Procedure for Accessing and Working in the Valve Halls and on associated Apparatus at Hunterston HVDC Converter Station

Size: px
Start display at page:

Download "Procedure for Accessing and Working in the Valve Halls and on associated Apparatus at Hunterston HVDC Converter Station"

Transcription

1 1. SCOPE This document identifies the procedures to be adopted to provide Safety from the System when accessing or working within the Valve Halls and on the converter transformers and the 400kV AC transformer connections at Hunterston. It also defines the working at height procedure for accessing the ceiling-mounted Valves. 2. ISSUE RECORD This is a Reference document. The current version is held on the EN Document Library. It is your responsibility to ensure you work to the current version. Issue Date Issue No. Author Amendment Details May W. Falconer D. Naylor N. Parry Initial Issue 3. ISSUE AUTHORITY Author Owner Issue Authority Name: William Falconer Title: Senior Project Engineer Transmission Operational Support Name: Gary Evans Title: Operational Compliance Manager Name: Wilma Kelly Title: Health & Safety Director 4. REVIEW Date:...1/6/17... This is a Reference document which has a 5 year retention period after which a reminder will be issued to review and extend retention or archive. The proposed revision date can be viewed in the Management Safety Procedures Document Index, DOC DISTRIBUTION This document is not part of a manual maintained by Document Control and does not have a maintained distribution list. SP Power Systems Limited Page 1 of 29 MSP 2.17

2 5. CONTENTS 1. SCOPE ISSUE RECORD ISSUE AUTHORITY REVIEW... 1 DISTRIBUTION CONTENTS REFERENCE AND RELATED DOCUMENTS Manufacturer s Manuals ScottishPower Documents DEFINITIONS INTRODUCTION AUTHORISATION HANDLING STORAGE AND TRANSPORTATION OF CAPACITOR UNITS FOR THYRISTOR MODULES ACCESS TO A VALVE HALL WORKING ON CONVERTER TRANSFORMERS GENERAL REQUIREMENTS FOR ALL WORK WITHIN A VALVE HALL PROCEDURE FOR WORK ON VALVE TOWERS WITHIN VALVE HALL PROCEDURE FOR WORKING AT HEIGHT ON VALVE TOWERS THAT REQUIRES A PERSON(S) TO LEAVE MOBILE ELEVATED WORKING PLATFORM RESCUE PROCEDURE TO BE UNDERTAKEN IN THE EVENT OF AN EMERGENCY WHEN WORKING AT HEIGHT ON THE THYRISTOR MODULE PLATFORM PRECAUTIONS FOR WORKING ON VALVE REACTORS ON THYRISTOR MODULE ADDITIONAL PRECAUTIONS FOR WORKING ON RESISTORS ON A THRYISTOR MODULE ADDITIONAL PRECAUTIONS FOR WORKING ON VALVE COOLING EQUIPMENT WITHIN THE VALVE HALL ADDITIONAL PRECAUTIONS WHEN WORKING ON THYRISTOR FIRING ELECTRONICS ADDITIONAL PRECAUTIONS FOR WORKING ON HV BUSHINGS WITHIN THE VALVE HALL PERFORMING CAPACITOR MEASUREMENTS PROCEDURE TO BE APPLIED WHEN A CAPACITOR UNIT HAS DISRUPTIVELY FAILED SP Power Systems Limited Page 2 of 29 MSP 2.17

3 6. REFERENCE AND RELATED DOCUMENTS 6.1 Manufacturer s Manuals Siemens Thyristor Valves and Associated Equipment Installation and Pre-Commissioning Manual P _E_F1_0111_HF-0 Siemens Thyristor Valves and Associated Equipment Maintenance Manual P _E_B4_0111_HF_B Siemens Valve Cooling System Equipment Manual P _E_B4_0121_HF_E Siemens Portable Earthing Manual P _E_B4_0571_H_001_B Siemens Thyristor Valve Towers Emergency Rescue from Height P _E_B4_0111_HF_ER 6.2 ScottishPower Documents OPSAF (PSSI 6) Demarcation of Work Areas in Substations OPSAF (PSSI 9) Testing High Voltage Apparatus OPSAF (PSSI 10) Plant and Apparatus Containing Sulphur Hexafluoride (SF 6 ) OPSAF (PSSI 11) High Voltage Static Capacitors OPSAF (PSSI 27) Work or Testing on or near to High Voltage Direct Current Plant and Apparatus UKHS-GSP-SMS Electromagnetic Fields Procedure Health Safety and Environmental Handbook 7. DEFINITIONS Terms printed in bold type are as defined in the ScottishPower Safety Rules (Electrical and Mechanical). Terms printed in italic type are as defined in OPSAF (PSSI 27) or in OPSAF Management Safety Procedures Definitions or are listed below: Pole The Hunterston end of the Western Link contains two identical circuits which convert AC to DC or from DC to AC dependent upon the running direction of the DC link. Each of these circuits is termed as a Pole and contains the following Apparatus. 400kV AC GIS switchgear Power Line Carrier Filter (PLCF) AC equipment Converter transformer Valve Hall (includes all AC/DC converting Apparatus.) DC Hall (including DC switchgear, reactors, capacitors, DC Current Measuring Devices and DC Voltage Dividers) DC cable SP Power Systems Limited Page 3 of 29 MSP 2.17

4 Figure 1. Valve Hall showing converter transformer bushings Valve Tower (Fig 2) An arrangement of twelve Thyristor Modules which are hung from the Valve Hall ceiling in two banks of six per phase which, when connected provide four complete valves in the 12-pulse Thyristor bridge. There are six Valve Towers in each Valve Hall. Figure 2. Valve Tower and arrangement within Valve Hall SP Power Systems Limited Page 4 of 29 MSP 2.17

5 Thyristor Module (Fig 3 and Fig 4) Each Thyristor Module contains 28 Thyristors connected in series and also contains the RC Snubbers, Grading Capacitors and Valve Reactors along with Valve triggering electronics and cooling pipework. RC Snubbers Grading Capacitors Thyristors Valve Reactors Figure 3. Thyristor Module Component Identification Figure 4.Thyristor Module SP Power Systems Limited Page 5 of 29 MSP 2.17

6 Thyristor (Fig 5) High power electrical device that converts AC to DC. There are 28 series-connected high-power Thyristors in each Thyristor Module. RC Snubber (Fig 6) Figure 5. Thyristor An RC Snubber, consists of a series circuit of a water cooled resistor and a capacitor is connected in parallel with each Thyristor. In interaction with the Valve Reactors, this arrangement limits the electrical stresses on the Thyristors to below the specified design levels. Figure 6. RC Snubber SP Power Systems Limited Page 6 of 29 MSP 2.17

7 Grading Capacitor (Fig 7) The Grading Capacitors linearize the voltage distribution among the four Valves (in a quadruple-valve tower) and within the Valves in the event of steep surge voltages. Each Thyristor Module includes two Valve sections connected in series (14 Thyristors each). In each Valve section the Grading Capacitor is shunting the series connection of Thyristor stack and Valve Reactors. A complete Valve is made up from three Thyristor Modules. Valve Reactor (Fig 8) Figure 7. Grading Capacitor Each Thyristor module contains four series-connected Valve Reactors. These are non-linear reactors with a pronounced saturation characteristic of the iron core. The reactors limit the inrush current of the Thyristors (discharge of stray capacitance) and limit the voltage level and rate of voltage rise at the Thyristors in the event of surge voltage phenomena. Valve Cooling System (Fig 9) Figure 8. Valve Reactor The Valve Cooling System is a two stage cooling system to ensure that the Thyristors do not overheat when in operation. The system contains a deionised water open header section which runs within the Valve Hall to the cooling plant where it is heat exchanged with a Glycol sealed system that runs from the cooling plant to cooling radiators located outside of the Valve Hall. SP Power Systems Limited Page 7 of 29 MSP 2.17

8 A: Outdoor Cooler B: Cooler Supply and return lines C: Control Cabinet Unit D: Cooling Unit E: Valve Hall Piping F: Primary Circuit Expansion Tank Discharge Stick (Fig 10) Figure 9 Valve Cooling System Layout An Approved device for the purpose of discharging a RC Snubber Capacitor or Grading Capacitor which may be charged. Note various Approved types exist which each fulfil the same purpose i.e. two insulated sticks with an electrical contact connected to a common earth clamp. Figure 10. Discharge Stick SP Power Systems Limited Page 8 of 29 MSP 2.17

9 Thyristor Module Rack Earth (Fig 11) Portable Earthing Device provided for the purpose of earthing the Thyristor Modules prior to accessing them for work or testing. Short-Circuiting Lead (Figs 12 and 13) Figure 11. Thyristor Module Rack Earths An Approved lead used for short-circuiting an individual Capacitor Unit. This can be a clip-on short used during the disconnection of a Capacitor Unit or a bolt-on short used during removal transportation and storage. Figure 12. Short-Circuiting Lead (example) Figure 13. Bolted Short-Circuiting Lead (example) SP Power Systems Limited Page 9 of 29 MSP 2.17

10 Thyristor Module Earth Spigot (Fig 14) Earthing point positioned on the Thyristor Module for the purpose of connecting Thyristor Module Rack Earths. The positions of these spigots are arranged such that they can be applied safely from below the Thyristor Module. Thyristor Module Earth Spigots Figure 14. Thyristor Module Earth Spigots. 8. INTRODUCTION There are two identical Valve Halls at Hunterston, one for each Pole. Each Valve Hall may be Isolated and Earthed separately from the other i.e. both need not be out of service simultaneously. The Valve Halls are the areas within the Converter Station that contain the Apparatus which undertakes the conversion process of AC to DC and from DC to AC, depending upon running configuration. This Apparatus includes the through bushings from the converter transformers, Thyristor Valve assemblies, earth switches, cooling equipment and HVDC (600kV and neutral) busbars which lead to the DC Hall. Each Valve Hall contains six Valve Towers suspended from the ceiling. There are two outdoor converter transformers- again one for each Pole, which transform from 251kV to 400kV. The 251kV bushings protrude through the wall of the Valve Hall where conductors connect to the Valves. The 400kV bushings are connected to the 400kV GIS switchgear by overhead connections to the PLCF building and then cable onto the switchgear. 9. AUTHORISATION The Valve Halls contain both High Voltage AC and DC Apparatus. Access to and work on Apparatus within the Valve Halls requires Persons to hold appropriate 275/400kV AC and HVDC authorisations. Despite the Valve AC voltage being 251kV the HV AC Apparatus between the Valves and the converter transformers shall be considered 275/400kV Apparatus for the purpose of authorisations since the transformers ultimately connect to the 400kV System. SP Power Systems Limited Page 10 of 29 MSP 2.17

11 In addition, although the converter transformers are entirely HV AC Apparatus, isolation at HVDC is required and the transformer 251kV bushings protrude into the Valve Hall. Therefore appropriate HVDC authorisations are required to access or work on them. See also section 21. Persons who do not hold appropriate authorisation may receive standby Supervision from an appropriately Authorised Person, in accordance with OPSAF (MSP 5.5) and OPSAF (MSP 5.1). Similarly work on the 400kV AC connections between the converter transformers and the PLCF Apparatus requires both 275/400kV AC and HVDC authorisations. 10. HANDLING STORAGE AND TRANSPORTATION OF CAPACITOR UNITS FOR THYRISTOR MODULES 10.1 Capacitors that are to be disconnected from the Thyristor Modules shall be discharged using a Discharge Stick before being short-circuited using a Short-Circuiting Lead and shall remain shortcircuited during transportation and storage Where there is a potential for RC Snubber Capacitors or Grading Capacitors to become charged they shall not be handled unless they are discharged using a Discharge Stick before being shortcircuited using a Short-Circuiting Lead If a clip-on Short-Circuiting Lead has been applied, then before a capacitor is removed from a Thyristor Modules the clip-on lead shall where practicable be replaced by a bolt-on short lead. 11. ACCESS TO A VALVE HALL The Valve Apparatus emits electromagnetic fields which pose Danger when in service. Therefore the Valve Hall is designed to prevent electromagnetic emissions from penetrating beyond its boundary and no access is permitted within the Valve Hall when the Pole is in operation or in a position to be made Live. In addition the HVDC 600kV conductors are at the lowest level of the Valve Towers and controlling access and entry routes ensures that Safety Distance is maintained. The Valve Hall entry doors and emergency exit doors are interlocked in such a way that all Earthing Devices associated with the circuit must be applied in addition to specific software interlocks that will ensure that the Pole is blocked from restarting. Section 13 describes the procedure to be followed to gain access to the Valve Hall where work has to be carried out. 12. WORKING ON CONVERTER TRANSFORMERS The converter transformers have outdoor 400kV bushings and through-wall 251kV bushings into the Valve Hall. Access to the bushings that are within the Valve Hall is governed by the same conditions laid out in section 11. The converter transformer shall be Isolated and Earthed and a Safety Document shall be issued prior to carrying out work that requires encroachment of Safety Distance. Isolation is required at 400kV AC and on the DC side of the appropriate Valve Hall, therefore a minimum of a single Pole outage is required. 13. GENERAL REQUIREMENTS FOR ALL WORK WITHIN A VALVE HALL 13.1 Before taking steps to establish Safety from the System the HVDC link shall be re-configured in accordance with DC Link Operating Procedures to ensure safe shutdown conditions are observed. SP Power Systems Limited Page 11 of 29 MSP 2.17

12 13.2 The Valve Hall to be worked in shall be Isolated and Primary Earths applied using Earthing Devices located outside the Valve Hall (e.g. GIS Switchroom and DC Hall). The earth switches within the Valve Hall are not appropriate for use as Primary Earths because it is not practicable for them to be Locked before the Safety Document is issued giving access to the Valve Hall The earth switches within the Valve Hall shall be closed remotely and where practicable a visual inspection of the earth switches shall be carried out. The earth switches are identified in figures 15 to 18 below and shown in their closed positions The Control Person shall ensure that the time delay between closing of the earth switches within the Valve Hall and the first Portable Primary Earth being applied is a minimum of 20 minutes. This is to allow sufficient time for the Grading Capacitors and RC Snubber capacitors to discharge. Figure 15. AC side star bushing earth switch (1T1A/2T1A) Figure 16. AC side delta bushing earth switch (1T1B/2T1B) SP Power Systems Limited Page 12 of 29 MSP 2.17

13 Figure 17. DC side HV bushing earth switch (D101A2/D201A2) Figure 18. DC side neutral bushing earth switch (D101B3/D201B3) 13.5 The combination of DC Link operating condition, and Apparatus isolation and earthing will permit the release of key interlock devices to enable access to the Valve Hall Demarcation shall be established at the entry points into the Valve Hall to be accessed in accordance with OPSAF (PSSI 6) Danger Notices shall be affixed to all possible points of entry to the Valve Hall not to be accessed A Permit for Work shall be issued to allow entry into the Valve Hall for the purpose of inspecting and securing the earth switches and the application of a Drain Earth to the neutral busbar of the star connected converter transformer bushings. The Permit for Work shall define the route to be taken through the Valve Hall while inspecting the earth switches and shall be issued with an Earthing Schedule. At no time shall Safety Distance be infringed during inspection of earth switches or application of Drain Earths The Person carrying out visual inspection shall remain on the DC Hall side of the Valve Hall as indicated in figures 19 and 20. SP Power Systems Limited Page 13 of 29 MSP 2.17

14 Figure 19. Path to take for visual inspection of the Valve Hall and the DC side earth switches for Valve Hall 1 Figure 20. Path to take for visual inspection of the Valve Hall and the DC side earth switches for Valve Hall The earth switches within the Valve Hall shall be confirmed closed and Locked onto hand control in the mechanism boxes adjacent to each of the DC earth switches. SP Power Systems Limited Page 14 of 29 MSP 2.17

15 Figure 21. Picture of typical earth switch mechanism box arrangement (Master and Slave) The AC earth switches shall be placed onto hand control and Locked - access to the master mechanism boxes on the AC side of the Valve Hall shall be by the path indicated in the figures 22 and 23. Figure 22 Path to master mechanism boxes on Valve Hall 1 AC side SP Power Systems Limited Page 15 of 29 MSP 2.17

16 Figure 23. Path to master mechanism boxes on Valve Hall 2 AC side If an earth switch is found not to be closed properly, the switch shall be rendered inoperative, a new Permit For Work issued and a Portable Drain Earth shall be attached adjacent to the faulty earth switch A Portable Drain Earth shall be applied using an earthing rod to the star neutral earthing trapeze, which is indicated in figure 24, to tie the star point to earth. This shall be applied in accordance with the Earthing Schedule issued with the Safety Document. Figure 24. Drain Earth trapeze on star neutral busbar The Permit for Work shall be cancelled. Another Safety Document and, where necessary Drain Earths and an Earthing Schedule shall be issued before further work or testing proceeds. SP Power Systems Limited Page 16 of 29 MSP 2.17

17 13.15 Where maintenance is to be carried out an earth switch within the Valve Hall, Drain Earths shall be applied adjacent to the earth switch. The Drain Earths shall be quoted on an Earthing Schedule. 14. PROCEDURE FOR WORK ON VALVE TOWERS WITHIN VALVE HALL Access to the Valve Towers is gained using a scissor Mobile Elevated Work Platform (MEWP) retained on site at Hunterston. The MEWP shall be earthed using a Field Equipment Earth. Refer to section 15 for the working at height procedures for accessing the Valve Towers. In addition to the completion of section 13 above the following shall be carried out to each specific Valve Tower to be worked on. Valve Towers not to be worked on shall be identified at ground level as being unavailable for work using barriers and Danger Notices in accordance with OPSAF (PSSI 6) section Consideration shall be given to any Danger presented by the Valve cooling system and appropriate precautions shall be taken if necessary refer to section 19. A Permit for Work or Sanction for Test shall be issued for the work or testing to be carried out along with an Earthing Schedule The Earthing Schedule shall state where the Drain Earths and Thyristor Module Rack Earths are to be applied and where the Discharge Stick is to be used. These points of earthing can include: (i) On the Valve Tower to be worked on all Thyristor Module Earth Spigots from ground level to the one above the point of work. See figure 25. Figure 25. Picture of Thyristor Module Rack Earth arrangement from earthing manual (ii) Additional points where a disconnection is planned to ensure both sides of the disconnection point remains connected to earth. SP Power Systems Limited Page 17 of 29 MSP 2.17

18 (iii) Any other point as deemed necessary by the Senior Authorised Person A distance of 0.8 metres shall be observed at all times during the application of Drain Earths and Thyristor Module Rack Earths A Field Equipment Earth shall be applied to the MEWP prior to accessing the Valve Tower. A Thyristor Module Rack Earth shall be applied using an Approved earthing rod to the bottommost Thyristor Module from either ground level or from a MEWP positioned adjacent to the Valve Tower and below the corona shield onto the Thyristor Module Earth Spigot. Where a MEWP is to be used to apply the Thyristor Module Rack Earth, the MEWP shall be at its lowest position that enables a Person standing on the MEWP to maintain the 0.8m distance to the corona shield prior to the application of the lowest-most Thyristor Module Rack Earth. The corona shield at the bottom of the Valve Tower is directly connected to the 600kV HVDC busbar which will have been confirmed as being in the closed position prior to accessing the Valve Tower for earthing purposes Before performing any work on the Valve Towers the recipient of the Safety Document shall ensure that: (i) Thyristor Modules are inspected at ground level for signs of leaks from the cooling pipework on the Valve Tower to be worked on. (ii) Thyristor Module Rack Earth is applied to the spigot of the bottommost thyristor module before raising the MEWP to that height (iii) Grading Capacitors and RC Snubber Capacitors are inspected at a distance greater than 0.8 metres in order to identify any abnormal Capacitor Unit(s) due to their positioning on the valve module. (iv) Drain Earths and Thyristor Module Rack Earths are applied in accordance with the issued Safety Document and Earthing Schedule where applicable. At no time shall a distance of 0.8m be encroached to any High Voltage Apparatus not already connected to earth until earths are applied and capacitors discharged Where testing requires the removal of earths and special requirements to allow subsequent access to Thyristor Modules, these actions shall be carried out by, or under the Personal Supervision of, a Senior Authorised Person under a Sanction for Test The RC Snubber capacitors and the Grading Capacitors on Thyristor Modules where Persons are to work shall be discharged. The process to discharge is as follows: (i) The Discharge Stick earth clamp shall be attached as close as is practicable to the earthing spigots on the underside of the Thyristor Module to be worked on. An example position is shown in figure 26 where the clamp is attached to the clamp of the earth. SP Power Systems Limited Page 18 of 29 MSP 2.17

19 Figure 26. Application of Discharge Stick earth end to middle part of the Thyristor Module frame. (ii) All of the RC Snubber capacitors shall be discharged by placing the one of the probes of the Discharge Stick onto each terminal of the RC Snubber capacitors as shown in figure 27. Care shall be taken to ensure the Discharge Stick does not interfere with any fibre optic cabling. An alternative point of contact for discharge is across the Thyristor by making contact to the aluminium spacers that are either side of each Thyristor. RC Snubber capacitor discharge point Thyristor spacer discharge point Figure 27. Discharge Sticks applied to the RC Snubber capacitors and at Thyristor spacers. (iii) The Grading Capacitors shall then be discharged by placing the one of the Discharge Stick probes onto each side of the Grading Capacitors Apply a Short-Circuiting Lead to all capacitors to be worked on. When any Person is in contact with a capacitor on a Thyristor Module the capacitor shall remain shorted by the Short- Circuiting Lead unless testing requires the Short-Circuiting Lead to be removed. When testing requires the removal of earths and special requirements to allow subsequent access to capacitors, these actions shall be carried out by, or under the Personal Supervision of a Senior Authorised Person under a Sanction for Test If testing has been carried out, capacitors on the Thyristor Module shall be discharged using a Discharge Stick by a Senior Authorised Person or under the Personal Supervision of a Senior Authorised Person and all Short-Circuiting Lead(s) re-applied. SP Power Systems Limited Page 19 of 29 MSP 2.17

20 15. PROCEDURE FOR WORKING AT HEIGHT ON VALVE TOWERS THAT REQUIRES A PERSON(S) TO LEAVE MOBILE ELEVATED WORKING PLATFORM. Access to the Valve Towers is gained by using a scissor MEWP retained on site at Hunterston HVDC Converter Station. In addition to precautions described in section 14 above, when undertaking work at height, the following safe system of work shall be applied when it is required to leave the MEWP and work on the Thyristor Module A minimum of three persons who are competent in the operation of the MEWP and the use of this procedure are required. 1. One person to travel in and operate the MEWP (MEWP operator). This person shall remain within the MEWP during normal work conditions and if required, undertake working at height rescue procedures. 2. A person to travel in the MEWP, who may also leave the MEWP to undertake the work on the Thyristor Module. 3. A person to manage the work area at ground level (ground-based person), which shall include operating and lowering the MEWP in an emergency situation such as vehicle power loss or damage In addition to equipment for discharging and earthing, the following tools, personal protective equipment (PPE) and rescue equipment are required. Where appropriate these shall be registered and within their current test / inspection date. 2 x full body harnesses 3 x permanent attachment slings approx 1 meter in length 3 x fall arrest lanyards 1 x rescue kit including descender facility and a telescopic rescue rod 1 x sliding board 4 x access boards SWL 150kg lock knife Depending on the type of MEWP in use especially if the platform may be rotated to a position where the rescue described in part cannot proceed, a second MEWP and additional person to operate it will be required to effect a rescue The MEWP to be used to access the Thyristor Module shall be suitable for the task, and shall have a gate facility that can allow safe access / egress to and from the Thyristor Module. Note: Climbing over the protective guard rails or using the guard rails as a platform is not permitted and shall not be carried out at any time A risk assessment for the working at height activities shall be completed including any likely requirement for a person to leave the MEWP Persons shall not carry tools, working at height PPE or work equipment whilst climbing the access ladder into the MEWP platform During working at height operations, an exclusion zone shall be established and maintained around the point of work, and no persons shall enter the zone unless communication has been established with and agreement gained from both the MEWP operator and ground-based person The MEWP vehicle shall be positioned below and adjacent to the Thyristor Module. With two persons aboard and the access gate closed, the platform shall then be raised to a height where the SP Power Systems Limited Page 20 of 29 MSP 2.17

21 top guard rail of the MEWP platform is level with the top of the Thyristor Module to be accessed. The sliding board shall be laid across to the Thyristor Module (taking care not to damage any components). See figure 28 below. Note: The sliding board is not rated for load bearing activities and is only designed for sliding and positioning the access boards which are rated for load bearing. Figure 28. Laying of sliding board on Thyristor Module Fit the first access board across the Thyristor Module, in a position where it will be in line with the MEWP platform gate and if required, additional access boards can be slid into position around the area where the work is to be carried out. See figure 29. Figure 29. Positioning of access boards. SP Power Systems Limited Page 21 of 29 MSP 2.17

22 15.9: After the required number of access boards have been positioned, the MEWP shall be raised until the standing platform of the MEWP is level with the access boards on the Thyristor Module. See figure 30 note the access boards are at the same height as and in line with the MEWP platform gate. Figure 30. Alignment of MEWP gate to access boards Before opening the access gate the person who is to leave the MEWP shall attach a permanent attachment sling on to the designated anchor point situated above the Thyristor Module to be worked on (see figure 31 below) and attach their fall arrest lanyard to the sling. Figure 31. Support insulator shackle being utilised as a permanent attachment point. SP Power Systems Limited Page 22 of 29 MSP 2.17

23 15.11 Now permanently attached, the person may open the access gate and safely access the Thyristor Module If work is required across a large area on the Thyristor Module, for example on the busbar connections between two Thyristor Module, then a second attachment sling and fall arrest lanyard may need to be applied at a more convenient point to give a greater range of movement. This shall be applied to the person s harness before the first is removed. At least one point of permanent attachment shall be applied and maintained at all times and after risk assessment this operation shall only be undertaken if it does compromise the safety of the persons involved. Figure 32. Access onto Thyristor Module from MEWP On completion of work all persons shall return to the MEWP platform and after the access gate is closed and locked, detach the sling and fall arrest equipment from the anchorage. The access board(s) and sliding board shall be returned to the MEWP floor. 16. RESCUE PROCEDURE TO BE UNDERTAKEN IN THE EVENT OF AN EMERGENCY WHEN WORKING AT HEIGHT ON THE THYRISTOR MODULE PLATFORM 16.1 A working at height rescue shall only be carried out by a competent member of the Working Party, who holds a valid rescue training certificate. SP Power Systems Limited Page 23 of 29 MSP 2.17

24 16.2 If the person working on the Thyristor Module platform receives an injury or falls from height, the MEWP operator shall communicate with the ground based person to raise the alarm and then carry out one of the following rescue techniques; If the injured person is within arm s reaching distance of the MEWP platform, the MEWP operator shall support or pull the injured person back towards and into the MEWP platform. Note: If this operation means opening the access gate, then the MEWP operator undertaking the rescue shall apply their harness and permanent attachment first using a fall arrest lanyard to the designated anchor point with an attachment sling before undertaking the rescue If the injured person is not within arm s reach of the MEWP platform, then the MEWP operator, while remaining within the MEWP platform, shall use the telescopic rescue rod to attach the rescue kit to the injured person s harness. Once correctly attached, the MEWP operator shall pull the rescue rope or wind the operating wheel to winch the injured person towards the MEWP and back into the platform. Note: If this operation means opening the access gate, then the MEWP operator undertaking a rescue shall apply their harness and permanent attachment first using a fall arrest lanyard) to the designated anchor point with an attachment sling before undertaking the rescue If the person working on the Thyristor Module platform slips or falls and is hanging suspended from the Thyristor Module platform, the MEWP operator will need to exit the MEWP platform to perform a rescue. This requires the MEWP operator to assess the situation and shall not compromise his own safety when carrying out this operation. The MEWP operator shall apply his harness and permanent attachment using a fall arrest lanyard to the designated anchor point with an attachment sling. The MEWP operator shall open the rescue kit and safely position the contents onto the Thyristor Module. The MEWP operator shall open the MEWP access gate and leave the MEWP platform in order to assess the position of the causality. The MEWP operator shall attach the rescue kit wheel to a designated anchor point, using a permanent attachment sling, and attach the rescue kit to the casualty. Ensuring his own safety is not compromised, the MEWP operator shall position himself at a safe distance from the Thyristor Module edge and use the telescopic rod to attach the rescue kit rope to the harness of the casualty. Once the rope is securely attached, the MEWP operator shall wind up the operating wheel to remove the tension from the casualty s fall arrest lanyard. When the tension has been adequately removed, the MEWP operator shall cut free or unbuckle the casualty s fall arrest lanyard, and begin to lower the casualty to ground level. Once the casualty has been lowered to ground, the MEWP operator shall return back into the MEWP platform, close the access gate, remove the permanent attachment from the designated anchor point and return to ground level If the MEWP power or controls fail, then all work at height activities shall stop, the MEWP operator shall communicate with the ground-based person and all persons at height shall return back into the MEWP platform, ensuring their permanent attachment devices are removed from the Thyristor Module. All tools, PPE and equipment shall be securely placed on the floor of the MEWP platform and not hung or stored on or over the outside of the MEWP safety rails. Consideration shall be given to the position that the MEWP and platform are in and if it is feasible for the MEWP to descend from that position. Some MEWPs may be designed to allow the working platform to rotate when at the working position (e.g; by rotating the platform, to allow it to fit between SP Power Systems Limited Page 24 of 29 MSP 2.17

25 Valve Towers). Situations like this may preclude the use of this rescue technique if the path of the descending platform might be blocked. With the access gate closed (and locked) the MEWP operator shall instruct the person on the ground to undertake a rescue from the ground and begin to lower the MEWP back to ground level. 17. PRECAUTIONS FOR WORKING ON VALVE REACTORS ON THYRISTOR MODULE The requirements of section 13 and 14 above shall first be completed. It shall be noted that the Valve Reactors contain water cooled sections. Prior to work beginning on the Valve Reactor, consideration shall be given to the application of safety precautions on the cooling water system as described in section 19 below. 18. ADDITIONAL PRECAUTIONS FOR WORKING ON RESISTORS ON A THRYISTOR MODULE The requirements of section 13 and 14 above shall first be completed. The resistors on the RC snubber circuit are water cooled and prior to working on them precautions shall be taken on the Valve Cooling System to prevent Danger. Section 19 below describes precautions to be taken on the Valve Cooling System prior to working on water cooled Apparatus. 19. ADDITIONAL PRECAUTIONS FOR WORKING ON VALVE COOLING EQUIPMENT WITHIN THE VALVE HALL 19.1 Where work is to be carried out on the Valve Cooling Equipment within the Thyristor Modules, the precautions described in sections 13, and 14 shall be carried out Appropriate actions to prevent Danger shall be carried out in accordance with the Scottish Power Safety Rules. These precautions include but are not limited to closing of inlet valves, opening of vent and drain valves where applicable. 20. ADDITIONAL PRECAUTIONS WHEN WORKING ON THYRISTOR FIRING ELECTRONICS 20.1 When in normal operation and configuration the lasers are of Class 1 type meaning that there is no exposed laser light emanating from the valve based electronics. Where work is not required on the valve based electronics then it is not necessary to isolate as the control system will be in Earthed position which blocks the firing pulses. During normal operation of the link the DC control system only sends firing signals to the Thyristors when the relevant system is in a deblocked position. While the DC system is in Blocked, Standby, Stopped or Earthed status then the control system automatically disables the laser firing of the control system If there are broken and/or disconnected fibres from the valve based electronics system the equipment falls into Class 4, requiring precautions to be taken. If there is a requirement to replace or repair a fibre in the valve based electronics the supply to the fibres shall be Isolated and a Safety Document issued prior to accessing the Thyristor Valves. This isolation is achieved by the Switching off of the Valve based electronics supply switches that are located within the relevant cubicle see figure 33. SP Power Systems Limited Page 25 of 29 MSP 2.17

26 Figure 33. Valve based electronics isolation Appropriate PPE such as Approved laser protection goggles shall be used to ensure safety of persons from potential of re-energisation of the laser electronics. 21. ADDITIONAL PRECAUTIONS FOR WORKING ON HV BUSHINGS WITHIN THE VALVE HALL 21.1 Where work is to be undertaken that requires the disconnection of busbars from the through-wall bushings from the converter transformer or from the DC Hall, in addition to ensuring that the Apparatus is Isolated and Earthed, the pressure within the SF 6 filled bushings shall be reduced to a safe pressure before a Safety Document is issued for removal of conductors The bushings that contain SF 6 within the Valve Hall are: Star-connected bushings on each phase of the converter transformers (6 in total). High Voltage side DC bushing leading to the DC Hall. SP Power Systems Limited Page 26 of 29 MSP 2.17

27 21.3 Locations for the connections to insert and remove SF 6 gas are located in the DC Hall for the DC wall bushings and on the turrets of the converter transformers outside of the Valve Hall for the AC bushings. Figure 34. DC Bushing SF6 gauge and top up point. SP Power Systems Limited Page 27 of 29 MSP 2.17

28 Figure 35. Location of AC Star Bushing SF6 monitoring and top-up points Where the conductors onto the bushings are to be removed, extra Drain Earths shall be applied to maintain earth continuity during the work. 22. PERFORMING CAPACITOR MEASUREMENTS In addition to the completion of sections 13 and 14 above the following shall be carried out: 22.1 Before and after performing capacitance measurements, the Capacitor Unit(s) in a parallel group shall be discharged using a Discharge Stick by a Senior Authorised Person or under the Personal Supervision of a Senior Authorised Person and all Short Circuiting Lead(s) re-applied. 23. PROCEDURE TO BE APPLIED WHEN A CAPACITOR UNIT HAS DISRUPTIVELY FAILED Industry experience of Capacitor Unit(s) suggest that there may not be visible signs of disruption on the Capacitor Unit case or bushings. Abnormal capacitor failures are Capacitor Units showing signs of excessive bulging, major leaks or broken bushings. On this type of failure there could be an open circuit on the bushing connection lead internally within the Capacitor Unit. In this situation a dangerous voltage may be present on the lead or if the lead was to come into contact with the casing it could make the casing Live at some point during removal or transportation. SP Power Systems Limited Page 28 of 29 MSP 2.17

29 Where there is no cause for concern that an open circuit exists the Capacitor Unit shall be removed using the procedure described in section 13 and 14 above. Where there is evidence to suggest that the bushing has been damaged and an open circuit may exist in the Capacitor Unit casing then an Approved procedure shall be written. A person with specialist knowledge of capacitors, their construction, failure modes and removal from service shall be consulted. SP Power Systems Limited Page 29 of 29 MSP 2.17

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and HIGH VOLTAGE METAL CLAD SWITCHGEAR WITH SPOUTS Copyright National Grid plc 2014, all rights reserved. No part of this publication

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and EARTHING HIGH VOLTAGE EQUIPMENT Copyright National Grid plc 2016, all rights reserved. No part of this publication may be reproduced,

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

This is a Reference document. The current version is held on the EN Document Library.

This is a Reference document. The current version is held on the EN Document Library. 1. SCOPE This section of the Live Working Manual details the procedures to be followed when working on alkaline or acid substation batteries of any type or voltage. It also covers work on or near to battery

More information

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2 3 ELECTRIC TRACTION SYSTEMS 2 3.1. SAFE FOR PEOPLE 2 3.1.1. Electric Traction System 2 3.1.2. Protection against unwanted access 2 3.1.3. Fencing 2 3.1.4. On bridges and other structures 2 3.1.5. At level

More information

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 03-0054 CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS EPN, LPN, SPN This standard details the procedures to be undertaken

More information

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS Title: Cranes - Inspection and Maintenance PROCEDURE Procedure No: P314.422 Issue: 1 Revision: 0 Operative Date: 22/12/2016 Department: HSEC Sect./Classification: Safety / Gear & Equipment Author: D Steel

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

Element C7.2 Lifting Work Equipment

Element C7.2 Lifting Work Equipment .2 Lifting Work Equipment Lifting Equipment LOLER Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it Cranes Mobile cranes Combined off

More information

Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations 1998 Regulation 9

Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations 1998 Regulation 9 GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: MLCC 03 Prepared by: MACHINERY LIFTS AND CRANE COMMITTEE Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations

More information

B kv Gas-insulated Substations

B kv Gas-insulated Substations 72.5 145 kv Gas-insulated Substations The increasing demand for electrical power in cities and industrial centres requires the installation of a compact and efficient distribution and transmission network.

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Proving High Voltage Conductors De-Energised

Proving High Voltage Conductors De-Energised Proving High Voltage Conductors De-Energised Summary This procedure supports the Power System Safety Rules and its requirements assembled under Making High Voltage Apparatus Safe for Work Category 5.5;

More information

Substation Lightning Protection. Document Number: 1-11-FR-11

Substation Lightning Protection. Document Number: 1-11-FR-11 Substation Lightning Protection Document Number: 1-11-FR-11 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-11 Substation Lightning Protection Asset

More information

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015 Engineering Procedure Electrical Distribution Unit PR D 78500 Electrical s Version 1.0 Date in Force: 4 November 2015 Procedure UNCONTROLLED COPY WHEN PRINTED Approved by: Sean Budge Manager Electrical

More information

GHA. Gas-Insulated Switchgear. Gas-Insulated Switchgear. Switchgear extension and replacement of a panel

GHA. Gas-Insulated Switchgear. Gas-Insulated Switchgear. Switchgear extension and replacement of a panel Gas-Insulated Switchgear GHA Gas-Insulated Switchgear Switchgear extension and replacement of a panel During this work, essential parts of the switchgear remain in operation No. AGS 535 066-01 Edition

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance WASHING HIGH VOLTAGE INSULATORS USING PORTABLE WASHING EQUIPMENT Copyright National Grid plc 2014, all rights reserved.

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD STANDARDS

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD STANDARDS DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD STANDARDS Filed with the Secretary of State on These rules become effective immediately upon

More information

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

GUIDANCE IN-SERVICE INSPECTION PROCEDURES GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: MLCC 03 Prepared by: MACHINERY LIFTS AND CRANE COMMITTEE Status: Issue 07 Date: 23/06/15 Reference: Health, Safety and Welfare at Work (General Application)

More information

SECTION 14: AERIAL LIFT PROGRAM

SECTION 14: AERIAL LIFT PROGRAM SECTION 14: AERIAL LIFT PROGRAM Fisher Auto Parts is committed to promoting a safe and healthy environment for all employees and customers. Protection from accidental loss of any resources, especially

More information

The Management of Electrical Safety in Quarries, Associated Plant and Equipment

The Management of Electrical Safety in Quarries, Associated Plant and Equipment Quarries National Joint Advisory Committee (QNJAC) Plant Information Sheet 1 (Version 1, November 2015, review date: 2020) The Management of Electrical Safety in Quarries, Associated Plant and Equipment

More information

Construction and Wiring Guidelines for Ergon Energy Substation Panels

Construction and Wiring Guidelines for Ergon Energy Substation Panels Construction and Wiring Guidelines for Ergon Energy Substation Panels Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 Panel Wiring...

More information

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title High Voltage and 1500 System Earthing References and Definitions Reference Number PDS 02 (RIC Standard: EP 12 00 00 01 SP) Document Control

More information

SUBSTATION INTERLOCKING SCHEMES

SUBSTATION INTERLOCKING SCHEMES SUBSTATION INTERLOCKING SCHEMES This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

B kv T&D GAS INSULATED SWITCHGEAR

B kv T&D GAS INSULATED SWITCHGEAR GAS INSULATED SWITCHGEAR B 105 170 300 kv The increasing demand for electrical power in cities and industrial centers necessitates the installation of a compact and efficient distribution and transmission

More information

Low Voltage Power Supplies in Electrified Areas

Low Voltage Power Supplies in Electrified Areas Low Voltage Power Supplies in Electrified Areas Synopsis This document mandates requirements for control of return and stray currents and the management of earthing for low voltage power supplies in electrified

More information

Title: Lifting Operations Involving Crane or Gantry Offshore

Title: Lifting Operations Involving Crane or Gantry Offshore PTW CHECKLIST - NO. 30 Title: Lifting Operations Involving Crane or Gantry Offshore Owner: Capability Coordinator Approver: Capability Coordinator Permit No.: Max Validity Period: 5 yrs Date: Latest Rev

More information

PROCEDURE. Revision: 1. Author: D Steel CONTENTS

PROCEDURE. Revision: 1. Author: D Steel CONTENTS PROCEDURE Title: Cranes - Safe Use Procedure No: P314.423 Issue: 1 Revision: 1 Operative Date: 22/09/2017 Department: HSEC Sect./Classification: Safety/Gear & Equipment Author: D Steel Approver Role: Manager

More information

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Page 1 of 14 Part A Synopsis A standard detailing the requirements for the control, safe use and operation of excavators,

More information

Locating Ground Mounted Equipment

Locating Ground Mounted Equipment Network Asset Technical Document Locating Ground Mounted Equipment Original issue: April 2008 Prepared by: Lee Chan & Robert Rogerson This revision: Original Issue Date for next review: April 2013 Copyright

More information

SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS)

SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS) SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS) About company The «Elektroapparat» plant starts its operation in 1922 as a plant manufacturing high-voltage electrical equipment. During the first two

More information

General Instructions and Inspection Instructions for Crane

General Instructions and Inspection Instructions for Crane General Instructions General Instructions and Inspection Instructions for Crane Distributed by Ergonomic Partners Sales@ErgonomicPartners.com www.ergonomicpartners.com Tel: 314-884-8884 EN R_(EN)/1 --

More information

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP)

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Low Voltage Distribution and Installations Earthing References and Definitions Reference Number PDS 03 (ARTC Standard: EP 12 00 00 02 SP) Document

More information

LV Capacitor CLMD03 Power Module Instruction manual

LV Capacitor CLMD03 Power Module Instruction manual LV Capacitor CLMD03 Power Module Instruction manual Table of Contents 1 Safety... 3 2 Upon reception... 3 2.1 Inspection on reception... 3 2.2 Storage- transportation handling... 3 3 Hardware Description...

More information

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category General Title Reference Number PMP 01 (RIC Standard: EP 00 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards and

More information

Procedure PR D Definitions and Conventions for Electrical Safety. Engineering Procedure Electrical Distribution Unit. Version 1.

Procedure PR D Definitions and Conventions for Electrical Safety. Engineering Procedure Electrical Distribution Unit. Version 1. Engineering Procedure Electrical Distribution Unit PR D 78100 Definitions and Conventions for Electrical Safety Version 1.0 Date in Force: 26 February 2016 Procedure UNCONTROLLED COPY WHEN PRINTED Approved

More information

High Voltage Operating Rods

High Voltage Operating Rods High Voltage Operating Rods Summary: This work instruction supports the Power System Safety Rules and its requirements assembled under Making High Voltage Apparatus Safe for Work Category 5.5; and Making

More information

Impulse Voltage Test System, Q Structure, kV

Impulse Voltage Test System, Q Structure, kV TCDYQ Series Impulse Voltage Test System, Q Structure, 200-3600kV Applications: Shunt reactors Power transformers Distribution transformer Instrument transformers Cables (type tests) Bushings Arresters

More information

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION)

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION) INTER PLANT STANDARD STEEL INDUSTRY I P S S SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION) Corresponding IS does not exist IPSS: 1-10-036-12 0 FOREWORD 0.1 This

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

KV4-300 mk2. KV5-200 mk2. KV5-100T mk2. KV3-250 mk2

KV4-300 mk2. KV5-200 mk2. KV5-100T mk2. KV3-250 mk2 OPERATING AND MAINTENANCE MANUAL Product: Type: High Voltage AC Test Set KV3-250 mk2 KV4-300 mk2 KV5-100 mk2 KV5-100T mk2 KV5-200 mk2 DESIGNED AND MANUFACTURED BY: T & R Test Equipment Limited 15-16 Woodbridge

More information

EMPAC Metal enclosed capacitor bank for wind applications

EMPAC Metal enclosed capacitor bank for wind applications EMPAC Metal enclosed capacitor bank for wind applications Introduction The EMPAC is a Metal Enclosed Capacitor Bank suitable for voltages between 1 kv and 36 kv for reactive compensation in MV networks

More information

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian Shunt Capacitor Bank Protection in UHV Pilot Project Qing Tian 2012-5 INTRODUCTION State Grid Corp. of China, the largest electric power provider in the country, has first build a 1000 kv transmission

More information

24V 3A EN54 Ancillary Power Supply

24V 3A EN54 Ancillary Power Supply 24V 3A EN54 Ancillary Power Supply Normal supply - green light on Fault condition - call Engineer Control relay - activated 3A Power Supply C-TEC Manufactured in England by C-Tec EN 54-4 : 1997 INSTALLATION

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

PN9000 Series Pneumatic Actuators Installation and Maintenance Instructions

PN9000 Series Pneumatic Actuators Installation and Maintenance Instructions 3579049/14 IM-P357-29 CTLS Issue 14 PN9000 Series Pneumatic Actuators Installation and Maintenance Instructions PN9100 PN9200 1. Safety information 2. General product information PN9300 3. Installation

More information

Schedules 1 to 4, Lot B: Extension of the Lessos Substation

Schedules 1 to 4, Lot B: Extension of the Lessos Substation 1.0 LIGHTNING ARRESTORS 1.1 ZNO lightning arrester, 192 kv rated voltage, 10 ka nominal discharge current 2.0 CAPACITIVE VOLTAGE TRANSFORMER ea. 45 2.1 220 kv capacitive voltage transformer 220/ 3 / 0.11/

More information

Gas-insulated switchgear up to 420 kv, 63 ka, 5000 A Type 8DQ1. siemens.com/energy. Answers for energy.

Gas-insulated switchgear up to 420 kv, 63 ka, 5000 A Type 8DQ1. siemens.com/energy. Answers for energy. Gas-insulated switchgear up to 420 kv, 63 ka, 5000 A Type 8DQ1 siemens.com/energy Answers for energy. Gaining from experience Our switchgear ensures extraordinarily high availability at a low operating

More information

SPECIFICATION FOR. MAINTENANCE OF POWERED LIFTING PLATFORMS (for use by disabled persons)

SPECIFICATION FOR. MAINTENANCE OF POWERED LIFTING PLATFORMS (for use by disabled persons) SPECIFICATION FOR MAINTENANCE OF POWERED LIFTING PLATFORMS (for use by disabled persons) INDEX MAINTENANCE REPORTS MANUFACTURER S REQUIREMENTS PERMIT TO WORK CERTIFICATION GUIDANCE MINOR REPAIRS Platform

More information

Technical Test Theory Mobile Elevating Work Platform - Boom A26

Technical Test Theory Mobile Elevating Work Platform - Boom A26 1 Why are those who operate MEWPs generally regarded as safety-critical workers? 2 What are the possible outcomes of facing prosecution for not complying with legislation and regulations? 3 How do stabilisers

More information

NZQA unit standard version 8 Page 1 of 5. Apply and remove earths from conductors on electricity supply networks

NZQA unit standard version 8 Page 1 of 5. Apply and remove earths from conductors on electricity supply networks Page 1 of 5 Title Apply and remove earths from conductors on electricity supply networks Level 4 Credits 4 Purpose People credited with this unit standard are able to: demonstrate knowledge of earthing

More information

Key elements of the AS3000 Wiring standards and some of the recent changes.

Key elements of the AS3000 Wiring standards and some of the recent changes. Key elements of the AS3000 Wiring standards and some of the recent changes. Dean of Engineering Steve Mackay Worked for 30 years in Industrial Automation 30 years experience in mining, oil and gas, electrical

More information

MAINTENANCE AND TESTING OF ENTITY WORKS, ELECTRICAL INSTALLATIONS AND ELECTRICAL EQUIPMENT CS-OHS-32

MAINTENANCE AND TESTING OF ENTITY WORKS, ELECTRICAL INSTALLATIONS AND ELECTRICAL EQUIPMENT CS-OHS-32 CS ENERGY OPERATIONS PROCEDURE FOR MAINTENANCE AND TESTING OF ENTITY WORKS, ELECTRICAL INSTALLATIONS AND ELECTRICAL CS-OHS-32 Responsible Officer: Electrical Services Engineering Manager Error! Bookmark

More information

"Accredited Test Laboratory" (ATL) means an organisation that is accredited by the South African National Accreditation System (SANAS).

Accredited Test Laboratory (ATL) means an organisation that is accredited by the South African National Accreditation System (SANAS). STAATSKOERANT, 24 APRIL 2015 No. 38708 13 No. R. 332 24 April 2015 MINE HEALTH AND SAFETY ACT, 1996 (ACT NO 29 OF 1996) REGULATIONS RELATING TO ELECTRICITY I ADV N.A.RAMATLHODI, Minister of Mineral Resources,

More information

NZQA registered unit standard version 1 Page 1 of 6

NZQA registered unit standard version 1 Page 1 of 6 Page 1 of 6 Title Demonstrate knowledge of theory and legislation for registration of electrical appliance servicepersons Level 3 Credits 3 Purpose This unit standard covers the theory assessment required

More information

Transformer Components & Accessories

Transformer Components & Accessories Transformer Components & Accessories Brian Brinson Mechanical Design Manager brian.brinson@spx.com Agenda 1. Standards / Equipment Overview 2. Bushings 3. Arresters 4. Cooling Equipment 5. Instrument Transformers

More information

Specifications for Surface Earthmoving Equipment Surface Mobile Equipment Major Hazard Standard

Specifications for Surface Earthmoving Equipment Surface Mobile Equipment Major Hazard Standard WMC Environment, Health & Safety Management System Specifications for Surface Earthmoving Equipment Surface Mobile Equipment Major Hazard Standard MHS-11 DocsOpen Ref: 57445, 21/05/1999 Uncontrolled copy

More information

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy 1 SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL Estimation and Costing & Utilization of Electrical Energy Estimation and Costing & Utilization of electrical Energy Estimation

More information

33kV Connection up to 90MVA

33kV Connection up to 90MVA Electricity Specification 217 Issue 2 December 2007 33kV Connection up to 90MVA Contents 1 Scope 2 General 3 Connection Arrangements 4 Equipment Records 5 Documentation 6 Documents Referenced 7 Keywords

More information

Vacuum Circuit-Breakers, Type HVX kv, of cassette design, cassette with motor drive

Vacuum Circuit-Breakers, Type HVX kv, of cassette design, cassette with motor drive Vacuum Circuit-Breakers, Type HVX 12 24 kv, of cassette design, cassette with motor drive Operating Instructions No. 531 321, Edition 09/00 Table of Contents 1 General 4 1.1 Operating Conditions 4 2 Design,

More information

Ensure staff are trained in use of equipment

Ensure staff are trained in use of equipment Work at height Can you avoid working at height in the first place? No Yes Plan the task required Risk assess the task required Ensure staff are trained in use of equipment Ensure equipment has been correctly

More information

Safelift Overhead Runway Beams & Rolling Beam Cranes

Safelift Overhead Runway Beams & Rolling Beam Cranes Operation & Maintenance Instructions Instructions for Safe Use Safelift Overhead Runway Beams & Rolling Beam Cranes Certification Safelift overhead runway beams and rolling beam cranes are lifting appliances

More information

IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 717 MOBILE OR TRANSPORTABLE UNITS

IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 717 MOBILE OR TRANSPORTABLE UNITS IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 717 MOBILE OR TRANSPORTABLE UNITS 717.1 Scope The particular requirements of this section apply to a.c. and d.c. installations for mobile or transportable

More information

Warning. Document ref: A October 2015

Warning. Document ref: A October 2015 Sentry Door Curtain Installation, Operation & Maintainance Instructions Dunham-Bush Ltd, Downley Road, Havant, Hampshire, P09 2JD Tel. 023 9247 7700 Email. info@dunham-bush.co.uk Document ref: 128-000-001-A

More information

MAINTENANCE AND TESTING OF PORTABLE ELECTRICAL EQUIPMENT, RCDS AND TOOLS CS-OHS-33

MAINTENANCE AND TESTING OF PORTABLE ELECTRICAL EQUIPMENT, RCDS AND TOOLS CS-OHS-33 CS ENERGY OPERATIONS PROCEDURE FOR MAINTENANCE AND TESTING OF PORTABLE ELECTRICAL EQUIPMENT, RCDS AND TOOLS CS-OHS-33 Responsible Officer: Electrical Services Engineering Manager Responsible Manager: Group

More information

Independent Testing Laboratory for High Voltage Equipment

Independent Testing Laboratory for High Voltage Equipment T E S T I N G L A B O R A T O R Y Independent Testing Laboratory for High Voltage Equipment 1 CHALLENGING ENVIRONMENT The primary concern for utilities is to ensure grid reliability, efficiency, and security.

More information

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST Use & Identification of Grounded and Grounding Conductors YES NO N/A Grounded conductors are identifiable and distinguishable from all other conductors.

More information

INSTALLATION MANUAL. Instructions, precautions, suggestions for installing and servicing resin transformers in full compliance with safety rules

INSTALLATION MANUAL. Instructions, precautions, suggestions for installing and servicing resin transformers in full compliance with safety rules INSTALLATION MANUAL Instructions, precautions, suggestions for installing and servicing resin transformers in full compliance with safety rules ING TABLE OF CONTENTS 1. General information 2 1.1 Standards

More information

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001 CLP POWER HONG KONG LIMITED SUPPLY March 2001 ADVISORY SERVICE Advice concerning matters relating to the supply of electricity may be obtained free of charge from the Company. OTHER COMPANY PUBLICATIONS

More information

Energized Electrical Work

Energized Electrical Work Manitoba STANDARD PROCEDURE INSTRUCTION Title Energized Electrical Work Department Supersedes SPI Dated N/A SPI 32-4 Effective Date MAR 30, 2012 Energized Electrical Work SPI 32-4 Page 1 of 9 STANDARD

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD (By authority conferred on the Director of the Department of Licensing and Regulatory Affairs

More information

HVDC. TMT&D provides the best and most economical HVDC system.

HVDC. TMT&D provides the best and most economical HVDC system. HVDC TMT&D HVDC TMT&D provides the best and most economical HVDC system. In 1955, TMT&D started the development of HVDC and is the leading HVDC supplier in Japan. TMT&D has continued to develop HVDC technology

More information

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

WORKING SAFELY NEXT TO WEST MIDLANDS METRO WORKING SAFELY NEXT TO WEST MIDLANDS METRO GUIDELINES FOR BUSINESSES, CONTRACTORS, EVENT ORGANISERS & OTHERS WORKING ON OR NEAR TO WEST MIDLANDS METRO. If you own, occupy a building or other assets near

More information

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04

More information

Overview Overvoltage protection

Overview Overvoltage protection A P P L I C AT I O N N OT E 1.0 Overview Overvoltage protection The APPLICATION NOTES (AN) are intended to be used in conjunction with the APPLICATION GUIDELINES Overvoltage protection Metal-oxide surge

More information

C1000 Series Automatic Cap Bank

C1000 Series Automatic Cap Bank C1000 Series Automatic Cap Bank Metal Enclosed - Medium Voltage Capacitors Assemblies Fixed / Auto Medium Voltage 5, 15, 25 and 35 kv Class Customized to your specifications The Reactive Power Solution

More information

Ladder Use in Construction Guideline

Ladder Use in Construction Guideline Ladder Use in Construction Guideline Forward This guideline has been prepared to assist workplace parties in understanding their obligations under the Occupational Health and Safety Act (OHSA) and its

More information

Health, Safety, Security and Environment

Health, Safety, Security and Environment Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no

More information

shortform operating instructions

shortform operating instructions B 0800 52 15 95 www.facelift.co.uk ascendant 17m shortform operating instructions SAFETY TIPS ALWAYS Inspect your machine before use. Check all operations including ground controls. Check ground conditions.

More information

NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations

NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations Version:- 3.0 Date of Issue:- Dec 2013 Page 1 of 13 NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations 1. Purpose This document is the technical specification

More information

ElectricCourseCatalog.

ElectricCourseCatalog. ElectricCourseCatalog www.energyu.org www.midwestenergy.org Electric Library (01000 Substations)...6 ELEC 01011 Circuit Breaker Timing and Testing... 6 ELEC 01012 Overhaul Maintenance of Substation Circuit

More information

Substation LV AC Supplies. Document Number: 1-11-FR-04

Substation LV AC Supplies. Document Number: 1-11-FR-04 Substation LV AC Supplies Document Number: 1-11-FR-04 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-04 LV AC Supplies Asset Class Strategy Intellectual

More information

EPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011

EPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011 EPRI HVDC Research John Chan, Ram Adapa, Bernie Clairmont & Gary Sibilant, EPRI EPRI HVDC & FACTS Conference August 30, 2011 Presentation Contents 1. Team Members 2. Research Program Objective & Scope

More information

English. Fitting Instructions: Trophy and Trophy SE A of 12. Parts Supplied:

English. Fitting Instructions: Trophy and Trophy SE A of 12. Parts Supplied: English Fitting Instructions: Trophy and Trophy SE A9808015 Thank you for choosing this Triumph genuine accessory kit. This accessory kit is the product of Triumph's use of proven engineering, exhaustive

More information

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS... TITLE SPECIFICATION FOR PORTABLE DATE: JULY 2006 PAGE: 1 OF 25 TABLE OF CONTENTS Page FOREWORD...3 INTRODUCTION...4 1 SCOPE...4 2 NORMATIVE S...4 3 DEFINITIONS AND ABBIATIONS...4 4 REQUIREMENTS...5 4.1

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) (Corr.1 June 2018) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements

More information

SWITCHGEAR DIVISION PRODUCT PROFILES

SWITCHGEAR DIVISION PRODUCT PROFILES SWITCHGEAR DIVISION PRODUCT PROFILES Metal-Enclosed Load-Interrupter Switchgear Product Profiles Three-Phase, Group-Operated Load-Interrupter Switches with Fuses in Single and Multi-Bay Assemblies Manual,

More information

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS 1. Scope: This policy and procedure applies to the design, construction testing, use, and maintenance or personnel platforms and hosting of personnel platforms

More information

CHAPTER II-1 D. Construction subdivision and stability, machinery and electrical installations

CHAPTER II-1 D. Construction subdivision and stability, machinery and electrical installations Only the Danish version is authentic Notice D II-1 D 1 October 2002 Technical regulation on the construction and equipment, etc. of passenger ships on domestic voyages CHAPTER II-1 D Construction subdivision

More information

APPROVED EQUIPMENT FOR HV RUBBER GLOVE WORKING

APPROVED EQUIPMENT FOR HV RUBBER GLOVE WORKING APPROVED EQUIPMENT FOR HV RUBBER GLOVE WORKING 1 SCOPE This section of the Live Working Manual lists those tools and items of equipment that are Approved for use in connection with HV Rubber Glove Working

More information

Scissor Lift Model : SC60 SC40 Installation Instructions

Scissor Lift Model : SC60 SC40 Installation Instructions Scissor Lift Model : SC60 SC40 Installation Instructions 0 XLT SCISSOR LIFT INSTALLATION INSTRUCTIONS Please read installation instructions carefully before installation and keep it for future reference.

More information

Pretest Module 29 High Voltage Unit 1

Pretest Module 29 High Voltage Unit 1 Pretest Module 29 High Voltage Unit 1 1. Is a person qualified to work on high-voltage installations when this module is completed? 2. What is the code definition of high-voltage? 3. What is the IEEE definition

More information

Engineering Instruction

Engineering Instruction Engineering Instruction Electrical Distribution Unit Approved by: Lidija Dumbaloska, Professional Head Electrical Engineering, Sydney Trains Authorised by: Jonathon McKinnon, Engineering Technical Publications

More information

Specification Pad-Mounted Capacitor Bank with Dual Fusing Integral Load-Interrupter on Line-Side Fuse Mountings

Specification Pad-Mounted Capacitor Bank with Dual Fusing Integral Load-Interrupter on Line-Side Fuse Mountings Page 1 Specification Pad-Mounted Capacitor Bank with Dual Fusing Integral Load-Interrupter on Line-Side Fuse Mountings I. General This specification covers the design requirements for a pad-mounted capacitor

More information

Operating procedures relating to the use of electrical equipment and installations

Operating procedures relating to the use of electrical equipment and installations Operating procedures relating to the use of electrical equipment and installations Reviewed November 2014. These operating procedures apply to all University staff with respect to electrical safety. Failure

More information

High-Voltage Circuit-Breakers 3AP1/ kv up to 550 kv. Power Transmission and Distribution

High-Voltage Circuit-Breakers 3AP1/ kv up to 550 kv. Power Transmission and Distribution High-Voltage Circuit-Breakers AP/ 7.5 kv up to 550 kv Power Transmission and Distribution The AP/ High-Voltage Circuit-Breakers Now Applicable for 550 kv Decades of our experience in high-voltage switching

More information

WELLS RURAL ELECTRIC COMPANY Adopted: March 1976 Revised: March 21, 2017 Reviewed: August 21, 1998 RULE NO. 2

WELLS RURAL ELECTRIC COMPANY Adopted: March 1976 Revised: March 21, 2017 Reviewed: August 21, 1998 RULE NO. 2 WELLS RURAL ELECTRIC COMPANY Adopted: March 1976 Revised: March 21, 2017 Reviewed: August 21, 1998 DESCRIPTION OF SERVICE A. General: RULE NO. 2 1. Alternating current service at 60-hertz (cycles per second)

More information

ES5 Security Theory/Regulations Answer Schedule

ES5 Security Theory/Regulations Answer Schedule ES5 Security Theory/Regulations Answer Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The marker

More information

100-30(02) (External Projections)

100-30(02) (External Projections) LVVTA Low Volume Vehicle Standard 100-30(02) (External Projections) Page 1 of 12 Low Volume Vehicle Technical Association Incorporated Low Volume Vehicle Standard 100-30(02) (External Projections) This

More information