CrystalSix. Sensor IPN L

Size: px
Start display at page:

Download "CrystalSix. Sensor IPN L"

Transcription

1 O P E R A T I N G M A N U A L CrystalSix Sensor

2

3 O P E R A T I N G M A N U A L CrystalSix Sensor INFICON reachus@inficon.com

4 Trademarks The trademarks of the products mentioned in this Operating Manual are held by the companies that produce them. INFICON, CrystalSix and Composer are trademarks of INFICON Inc. ConFlat is a registered trademark of Varian Associates. Teflon is a registered trademark of Dupont. Scotch-Brite is a trademark of 3M. SWAGELOK and CAJON are registered trademarks of Swagelok, Co. Inconel is a registered trademark of International Nickel Co. Microdot is a registered trademark of Microdot Corp. All other brand and product names are trademarks or registered trademarks of their respective companies. Disclaimer The information contained in this Operating Manual is believed to be accurate and reliable. However, INFICON assumes no responsibility for its use and shall not be liable for any special, incidental, or consequential damages related to the use of this product. Due to our continuing program of product improvements, specifications are subject to change without notice. Copyright 2001 All rights reserved. Reproduction or adaptation of any part of this document without permission is unlawful.

5 Warranty WARRANTY AND LIABILITY - LIMITATION: Seller warrants the products manufactured by it, or by an affiliated company and sold by it, and described on the reverse hereof, to be, for the period of warranty coverage specified below, free from defects of materials or workmanship under normal proper use and service. The period of warranty coverage is specified for the respective products in the respective Seller instruction manuals for those products but shall not be less than one (1) year from the date of shipment thereof by Seller. Seller's liability under this warranty is limited to such of the above products or parts thereof as are returned, transportation prepaid, to Seller's plant, not later than thirty (30) days after the expiration of the period of warranty coverage in respect thereof and are found by Seller's examination to have failed to function properly because of defective workmanship or materials and not because of improper installation or misuse and is limited to, at Seller's election, either (a) repairing and returning the product or part thereof, or (b) furnishing a replacement product or part thereof, transportation prepaid by Seller in either case. In the event Buyer discovers or learns that a product does not conform to warranty, Buyer shall immediately notify Seller in writing of such non-conformity, specifying in reasonable detail the nature of such non-conformity. If Seller is not provided with such written notification, Seller shall not be liable for any further damages which could have been avoided if Seller had been provided with immediate written notification. THIS WARRANTY IS MADE AND ACCEPTED IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, WHETHER OF MERCHANTABILITY OR OF FITNESS FOR A PARTICULAR PURPOSE OR OTHERWISE, AS BUYER'S EXCLUSIVE REMEDY FOR ANY DEFECTS IN THE PRODUCTS TO BE SOLD HEREUNDER. All other obligations and liabilities of Seller, whether in contract or tort (including negligence) or otherwise, are expressly EXCLUDED. In no event shall Seller be liable for any costs, expenses or damages, whether direct or indirect, special, incidental, consequential, or other, on any claim of any defective product, in excess of the price paid by Buyer for the product plus return transportation charges prepaid. No warranty is made by Seller of any Seller product which has been installed, used or operated contrary to Seller's written instruction manual or which has been subjected to misuse, negligence or accident or has been repaired or altered by anyone other than Seller or which has been used in a manner or for a purpose for which the Seller product was not designed nor against any defects due to plans or instructions supplied to Seller by or for Buyer. This manual is intended for private use by INFICON Inc. and its customers. Contact INFICON before reproducing its contents. NOTE: These instructions do not provide for every contingency that may arise in connection with the installation, operation or maintenance of this equipment. Should you require further assistance, please contact INFICON. reachus@inficon.com

6

7 CrystalSix Sensor Operating Manual Table Of Contents Chapter 1 Sensor Specifications 1.1 Specifications for CrystalSix Sensor G Installation Requirements Feedthrough Other Utilities Materials Unpacking Instructions Inventory IPN K Chapter 2 Sensor Installation 2.1 Crystals in the CrystalSix Sensor Handle the Crystal with Care Care of the Ceramic Retainer Pre-installation Sensor Check IC/5 Deposition Controller XTC/2 or XTC/C Deposition Controller IC/4 or IC/4 PLUS Deposition Controller IC-6000 or XTC Deposition Controller General Guidelines for CrystalSix Sensor Crystal Sensor Installation CrystalSix Sensor Installation when used with an IC/ Programming the Relay Outputs Wiring the Relay Outputs with Relay I/O Boards G1 or G1/G CrystalSix Sensor Installation when used with an XTC/2 or XTC/C CrystalSix Sensor Installation when used with an IC/4 or IC/4 PLUS Programming the Relay Outputs Wiring the Relay Outputs with Relay I/O Boards G1 or G1/G CrystalSix Sensor Requirement when Not Installed with an IC/5, XTC/2, XTC/C, IC/4, or IC/4 PLUS TOC - 1

8 CrystalSix Sensor Operating Manual Chapter 3 Installation of the Solenoid Valve Assembly 3.1 Installation with 1 Bolts Installation with 2 3/4 Feedthrough Electrical and Pneumatic Connections Electrical Pneumatic Chapter 4 Maintenance 4.1 General Precautions Maintain the Temperature of the Crystal Use the Optimum Crystal Type Crystal Concerns when Opening the Chamber Crystal Holder Maintenance Retainer Spring Adjustment Instructions Alignment Instruction for INFICON CrystalSix Sensor (IPN ) Alignment Instructions Disassembly Instructions Assembly Instructions Troubleshooting the CrystalSix Sensor Replacing the Bellows Assembly [lpn P2] How To Contact Customer Support Returning Your Instrument to INFICON Chapter 5 Feedthrough Outline Drawings IPN K TOC - 2

9 Chapter 1 Sensor Specifications 1.1 Specifications for CrystalSix Sensor G1 CAUTION Incorrect rotation direction with the stops disabled will cause permanent damage rendering transducer inoperative. See Figure 1-2 on page 1-5 for proper direction of rotation. The CrystalSix sensor is a (six crystal) quartz crystal deposition monitor transducer. When the monitor crystal being used fails a new crystal is advanced into position, fully replacing that crystal s function. The mechanism used for providing this motion is pneumatically powered. The logic for automatic operation of this transducer is conveniently provided on most current INFICON Deposition Controllers. It is manufactured under US Patent #5,025,644, with foreign patents pending. Figure 1-1 CrystalSix Sensor Table 1-1 Sensor specification Maximum bakeout temp with no water 130 C Maximum operating isothermal environment temperature with minimum water flow Size (maximum envelope) 400 C 3.8" (9.7 cm) DIA x 2.0" (5.1 cm) high 1-1

10 Table 1-1 Sensor specification (continued) Water, air and coax length Crystal exchange Mounting Standard 30" (76 cm) Front-loading, extraction tool required (supplied with unit) Six #4-40 tapped holes on the back of the sensor body Installation Requirements Feedthrough Other Utilities Qty (1) 2-3/4" ConFlat with two coaxial feedthroughs, two pass water, one air IPN , See Figure 5-2 on page 5-2 or, Qty (1) 1" bolt with one coaxial feedthrough, two pass water, one air IPN G1, see Figure 5-1 on page 5-1. User to provide vacuum-tight braze joints or connectors for the water and air tubes. Valve assembly for air, IPN G1 (not provided), with a 0.022" restrictor orifice installed by the user. (Orifice included with CrystalSix accessory kit.) See Table 1-3 on page 1-3. XIU or Oscillator designed to interface with the deposition controller. Deposition controller must have been designed for this specific crystal sensor (INFICON XTC/2, XTC/C, IC/4, IC/4 PLUS, IC/5). Minimum water flow cc/min, 30 C max (Do not allow water to freeze). Coolant should not contain chlorides as stress corrosion cracking may occur. Regulated air supply PSIG (5.5 bar bar) [550 kpa kpa] 2 meter maximum length of 1/8" tubing between bellows assembly and the control valve. CAUTION Do not allow water tubes to freeze. This may happen if the tubes pass through a cryogenic shroud and the fluid s flow is interrupted. 1-2

11 1.1.2 Materials Table 1-2 Materials Plate, Holders, Material Shield, Mechanical Parts 304 type stainless steel Springs, Electrical Contacts Au plated Be-Cu, Au Plate Inconel, 303 stainless steel Water and air tubes S-304, 0.125" (0.32 cm) O.D. x.016" (.04 cm) Wall Thickness 30" Long (76 cm) Seamless Stainless Steel Tubing Connector (Microdot) Stainless steel Insulators >99% A1 2 O 3 Cable Crystal Body and Carousel Teflon insulated copper 0.550" Diameter 2024 T351 Aluminum Unpacking Instructions Inventory The CrystalSix sensor and accessories are packaged in a single cardboard carton with rigid foam inserts. Carefully remove the packaged accessories before removing the sensor, then remove the red shipping plug from the sensor carousel. In addition to the basic transducer, the complete shipping package includes an accessory kit (IPN G1) which consists of the following: Table 1-3 Contents of Accessory Kit Qty IPN Description X G1 Accessory Kit, CrystalSix Sensor G1 Assembly, Alignment Tool P1 Crystal Puller G1 Thin Film Manuals CD G10 Assembly, Sensor Crystal 6MHz CC Orifice " diameter #4 Split Lock Washer, Stainless Steel #4-40x0.375" Long Socket Head Cap Screw, Stainless Steel 1-3

12 Table 1-3 Contents of Accessory Kit (continued) Qty IPN Description #4-40x0.500" Long Socket Head Cap Screw, Stainless Steel #4-40x0.688" Long Socket Head Cap Screw, Stainless Steel Hex Wrench 1/16" SC Hex Wrench 3/32" SC Hex Wrench 5/64" SC G1 Spring Tube Bender Kit Crystal Snatcher G1 Molybdenum disulfide in Alcohol 1-4

13 Figure 1-2 Outline Multi Crystal Sensor 1-5

14 Figure 1-3 Assembly CrystalSix Sensor 1-6

15 Chapter 2 Sensor Installation Successful operation of any crystal sensor depends on proper placement, compatibility of its construction with its operating environment and connection to proper utilities. NOTE: The sensor head, water tubes, cable, etc. should be clean and grease free when installed in the vacuum chamber. These parts should be handled while wearing clean nylon gloves. If parts do become contaminated, clean them thoroughly using a suitable solvent to avoid outgassing and excessive peeling of deposition material from the sensor s surfaces. CAUTION Incorrect rotation direction will cause permanent damage rendering transducer inoperative. Refer to Figure 1-2 on page 1-5 for proper direction of rotation. 2.1 Crystals in the CrystalSix Sensor Handle the Crystal with Care Always use clean nylon lab gloves and clean plastic tweezers when handling the crystal. Handle the crystals only by their edges. Anything that comes in contact with the crystal surfaces may leave contamination, which may lead to poor film adhesion. Poor film adhesion will result in high rate noise and premature crystal failure. CAUTION Do not use metal tweezers to handle crystals. Metal tweezers may chip the edge of the crystal. 2-1

16 2.1.2 Care of the Ceramic Retainer CAUTION Do not use excessive force when handling the Ceramic Retainer Assembly since breakage may occur. Always use the crystal snatcher. To prevent scratching the crystal electrode, do not rotate the ceramic retainer after installation. Always use clean nylon lab gloves and plastic tweezers for handling the crystal. This avoids contamination which may lead to poor adhesion of deposited material to the electrode. Follow the procedure below to install or replace the crystals in the CrystalSix sensor. (Reference Figure 1-3 on page 1-6). CAUTION Rotating the unit in the wrong direction with the stops disabled will cause severe damage! Do not rotate the unit by hand to install the crystals or to check indexing. 1 Remove the heat shield (item #8) by gently pulling on the outside circumference of the shield. The shield should snap off. 2 Since the crystal holders are packaged separately, skip the remainder of this step for first-time installations. Using the crystal puller (IPN P1, provided in ship kit ), remove the crystal holder by pushing the tips of the crystal puller over the outside circumference of the crystal holder (see Figure 2-2 on page 2-4). Gently pull the crystal holder from its receptacle. A slight amount of pressure applied to collapse the tips of the crystal puller may be required to extract the crystal holder. 3 Insert the tapered end of the crystal snatcher (part number ) into the ceramic retainer (A) and apply a small amount of pressure. This locks the retainer to the snatcher and allows the retainer to be pulled straight out (B). See Figure

17 Figure 2-1 Using the Crystal Snatcher 4 Invert the crystal holder and the crystal will drop out. (Skip this step for first-time installations.) 5 Install the new crystal per section on page 2-1 and section on page Using clean nylon gloves, grasp the edge of the new crystal with a clean pair of plastic tweezers. Orient the crystal so the patterned electrode is facing up. Gently insert the edge of the crystal beneath one of the wire segments that protrude into the crystal cavity. Release the crystal. 7 Replace the ceramic retainer. Initially orient it at an angle to displace the spring wire segments in the crystal holder. 8 Release the crystal snatcher with a slight side-to-side rocking motion. Using the backside of the crystal snatcher, push on the ceramic retainer to ensure it is completely seated. 9 Position the crystal holder between the tips of the crystal puller as illustrated in Figure Push the crystal holder into the receptacle of the CrystalSix sensor until completely seated. Snap the crystal puller to one side to release the crystal holder from the crystal puller. Using the non-slotted end of the crystal puller, apply pressure to the crystal holder until it is completely seated. Verify that the crystal fail signal on the controller display disappears. If the crystal fail signal does not disappear, consult section 4.5 on page Press the crystal switch button on the hand held controller or the controller front panel. The sensor will advance to the next crystal position. Repeat procedure from Step 2 until all six new crystals have been installed. 12 Install the heat shield (item #8) by first orienting the slot in the heat shield to accommodate the water tubes, then secure the heat shield by applying pressure near the center of the shield. The shield should snap in place. 2-3

18 Figure 2-2 Using the Crystal Puller 2.2 Pre-installation Sensor Check Prior to installing the sensor in the vacuum system, you should make certain that it is in proper working condition by following the procedure outlined below IC/5 Deposition Controller 1 Connect the in-vacuum sensor head cable to the feedthrough or a coax adapter (microdot/bnc). 2 Connect one end of the 6" XIU cable (IPN G6) to the BNC connector of the feedthrough. 3 Connect the other end of the 6" XIU cable to the connector of the XIU/5 (IPN G1). 4 Connect one end of the XIU/5 cable (IPN Gxx) to the mating connector of the XIU/5. 5 Connect the other end of the XIU/5 cable to a sensor channel at the rear of the controller. 6 Connect power to the controller and set power switch to ON. Set density at 1.00 gm/cc, and zero thickness. The display should indicate 0/ or +/-.001 KÅ. Crystal life should read from 0 to 5%. 7 Breathe heavily on the crystal. A thickness indication of to KÅ should appear on the display. When the moisture evaporates, the thickness indication should return to approximately zero. If the above conditions are observed, you can assume the sensor is in proper working order and may be installed. 2-4

19 2.2.2 XTC/2 or XTC/C Deposition Controller 1 Connect the in-vacuum sensor head cable to the feedthrough or a coax adapter (microdot/bnc). 2 Connect one end of the 6" XIU cable (IPN G6) to the BNC connector or the feedthrough. 3 Connect the other end of the 6" XIU cable to the connector of the XIU (IPN G1). 4 Connect one end of the XX' long XIU cable (IPN GXX) to the mating connector of the XIU. 5 Connect the other end of the XIU cable to a sensor channel at the rear of the controller. 6 Connect power to the controller and set power switch to ON. Set density at 1.00 gm/cc, and zero thickness. The display should indicate 0/ or +/-.001 KÅ. Crystal life should read from 0 to 5%. 7 Breathe heavily on the crystal. A thickness indication of to KÅ should appear on the display. When the moisture evaporates, the thickness indication should return to approximately zero. If the above conditions are observed, you can assume the sensor is in proper working order and may be installed IC/4 or IC/4 PLUS Deposition Controller 1 Connect the in-vacuum sensor head cable to the feedthrough or a coax adapter (microdot/bnc). 2 Connect one end of the 6" XIU cable (IPN G6) to the BNC connector or the feedthrough. 3 Connect the other end of the 6" XIU cable to the connector of the XIU (IPN G1). 4 Connect one end of the 15' long XIU cable (IPN G15) to the mating connector of the XIU. 5 Connect the other end of the XIU cable to a sensor channel at the rear of the controller. 6 Connect power to the controller and set power switch to ON. Set density at 1.00 gm/cc, and zero thickness. The display should indicate 0/ or +/-.001 KÅ. Crystal life should read from 0 to 5%. 7 Breathe heavily on the crystal. A thickness indication of to KÅ should appear on the display. When the moisture evaporates, the thickness indication should return to approximately zero. If the above conditions are observed, you can assume the sensor is in proper working order and may be installed. 2-5

20 2.2.4 IC-6000 or XTC Deposition Controller NOTE: See section 2.7 on page Connect the in-vacuum sensor head cable to the feedthrough or a coax adapter (Microdot/BNC). 2 Connect one end of the 6" OSC cable (IPN ) to the receptacle on the feedthrough. 3 Connect the other end of the 6" OSC cable to the receptacle marked XTAL on the oscillator (IPN ). 4 Connect the end of the oscillator source/sensor cable (IPN ) to the remaining BNC receptacle on the oscillator. 5 Connect the other end of the OSC source/sensor cable to the receptacle marked OSC on the rear panel of the controller. 6 Connect power to the controller and set power switch to ON. Set density at 1.00 gm/cc, and zero the thickness. The display should indicate 0/ or +/ KÅ. Crystal life should read from 0 to 5%. 7 Breathe heavily on the crystal. A thickness indication of to KÅ should appear on the display. When the moisture evaporates, the thickness indication should return to approximately zero. If the above conditions are observed, you can assume the sensor is in proper working order and may be installed. 2.3 General Guidelines for CrystalSix Sensor Figure 2-3, Figure 2-4, and Figure 2-5 show the typical installation of an INFICON water-cooled crystal sensor in the vacuum process chamber. Use the illustration and the following guidelines to install your sensors for optimum performance and convenience. 2-6

21 Figure 2-3 Typical CrystalSix Installation for IC/5 G IPN G1 2-7

22 Figure 2-4 Typical CrystalSix Installation for XTC/2 and XTC/C G IPN G1 2-8

23 Figure 2-5 Typical CrystalSix Installation for IC/4 PLUS G IPN G1 2-9

24 2.3.1 Crystal Sensor Installation Generally, install the sensor as far as possible from the evaporation source (a minimum of 10" or 25.4 cm) while still being in a position to accumulate thickness at a rate proportional to accumulation on the substrate. Figure 2-6 shows proper and improper methods of installing sensors. Figure 2-6 Sensor Installation Guidelines Correct Incorrect Obstruction Incorrect Correct Incorrect Source To guard against spattering, use a source shutter to shield the sensor during the initial soak periods. If the crystal is hit with even a minute particle of molten material, it may be damaged and stop oscillating. Even in cases when it does not completely stop oscillating, it may immediately become unstable, or shortly after deposition begins instability may occur. Plan the installation to insure that there are no obstructions blocking a direct path between the sensor and the source. Install sensors in such a manner that the center axis of the crystal is aimed directly at the source to be monitored. Verify that the angle of the sensor location (with reference to the source) is well within the evaporant stream. Attach the sensor with a mounting bracket anchored to the deposition chamber. With the bracket in place, temporarily position and attach the sensor head as outlined in the general guidelines above. Next, temporarily install the feedthrough. You may now form, measure, and mark the sensor tubes (use the bending tool (IPN ) to form tubes in the system). 2-10

25 Build the Sensor/Feedthrough Assembly. Remove the sensor and the feedthrough, cut the water cooling tubes and air tubes to the proper length and connect them directly to the feedthrough or use vacuum rated couplings. CAUTION To prevent damage to the feedthrough or sensor during welding or brazing, insure that at least one inch of water tube is left between the sensor and the feedthrough. After cutting the water and air tubes, verify that they are clear of metal particles by forcing compressed air through the tubing. Heliarc welding is recommended (torch brazing may also be acceptable) for connecting the sensor to the feedthrough water tube. Vacuum rated connectors such as CAJON are recommended for use between the sensor and the feedthrough to speed maintenance. If brazing adapters are to be used, attach them to the sensor water-cooling tubes prior to connection to the feedthrough. Make connections as follows: 1 Clean the water tube and adapter surfaces with solvent if necessary. 2 Apply brazing flux to surfaces being joined. 3 Braze the connections using a flame temperature appropriate for the brazing material being used. CAUTION Excessive application of brazing material, or excessive heat due to brazing, may result in blockage of the water tube. 4 Verify that each joint is not blocked by blowing compressed air through the cooling tubes. 5 Thoroughly clean the braze joint and helium leak test before installing the sensor and feedthrough into the process chamber. Once all water and air tube connections are fabricated, install the sensor and feedthrough assembly into the process system and secure all retaining hardware. Shield the coax cable from heat radiating from the evaporant source or the substrate heater. You can do this very simply, if your process allows, by wrapping aluminum foil around the cable and water tubes. Connect the external water tubes from the feedthrough to your water supply system and flow controller. We recommend using detachable couples (Swagelok or equivalent) for external water tube connections. Apply water pressure to verify flow and tightness. 2-11

26 Because of geometric factors, variations in surface temperature, and differences in electrical potential, the crystal and substrates often do not receive the same amount of material. If you want the thickness indication on the unit to represent the thickness on the substrates, calibration is required to determine the tooling. Consult your controller s manual for the proper procedure for obtaining the tooling factor. CAUTION Use of more than 80" (2 meters) of 1/8" tubing between the valve and the bellows may cause a switcher failure because of the time required to bleed out sufficient air during de-pressurization. If tubing greater than 1/8" is used, the maximum length must be reduced proportional to the additional volume. 2.4 CrystalSix Sensor Installation when used with an IC/ Programming the Relay Outputs 1 From the program menu select Source/Sensor Directory (F4). 2 Select Sensor board 1, 2, 3 or 4 (depending upon unit configuration). 3 Enter the edit mode. (F5) 4 Select Sensor type six (6) for the CrystalSix Sensor. This will enable the Crystal Switch output (Switch Out (0, 1-38). 5 Select a CrystalSwitch output depending upon which I/O board is used Wiring the Relay Outputs with Relay I/O Boards G1 or G1/G2 On the relay connector, connect the leads of the solenoid valve across the one side of a 24 volt supply (see Table 11.5 of IC/5 Operating Manual) and one side of a relay (1-8, 1-16, or 1-24 whichever was programmed). Refer to Table 11.3 of the IC/5 Operating Manual. Connect a jumper between the second side of the 24 volt supply and the second side of the selected relay. 2.5 CrystalSix Sensor Installation when used with an XTC/2 or XTC/C Follow the instructions of Section of the XTC/2 - XTC/C Operating Manual ( ). 2-12

27 2.6 CrystalSix Sensor Installation when used with an IC/4 or IC/4 PLUS Programming the Relay Outputs CrystalSix Operating Manual 1 From the program menu select Source/Sensor (F4). 2 Select Sensor board 1 or Sensor board 2. 3 Enter the edit mode. (F5) 4 Select Sensor type six (6) for the CrystalSix Sensor. This will enable the CrystalSwitch output. 5 Select a CrystalSwitch output (Relay 1-8 or 1-16) depending upon which I/O board is used. 6 Turn the instrument s power OFF, then ON, to ensure that the change takes place permanently Wiring the Relay Outputs with Relay I/O Boards G1 or G1/G2 1 On the relay connector, see Figure 2-7 on page 2-14, connect the leads of the solenoid valve across the one side of a 24 volt supply (see listing) and one side of a relay (1-16 whichever was programmed). Connect a jumper between the second side of the 24 volt supply and the second side of the selected relay. Refer to Figure 2-5 on page 2-9 for a typical installation utilizing relay 1 to perform the crystal advance function for the relay I/O board. Table 2-1 Wiring Connectors (P4) Top Relay Connector (P5) Input Lines Relay Pins Input Pins 1 24, , , , , , , , , , , , , , , 7 8 8,

28 Table 2-1 Wiring Connectors (continued) (P3) (available on G2 only) Bottom Relay Connector Relay Pins 9 47, , , , , , , , , , , , , , , , 28 Isolated 24 V(dc) source is available with a maximum of 0.4 amps total on connector P4 at Pins 4, 9, 15 and 21 with Pins 8, 14, 20 and 25 used as returns. 2 In similar fashion, connect the Pneumatic Actuator for the source shutter if required. 3 Connect the oscillator cable to the appropriate channel of the sensor board programmed. 4 Connect the source one or source two cable (whichever has been programmed) to the source controller. Figure 2-7 Relay outputs: typical connector configuration utilizing relay #1 NOTE: Contact arrangements shown are of pin mating face (plug or receptacle). The socket mating face is a mirror image of Figure

29 2.7 CrystalSix Sensor Requirement when Not Installed with an IC/5, XTC/2, XTC/C, IC/4, or IC/4 PLUS The CrystalSix can be manually operated with other Deposition Controllers. The user must, however, be aware of the functional requirements for operation. These include, but are not limited to: 1 The solenoid assembly must be energized and de-energized twice per crystal position. Twelve pulses complete one revolution. 2 The electrical pulse applied to the solenoid valve must be at least one second in duration during both the pressurization and de-pressurization phase. 3 A 24 volt AC or DC supply is required to energize the solenoid assembly. Consult Figure 3-1 on page 3-4 for wiring assignments. 4 The user should provide some means of determining the quantity of good crystals when initially loaded, and quantity of good crystals remaining at any time. 5 Follow the guidelines shown in section 2.3 on page 2-6 for installation. 6 You will need to keep track of the total thickness as a manually generated sum of the deposit accumulated on each crystal. 2-15

30 This page is intentionally blank. 2-16

31 Chapter 3 Installation of the Solenoid Valve Assembly The solenoid valve assembly (IPN G1) and the feedthrough should be installed at the same time. The same valve assembly is used for both the 1" and the (recommended) 2 3/4" feedthroughs. However, if the assembly is to be used with the 2 3/4" feedthrough, you will need to modify the valve bracket as follows. For the following steps, see Figure 3-2 on page 3-5. (DWG G1) 1 Align the score line on the valve assembly bracket (item #5) over the edge of a table or other square edge. 2 Using pliers, grasp the part of the bracket extending over the edge and push down. The bracket will break along the score line. Use a file to smooth any rough edges which occur along the break. NOTE: In order for the CrystalSix sensor to operate properly, a.022" diameter orifice (IPN provided in Kit ) must be installed in line between the air supply and the solenoid valve assembly. This is accomplished by the following procedure. See Figure 3-1 on page Unthread the tube fitting attached to the normally closed (N.C.) P Supply port of the 3-way solenoid valve (item #7). 2 Install the orifice by threading it into the normally closed (N.C.) port of the 3-way solenoid valve. 3 Thread the tube fitting previously removed into the orifice. NOTE: Do not install the orifice into the normally open output port. This will require a longer time interval for depressurization of the bellows assembly and may lead to an apparent sensor failure. 3-1

32 3.1 Installation with 1 Bolts Installation of the solenoid valve assembly for the CrystalSix sensor requires one 1" bolt feedthrough (IPN G1, see Figure 5-1 on page 5-1). Follow these steps: 1 Ensure that the o-ring is in placed on the bolt. Insert the 1" bolt such that the hexagonal shaped end of the bolt is on the vacuum side of the chamber. 2 Add the Bracket. 3 Add the Washer. 4 Add the Nut. 5 Tighten the feedthrough nut. 6 Add the air fitting to the tube which has the female thread adapter installed. 7 Connect 1/8" diameter tubing from the valve output (A) to the feedthrough fitting. CAUTION Use of more than 80" (2 meters) of 1/8" tubing between the valve and the bellows may cause switcher failure because of the time required to bleed out sufficient air during de-pressurization. If tubing greater than 1/8" is used, the maximum length must be reduced proportional to the additional volume. 8 Attach the valve s supply (normally closed (NC) port) to the PSIG (5.5 bar bar) [550 kpa kpa] source of air. Verify that the orifice (IPN ) has been installed into this NC valve port. (See Figure 3-1b of Figure 3-1 on page 3-4.) 3-2

33 3.2 Installation with 2 3/4 Feedthrough CrystalSix Operating Manual Installation of the solenoid valve requires a 2 3/4" feedthrough inclusive of two coaxial feedthroughs (IPN , see Figure 5-2 on page 5-2). The second coaxial feedthrough is not used, and should be protected from damage as a result of process material. Follow the steps below: 1 Install the Feedthrough. 2 Add the valve bracket (modified) to the desired location as illustrated in Figure 3-3 on page Tighten the feedthrough bolts. 4 Install the air fitting to the female thread adapter. 5 Connect 1/8" diameter tubing from the valve output (A) to the feedthrough fitting. See the CAUTION in section 3.1 above. 6 Attach the valve s supply (P) (normally closed (NC) port) to the PSIG (5.5 bar bar) [550 kpa kpa] source of air. Verify that the orifice (IPN ) has been installed into this NC valve port. (See Figure 3-1b of Figure 3-1 on page 3-4.) NOTE: Maximum temperature for the solenoid valve assembly is 105 C for bakeout and operation. 3.3 Electrical and Pneumatic Connections Electrical To complete installation of the assembly, make electrical connections where indicated in Figure 3-3 on page 3-6 to either 24 V(ac) or V(dc). Current required is approximately 70 ma. CAUTION Maximum applied voltage must not exceed 26 V(ac). 3-3

34 3.3.2 Pneumatic Figure 3-1 Pneumatic Solenoid Tube Connections Figure 3-1a Solenoid Valve Without Orifice (As Supplied) EXHAUST (Normally Open) PSIG AIR SUPPLY P SUPPLY (Normally Closed) A OUTPUT PORT TO AIR FITTING OF FEEDTHROUGH TUBE FITTING (Provided with Valve) Figure 3-1b Solenoid Valve With Orifice (Installed by User) EXHAUST (Normally Open) Figure 3-1b shows the proper installation for all CrystalSix applications PSIG AIR SUPPLY P SUPPLY (Normally Closed) A OUTPUT PORT TO AIR FITTING OF FEEDTHROUGH TUBE FITTING (Provided with Valve) ORIFICE ( ) (Provided with Accessory Kit G1) 3-4

35 Figure 3-2 Solenoid Valve Assembly 3-5

36 Figure /4 Dual Coaxial Feedthrough & Valve Assembly 3-6

37 Chapter 4 Maintenance 4.1 General Precautions Maintain the Temperature of the Crystal Periodically measure the water flow rate through the crystal sensor to verify that it meets or exceeds the value specified in chapter one. Depending upon the condition of the cooling water used, the addition of an in-line water filtering cartridge system may be necessary to prevent flow obstructions. Many system coaters use parallel water supply taps that provide high total flows. An obstruction or closed valve in the pipe that supplies water to the sensor head would not result in a noticeable reduction of total flow. The best test is to directly monitor the flow leaving the sensor. The crystal requires sufficient water cooling to sustain proper operational and temperature stability. Ideally, a constant heat load is balanced by a constant flow of water at a constant temperature. INFICON quartz crystals are designed to provide the best possible stability under normal operating conditions. No crystal can completely eliminate the effects of varying heat loads. Sources of heat variation include radiated energy emanating from the evaporant source and from substrate heaters Use the Optimum Crystal Type Certain materials, especially dielectrics, may not adhere strongly to the crystal surface and may cause erratic readings. For many dielectrics, adhesion is improved by using crystals with silver coated electrodes. Gold is preferred for other applications Crystal Concerns when Opening the Chamber Thick deposits of some materials, such as SiO, Si and Ni will normally peel off the crystal when it is exposed to air, due to changes in film stress caused by gas absorption. When peeling material is observed, replace the crystal. 4.2 Crystal Holder Maintenance In dielectric coating applications, the surface where the crystal contacts the crystal holder may require periodic cleaning. Since most dielectrics are insulators, any buildup due to blow-by will eventually cause erratic or poor electrical contact 4-1

38 between the crystal and the sensor body. This buildup will also cause a reduction in thermal transfer from the crystal to the sensor body. Both of these will result in noisy operation and early crystal failure. Cleaning may be accomplished by gently buffing the crystal holder to crystal seating surface with a white Scotch-Brite pad followed by an ultrasonic bath in soap solution followed by thorough rinsing in deionized water and drying or by ultrasonic cleaning and rinsing only. NOTE: The crystal holder seating surface is machined to a very fine finish (16 micro inches rms). This high quality finish is essential to provide good electrical and thermal contact with the crystal. Applying excessive force during cleaning or using overly abrasive cleaning materials may damage this finish and reduce sensor performance. 4.3 Retainer Spring Adjustment Instructions Occasionally you may become dissatisfied with the way the ceramic retainer is secured in the crystal holder. To alter the magnitude of the retaining force, use the following procedure. Tools required: Scribe or other pointed tool. Needle nose pliers (two required). 1 Position the crystal holder with the crystal aperture oriented downward. 2 Insert the point of the scribe between the inside edge of the crystal holder cavity and one of the two wire segments that protrude into the crystal cavity (Figure 4-1-a). 3 Using the scribe, gently remove the spring from its groove in the crystal holder cavity. 4 Consult Figure 4-1-b to determine the direction in which the 'transition point' must be relocated, to attain the desired retention forces. Moving this transition point approximately 1/8" is generally sufficient. 5 Grasp the spring, with the pliers, just below the transition point. Using the second set of pliers, bend the spring as illustrated by the dashed line in Figure 4-1-c to remove the existing transition point. 4-2

39 Figure 4-1 Location of the Transition Point 6 Use both pliers to form a new transition point according to Figure 4-1-b, thus returning the spring to a shape similar to the solid line delineation of Figure 4-1-c. 7 Reinstall the spring into the groove provided in the crystal cavity. 8 Determine if the retention force is acceptable and that the wire does not impede crystal insertion. Repeat these instructions if unacceptable retention forces persist. 4.4 Alignment Instruction for INFICON CrystalSix Sensor (IPN ) During shipment, units may vibrate slightly out of position. This does not mean alignment is required. The unit will return to the centered position the first time it is pneumatically activated. The unit in the shipped condition has been aligned at the factory, no further alignment is required. NOTE: Realignment is only required if the unit has been disassembled for any reason, such as evaporant material removal, or any electrical problem that may occur, or if the ratchet (item #22 DWG shown on Figure 1-3 on page 1-6) is loosened, or removed. This procedure is critical and must be carefully undertaken. 4-3

40 CAUTION Incorrect rotation direction with the stops disabled will cause permanent damage rendering transducer inoperative. Refer to Figure 1-2 on page 1-5 for proper direction of rotation. The unit, when properly aligned, will index the crystal to a position that is centered within the aperture provided in the heat shield. The unit must be aligned if this condition does not exist. Reference Figure 1-3 on page 1-6. Equipment Required: 5/64" allen wrench (Included in Kit) 1/16" allen wrench (Included in Kit) 3/32" allen wrench (Included in Kit) Alignment tool assembly G1 (Included in kit) Regulated air supply PSIG (5.5 bar bar) [550 kpa kpa] Alignment Instructions NOTE: 75 PSIG (5.2 bar) [520 kpa] for alignment purposes only) With the required equipment at hand, proceed as follows: 1 Temporarily connect an air supply to the bellows assembly supply tube. Regulate the air pressure to 75 PSIG (5.2 bar) [520 kpa]. 2 Remove the actuator cover (item 15) and related hardware. 3 Insert the 0.125" diameter alignment pin (of the G1 assembly) in the alignment hole (if not already installed) as shown in Figure 4-2 on page 4-6. The carousel may need to be rotated to achieve the alignment condition shown in Figure Loosen the set screws (two set screws per item) of the ratchet (item #22) and the stop ratchet (item #38). 5 Loosen the #2 fastener (item #42) that attaches the detent (item #41) to the bellows assembly item #19). Do NOT remove detent. 6 Actuate the bellows assembly by applying 24 volts to the leads of the solenoid valve of the solenoid valve assembly. Consult Figure 3-1 on page 3-4 for wiring assignments. The air pressure must be sustained. 4-4

41 7 Rotate the ratchet (item #22) counterclockwise until one tooth contacts the pin of the pawl and actuator stem assembly (item #24). Secure the ratchet to the 0.25" diameter shaft of the carousel assembly (item #5) utilizing the #6-32 x.125" long socket set screw (item #33). 8 Rotate the stop ratchet (item #38) CW (clockwise) until it contacts the stem of the pawl and actuator stem assembly (item #24) as shown in Figure 4-3 on page Secure the stop ratchet to the 0.25 diameter shaft of the carousel utilizing the #6-32 x.125 long socket set screws (item #33). 9 Rest the detent spacing tool on the top of the alignment pin as shown in Figure 4-4 on page Position the detent spacing tool (of the G1 assembly) between the detent (item #41) and ratchet (item #22) as shown in Figure 4-4. Pull the detent against the detent spacing tool and subsequently against the tooth of the ratchet. Tighten the #2 fastener (item #42) to secure the detent to the bellow assembly. 10 Remove the detent spacing tool. 11 Release air pressure from the bellows assembly (item #19). 12 Remove the diameter alignment pin of the G1 alignment tool assembly from the hole. 13 Prior to installation of the crystal holder assembly, check the continuity between the center contact of the connector and the electrical contacts associated with the carousel assembly (item #5). Install the crystal holder assembly when electrical continuity is verified. If electrical continuity is not verified, the unit should be disassembled (see section on page 4-6). The electric contact associated with the carousel will have to be adjusted to ensure electrical contact when assembled. 14 Press the crystal switch button on the handheld controller or the instrument front panel. The sensor will advance to the next crystal position. Each crystal should be centered in the aperture. Repeat step #10 for each crystal position. Make certain the detent drops in to engage each tooth of the ratchet (item #22) on each pulse. 15 Secure the actuator cover (item #15) to the top plate (item #10) using two #4-40 x 0.187" long socket head cap screws (items #16 and #17). 16 Install the heat shield (item #8) by first orienting the slot in the heat shield to accommodate the water lines, then secure the heat shield by applying pressure near the center of the shield. The shield should snap in place. 17 Regulate the air supply to PSIG (5.5 bar bar) [550 kpa kpa] for operation. Unit is now ready for operation. 4-5

42 Figure 4-2 Alignment Pin Installation Disassembly Instructions In the following steps, reference Figure 1-3 on page 1-6 and Figure 4-2 on page Remove the two #4 fasteners that secure the actuator cover (item #15) to the top plate (item #10). 2 Remove the actuator cover. Remove the heat shield (item #8) by gently pulling on the outside of the shield, the shield should snap off. 3 Remove the extension spring from the pawl and actuator stem assembly (item #24). 4 Remove the two #4 fasteners (item #20) that secure the bellows assembly (item #19) to the top plate (item #10). 5 Carefully remove the bellows assembly. The pawl and actuator stem assembly (item #24) and the detent (item #41) will be removed with the bellows assembly. 6 Using the 1/16" allen wrench, loosen the set screws (item #33) that secures the ratchet (item #22) and the stop ratchet (item #38) to the carousel assembly (item #5). Remove the ratchet (item #22) and the stop ratchet (item #38). 7 Remove the three #4 fasteners (item #14) that secure the top plate (item #10) to the sensor body (item #11). 8 Remove the top plate (item #10). 9 Remove the Teflon washer (item #39). 4-6

43 CAUTION When removing the top plate make certain the connector terminal does not become damaged. 10 Remove the compression spring (item #28). 11 Remove the carousel assembly (item #5) CAUTION When removing the carousel make certain the 0.126" diameter ball (item #27) does not become lost Assembly Instructions In the following steps, reference Figure 1-3 on page 1-6 and Figure 4-2 on page Place the 0.126" diameter ball (item #27) in the countersunk hole of the sensor body (item #11). 2 Attach the corrugated springs (item #31) if not already attached to the sensor body (item #11), as illustrated in detail "F" of Figure 1-3 on page 1-6, utilizing the 0-80 pan head screws (item #45). CAUTION Be extremely careful when handling the corrugated springs to avoid distortion. The successful operation of this apparatus is dependent on this component's integrity. 3 With the free end of each corrugated spring outside the sensor body, install the carousel assembly (item #5) so that it rests on the.126" diameter ball. Insert the corrugated springs into the space between the carousel (item #5) and the body (item #11). Make certain that the corrugated springs are not damaged upon installation. 4 Rotate the carousel clockwise until the alignment hole in the carousel lines up with the alignment hold of the body. Insert the 0.125" diameter alignment pin of the alignment tool assembly ( ) provided. Refer to Figure 4-2 on page

44 5 Place the compression spring (item #28) in the cavity surrounding the 0.25" diameter shaft of the carousel assembly. Install the Teflon washer (item #39) onto the.25" diameter shaft. 6 With the connector facing outward, pass the top plate (item #10) over the 0.25" diameter shaft of the carousel assembly (item #5) and the.125" diameter alignment pin. 7 Secure the top plate to the sensor body utilizing the three #4-40 screws (items #14 and 17). 8 Install the pawl and actuator stem assembly (item #24) into the bellows assembly (item #19) by threading the actuator stem into the mating hole located in the bore of the bellows assembly. Continue to thread the actuator stem until the shoulder of the actuator stem is approximately.035" away from the bellows assembly. This.035" distance specification is for reference only; the actuator stem position may have to be adjusted to obtain the desired condition, as illustrated in Figure 1-3 on page Fasten the bellows assembly to the top plate utilizing the two #4-40 x 1.125" long screws (item #20). Do not tighten the screws. Position the bellows assembly in such a fashion as to allow the actuator stem to come in contact with the ball bearings (item #25) as illustrated in Figure 1-3 on page 1-6. Tighten the screws. Loosen the #2 screw (item #42) which secures the detent to the bellow assembly (item #19). 10 Slide the ratchet (item #22) and the stop ratchet (item #38) onto the 0.25" diameter shaft of the carousel assembly (item #5) as illustrated. Do not tighten the #6-32 set screws (item #33). 11 Attach the loop of the extension spring in the hole provided in the pawl of the pawl and actuator stem assembly (item #24). 12 Position the ratchet (item #22) such that it engages the pin of the pawl and actuator stem assembly (item #24). 13 Position the detent (item #41) so it engages the ratchet (item #22). Unit is now ready to be aligned, refer to section on page

45 4.5 Troubleshooting the CrystalSix Sensor Table 4-1 Troubleshooting CrystalSix Operating Manual Symptom Cause Remedy 1. Crystal fail signal on front panel of unit will not disappear even though crystal can be seen through heat shield aperture. 1a. Damaged Crystal. 1a. Replace crystal. 1b. Loss of electrical signal. 1b. Check for electrical continuity between feedthrough and leaf springs that make contact with the crystal holder in the sensor.* If electrical problem originates in the sensor, consult Chapter 4 for disassembly instructions, if necessary. 2. Unit will not advance when crystal switch key is pressed. 3. Crystal not centered in aperture. 2a. Loss of pneumatic supply, or pressure is insufficient for proper operation. 2b. Operation has been impaired as a result of peeling of the material accumulated on the face of the cover. * Make certain the leaf springs in the carousel assembly are bent up far enough to contact the crystal holder when installed. 2a. Establish air supply and regulate to PSIG for operation. 2b. Consult Chapter 4 for disassembly instructions to remove material or to correct mechanical failure. 3a. Improper alignment. 3a. Realign per alignment instructions in Chapter 4. 3b diameter orifice not installed inline to the supply side of the solenoid valve assembly. 3b. Install orifice where shown on Figure 2-3 on page

Holds six crystals with robust, automatic switching to maximize process uptime

Holds six crystals with robust, automatic switching to maximize process uptime CrystalSix Sensor The INFICON CrystalSix sensor is critical for long processes demanding continuous rate control. Whether an OLED, MBE, Solar, long Optical Coating, or other processes having an extended

More information

CrystalSix. Sensor PN M

CrystalSix. Sensor PN M Cover Page O P E R A T I N G M A N U A L CrystalSix Sensor Title Page O P E R A T I N G M A N U A L CrystalSix Sensor www.inficon.com reachus@inficon.com Trademarks The trademarks of the products mentioned

More information

Sputtering. Sensor PN M

Sputtering. Sensor PN M Cover Page O P E R A T I N G M A N U A L Sputtering Sensor Title Page O P E R A T I N G M A N U A L Sputtering Sensor www.inficon.com reachus@inficon.com Trademarks The trademarks of the products mentioned

More information

NEO-DYN MODEL 100P ENCLOSURE 7 ADJUSTABLE EXPLOSION-PROOF PRESSURE SWITCH

NEO-DYN MODEL 100P ENCLOSURE 7 ADJUSTABLE EXPLOSION-PROOF PRESSURE SWITCH NEO-DYN MODEL 100P ENCLOSURE 7 ADJUSTABLE EXPLOSION-PROOF PRESSURE SWITCH INSTALLATION AND OPERATION MANUAL PN 610-0006 Rev E WARNING CAUTION SPECIAL CONDITIONS FOR SAFE USE NOTE Manual No. 610-0006 Rev

More information

AGCO. Corn Header Manual d HEADSIGHT.COM

AGCO. Corn Header Manual d HEADSIGHT.COM AGCO Corn Header Manual 09020401d HEADSIGHT.COM 574.546.5022 About Headsight Headsight Contact Info Headsight, Inc. 4845 3B Road Bremen, IN 46506 Phone: 574-546-5022 Fax: 574-546-5760 Email: info@headsight.com

More information

CRD400 Fitting Inserter OPERATIONS MANUAL

CRD400 Fitting Inserter OPERATIONS MANUAL CRD400 Fitting Inserter OPERATIONS MANUAL ORIGINAL INSTRUCTIONS VERSION 3.4 LAST EDITED 01.07.2019 www.cleanroomdevices.com 1 Table of Contents Title Page.. 1 Table of Contents... 2 1.0 General Product

More information

12 Volt Utility Controller for 4, 6, or 8 Brakes No

12 Volt Utility Controller for 4, 6, or 8 Brakes No 12 Volt Utility Controller for 4, 6, or 8 Brakes No. 1300-76 P-1396-WE 819-0301 Installation Instructions An Altra Industrial Motion Company Contents Introduction... 2 Installation... 3 Mounting Under

More information

Installation, Operating & Maintenance Instructions. Series 081, DN (I.D. 2½" - 4") Hot surfaces; do not touch!

Installation, Operating & Maintenance Instructions. Series 081, DN (I.D. 2½ - 4) Hot surfaces; do not touch! Vacuum Gate Valve This manual is valid for the valve ordering number(s): 08136-FA14/24/34/44 08138-FA14/24/34/44 08140-FA14/24/34/44 The fabrication number is indicated on each product as per the label

More information

LEXION SINGLE FUNCTION HYDRAULIC VALVE KIT

LEXION SINGLE FUNCTION HYDRAULIC VALVE KIT LEXION SINGLE FUNCTION HYDRAULIC VALVE KIT Conversion Manual 09062010b HEADSIGHT.COM 574.546.5022 About Headsight Headsight Contact Info Headsight, Inc. 4845 3B Road Bremen, IN 46506 Phone: 574-546-5022

More information

CRD610 Automatic Fitting Inserter

CRD610 Automatic Fitting Inserter CRD610 Automatic Fitting Inserter OPERATIONS MANUAL VERSION 1.2 LAST EDITED 12.12.2018 cleanroomdevices.com 1 Table of Contents Title Page. 1 Table of Contents...2 1.0 General Product & Safety Information....3

More information

GERINGHOFF. Corn Header Manual f HEADSIGHT.COM

GERINGHOFF. Corn Header Manual f HEADSIGHT.COM GERINGHOFF Corn Header Manual 09020701f HEADSIGHT.COM 574.546.5022 About Headsight Headsight Contact Info Headsight, Inc. 4845 3B Road Bremen, IN 46506 Phone: 574-546-5022 Fax: 574-546-5760 Email: info@headsight.com

More information

Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions

Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions Revision 012211 Table of Contents Basic Conveyor Features 3 Getting Started 4 Setting Up the Incline Conveyor 5 Belt Removal

More information

Compressor Clutch Replacement Procedure

Compressor Clutch Replacement Procedure Clutch Replacement Procedure P-1401-WE 819-0316 Installation Instructions An Altra Industrial Motion Company Warner Replacement Clutches for the following compressors: Denso 6E171 10P15 6P148 6C17 Ford

More information

AGCO Conversion Manual a HEADSIGHT.COM

AGCO Conversion Manual a HEADSIGHT.COM AGCO 3300 Conversion Manual 09040404a HEADSIGHT.COM 574.546.5022 About Headsight Headsight Contact Info Headsight, Inc. 4845 3B Road Bremen, IN 46506 Phone: 574-546-5022 Fax: 574-546-5760 Email: info@headsight.com

More information

Utility Controller Hand Air Operated

Utility Controller Hand Air Operated Utility Controller Hand Air Operated P-1395 819-0288 Installation Instructions Introduction The Warner Electric air/manual Utility Controller combines manual and automatic (air) actuation for the operation

More information

Mini UHV gate valve with manual actuator with pneumatic actuator

Mini UHV gate valve with manual actuator with pneumatic actuator Mini UHV gate valve with manual actuator with pneumatic actuator This manual is valid for the valve ordering numbers: 004/8/3/34-. E0/08 004/8/3/34-. E//3/4 004/8/3/34-. E//3/4 004/8/3/34-. E4/4/34/44

More information

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

CLEAN ROOM DEVICES, LLC WHERE TUBING AND FITTINGS COME TOGETHER CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER" CRD400 Fitting Inserter OPERATIONS MANUAL VERSION 3.1 LAST EDITED 03.08.11 DOCUMENT NUMBER 001 cleanroomdevices.com 1 Table of Contents

More information

EZ-IN Series Turbine Flowmeter

EZ-IN Series Turbine Flowmeter Class I, Group A, B, C, D, Division I Complies with ASME Standard B31.3 NUFLO EZ-IN Series Turbine Flowmeter Installation Manual Part No. 9A-100062997, Rev. 01 Measurement Systems EZ-IN Series BF Turbine

More information

Rectangular Door L-VAT with pneumatic actuator double acting

Rectangular Door L-VAT with pneumatic actuator double acting Rectangular Door L-VAT with pneumatic actuator double acting This manual is valid for the products: 0 7 5 1 0 U A 2 4 0 0 0 1 4 character option code Size 10... 46 x 236 12... 50 x 336 Actuator 24... without

More information

HYGRODYNAMICS DEW POINT MONITOR MODEL 8092P 8092P-230VAC TABLE OF CONTENTS DIAGRAMS

HYGRODYNAMICS DEW POINT MONITOR MODEL 8092P 8092P-230VAC TABLE OF CONTENTS DIAGRAMS HYGRODYNAMICS DEW POINT MONITOR MODEL 8092P 8092P-230VAC TABLE OF CONTENTS SPECIFICATIONS 1 PRINCIPLE OF OPERATION 1 INSTALLATION 2 Choosing a Sampling Location 2 Mounting the Enclosure 2 Remote Alarm

More information

CRD600 Automatic Fitting Inserter

CRD600 Automatic Fitting Inserter CRD600 Automatic Fitting Inserter OPERATIONS MANUAL VERSION 2.3 LAST EDITED 12.07.2018 cleanroomdevices.com 1 Table of Contents Title Page.. 1 Table of Contents. 2 1.0 General Product & Safety Information...3

More information

DRAGO. Corn Header Manual f HEADSIGHT.COM

DRAGO. Corn Header Manual f HEADSIGHT.COM DRAGO Corn Header Manual 09020801f HEADSIGHT.COM 574.546.5022 About Headsight Headsight Contact Info Headsight, Inc. 4845 3B Road Bremen, IN 46506 Phone: 574-546-5022 Fax: 574-546-5760 Email: info@headsight.com

More information

HV Gate Valve with pneumatic actuator

HV Gate Valve with pneumatic actuator HV Gate Valve with pneumatic actuator This manual is valid for the valve ordering number(s): 09134-_E14/24/34/44 09136-_E14/24/34/44 09138-_E14/24/34/44 09140-_E14/24/34/44 09144-_E14/24/34/44 The fabrication

More information

Single Post Caliper Brake VC500

Single Post Caliper Brake VC500 Single Post Caliper Brake VC500 1 In accordance with Nexen s established policy of constant product improvement, the specifications contained in this manual are subject to change without notice. Technical

More information

Installation Guide Document N Cleanroom Mirrors Copyright 2016 Terra Universal Inc. All rights reserved. Revised November 2016

Installation Guide Document N Cleanroom Mirrors Copyright 2016 Terra Universal Inc. All rights reserved. Revised November 2016 Document N0. 1800-09 Copyright 2016 Terra Universal Inc. All rights reserved. Revised November 2016 Terra Universal, Inc. TerraUniversal.com 800 S. Raymond Ave. Fullerton, CA 92831 TEL: (714) 578-6000

More information

UNIBLOC-GP Operation & Service Manual

UNIBLOC-GP Operation & Service Manual UNIBLOC-GP Operation & Service anual odels: 275-375 ANUAL NO.: GP275-375 REVISION: 01/2017 Original Instructions UNIBLOC PUP UNIBLOC PUP Unibloc-Pump, Inc. 1701 Ashborough Road SE arietta, Georgia 30067

More information

INSTALLATION DATA MANUAL. Model 521/522 Pressure Transmitter

INSTALLATION DATA MANUAL. Model 521/522 Pressure Transmitter INSTALLATION DATA MANUAL Model 521/522 Pressure Transmitter 3829 Forest Parkway, Suite 500 Wheatfield, NY 14120 Toll Free: 1-800-688-0030 International: 1-716-629-3800 Fax: 716-693-9162 www.viatran.com

More information

MULTIPOSITION AIR CYLINDER

MULTIPOSITION AIR CYLINDER MULTIPOSITION AIR CYLINDER CAST ALUMINUM FOUR-POSITION - ALL AIR SERVICE INFORMATION MOUNTING! Devices should be mounted and positioned in such a manner that they cannot be accidentally operated. INSTALLATION

More information

MEX (55) QRO (442) Web Controls

MEX (55) QRO (442) Web Controls Web Controls SINGLE AND DUAL ROTOR TENSION CONTROL BRAKES MODELS:,,,, AND INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS Read this manual carefully, making full use of its explanations and instructions.

More information

INSTALLATION, OPERATION & MAINTENANCE MANUAL

INSTALLATION, OPERATION & MAINTENANCE MANUAL Rack & Pinion Pneumatic Actuators INSTALLATION, OPERATION & MAINTENANCE MANUAL QSM, Inc. 127 Village Lane Easley, SC 29642 U.S.A. Ph: (864) 605-0150 Fax: (864) 605-0830 www.tru-flo.com TABLE OF CONTENTS

More information

JD 900F TILT SENSOR INSTALLATION

JD 900F TILT SENSOR INSTALLATION JD 900F TILT SENSOR INSTALLATION Conversion Manual 09040108b HEADSIGHT.COM 574.546.5022 About Headsight Headsight Contact Info Headsight, Inc. 4845 3B Road Bremen, IN 46506 Phone: 574-546-5022 Fax: 574-546-5760

More information

CV Control Valves Installation and Operation Manual

CV Control Valves Installation and Operation Manual CV1500 - Control Valves Installation and Operation Manual 652-EN Overview Warning: This bulletin should be used by experienced personnel as a guide to the installation of the Armstrong CV1500 Control Valve.

More information

INSTALLATION DATA MANUAL Model 510 Pressure Transmitter

INSTALLATION DATA MANUAL Model 510 Pressure Transmitter INSTALLATION DATA MANUAL Model 510 Pressure Transmitter 3829 Forest Parkway, Suite 500 Wheatfield, NY 14120 Toll Free: 1-800-688-0030 International: 1-716-629-3800 Fax: 716-693-9162 www.viatran.com solutions@viatran.com

More information

Full View Flow Indicator

Full View Flow Indicator Full View Flow Indicator Threaded and Flanged Process Connection Installation / Operation / Maintenance Manual P.O. Box 1116 Twinsburg, OH 44087 Phone: 330/405-3040 Fax: 330/405-3070 E-mail: view@ljstar.com

More information

Saf-T-Bar Conductor Bar T Series

Saf-T-Bar Conductor Bar T Series Saf-T-Bar Conductor Bar T Series P/N 964001 2012.04.12 Rev. 6 SERIES T SAF-T-BAR CONDUCTOR BAR 1 Conductix Incorporated The technical data and images which appear in this manual are for informational purposes

More information

Maintenance Information

Maintenance Information 80234313 Edition 1 June 2006 Air Grinder, Die Grinder, Sander and Belt Sander Series G1 (Angle) Maintenance Information Save These Instructions WARNING Always wear eye protection when operating or performing

More information

Guardian Taper Grid Shaft Coupling

Guardian Taper Grid Shaft Coupling Guardian Taper Grid Shaft Coupling P-8608-GC GUA-MRK-DOC-025 Service & Installation Instructions TABLE OF CONTENTS NOTICES AND WARNINGS PAGE 2 SECTION 1 COUPLING OVERVIEW PAGE 3 SECTION 2 TOOLS/MATERIALS

More information

TBM Series 3-Way Ball Valve

TBM Series 3-Way Ball Valve www.simtechusa.com TBM Series 3-Way Ball Valve Operating, Installation, & Maintenance Manual Corrosion Resistant Fluid and Air Handling Systems. Dated 06-26-13 TBM Series Ball Valves SIMTECHRECOMMENDSREADINGTHEFOLLOWINGINFORMATIONPRIORTOINSTALLINGANDUSING

More information

Laboratory Series. Ultraviolet Ozone Destruct System Installation, Operation and Maintenance Manual. One Source for All Your UV Needs!

Laboratory Series. Ultraviolet Ozone Destruct System Installation, Operation and Maintenance Manual. One Source for All Your UV Needs! Laboratory Series Ultraviolet Ozone Destruct System Installation, Operation and Maintenance Manual KEEP THIS MANUAL ON HAND IT IS IMPORTANT THAT THOSE RESPONSIBLE FOR THE INSTALLATION OF THIS EQUIPMENT,

More information

FOR TECHNICAL ASSISTANCE

FOR TECHNICAL ASSISTANCE ACORN ENGINEERING COMPANY P.O. BOX 3527 CITY OF INDUSTRY, CA 91744 UNITED STATES OF AMERICA WWW.ACORNENG.COM INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS SV16 TEMPERATURE/PRESSURE BALANCING MIXING

More information

DeZURIK 2 20" BOS BUTTERFLY VALVES

DeZURIK 2 20 BOS BUTTERFLY VALVES 2 20" BOS BUTTERFLY VALVES Instruction D10459 October 2013 2-20 BOS Butterfly Valves Instructions These instructions provide information about BOS Butterfly Valves. They are for use by personnel who are

More information

ECONOMAIR SERIES CYLINDERS

ECONOMAIR SERIES CYLINDERS OPERATOR S MANUAL INCLUDING: APPLICATION, LUBRICATION, INSTALLATION & SERVICE ECONOMAIR SERIES CYLINDERS 2XXX-XXX9-XXX RELEASED: 9-14-92 REVISED: 3-6-01 (REV. B) READ THIS MANUAL CAREFULLY BEFORE INSTALLING,

More information

580RK SERVICE GUIDELINES For coupling models: 580 & 580J

580RK SERVICE GUIDELINES For coupling models: 580 & 580J 580 Coupling THE FIRST NAME IN QUALITY COUPLINGS 580RK SERVICE GUIDELINES For coupling models: 580 & 580J BEFORE GETTING STARTED: This procedure should only be performed by a qualified mechanic. Measure

More information

Guardian Steel Gear Shaft Coupling

Guardian Steel Gear Shaft Coupling Guardian Steel Gear Shaft Coupling P-8609-GC GUA-MRK-DOC-026 Service & Installation Instructions TABLE OF CONTENTS NOTICES AND WARNINGS PAGE 2 SECTION 1 COUPLING OVERVIEW PAGE 3 SECTION 2 TOOLS/MATERIALS

More information

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN Fusing Equipment MN132021EN Effective November 2016 Supersedes June 2011 (S240-97-1) COOPER POWER SERIES Installation Instructions DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information,

More information

Operating and Installation Instructions

Operating and Installation Instructions Model Number 20902 Fabricator's Power Module Kit - Aluminum Operating and Installation Instructions CAUTION! This product is to be installed only by persons knowledgeable in the repair and modification

More information

GC-1. Roof and Gutter De-Icing Control Installation and Operating Instructions FOR EXTERIOR INSTALLATION ONLY

GC-1. Roof and Gutter De-Icing Control Installation and Operating Instructions FOR EXTERIOR INSTALLATION ONLY GC-1 Roof and Gutter De-Icing Control Installation and Operating Instructions FOR EXTERIOR INSTALLATION ONLY GENERAL INFORMATION The GC-1 heating cable controller has been designed and manufactured for

More information

Maintenance Information

Maintenance Information 04581245 Edition 2 May 2014 Air Grinder, Die Grinder and Sander Series G2 (Angle) Maintenance Information Save These Instructions Product Safety Information WARNING Failure to observe the following warnings,

More information

Maintenance Information

Maintenance Information 80234313 Edition 2 May 2014 Air Grinder, Die Grinder, Sander and Belt Sander Series G1 (Angle) Maintenance Information Save These Instructions Product Safety Information WARNING Failure to observe the

More information

CORN HEADER MANUAL: CNH PRE-2012

CORN HEADER MANUAL: CNH PRE-2012 CORN HEADER MANUAL: CNH PRE-2012 09020201c HEADSIGHT.COM 574.546.5022 About Headsight Headsight Contact Info Headsight, Inc. 4845 3B Road Bremen, IN 46506 Phone: 574-546-5022 Fax: 574-546-5760 Email:

More information

12 Volt Utility Controller for 4, 6 or 8 Brakes No P

12 Volt Utility Controller for 4, 6 or 8 Brakes No P 12 Volt Utility Controller for 4, 6 or 8 Brakes No. 1300-77 P-1379 819-0094 Installation Instructions Introduction The Warner Electric manually operated Utility Controller operates 4, 6, or 8 twelve-volt

More information

LEAK TEST PROCEDURE MRTALPCH611LDC REMOTE READY LIFTERS W/ 3 BUTTON CONTROL APPLICABLE TO LIFTERS WITH SERIAL NUMBERS GREATER THAN #

LEAK TEST PROCEDURE MRTALPCH611LDC REMOTE READY LIFTERS W/ 3 BUTTON CONTROL APPLICABLE TO LIFTERS WITH SERIAL NUMBERS GREATER THAN # LEAK TEST PROCEDURE MRTALPCH611LDC REMOTE READY LIFTERS W/ 3 BUTTON CONTROL APPLICABLE TO LIFTERS WITH SERIAL NUMBERS GREATER THAN # 20100742 TESTING AND MAINTENANCE MUST BE DONE BY A QUALIFIED PERSON

More information

SUNTURA HD SOLAR TRACKER

SUNTURA HD SOLAR TRACKER WindyNation SUNTURA HD SOLAR TRACKER SOT-TRKS-NFHD User s Manual Page 1 of 11 WindyNation 08/09/2012 Table of Contents 1! Introduction... 3! 1.1! Limited Warranty... 3! 1.2! Restrictions... 3! 1.3! Warranty

More information

"WHERE TUBING AND FITTINGS COME TOGETHER"

WHERE TUBING AND FITTINGS COME TOGETHER CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER" CRD200SS TUBE EXPANDER OPERATIONS MANUAL VERSION 4.3 LAST EDITED 06.17.15 cleanroomdevices.com Table of Contents Table of Contents....1

More information

Control Gate Valve with stepper motor actuator

Control Gate Valve with stepper motor actuator Control Gate Valve with stepper motor actuator This manual is valid for the valve ordering numbers: 64036-.E52 and 64040-.E52 The respective product identification is given on each valve in the following

More information

SUNTURA SOLAR TRACKER

SUNTURA SOLAR TRACKER WindyNation SUNTURA SOLAR TRACKER SOT-TRKS-NF User s Manual Page 1 of 10 WindyNation 08/09/2012 Table of Contents 1 Introduction... 3 1.1 Limited Warranty... 3 1.2 Restrictions... 3 1.3 Warranty Claims

More information

AT Clutch Major Service Sizes 25, 55, 115

AT Clutch Major Service Sizes 25, 55, 115 P-1404 819-0324 AT Clutch Major Service Sizes 25, 55, 115 Installation Instructions Contents Introduction............................ 2 Warranty....................... back cover Failure to follow these

More information

HR-20P Pneumatically Controlled Pressure Regulator

HR-20P Pneumatically Controlled Pressure Regulator HR-20P Pneumatically Controlled Pressure Regulator Instruction and Service Manual Hydroplex Corporation 230 West Gloria Switch Rd. Lafayette, LA 70507 337-233-0626 www.hydroplexpumps.com I. General Instructions

More information

OnBoard Drum Major Podium

OnBoard Drum Major Podium Assembly and Owner s Manual OnBoard Drum Major Podium CONTENTS CONTENTS................................................................................. 1 SAFETY...................................................................................

More information

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

CLEAN ROOM DEVICES, LLC WHERE TUBING AND FITTINGS COME TOGETHER CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER" CRD600 Automatic Fitting Inserter OPERATIONS MANUAL VERSION 2.1 LAST EDITED 7.25.14 DOCUMENT NUMBER 001 cleanroomdevices.com 1 Table of

More information

INTRODUCTION INSTALLATION

INTRODUCTION INSTALLATION INTRODUCTION INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS This instruction manual includes installation, operation and maintenance information for the figure G73 gear operator. The figure G73 is

More information

Tissue Master. User Manual

Tissue Master. User Manual Tissue Master User Manual This page left blank intentionally This manual is a guide for the use of the Omni International Tissue Master and accessories. Data herein has been verified and validated. It

More information

Pneumatic Cylinder 14 Bore X 22 Stroke Part No. R (Formerly P )

Pneumatic Cylinder 14 Bore X 22 Stroke Part No. R (Formerly P ) Pneumatic Cylinder 14 Bore X 22 Stroke Part No. R434001268 (Formerly P -193419-00003) Service Information INSTALLATION Before installing this cylinder, all air lines in the system should be blown clean

More information

HA/HAB Fiberglass Wall Mount Ventilators

HA/HAB Fiberglass Wall Mount Ventilators HA/HAB Fiberglass Wall Mount Ventilators INSTALLATION, OPERATION & MAINTENANCE MANUAL IM-3100 August 2015 Throughout this manual, there are a number of HAZARD S that must be read and adhered to in order

More information

3M Overhaul Service Kit

3M Overhaul Service Kit SERVICE INSTRUCTIONS FOR 3M 12,000 RPM 5 in. (127 mm) and 6 in. (150 mm) RANDOM ORBITAL SANDERS 3M Overhaul Service Kit The part number 20347, 3M Overhaul Service Kit, contains all the replacement parts

More information

Single-Position Detent Clutch DC Series. (i) MTY (81) MEX (55) QRO (442)

Single-Position Detent Clutch DC Series. (i) MTY (81) MEX (55) QRO (442) Single-Position Detent Clutch DC Series (i) FORM NO. L-2017-A-001 In accordance with Nexen s established policy of constant product improvement, the specifications contained in this manual are subject

More information

Procedure to Install the New Autogap components in ER-1225 and ER825 Brake with inverted Armature Hub

Procedure to Install the New Autogap components in ER-1225 and ER825 Brake with inverted Armature Hub Procedure to Install the New Autogap components in ER-15 and ER85 Brake with inverted P-30-1 819-0376 Installation & Operating Instructions Contents Introduction........................... Kit Parts List..........................

More information

3M Overhaul Service Kit

3M Overhaul Service Kit SERVICE INSTRUCTIONS FOR 3M 12,000 RPM 3 in. (77 mm) RANDOM ORBITAL SANDERS 3M Overhaul Service Kit The part number 20346, 3M Overhaul Service Kit, contains all the replacement parts that naturally wear

More information

Installation and Operation Instructions Safety Director Arrow

Installation and Operation Instructions Safety Director Arrow Installation and Operation Instructions Safety Director Arrow! WARNING! Failure to install or use this product according to manufacturers recommendations may result in property damage, serious bodily/personal

More information

Effective November 2016 Supersedes February 2012 (S )

Effective November 2016 Supersedes February 2012 (S ) Fusing Equipment MN132033EN Effective November 2016 Supersedes February 2012 (S240-97-2) 200 A Fused Loadbreak Elbow Connector Shorting Bar (solid link) Installation Instructions COOPER POWER SERIES Pulling

More information

Gen 2 Electrically Released Motor Brake Module for EM-MBFB and EUM-MBFB

Gen 2 Electrically Released Motor Brake Module for EM-MBFB and EUM-MBFB Gen 2 Electrically Released Motor Brake Module for EM-MBFB and EUM-MBFB P-273-8 819-0531 Installation Instructions Vented Enclosed Version Optional An Altra Industrial Motion Company Warner Electric s

More information

Compressor Clutch Replacement Procedure

Compressor Clutch Replacement Procedure P-1411 819-0361 Compressor Clutch Replacement Procedure Installation Instructions World Clutch with Unidamp Armature for Ford FX-15 and FS-10 Compressors and all Denso Models with 30mm bearing fit. Keep

More information

Electric Actuator Installation, Operation & Maintenance Manual

Electric Actuator Installation, Operation & Maintenance Manual ICI Indelac Controls, Inc. Electric Actuator Installation, Operation & Maintenance Manual 6810 Powerline dr.-florence, Ky. 41042 - Telephone 859-727-7890, Tool free 800-662-9424 Fax. 859-727-4070, e-mail:

More information

Pneumatic Cylinder 14 Bore X 21 Stroke Part No. P Replaces Part No. P

Pneumatic Cylinder 14 Bore X 21 Stroke Part No. P Replaces Part No. P Pneumatic Cylinder 14 Bore X 21 Stroke Part No. P -322908-00000 Replaces Part No. P-191067-00000 Service Information WARNING: INSTALLATION AND MOUNTING The user of these devices must conform to all applicable

More information

DIFFERENTIAL PRESSURE RELIEF REGULATOR TYPE A4AL Port Size 3/4"- 4" (20-100mm) For Ammonia, R-22, R134a, R404a, R507 and other common refrigerants.

DIFFERENTIAL PRESSURE RELIEF REGULATOR TYPE A4AL Port Size 3/4- 4 (20-100mm) For Ammonia, R-22, R134a, R404a, R507 and other common refrigerants. DIFFERENTIAL PRESSURE RELIEF REGULATOR TYPE A4AL Port Size 3/4"- 4" (20-100mm) For Ammonia, R-22, R134a, R404a, R507 and other common refrigerants. FEATURES Pilot operated characterized Modulating Plug

More information

IMPORTANT OPERATING CONDITIONS. Failure to comply with any of these conditions invalidates the warranty. STANDARD CONFIGURATIONS

IMPORTANT OPERATING CONDITIONS. Failure to comply with any of these conditions invalidates the warranty. STANDARD CONFIGURATIONS X-SERIES TRIPLEX CERAMIC PLUNGER PUMPS OPERATING MANUAL MODELS X8 X10 X20 IMPORTANT OPERATING CONDITIONS Failure to comply with any of these conditions invalidates the warranty. Lubrication - Prior to

More information

Sample Pro 3/4" Portable MicroPurge Pump. User's Guide P/N REV The World Leader in Air Powered Pumps

Sample Pro 3/4 Portable MicroPurge Pump. User's Guide P/N REV The World Leader in Air Powered Pumps PATENT PENDING Pro 3/4" Portable MicroPurge Pump User's Guide P/N 959 REV. -8-03 The World Leader in Air Powered For Remediation, Landfills and Ground Water Sampling Ground water Sampling Remediation,

More information

Product/ Title Guardian Super Flex Shaft Coupling Product/ Title

Product/ Title Guardian Super Flex Shaft Coupling Product/ Title Product/ Title Guardian Super Flex Shaft Coupling Product/ Title GUA-MRK-DOC-027 P-XXXX-GC Service&&Installation Installation Instructions Instructions Service An Altra Industrial Motion Company TABLE

More information

BAK1500 INSTALLATION/OWNER'S MANUAL Compact Amplified Subwoofer

BAK1500 INSTALLATION/OWNER'S MANUAL Compact Amplified Subwoofer BAK1500 INSTALLATION/OWNER'S MANUAL Compact Amplified Subwoofer PREPARATION Getting Started Thank you for purchasing the Dual BAK1500 compact amplified subwoofer. Although Dual has attempted to ensure

More information

TOTALIZER-TRANSMITTER

TOTALIZER-TRANSMITTER TOTALIZER-TRANSMITTER MODEL TR04-2 OPERATION AND MAINTENANCE MANUAL PARTS LIST FEATURING: *SEALED HOUSING *STANDARD TOTALIZER ASSEMBLY *MAGNETICALLY ACTUATED REED SWITCH 3255 WEST STETSON AVENUE HEMET,

More information

TBX10A INSTALLATION/OWNER'S MANUAL 10" Sealed Enclosure with Built-in Amplifier

TBX10A INSTALLATION/OWNER'S MANUAL 10 Sealed Enclosure with Built-in Amplifier TBX10A INSTALLATION/OWNER'S MANUAL 10" Sealed Enclosure with Built-in Amplifier Getting Started Thank you for purchasing the Dual TBX10A 10" ported enclosure with built-in amplifier. Although Dual has

More information

Air and water reels. Models and Series B. Installation and maintenance guide DANGER

Air and water reels. Models and Series B. Installation and maintenance guide DANGER Installation and maintenance guide Air and water reels Models 83753 and 83754 Series B Date of issue June 2014 Form number 404665A Section E35 Page 83A DANGER Read manual prior to installation or use of

More information

Single Leg AM / CM 20, 24 and 30. Installation

Single Leg AM / CM 20, 24 and 30. Installation 1-800-846-9659 www.equalizersystems.com Installation and Operation Guide January 2011 Single Leg AM / CM 20, 24 and 30 Installation Tools Required for Installation Ratchet, Sockets and Wrench Set Wire

More information

TRANSDUCER INSTRUCTION MANUAL... TYPE SLIM CELL TRANSDUCER. INSTRUCTION NUMBER: AO of 9

TRANSDUCER INSTRUCTION MANUAL... TYPE SLIM CELL TRANSDUCER. INSTRUCTION NUMBER: AO of 9 CLEVELAND-KIDDER SLIM CELL TRANSDUCER INSTRUCTION MANUAL... TYPE SLIM CELL TRANSDUCER INSTRUCTION NUMBER: AO-70165 1 of 9 1.0 GENERAL INFORMATION 1.1 RECEIVING AND UNPACKING Handle and unpack the equipment

More information

12 Meter Add-On Kit for the Hustler 4/5/6-BTV Vertical Antennas

12 Meter Add-On Kit for the Hustler 4/5/6-BTV Vertical Antennas 12 Meter Add-On Kit for the Hustler 4/5/6-BTV Vertical Antennas DXE-AOK-12M Patent Pending DXE-AOK-12M-INS Revision 1d DXE-AOK-12M Installed on a BTV with optional Tilt Base and Direct Coax Feedpoint DX

More information

RANGE HOODS USER INSTRUCTIONS

RANGE HOODS USER INSTRUCTIONS RANGE HOODS USER INSTRUCTIONS Model: Advanta Pro III 30 & 36 IMPORTANT SAFETY INSTRUCTIONS Carefully read the following important information regarding installation safety and maintenance. Keep these instructions

More information

UHV Angle valve (Series 284) with pneumatic actuator, single acting with closing spring (NC)

UHV Angle valve (Series 284) with pneumatic actuator, single acting with closing spring (NC) UHV Angle valve (Series 84) with pneumatic actuator, single acting with closing spring (NC) This manual is valid for the valve ordering number(s): 84 85 The fabrication number is indicated on each product

More information

User s Manual and Operating Instructions

User s Manual and Operating Instructions User s Manual and Operating Instructions Model Numbers: CL-36-BDF-A, CL-42-BDF-A, CL-48-BDF-A E355088 READ AND SAVE THESE INSTRUCTIONS IMPORTANT: Read and understand all of the instructions in this manual

More information

NEO-DYN MODELS 100T AND 100TC ADJUSTABLE TEMPERATURE SWITCHES; ENCLOSURE 3X FOR WEATHERPROOF APPLICATIONS INSTALLATION AND OPERATION MANUAL

NEO-DYN MODELS 100T AND 100TC ADJUSTABLE TEMPERATURE SWITCHES; ENCLOSURE 3X FOR WEATHERPROOF APPLICATIONS INSTALLATION AND OPERATION MANUAL NEO-DYN MODELS 100T AND 100TC ADJUSTABLE TEMPERATURE SWITCHES; ENCLOSURE 3X FOR WEATHERPROOF APPLICATIONS INSTALLATION AND OPERATION MANUAL PN 610-0012 Rev B Manual No. 610-0012 REV B Neo-Dyn 28150 Industry

More information

BEAMER Tilt Beam Sensor

BEAMER Tilt Beam Sensor User s Manual BEAMER Tilt Beam Sensor Serial No. 140 Chestnut Street San Francisco, CA 94111 Phone: 415 364 3200 Fax: 415 861 1448 www.geomechanics.com CAUTION: Never measure the sensor inside your Beamer

More information

Installation, Operation and Maintenance of Airflex Model AA2, B2, B3 and C2 Rotorseals

Installation, Operation and Maintenance of Airflex Model AA2, B2, B3 and C2 Rotorseals RS 9010 Warning Forward this manual to the person responsible for Installation, Operation and Maintenance of the product described herein. Without access to this information, faulty Installation, Operation

More information

Electrically Released Motor Brake Module for EM-MBFB and EUM-MBFB Size 50, 100, 180

Electrically Released Motor Brake Module for EM-MBFB and EUM-MBFB Size 50, 100, 180 Electrically Released Motor Brake Module for EM-MBFB and EUM-MBFB Size 50, 100, 180 P-273-8-WE 819-0531 Installation Instructions Vented Enclosed Version Optional Warner Electric s MBFB series of Electrically

More information

DAP-625S and DAP-875S

DAP-625S and DAP-875S AIR CHAMP PRODUCTS DAP-625S and DAP-875S (i) FORM NO. L-20078-B-0501 In accordance with Nexen s established policy of constant product improvement, the specifications contained in this manual are subject

More information

Aquaflush. Z6000 Series Aquaflush Exposed Flushometer Installation, Operation, Maintenance, and Parts Manual Z6000 Z6003

Aquaflush. Z6000 Series Aquaflush Exposed Flushometer Installation, Operation, Maintenance, and Parts Manual Z6000 Z6003 Z6000 Series Exposed Flushometer Installation, Operation, Maintenance, and Parts Manual Patented and Patents Pending Z6000 ADA Z6003 Exposed Closet/Urinal Systems Z6000 Z6001 Z6003 Z6010 Z6014 Z6017 Z6096

More information

MAINFRAME HOT RUNNER TEMPERATURE CONTROL SYSTEMS. Instruction Manual

MAINFRAME HOT RUNNER TEMPERATURE CONTROL SYSTEMS. Instruction Manual MAINFRAME HOT RUNNER TEMPERATURE CONTROL SYSTEMS Instruction Manual Copyright, Athena Controls, Inc., 2006 Printed in USA CompuStep is a registered trademark of Athena Controls, Inc. SafeChange is a trademark

More information

Installation and Maintenance Instructions

Installation and Maintenance Instructions Limited One Year Warranty T&S warrants to the original purchaser (other than for purposes of resale) that such product is free from defects in material and workmanship for a period of one (1) year from

More information

P SERIES PUMPS. 18mm Versions Nickle-Aluminum Bronze Models: P , P , P , P , P , P , P

P SERIES PUMPS. 18mm Versions Nickle-Aluminum Bronze Models: P , P , P , P , P , P , P P200-3100 SERIES PUMPS 18mm Versions Nickle-Aluminum Bronze Models: P217-3100, P218-3100, P219-3100, P220-3100, P221-3100, P227-3100, P230-3100 Triplex Ceramic Plunger Pump Operating Instructions/ Repair

More information

Guardian FBA Flywheel Coupling

Guardian FBA Flywheel Coupling Guardian FBA Flywheel Coupling P-8602-GC GUA-MRK-DOC-010 Service & Installation Instructions TABLE OF CONTENTS NOTICES AND WARNINGS PAGE 2 SECTION 1 COUPLING OVERVIEW PAGE 3 SECTION 2 TOOLS/MATERIALS REQUIRED

More information

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

CLEAN ROOM DEVICES, LLC WHERE TUBING AND FITTINGS COME TOGETHER CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER" CRD600AF Automatic Fitting Inserter With Auto Feed OPERATIONS MANUAL (Shown with optional alcohol dispenser) 1 VERSION 1.1 LAST EDITED

More information

Nor East. Instructions Safety Messages. Inspection. Parts. DeZURIK Service. Type 05 Pneumatic Actuator Used With Globe Valves

Nor East. Instructions Safety Messages. Inspection. Parts. DeZURIK Service. Type 05 Pneumatic Actuator Used With Globe Valves Instructions Safety Messages These instructions are intended for personnel who are responsible for installation, operation and maintenance of your DeZURIK Actuator. All safety messages in the instructions

More information