio Fernández Balaguer City profile Madrid is the capital and largest city of Spain and the third largest in Europe (after London and Berlin): 3.23 million inhabitants

More information

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE Sheet 1 AVAILABILITY Electric delivery service shall be taken under this rate for all purposes by any customer who is placed on the rate by the Company in accordance with this paragraph. The Company shall

More information

Road fatalities in 2012

Road fatalities in 2012 Lithuania 1 Inhabitants Vehicles/1 000 inhabitants Road fatalities in 2012 Fatalities /100 000 inhabitants in 2012 2.98 million 751 301 10.1 1. Road safety data collection Definitions Road fatality: person

More information

X PLICIT. Key Economic Indicators December Member of HVB Group. Banking for success.

X PLICIT. Key Economic Indicators December Member of HVB Group. Banking for success. Member of HVB Group Business Information www.ba-ca.com X PLICIT Key Economic Indicators December 2002 Banking for success. ECONOMIC FORECASTS FOR AUSTRIA* Percentage change over previous year 2000 200

More information

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT MINISTRY OF ENERGY AND MINERAL DEVELOPMENT COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT Dr. Stephen Robert Isabalija PERMANENT SECRETARY 13 th -15

More information

The Evans Network of Companies. Northeast Drayage Workshop Boston, MA October 13, 2010

The Evans Network of Companies. Northeast Drayage Workshop Boston, MA October 13, 2010 The Evans Network of Companies Northeast Drayage Workshop Boston, MA October 13, 2010 Evans Network Fast Facts Third Largest Container Drayage Carrier in the U.S. $245,000,000 Revenue Billed 425,000 150,000

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

BRASOV TARGU MURES CLUJ - BORS MOTORWAY

BRASOV TARGU MURES CLUJ - BORS MOTORWAY GOVERNMENT OF ROMANIA DEPARTMENT FOR INFRASTRUCTURE PROJECTS AND FOREIGN INVESTMENT BRASOV TARGU MURES CLUJ - BORS MOTORWAY Project Sheet 1 1. PROJECT NAME Brasov Targu Mures Cluj Motorway, Comarnic Brasov

More information