THERMAL RESISTIVITY FALLING WEIGHT DEFLECTOMETER PRESSUREMETER TEST GROUTING GEOTECHNICAL INVESTIGATION PILE INTEGRITY TEST

Size: px
Start display at page:

Download "THERMAL RESISTIVITY FALLING WEIGHT DEFLECTOMETER PRESSUREMETER TEST GROUTING GEOTECHNICAL INVESTIGATION PILE INTEGRITY TEST"

Transcription

1 NON DESTRUCTIVE TEST THERMAL RESISTIVITY FALLING WEIGHT DEFLECTOMETER PRESSUREMETER TEST GROUTING GEOTECHNICAL INVESTIGATION PILE INTEGRITY TEST NUCLEAR DENSITY TEST PILE DYNAMIC TEST CONE PENETRATION TEST sheet 1 of 31 Office Address : 119 Sauyo Road Novaliches, Quezon City jmcgpi@gmail.com Homepage : Business Development : Trunk line : / Fax Number :

2 I. BRIEF HISTORY GEOTECHNICS PHILIPPINES, INCORPORATED, was founded and organized on October 04, 1966 and registered with the Securities and Exchange Commission on October 18 of the same year. It is composed of a group of professionals, each respected in their own fields of endeavor. It s preliminary goal was to provide geotechnical consulting services and carry a general contracting business in all kinds of construction, mining, manufacturing and infrastructure activities. With the purpose of providing technological assistance to the ever-increasing needs of the industrialization of the country, the company has expanded its services in Geotechnical Engineering and it has gained the statue as one of the leading corporations in its field. From a meager capital of Php250,000.00, it is now operating on a capital base of Php20M. ACCREDITATION AND MEMBERSHIP Philippine Constructors Association (PCA member) PCAB - General Engineering B CIAP - Dept. of Trade and Industry (DTI) Accredited testing laboratory - Bureau of Research and Standard (DPWH) Accredited Driller - National Water Resources Board (NWRB) Council of Engineering Consultants of the Philippines (CECOPHIL)-Member II. VISION STATEMENT To meet global standards and provide technological innovation for premium value geotechnical services and reliable results. Maintain the safety/quality requirements and continuous recognition. MISSION STATEMENT To provide cost effective solutions, safe and timely delivery of service for the satisfaction and needs of the Client. POLICY ON QUALITY The management and staff of GEOTECHNICS PHILIPPINES, INC. (GPI) is committed to satisfy customer satisfaction of packaging accurate test reports with an assured level of quality. By virtue of accreditation to the quality system based on the requirements of the International Standard (ISO/IEC 17025) General requirements for the competence of calibration and testing laboratories, the following shall be complied: The quality and reliability of our reports A philosophy of continuous improvement will be adopted by all employees so that the Quality system will be a continuously evolving program. Education and training of all employees are purposively to understand company policy will be achieved through induction and structured training programs. The attainment of these quality goals requires strong and responsive management and a concerted effort of all employees. sheet 2 of 31

3 III. CORPORATE DIRECTORS Ricardo A. Tabujara III - Chairman of the Board Eric A. Cruz - President Diosdado A. Ureña - EVP/General Manager Alexis A. Acacio - Secretary-Treasurer Virgilio Santos - Director Felisberto GL Reyes - Director IV. PERMANENT CONSULTING & OPERATING OFFICERS Salvador F. Reyes - M.S. PhD. Soil & Rock Mechanics (University of Illinois) B.S.C.E. (University of the Philippines) Certificate in Highway Traffic (Yale University) Benjamin R. Buensuceso - PhD. Geotechnical Engineering (Asian Institute of Technology) M.S. Geotechnical Engineering (Asian Institute of Technology) B.S.C.E. (University of the Philippines Alexis A. Acacio - PhD. Geotechnical Engineering (University of Tokyo) M.S. Geotechnical Engineering (University of Tokyo) B.S. C.E. (University of the Philippines) Brian B. Tan - M.S. Civil Engineering (Massachusetts Institute of Technology) B.S. C.E. (University of the Philippines) Roy Anthony C. Luna - M.S.C.E. (University of the Philippines) B.S. C.E. (University of the Philippines) Michael Paolo V. Follosco - M.S.C.E. (University of the Philippines) B.S.C.E. (University of the Philippines) Bernardo Barcelona - Doctor of Science in Structural Geology (Tokyo University) Master of Science in Structural Geology (Tokyo University) B.S. Geology (Mapua Institute of Technology) B.S. Mining Engineering (Mapua Institute of Technology) Diosdado A. Ureña - B.S. C.E. (Adamson University) Elmer Z. Valencia - B.S.C.E. (Siliman University) sheet 3 of 31

4 OUR SERVICES: Geotechnical Engineering/Soil Exploration Standard Penetration Test and Split-Barrel Sampling of Soils Thin Walled Tube Sampling Diamond Core Drilling Auger Boring Cone Penetration Test Bearing Test Soils in-place Bearing Capacity of Soil for Static Load on spread footings Repetitive static plate load tests of soils and flexible pavement components For use in evaluation and design of airport and highway pavement Menard Pressure meter Construction Control Tests Density and unit weight of soil in-place by Sand-Cone Method Bearing Ratio of Laboratory Determination of water (moisture content) of soil by the Direct Heating Method Determination of water (moisture) content of soil by the Microwave Oven Method Pile Tests Piles under static axial compressive load High strain dynamic testing of Pile Dynamic Analyzer (PDA) Low strain dynamic testing of Pile Integrity Tester (PIT) Static Load Tests on Piles Sonic Logging on Bored Piles Geophysical Tests Seismic Refraction Survey Ground Penetrating Radar Survey Geo Resistivity Survey sheet 4 of 31

5 LIST OF EQUIPMENT Equipment Name Type / Brand Size Maximum Depth of Penetration (m) Qty A. FIELD EQUIPMENT DRILLING RIG Bundok Drilling Hydraulic Feed Big 50~300 1-unit Christensen Hydraulic Feed Big 50~300 1-unit Crawler 1, 2, 3 & 4 Hydraulic Feed Big 50~300 4-units Long Year 38 & 44 Hydraulic Feed Big 50~300 2-units Tone TGM Hydraulic Feed Big 50~300 1-unit Tone TBM 1 & 2 Hydraulic Feed Big 50~300 2-units Toho 1, 4 & 5 Hydraulic Feed Big 50~300 3-units YBM-3 Hydraulic Feed Big 50~300 1-unit KOKEN RK 1 & 2 Hydraulic Feed Big 50~300 2-units GY Hydraulic Feed Medium 45~230 1-unit Bell Machine 1 & 2 Hydraulic Feed Medium 30~50 2-units Tone THS 5-1 & 5-2 Hydraulic Feed Medium 30~50 2-units Tone FFC Hydraulic Feed Medium 30~50 1-unit Toho 2, 3, 6, 7, 8, 9, 10 Hydraulic Feed Medium 30~50 7-units YBM-1, 4, 5, 6, 7 Hydraulic Feed Medium 30~50 5-units KOKEN OP 2, 3, 4 & 5 Hydraulic Feed Medium 30~50 4-units KSK OP 2 Hydraulic Feed Medium 30~50 1-unit KSK small 1, 2 & 3 Hydraulic Feed Small 20~30 3-units Sander 2, 3, 4, 5 & 6 Hydraulic Feed Small 15~30 5-units Sander 1 Manual Feed Small 10~25 1-unit Total 49-units SPECIAL TEST Type / Brand Size Qty CPT machine Hydraulic Feed Big 60 1unit DRILLING PUMP Size Discharge Capacity (gpm) Pressure (psi) MG 25 Pump Big unit Tone NAS Big units SG-75mk III Big unit Bean Royal 535 Medium units FMC 535 Medium unit Koken MG-10 Medium units Bean Royal 555 Medium unit BW 250 mud Pump Small unit Toho BG-15 Medium unit Toho BG-10 Medium units FMC 520 Small unit KSK MG-10 Big unit Bean Royal 520 Small units YBM Single Piston Small units Myers Pump Small units BW 120 Pump Small unit Dewatering Pump Small unit Total Qty 47-units sheet 5 of 31

6 Geotechnical Engineering/Soil Exploration G.I. Tayabasan River Water Supply Tayabasan Rizal YBM rig for Walvis Bay Project, Namibia Africa Geotechnical Investigation for Novaliches - Balara CEMEX Cement Plant Project - Cebu sheet 6 of 31

7 RIGS LONG YEAR 44 RIG CRAWLER 3 RIG TOHO 4 RIG KOKEN OP RIG KOKEN RK RIG GY 150 RIG TOHO 9 RIG TONE TBM RIG YBM RIG KSK SMALL RIG CRAWLER 4 RIG sheet 7 of 31

8 SOIL NAILING / GROUTING Parameters of Drill Rig KY100J Feature : KY100J Rock rigidity F=6-20 Dia.of hole M Optium drilling depth 25M-180M Working pressure 5-12bar Air consumption =10mm 3 /min Rotation speed 0-65rpm Torque 983N. M Lift power 15KN Dimensions 4100*2030*2020 Weight 3100KG Drive system YC2108 Engine 33KW Motor Drilling Commponents(potion) 1.Hammer CW930 2.Rod Φ60*2200mm 3.Bit 90mm Recommonded compressor LGCY-12/10 Air compressor LGCY-12/10 Capacity m 3 /min(cfm) 12(424) Pressure bar (psig) 10(145) Compression Stage single Diesel Engine Engine Model No. YC6B 150Z-K20 Rated power (KW/HP) 110/150 Rated RPM(r/min) 1800 Unload RPM (r/min) 1400 Dimensions(mm) 3970*1940*2350 Weight (KW) 2380 sheet 8 of 31

9 Similar Project for Grouting / Slope Stability Project PROJECT NAME LOCATION CLIENT Drilling & Grouting for San Gabrielv CCPP Soil Improvement/Stabilization of Proposed Lbp Tarlac Office Sta. Rita,Batangas Tarlac City Sta.Elena Construction and Development Corp LBP Resources Ground Improvements by Cement Injection for 4-Storey Rectory Prop. Naga II Grouting Naga, Cebu I.C.C. / FILSYSTEM Prop. Slope Stabilization Subic Naval Base D.M. CONSUNJI, INC Proposed Slope Stabilization Bo. Ugong, Pasig City UNION AJINOMOTO, INC Slope Stability Project Staff House CITIBANK Baguio City CITIBANK Slope Stability Project Staff House Procter & Gamble Baguio City PROCTER & GAMBLE PHILS. Inc Proposed Slope Stabilization Project Pasig City ASB REALTY CORP. Drilling & Grouting San Agustin Church Intramuros, Manila MR. VIRGILIO SANTOS Drilling & Grouting Work Cubao, QC FILSYSTEM INC. Drilling & Grouting Work UCBP Project Valero St. Salcedo Vill., FILSYSTEM INC. Makati City Drilling & Grouting Works & Geophysical Survey Masinloc, Zambales MITSUBISHI CORPORATION The Monte Real Project Slope Stability Study Part I Brgy. Langub, Davao City ALSONS DEV. & INVESTMENT CORPORATION Drilling & Grouting Works Land Bank of the Phils. La Trinidad, Benguet LAND BANK OF THE PHILIPPINES Soil Improvement by Cement Grouting at Koyo-Seiko Plant Lima-Malvar, Batangas TAISEI PHIL. CONST., INC Drilling & Grouting for Cabalan Meetinghouse Cabalan, Olongapo AG ORTIZ ENGINEERING S.I. for the Existing Slope / Vertical Wall Valencia St., QC MS. EDNA SACRANI Cement Injection. Iglesia Ni Cristo Chapel Libertad, Agusan del Norte A. CRUZ CONSTRUCTION Cement Injection. Iglesia Ni Cristo Chapel Maria Aurora, Aurora A. CRUZ CONSTRUCTION Province Cement Injection/Consolidation Grouting for Existing YKT Bldg. Gandara St, Manila HILMARCS CONST. CORP. Cement Injection. Iglesia Ni Cristo Chapel San Fernando, Pampanga A. CRUZ CONSTRUCTION Ground Improvement/ Cement Injection INC. Chapel Mansaya, Ilo-ilo City IGLESIA NI CRISTO Ground Improvement for Iglesia Ni Cristo Chapel Manjuyod, Negros Oriental TAISEI PHIL. CONST., INC Cement Injection Consolidation Grouting for Existing YRT Bldg. Gandara St. Binondo TAISEI PHIL. CONST., INC Manila Cement Injection/Grouting for Iglesia Ni Cristo Chapel Magsaysay, Tondo Manila LAND BANK OF THE PHILS. Cement Grouting Works for the Proposed Reservoir 2 Lucban J.H. PATAWARAN CONST. CO. Jet Cement Grouting for the Proposed 4-Storey Bldg. N. Ramirez St. EMBROCAL BUILDERS, INC Soil Improvement by Cement Injection Pandacan A. CRUZ CONSTRUCTION Soil Improvement by Cement Injection for INC Chapel A.R. CRUZ CONSTRUCTION Drilling & Grouting for the Proposed Imperial Palace Maribago, Lapu-lapu City PHILIPPINE BXT CORPORATION Drilling & Grouting Pantal Bridge Dagupan City A. AQUINO BUILDERS Soil Nailing in Shangrila Boracay Brgy. Yapak, Boracay, D.M. CONSUNJI, INC. Aklan Iglesia Ni Cristo Chapel Navotas, MM IGLESIA NI CRISTO Drilling & Grouting for SLEX Rehabilitation and Widening Project Alabang-Calamba Section F.F. CRUZ & CO. INC. Cement Injections for Antipolo MWCI Reservoir J.H. PATAWARAN CONST. CO. Proposed 3-Storey Classroom Calumpit COMPACT BUILDERS Pilling Works for INC Guagua Guagua ARC CONSTRUCTION sheet 9 of 31

10 Similar Project for Geotechnical Works PROJECT NAME LOCATION CLIENT Geotechnical Investigation for the Groove Project Pasig City Rockwell Land Corp./ Mr. Salvador Esguerra Proposed Manggahan Bridge Pasig City M.G. LUALHATI CONST. S.I. Works for Proposed Dolphin at PKI Pier Area Misamis Oriental Pilipinas Kao, Inc./Mr. Carlo Jamoe Proposed Church of Our Lady of Fatima Parish Pasay City Our Lady of Fatima Parish/Fr. Mike Kalaw Proposed 4-Storey Building Metro Manila Jacon Steel Builders/Mr. Jonny Hao Geotechnical Studies for Twin Lakes Phase 2 Batangas Global Estate Resort, Inc/Arch. Ed Pinga G.I. Works for PROJECT STAR Cebu FF Cruz & Co, Inc/Mr. Mario G.I. Works for Daang Hari SLEX Link Road Slope Stability Analysis/Remediation for the 300 MW Redondo Peninsula Power Plant G.I. for New Bohol Airport Construction Zambales Bohol Tanalgo Philipps Technical Consultants, Corp. First Balfour, Inc Japan Airport Consultants, Inc /NJS Proposed Bocong Bridge Ilocos Norte M.G. LualHati Const. G.I. Works for PRA Offshore Dredging Cavite Philipps Technical Consultants Corp Foundation Soil Investigation Works for Integrated Meter Management Building at Maynilad Manila Maynilad Water Service, Inc Proposed 16-Storey Building, Proposed 4-Storey Bldg, Proposed Helipad Quezon City D.C. Garcia Construction Installation & Monitoring of Piezometer for Therma South Inc. Site Development Davao City First Balfour Development Work for 300 MW Coal fire power plant Proposed Structure Engineering & Development Corp. of the Philippines Additional Soil Investigation for Petron RMP-2 Daelim Industrial Co. Ltd Soil Investigation for Pier, Conveyor System & Support Philippines Technical Consultants Surigao Del Norte Structure Corp. Geotechnical Investigation & Topographic, Bathymetric & Oceanographic Data Daelim Industrial Co. Ltd Soil Investigation for Yakult Project Marilao, Bulacan Taesei Philippines Cinstraction, Inc Offshore / Onshore Investigation for pier, Conveyor System Philippines technical Consultant Surigao Del Norte & Support Structures for Conveying Corp. Geotechnical Investigation Work for PTG Alegre Resort Cebu City Alegre Resort Corp. Proposed B-Hive Plaza Valenzuela City Brazen International., Inc. Proposed Helipad Quezon City D.C. Garcia Construction Ground Penetrating Radar for Proposed 17-Storey Office Building w/ Penthouse Quezon City Monolith Const. & Dev t Corp. Soil Investigation for Balanga Bataan Bataan City Mr. Reynaldo Faminial Proposed Mindanao Tactical Operation Center Zamboanga City Mr. Brian Wee Proposed Flood Control Project Engineering & Development Corp of the Philippines Site Investigation for Berth 6 North Harbor, Manila International Container Terminal Services, Inc.(ICTSI) Soil Analysis for Heavy Metal Pollution Lima, Batangas Taisei Phil. Const., Inc. Soil Investigation for Treetop Restaurant Boracay Island, Aklan Boaracay Shangri-La Hotel & Resort, Inc sheet 10 of 31

11 Similar Project for Pier / Port s PROJECT NAME LOCATION CLIENT Site Assessment for Bulacan Bulacan Environmental Conncelor, Inc. Proposed Coal yard, ash yard & assistant Bldg area. Mariveles China Const. & Electrical Equipment Phil. Corp. G. I. -New Prop. Marine Petroleum Offloading Facilities Walvis Bay Harbor BURMEISTER & PARTNERS (PTY.) LTD. S.I. Works on Boton Storage Tank (NSD Area) U.S. Naval Supply Depot, Subic Bay PHILIPPINE COASTAL STORAGE & PIPELINE CORP. Site Investigation for Berth 6 North Harbor, Manila INTERNATIONAL CONTAINER TERMINAL SERVICES, INC (ICTSI) Add l Geotechnical Investigation for the Existing Pier Antique, Aklan TAISEI PHIL. CONST., INC Soil Investigation Works for the Proposed Pier Dapitan, Zamboanga del ZAMBOANGA & DEVT. MGT. CORP. Norte S.I. For Seafood Wharf Restaurant Luneta, Manila MR. KIM WONG Soil testing for the Existing Wharf Extension Davao City D.M. CONSUNJI, INC. Offshore Drilling for Berthing Facilities for Semirara Antique, Aklan TAISEI PHIL. CONST., INC Island Additional Geotechnical Investigation along Taguibo Butuan City KAJIMA / CIRIACO JOINT VENTURE River Soil Investigation for the Proposed Port Terminal Bldg. Cagayan de Oro City PHILIPP'S TECHNICAL CONSULTANTS INC. Manila South Harbor Design Ground Investigation ATI, Pier-3,Port of Mla. ASIAN TERMINAL, INC./HALCROW GROUP LTD. S.I. for the Prop. 4.5 Has ATI Container Yard Calamba, Laguna ASIAN TERMINAL, INC. Soil Inv. for the Manila Yacht Club Expansion and Roxas Blvd., Mla. CLIPPER VENTURES PHILS., INC. Dev. Soil Exploration for the MICT Breakwater North Harbor, Manila PKII ENGINEERS S.I. for the Agno and Allied Rivers Urgent Rehabilitation Agno, Pangasinan DEPT. OF PUBLIC WORKS AND HIGHWAYS (DPWH) Proposed Subic Port Subic, Olongapo PACIFIC CONSULTANTS INTERNATIONAL Bataan Jetty Rehabilitation Project Mariveles, Bataan PHILIPP S TECHNICAL CONSULTANTS CORP. Confirmatory Boring for the MICT Expansion Project Port Area, Tondo, Mla. PHILIPP'S TECHNICAL CONSULTANTS INC. Boring Test Pier 5 Tondo, Manila KAWASAKI STEEL CORP. Offshore Drilling for the New RAGC Plant s Jetty and Berthing Facilities Bauan, Batangas REPUBLIC-ASAHI GLASS CORPORATION S.I. Proposed Mooring Facilities Power Barge, of Navotas, MM AST ASIA POWER CORP. EAPC S.I. Batangas Port Development Project, Phase I Batangas HANJIN ENG G. & CONST., CO. LTD. S.I. Proposed Expansion of Batangas Port Batangas City HANJIN ENG G. & CONST., CO. LTD. S.I. for Manila International MICT Container North Harbor MAUNSELL PTY LTD. / ICTSI Terminal Offshore Investigation for the Prop. Entrance Cebu PKS SHIPPING CO., INC. Channel & RC Pier Berth 5 MICT Project (Offshore Drilling) North Harbor, Manila INT L. CONTAINER TERMINAL SERVICES, INC Soil Investigation Proposed Pier San Fernando, Cebu GRAND CEMENT CORP. S.I. Puerto Azul Port and Marina Project Ternate, Cavite PUERTO AZUL LAND, INC. Soil Investigation for the Construction of R.C Pier Port of Jolo, Sulu PHILIPPINE PORTS AUTHORITY Bicol River Basin Flood Control & Irrigation Development Project Proposed MCCI Iligan Pier Extension Naga, Bicol Assumption, Hts., Iligan City SIR WILLIAM HALCROW LTD. INC. MCCI CORPORATION sheet 11 of 31

12 Similar Project for Power Plant PROJECT NAME LOCATION CLIENT Proposed San Gabriel Avion Power Plant Batangas Prime Meridian Power Gen G.I. for 2x300 MW Coal fired power plant Mariveles China Const. & Electrical Equip. Phil. Corp. Tide & Convert measurements for Phil. Mariveles China Const. & Electrical Equip. Mariveles City 2x300 MW coal power plant Phil. Corp. On-land Investigation for 2 x 300 MW Coal Fired CHINA NATIONAL ELECTRIC Mariveles Power Plant EQUIPMENT CORP (CNEEC) PHILIPPINE MARIVELES 2 x 300 MW Coal Fired CCC THIRD HARBOR Mariveles Power Plant CONSULTANTS CO. LTD. Geological Exploration of Power Plant & Coal Pier GOODFOUND ENG'G AND CONST. Brgy. Cawag, Subic Site CORP. S.I. - Cebu CFB 103 Coal Fired Power Plant Naga Doosan Heavy Industries & Const., CO. LTD. Geological investigation of Kalayaan III Power Plant Kalayaan R.C. TOLLO SURVEYING SERVICES G.I. for the Proposed DMCI Power Plant A. Mobo, Masbate D.M. CONSUNJI, INC. Proposed Mirant Toledo-Sangi Power Station Toledo, Cebu BLACK & VETCH CORP. Soil Investigation for Mindanao Coal-Fired Power Plant Mindanao TAISEI PHIL. CONST., INC Offshore Boring, Mindanao 210 MW Coal Fired Power Brgy. San Martin, Plant-Jetty Work Villanueva, Mis. Oriental JFE Civil Eng g & Const., Corp. G.I. for the Mindanao 210 MW Coal Fired Tagoloan, Misamis Oriental JFE Civil Eng g & Const., Corp. S.I. for MCI-Covanta Power Plant Stack ELECTROWATT-EKONO (PHILS), Rasario, Cavite Reconfiguration INC. Soil Investigation for the Proposed Power Plant Clark Field, Pampanga POLAR ENERGY, INC./ MR. FELIPE F. CRUZ Subsurface Investigation Proposed Masinloc Power Plant Project Masinloc, Zambales MITSUBISHI CORPORATION Field Permeability Test Lauis River - Masinloc Power Plant Masinloc, Zambales MITSUBISHI CORPORATION Soil and Water Investigation for NPC 1200 MW Green- Brgy. Ilijan, Batangas City ABB POWER, INC. S.I. Proposed 60 MW Power Plant Sipalay, Negros Occidental MARICULUM MINING Sual Power Station Project 1200 MW Power Plant Sual, Pangasinan NEW SAMPAGUITA BUILDERS CONST., INC. Soil Investigation for the Bislig Power Plant Bislig, Surigao del Sur D.M. CONSUNJI, INC. 300 Combined Cycle Power Limay, Bataan TOYO CONSTRUCTION CO. LTD. Prop. 300MW Combine Cycle Station Limay, Bataan TOYO CONSTRUCTION CO. LTD. Bago Hydroelectric Proj. Murcia, Negros Occ. NATIONAL POWER CORP. Prop. Power Generating Plant Pasig City UNION AJINOMOTO, INC. Geological and Eng'g. Matutinao Mini Hydro Proj. Matutinao, Cebu NATIONAL ELECTRIFICATION ADMIN Proposed Naga II Naga City FILSYSTEM INC. Prop. Agus I Drilling Project Iligan City ENGINEERING GEOSCIENCE INC. Proposed Coal Conversion Plant Norzagaray, Bulacan PACIFIC ENGINEERING CORP./ RCC Prop. Forcem Coal Conversion Plant Mapulo Taysan, Batangas FORTUNE CEMENT CORP. Prop. Bago River A & B Minihydro Bacolod DCCD ENGINEERING CORP Prop. Kipot Falls & Maragandang Mini Hydro Bacolod DCCD ENGINEERING CORP Prop. 55 MW Naga II CFTPP Naga AUSTROPHIL Proposed HEP (Schedule I & II) Nueva Ecija NIPPON KOEI LTD. - EGI Proposed Agua Grande Mini Hydro Pagudpod, Ilocos Norte DCCD ENGINEERING CORP Prop. Mini Hydro Project Bicol DCCD ENGINEERING CORP sheet 12 of 31

13 Similar Project for Georesistivity PROJECT NAME LOCATION CLIENT Soil Resistivity Test at the Proposed Nasulo Power Valencia ENERGY DEVELOPMENT CORP. Plant Seismic Survey / GPR Scanning for Tateh Premium South Cotabato SANTEH FEEDS CORPORATION Polomolok Plant Dynamic Shear Wave Test for APC Cement Mill & Naga City TCGI ENGINEERS Conveyor Seismic Study w/ Refraction/MASW at Nestle Property Old National Rd, Brgy. Alabang MDC BUILD PLUS INC. / ENGR. JIM ALVAREZ Seismic Refraction Survey for INC Chapel Brgy. Passing, Cagayan IGLESIA NI CRISTO Seismic Refraction Survey for INC Chapel Brgy. Bagong Silang, IGLESIA NI CRISTO Isabela Seismic Survey for INC Chapel Fugu Grande, Isabela South IGLESIA NI CRISTO Seismic Survey for INC Chapel Brgy. Narra, Pangasinan IGLESIA NI CRISTO Refraction / Microtremor for National Library ANGEL LAZARO & ASSOCIATES Refraction / Microtremor at TDD Project Cheers MAKATI DEVELOPMENT CORP. Seismic Refraction & Georesistivity Survey for MPSA HOLCIM PHILIPPINES INC. Seismic Refraction & Georesistivity Survey for MPSA Brgy. Cupag HOLCIM PHILIPPINES INC. Geophysical Surveyfor the Proposed Korean Embassy GEORGE PADILLA & ASSOCIATES Georesistivity Survey for Ground Exploration Concha Cruz Drive, CITYLAND CORP. Almanza, Las Piñas City Georesistivity Survey for Ground Exploration at Las Las Piñas City CITYLAND INCORPORATED Piñas Property Seismic Refraction & Microtremor for Petron, Bataan Bataan DAELIM INDUSTRIAL CO. LTD. Ground Exploration Program for INC Chapel ERAP City, Montalban, Rizal IGLESIA NI CRISTO Soil Resistivity Survey at Air Transport Office (ATO) Pasay City NIPPON KOEI CO. LTD. G.I. Subic-Clark-Tarlac Expressway Tipo Toll - Hermosa - PCI/KEI/NK JOINT VENTURE Dinalupihan Section Georesistivity Test for Groundwater Investigation Lucena City SENBEL FINE CHENICALS CO., INC. Georesistivity Test Teresa, Rizal ENGR. MAR GERONA sheet 13 of 31

14 Similar Project for Hotel / Mall PROJECT NAME LOCATION CLIENT Geotechnical Investigation for Blk 14 SM Mall of Asia Complex SM INVESTMENTS CORPORATION S.I. for Alabang Town Center Expansion Alabang, Muntinlupa AYALA LAND INC. S.I. for the Proposed Binañ Town Mall Biñan, Laguna ASIAN TECHNICON INC. / AYALA LAND INC. Soil Boring Test for the Prop. Insular Centry Hotel Davao City AYALA HOTEL INC. S.I. for Filinvest's Festival Supermall Alabang, Muntinlupa FILINVEST ALABANG INC. S.I. for Proposed Panimam Grand Hotel Puerto Azul Ternate, Cavite PUERTO AZUL LAND INC. Prop. SM South Alabang Commercial Complex Almansa, Las Piñas GHT SERVICES INC. / SHOEMART INC. Prop. Shoemart Cebu, City D.A. ABCEDE & ASSOC. Prop. SM Megamall Basement Parking EDSA, Quezon City FIRST ASIA REALTY DEV. CORP. / D.A. ABCEDE & ASSOCIATES Prop. SM - Shoemart Cebu Supplementary G.I. Cebu CONSULTANTS MANAGEMENT SERVICES, INC. Prop. SM Cebu Cebu, City D.M. CONSUNJI, INC. Prop. Shoemart Commercial Bldg. Magsaysay Blvd., Sta. Mesa, MM D.A. ABCEDE & ASSOC. Prop. EDSA Central Commercial Complex Mandaluyong City ENGINEERING GEOSCIENCE INC. Prop. Farmers Redevelopment Project Araneta Ave. Cubao, Q.C. PROGRESSIVE DEV. CORP. Prop. Alimall II Cubao, QC SINDIONG, OCAMPO, GARCIA & ASSOCIATES Prop. Shoemart Bldg. Prop. Resort Hotel Bldg. Carlos Palanca, Echaguq, M.M Lucban, Quezon D.A. ABCEDE & ASSOC. ABAD CONST. & DEVELOPMENT CORP. Prop. Shoe Mart Cubao, QC D.A. ABCEDE & ASSOC. Silahis International Hotel Roxas Blvd., Manila BECHTEL OVERSEAS CORPORATION Virra Shopping Mall Greenhills, San juan VIRRA REALTY CORPORATION Cebu Insular Hotel Cebu City AYALA CORPORATION Baguio South Drive Hotel Baguio City ARCENAS, PAYUMO, DEE ANDREWS Zamboanga Plaza Hotel Pasanonka Park, SINDIONG, OCAMPO, GARCIA & Zamboanga ASSOCIATES Cebu Midtown Hotel Fuente Osmenia, Cebu City ARCENAS, PAYUMO, DEE ANDREWS Midland Shopping Center Adriatico, Ermita, MM Midland Plaza Golf Clubhouse & Hotel Prop. Peninsula Hotel Midtown Plaza Proposed Hotel Mirador Prop. Shoemart Hotel Intercon Annex Proposed Quad Theater Adriatico St., Manila Nasugbu, Batangas Ayala Ave., Makati, Metro Manila Cr. Pedro Gil & Adriatico St. Manila San Marcelino St. Ermita Manila Makati, Rizal Makati, Rizal, Makati, Metro Manila Makati Commercial Center GABRIEL FURMOSO & ASSOCIATES CFC CORP. - MR. ZABLAN ARCHITECH JUAN SISON sheet 14 of 31

15 Similar Project for Land Development PROJECT NAME LOCATION CLIENT Soil Investigation for Navotas Sasmuan Navotas Phase 1A YJP SURVEYORS PTE, LTD. Soil Subsurface Investigation Works for LBP Property Regional Govt. Ctr. Carig Sur Tuguegarao City LAND BANK OF THE PHILIPPINES Geotechnical Studies for Twin Lakes Phase 2 Laurel GLOBAL STATE RESORT INC/Arch. Ed Pinga Offshore Drilling for Baseco Reclamation Expansion Baseco Compound F.F. CRUZ & CO. INC. Proposed Reclamation Jayme St., Paknaan, Mandaue City LORETA REALTY & DEVT. CORP. Offshore Drilling for Baseco Reclamation Expansion Baseco Compound F.F. CRUZ & CO. INC. Site Exploration Works for Rapid City & Hard Rock HOLCIM PHILLIPINES, INC. G.I. for Landmark Devt - Proj 66 Fort Bonifacio FEDERAL LAND INC. Geotechnical Investigation for Blk 14 SM Mall of Asia Complex SM INVESTMENT CORPORATION Site Exploration Works for Rapid City & Hard Rock HOLCIM PHILLIPINES, INC. Offshore Drilling for Baseco Reclamation Expansion Baseco Compound F.F. CRUZ & CO. INC. 800 Hectares Township Porac LLL HOLDNGS INC. Geotechnical Investigation for 18 Hectares Turbo MAKATI DEVELOPMENT Bocaue, Bulacan Project CORPORATION Geotechnical/Hydrogeological Inv. for Sta. Monica PHILIPPS TECHNICAL Angat, Bulacan Subd. CONSULTANTS CORP. Banza, Butuan City, Agusan CHINA INTERNATIONAL WATER & Soil Exploration for the Proposed Lower Agusan Dev. Del Norte ELECTRONIC CORP. sheet 15 of 31

16 Similar Project for Offshore Drilling PROJECT NAME LOCATION CLIENT Offshore drilling for Danao Port Cebu SKI Energy Resources, Inc. (Seri Mining) Offshore Verification Survey/ seabed scanning Phil. Mariveles 2x300MW China Const. & Electrical Equipment coal fired power plant Phil. Corp. Proposed Intake and outfall Structure Offshore area Mariveles China Const. & Electrical Equipment Phil. Corp. S.I. for Offshore Drilling Mabahong TIGERLAND AGRO-INDUSTRIAL ECONOMIC ZONE Addendum: S.I. for Offshore Drilling Mabahong TIGERLAND AGRO-INDUSTRIAL ECONOMIC ZONE Offshore Drilling at Leyte Gulf BLACK SAND ENTERPRISES LTD. Sub-soil & Seabed Materials Inv. & Current Wave Observation for Walvis Bay Port Namibia PADECO CO.LTD MICT Berth 6, Container Terminal Orion MAUNSELL PHILIPPINES, INC. Offshore Drilling at NAIC, Cavite G.I.-The Strategic Expansion of the Walvis Bay Additional G.I.-The Strategic Expansion of the Walvis Bay Namibia Namibia F.F. CRUZ & CO. INC. NAMIBIAN PORTS AUTHORITY (NAMPORT)\ NAMIBIAN PORTS AUTHORITY (NAMPORT)\ sheet 16 of 31

17 Similar Project for Roads / Bridges PROJECT NAME LOCATION CLIENT Proposed Bridge, Canyon Ranch Subd., San Lazaro Leisure Park Carmona VJS BUILDERS Pipelaying Works along Coastal Road Cavite - Parañaque D.M. CONSUNJI, INC. S.I. for Peñafrancia Bridge Peñafrancia, Paco PHILIPP'S TECHNICAL CONSULTANTS INC. S.I. Works for Boton Highway US Naval Supply Depot PHILIPPINE COASTAL STORAGE & PIPELINE CORP. Confirmatory Boring for Pantal Bridge Dagupan A. AQUINO BUILDERS S.I. - Manaoag Bridge Manaoag, Pangasinan C.M. PANCHO CONSTRUCTION S.I. - Slope Along Catarman-Calbayog Maharlika Highway PACIFIC CONSULTANTS INTERNATIONAL Proposed Bridge Didipio, Nueva Viscaya PHILIPP'S TECHNICAL CONSULTANTS INC. Soil Boring Test for MRT Line 3 Phase 2 Caloocan City PHILIPPINES TECHNICAL CONSULTATIONS CORP. Geotechnical Investigation of the Kafaed Project Lanao del Norte DESIGN SCIENCE, INC. Geotechnical Investigation Works for Pinagkalagan Bridge Upgrading Sultan Kudarat,Maguindanao PHILIPPS TECHNICAL CONSULTANTS CORP. Testpitting works for Daang Hari Project Muntinlupa City PHILIPPS TECHNICAL CONSULTANTS CORP. PDA & PIT for the Construction of Calaba Bridge Bangued, Abra J.H. PAJARA CONST. CO. Cebu South Coastal Road Project (Tunnel)Section Segment 3B -2 Cebu City KAJIMA CORPORATION Soil Investigation for Shariff-Aguak-Rajah Buayan Maguindanao PHILIPPS TECHNICAL CONSULTANTS CORP. Proposed Magsaysay Viaduct Butuan City TOA CORPORATION Simuay-Darapangan-Matengen Road Ugrading Project Geotechnical Inv. For the Proposed LGPF Reinjection to Line PAD 4D Soils & Foundation Inv.for 6525 / 6529 Building Municipality of Sultan Kudarat Kananga, Leyte Northgate Cyberzone, Filinvest Corporate City PHILKOEI INTERNATIONAL, INC. PNOC-ENERGY DEVELOPMENT CORP. CYBERZONE PROPERTIES, INC. Proposed Banza Sluice Structure & Tumampi CHINA INTENRATIONAL WATER AND Butuan City Vehicular Bridge ELECTRONIC CORP. General Santos-Tacurong, 138 T/L Tacurong, Cotabato City NATIONAL TRANSMISSION CORP. Confirmatory Boring for Subic-Clark-Tarlac Expressway-Package I Subic-Clark Section TREVI FOUNDATIONS PHILS., INC. Bongabon-Baler Road Uimprovement, DIAAT Bridge Maria Aurora, Quezon C.M. PANCHO CONSTRUCTION, INC. Soil Investigation for the Proposed Lambingan Bridge Mandaluyong City ARS TESTING & INSPECTION Confirmatory Soil Boring Test - Jalandoni Bridge Iloilo City NEW SAN JOSE BUILDERS, INC. Geotechnical Investigation for Amnay Bridge Sta. Cruz, Occidental Mindoro NIPPON KOEI CO. LTD. S.I. for the Prop. Sampaguita Widening Project NTI-South Luzon Tollway Site Development Project Geotechnical Investigation Works Taytay El Nido Road Rehab. Additional Soil Investigation and Laboratory Test at Banza Bridge Geotechnical Investigation for the Cebu South Coastal Along C-5 Taguig, MM Bo. Calaboso, Binan, Laguna Northern Palawan Butuan City Cebu PHILIPP S TECHNICAL CONSULTANTS CORP. EMBROCAL BUILDERS, INC. PACIFIC CONSULTANTS INTERNATIONAL KAJIMA-CIRIACO J.V. KAJIMA CORPORATION sheet 17 of 31

18 Similar Project for Geological PROJECT NAME LOCATION CLIENT Geological & Geotechnical Survey Limay 101 Co. Ltd. Geological and Geotechnical Investigation Works on Tagoloan, Misamis the Tower Sites Oriental TAISEI PHIL. CONST., INC Geological Survey and Testing for the Project for MOHRI, ARCHITECTS & Bulacan and Nueva Ecija Improvement ASSOCIATES, INC. Geological Soil Survey-Phase II for Proposed Water Treatment Plant Various sites in Pangasinan, Laguna T.I. ASUNCION & ASSOCIATES Geological Investigation & Pumping Test for Water Roxas City, Iloilo & Leyte JAPAN TECHNO CO. LTD. Engineering & Geological Assessment for the Proposed Brgy. De La Paz, Antipolo City MRS. MARIA SENGA SANTOS Geological Inv. and Corrosion Study of the South MAYNILAD WATER Various sites Manila SERVICES, INC. Geological Soil Survey for Basic Design Study for the Various Sites in Visayas JAPAN TECHNO CO. LTD. / MR. T. ASUNCION Geological Supervision/Monitoring of Excavation Makati City ECW JOINT VENTURES, INC. Geological Investigation on Limestone Reserve Naga, Cebu TAIWAN CEMENT CORP. sheet 18 of 31

19 HIGH RISE BUILDING (MALL/HOTEL/CONDO) LOCATION CLIENT Geotechnical Investigation for Blk 14 SM Mall of Asia Complex SM INVESTMENTS CORPORATION Geotechnical Investigation Works for Block 5 & 17 SM Mall of Asia Complex SM INVESTMENTS CORPORATION SM Showroom Block 15 SM, Bay City -CBP-1A SM INVESTMENTS CORPORATION S.I.-Serendra 3A Project Fort Bonifacio Global City AYALA LAND, INC. Soil Investigation Works Serendra Project Fort Bonifacio, Taguig, MM AYALA LAND, INC. Soil Sub-surface Investigation for the SM City Lipa, Batangas SM PRIME HOLDINGS, INC. / GHT SERVICES, INC. S.I. for the Prop. One Storey Bldg. Greenhills, San Juan, MM SM BANCO DE ORO S.I. for Alabang Town Center Expansion Alabang, Muntinlupa AYALA LAND, INC. Soil Boring Test for the Prop. Insular Centry Hotel Davao City AYALA HOTELS, INC. Soil Investigation for the Proposed Pineridge-2 Torres St., Baguio City AYALA LAND, INC. Cavity Detection/Survey of the Condominium Site Cebu AYALA LAND, INC. Soil Investigation for the Proposed Mid Market Cebu City AYALA HOTELS, INC. Condo I & II Prop. Cebu Business Park (CBP) Residential Cebu City AYALA LAND, INC. S.I. Proposed Ayala Life Building Bo. Hippodromo, Cebu City AYALA HOTELS, INC. / CEBU HOLDINGS, INC. S.I. of Ayala Cebu Hotel Cebu City AYALA HOTEL, INC. / SHIMIZU PHILLPINE CONTRACTORS, INC. Prop. Ayala Heights Townhouses Capitol Hills, Quezon City AYALA LAND, INC. Ayala Parking Building Makati, MM AYALA CORP. Prop. Makati Sports Club Makati, MM AYALA CORP. Cebu Insular Hotel Cebu City AYALA CORP. MINING EXPLORATION Some projects engaged with: Magnetite Samal Potential Along Coast Between Cadiz and Sicaba - Negros Occidental Soil Sampling (Offshore) - Negros Offshore drilling at Leyte Gulf - Leyte BLACK SAND ENTERPRISES LTD. Mindoro Nickel Project - Calapan, Mindoro INTEX RESOURCES (PHILS.) INC. Proposed Mine Site - Negros Occidental PHILIPPINE CZECH MINING COMPANY sheet 19 of 31

20 RAILWAY LOCATION CLIENT S.I. for the Proposed LRT-2 P1 Depot Marikina FUJITA PHILIPPINES CONST AND DEVT. INC G.I. at Ortigas Interchange MRT-3 Project Ortigas Interchange ICF KAISER ENG G. INC. Proposed MRT-3 North Triangle North EDSA, Q. C. PARSONS INTERPRO INC. Proposed LRT-3 North EDSA, Q.C. PARSONS INTERPRO, INC. Proposed LRT Expansion Divisoria-Cubao Route PACIFIC CONSULTANTS INTL. Proposed LRT Arroceros, Rizal Avenue F.F. CRUZ & CO. INC. Propsed LRT Taft Avenue ELECTROWATT ENG G.SERVICES Proposed North PNR Bayambang-Batangas ZURICHCONSULT WINDFARM G.I. works for 80MW Windfarm Ilocos Norte PHILIPPS TECHNICAL CONSULTANT, INC. G.I. for UPC Windfarm Ilocos Norte PHILIPPS TECHNICAL CONSULTANT, INC. POWER PLANT S.I. at the Proposed Power Plant-New Aimeliik Palau, Micrronesia KIONE ISECHAL Proposed San Gabriel Avion Power Plant Batangas City PRIME MERIDIAN POWERGEN CORPORATION Proposed Biomass/Coal Fired Power Plant Misamis Oriental FDC UTILITIES, INC. Slope Stability Analysis for 300 MW Redondo Subic FIRST BALFOUR, INC. Peninsula Power Plant Soil Resistivity Test at the Proposed Nasulo Negros Oriental ENERGY DEVELOPMENT CORP. Power Plant 2 X 150 mw Coal Fired Power Plant Davao THERMA SOUTH, INC. Proposed Coal Fired Power Plant Toril, Davao ABOITIZ POWER CORPORATION 2 X 300 MW Coal Fired Power Plant Mariveles, Bataan CHINA CONST. & ELECTRICAL EQUIPMENT PHIL. CORP. 2 X 300 MW Coal Fired Power Plant Mariveles, Bataan CCC THIRD HARBOR CONSULTANTS CO. LTD. MALL / HOTEL Proposed Structure (Robinsons Place) Cebu FREYSSINET FILIPINAS CORP Geotechnical Investigation for Shangri-La Hotel Taguig FORT BONIFACIO SHANGRI-LA HOTEL, INC. Soil Investigation-Serendra 3A Project Taguig AYALA LAND, INC. Soil Investigation SM Showroom Pasay SM INVESTMENTS CORP. Static Load Test for SM Super Center Sucat TREVI FOUNDATIONS, PHILS. Soil Investigation Works Cebu BoardWalk Mandaue, Cebu MARRECO Pile Dynamic Test at SM City Manila SM PRIME HOLDINGS, INC. Soil Investigation for SM Angeles Pampanga GHT SERVICES Soil Investigation for SM City Lipa, Batangas SM PRIME HOLDINGS, INC. Soil Investigation for Herald Suites Hotel Eastwood, Q.C. HERALD SUITES Proposed 3-Storey Mall Balanga, Bataan MEINHARDT PHILIPPINES Geotechnical Investigation for SM Mall of Asia Pasay City GHT SERVICES, INC. Proposed Building (Mall) Cagayan de Oro LIMKETKAI & SONS, INC. ROADS/BRIDGES S.I. for Daang Hari SLEX Link Road Muntinlupa PHILIPPS TECHNICAL CONSULTANTS CORP. Geotechnical Investigation for Philippines Samar PHILIPPS TECHNICAL CONSULTANTS CORP. Secondary National Road Development Improvement/Const of Roads & Bridges Aurora Province FF CRUZ & CO. INC. Slope Along Catarman-Calbayog Maharlika Highway Samar PACIFIC CONSULTANT INTERNATIONAL Simuay-Darapangan-Matengen Road Upgrading Maguindanao PHILKOEI INTERNATIONAL, INC. Proposed Magsaysay Viaduct Butuan TOA CORPORATION Cebu South Coastal Road Segment 3B-2 Cebu KAJIMA CORPORATION Subic-Clark-Tarlac Expressway (Package 1) Pampanga / Tarlac TREVI FOUNDATION PHILS. INC. Catanduanes Circumferential Road Improvement Catanduanes NIPPON KOEI CO. LTD. Detailed Design Study on the Project for Improvement Republic of Palau PACIFIC CONSULTANTS INTERNATIONAL Geotechnical Survey for NRIMP-1 Negros Oriental KATAHIRA & ENGINEERS INTERNATIONAL sheet 20 of 31

21 B. Special Field Test 1 Mitsubishi Crawler Drill Hydraulic Feed 1-unit 2 Motorized Cathead Mechanical Feed 1-unit 3 Core-It (Geonor) Mechanical Feed 1-unit 4 Cone Penetrometer Drill Mechanical Feed 1-unit 5 Dynamic Cone Penetrometer Mechanical Feed 2-units 6 Falling Weight Deflectometer Hydraulic Feed 1-unit FALLING WEIGHT DEFLECTOMETER Manufacturer: GRONTMIJ, Denmark Falling Weight Deflectometer applies a load to the pavement inducing a deflection bowl similar to the one of a passing truck Urgent Infrastructure Development Project, Rehabilitation of Epifanio De Los Santos Avenue (EDSA) Benefits of the Cone Penetrometer Test Accurately profiles the geological strata Measures the low strain shear wave velocity for seismic evaluations satisfying the new International Building Code (IBC) requirements Can be used to predict vertical pile capacity In normally consolidated or recently aged cohesion less soils, provides good estimates of settlement for shallow foundations sheet 21 of 31

22 CPT for geotechnical applications was standardized in 1986 by ASTM Standard D 3441 (ASTM, 2004). ISSMGE provides international standards on CPT and CPTU. CONE PENETROMETER Manufacturer: Environmental AB, Sweden MEMOCONE Manufacturer: Environmental Mechanics, Sweden PICOSCOPE Manufacturer: Pico Technology United Kingdom sheet 22 of 31

23 The seismic refraction method is based on the measurement of the travel time of seismic waves refracted at the interfaces between subsurface layers of different velocity. The seismic cross hole method provides a designer with information pertinent to the seismic wave velocities of the materials in question. This data maybe used as input into static/dynamic analyses, as a means for computing shear modulus, young s modulus, and Poisson s ratio, or simply for the determination of anomalies SEISMIC REFRACTION SURVEY Manufacturer: ABEM, Sweden CROSSHOLE SEISMIC Manufacturer: Soils Engineering & Geophysics, Inc. Mississippi, USA SEISMIC REFRACTION AND MICROTREMOR SURVEY The TERRALOC MK6 has been conceived to be adaptable to sub-surface seismic investigations, from the upper layers of the earth to the deepest and whatever the study, the TERRALOC is the seismograph to use.(see figure 3 and 4) sheet 23 of 31

24 Benefits of the Pressuremeter Test: Can be conveniently used with drilling equipment or pushed in with direct push equipment. While tests can be done in soft clay or loose sands, the test is best used in dense sands, hard clays and weathered rock which cannot be tested with push equipment. An extensive database of load test results allows the geotechnical engineer to accurately design for shallow foundations and for lateral and vertical capacity of deep foundations. MENARD PRESSUREMETER Manufacturer: APAGEO SEGELM GROUND PENETRATING RADAR Manufacturer: Germany sheet 24 of 31

25 TEMPERATURE, LEVEL, CONDUCTIVITY Conductivity Measurements The TLC Meter uses a smart conductivity sensor with platinum electrodes to read conductivity from 0 80,000 μs. The conductivity is displayed on the rotating screen along with the associated temperature measurement. The smart conductivity probe displays conductivity automatically standardized to 25 C, i.e. specific conductance. The conductance temperature coefficient is 2.0% per C. Calibration is simple, using 1413 μs and 80,000 μs solutions for single or two point conductivity calibration. A Tape Guide/Datum allows the depth measurement to be read at the marked position on the Tape Guide, to give reliable, repeatable, accurate depth measurements when profiling a well. The Tape Guide protects the tape from damage on rough edges of well casing. Temperature Measurements The TLC Meter operates in a range from 15 C to +50 C (23 F to 122 F). You may choose to have the readings displayed on the LCD screen in C or F. Accuracy is +/- 0.3 C in Celsius, or +/-0.5 F in Fahrenheit. Conductivity measurements are temperature sensitive. The smart TLC probe automatically adjusts the measured conductivity values to display as specific conductance. This provides standardized repeatably comparable measurements. When the probe is turned on, the LCD screen displays both conductivity and temperature. A short wait of 20 seconds per degree Celsius of temperature change is required for the measurements to stabilize at each desired depth, before recording the three measurements. sheet 25 of 31

26 HYDROGRAPHIC SURVEY Accurate positioning of the Survey Vessel and Marine Sensors is obtained by Differential Global Positioning System (D.G.P.S.) This is a Satellite based navigation system and Differential corrections can be supplied by a shore-based reference station for high accuracy in-shore surveys (UHF Telemetry link provides sub-meter accuracies referenced to a Bench Mark). Bathymetry Bathymetric surveys obtain water depths of the area by single and dual frequency, Digital Echo Sounders. Tidal corrections to reduce the water depths to a common datum can be obtained by Government predictions or by recording, digital Tide Gauges. Project engaged with: Bathymetric of approximately 1.4 sq. km or has - Masinloc, Zambales Current Measurement - Masinloc, Zambales sheet 26 of 31

27 V. GEOTECHNICAL SOFTWARE GEO4 Analysis of Geotechnical Structure (Bearing Capacity) GEO4 Analysis of Geotechnical Structure (Slope Stability) PDAPLOT for Pile Dynamic Test and Pile Integrity Test for Seismic Refraction Survey Seisopt REMI for Shear-wave Profile Using Refraction Microtremor Three-Dimensional Tomography Program (Crosshole Seismic Survey) Multichannel Analysis of Surface Waves - Geometrics, Inc. (Surface Wave, Seismic Survey) Rosy Design Version (Falling Weight Deflectometer Test) Primax FWD Data Collection Version SQL KD2 Pro Utility Software ver (Thermal Resistivity) PC Mon Utility Software for Cone Penetration Test VTK Series Geotechnical & Environmental Data Acquisition System and Processing Software VII. SERVICE VEHICLE (16 units) 1-unit Isuzu Fuego 1-unit Isuzu ELF 1-unit Elf Truck 1-unit Nissan Pathfinder 4-units Boom Truck 1-unit Water Truck 2-units Pick-up Truck 3- units Nissan Navarra 1-unit Ford Ranger 1-unit Mitsubishi Estrada sheet 27 of 31

28 VIII. LABORATORY SERVICES SOILS: TEXTURE, PLASTICITY & DENSITY CHARACTERISTICS Laboratory Determination of Water Content of soil and rock Liquid Limit, Plastic Limit and Plasticity Index of Soils (Atterberg Limit) Particle Size Analysis of Soils Specific gravity of Soils Shrinkage Factors of Soils by Mercury Method Unit Weight of Soils Laboratory Compaction Characteristics of Soils using Standard Effort [12,400 ft-lb/ft (600 kn-m/m)] Laboratory Compaction characteristics of Soil using Modified effort [56,0000 ft-lb/ft (2,700 kn-m/m)] Moisture, Ash and Organic Matter of Peat and other organic soils STRUCTURAL PROPERTIES Laboratory miniature Vane Shear test for Saturated fine grained clayey soil Unconfined Compressive Strength of Cohesive Soils Direct Shear Test of Soils under Consolidated Drained Conditions One Dimensional Consolidation properties of soils Unconsolidated Undrained Compressive Strength of Cohesive Soils in Triaxial Compression Consolidated Undrained Triaxial Compression Test on Cohesive Soils Consolidated Drained Triaxial Compression on Cohesive Soils HYDROLOGIC PROPERTIES Permeability of Granular Soils-Constant Head Method Permeability of fine-grained Soils- Falling Head Method ROCK DEFORMATION AND STRENGTH Slake Durability of Shale and Similar Weak Rock Splitting Tensile Strength of Intact Rock Core Specimen Unconfined Compressive Strength of Intact Rock Core Specimen Point Load Strength Index of Rock Uniaxial Compression Test AGGREGATES Specific gravity and Absorption of Fine Aggregates Specific gravity and Absorption of Coarse Aggregates Clay Lumps and Friable Particles in Aggregates Resistance to Degradation of Small-size coarse aggregates by Abrasion and Impact in the Los Angeles Machine Total Moisture Content of Aggregate by Drying Material Finer than 0.75mm (No. 200) sieve in mineral aggregates by washing Sieve Analysis of Fine & Coarse Aggregates Soundness of Aggregates by use of Sodium Sulfate or Magnesium Sulfate Surface Moisture Content in Fine Aggregates Unit Weight and Voids in Aggregate Lightweight pieces in aggregates sheet 28 of 31

29 CONCRETE MIXTURES Slump of Portland Cement Concrete Making and Curing Concrete Test Specimen Capping Cylindrical Concrete Specimen Compressive Strength of Beam Concrete Specimen Flexural Strength of Beam Concrete Specimen using third point loading Specific Gravity and Adsorption and Voids in Hardened Concrete Obtaining and Testing Cores Other Laboratory Test (New) Uniaxial Compression Test Provide a very accurate electrical signal, strictly proportional to the strain of the specimen submitted to load application, for determining the Elastic Modulus and strength characteristics Pin Hole Dispersion Device (ASTM D4647): This test is used for evaluating clay soils for erodibility by flowing water through a small hole that is drilled through the compacted specimen sheet 29 of 31

30 THERMAL RESISTIVITY The test method presents a procedure for determining the thermal resistivity of soil and soft rock using a transient heat method. KD2 PRO Supplier: Decagon Devices Washington Compliant to : ASTM D5334 IEEE 442 Nuclear Density Test Nuclear density test is a quality control and acceptance testing of compacted soil and soil-aggregate mixtures as used in construction and also for research and development. Nuclear density test is useful as a rapid, nondestructive technique for in-place measurements of wet density and water content of soil and soil-aggregate and the determination of dry density. sheet 30 of 31

31 VI. PARTIAL LIST OF PROJECTS ENGAGED WITH: TYPE OF TEST PROJECT / LOCATION CONTRACT AMOUNT YEAR COMPLETED CLIENT LABORATORY In-house Laboratory- South Luzon Tollway Site Development, Laguna Over Php 1 M 2006 Semirara Mining Corporation Plate Load Test for Honda Philippines, Inc. New Factory, Batangas Over Php 1 M 2005 Zamboanga & Devt. Mgt, Corp. Swedish Sounding Test and DCP for the Proposed Building, Quezon City Under Php 1M 2004 Semirara Mining Corporation Resistivity Survey for YAP FSM & Water Line Dev t Project in Federated States of Micronesia Yap island Over Php 1 M 2010 GPPC, INC. Field Density Test for proposed INC Chapel in Taguig City Under Php 1M 2010 B & G LUMBER Dynamic Cone Penetrometer for 100 MLD Water Treatment Plant Muntinlupa City Under Php 1M 2010 D.M. Consunji, Inc. Field Density Test for Phoenix Retail Station Camp Olivas in San Fernando Pampanga Under Php 1M 2010 RJT Builders Plate Load Test for UAM Factory in FPIP Sto. Tomas, Batangas Under Php 1M 2010 Taisei Phils, Const. Inc. Consolidation Test for proposed 3-Storey Building in Naga City, Camsur Under Php 1M 2011 Grand East Geotech Triaxial Testing for Proposed PADS F & Re- Hook up in Sorsogon Under Php 1M 2011 A.M. Geoconsult Laboratory Testing for ATI Project in Manila South Harbor Container Yard Under Php 1M 2011 Pearl & Jade Const., Dev t Corp. Laboratory Testing for SoLID Waste Management (LGU) Palauig, Zambales Under Php 1M 2011 LGU Palauig, Zambales Provision of On-site soil testing services (supply of technician and equipment to conduct NMC, Soil Class., FDT, AL, & GSA Over Php 1M 2011 Oceana Gold sheet 31 of 31

PNR North Commuter Railway Phase 1

PNR North Commuter Railway Phase 1 PNR North Commuter Railway Phase 1 Connects Tutuban, Manila to Malolos, Bulacan Project type Commuter rail Length 38 km Cost PhP 105 billion Source of funds ODA-Japan Proponent Department of Transportation

More information

ENJOY WORRY-FREE SHOPPING WITH BANK OF COMMERCE INSTALLMENT PLUS

ENJOY WORRY-FREE SHOPPING WITH BANK OF COMMERCE INSTALLMENT PLUS ENJOY WORRY-FREE SHOPPING WITH BANK OF COMMERCE INSTALLMENT PLUS Pay for your gadgets, appliances, dream vacations, and more at 0% interest installment plans payable in as long as 36 months*! List of partner

More information

SEMIRARA MINING CORPORATION. Company Profile

SEMIRARA MINING CORPORATION. Company Profile SEMIRARA MINING CORPORATION Company Profile ORGANIZATIONAL STRUCTURE SEMIRARA MINING CORPORATION A member of the DMCI Holdings, Inc. group of companies 100% 100% 100% 100% 100% 100% 100% Sem-Calaca Power

More information

Summary of the Contestable Market

Summary of the Contestable Market I. CREM Participants Summary of the Contestable Market as of August 2017 Nu m ber of CCs Demand (MW) Sh a re in T ot a l Ret a il Ma rket Dem a n d Sy st em Pea k in MW (a s of A u g u st 2 01 7 ) Sh a

More information

Geoscience Testing laboratory (Al Ain)

Geoscience Testing laboratory (Al Ain) Soil 1 In-situ Density by Sand Replacement Method Using Large Pouring Cylinder & Small Pouring Cylinder In-place Density Test by Sand Cone Method BS 1 Part ASTM D 1556 Dry Density Moisture Content Relationship

More information

SEMIRARA MINING & POWER CORPORATION. Company Profile

SEMIRARA MINING & POWER CORPORATION. Company Profile SEMIRARA MINING & POWER CORPORATION Company Profile ORGANIZATIONAL STRUCTURE A member of the DMCI Holdings, Inc. group of companies 100% 100% 100% 100% 100% 100% 100% Sem-Calaca Power Corp. *Southwest

More information

Laboratory Certification For. Shakib Dastaggir Construction & Design Company (S-CAD) Laboratory

Laboratory Certification For. Shakib Dastaggir Construction & Design Company (S-CAD) Laboratory Laboratory Certification For Shakib Dastaggir Construction & Design Company (S-CAD) Laboratory Lab ID: LCP-006 Issue date: Sept 19, 2016 Expiry date: March 18, 2017 This letter confirms the completion

More information

Mattest (Ireland) Ltd

Mattest (Ireland) Ltd Unit 2, Northwest Business Park, Ballycoolin, Dublin 15 Testing Laboratory Registration number: 286T is accredited by the Irish National Board (INAB) to undertake testing as detailed in the Schedule bearing

More information

CHAPTER 9 PROJECTS PROPOSED BY VARIOUS ENTITIES AND PRE-SCREENING OF PROPOSED PROJECTS

CHAPTER 9 PROJECTS PROPOSED BY VARIOUS ENTITIES AND PRE-SCREENING OF PROPOSED PROJECTS CHAPTER 9 PROJECTS PROPOSED BY VARIOUS ENTITIES AND PRE-SCREENING OF PROPOSED PROJECTS CHAPTER 9 ROAD PROJECTS PROPOSED BY VARIOUS ENTITIES AND PRE-SCREENING OF PROPOSED PROJECTS 9.1 PROPOSED PROJECTS

More information

INFRASTRUCTURE AS A MAIN THRUST OF THE DUTERTE ADMINISTRATION

INFRASTRUCTURE AS A MAIN THRUST OF THE DUTERTE ADMINISTRATION INFRASTRUCTURE AS A MAIN THRUST OF THE DUTERTE ADMINISTRATION ROLANDO G. TUNGPALAN Undersecretary for Investment Programming NATIONAL ECONOMIC AND DEVELOPMENT AUTHORITY PFIC Global Investment Forum How

More information

PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure

PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure BANGKOK, THAILAND December 19-21, 2016 PPA is a public corporate body

More information

8. TRIP DISTRIBUTION. 8.1 Trip Distribution by Trip Purpose. Figures 8.1 show desire lines by trip purpose. < To Work >

8. TRIP DISTRIBUTION. 8.1 Trip Distribution by Trip Purpose. Figures 8.1 show desire lines by trip purpose. < To Work > 8. TRIP DISTRIBUTION 8.1 Trip Distribution by Trip Purpose Figures 8.1 show desire lines by trip purpose. < To Work > Quezon (II) and Makati form large centers for to Work trips. Manila also attracts a

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK The Old School Stillhouse Lane Bedminster BS3 4EB Contact: Dr Dimitris Xirouchakis Tel: +44 (0)117-9471000 Fax: +44 (0)117-9471004 E-Mail:

More information

ENJOY WORRY-FREE SHOPPING WITH BANK OF COMMERCE INSTALLMENT PLUS

ENJOY WORRY-FREE SHOPPING WITH BANK OF COMMERCE INSTALLMENT PLUS ENJOY WORRY-FREE SHOPPING WITH BANK OF COMMERCE INSTALLMENT PLUS Pay for your gadgets, appliances, dream vacations, and more at 0% interest installment plans payable in as long as 36 months*! *0% interest

More information

OneTaipan Holdings, a company of the ShoeMart (SM) retail

OneTaipan Holdings, a company of the ShoeMart (SM) retail 48 INFRASTRUCTURE National Grid s new owners The firm of retail and property development mogul Henry Sy has bought the 30% stake of Monte Oro Grid in the consortium that owns the National Grid Corp. of

More information

Sectoral Perspective: Domestic Water and the Role of Metropolitan Waterworks and Sewerage System (MWSS) Rebecca R. de Vera Project Management Officer

Sectoral Perspective: Domestic Water and the Role of Metropolitan Waterworks and Sewerage System (MWSS) Rebecca R. de Vera Project Management Officer Sectoral Perspective: Domestic Water and the Role of Metropolitan Waterworks and Sewerage System (MWSS) Rebecca R. de Vera Project Management Officer A, MWSS Outline Metropolitan Waterworks and Sewerage

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Schedule of ccreditation United Kingdom ccreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK ccredited to Bootham Lane Industrial Estate Bootham Lane Dunscroft Doncaster

More information

REPUBLIC OF THE PHILIPPINES. Republic of the Philippines

REPUBLIC OF THE PHILIPPINES. Republic of the Philippines Existing National, Bilateral and Multilateral Standards of Weights, Dimensions and Emissions for Road Freight Vehicles; Enforcement Mechanisms for Both National and Foreign Road Freight Vehicles PHILIPPINES

More information

BILLING RATES - FY 18/19

BILLING RATES - FY 18/19 Room 21 Lowry (soil mechanics lab) Use of Soil Mechanics Lab (room 21 Lowry ) Atterberg plastic limit test (ASTM D4318) Atterberg liquid limit test (ASTM D4318) Sieve analysis with wash #200 sieve (ASTM

More information

Toy Kingdom. Toy Kingdom Gift Certificate may be redeemed and used in these Toy Kingdom Stores:

Toy Kingdom. Toy Kingdom Gift Certificate may be redeemed and used in these Toy Kingdom Stores: Toy Kingdom Toy Kingdom Gift Certificate may be redeemed and used in these Toy Kingdom Stores: SM Fairview SM Lucky Chinatown SM Makati SM Mall of Asia SM Megamall SM North Edsa SM Podium SM Southmall

More information

BILLING RATES - FY 17/18

BILLING RATES - FY 17/18 Room 17 (Materials Testing Equipment) Use of 10 kip UTM Day $500.00 External Use of Torsion Machine Day $500.00 External Room 21 Lowry (soil mechanics lab) Use of Soil Mechanics Lab (room 21 Lowry ) Hour

More information

LIST OF PROJECTS ON CHILLED WATER & VRV/VRF INSTALLATION & DUCTING WORK

LIST OF PROJECTS ON CHILLED WATER & VRV/VRF INSTALLATION & DUCTING WORK LIST OF PROJECTS ON CHILLED WATER & VRV/VRF INSTALLATION & DUCTING WORK 1. HOSEKI INC. THE PODIUM 2. BANKO SENTRAL NG PILIPINAS 3. Digital Walker North EDSA 4. Lechon Haus SM Manila 5. Lechon Haus SM Dasmarinas

More information

Promoting Investment in the Energy Sector

Promoting Investment in the Energy Sector October 16, 2013 Marubeni as a Sogo Shosha The Japanese sogo shosha is a collection of various groups involved in different business fields. Each part of the organization has something unique to offer

More information

SEMIRARA MINING & POWER CORPORATION. Company Profile

SEMIRARA MINING & POWER CORPORATION. Company Profile SEMIRARA MINING & POWER CORPORATION Company Profile ORGANIZATIONAL STRUCTURE A member of the DMCI Holdings, Inc. group of companies 100% 100% 100% 100% 100% 100% 100% Sem-Calaca Power Corp. *Southwest

More information

List of Participating SM Retail Stores

List of Participating SM Retail Stores List of Participating SM Retail Stores Click the name of the store to view partcipatni branches. Ace Hardware Our Home Adidas Shop Pet Express Baby & Company Sfera Bata Shoes SM Appliance Center Crate

More information

FIT-ALL FUND ADMINISTRATION

FIT-ALL FUND ADMINISTRATION National Transmission FIT-ALL FUND ADMINISTRATION ACCOMPLISHMENT REPORT FOR THE YEAR ENDED DECEMBER 31, 2016 AND QUARTER ENDED MARCH 31, 2017 Photo credit:rodel Diaz Photography CONTENTS CONTENTS 2 Feed-in-Tariff

More information

Power crisis in Mindanao

Power crisis in Mindanao 42 INFRASTRUCTURE Power crisis in Mindanao Mindanao is expected to experience power shortfalls starting next year as growing power demand is projected to outstrip supply. Currently, the Philippines 2nd

More information

CIVIL AVIATION AUTHORITY OF THE PHILIPPINES AERODROME DEVELOPMENT & MANAGEMENT SERVICE PASSENGER MOVEMENT for CY 2017

CIVIL AVIATION AUTHORITY OF THE PHILIPPINES AERODROME DEVELOPMENT & MANAGEMENT SERVICE PASSENGER MOVEMENT for CY 2017 CIVIL AVIATION AUTHORITY OF THE PHILIPPINES AERODROME DEVELOPMENT & MANAGEMENT SERVICE PASSENGER MOVEMENT for CY 2017 Laoag (Int'l.) AIRLINE Airport OPERATOR JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY

More information

Index for Labs under Civil Engineering

Index for Labs under Civil Engineering Index for Labs under Civil Engineering Sr. No. Laboratory Name 1 Applied Mechanics Laboratory- 1 2 Transportation Engineering Laboratory 3 Surveying Laboratory 4 Environmental Engineering Laboratory-2

More information

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Engineering Specification Track L1-CHE-SPE-064 Ballast Supply Version: 1 Issued: October 2015 Owner: Engineering Group Approved By: Gordon Djurdjevic Track Engineering Manager PRINTOUT MAY NOT BE UP-TO-DATE;

More information

Wirth pile top drill rigs. Reliable systems for on- and offshore

Wirth pile top drill rigs. Reliable systems for on- and offshore Wirth pile top drill rigs Reliable systems for on- and offshore 2 About us Solid foundations with Wirth pile top systems About Aker Solutions Aker Solutions provides oilfield products, systems and services

More information

DIVISION III MATERIALS AGGREGATES SECTION 901 COARSE AGGREGATE

DIVISION III MATERIALS AGGREGATES SECTION 901 COARSE AGGREGATE DIVISION III MATERIALS AGGREGATES SECTION 901 COARSE AGGREGATE 901-1 General. 901-1.1 Composition: Coarse aggregate shall consist of naturally occurring materials such as gravel, or resulting from the

More information

Evaluation of Pile Setup using Dynamic Restrike Analysis in Alabama Soils

Evaluation of Pile Setup using Dynamic Restrike Analysis in Alabama Soils 45 th STGEC - Mobile, AL Oct. 29, 2014 CE Pile 360 Setup Spring AL 13 Evaluation of Pile Setup using Dynamic Restrike Analysis in Alabama Soils Eric Steward, Ph.D. Assistant Professor University of South

More information

TRANSMISSION DEVELOPMENT PLAN

TRANSMISSION DEVELOPMENT PLAN FINAL REPORT TRANSMISSION DEVELOPMENT PLAN NOVEMBER 2009 DISCLAIMER The Transmission Development Plan (TDP) is prepared and published solely for information purposes. While NGCP, to the best of its knowledge,

More information

Soil Stabilization FIELD REPORT WILL FERGUSON. TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102

Soil Stabilization FIELD REPORT WILL FERGUSON. TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102 2016 Soil Stabilization FIELD REPORT WILL FERGUSON TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102 TABLE OF CONTENTS SOIL STABILIZATION FIELD REPORT Overview Page 2 Test Pads Specs of Construction

More information

Falling Weight Deflectometer

Falling Weight Deflectometer Falling Weight Deflectometer Pave FWD Pave HWD Pave SHWD For all your pavement testing needs Design Overview A Falling Weight Deflectometer (FWD) is used to measure the vertical deflection response of

More information

Dando Drilling International

Dando Drilling International Dando Drilling International Dando Terrier and Tooling The Dando Terrier drilling rig has been designed specifically for sampling and testing for geotechnical and environmental analysis. The rig is crawler

More information

STATE OF OKLAHOMA DEPARTMENT OF TRANSPORTATION GEOTECHNICAL SPECIFICATIONS FOR ROADWAY DESIGN. June 29, 2011

STATE OF OKLAHOMA DEPARTMENT OF TRANSPORTATION GEOTECHNICAL SPECIFICATIONS FOR ROADWAY DESIGN. June 29, 2011 STATE OF OKLAHOMA DEPARTMENT OF TRANSPORTATION GEOTECHNICAL SPECIFICATIONS FOR ROADWAY DESIGN June 29, 2011 APPENDIX 5. STANDARD FORMS FOR REPORTING GEOTECHNICAL INFORMATION In order to insure uniformity

More information

Company Profile MAXIPRO DEVELOPMENT CORPORATION. Maximizing Professionals

Company Profile MAXIPRO DEVELOPMENT CORPORATION. Maximizing Professionals Company Profile of MAXIPRO DEVELOPMENT CORPORATION Maximizing Professionals # 86, Apo St., Brgy. Lourdes, Sta. Mesa Heights, Quezon City, Philippines, 1118 Tel. Nos.: (632) 781-3725 / 708-2529 / 410-6967

More information

0 Issued for Information SHS 10/06/16 JAL 10/10/16 JCP 10/10/16

0 Issued for Information SHS 10/06/16 JAL 10/10/16 JCP 10/10/16 Project/Plant: Unit(s): Plant Gorgas Gypsum Pond Units 6-7 Title/Subject: Slope Stability Analysis of Plant Gorgas Gypsum Pond Dam Purpose/Objective: Analyze slope stability of the Plant Gorgas Gypsum

More information

P.12 P.23 P.24 P.26 DRILLING RIGS AND ACCESSORIES

P.12 P.23 P.24 P.26 DRILLING RIGS AND ACCESSORIES DRILLING RIGS AND ACCESSORIES P.12 HEAVY DYNAMIC PENETROMETER AND DRILLING RIGS APAFOR APAFOR 50 APAFOR 100 APAFOR 200 APAFOR 220 APAFOR 330 AND 340 APAFOR 430 APAFOR 450 RS APAFOR 450 APAFOR 550 AND 560

More information

Class 1 Crushed rock ballast for use primarily on main line track. Class 2 Crushed rock ballast for use only on other than main line track.

Class 1 Crushed rock ballast for use primarily on main line track. Class 2 Crushed rock ballast for use only on other than main line track. PAGE 1 OF 8 PART 1 - GENERAL REQUIREMENTS 1.1 DESCRIPTION OF SPECIFICATION This document outlines the material, stockpiling, and handling specifications of ballast. It covers the supply of ballast from

More information

I. The MWSS Regulatory Office. Role Function Structure. Legal Framework Reasons for Privatization Objectives of Privatization

I. The MWSS Regulatory Office. Role Function Structure. Legal Framework Reasons for Privatization Objectives of Privatization Regulatory Office JORGE C. MATEO Dept. Manager, Water Quality Control TECHNICAL REGULATION October 23, 2007 Sulo Hotel, Quezon City OUTLINE I. The MWSS Regulatory Office Creation Role Function Structure

More information

Terminology, Shaft Comparison & General Discussion

Terminology, Shaft Comparison & General Discussion Helical Foundation Systems: Topics We Will Cover Considerations for the Design and Installation of Helical Pile Foundations Presented by: Kyle Olson, PE Senior Structural Engineer Foundation Supportworks,

More information

XY-42A CORE DRILLING RIG

XY-42A CORE DRILLING RIG XY-42A CORE DRILLING RIG Ⅰ. Applications XY-42A is a kind of core drill driven with Tungaloy-carbide-tipped bit and diamond-bit, small-diameter. It is mainly suitable for exploration of metal or non-metal

More information

Parameters Affecting Selection of Dredge Equipment

Parameters Affecting Selection of Dredge Equipment Parameters Affecting Selection of Dredge Equipment EADA - 2017 RAKESH ROY COO, Naval Architect VEDAM DESIGN & TECHNICAL CONSULTANCY PVT. LTD. 504-506, Acropolis, Military Road, Marol, Andheri (E), Mumbai-59,

More information

Mr. Gabriel Ojeda Fritz-Pak Corporation Phone: (214) Eastover Circle Fax: (214)

Mr. Gabriel Ojeda Fritz-Pak Corporation Phone: (214) Eastover Circle Fax: (214) December 15, 2011 Mr. Gabriel Ojeda Fritz-Pak Corporation Phone: (214) 221-9494 4821 Eastover Circle Fax: (214) 341-3182 Mesquite, TX 75149 Email: gabrielojeda@fritzpak.com Subject: Final Report (Revised)

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK ccredited to Laboratory locations: Schedule of ccreditation United Kingdom ccreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Unit 1 Rough Hey Road Grimsargh Preston PR2

More information

Concrete Airport Pavement Workshop Right Choice, Right Now ACPA SE Chapter Hilton Atlanta Airport November 8, 2012

Concrete Airport Pavement Workshop Right Choice, Right Now ACPA SE Chapter Hilton Atlanta Airport November 8, 2012 Concrete Airport Pavement Workshop Right Choice, Right Now ACPA SE Chapter Hilton Atlanta Airport November 8, 2012 W. Charles Greer, Jr., P.E. AMEC Subash Reddy Kuchikulla MME James Drinkard, P.E. ATL

More information

BUS RAPID TRANSIT INTRODUCTION IN METRO MANILA USING IGES CO

BUS RAPID TRANSIT INTRODUCTION IN METRO MANILA USING IGES CO ESTIMATION OF CO BENEFIT FROM BUS RAPID TRANSIT INTRODUCTION IN METRO MANILA USING IGES CO BENEFIT GUIDELINE by Dr. Alexis Fillone, De La Salle University Manila Prof. Dr. Atsushi Fukuda, Nihon University,

More information

When you need to find a way

When you need to find a way When you need to find a way 2003-2018 OVER A DECADE OF EXCELLENCE WWW.JWAOIL.COM Overview JWA Oilfield Supplies Pty Ltd is a member of the JWA Groups of Companies and is wholly Australia owned and operated.

More information

COLOR MILEAGE (KMS) REGISTERED IN SELLING PRICE FLOOR PRICE

COLOR MILEAGE (KMS) REGISTERED IN SELLING PRICE FLOOR PRICE AS OF MAY 24, 2018 # Model MAKE/MODEL PLATE NO COLOR MILEAGE (KMS) REGISTERED IN SELLING PRICE FLOOR PRICE 1 2017 CHEVROLET TRAILBLAZER 2.8L - A/T WD-6181 SUMMIT WHITE 18,730 PASIG 1,190,000.00 1,080,000.00

More information

Bahay Financial Services (BFS) All Foreclosed Properties for sale as of January 1, 2019 Reminder: Don t forget to tell BFS that you learned about them from Philippines.com to get the best deals! TOTAL

More information

Showa Advance Corporation is a joint venture company between Showa Corporation of Japan and Power Crown Industrial Corporation.

Showa Advance Corporation is a joint venture company between Showa Corporation of Japan and Power Crown Industrial Corporation. COMPANY PROFILE Business Overview Showa Advance Corporation is a joint venture company between Showa Corporation of Japan and Power Crown Industrial Corporation. Showa Advance Corporation is a 60% Japanese

More information

Opportunities and Challenges for the. Friday September 24,

Opportunities and Challenges for the. Friday September 24, LRFD Facts and Misconceptions: Opportunities and Challenges for the Micropile il Community Friday September 24, 2010 By Jerry A. DiMaggio, PE, M.ASCE Email: jdimaggio2@verizon.net Email: jdimaggio@nas.edu

More information

When it comes to the length of time people spend daily

When it comes to the length of time people spend daily 102 INFRASTRUCTURE Manila is 3rd city with worst traffic in Asia Manila now ranks 3rd city with the worst traffic in Asia where people spend the 3rd longest average time being stuck in traffic each day

More information

Managing Director & Country Manager Namibia. SVP, Exploration

Managing Director & Country Manager Namibia. SVP, Exploration 96 97 Managing Director & Country Manager Namibia SVP, Exploration 98 Deep-water port access (Walvis Bay) MINING IN NAMIBIA 99 Population of 2.3 million (2011 World Bank estimate) Strong history of mining

More information

L i s t o f O n - G o i n g a n d C o m p l e t e d P r o j e c t s

L i s t o f O n - G o i n g a n d C o m p l e t e d P r o j e c t s Y e a r 2017 - Present P r o j e c t s L i s t o f O n - G o i n g a n d C o m p l e t e d P r o j e c t s Supply of labor, materials, equipment and engineering design for the improvement/ rerouting of

More information

Bahay Financial Services (BFS) All Foreclosed Properties for sale as of October 1, 2018 Reminder: Don t forget to tell BFS that you learned about them from Philippines.com to get the best deals! * Prices

More information

Philippines Ex-post Monitoring for the ODA Loan Project South Luzon Expressway Construction Project

Philippines Ex-post Monitoring for the ODA Loan Project South Luzon Expressway Construction Project Philippines Ex-post Monitoring for the ODA Loan Project South Luzon Expressway Construction Project 1. Outline of the Project Evaluator: Atsushi Hashimoto (Maenam Advisory) Field Survey: May 2008 Manila

More information

Overseas Market Conditions of Construction and Mining Equipment

Overseas Market Conditions of Construction and Mining Equipment 1 Overseas Market Conditions of Construction and Mining Equipment December 17, 2012 Hisashi Shinozuka Senior Executive Officer President of Construction and Mining Marketing Division Komatsu Ltd. 2 1.

More information

The Use of Falling-Weight Deflectometers in Determining Critical Velocity Problems. Craig Govan, URS, Trackbed Technology

The Use of Falling-Weight Deflectometers in Determining Critical Velocity Problems. Craig Govan, URS, Trackbed Technology The Use of Falling-Weight Deflectometers in Determining Critical Velocity Problems Craig Govan, URS, Trackbed Technology Railway Track Science & Engineering Workshop, UIC, Paris December 5th, 2013 Content

More information

III: TRANSMISSION SYSTEM PROFILE... 6 IV: PLANNING CRITERIA V: NEED FOR O&M CAPITAL EXPENDITURES... 16

III: TRANSMISSION SYSTEM PROFILE... 6 IV: PLANNING CRITERIA V: NEED FOR O&M CAPITAL EXPENDITURES... 16 TABLE OF CONTENTS I: INTRODUCTION... 1 II: EXISTING TRANSMISSION SYSTEM... 3 1.0 North Luzon Region... 3 2.0 South Luzon Region... 3 3.0 Visayas Region... 4 4.0 Mindanao Region... 5 III: TRANSMISSION SYSTEM

More information

INTRODUCTION HISTORY. Enfocus Software - Customer Support

INTRODUCTION HISTORY. Enfocus Software - Customer Support INTRODUCTION Address : No. 7-2, San-Hu Li, Yangmei City 32669, Taoyuan, Taiwan Date of Incorporation : January 11, 1966 Capital : NT$362 Million (US$ 11 Million) President : Ming-Yih Cheng Products: Mining

More information

Pump Division AFV. Vertical Axial Flow Pumps. Bulletin PS-40-3 (E)

Pump Division AFV. Vertical Axial Flow Pumps. Bulletin PS-40-3 (E) AFV Vertical Axial Flow Pumps Bulletin PS-0-3 (E) Pump Supplier To The World Flowserve is the driving force in the global industrial pump marketplace. No other pump company in the world has the depth or

More information

GOPALAN COLLEGE OF ENGINEERING AND MANAGEMENT Department of Civil Engineering COURSE PLAN

GOPALAN COLLEGE OF ENGINEERING AND MANAGEMENT Department of Civil Engineering COURSE PLAN Appendix - C GOPALAN COLLEGE OF ENGINEERING AND MANAGEMENT Department of Civil Engineering Academic Year: 2016-17 Semester: EVEN COURSE PLAN Semester: VI Subject Code& Name: 10CV64 & Geotechnical Engineering-II

More information

CHAPTER 4 TRAFFIC STUDY

CHAPTER 4 TRAFFIC STUDY CHAPTER 4 TRAFFIC STUDY 4.1 PRESENT TRAFFIC CONDITION 4.1.1 Type of Surveys Carried Out CHAPTER 4 TRAFFIC STUDY A number of surveys were carried out to better understand the characteristics of the study

More information

Admaterials Technologies Pte Ltd Certificate No. : LA B 58 Sungei Kadut Loop Singapore Issue No. : 14

Admaterials Technologies Pte Ltd Certificate No. : LA B 58 Sungei Kadut Loop Singapore Issue No. : 14 Admaterials Technologies Pte Ltd Certificate No. : LA-2008-0422-B 58 Sungei Kadut Loop Singapore 729501 Issue No. : 14 Date : 20 September 2018 Page : 1 of 34 FIELD OF TESTING : Civil Engineering Testing

More information

Use of New High Performance Thin Overlays (HPTO)

Use of New High Performance Thin Overlays (HPTO) Northeast Asphalt User/Producer Group Wilmington/Christiana Delaware October 11-12, 2006 Use of New High Performance Thin Overlays (HPTO) Thomas Bennert Rutgers University NJ s s Thin-Lift Materials New

More information

Innovative pile plugging Musandam Rock Loading Facility

Innovative pile plugging Musandam Rock Loading Facility DGF meeting 2010-02-11: Pile foundation Innovative pile plugging Musandam Rock Loading Facility Jørgen S. Steenfelt COWI A/S, Denmark 1 Innovative pile plugging Outline - introduction Project location

More information

Arabian Gulf Threats. 17 M barrels/ day, 35% of the world oil trade. Largest offshore oil development area in the world

Arabian Gulf Threats. 17 M barrels/ day, 35% of the world oil trade. Largest offshore oil development area in the world 1 Arabian Gulf Threats 1. Ballast water discharged, 2. Dredging and infilling for coastal development, 3. Intentional or accidental oil spills, 4. Tank cleaning leakage from drilling rigs and production

More information

The EGS Group & EGS Taiwan

The EGS Group & EGS Taiwan The EGS Group & EGS Taiwan Speaker Introduction: Lau Siu Pong Director EGS Group COO EGS (Asia) Limited Director EGS (Taiwan) Limited Established in 1974 Main Business Areas: Submarine Cables Offshore

More information

A&A CONSULTANTS, INC Pine Hollow Road McKees Rocks, PA 15136

A&A CONSULTANTS, INC Pine Hollow Road McKees Rocks, PA 15136 A&A CONSULTANTS, INC. 1800 Pine Hollow Road McKees Rocks, PA 15136 Telephone: (412) 323-2200 Fax: (412) 323-2202 Civil, Geotechnical & Structural Engineers Ms. Lisa L. Cessna, Executive Director Washington

More information

PROFESSIONAL BACKGROUND: ENGR. GODOFREDO N. GUYA. General Manager, DASURECO

PROFESSIONAL BACKGROUND: ENGR. GODOFREDO N. GUYA. General Manager, DASURECO PROFESSIONAL BACKGROUND: Practicing Electrical Engineer since 1996 GENERAL MANAGER, Davao del Sur Electric Cooperative, Inc. (DASURECO) Since July 1, 2011 up to present MEMBER, Task Force Duterte Zamboanga

More information

ASTM International: Proficiency Test Programs and Technical and Professional Training Courses

ASTM International: Proficiency Test Programs and Technical and Professional Training Courses ASTM International: Proficiency Test Programs and Technical and Professional Training Courses ASTM Proficiency Testing Programs Designed to provide participating laboratories with a statistical quality

More information

Liquid Filtration Experience and Capabilities

Liquid Filtration Experience and Capabilities Liquid Filtration Experience and Capabilities Donaldson understands the need for new and unique liquid filtration technologies and solutions. We have a global infrastructure and technical expertise to

More information

Shawal CGC Calibration Profile

Shawal CGC Calibration Profile Shawal CGC Calibration Profile Phone Number: +93 700021925, +93 748468800, +93 779015120 TABLE OF CONTENTS 1.0. INTRODUCTION 2.0 COMPANY STRUCTURE 3.0 CALIBRATION & EQUIPMENT & REPAIR SERVICES 4.0 COMPETITIVE

More information

Dragflow srl Via Pasubio, Vil afranca (VR) Italy tel fax products catalogue

Dragflow srl Via Pasubio, Vil afranca (VR) Italy tel fax products catalogue Dragflow srl Via Pasubio, 40 37069 Villafranca (VR) Italy tel. +39.045.6304521 fax +39.045.6335758 info@dragflow.it www.dragflow.it products catalogue History Dragflow S.r.l. was born at the end of the

More information

Boat Mold Lift. A custom Pflow Industries Series F material lift,

Boat Mold Lift. A custom Pflow Industries Series F material lift, Boat Mold Lift Custom Pflow lift helps Sea Ray Boats create 9,600 sq ft of storage within existing building at Palm Coast Florida facility Features and Benefits Important component of retrofit design that

More information

HA Thickness Gauge IS:2386 (part 1)- 1963

HA Thickness Gauge IS:2386 (part 1)- 1963 AGGREGATE TESTING HA50.05 Mechanical Rotating Sample Divider (Motorised) IS : 1607-1960 For obtaining representative sample for sieve analysis. It is suitable for dry sands, fine powders, ores, refractory

More information

An innovative solution for water and sewer installation AXIS. Guided Boring System

An innovative solution for water and sewer installation AXIS. Guided Boring System An innovative solution for water and sewer installation AXIS TM Guided Boring System A need for new installation options A growing number of water and sewer projects are required to be placed precisely

More information

LVL User s Guide. Technical Data for LVL Headers, Beams, Column Applications for Residential Floor and Roof Systems

LVL User s Guide. Technical Data for LVL Headers, Beams, Column Applications for Residential Floor and Roof Systems LVL User s Guide Technical Data for LVL Headers, Beams, Column Applications for Residential Floor and Roof Systems U N I T E D S T A T E S V E R S I O N Quality Products Committed Service O U R H I S TO

More information

Pump Division MSP. Vertical, In-line, Medium Speed Pump. Bulletin PS-10-1c (E/A4)

Pump Division MSP. Vertical, In-line, Medium Speed Pump. Bulletin PS-10-1c (E/A4) MSP Vertical, In-line, Medium Speed Pump Bulletin PS-10-1c (E/A4) Pump Supplier To The World Flowserve is the driving force in the global industrial pump marketplace. No other pump company in the world

More information

Mattest (Ireland) Ltd

Mattest (Ireland) Ltd Unit 18 University Hall, Sarsfield Road, Wilton, Cork Registration number: 289T is accredited by the Irish National Board (INAB) to undertake testing as detailed in the Schedule bearing the Registration

More information

INTEGRATED LOGISTICS SOLUTIONS FOR THE INDUSTRIAL PROJECTS INDUSTRY

INTEGRATED LOGISTICS SOLUTIONS FOR THE INDUSTRIAL PROJECTS INDUSTRY INTEGRATED LOGISTICS SOLUTIONS FOR THE INDUSTRIAL PROJECTS INDUSTRY Follow Bolloré Logistics on BOLLORÉ LOGISTICS, A GLOBAL LEADER IN INTERNATIONAL TRANSPORT & LOGISTICS In order to support its customers

More information

The Cargo Train Project proposed by MRail Inc. (MRail),

The Cargo Train Project proposed by MRail Inc. (MRail), INFRASTRUCTURE 71 P10-Bn Cargo Rail Line proposed The cargo project is the first unsolicited proposal submitted for consideration to the newly installed Rodrigo Duterte Administration. Once approved, the

More information

One credit card, a world of rewards. HSBC s Premier Rewards Catalogue 2017

One credit card, a world of rewards. HSBC s Premier Rewards Catalogue 2017 One credit card, a world of rewards. HSBC s Premier Rewards Catalogue 2017 REAL REWARDS ARE WORTH THE WAIT. TREAT YOURSELF TO A MYRIAD OF REWARDS TAILORED ESPECIALLY FOR YOU. HSBC s Credit Card Rewards

More information

Characterization of LTPP Pavements using Falling Weight Deflectometer

Characterization of LTPP Pavements using Falling Weight Deflectometer Characterization of LTPP Pavements using Falling Weight Deflectometer Author Chai, Gary, Kelly, Greg Published 28 Conference Title The 6th International Conference on Road and Airfield Pavement Technology

More information

Japanese ODA Loan. Ex-ante Evaluation

Japanese ODA Loan. Ex-ante Evaluation Japanese ODA Loan Ex-ante Evaluation 1.Name of the Project Country:Republic of the Philippines Project:Capacity Enhancement of Mass Transit Systems in Metro Manila Project Loan Agreement:27 March 2013

More information

VDZ-Service portfolio Concrete and mortar

VDZ-Service portfolio Concrete and mortar Verein Deutscher Zementwerke e.v. Research Institute of the Cement Industry VDZ- portfolio Concrete and mortar Synergies gained from current research and expertise VDZ-service portfolio Concrete and mortar

More information

Ronnie van Eeden. Senior Mining Engineer. Overview

Ronnie van Eeden. Senior Mining Engineer. Overview Senior Mining Engineer Overview is a qualified Mining Engineer with other commercial qualifications. He has 46 years of experience in the coal industry working for mining houses, the smaller coal industry,

More information

Infrastructure: Road and Rail

Infrastructure: Road and Rail Infrastructure: Road and Rail Sector Background and Potential Ground transportation infrastructure is essential for investment and job creation which are necessary to reduce poverty in the Philippines.

More information

DIVISION 400 OFF-STREET PARKING AND LOADING

DIVISION 400 OFF-STREET PARKING AND LOADING Page 238 of 268 DIVISION 400 OFF-STREET PARKING AND LOADING INDEX Section 401 Provision of Off-Street Parking 402 Off-Street Parking for New and Existing Buildings, Structures and Uses 403 Voluntary Establishment

More information

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT MINISTRY OF ENERGY AND MINERAL DEVELOPMENT COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT Dr. Stephen Robert Isabalija PERMANENT SECRETARY 13 th -15

More information

ABOITIZ POWER CORPORATION

ABOITIZ POWER CORPORATION ABOITIZ POWER CORPORATION First Quarter 2013 Financial & Operating Results 3 May 2013 NET INCOME (in million pesos) 5,600 EPS = P0.76 18% 4,595 EPS = P0.62 5,083 3,971-22% 733 749 2% Distribution Generation

More information

Manila Metro Rail Systems LRT - MRT Status.

Manila Metro Rail Systems LRT - MRT Status. Manila Metro Rail Systems LRT - MRT Status. Inc Operations, Proposals, Project Updates and Monorails Compiled by - Brad Peadon Philippine Railway Historical Society May 2017 - V3 Hello, welcome to the

More information

Decanter Centrifuges Products Overview Revision H

Decanter Centrifuges Products Overview Revision H Decanter Centrifuges Products Overview 2017 Revision H Full-Service OEM Engineering, Design, Manufacturing, Commissioning and Servicing. Solids Control Waste Management System Integration and Modular Construction

More information

Update on the Philippine Wholesale Electricity Spot Market

Update on the Philippine Wholesale Electricity Spot Market Update on the Philippine Wholesale Electricity Spot Market A Presentation to the APEx Asia Pacific Conference New Delhi, India 1 Presentation WESM Overview 2010 Market Results Market Outlook 2 WESM Overview

More information

Industry/PennDOT Initiative On Performance Testing. AN UPDATE January 22, 2019

Industry/PennDOT Initiative On Performance Testing. AN UPDATE January 22, 2019 Industry/PennDOT Initiative On Performance Testing AN UPDATE January 22, 2019 Outline Testing Modes A Review of Semi-Circular Bend (SCB) Test PA Industry Initiative on SCB Results & Observations Next Steps

More information

Sustained occupancy, amid wait-and-see attitude from occupiers

Sustained occupancy, amid wait-and-see attitude from occupiers Colliers Quarterly MANILA INDUSTRIAL Q2 2018 13 August 2018 Sustained occupancy, amid wait-and-see attitude from occupiers Joey Roi Bondoc Research Manager Foreign investment pledges into the Philippines

More information