- Randolph Hardy
- 5 years ago
- Views:
Transcription
1 Energy Savings and Incentives with PG&E Chad Stout Account Manager
2 Electric Rates: Do you have options? AG-4 For customers with moderate annual operating hours (generally 500 to 1,200). Additional savings are possible if you can minimize electricity use on summer weekdays between noon and 6 p.m. Customers whose service has a single motor load of at least 35 hp or multiple motor load of at least 15 hp may save even more on AG-4C if they can minimize usage on summer and winter weekdays from 8:30 a.m. through 9:30 p.m. AG-5 For customers with high annual operating hours. Additional savings are possible if you can minimize electricity use on summer weekdays between noon and 6 p.m. Customers whose service has a single motor load of at least 35 hp or multiple motor load of at least 15 hp may save even more on AG-5C if they can minimize usage on summer and winter weekdays from 8:30 a.m. through 9:30 p.m.
3 Time of Use
4 45-39K Rate Analysis Current Rate Best Rate Total Months Use for Analysis Annual Total Bill Current Rate Annual Total Bill Best Rate %Bill Bill Saving Annual Annual Savings s from Max Total Peak Partial from Rate Rate Demand Energy Kwh Kwh change change kw kwh Summer Summer Off Kwh Summer Partial Kwh Winter Off Kwh Winter Peak Kwh Summer % Partial Kwh Summer % Off Kwh Summer % Partial Kwh Winter % Off Kwh Winter % AG1B AG4B 12 $15,898 $13,782 $2,115 13% 79 56,205 3,800 19,980 30,068 2, % 37% 56% 99% 1% AG4B AG5B 12 $11,530 $11,242 $288 2% 35 51,265 18,505 8,162 17,998 5,031 1,569 41% 18% 40% 76% 24% AG1B AG4B 12 $15,468 $13,674 $1,794 12% ,883 14,115 13,315 22,102 8,354 7,997 28% 27% 45% 51% 49% AG1B AG4B 12 $24,137 $21,685 $2,451 10% , ,825 18,202 32,241 18,007 12,450 30% 25% 45% 59% 41% AG5B AG4B 12 $16,706 $16,272 $433 3% 70 78,226 6,077 26,050 38,152 3,040 4,908 9% 37% 54% 38% 62%
5 -Review your rates at least once per year-operations and usage do change -It s a simple fix -Sit down with an account rep and talk about your options-we have tools that help us help you -You can also go on MyEnergy at or call PG&E s Ag Hotline at FARM -InterAct Energy Management Tool-usage and data analysis, What If tool, and historical reporting
6 Speaking of Rates The CPUC oversees and approves the energy efficiency programs funded by charges established in: Public Utilities Code Section 381 (Public Goods Charge): Created by Assembly Bill (AB) 1890 in September 1996 Established a Public Goods Charge (PGC) that consumers pay on electricity consumption for cost-effective energy efficiency, renewable technologies, and public interest research In September 2000, AB 995 became law, extending the electric PGC through January 1, 2012 Public Utilities Code Section (b)/379.5: Created by AB 970 in September 2000 for expanded energy efficiency programs plus new load control and distributed generation initiatives Expanded appliance, lighting, and HVAC rebates, appliance recycling, and oil and gas efficiency programs
7 What does the Public Purpose Fund mean to you? AG4 Rate: Average of $ per kwh Ag5 Rate: Average of $ per kwh The Ag sector accounts for 6% of the electricity usage and 5% of gas usage in California. From 2010 to 2012, these customers received over $28 million in incentives. More than $70 million were paid to commercial customers. So take advantage of the incentive programs available!!
8 Demand Response: Peak Day Pricing Event Days/year-curtail from 2pm to 6pm -Substantial credits toward electricity use on other days -First year Bill Stabilization
9 Energy Efficiency Rebates Select qualified item from deemed catalog Check with your Account Manager to see if there are qualifiers Purchase item & install Complete and submit application with paid invoice Receive rebate Lighting Sprinkler-to-Drip Irrigation Low Pressure Sprinkler Nozzles
10 Customized Incentives -Engineer will calculate your energy savings which will determine your incentive -Incentive is capped at 50% of the project cost -Project requires: -A pre-inspection, specification and vendor proposal are submitted to the engineer. -The application then goes to the Project Office where they will review and notify you to proceed with the project (if you proceed prior to the Project Office notifying you to proceed, it will void your application!!). -Notify the Project Office of completion and submit your paid invoices. -A technical review will finalize your incentive and a check will be paid to you.
11 Examples of Customized Incentives and Energy Efficiency measures: -VFD retrofits and new construction -Sprinkler to drip tape -Pump impellor and bowl repair (APEP Program) -Lighting and Refrigeration (AMBAG Program) -Floating head pressure -Oversized condenser -Refrigeration controls -Compressor VFD s -What other projects do you have where you can quantify savings?
12 Title 24 updates Coming July 1 st, 2014 If you plan on applying for rebates with PG&E, consider the following: Some rebates may not be available or may change after this date Compliance may require a permit Linear fluorescent rebates reduced after June 30 th, 2014
13 APEP: Advanced Pumping Efficiency Program -Incentives for bowl and impellors -PG&E raised the incentive to $0.12/kwh to assist with the drought -$200 incentive paid to pump tester for a pump test (25HP minimum qualifier) -Local program pump testers Pump Efficiency Video
14
15 Energy Efficiency Financing Loan Details Loans for commercial energy efficient retrofit projects 0 % Interest Projects with 5 year paybacks or less Added to your monthly PG&E bill
16 Did You Know? -During 2013, PG&E installed 1400 Mega Watts of Solar -Our portfolio: Renewables-19% Nuclear-21% Hydro-11% Natural Gas-21% Power Purchases-21% -There are now more than 60,000 solar customers connected to the grid -See our Pipeline Enhancement progress at:
17
18 Thank you! Chad Stout
Zero Emission Bus Impact on Infrastructure
Zero Emission Bus Impact on Infrastructure California Transit Association (CTA) Fall Conference Nov 17, 2016 Russ Garwacki Director, Pricing Design & Research 626.302.6673 Russell.Garwacki@sce.com Barbara
More informationDelaware Electric Cooperative. Solar: What You Need to Know
Delaware Electric Cooperative Solar: What You Need to Know National Solar Industry 9,000 solar companies Employing over 209,000 people Nearly 32 GW currently installed nationwide Enough solar to power
More informationPART 2 GUIDELINES. To be eligible to receive a financial incentive, the following conditions must be met:
PART 2 GUIDELINES 1. Program Objective and Scope The objective of the Business Incentive Program ("BIP") is for Toronto Hydro-Electric System Limited ("Toronto Hydro") to provide financial incentives to
More informationSOLAR DISTRIBUTED GENERATION PROGRAM UPDATE
SOLAR DISTRIBUTED GENERATION PROGRAM UPDATE PRESENTED BY: CRIS EUGSTER ACTION: APPROVAL DATE: MAY 19, 2014 EXECUTIVE SUMMARY CPS Energy proposes to significantly expand its Solar Distributed Generation
More informationELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES
Revised Cal. P.U.C. Sheet No. 33759-E Cancelling Revised Cal. P.U.C. Sheet No. 33566-E ELECTRIC SCHEDULE E-1 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase
More informationENERGY MANAGEMENT AT COOPER TIRE
OMA Energy Committee June 25, 2014 Anthony Smith, PE ENERGY MANAGEMENT AT COOPER TIRE 1 A Leader in the Tire Industry 5% 2012 Sales by Segment 35% North America 65% International 5% Sales by Product 20%
More informationELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS
Revised Cal. P.U.C. Sheet No. 31575-E Cancelling Revised Cal. P.U.C. Sheet No. 29680-E ELECTRIC SCHEDULE E-9 APPLICABILITY: This optional experimental schedule applies to electric service to customers
More informationInvestSmart Business Energy Upgrades Custom Equipment Catalog 01/01/2017
2017 InvestSmart Business Energy Upgrades 01/01/2017 Table of Contents 1 Custom Measures...1-1 1.1 Custom Measures... 1-1 2 Sample Rebate Worksheet...1-4 1 Custom Measures This Equipment Catalog describes
More informationSouthern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4 ERRATA Replacing Appendix D, Pages D-1 & D-3
Application No.: Exhibit No.: Witness: A.11-03-003 SCE-1, Volume 5 (Appendices to SCE-1 Volumes 1 4) - ERRATA (U 338-E) Southern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4
More informationPortland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.
Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. 7-1 AVAILABLE In all territory served by the Company. APPLICABLE To Residential
More informationPer Meter, Per Month. Effective July 1, 2018 Customer Charge Flat Charge $8.86
SCHEDULE D TOU TIERED DOMESTIC TIME OF USE SERVICE TIERED (This rate schedule is closed to new customers as of July 1, 2018. On July 1, 2019, existing customers will be transitioned to their otherwise
More informationSDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009
SDG&E Customer Distributed Generation Programs Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009 About SDG&E... A regulated public utility that provides service in San Diego
More informationEvolving our Customer Relationship: Edison SmartConnect Programs & Services Mark Podorsky, Sr. Manager Business Design
Edison SmartConnect Evolving our Customer Relationship: Edison SmartConnect Programs & Services Mark Podorsky, Sr. Manager Business Design Southern California Edison An Edison International Company Southern
More informationRenewable Net Metering Program Appendix ESD APX 001 1
CITY OF ST.GEORGE Energy Services Department (SGESD) Renewable Net Metering Program Appendix Document No. Effective Date 10/15/2005 Revision No. 1.0 Review Date 02/18/2016 Review Cycle Annually Creation
More informationRevised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California
Revised Cal. P.U.C. Sheet No. 42736-E Cancelling Revised Cal. P.U.C. Sheet No. 41884-E ELECTRIC SCHEDULE EL-1 Sheet 1 APPLICABILITY: This schedule is applicable to single-phase and polyphase residential
More information24. SOLAR INCENTIVE PROGRAM II
24. SOLAR INCENTIVE PROGRAM II A. General California Senate Bill 1 requires publicly owned utilities that sell electricity at the retail level, to adopt, implement, and fund a solar incentive program for
More informationELG 4126 DGD Sustainable Electrical Power Systems
ELG 4126 DGD Sustainable Electrical Power Systems Winter 2015 DGD Introduction TA: Viktar Tatsiankou (PhD student) e-mail: viktar.tatsiankou@gmail.com Objectives of the DGD: to teach students the economics
More information2019 NYC Solar Installer Workshop: Solar and Storage. March 18, 2019
2019 NYC Solar Installer Workshop: Solar and Storage March 18, 2019 2 ConEdison Activity Since MW Block Redesign Commercial MW Block Activity 3 15 MW submitted since redesign - 6/17/2018 10 rooftop canopy
More informationGMP Summary of Available Rates
GMP Summary of Available Rates Glossary: kw: stands for kilowatt, this is a unit of power, an amount of energy at a given instant. kwh: stands for kilowatt-hour, this is the unit of electricity used for
More informationSCE s Conceptual Plans to Launch ZigBee Enabled Programs and Services
Leading the Way in Electricity TM SCE s Conceptual Plans to Launch ZigBee Enabled Programs and Services Connectivity Week June 10, 2009 1 About Southern California Edison Largest electric utility in California
More informationLighting and Lighting Controls Energy Savings Opportunities Technical Training Series
Lighting and Lighting Controls Energy Savings Opportunities 2017 Technical Training Series Agenda Solutions for Business: Overview & Successes Program Rebates: What Qualifies? Submitting an Application:
More informationA Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012
A Guide to the medium General Service Conservation Rate BC Hydro Last Updated: February 24, 2012 Executive summary The way Medium General Service (MGS) accounts pay for electricity is changing. MGS is
More informationPG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar. March 26, 2009
PG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar March 26, 2009 Goals Update of PG&E s CSI incentive program Overview of PG&E s NEM interconnection process What
More informationRevised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California
Revised Cal. P.U.C. Sheet No. 25718-E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No. 24808-E APPLICABILITY: TERRITORY: This voluntary schedule is available to customers for
More information250kW Solar PV System Poultry Shed Solution - Gatton
250kW PV System Poultry Shed Solution - Gatton Document Created by Luke M Hardy lmhardy@smartconsult.com.au Smartcom P/L www.smartconsult.com.au 14 June 2013 Key Points for a PV System 250kW System at
More informationSpringfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)
Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1) 4-2-2 NET METERING. The objective of this net metering policy is to establish Springfield Utility Board (SUB)
More informationSolar Seminar. July 21st, Barry Cinnamon
Solar Seminar July 21st, 2018 Barry Cinnamon Agenda 1. Company Overview 2. Solar Economics Cost of Electricity Solar Incentives Solar Costs Are You a Candidate? 3. Solar Technology PV Solar Shingles Battery
More informationTo: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resource Planning. From: Alan Hanger Approved by: /s/
AGENDA ITEM NO.: 4.J.1 To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resource Planning From: Alan Hanger Approved by: /s/ Senior Energy Resource Analyst Glenn O. Steiger
More informationXcel Energy s Energy Efficiency Programs. Derek Shockley Trade Relations Manager Commercial and Industrial
Xcel Energy s Energy Efficiency Programs Derek Shockley Trade Relations Manager Commercial and Industrial Driver: Colorado s Energy Needs In the last decade: Up 39% Up 15% Up 19% Number of Customers Electric
More informationAppendix G - Danvers Electric
Appendix G - Danvers Electric Energy Efficiency and Conservation Programs Revision ID Date Author Notes Approval (initials and date) 1.0 9-6-2011 Clint Allen The purpose of Version 1 is to release certain
More informationTHE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23
P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 Canceling P.S.C. Mo. No. 5 Sec. 4 Original Sheet No. 23 PURPOSE: The purpose of this Rider SR is to implement the solar rebate established through 393.1030
More informationRENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017
RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017 Structure of Electricity Sector Generation & Policy Maker Regulator Power Transmission Distribution Producers Ministry of Energy & Mineral Resources
More informationOrigin Solar Presentation
Origin Solar Presentation Presentation to: Body Corporate Seminar Location: Colmslie Hotel Morningside Date : 08-03-2011 Origin Solar Presentation Body Corporate Seminar Page 2 Figures based on Origin's
More informationCUSTOMER OWNED SOLAR IN WISCONSIN
CUSTOMER OWNED SOLAR IN WISCONSIN Michael R Moore Sr. Renewable & Product Services Consultant Wisconsin Public Service MREC 2-19-2015 Customer Owned Solar in Wisconsin Historical Perspective Costs Past
More informationTHE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE
Sheet 1 AVAILABILITY Electric delivery service shall be taken under this rate for all purposes by any customer who is placed on the rate by the Company in accordance with this paragraph. The Company shall
More informationRevised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E
Revised Cal. P.U.C. Sheet No. 41679-E Cancelling Revised Cal. P.U.C. Sheet No. 40893-E ELECTRIC SCHEDULE ESR Sheet 1 APPLICABILIT: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase
More informationELECTRIC SERVICE RATES UPDATED NOVEMBER 2016
ELECTRIC SERVICE RATES UPDATED NOVEMBER 2016 RESIDENTIAL SERVICES (RS) EFFECTIVE: OCTOBER 1, 2008 AVAILABILITY - Available exclusively to residential customers for residential use within the service area
More informationThe Rebate Program can change without notice. CPS Energy reserved the right to discontinue the program at any time.
COMMERCIAL & INDUSTRIAL CUSTOMERS Program Overview The CPS Energy Rebate Program for Commercial and Industrial Customers (Rebate Program) was developed to provide incentives for the new installation and
More informationThe Gambia National Forum on
The Gambia National Forum on Renewable Energy Regulation Kairaba Hotel, The Gambia January 31 February 1, 2012 Tariff and Price Regulation of Renewables Deborah Erwin Public Service Commission of Wisconsin
More informationAll of Texas Has Excellent Solar Resources. United States Solar Installed (as of mid 2013): 10 GW Germany Solar Installed (end of 2013): 35.
All of Texas Has Excellent Solar Resources United States Solar Installed (as of mid 2013): 10 GW Germany Solar Installed (end of 2013): 35.962 GW Benefits of Solar Investing in Solar Creates Good Local
More informationEXHIBIT A ORDINANCE NO. O CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE
ORDINANCE NO. O-2017-14 CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE AVAILABILITY This schedule is closed to new customers. Available to Residential Consumers being
More informationRevised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E
Revised Cal. P.U.C. Sheet No. 35229-E Cancelling Original Cal. P.U.C. Sheet No. 28209-E ELECTRIC SCHEDULE EM-TOU Sheet 1 APPLICABILITY: TERRITORY: This schedule is applicable to service for residential
More informationSummer Reliability Assessment Report Electric Distribution Companies Perspective
Energy Association of Pennsylvania Summer Reliability Assessment Report Electric Distribution Companies Perspective to the Pennsylvania Public Utility Commission June 9, 2011 Harrisburg, PA Terrance J.
More informationAndrew Tang Smart Energy Web Pacific Gas and Electric Company September 18, 2009
Andrew Tang Smart Energy Web Pacific Gas and Electric Company September 18, 2009 Balancing Competing Priorities Environmental Sustainability Reliable Service Reasonable Cost Smart Grid 2 Challenges for
More informationMichigan Renewable Energy Case Study
Michigan Renewable Energy Case Study NARUC ENERGY REGULATORY PARTNERSHIP WITH GEORGIAN NATIONAL ENERGY AND WATER SUPPLY REGULATORY COMMISSION TBILISI, GEORGIA JANUARY 27-31, 2014 GREG R. WHITE, COMMISSIONER
More information2019 BQDM Extension Auction Frequently-Asked Questions Updated January 29, 2018
2019 BQDM Extension Auction Frequently-Asked Questions Updated January 29, 2018 See 2019 BQDM Extension Auction Technical Requirements for definitions of terms in bold. General Auction Questions 1. How
More informationAgricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers
CALIFORNIA FARM BUREAU FEDERATION Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers Q1. Who is eligible to sign up for an AG-ICE program? A. In order to be
More informationELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE
Revised Cal. P.U.C. Sheet No. 36458-E Cancelling Revised Cal. P.U.C. Sheet No. 36036-E ELECTRIC SCHEDULE AG-ICE Sheet 1 APPLICABILITY: This rate schedule is available to agricultural customers who currently
More informationCommercial and Industrial Energy Efficiency Rebate Program
Appalachian Power Virginia Commercial and Industrial Energy Efficiency Rebate Program www.takechargewv.com/business Welcome! Introduce Appalachian Power s Virginia C&I Program Define program rules Explain
More informationALZ Electrical Solar Consumer Guide
ALZ Electrical Solar Consumer Guide ALZ Electrical Unit 6/3 Southern Cross Circuit, Urangan QLD 4655 T: (07) 4124 9552 E: admin@alzelectrical.net W: www.alzelectrical.net Why go solar? Solar power systems
More informationContents. 04 Overview. 05 Residential Energy Efficiency Program. 07 Heating Ventilation and Air Conditioning (HVAC) Systems
Contents 04 Overview 05 Residential Energy Efficiency Program 07 Heating Ventilation and Air Conditioning (HVAC) Systems 08 Custom Energy Efficiency Program 08 New Construction and Major Tenant Renovation
More informationMISSOURI SERVICE AREA
MO.P.S.C. SCHEDULE NO. 6 4th Revised SHEET NO. 88 CANCELLING MO.P.S.C. SCHEDULE NO. 6 3rd Revised SHEET NO. 88 PURPOSE SOLAR REBATE The purpose of this Rider SR is to implement the solar rebate established
More informationResidential Time-of-Day Service Rate Schedule R-TOD
I. Applicability This Rate Schedule 1-R-TOD applies to single- and three-phase service for the following types of residential premises: 1. Individual or dual metered residences with digital communicating
More informationManager of Market Strategy and Planning September 22, 2008
One Utility s Perspective on Investment in Clean Energy Frederick Lynk Manager of Market Strategy and Planning September 22, 2008 6,400 employees N W 2.1M electric customers S 1.7M gas customers 24/7 operation
More informationNet Metering in Missouri
Net Metering in Missouri Make A Good Policy Great (AGAIN) Executive Summary More and more Americans every year are able to produce their own electricity. As the cost of solar continues to plummet, homeowners
More informationCL&P s new time-of-use (TOU) rates
CL&P s new time-of-use (TOU) rates WHY Why are these new TOU rates being implemented? To provide customers with a new opportunity to achieve a benefit from shifting consumption to off-peak periods. Current
More informationORDINANCE NO. The People of the City of Pasadena ordain as follows:
Introduced by Councilmember ORDINANCE NO. AN ORDINANCE OF THE CITY OF PASADENA AMENDING THE LIGHT AND POWER RATE ORDINANCE, CHAPTERS 13.04 OF THE PASADENA MUNICIPAL CODE, TO REVISE ELECTRIC RATES. The
More informationARISEIA Energy Forum APS Residential Rate Design
ARISEIA Energy Forum APS Residential Rate Design A Brief History and What s Next for Arizona? November 7, 2015 Leland Snook Director, Rates and Rate Strategy Arizona Public Service Company Arizona s largest
More informationBrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule)
KEY RATE DEFINITIONS Seasonal Rate Periods (applicable to all rates) Billing Months are defined as June, July, August, and September. Billing Months are defined as December, January, February, and March.
More informationEfficiency Works Business
Efficiency Works Business 3 rd Annual Service Provider Appreciation Networking and Social November 29, 2018 Introduction Efficiency Works is a collaboration of common efficiency programs between Platte
More informationRevised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California
Revised Cal. P.U.C. Sheet No. 26003-E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No. 25736-E APPLICABILITY: This schedule is applicable to single-phase and polyphase residential
More informationGeorgia Power Renewable Update. October 31, 2016 Marc Vinson
Georgia Power Renewable Update October 31, 2016 Marc Vinson Georgia Power at a glance Largest of four Southern Company electric utilities $7.2 billion in revenue 7,600 employees 2.5 million customers 13k
More informationINDUSTRIAL EQUIPMENT INCENTIVES FOR OREGON BUSINESS CUSTOMERS
INDUSTRIAL Standard Incentives INDUSTRIAL EQUIPMENT INCENTIVES FOR OREGON BUSINESS CUSTOMERS SAVE MONEY AND ENERGY NOW AND FOR YEARS TO COME EFFECTIVE JANUARY 2018 INCENTIVES ARE SUBJECT TO AVAILABILITY
More informationTo: Honorable Public Utilities Board Submitted by: /s/ Janet Oppio AGM - Energy Resource Planning
AGENDA ITEM NO: 5.E.1 ADMINISTRATIVE REPORT NO. 2013-02 To: Honorable Public Utilities Board Submitted by: /s/ Janet Oppio AGM - Energy Resource Planning From: Alan Hanger Senior Energy Resources Analyst
More informationKicking off Commercial and Industrial Program
Appalachian Power Virginia Kicking off Commercial and Industrial Program www.takechargeva.com/business Welcome! Explain C&I program offering and rules Showcase lighting technology upgrades Describe how
More informationRevised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E
Revised Cal. P.U.C. Sheet No. 40092-E Cancelling Revised Cal. P.U.C. Sheet No. 38105-E ELECTRC SCHEDULE EV Sheet 1 RESDENTAL TME-OF-USE SERVCE FOR PLUG-N ELECTRC VEHCLE CUSTOMERS APPLCABLTY: This optional
More informationWhite River Electric Association, Inc. Net Metering Information & Service Requirements
White River Electric Association, Inc. Net Metering Information & Service Requirements What is Net Metering? Net Metering is an electric policy and service for consumers who own and utilize renewable energy
More informationEnergy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities
Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities By: Nasser Kutkut, PhD, DBA Advanced Charging Technologies
More informationRealizing Energy Savings in Fan and Pump Systems using Variable Frequency Drives. Schaedler Yesco Expo 2012
Realizing Energy Savings in Fan and Pump Systems using Variable Frequency Drives Cocoa Suite 4 April 11, 2012 09:30 AM Presenter: Dan Dillon Schaedler Yesco Expo 2012 Energy Savings no-brainer: Motor Efficiency
More informationINDEX RATE SCHEDULES
Fifteenth Revised Sheet No. 7.000 City of St. Cloud Canceling Fourteenth Revised Sheet No. 7.000 INDEX RATE SCHEDULES Schedule Description Sheet No. FC Fuel Charge 7.010 RS Residential 7.100 PSR Prepaid
More information2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions
1 What did Black Hills Energy file? We submitted a Phase 2 Rate Review proposal to the Colorado Public Utilities Commission (PUC) to complete the two-step process of updating electric rates, which were
More informationAgricultural Service Rate Schedule AG
I. Applicability Agricultural Service This Rate Schedule 1-AG applies to single- or three-phase nonresidential agricultural service, delivered at standard voltages designated by SMUD as available at the
More informationELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)
ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA () Availability This rate shall be available for the firm power requirements
More informationNet Metering in Ontario POWER YOUR ELECTRICITY NEEDS AND MANAGE YOUR ENERGY COSTS.
Net Metering in Ontario POWER YOUR ELECTRICITY NEEDS AND MANAGE YOUR ENERGY COSTS. Generate Savings. Learn About Net Metering. WHAT IS NET METERING? Ontario s net metering regulation allows you to send
More informationResident Utility Allowance Program Update. Davis-Monthan Air Force Base 22 June 2016
Resident Utility Allowance Program Update Davis-Monthan Air Force Base 22 June 2016 RESIDENT UTILITY ALLOWANCE UPDATE 2 AGENDA INTRODUCTION Purpose, Agenda AF Policy Overview UA PROGRAM HOW IT WORKS Like
More informationFrequently Asked Questions Trico Proposed Net Metering Tariff Modifications
Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications 1. Who is a self-generation or Net Metering Member? This is a Member who has installed grid-connected renewable generation, such
More informationCITY OF SANTA CLARA. RATE OPTIONS: Non Time of Use Time of Use CUSTOMER CHARGE For Each Service Address per meter per month $ $306.
Sheet 1 of 6 DESCRIPTION OF SERVICE This Schedule is optional to Customers who occupy one or more demand-metered service addresses served by Silicon Valley Power (SVP), where electric service from SVP
More informationEnergy Efficiency Program Overview
Energy Efficiency Program Overview Rick Tonielli Sr. Program Manager C O N F I D E N T I A L Who We Are and What We Do Help customers save money and energy Cash incentives Technical services Whole-building
More informationGlossary of Community Choice Energy and Related Terms
Glossary of Community Choice Energy and Related Terms Assembly Bill (AB) 117 Behind-the-meter (BTM) Bundled Services California Energy Commission (CEC) California Independent System Operator (CAISO) California
More informationImpact of Energy Efficiency and Demand Response on Electricity Demand
October 26, 2009 Impact of Energy Efficiency and Demand Response on Electricity Demand Perspectives on a Realistic United States Electric Power Generation Portfolio: 2010 to 2050 Presented by Lisa Wood
More informationENERGY & UTILITIES. Electricity Metering & Sub-Metering Concepts and Applications. BuildingsOne April 30, 2018
BuildingsOne April 30, 2018 The measurement of base building systems and tenantspecific equipment electricity consumption, through submetering applications, is increasing in importance within the commercial
More informationFebruary 4, 2019 VIA ELECTRONIC FILING. Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR Attn: Filing Center
February 4, 2019 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: Advice No. 19-003 Schedule 12 Quarterly Meter Reading
More informationA Renewable Energy Initiative for Colorado
A Renewable Energy Initiative for Colorado Chris Bunch Angela Cook Nick Goldstein Erica Johnson Kindra Priest Jacob Walter Social Factors and Earth Science Prof. Hartmut Spetzler May 6 th, 2006 Goals Reduce
More informationNational Grid s Solar Initiatives and Net-Metering
National Grid s Solar Initiatives and Net-Metering Tim Roughan Director of Distributed Resources, National Grid EBC, February 4, 2010 Agenda Who we are National Grid s Solar Projects Net-Metering changes
More information2018 Summary of Eastern Massachusetts Electric Rates for Greater Boston Service Area
2018 Summary of Eastern Massachusetts Electric Rates for Greater Boston Service Area Rates Effective: January 1, 2018 The following rates are available to our customers and have been approved by the Massachusetts
More informationSALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE Effective: April 2015 Billing Cycle AVAILABILITY: The E-27 Price Plan is subject
More informationPG&E s Commercial Electricity Vehicle Rate
PG&E s Commercial Electricity Vehicle Rate Webinar November 20, 2018 Michael Pimentel California Transit Association Cal Silcox Pacific Gas & Electric How to Ask Questions Submit your questions anytime
More informationPSE&G Renewable Energy Programs Susanna Chiu Director - Business Development
PSE&G Renewable Energy Programs Susanna Chiu Director - Business Development 1 Advantages of Solar Energy Energy Independence. Solar energy is renewable. We never have to worry about running out of sunlight
More informationMCE Napa County Cleaner energy and lower rates. Honig Winery, Rutherford
MCE Napa County Cleaner energy and lower rates Honig Winery, Rutherford Public Power by Community Choice Communities collectively purchase electricity as an alternative to investor-owned utility power
More informationCreating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.
Massachusetts RPS Solar Carve-Out: Overview & Program Basics November 2, 2011 Outline Learn how the solar PV market has grown in MA since 2007 Understand the policy design of the MA RPS Solar Carve-Out
More informationConsiderations for Interconnecting with Renewable Generators
Considerations for Interconnecting with Renewable Generators September 30, 2015 Andrew Fusco Vice President, Member Services and Corporate Planning Agenda for Solar Discussion Why is solar so popular today?
More informationSmall General Service Time-of-Use Rate Schedule GS-TOU3
I. Applicability Small General Service Time-of-Use This Rate Schedule 1-GS-TOU3 applies to single- or three-phase service, delivered at standard voltages designated by SMUD as available at the customer
More informationElectricity Trends in Pennsylvania
Electricity Trends in Pennsylvania Energy and How We Pay for it in Pennsylvania: The Next Five Years and Beyond Central Susquehanna Citizen s Coalition April 1, 2010 William Steinhurst www.synapse-energy.com
More informationExample 1MW Solar System for Fosters Yatala
Example 1MW Solar System for Fosters Yatala Document Created by Luke M Hardy lmhardy@smartconsult.com.au Smartcom P/L 31 December 2012 Highlights Luke M Hardy MBA, Grad Cert Carbon Management Key Points
More informationPlug-in Electric Vehicle Program. Wisconsin Public Utility Institute Transportation Fuels Program July 14, 2011
Plug-in Electric Vehicle Program Wisconsin Public Utility Institute Transportation Fuels Program July 14, 2011 Company Profile The Utility Principal subsidiary of CMS Energy 7,000+ employees $6.8B in annual
More informationATTACHMENT 14 RESOLUTION NO. 5888(14) Supersedes Schedule NEM of Resolution No. 5592(09) Schedule NEM NET ENERGY METERING
APPLICABILITY ATTACHMENT 14 RESOLUTION NO. 5888(14) Supersedes Schedule NEM of Resolution No. 5592(09) Schedule NEM NET ENERGY METERING This net metering schedule applies to residential and/or small commercial
More informationScaling Successful Mini-grid Programs: Experience of Bangladesh
Frontier Developments in Mini-grids Scaling Successful Mini-grid Programs: Experience of Bangladesh Farzana Rahman Unit Head (Investment), Renewable Energy IDCOL, Bangladesh 6 December 2017 Abuja, Nigeria
More informationUnited Energy Tariff Criteria (effective 1 January 2019)
United Energy Tariff Criteria (effective 1 January 2019) 08.11.18 08.11.18 1 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DEFAULT NETWORK TARIFFS FOR NEW CONNECTIONS:... 4 2.1. LVS1R - Low voltage small 1
More informationR ANCHO C UCAMONGA MUNICIPAL U TILITY
R ANCHO C UCAMONGA MUNICIPAL U TILITY Energy Reliability Commitment 2014 ANNUAL REPORT RANCHO CUCAMONGA MUNICIPAL UTILITY Page 2 Message from the Utility In 2014, the Rancho Cucamonga Municipal Utility
More informationIncentives, Grants, and Loans for Renewable and Energy Efficient Systems. Stacy Miller Solar Policy Specialist
Incentives, Grants, and Loans for Renewable and Energy Efficient Systems Stacy Miller Solar Policy Specialist Annual (kw DC ) Cumulative (kw) 6,000 Minnesota's Solar Capacity as of September 30, 2014 5,000
More information