1 MOLTEN SULFUR FIRE SEALING STEAM REQUIREMENTS PROPOSED MODIFICATIONS TO NFPA 655 Alan D. Mosher Black & Veatch Corporation Sean M. McGuffie Dennis H. Martens Porter McGuffie, Inc. Brimstone Sulfur Symposium Vail, Colorado September 14 18, 2015 Abstract National Fire Protection Association (NFPA) 655, Standard for Prevention of Sulfur Fires and Explosions (current edition: 2012), Chapter 5, Handling of Liquid Sulfur at Normal Handling Temperatures, Section 5.5, Fire Fighting, states that protection of covered liquid sulfur storage tanks, pits and trenches shall be by one of the following means: (1) inert gas system, (2) steam extinguishing system capable of delivering a minimum of 2.5 pounds per minute (lb/min) (1.13 kilograms per minute [kg/min]) of steam per 100 cubic feet (ft 3 ) (2.83 cubic meters [m 3 ]) of volume, or (3) rapid sealing of enclosure to exclude air. The NFPA snuffing steam rate stated in the standard results in a large steam rate being fed to sulfur tanks and sulfur pits that typically have a low design pressure. The sulfur tanks and sulfur pits are typically designed with air sweep systems to prevent the accumulation of hydrogen sulfide (H 2 S) in the vapor space, thereby eliminating the flammable mixture. The air intake and exhaust systems are typically designed with very low pressure drops for normal operation. If snuffing steam is fed to sulfur tanks and sulfur pits at the rate specified in NFPA 655, the built up back pressure typically far exceeds the design pressure of the enclosure. For these reasons, the refining and gas plant industry has tended to choose not to follow the NFPA 655 specified snuffing steam rate. Actual operating data from sulfur fires in sulfur tanks and sulfur pits indicate that a lower sealing steam rate is adequate to extinguish the fire by sealing the sulfur tank or sulfur pit from air ingress and purging some of the air as the fire is extinguished by lack of oxygen. Some computational fluid dynamics (CFD) modeling has been completed that supports the field data showing that a lower steam rate is adequate to extinguish the fires. This paper focuses on the potential problems caused by the current NFPA 655 snuffing steam rate, analysis of actual field data for fires in sulfur tanks and pits, and a recommendation for the NFPA 655 committee to consider regarding a steam rate to seal the enclosure and extinguish the fire in a sulfur tank and sulfur pit. The paper also includes comments on good engineering practice resulting from the calculations and CFD analyses that were completed. NFPA 655 is currently being updated and will be reissued in This paper was initially prepared to document issues with the current NFPA 655 snuffing steam rate for molten sulfur and to recommend a reduced rate to NFPA during the first public comment period that ended on January 5, Black & Veatch 1 September 2015

2 Executive Summary On the basis of the data collected and analysis performed for this paper, in December 2014 the authors recommended the following changes (text in red) to National Fire Protection Association (NFPA) 655, Standard for Prevention of Sulfur Fires and Explosions (current edition: 2012), Chapter 5, Handling of Liquid Sulfur at Normal Handling Temperatures: 5.5 Fire Fighting Protection for covered liquid sulfur storage tanks, pits, and trenches shall be by one of the following means: (1) Inert gas system in accordance with NFPA 69, Standard on Explosion Prevention Systems (2)*Steam extinguishing system capable of delivering a minimum of 2.5 lb/min (1.13 kg/min) of steam per 100 ft 3 (2.83 m 3 ) of volume. (3) Rapid sealing of the enclosure to exclude air (3)*Rapid sealing of the enclosure to exclude air. For sulfur tanks and sulfur pits, the use of a steam rate of 1.0 lb/min (0.45 kg/min) of steam per 100 ft 3 (2.83 m 3 ) of total tank or pit volume is expected to develop a positive pressure in the enclosure, thereby sealing the sulfur tank or sulfur pit, preventing air ingress, and extinguishing the fire Snuffing Steam and Sealing Steam Precautions The vent systems on enclosed sulfur tanks and sulfur pits must be designed to allow the required snuffing steam rate or sealing steam rate to vent without overpressuring the enclosure. The vent systems must also be designed for proper operation during normal operation Water Extinguishing Precautions Liquid sulfur stored in open containers shall be permitted to be extinguished with a fine water spray Use of high pressure hose streams shall be avoided The quantity of water used shall be kept to a minimum Dry Chemical Extinguishers. Where sulfur is being heated by a combustible heat transfer fluid, dry chemical extinguishers complying with NFPA 17, Standard for Dry Chemical Extinguishing Systems, shall be provided. A.5.5.1(3) For enclosed sulfur tanks or sulfur pits with air sweep systems, the sealing steam should be fed into the enclosure very near the air inlets. As the sealing steam vents backward through the air inlets, the sealing steam will quickly stop air ingress to the fire. Sealing steam should be fed into the sulfur tank or sulfur pit for a minimum of 15 minutes or until the temperature has returned to near normal. For further information and good engineering practice regarding sealing steam, refer to Molten Sulfur Fire Sealing Steam Requirements. C Other Publications. Mosher, A. D., McGuffie, S. M., and Martens, D.H., Molten Sulfur Fire Sealing Steam Requirements, Brimstone Sulfur Symposium, Vail, CO, September In February 2015, the above information was discussed with the NFPA 655 Committee that oversees changes to the document. The committee accepted the concept that was being presented but some wording changes were made and the statement about 1.0 lb/min (0.45 kg/min) of steam per 100 ft 3 was relocated to the document annex. In April 2015 the Black & Veatch 2 September 2015

3 committee members voted to accept the revised wording. The next step in the approval process is posting of the first draft of the revised document followed by a second public comment period in the fall of 2015, with the final goal of issuing a new edition of NFPA 655 in Introduction National Fire Protection Association (NFPA) 655, Standard for Prevention of Sulfur Fires and Explosions, (1) contains information about snuffing steam requirements for extinguishing fires in sulfur tanks and sulfur pits. The rate that is listed in Chapter 5, Handling of Liquid Sulfur at Normal Handling Temperatures, is excessive and causes problems with the venting systems of these enclosures and can cause built up back pressure within these enclosures that exceeds the original design pressure. Sulfur produced in oil and gas facilities contains quantities of hydrogen sulfide (H 2 S). This H 2 S is slowly released from the molten sulfur during storage. To eliminate the flammable mixture, sulfur tanks and sulfur pits in these facilities are typically designed with air sweep systems to prevent the accumulation of H 2 S in the vapor space. Continuous sweeping with air also prevents accumulation of pyrophoric iron sulfide (FeS) by oxidizing the material. The FeS is generated by corrosion of carbon steel components in contact with H 2 S. The air intake and exhaust systems for sulfur tanks and sulfur pits must be carefully designed with consideration for very low pressure drops during normal operation, must account for the buoyancy effect of the heated air intakes, and must account for the effect of wind blowing across the vents. Developing a vent design that accounts for all the normal operating parameters can be quite difficult and can become impractical when the vents must also be capable of venting the snuffing steam fed at the NFPA 655 rate of 2.5 pounds per minute (lb/min) per 100 cubic feet (ft 3 ) of volume. This paper focuses on the potential problems caused by the current NFPA 655 snuffing steam rate and recommendations for a revised rate by: Presenting analysis of available actual field data for extinguishing fires in sulfur tanks and sulfur pits provided by owners of oil and gas facilities. Providing the basis for a recommendation to the NFPA 655 committee to consider defining a steam rate to suitably seal the sulfur tanks and sulfur pits to exclude oxygen and, thereby, safely extinguish sulfur fires. Recommending a sealing steam rate based on documented industry practice for extinguishing fires in sulfur tanks and sulfur pits and computational fluid dynamics (CFD) studies. Comments on good engineering practice resulting from the analysis of the information gathered and from CFD modeling that was completed are included. Black & Veatch 3 September 2015

4 NFPA 655 is currently being updated and will be reissued in The original revision of this paper was prepared to document issues with the current NFPA 655 snuffing steam rate for molten sulfur fires and recommend incorporating a sealing steam rate to NFPA during the first public comment period for NFPA 655 that ended on January 5, Note: No part of this document addresses fire fighting for solid dust sulfur fires. This document only addresses steam requirements for molten sulfur fires. 2.0 Brief History of NFPA 655 Snuffing Steam Requirements The fire fighting techniques listed by NFPA for molten sulfur have evolved since the initial adoption of NFPA 655 in The following information was taken from documents such as revision history, Technical Committee Reports, etc., available on NFPA s website Edition The Technical Committee Report for Amendments to be included in the 1968 edition of NFPA 655 included the following text: 45. Fire Fighting Covered liquid sulfur storage tanks should be provided with some inert gas system for extinguishing fires that may occur in the tank. The inert gas may consist of carbon dioxide, nitrogen, flue gas or steam. Since the inert must be supplied rapidly enough to displace the ventilation air from the vents, steam is usually the most effective and economical choice Where liquid sulfur containers are of sufficiently small size to permit such action, it is recommended that they be so arranged so that they can be sealed rapidly to exclude air in case of fire; formation of sulfur dioxide will exhaust the oxygen in the enclosure and smother the fire. The system should be allowed to cool below 154C (310F) before reopening it to the atmosphere Liquid sulfur stored in open containers can best be extinguished with a fine water spray. Avoid the use of pressure hose streams which may scatter the burning liquid sulfur. The quantity of water used should be kept to a minimum Edition The Technical Committee Report for Amendments to be included in the 1982 edition of NFPA 655 included the following text: 4 4 Fire Fighting. 1 NFPA s website is Black & Veatch 4 September 2015

5 4 4.1 Covered liquid sulfur tanks shall be provided with a gaseous fire extinguishing system. (See Appendix E of NFPA 86A, Standard Ovens and Furnaces, Appendix E, and NFPA 69, Standard on Explosion Prevention Systems.) * Where a fixed inerting system is used, thin Teflon rupture discs shall be placed over the inerting nozzles so that sulfur cannot condense within the nozzle * Where liquid sulfur containers are small enough, they may be arranged so that they can be rapidly sealed to exclude air in case of fire. The sulfur dioxide produced by the fire will smother the fire. In such cases, the system shall be allowed to cool below 154C before reopening Liquid sulfur stored in open containers may be extinguished with a fine water spray. Use of high pressure hose streams shall be avoided. Quantity of water used shall be kept to a minimum Edition The Report of the Committee included the following recommendation, which was accepted and became part of the 1993 edition: 1. Revise 4 4.1" and add an Exception to read: 4 4.1* Covered liquid sulfur tanks shall be provided with a steam extinguishing system or an inert gas system in accordance with NFPA 86, Standard for Ovens and Furnaces and NFPA 69, Standard on Explosion Protection Systems. Exception: Where liquid sulfur containers can be rapidly sealed to exclude air, the SO 2 produced will smother the fire. In such cases, steam extinguishing systems or inert gas systems shall not be required. The system shall be allowed to cool below 154C (309F) before reopening. 2. Delete existing text of Edition The Report of the Committee included the following recommendation, which was accepted and became part of the 2001 edition: RECOMMENDATION : Revise as follows: Protection for covered liquid sulfur storage tanks, pits and trenches shall be by one of the following means: (a) Inert gas system in accordance with NFPA 69, Standard for Explosion Prevention Systems. Black & Veatch 5 September 2015

6 (b)* Steam extinguishing system capable of delivering 8 lbs/min of steam per 100 cu ft of volume. Bold added by current authors (c) Rapidly seal the enclosure to exclude air. A 4 4.1(b) The steam should preferably be introduced near the surface of the molten sulfur. See NFPA 86, Standard for Ovens and Furnaces, Appendix E 3. SUBSTANTIATION: This recommendation brings the steam flooding requirement in line with NFPA 86. The recommendation is based on 1934 FMRC fire test of a gasoline fire where the steam was applied above the gasoline fire and combustion air was introduced below the steam injection point. It in essence requires supplying 200 cu ft/min steam for every 100 cu ft of enclosure volume. For hot enclosures (above 220F) where the steam is injected at the surface of the liquid sulfur, a supply capable of 4 cu ft/min per 100 cu ft of enclosure volume would be satisfactory. This requirement ensures that the available steam supply is adequate to furnish enough steam at a rate sufficient to extinguish the fire Edition The Report of the Committee shows a recommendation and acceptance of a complete revision of the 2001 edition of NFPA 655 to become the 2007 edition. The 2007 edition showed the following text: 5.5 Fire Fighting Protection for covered liquid sulfur storage tanks, pits, and trenches shall be by one of the following means: (1) Inert gas system in accordance with NFPA 69, Standard on Explosion Prevention Systems (2)* Steam extinguishing system capable of delivering a minimum of 2.5 lb/min (1.13 kg/min) of steam per 100 ft 3 (2.83 m 3 ) of volume Bold added by current authors (3) Rapid sealing of the enclosure to exclude air 5.5.2* Where a fixed inerting system is used, thin corrosion resistant rupture discs shall be placed over the inerting nozzles so that sulfur cannot condense within the nozzle Water Extinguishing Precautions Liquid sulfur stored in open containers shall be permitted to be extinguished with a fine water spray Use of high pressure hose streams shall be avoided. Black & Veatch 6 September 2015

7 The quantity of water used shall be kept to a minimum Dry Chemical Extinguishers. Where sulfur is being heated by a combustible heat transfer fluid, dry chemical extinguishers complying with NFPA 17, Standard for Dry Chemical Extinguishing Systems shall be provided Edition The Report of the Committee shows a recommendation and acceptance of a revised wording of the 2007 edition of NFPA 655 to become the 2012 edition as follows: 5.5 Fire Fighting Protection for covered liquid sulfur storage tanks, pits, and trenches shall be by one of the following means: (1) Inert gas system in accordance with NFPA 69, Standard on Explosion Prevention Systems (2)* Steam extinguishing system capable of delivering a minimum of 2.5 lb/min (1.13 kg/min) of steam per 100 ft 3 (2.83 m 3 ) of volume (3) Rapid sealing of the enclosure to exclude air 5.5.2* Where a fixed inerting system is used, thin corrosion resistant rupture discs shall be placed over the inerting nozzles so that sulfur cannot condense within the nozzle Water Extinguishing Precautions Liquid sulfur stored in open containers shall be permitted to be extinguished with a fine water spray Use of high pressure hose streams shall be avoided The quantity of water used shall be kept to a minimum Dry Chemical Extinguishers. Where sulfur is being heated by a combustible heat transfer fluid, dry chemical extinguishers complying with NFPA17, Standard for Dry Chemical Extinguishing Systems, shall be provided Edition The next edition of NFPA 655 is due to be published in The public input closing date was January 5, Black & Veatch 7 September 2015

8 2.8 Equivalency of Various Required Snuffing Steam Rates Table 1 provides a comparison of different snuffing steam rates for molten sulfur that have been listed in different editions of NFPA 655. Table 1. Snuffing Steam Rates for Molten Sulfur Listed in NFPA 655 lb/min per 100 ft 3 ft 3 /min per 100 ft 3 Comment 2001 Edition Based on 1934 Factory Mutual Research Corporation (FMRC) fire test of a gasoline fire discussion prior to issue of official edition 2007 Edition Comment made as part of substantiation of item above. When steam is injected at the surface of the liquid sulfur, this rate would be satisfactory. 3.0 Issues with Current NFPA 655 Snuffing Steam Requirement Most existing and new sulfur recovery units (SRUs) within oil refineries and gas processing facilities have enclosed below grade sulfur pits and/or above grade sulfur tanks for storage of produced molten sulfur. Many of these sulfur pits and sulfur tanks have been designed with air sweep systems in the vapor space to maintain the concentration of H 2 S below 25 percent of the lower flammable limit (LFL) in accordance with NFPA 69, Standard on Explosion Prevention Systems (2), Chapter 8, Deflagration Prevention by Combustible Concentration Reduction. Because of safety concerns regarding possible venting of H 2 S to the environment through leaks in the sulfur pit, many of the sulfur pits and sulfur tanks are operated with a slight vacuum. The vacuum is often created by mechanical blowers or ejectors that pull the required amount of sweep air through the vapor space of the enclosure and then discharge that air/vapor to an appropriate disposal location/device at a slightly elevated pressure. Because of the buoyancy effect, the vacuum can also be created by the height difference between a heated vent stack and the heated air intake. The typical design internal and external pressures of sulfur tanks are low (approximately 3 to +10 inch water column [inch WC] or less), and therefore, the vent systems must be carefully designed to prevent excessive vacuum from causing damage to the sulfur tank. Unlike tanks or vessels, sulfur pits may or may not be designed with the intention of having a specific internal design pressure. However, sulfur pits are typically designed with a concrete roof thickness of 12 to 15 inches. Based solely on the weight of the roof slab, the sulfur pit should be able to contain a pressure of pounds per square inch (psi) (28 36 inch WC). However, sulfur pit roofs frequently contain access hatches. Precast concrete hatches typically range from 4 to 6 inches thick and can therefore withstand an internal pressure of only approximately 0.35 to 0.51 psi (10 14 inch WC) before lifting. Roof hatches or deflagration hatches can also be made from thin aluminum sheet material that is much lighter than the concrete and therefore able to withstand an internal pressure of only approximately inch WC before lifting. The air inlets to the sulfur pit or sulfur tank are typically heated with steam (steam jacketed) to prevent sulfur solidification and the resulting plugging within the air Black & Veatch 8 September 2015

9 inlet. The heating of the air intakes causes a buoyancy effect to occur, and the sulfur pit or sulfur tank must be operated under a slight vacuum to overcome this buoyancy effect and ensure that air is flowing into the sulfur pit or sulfur tank. Wind blowing across the roof of a sulfur tank also causes uplift on the leeward side that can cause a reversal of air flow from the air intakes and vent the vapor space out through the air intakes rather than out through the exhaust. The typical operating pressure of the vapor space of a sulfur pit or sulfur tank is in the range of inch WC vacuum. The number and size of the air inlets must be carefully selected so that the air inlets will provide enough air flow to achieve the required air sweep but also induce enough pressure drop so that the vapor space remains at or below the required vacuum needed to offset the buoyancy effect and uplift caused by wind. If there is too much air inlet area, the air intakes can draft backward and allow the air intakes to exhaust H 2 S to the atmosphere. Therefore, the air inlet area is set on the basis of the required air rate for a proper sweep of the vapor space but, at the same time, making sure that the vapor space stays at a vacuum level greater than the buoyancy effect caused by the heated air intakes. After the air intake area is set for normal operation (and in the absence of a relief valve, which most sulfur pits and sulfur tanks do not have), then that is the only area available to vent snuffing steam when steam is used to extinguish an internal fire. The current snuffing steam extinguishing system requirements in NFPA 655 of 2.5 lb/min per 100 ft 3 of volume become a very high steam flow rate for most sulfur tanks and some sulfur pits so that this rate can easily overpressure the sulfur tank and sulfur pit, causing the sulfur tank or sulfur pit to rupture. It is not practical to design a sulfur tank air sweep system to provide the necessary vacuum to prevent flow reversals in the air inlets during normal operation and provide the necessary air intake area to vent the required snuffing steam rate during a fire scenario. To illustrate the issues with overpressure of sulfur tanks, the authors evaluated six existing sulfur tanks that were designed for air sweep of the vapor space to reduce the H 2 S concentration and the resulting back pressure if steam is fed to snuff a fire according to NFPA 655 s rate of 2.5 lb/min per 100 ft 3 (refer to Table 2). As shown in Table 2, the NFPA 655 snuffing steam rate ranges from approximately 30 to 200 times the original sweep air rate. This snuffing steam rate results in a built up back pressure within the sulfur tank of inch WC. This built up back pressure would exceed the design pressure of 4 out of 6 of the sulfur tanks, as shown by the red text in Table 2. Tanks C and D have lower built up back pressure, and they have a total volume less than 6,000 ft 3. All the tanks with a volume of approximately 50,000 ft 3 and larger would have built up back pressure far higher than their design pressure. A general statement can likely be made that the vents on smaller tanks may be able to vent the current NFPA 655 snuffing steam rate, but it is likely that the vents on larger tanks cannot vent the current NFPA 655 snuffing steam rate without the built up back pressure exceeding the tank design pressure. Figure 1 is a scaled comparison of the size of the six existing sulfur tanks that were evaluated. Black & Veatch 9 September 2015

10 Table 2. Existing Sulfur Tanks with Steam at 2.5 lb/min per 100 ft 3 Tank A Tank B Tank C Tank D Tank E Tank F Dimensions 66 6" Dia x 35' 0" H 59 6" Dia x 48' 0" H 19' 8" Dia x 17' 9" H 14' 5" Dia x 16' 4" H 42' 8" Dia x 32' 10" H 47' 6" Dia x 24' 10" H Volume, ft 3 138, ,635 5,800 2,833 48,885 49,435 Design Pressure, inch WC 3 / / / / / / +3.5 Air Inlets Six 10" Two 16" Three 6" Three 6" Six 6" Six 6" Air Outlet One 10" One 16" One 8" One 8" One 18" One 8" Air Movement Method Blower sucks air through tank and pushes through caustic scrubber Natural draft 2 inlets, 1 outlet Natural draft 3 inlets, 1 outlet Natural draft 3 inlets, 1 outlet Natural draft 6 inlets, 1 outlet Natural draft 6 inlets, 1 outlet Normal Op Pressure, inch WC Unknown Air Sweep Objective <16% H2S lower flammability limit (LFL), with 150 parts per million (weight) (ppm[wt]) H2S in sulfur feed <21% H2S LFL, with 150 ppm(wt) H2S in sulfur feed <50% H2S LFL, with 150 ppm(wt) H2S in sulfur feed <50% H2S LFL, with 150 ppm(wt) H2S in sulfur feed <25% H2S LFL, with 300 ppm(wt) H2S in sulfur feed Unknown Pressure inch WC with steam at 2.5 lb/min/ 100 ft Steam volumetric rate (@ 2.5 lb/min/100 ft 3 ) compared to sweep air rate 29 x 190 x 198 x 79 x 53 x Unknown Black & Veatch 10 September 2015

11 Figure 1. Sulfur Tank Size Comparison Black & Veatch 11 September 2015

12 To illustrate the issues with overpressure of sulfur pits, the authors evaluated five existing sulfur pits that were designed for air sweep of the vapor space to reduce the H 2 S concentration and the resulting back pressure if steam is fed to snuff a fire according to NFPA 655 s rate of 2.5 lb/min per 100 ft 3 (refer to Table 3). As shown in Table 3, the NFPA 655 snuffing steam rate ranges from approximately 10 to 31 times the original sweep air rate. This snuffing steam rate results in a built up back pressure within the sulfur pits of 17.6 inch WC to 1,585 inch WC (50 pounds per square inch gauge [psig]). This built up back pressure would exceed the pressure rating of the hatch covers on all five sulfur pits, as shown by the red text in Table 3. For all five sulfur pits analyzed, the hatch covers would lift if steam was fed at the current NFPA 655 rate of 2.5 lb/min per 100 ft 3. No calculations were performed to determine the resulting built up back pressure that would remain in the sulfur pit after the hatch covers lifted, because that would require extensive and difficult calculations. The one sulfur pit that would theoretically achieve 50 psig pressure in the pit (if the hatch covers did not lift) is large, with a total capacity of 60,665 ft3. This sulfur pit is associated with an SRU with a capacity of approximately 675 long tons per day (LTPD), which is a big plant, but certainly there are other existing plants that are much larger. This particular sulfur pit has a large reduction in inlet line size 8 inches down to 4 inches to feed into a flow meter. The flow reaches sonic velocity in this 4 inch diameter section, resulting in very high built up back pressures. A general statement can likely be made that the vents on most sulfur pits associated with an SRU cannot vent the current NFPA 655 snuffing steam rate without the built up back pressure exceeding the pressure that can be contained by the hatch covers. When these hatch covers lift, steam containing H 2 S and sulfur dioxide (SO 2 ) will vent to the atmosphere at ground level and cause a serious safety concern. Figure 2 is a scaled comparison of the size of the five existing sulfur pits that were evaluated. Black & Veatch 12 September 2015

13 Table 3. Existing Sulfur Pits with Steam at 2.5 lb/min per 100 ft 3 Pit A Pit B Pit C Pit D Pit E Dimensions 24' 0"W x 35' 0"L x 10' 6"D 47' 7"W x 72' 2"L x 17' 8"D 14' 0"W x 34' 0"L x 11' 0"D 13' 2"W x 49' 10"L x 9' 2"D 21' 0"W x 30' 0"L x 8' 0"D Volume, ft 3 8,820 60,665 5,236 6,015 5,040 Design Pressure, inch WC unknown / +9.5 set by precast concrete access hatch covers unknown / set by aluminum hatch covers unknown / +9.6 set by precast concrete access hatch covers unknown / set by precast concrete access hatch covers unknown / set by aluminum hatch covers Air Inlets One 6" Two 8" One 4" One 4" One 6" Air Outlet One 6" Two 8" One 4" Two 3" One 6" Air Movement Method Ejector sucks air through air inlet and pushes to thermal reactor Ejector sucks air through air inlets and pushes to thermal reactor Ejector sucks air through air inlet and pushes to thermal reactor Ejector sucks air through air inlet and pushes to incinerator Ejector sucks air through air inlet and pushes to incinerator Normal Op Pressure, inch WC Air Sweep Objective <15% H2S LFL, with 300 ppm(wt) H2S in sulfur feed <25% H2S LFL, with 300 ppm(wt) H2S in sulfur feed <25% H2S LFL, with 300 ppm(wt) H2S in sulfur feed Unknown Unknown Pressure inch WC with steam at 2.5 lb/min/ 100 ft psig if hatch covers do not lift, sonic velocity back through air inlets /17.6 (Note 1) Steam volumetric rate (@ 2.5 lb/min/100 ft 3 ) compared to sweep air rate 16 X 31 x 17 x 30 x 9.7 x Notes: 1. The second value listed is the built up back pressure for this sulfur pit based on the ejector staying in operation. All other sulfur pits analyzed have a safety instrumented system (SIS) that will trip ejectors when fire is detected. Black & Veatch 13 September 2015

14 Figure 2. Sulfur Pit Size Comparison Black & Veatch 14 September 2015

15 4.0 Attempted Oxygen Concentration Dilution Calculation When considering a new approach to determining an adequate steam rate to extinguish a sulfur fire, the authors first considered a dilution calculation for oxidant concentration reduction or combustible concentration reduction as described in NFPA 69, Standard on Explosion Protection Systems. To be able to complete the dilution calculation, the limiting oxygen concentration (LOC) or LFL of the vapor mixture must be known. Surprisingly, the LOC and LFL for molten sulfur could not be found. Several searches were conducted: an internet search, a search of common reference books, and a search of sulfur specific books. Several research organizations and numerous engineering/operating/simulation companies that specialize in SRUs were contacted. The LOC and LFL of molten sulfur are not readily available at any of these sources. Some material safety data sheet (MSDS) were located that showed an LFL of molten sulfur, but further investigation showed that the LFL listed was actually for H 2 S. Some MSDS actually added a footnote indicating the value listed is for H 2 S, and others did not include the detail. At the normal temperature that molten sulfur is typically stored, it could be argued that the sulfur vapor pressure is so low that the real danger for fire is based on the concentration of H 2 S that has evolved from the sulfur and not the sulfur itself. The LOC and LFL for H 2 S are available. It has been shown experimentally that the LFL of a substance typically decreases with increasing temperature. Zabetakis (3) developed some correlations for predicting the temperature effect on the LFL for paraffin hydrocarbons. The LFL of a paraffin hydrocarbon approaches zero at temperatures above approximately 2,192F (1,200C). The LOC of a substance also typically decreases with increasing temperature. The LFL and LOC of a substance also vary with the specific inert that is present. Without experimental data for H 2 S and molten sulfur with steam as the inert, it can only be speculated on what happens to the LFL and LOC in gas mixtures near an existing fire. However, it could reasonably be speculated that the LFL and LOC of H 2 S and molten sulfur will fall to near zero, if the fire raises localized temperatures to where they approach 2,192F (1,200C). Even at lower localized temperatures, the LFL and LOC concentration will be very low. Therefore, once a fire has started, considering LFL and LOC as parameters to target for snuffing steam dilution calculations is not productive. 5.0 Actual Operating Data for Molten Sulfur Fire Extinguishing Steam The authors were unable to find any published data on testing completed on molten sulfur fires or data collected from actual fires in industrial molten sulfur applications. Through various molten sulfur production forums (technical conferences, sulfur production specialist user groups, etc.) and personal contacts in the industry, the authors contacted a broad spectrum of sulfur production specialists at the major refining and gas plant companies in North America that operate SRUs to request data on any sulfur fires that have occurred in sulfur pits and sulfur tanks at the owner s facilities. The sulfur production specialists contacted should have had access to data from approximately 75 locations in North America that operate SRUs. Some locations operate more than one SRU and some locations have as many as 10 sulfur pits or sulfur tanks. On the conservatively low side, the request should have been able to gather data from 100 to 200 sulfur pits and sulfur tanks. Black & Veatch 15 September 2015

16 The request was made with the promise that the sources of all data would remain anonymous. The request elicited some useful information about actual molten sulfur fires that have occurred in sulfur pits and sulfur tanks. Many owner responses indicated they had been fortunate enough to never have experienced a fire. Several owner responses indicated that they have had fires, but they occurred more than 10 years ago and therefore cannot remember much about them. Some owner responses indicated that they had experienced fires, but their corporate practice is such that they could not get corporate legal approval to allow data released outside of the organization. Some owner responses indicated that they had experienced sulfur fires, but they were unable to find sufficient documentation to indicate how the fires had been extinguished, or they knew that steam had been used, but they had no way to determine how much steam was used and the duration of the steam flow. One owner indicated that fires had occurred in three separate sulfur pits at one location and the fires were extinguished with a combination of steam and nitrogen, but no rate information was available. The authors analyzed the sulfur fire data that were made available by four owners. The rest of this section describes the data that were collected and the analysis of that data. 5.1 Detection of Sulfur Pit and Tank Fires As a side note, one outcome of the data collection was to discover how some owners detected and responded to sulfur pit fires. For newer unit designs, it is relatively common to have a Safety Instrumented System (SIS) that receives inputs from instrumentation around the sulfur pit. If unsafe conditions are detected, the SIS will isolate certain systems around the sulfur pit in an attempt to prevent damage to equipment, environmental releases and exposure of operators to toxic or dangerous environments. It is not uncommon for the SIS to monitor the vapor space temperature of a sulfur pit, and if the temperature increases above a high set point, the SIS will trip the ejector system and stop drawing air through the sulfur pit. This trip system is in place to prevent air from being drawn through the sulfur pit and intensifying the fire. One owner responded that it specifically did not want its ejector system to shut down on high sulfur pit vapor space temperature. That owner wanted the ejector system to stay online during a fire so that the majority of the SO 2 generated could be routed by the ejector to the SRU incinerator, allowing the emissions to be tracked and recorded. If the ejector system was shut down, the owner would need to estimate the emissions to be able to report them to the regulator agency. This particular owner experienced a number of sulfur pit fires in two sulfur pits over a 5 year period before the systems could be analyzed and modified to eliminate the sources of the fires. During this 5 year period, the owner s operations staff determined that whenever they experienced a rapid increase in the incinerator stack SO 2 emissions (the concentration would increase from a normal value of parts per million by volume [ppmv], through the alarm point at 125 ppmv, to 1,000 1,200 ppmv), it was typically a sulfur pit fire. This causal relationship was so strong that procedures were modified to train the operators to immediately start steam to the sulfur pit whenever they saw the incinerator stack SO 2 emissions climb rapidly. The operators would start steam to Black & Veatch 16 September 2015

17 the sulfur pit and allow the steam to flow for 15 minutes before shutting it off. After the steam was shut off, the operators would monitor the incinerator stack SO 2 emissions, and in most cases, the emissions levels returned to normal. If the emissions limits did not return to normal, the operators would then look at other causes, such as an upset in the tail gas treating unit (TGTU). This owner stated that when a fire occurred in the sulfur pits, the results could be seen in the incinerator stack first, then, about 30 seconds later, the sulfur pit vapor space temperature would begin to rise. The sulfur pit vapor space temperature would only increase by approximately 50 to 60F (28 to 33C) during a fire. The operators considered the sulfur pit vapor space temperature increase as confirmation of a fire but used the incinerator stack emissions increase as their indication to immediately start steam to the sulfur pit. Figure 3 is a plot of the distributed control system (DCS) data showing the incinerator stack SO 2 emissions and the sulfur pit vapor space temperature during a typical sulfur pit fire for this owner. The data on Figure 3 show a 30 to 40 second difference in the time between when the incinerator stack SO 2 emissions start to increase and when the sulfur pit vapor space temperature starts to increase. Figure 3 is a re plot of the raw data and not the actual plot the operators would see. When operators look at a plot trend generated by the DCS, it will have different scales associated with each parameter. In fact, the incinerator stack SO 2 emissions are reported by both a low range analyzer 0 to 500 ppmv and a high range analyzer, greater than 500 ppmv. Therefore, it makes sense that the operators would notice the initial rapid increase in the incinerator stack SO 2 emissions more easily than the slower increase in the sulfur pit vapor temperature. Because of the quick action by the operators, the incinerator stack SO 2 emissions decreased below the alarm setting of 125 ppmv within 25 minutes of the initial alarm. It should be considered that, for the example described above, the thermocouple that was in the sulfur pit vapor space never indicated a significant temperature increase during fire events. This is likely due to the location of the thermocouple compared to the location of the fire within the vapor space. It could be concluded that, during the fires experienced in the sulfur pit examples described above, the fires were somewhat localized and did not consume the entire vapor space. For configurations that intend to leave the ejectors operating through a fire event, locating the temperature indicator in the ejector suction line is likely better than locating it in the sulfur pit vapor space. At least with the temperature indicator in the ejector suction line, the thermocouple will see an average temperature of the gas passing through the sulfur pit vapor space rather than seeing a point temperature at a single location within the vapor space. Sulfur tanks typically do not include an SIS with high temperature input, and therefore, the typical method for sulfur fire detection is a visual indication of a yellow plume being vented from the tank. Some tanks do have a temperature indicator that operators can use to indicate that a fire is occurring. Black & Veatch 17 September 2015

18 Figure 3. Incinerator Stack SO 2 and Sulfur Pit Vapor Space Temperature During a Sulfur Fire 5.2 Sulfur Pit Fires Owner No. 1 experienced a number of sulfur pit fires in two sulfur pits over a 5 year period before the systems could be analyzed and modified to eliminate the sources of the fires. This owner provided data on how sulfur pit fires are extinguished. The sulfur pits in question are 21' 0" W x 30' 0" L x 8' 0" D, and each has a single 2 inch steam line from the header that reduces to 1 ½ inches near the connection on the roof of each sulfur pit. The sulfur pits are typical concrete pits that are completely enclosed, with one air inlet line and one air exit line that feeds an ejector for each sulfur pit. The ejector sweeps air through the vapor space of the sulfur pit and discharges to an incinerator. When a sulfur fire is suspected, the operators immediately open the 2 inch gate valve in the steam line to start steam flow to the sulfur pit. The owner reported that the operators will open the gate valve to a point where they see steam flowing out of the single 6 inch air intake line on the sulfur pit, which indicates they have put in enough steam to overcome the capacity of the sulfur pit ejector and sealed the enclosure/sulfur pit. The owner reported that the 2 inch gate valve is approximately one third open when the operators see steam exiting from the air intake line. The steam is left flowing for a period of 15 minutes, then the flow is stopped, and the operators look at the incinerator stack SO 2 emissions to see if they have returned to normal. In almost all cases that this owner experienced, after 15 minutes of steam flow, the fire had been extinguished. The owner could only recall one incident when the fire returned after the steam was stopped. The owner speculated that for this one case, a re ignition event may have occurred, rather than lack of suppression of the first fire. Black & Veatch 18 September 2015

19 Owner No. 1 provided the piping isometric for the steam line. Hydraulic calculations were completed for the steam based on the steam header pressure, the one third open gate valve, and information from the piping isometric. The analysis showed that the steam flow achieves sonic velocity in the 1 ½ inch section of pipe near the steam line exit into the sulfur pit. The flow of the steam was calculated to be 2,644 pounds per hour (lb/hr). The total volume of the sulfur pit is 5,040 cubic feet (ft 3 ). Calculating the steam rate to sulfur pit volume ratio shows that the steam rate this owner has been using is 0.87 lb/min per 100 ft 3 of total sulfur pit volume. The owner reported that multiple sulfur fires have been successfully extinguished in the sulfur pits with this rate when the steam has flowed for 15 minutes. This rate is 2.87 times less than (or about 35 percent of) the current NFPA 655 specified value of 2.5 lb/min per 100 ft 3 for snuffing steam methodology. The owner reported that no damage has been experienced in these sulfur pits by the numerous fires because of the fact that the fire can be extinguished in 15 minutes. It is difficult to accurately determine the resistance coefficient (K) for a partially opened gate valve without having true flow test data from the manufacturer of the actual gate valve. The authors determined that with a completely open full port gate valve (K values are available) the flow of steam would only increase to 2,900 lb/hr because the steam flow hits sonic velocity in the 1 ½ inch section near the sulfur pit roof. Therefore, the maximum flow of steam possible with the existing piping configuration is 2,900 lb/hr. Calculating the steam rate to sulfur pit volume ratio shows the maximum steam rate this owner could possibly feed, assuming a completely open gate valve, would be 0.96 lb/min per 100 ft 3 of total sulfur pit volume. This number is not substantially different from the estimated rate with the gate valve only one third open. It should be considered that for the sulfur pit evaluated above, the operators specifically adjust the steam flow until they see steam coming out of the air intake piping. The flow of steam effectively seals the air intake and prevents air from entering the sulfur pit. The steam is also diluting the air that is in the vapor space and pushing some of it out of the air intake piping. In the Computational Fluid Dynamics Modeling of a Sulfur Pit section, CFD is used to determine the oxygen concentration during the 15 minute period when steam is fed. As the fire consumes sulfur and oxygen from the air, SO 2 is produced. This SO 2 is heavy and could possibly sit on the surface of the molten sulfur, helping to limit the fire access to oxygen in the vapor space. Alberta Sulphur Research Ltd (ASRL) has completed some preliminary evaluations of fires in rail cars. According to Clark [Clark, P.D. personal communication October 8, 2014], ASRL completed experiments that simulated what happens if a rail car of solid sulfur ignited. What they observed was that the sulfur started to burn only after it became liquid. In addition, they saw that the flame temperature never reached the maximum value in air (ca. 1,200F [650C] but stalled around 840F (450C), after all of the solid had liquefied. They preliminarily concluded that the SO 2 produced at the sulfur surface prevented mass transfer of air to the sulfur, limiting the rate of combustion. These experiments were done in an open box without a lid. Clark also speculated that since the surface of the liquid sulfur was adjacent to the hot vapor at 840F (450C), evaporation of liquid sulfur to the gas phase may be impeded by a viscous sulfur layer at or near the surface. Thus, the equilibrium vapor pressure at the bulk liquid sulfur temperature (ca. 356F [180C]) might not be obtained during a fire in a pit due to the kinetic effects of evaporation. Black & Veatch 19 September 2015

20 Even if the SO 2 is well dispersed within the vapor space, by effectively sealing all air entrances to the sulfur pit with steam, the fire becomes self limiting and is quickly extinguished. Owner No. 2 experienced a sulfur pit fire in one sulfur pit recently. This owner provided the authors with data on how the sulfur pit fire was extinguished. The sulfur pit in question is 19' 6" W x 57' 0" L x 10' 0" D and has a single 2 inch steam line from the header that branches into three separate 2 inch lines, which each feed a 3 inch connection with a rupture disk on 3 inch connections on the roof of each sulfur pit. The three connections on the sulfur pit roof are roughly 20 feet apart and feed the common vapor space above different sections within the sulfur pit. The sulfur pit is a typical concrete pit that is completely enclosed with one air inlet line and one air exit line that feeds two ejectors (one ejector can be used to feed the sulfur pit sweep air to the incinerator, and the other can be used to feed the sulfur pit sweep air back to the front end of the SRU at the thermal reactor). The owner reported that when an increase in temperature of the sulfur pit vapor space was noticed (120F [66.7C] in just a few minutes), the steam 2 inch ball valve was opened about one quarter. The steam was left flowing for a period of approximately 2 minutes, the sulfur pit vapor space temperature began to decrease, and the steam flow was stopped. The operators then monitored the sulfur pit vapor space temperature and noticed that, approximately 30 minutes after stopping the steam flow, the temperature started to increase again. At that point, the operator cracked open the 2 inch ball valve in the steam line and let the steam flow for an additional minute until they saw the sulfur pit vapor space temperature start to decrease. The steam valve was then closed, and the fire did not return. Figure 4 is DCS data showing the temperature of the sulfur pit vapor space and the liquid sulfur temperature during the fire in Owner No. 2 s sulfur pit. As can been seen, the sulfur pit vapor temperature increased 120F (66.7C) approximately 8 minutes after a sulfur pump tripped due to high viscosity (molten sulfur viscosity increases as temperature increases). Steam was started for 2 minutes and, when the operators saw the temperature begin to decrease, the steam was stopped. The sulfur pit vapor space and liquid sulfur temperature continued to decrease to normal values over an approximate 30 minute period. Then a second temperature spike occurred in the sulfur pit vapor and liquid sulfur. A small amount of steam was added for about 1 minute, and the temperatures again started to decrease toward normal values. When the steam flow was initially started, only one of the three rupture disks actually burst. The rupture disk that was closest to the steam supply valve was the disk that burst. The other two rupture disks remained intact through both steam events. Although not perhaps apparent during the original design, but obvious in hindsight, having multiple rupture disks on a single steam supply line will likely result in only one disk bursting. The rupture disks are located directly on the sulfur pit nozzles to prevent sulfur pit vapors from backing into the steam line, condensing, and then solidifying and plugging the line during normal operation. The rupture disks are located at practically the lowest pressure in the piping system. Therefore, with slight differences in the actual bursting pressure of the rupture disks and slightly different pressures in each section of piping feeding the rupture disks, it is logical that only one of the rupture disks would burst, and all the flow would enter the sulfur pit at that location. Black & Veatch 20 September 2015

21 Figure 4. Sulfur Pit Fire DCS Temperature Data Owner No. 2 provided the piping isometric for the steam line. Hydraulic calculations were completed for the steam based on the steam header pressure, the one quarter open ball valve, and information from the piping isometric. The flow of the steam was calculated to be 891 lb/hr. The analysis shows that the steam flow only achieves about 10 percent of sonic velocity in the upsized 3 inch section of pipe near the steam line exit into the sulfur pit. The total volume of the sulfur pit is 11,115 ft 3. Calculating the steam rate to sulfur pit volume ratio shows the steam rate this owner used was 0.13 lb/min per 100 ft 3 of total sulfur pit volume. This rate likely was successful in extinguishing the initial sulfur fire in the sulfur pit when this rate was used for only about 2 minutes. The owner did experience a second fire 30 minutes later, but it was likely a re ignition event. The authors did not calculate a steam rate for the second event because the operators said they only cracked the valve open slightly for 1 minute. Therefore, the steam rate fed the second time was less than the first rate shown above. The steam rate above is 19 times less than (or about 5 percent of) the current NFPA 655 specified value of 2.5 lb/min per 100 ft 3. The rate discussed above of 0.13 lb/min per 100 ft 3 is practically the same value as listed in Table 1 of Section 2.8 regarding a statement made in substantiation of changes to the 2001 edition of NFPA 655, namely, that, if steam is injected at the surface of the sulfur, 4 ft 3 /min per 100 ft 3 of enclosure volume would be satisfactory (4 ft 3 /min per 100 ft 3 is equal to 0.14 lb/min per 100 ft 3 ). Black & Veatch 21 September 2015

22 It is difficult to accurately determine the resistance coefficient (K) for a partially opened ball valve without having true flow test data from the manufacturer of the actual ball valve. The authors determined that with a completely open full port ball valve (K values are available), the flow of steam would only increase to 2,779 lb/hr. The velocity at this rate was still only 29 percent of sonic velocity in the 3 inch section near the sulfur pit roof. The maximum flow of steam possible with the existing piping configuration is 2,779 lb/hr. Calculating the steam rate to sulfur pit volume ratio shows the maximum steam rate this owner could possibly feed, assuming a completely open ball valve, would be 0.41 lb/min per 100 ft 3 of total sulfur pit volume. This number is more than 3 times the estimated rate with the ball valve only one quarter open. However, this steam rate is still 6 times less than (or about 16 percent of) the current NFPA 655 specified value of 2.5 lb/min per 100 ft 3. Owner No. 3 experienced a sulfur pit fire in one sulfur pit in December That fire was the first known sulfur pit fire in the 21 years of operation of that unit. This owner provided data on how the sulfur pit fire was extinguished. The sulfur pit in question is 12' 0" W x 36' 6" L x 8' 0" D and has a single 2 inch steam line from the header that branches into three separate 2 inch lines, each of which feeds a 3 inch connection on the roof of the sulfur pit. The three connections on the sulfur pit roof feed the vapor space in the sulfur pit. The sulfur pit is a typical concrete pit that is completely enclosed, with one air inlet line and one air exit line that feeds an ejector. The steam driven ejector sweeps air through the vapor space of the sulfur pit and discharges to an incinerator. The owner stated that their written procedure for a sulfur pit fire is to open the 2 inch valve in the steam line 100 percent and keep the steam on for at least 15 minutes. The owner reported that, when troubleshooting high incinerator stack SO 2 emissions, they reduced the motive steam flow to the ejector, and almost immediately (less than 5 minutes) the incinerator stack SO 2 emissions returned to normal. By temporarily reducing the motive steam flow to the ejector, the ejector pulled less air through the sulfur pit, and the fire extinguished itself. No steam flow was required for this particular sulfur fire. 5.3 Sulfur Tank Fires Owner No. 4 experienced a few sulfur tank fires. This owner provided data on how the sulfur tank fires were extinguished. The sulfur tank in question is 20' 0" Dia x 32' 0" H and has a 4 inch steam line from the header that feeds four 2 inch connections on the roof of the sulfur tank. The sulfur tanks are typical carbon steel tanks with a fixed roof and with multiple air inlet lines around the periphery of the roof and one center air exit line that vents to the atmosphere. The owner reported that, when they noticed a fire in the sulfur tank, they opened the steam 4 inch ball valve about one quarter. The steam was left flowing for a period of 30 minutes and then the flow was stopped. The owner stated that they noticed the temperature in the tank decreased after 5 to 10 minutes, but they kept the steam on for 30 minutes to be sure the fire was completely extinguished. The authors completed hydraulic calculations for the steam based on the steam header pressure, the one quarter open valve, and information regarding the piping routing. The flow of the steam was calculated to be 10,840 lb/hr. The analysis showed that the steam flow achieves only about 60 percent of sonic velocity in the downsized 2 inch sections of pipe at the nozzles on the sulfur tank. The total volume of the sulfur tank is 123,150 ft 3. Calculating the steam rate to sulfur tank volume ratio showed the steam rate this owner Black & Veatch 22 September 2015

23 has been using is 0.15 lb/min per 100 ft 3 of total sulfur pit volume. The owner reported successfully extinguishing the sulfur fire in the sulfur tank with this rate when the steam flowed for 30 minutes (fire was likely out in 5 to 10 minutes). This rate is 17 times less than (or about 6 percent of) the current NFPA 655 specified value of 2.5 lb/min per 100 ft 3. The owner reported that no damage was experienced in the sulfur tank by this fire, because it was likely extinguished in 5 to 10 minutes. It is difficult to accurately determine the resistance coefficient (K) for a partially opened valve without having true flow test data from the manufacturer of the actual valve. The authors determined that with a completely open full port valve (K values are available), the flow of steam would only increase to 14,836 lb/hr. The velocity at this rate was still only 80 percent of sonic velocity in the 2 inch section of pipe at the nozzles on the sulfur tank roof. The maximum flow of steam possible with the existing piping configuration is 14,836 lb/hr. Calculating the steam rate to sulfur pit volume ratio shows the maximum steam rate this owner could possibly feed, assuming a completely open valve, would be 0.20 lb/min per 100 ft 3 of total sulfur pit volume. This number is not substantially different from the estimated rate with the valve only one quarter open. Owner No. 4 reported that fires had occurred in sulfur tanks at another location, but it had been 10 years or more since the last one. For this site, when a fire occurred steam valve(s) would be opened for a period of 20 to 30 minutes. 6.0 Computational Fluid Dynamics Modeling of a Sulfur Pit A CFD model of the first sulfur pit described in Section 5.2 was created. The CFD model was set up to determine concentrations of oxygen and steam as well as the velocities throughout the model. The model did not include the effects of actual combustion of oxygen with sulfur. Therefore, all changes in oxygen concentration are a direct result of dilution of the oxygen with steam and exhausting the oxygen containing air from the sulfur pit through the ejector suction line and backward through the air intake line. All reported oxygen concentrations are, therefore, conservative, and the actual values would be lower because of the consumption of oxygen by combustion of sulfur. Two flow conditions were considered with the model: a current configuration model and a model that considered a relocation of the steam inlet. It should be noted that the disturbance of the sulfur s surface by possible high speed jets, which would result in more sulfur available for a pit fire, was not considered in these analyses. As has been shown in a previous publication by one of this paper s authors (4), the following steps are involved in all CFD analyses: Selection and construction of computational domains. Development of computational grid. Selection of domain physics. Application of boundary conditions. Solution. Black & Veatch 23 September 2015

24 The following subsections detail how each of these steps was implemented for the CFD analyses, the results and general discussion from the analyses. 6.1 Selection and Construction of Computational Domains The model was based on the overall internal dimensions of the sulfur pit, along with the dimensions of the air inlet and ejector suction lines. The overall domain for both models included the pit vapor space at a 45 percent fill level. Figure 5 shows the three geometric domains created for the analyses, the main pit space (steel blue light, 40 percent transparent) and the two abandoned sparger boxes (turquoise green). Figure 5. Domains Used for CFD Analyses 6.2 Development of Computational Grid The computational grid was constructed using Star CCM+ s automatic polyhedral mesher with wall prism layers enabled. The final computational grid contained 1,001,116 cells and is shown on Figure 6. Black & Veatch 24 September 2015

25 Figure 6. Computational Grid Developed for CFD Analyses 6.3 Selection of Domain Physics The following physics models were enabled for the analyses: Space 3 dimensional. Time Implicit unsteady. Material Multispecies, gas (H 2 S, H 2 O, O 2 and N 2 ). Equation of state Ideal gas. Turbulence RANS, Realizable k, All y+ Wall Law. Segregated fluid temperature. Gravity ( 9.81 m/s in y direction). Black & Veatch 25 September 2015

26 6.4 Selection of Boundary Conditions Figure 7 shows the boundary conditions applied for the current configuration analysis. The steam inlet is denoted by the dot in the red circle, and the air inlet is denoted by the top of the pipe in the blue circle. The ejector outlet is shown in yellow. The steam inlet was defined as a mass flow inlet, with an inlet flow rate of 2,456 lb/hr. The steam inlet was sized to have an inlet velocity of 0.7 Mach, as sonic flow would require considerably more computational resources to solve. The air inlet was defined as a stagnation inlet at atmospheric pressure. The ejector was defined as a velocity outlet with a flow rate based on the design data sheet value of 350 actual cubic feet per minute (acfm). Figure 7. Boundary Conditions Applied for Current Configuration Analysis Figure 8 shows the boundary conditions applied to the steam inlet moved model. The air inlet is circled in blue, the steam inlet is circled in red and the ejector outlet is circled in yellow. Since this model was originally run with a pressure boundary at the ejector outlet, there is a contraction to prevent backflow. The same values listed above were applied to this model. Black & Veatch 26 September 2015

27 Figure 8. Boundary Conditions Applied to Steam Inlet Moved Model Figure 9 shows the common boundary conditions applied to the models. The unheated sparger walls are shown in magenta. The heated sulfur level is shown in yellow, and the sulfur rundowns are shown in white. Both the sulfur level and rundowns were set to a defined temperature of 315.5F (157.5C). Figure 9. Common Boundary Conditions Applied to Models Black & Veatch 27 September 2015

28 6.5 Solution The transient solutions were conducted on a high performance computing cluster (HPCC) using 120 processors. An adaptive time step was used so that the maximum convective Courant number was below 1 for each time step. 6.6 Results The following subsections detail the results for the two configurations that were analyzed Current Configuration Results The maximum and the average oxygen concentration in the sulfur pit vapor space versus time, for the current configuration case, are plotted on Figure 10. As can be seen on the figure, at the end of the 15 minute steam period, the maximum oxygen concentration in the sulfur pit vapor space is about 0.24 mole%. However, the average oxygen concentration is only about mole%. The average oxygen concentration is 16 times lower than the maximum value, indicating that there are very few locations within the vapor space of the sulfur pit with oxygen concentrations near the maximum. The very low average oxygen concentration supports the field data that the sulfur pit fire is extinguished before the steam is stopped after 15 minutes. The actual oxygen concentration in the sulfur pit vapor space will be even lower than indicated on the figure because the CFD model does not account for the oxygen consumed by the sulfur fire. Figure 10. Oxygen Concentrations in Sulfur Pit Vapor Space Black & Veatch 28 September 2015

29 Data were also extracted from the CFD model to show the maximum oxygen concentration in the sulfur pit air inlet line and in the suction line to the ejector. These data, along with the maximum oxygen and the average oxygen concentration in the sulfur pit vapor space, are plotted on Figure 11. The figure shows that the maximum oxygen concentration in the ejector suction line immediately starts to decrease after the steam is started. This is as expected since the steam is fed into the sulfur pit near the nozzle on the sulfur pit that feeds the ejector suction. The figure shows that the maximum oxygen concentration in the air inlet line remains at the ambient value of 21 mole% for about 15 seconds as the steam passes through the vapor space of the sulfur pit to reach the air inlet on the far side of the sulfur pit. After about 15 seconds, the maximum oxygen concentration in the air inlet line begins to decrease (as steam begins flowing backward through the air inlet line) and basically matches the maximum oxygen concentration in the ejector suction line after 90 seconds. The maximum oxygen concentration in the ejector suction and the maximum oxygen concentration in the air inlet line practically lie on top of the line for the average oxygen concentration in the sulfur pit vapor space, making it difficult to distinguish the three lines in the figure. Although not shown on the figure, the average oxygen concentration and the maximum oxygen concentration in the ejector suction line do not differ by more than 1 percent after about 25 seconds of elapsed purge time. The fact that the maximum oxygen concentration in the ejector suction line, air inlet line and the vapor space are basically the same value indicates that the sulfur pit vapor space is fairly well mixed and venting the same concentration from both ends of the sulfur pit. Figure 11. Oxygen Concentrations in Sulfur Pit Vapor Space, Air Inlet and Ejector Suction Black & Veatch 29 September 2015

30 6.6.2 Relocated Configuration Results The maximum and the average oxygen concentration in the sulfur pit vapor space versus time for the current steam location, and with the steam relocated near the air inlet line are plotted on Figure 12. As can be seen on the figure, relocating the steam inlet near the air inlet line significantly lowers the average and maximum oxygen concentration in the sulfur pit vapor space compared to those same parameters with the steam at its existing location. The model was stopped after about 12 minutes (720 seconds) because the oxygen concentrations were so low. At the end of 12 minutes, the maximum oxygen concentration in the sulfur pit vapor space was less than mole%, and the average oxygen concentration in the sulfur pit vapor space was less than mole%. Again, the actual oxygen concentration in the sulfur pit vapor space will be even lower than indicated on the figure because the CFD model does not account for the oxygen consumed by the sulfur fire. It is obvious from the data that introducing the steam near the air inlet line will seal the air inlet line quicker and thereby drive the oxygen concentration in the vapor space to low levels much faster than locating the steam on the far side of the sulfur pit near the ejector suction line. The data indicate that by relocating the steam feed to near the air inlet line, after about 5 minutes the maximum and average oxygen concentrations in the sulfur pit vapor space can be decreased to values similar to the values achieved in 15 minutes with the existing steam location. Figure 12. Oxygen Concentrations in Sulfur Pit Vapor Space with Steam Relocated Near Air Inlet Black & Veatch 30 September 2015

31 6.6.3 Velocity Streamline Comparisons Figure 13 shows the velocity streamlines for the current configuration analysis. As can be seen, the high speed jet impinges on the liquid sulfur surface and then travels around the perimeter. In this flow condition, little purging is occurring in the center of the pit, which results in the longer purge times shown on Figure 10 through Figure 12. Figure 14 shows the velocity streamlines for the steam inlet relocated configuration. As can be seen in this case, a large portion of the steam enters the pit and is immediately exhausted through the air inlet. This will result in rapidly stopping all O 2 flow into the pit. Figure 13. Velocity Streamlines for Current Configuration Analysis Black & Veatch 31 September 2015

32 6.7 General Discussion Figure 14. Velocity Streamlines for Moved Steam Inlet Case Additional CFD studies are needed to verify the impacts of locating the steam connection near the air inlet lines for other sulfur pit configurations. However, it is logical to conclude that by locating the steam near the air inlets, the steam will quickly seal the air inlets and thereby stop ingress of oxygen that would maintain the sulfur fire. It is also logical to assume that locating the steam near the air inlets rather than near the ejector suction allows more time for the ejector to remove the existing sulfur pit vapor space gas mixture (air, sulfur vapor, H 2 S, SO 2 ) before the mixture begins to be diluted with steam. Therefore, the oxygen is removed from the sulfur pit vapor space more quickly. Additional CFD studies are also needed to confirm how the oxygen concentration is reduced for designs where the sulfur pit ejector is tripped off on the basis of the sulfur pit vapor space temperature. Porter McGuffie Inc. estimates that it would take approximately 3 man days to set up a new sulfur pit model and execute one set of conditions. Each additional set of conditions would require about 1.5 man days to execute. Black & Veatch 32 September 2015

by Jim Phillips, P. E.

by Jim Phillips, P. E. by Jim Phillips, P. E. Baking flour, coal dust and gasoline; what do these things have in common? They are not the ingredients for a strange new cake recipe. Each of these ingredients is the fuel that

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

in Preventing Explosions within Fired Equipment: The Role of Basic Design Data Robert Wasileski A Case Study Process Safety & Loss Prevention Engineer

in Preventing Explosions within Fired Equipment: The Role of Basic Design Data Robert Wasileski A Case Study Process Safety & Loss Prevention Engineer 55 th Canadian Chemical Engineering Conference October 16-19, 2005 The Role of Basic Design Data in Preventing Explosions within Fired Equipment: A Case Study Robert Wasileski Process Safety & Loss Prevention

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

SAFETY TRAINING LEAFLET 04 NITROUS OXIDE

SAFETY TRAINING LEAFLET 04 NITROUS OXIDE SAFETY TRAINING LEAFLET 04 NITROUS OXIDE Doc 23.04/18 EUROPEAN INDUSTRIAL GASES ASSOCIATION AISBL AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel: +32 2 217 70 98 Fax: +32 2 219 85 14 E-mail: info@eiga.eu Internet:

More information

Methanol distribution in amine systems and its impact on plant performance Abstract: Methanol in gas treating Methanol impact on downstream units

Methanol distribution in amine systems and its impact on plant performance Abstract: Methanol in gas treating Methanol impact on downstream units Abstract: Presented at the AIChE Spring 2015 meeting in Austin, TX, USA Methanol distribution in amine systems and its impact on plant performance Anand Govindarajan*, Nathan A. Hatcher, and Ralph H. Weiland

More information

Pyrophoric Ignition Hazards in Typical Refinery Operations

Pyrophoric Ignition Hazards in Typical Refinery Operations Pyrophoric Ignition Hazards in Typical Refinery Operations CAER Safety Summit Meeting December 2010. Doug Jeffries Chief Fire Protection Engineer Agenda. Definitions and chemistry of pyrophorics Conditions

More information

PEIRCE SMITH CONVERTER HOOD IMPROVEMENTS AT BHP COPPER

PEIRCE SMITH CONVERTER HOOD IMPROVEMENTS AT BHP COPPER PEIRCE SMITH CONVERTER HOOD IMPROVEMENTS AT BHP COPPER Ovidiu Pasca and John Bryant BHP Copper Arizona, USA Paykan Safe and Brian Wiggins Gas Cleaning Technologies Dallas, USA ABSTRACT Several improvements

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 16/9/16 (Information paper) English only ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 37: Other issues to be considered by the Technical

More information

Chapter 4 ANALYTICAL WORK: COMBUSTION MODELING

Chapter 4 ANALYTICAL WORK: COMBUSTION MODELING a 4.3.4 Effect of various parameters on combustion in IC engines: Compression ratio: A higher compression ratio increases the pressure and temperature of the working mixture which reduce the initial preparation

More information

GASOLINE VAPOR BEHAVIOR DURING LEAK DETECTION ACTIVITIES ON A MOTOR VEHICLE

GASOLINE VAPOR BEHAVIOR DURING LEAK DETECTION ACTIVITIES ON A MOTOR VEHICLE GASOLINE VAPOR BEHAVIOR DURING LEAK DETECTION ACTIVITIES ON A MOTOR VEHICLE January 17, 2005 Combustion & Environment Research Group Dr. M. D. Checkel and K. M. Frank Department of Mechanical Engineering

More information

Describe Flame Arrestor Operation and Maintenance Human Development Consultants Ltd.

Describe Flame Arrestor Operation and Maintenance Human Development Consultants Ltd. Training Module Describe Flame Arrestor Operation and Maintenance Human Development HDC Human Development All rights reserved. No part of this publication may be copied, reproduced, stored in a computer

More information

Flammability of Bakken Crude Oil: Dangerous. Rail Cargo Even When Empty. (by Dr. Gerard Macri, Expert Witness)

Flammability of Bakken Crude Oil: Dangerous. Rail Cargo Even When Empty. (by Dr. Gerard Macri, Expert Witness) Flammability of Bakken Crude Oil: Dangerous Rail Cargo Even When Empty (by Dr. Gerard Macri, Expert Witness) Suppose for the moment a noteworthy author published a paper dealing with the chemical properties

More information

Experimental Investigation of Hot Surface Ignition of Hydrocarbon-Air Mixtures

Experimental Investigation of Hot Surface Ignition of Hydrocarbon-Air Mixtures Paper # 2D-09 7th US National Technical Meeting of the Combustion Institute Georgia Institute of Technology, Atlanta, GA Mar 20-23, 2011. Topic: Laminar Flames Experimental Investigation of Hot Surface

More information

PERFORMANCE AND EMISSION ANALYSIS OF DIESEL ENGINE BY INJECTING DIETHYL ETHER WITH AND WITHOUT EGR USING DPF

PERFORMANCE AND EMISSION ANALYSIS OF DIESEL ENGINE BY INJECTING DIETHYL ETHER WITH AND WITHOUT EGR USING DPF PERFORMANCE AND EMISSION ANALYSIS OF DIESEL ENGINE BY INJECTING DIETHYL ETHER WITH AND WITHOUT EGR USING DPF PROJECT REFERENCE NO. : 37S1036 COLLEGE BRANCH GUIDES : KS INSTITUTE OF TECHNOLOGY, BANGALORE

More information

First Responder Guide: CNG and LNG Vehicle Fuel Systems

First Responder Guide: CNG and LNG Vehicle Fuel Systems First Responder Guide: CNG and LNG Vehicle Fuel Systems ENP-084 Rev. C: July 2017 I. Proprietary Statement The information provided within this manual is proprietary and confidential. All prior versions

More information

Propane 101. Study Guide. Course Code: 8517

Propane 101. Study Guide. Course Code: 8517 Propane 101 Study Guide Course Code: 8517 2015 Navistar, Inc. 2701 Navistar Drive, Lisle, IL 60532. All rights reserved. No part of this publication may be duplicated or stored in an information retrieval

More information

INSTALLATION AND OPERATING INSTRUCTIONS FOR CONCRETE VAULT TYPE UNITS

INSTALLATION AND OPERATING INSTRUCTIONS FOR CONCRETE VAULT TYPE UNITS INSTALLATION AND OPERATING INSTRUCTIONS FOR CONCRETE VAULT TYPE UNITS CONTENTS Introduction Safety Operating Principle System Installation Initial Startup System Operations Troubleshooting Maintenance

More information

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 RULE 425.2 Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 I. Purpose The purpose of this Rule is to limit oxides of nitrogen (NOx) emissions

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT DRAFT STAFF REPORT Draft Amendments to Rule 4621 (Gasoline Transfer into Stationary Storage Containers, Delivery Vessels, and Bulk Plants) and Rule 4622 (Gasoline Transfer into Motor Vehicle Fuel Tanks)

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

Proposed Addendum ag to Standard , Ventilation for Acceptable Indoor Air Quality

Proposed Addendum ag to Standard , Ventilation for Acceptable Indoor Air Quality BSR/ASHRAE Addendum ag to ANSI/ASHRAE Standard 62.1-2016 Public Review Draft Proposed Addendum ag to Standard 62.1-2016, Ventilation for Acceptable Indoor Air Quality First Public Review (January 2019)

More information

Requirements for Dispensing of Compressed Natural Gas. Yvonne Espinoza, PE Austin Fire Department Engineering Services

Requirements for Dispensing of Compressed Natural Gas. Yvonne Espinoza, PE Austin Fire Department Engineering Services Requirements for Dispensing of Compressed Natural Gas Yvonne Espinoza, PE Austin Fire Department Engineering Services Course Overview Enforcement of code requirements Application of code requirements Hazard

More information

First Correlating Revision No. 1-NFPA [ Section No ]

First Correlating Revision No. 1-NFPA [ Section No ] First Correlating Revision No. 1-NFPA 85-2013 [ Section No. 3.3.52.1 ] 3.3.52.1 Booster Fan. A device fan used to assist in the supply of air to, or the removal of flue gas products from, the combustion

More information

Steam Turbine Seal Rub

Steam Turbine Seal Rub Steam Turbine Seal Rub Date : November 19, 2014 Steam Turbine Seal Rub Vibration data helps to identify a steam turbine seal rub. Sotirios Christofi Deputy Manager, Head of Mechanical Maintenance, Thessaloniki

More information

Emission from gasoline powered vehicles are classified as 1. Exhaust emission 2. Crank case emission 3. Evaporative emission. Table 1.

Emission from gasoline powered vehicles are classified as 1. Exhaust emission 2. Crank case emission 3. Evaporative emission. Table 1. Introduction: Main three types of automotive vehicle being used 1. Passenger cars powered by four stroke gasoline engines 2. Motor cycles, scooters and auto rickshaws powered mostly by small two stroke

More information

Physical Scaling of Water Mist Protection of 260-m 3 Machinery Enclosure

Physical Scaling of Water Mist Protection of 260-m 3 Machinery Enclosure Physical Scaling of Water Mist Protection of 260-m 3 Machinery Enclosure Hong-Zeng (Bert) Yu International Water Mist Conference October 28 29, 2015 Amsterdam, The Netherlands Background To reduce the

More information

The purpose of this rule is to limit VOC emissions from the transfer of organic liquids.

The purpose of this rule is to limit VOC emissions from the transfer of organic liquids. RULE 4624 TRANSFER OF ORGANIC LIQUID (Adopted April 11, 1991; Amended September 19, 1991; Amended May 21, 1992; Amended December 17, 1992; Amended December 20, 2007) 1.0 Purpose The purpose of this rule

More information

Fire Safety for New Battery Technologies What's in Store for Your Jurisdiction? Kelly Nicolello Senior Regulatory Engineer

Fire Safety for New Battery Technologies What's in Store for Your Jurisdiction? Kelly Nicolello Senior Regulatory Engineer Fire Safety for New Battery Technologies What's in Store for Your Jurisdiction? Kelly Nicolello Senior Regulatory Engineer Energy Storage System (ESS) Applications Historical stationary battery system

More information

Things To Know About Propane Autogas

Things To Know About Propane Autogas Spring 2012 Things To Know About Propane Autogas In this Think Safety, we will discuss various components of propane autogas. While a limited infrastructure may somewhat curtail its over-the-road use by

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services

More information

Increased flexibility of refineries by O 2 enrichment. Sulphur recovery and new opportunities.

Increased flexibility of refineries by O 2 enrichment. Sulphur recovery and new opportunities. Increased flexibility of refineries by O 2 enrichment. Sulphur recovery and new opportunities. Janusz Kertynski, Dr Bernhard Schreiner Budapest, 13-14 October 2015 1 The Linde Group 2 Actual needs of refining

More information

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2015 edition of, to the 2015 International Fire Code (). Please note that

More information

GROUP WORKING WORKING PAPER. International FIRST MEETING. related tests SUMMARY. 1.1 independent. The DGP also may 1.2. The report, strategies. 1.

GROUP WORKING WORKING PAPER. International FIRST MEETING. related tests SUMMARY. 1.1 independent. The DGP also may 1.2. The report, strategies. 1. International Civil Aviation Organization 1. INTRODUCTION 1.1 At DGP/23 meeting, the Secretariat requested data on tests that have been conducted on lithium batteries. Since 2005 PRBA has contracted with

More information

Specifications of STICKTITE and PILOTPAK Nozzles

Specifications of STICKTITE and PILOTPAK Nozzles Low Temperature urners - STICKTITE and PILOTPK Nozzles 1-1.1-5 Specifications of STICKTITE and PILOTPK Nozzles This graph indicates the relationship between capacity and applied mixture differential pressure

More information

RESOLUTION MEPC.205(62) Adopted on 15 July GUIDELINES AND SPECIFICATIONS FOR ADD-ON EQUIPMENT FOR UPGRADING RESOLUTION

RESOLUTION MEPC.205(62) Adopted on 15 July GUIDELINES AND SPECIFICATIONS FOR ADD-ON EQUIPMENT FOR UPGRADING RESOLUTION MEPC.60(33)-COMPLIANT OIL FILTERING EQUIPMENT MEPC.60(33)-COMPLIANT OIL FILTERING EQUIPMENT MEPC 62/24/Add.1 Annex 24, page 1 ANNEX 24 RESOLUTION MEPC.205(62) 2011 GUIDELINES AND SPECIFICATIONS FOR ADD-ON

More information

Today, we re going to talk about battery safety. We ll discuss all the key issues associated with using batteries safely, including battery hazards,

Today, we re going to talk about battery safety. We ll discuss all the key issues associated with using batteries safely, including battery hazards, Today, we re going to talk about battery safety. We ll discuss all the key issues associated with using batteries safely, including battery hazards, battery charging, and battery maintenance. Although

More information

Rarely Acknowledged Energy Benefits of Sulphur Recovery. Sulphur 2016 London, UK November 9, 2016

Rarely Acknowledged Energy Benefits of Sulphur Recovery. Sulphur 2016 London, UK November 9, 2016 Rarely Acknowledged Energy Benefits of Sulphur Recovery Sulphur 2016 London, UK November 9, 2016 AGENDA AGENDA INTRODUCTION CRUDE OIL PRICE $140 $130 $120 $110 Crude Oil Price (US Dollars per Barrel) $100

More information

Bisnet Solutions for Tomorrow, Today! The Die Casting Process Planner. Users Manual. August 5, A Product By: Bisnet - 1 -

Bisnet Solutions for Tomorrow, Today! The Die Casting Process Planner. Users Manual. August 5, A Product By: Bisnet - 1 - Bisnet Solutions for Tomorrow, Today! The Die Casting Process Planner Users Manual August 5, 2002 A Product By: Bisnet - 1 - DCPP Users Manual Table of Contents CHAPTER 1 PQ 2 4 What is PQ Squared? 4 CHAPTER

More information

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC 2011 Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC Ohio EPA, Division of Air Pollution Control 1/1/2011 Page 2

More information

Evaporative Emissions

Evaporative Emissions Page 1 of 6 Published : Apr 8, 2005 Evaporative Emissions 4.4L V8 Evaporative Emissions Component Layout Item Part Number 1 - Fuel filler head 2 - DMTL pump filter (NAS only) 3 - Fuel tank vent hose to

More information

R&D on Environment-Friendly, Electronically Controlled Diesel Engine

R&D on Environment-Friendly, Electronically Controlled Diesel Engine 20000 M4.2.2 R&D on Environment-Friendly, Electronically Controlled Diesel Engine (Electronically Controlled Diesel Engine Group) Nobuyasu Matsudaira, Koji Imoto, Hiroshi Morimoto, Akira Numata, Toshimitsu

More information

COMBUSTION EFFICIENCY

COMBUSTION EFFICIENCY COMBUSTION EFFICIENCY Don Hunter Pr.Eng. MSc(struct)MSAICE Chief Executive Officer FFS Refiners (Pty) Ltd Durban South Africa The efficiency of a heating appliance or application is dependent on the efficiency

More information

IMO UNIFIED INTERPRETATIONS TO SOLAS CHAPTER II-2 AND RELATED FIRE TEST PROCEDURES. Comments on document FP 46/5/8. Submitted by Japan

IMO UNIFIED INTERPRETATIONS TO SOLAS CHAPTER II-2 AND RELATED FIRE TEST PROCEDURES. Comments on document FP 46/5/8. Submitted by Japan INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON FIRE PROTECTION 46th session Agenda item 5 FP 46/5/12 14 December 2001 Original: ENGLISH UNIFIED INTERPRETATIONS TO SOLAS CHAPTER II-2 AND RELATED

More information

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS RULE 1146.1. EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (a) Definitions 1. ANNUAL HEAT INPUT means the actual amount

More information

Parking Precautions Indoor and Outdoor

Parking Precautions Indoor and Outdoor Spring 2013 Parking Precautions Indoor and Outdoor What are the proper procedures for dealing with vehicles loaded with substantial amounts of propane within an enclosed structure such as a garage? Two

More information

OIG-SR-17-01, OIG Special Report Department of Energy s Actions to Address Worker Concerns Regarding Vapor Exposures at the Hanford Tank Farms

OIG-SR-17-01, OIG Special Report Department of Energy s Actions to Address Worker Concerns Regarding Vapor Exposures at the Hanford Tank Farms OIG-SR-17-01, OIG Special Report Department of Energy s Actions to Address Worker Concerns Regarding Vapor Exposures at the Hanford Tank Farms November 2016 The Department of Energy Office of Inspector

More information

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society Guideline No.: E-07(201712) E-07 TRANSFORMERS Issued date: December 26, 2017 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

Lecture 27: Principles of Burner Design

Lecture 27: Principles of Burner Design Lecture 27: Principles of Burner Design Contents: How does combustion occur? What is a burner? Mixing of air and gaseous fuel Characteristic features of jet Behavior of free (unconfined) and confined jet

More information

Combustion Control Problem Solution Combustion Process

Combustion Control Problem Solution Combustion Process Combustion Control Problem Until recent years, only the largest boilers could justify sophisticated combustion controls. Now, higher fuel costs and occasionally limited fuel availability make it necessary

More information

Valves. External Valves, Gages and Fittings. Bulletin No What options are available when stainless steel is not suitable for external parts.

Valves. External Valves, Gages and Fittings. Bulletin No What options are available when stainless steel is not suitable for external parts. External Valves, Gages and Fittings Bulletin No. 218 What options are available when stainless steel is not suitable for external parts. Unless otherwise specified, the external valves, gages, fittings

More information

Optimization of Packed Tower Inlet Design by CFD Analysis. Dana Laird Koch-Glitsch, Inc.

Optimization of Packed Tower Inlet Design by CFD Analysis. Dana Laird Koch-Glitsch, Inc. 39e Optimization of Packed Tower Inlet Design by CFD Analysis Dana Laird Koch-Glitsch, Inc. Brian Albert ExxonMobil Research and Engineering (formerly with Koch-Glitsch, Inc.) Carol Schnepper John Zink

More information

Module 3: Influence of Engine Design and Operating Parameters on Emissions Lecture 14:Effect of SI Engine Design and Operating Variables on Emissions

Module 3: Influence of Engine Design and Operating Parameters on Emissions Lecture 14:Effect of SI Engine Design and Operating Variables on Emissions Module 3: Influence of Engine Design and Operating Parameters on Emissions Effect of SI Engine Design and Operating Variables on Emissions The Lecture Contains: SI Engine Variables and Emissions Compression

More information

Congratulations PRE-OPERATION SETUP

Congratulations PRE-OPERATION SETUP Congratulations on the purchase of your new ProVac Industrial Pumpout Station. Your new ProVac has been manufactured with the best quality components to give you year after year of trouble free service.

More information

M-22 DUAL FUEL ENGINE

M-22 DUAL FUEL ENGINE Guideline No.: M-22(201510) M-22 DUAL FUEL ENGINE Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

NFPA 286 STANDARD METHODS OF FIRE TESTS FOR EVALUATING CONTRIBUTION OF WALL AND CEILING INTERIOR FINISH TO ROOM FIRE GROWTH

NFPA 286 STANDARD METHODS OF FIRE TESTS FOR EVALUATING CONTRIBUTION OF WALL AND CEILING INTERIOR FINISH TO ROOM FIRE GROWTH NFPA 286 STANDARD METHODS OF FIRE TESTS FOR EVALUATING CONTRIBUTION OF WALL AND CEILING INTERIOR FINISH TO ROOM FIRE GROWTH Contego Latex Fire Barrier Intumescent (Also marketed in Canada by Pyrologistics,

More information

Conversion Processes 1. THERMAL PROCESSES 2. CATALYTIC PROCESSES

Conversion Processes 1. THERMAL PROCESSES 2. CATALYTIC PROCESSES Conversion Processes 1. THERMAL PROCESSES 2. CATALYTIC PROCESSES 1 Physical and chemical processes Physical Thermal Chemical Catalytic Distillation Solvent extraction Propane deasphalting Solvent dewaxing

More information

Specifications of STICKTITE and PILOTPAK Nozzles

Specifications of STICKTITE and PILOTPAK Nozzles -.-5 Specifications of STICKTITE and PILOTPK Nozzles This graph indicates the relationship between capacity and applied mixture differential pressure for STICKTITE and PILOTPK nozzles when fed with an

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

Type 4 Cylinder Owner s Manual

Type 4 Cylinder Owner s Manual Quantum PN 116843 Rev X1 . Forward Thank you for purchasing your Quantum Type 4 Cylinder. This manual contains information for the use of Quantum Fuel Cylinders. Read this manual from cover to cover and

More information

CONTROLS UPGRADE CASE STUDY FOR A COAL-FIRED BOILER

CONTROLS UPGRADE CASE STUDY FOR A COAL-FIRED BOILER CONTROLS UPGRADE CASE STUDY FOR A COAL-FIRED BOILER ABSTRACT This paper discusses the measures taken to upgrade controls for a coal-fired boiler which was experiencing problems with primary air flow, furnace

More information

ENGINE & WORKING PRINCIPLES

ENGINE & WORKING PRINCIPLES ENGINE & WORKING PRINCIPLES A heat engine is a machine, which converts heat energy into mechanical energy. The combustion of fuel such as coal, petrol, diesel generates heat. This heat is supplied to a

More information

HYDROGEN TEST CELLS. T. Wallner, R. Scarcelli, H. Lohse-Busch, B. Wozny. S. Miers Michigan Technological University. September 16 18, 2009

HYDROGEN TEST CELLS. T. Wallner, R. Scarcelli, H. Lohse-Busch, B. Wozny. S. Miers Michigan Technological University. September 16 18, 2009 SAFETY CONSIDERATIONS FOR HYDROGEN TEST CELLS T. Wallner, R. Scarcelli, H. Lohse-Busch, B. Wozny Argonne National Laboratory S. Miers Michigan Technological University 3 rd International Conference on

More information

Ignition Temperatures of R1234yf

Ignition Temperatures of R1234yf Ignition Temperatures of R1234yf Content Intention Self ignition phenomena Influences on IT Analysis of published IT Consequences if MIT is used Further thoughts Summary/Conclusions 24.01.2014 3rd Meeting

More information

Design of Piston Ring Surface Treatment for Reducing Lubricating Oil Consumption

Design of Piston Ring Surface Treatment for Reducing Lubricating Oil Consumption The 3rd International Conference on Design Engineering and Science, ICDES 2014 Pilsen, Czech Republic, August 31 September 3, 2014 Design of Piston Ring Surface Treatment for Reducing Lubricating Consumption

More information

Analysis of Emission characteristics on Compression Ignition Engine using Dual Fuel Mode for Variable Speed

Analysis of Emission characteristics on Compression Ignition Engine using Dual Fuel Mode for Variable Speed International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 4, Issue 3 (October 2012), PP. 23-27 Analysis of Emission characteristics on Compression

More information

LIQUEFIED GAS PUMP INSTALLATION

LIQUEFIED GAS PUMP INSTALLATION LIQUEFIED GAS PUMP INSTALLATION Z400C ENGINEERING DATA AND DESIGN HANDBOOK THE APPLICATION OF PUMPS TO LIQUEFIED GAS TRANSFER Although we cannot change the nature of the liquefied gas, there are many things

More information

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year. 1 of 11 8/21/2012 10:19 AM SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1146 - EMISSIONS OF OXIDES OF NITROGEN FROM INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS

More information

PVP Field Calibration and Accuracy of Torque Wrenches. Proceedings of ASME PVP ASME Pressure Vessel and Piping Conference PVP2011-

PVP Field Calibration and Accuracy of Torque Wrenches. Proceedings of ASME PVP ASME Pressure Vessel and Piping Conference PVP2011- Proceedings of ASME PVP2011 2011 ASME Pressure Vessel and Piping Conference Proceedings of the ASME 2011 Pressure Vessels July 17-21, & Piping 2011, Division Baltimore, Conference Maryland PVP2011 July

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

Ignition energy enough for igniting the mixture is available, such as sparkles generated by friction and impaction, electric arc or hot surfaces.

Ignition energy enough for igniting the mixture is available, such as sparkles generated by friction and impaction, electric arc or hot surfaces. Elementary knowledge of safety and explosion protection 1.1 Characteristics of explosion A phenomenon, in which substances are converted from one state into another and massive energy and sounds are instantaneously

More information

Results Certified by Core Labs for Conoco Canada Ltd. Executive summary. Introduction

Results Certified by Core Labs for Conoco Canada Ltd. Executive summary. Introduction THE REPORT BELOW WAS GENERATED WITH FEEDSTOCK AND PRODUCT SAMPLES TAKEN BY CONOCO CANADA LTD, WHO USED CORE LABORATORIES, ONE OF THE LARGEST SERVICE PROVIDERS OF CORE AND FLUID ANALYSIS IN THE PETROLEUM

More information

Guideline No.: E-07(201610) E-07 TRANSFORMERS. Issued date: October 28,2016. China Classification Society

Guideline No.: E-07(201610) E-07 TRANSFORMERS. Issued date: October 28,2016. China Classification Society Guideline No.: E-07(201610) E-07 TRANSFORMERS Issued date: October 28,2016 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection and

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

Module7:Advanced Combustion Systems and Alternative Powerplants Lecture 32:Stratified Charge Engines

Module7:Advanced Combustion Systems and Alternative Powerplants Lecture 32:Stratified Charge Engines ADVANCED COMBUSTION SYSTEMS AND ALTERNATIVE POWERPLANTS The Lecture Contains: DIRECT INJECTION STRATIFIED CHARGE (DISC) ENGINES Historical Overview Potential Advantages of DISC Engines DISC Engine Combustion

More information

Copeland Screw Compressors Semi-Hermetic Compact Operating Instructions

Copeland Screw Compressors Semi-Hermetic Compact Operating Instructions Copeland Screw Compressors Semi-Hermetic Compact Operating Instructions SCH2 & SCA2 High Temperature Compressors 35-240 Horsepower 1. Introduction This series of semi-hermetic compact screw compressors

More information

DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE

DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE International Civil Aviation Organization DGP-WG/12-WP/40 11/9/12 WORKING PAPER DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE Montréal, 15 to 19 October 2012 Agenda Item 2: Development

More information

LANDFILL GAS ELEVATED (CANDLESTICK) FLARE SYSTEM

LANDFILL GAS ELEVATED (CANDLESTICK) FLARE SYSTEM LANDFILL GAS ELEVATED (CANDLESTICK) FLARE SYSTEM Part 1. General 1.01 Description A. This section describes a candlestick flare system for the combustion of landfill gases. The flare system must be of

More information

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2008 edition of NFPA 30A, and the 2006 International Fire Code (IFC). Please

More information

Load Side PV Connections

Load Side PV Connections Perspectives on PV Load Side PV Connections 705.12(D) in the 2014 NEC by John Wiles Through the exceptional efforts of the members of NFPA NEC Code-Making Panel 4 working with the proposals and comments

More information

White paper. MARPOL Annex VI fuel strategies and their influence on combustion in boilers

White paper. MARPOL Annex VI fuel strategies and their influence on combustion in boilers MARPOL Annex VI fuel strategies and their influence on combustion in boilers May 2018 Intro In 2004, MARPOL Annex VI Regulations for the Prevention of Air Pollution from Ships were adopted and in regulation

More information

Development of super low-level NOx RT burner for annealing furnace TAKAHITO SUZUKI KUNIAKI OKADA

Development of super low-level NOx RT burner for annealing furnace TAKAHITO SUZUKI KUNIAKI OKADA Development of super low-level NOx RT burner for annealing furnace BY TAKAHITO SUZUKI KUNIAKI OKADA SYNOPSIS In the CGL of Fukuyama steelworks, we decided to adapt an only RT (radiant tube) furnace in

More information

Measures against Incineration Problems Caused by Clogging of White Smoke Prevention Preheater

Measures against Incineration Problems Caused by Clogging of White Smoke Prevention Preheater Measures against Incineration Problems Caused by Clogging of White Smoke Prevention Preheater M. Hayasaka Water Quality Section, Plant Management Division, Tokyo Metropolitan Sewerage Service Corporation,

More information

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES FOR ALL FOUR OZONE NONATTAINMENT AREAS:! Delay of repair beyond the next process unit shutdown is allowed if the component is isolated from

More information

Inspection of Vehicles Equipped with 2007 or Later EPA-Certified Engines

Inspection of Vehicles Equipped with 2007 or Later EPA-Certified Engines Summary Created: Nov. 19, 2008 Revised: May 19, 2010 Revised: April 27, 2017 This Inspection Bulletin explains how to safely inspect motorcoaches, buses, trucks and truck tractors equipped with 2007 or

More information

Internal Combustion Engines

Internal Combustion Engines Emissions & Air Pollution Lecture 3 1 Outline In this lecture we will discuss emission control strategies: Fuel modifications Engine technology Exhaust gas aftertreatment We will become particularly familiar

More information

Combustion Gas Turbine Fuel Pumps. CIRCOR White Paper

Combustion Gas Turbine Fuel Pumps. CIRCOR White Paper Combustion Gas Turbine Fuel Pumps CIRCOR White Paper The modern combustion gas turbine is one of the most reliable machines in use and a workhorse of the electric power generation industry. It can be on-site

More information

AUTOGAS 150 SERIES PUMPS INSTALLATION GUIDELINES FOR UNDERGROUND TANK APPLICATIONS

AUTOGAS 150 SERIES PUMPS INSTALLATION GUIDELINES FOR UNDERGROUND TANK APPLICATIONS Application Bulletin A Unit of IDEX Corporation No. 13 June 21 AUTOGAS 1 SERIES PUMPS INSTALLATION GUIDELINES FOR UNDERGROUND TANK APPLICATIONS CORKEN, INC. A Unit of IDEX Corporation P.O. Box 12338, Oklahoma

More information

Transportation and Transfer

Transportation and Transfer Participant Guide Module 4 Transportation and Transfer Module Objective Upon completion of this module, participants should be able to describe how ethanol-blended fuels are transported and transferred

More information

Ignition Reliability in SGT-750 for Gas Blends at Arctic Conditions. Magnus Persson Combustion Expert / Distributed Generation / Sweden

Ignition Reliability in SGT-750 for Gas Blends at Arctic Conditions. Magnus Persson Combustion Expert / Distributed Generation / Sweden Ignition Reliability in SGT-750 for Gas Blends at Arctic Conditions Magnus Persson Combustion Expert / Distributed Generation / Sweden siemens.com/power-gas Table of content Objectives of the Project SGT-750

More information

Application & Installation Guide. Crankcase Ventilation Systems LEBW

Application & Installation Guide. Crankcase Ventilation Systems LEBW Application & Installation Guide Crankcase Ventilation Systems LEBW4958-04 Contents Crankcase Ventilation Systems... 1 Crankcase Emissions... 2 Blow-by... 2 Crankcase Ventilation... 3 Ingestive... 3 Low

More information

ANALYSIS OF THE ENGINE FUELS IMPACT ON CARBON DIOXIDE EMISSIONS

ANALYSIS OF THE ENGINE FUELS IMPACT ON CARBON DIOXIDE EMISSIONS Journal of KONES Powertrain and Transport, Vol. 18, No. 4 2011 ANALYSIS OF THE ENGINE FUELS IMPACT ON CARBON DIOXIDE EMISSIONS Barbara Worsztynowicz AGH University of Science and Technology Faculty of

More information

IA HYSAFE & JRC IET WORKSHOP Research Priorities and Knowledge Gaps in Hydrogen Safety. Hydrogen Ignition and Light up Probabilities.

IA HYSAFE & JRC IET WORKSHOP Research Priorities and Knowledge Gaps in Hydrogen Safety. Hydrogen Ignition and Light up Probabilities. IA HYSAFE & JRC IET WORKSHOP Research Priorities and Knowledge Gaps in Hydrogen Safety Hydrogen Ignition and Light up Probabilities www.hsl.gov.uk An An Agency Agency of the of Health the Health and Safety

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

University Turbine Systems Research Industrial Fellowship. Southwest Research Institute

University Turbine Systems Research Industrial Fellowship. Southwest Research Institute Correlating Induced Flashback with Air- Fuel Mixing Profiles for SoLoNOx Biomass Injector Ryan Ehlig University of California, Irvine Mentor: Raj Patel Supervisor: Ram Srinivasan Department Manager: Andy

More information

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of 13 Pumps and Accessory Equipment Revised

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of 13 Pumps and Accessory Equipment Revised DRIVER OPERATOR Page 1 of 13 PUMPS AND ACCESSORY EQUIPMENT Pumps are designed for many different purposes. In order to understand the proper application and operation of a pump in a given situation, firefighters

More information

Guideline No.: E-07(201501) E-07 TRANSFORMERS. Issued date: October 20,2015. China Classification Society

Guideline No.: E-07(201501) E-07 TRANSFORMERS. Issued date: October 20,2015. China Classification Society Guideline No.: E-07(201501) E-07 TRANSFORMERS Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection and

More information

Conversion of Naturally Aspirated Genset Engine to Meet III A Norms for Tractor Application by Using Turbocharger

Conversion of Naturally Aspirated Genset Engine to Meet III A Norms for Tractor Application by Using Turbocharger Conversion of Naturally Aspirated Genset Engine to Meet III A Norms for Tractor Application by Using Turbocharger M. Karthik Ganesh, B. Arun kumar Simpson co ltd., Chennai, India ABSTRACT: The small power

More information

Product overview. Technical data

Product overview. Technical data VALVES & CONTROLS ANDERSON GREENWOOD BLANKETING SYSTEMS The Complete Blanketing and Safety Valve System! Product overview Pad Valves Anderson Greenwood is a world leader in tank protection and blanketing.

More information