Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Similar documents
Jemena Electricity Networks (Vic) Ltd

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

Enquiry Form for Micro and Small Generators 5MW and Less

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Large Embedded Generation User Guide A

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

SA Power Networks Commissioning Witnessing Checklist

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

APPLICATION ELECTRICITY SERVICES. APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Form C Renewable Energy Micro-Generation Connection Application Distribution System

Guidelines for connection of generators:

NS194B Guidelines for Rotating Machines Connected to the Ausgrid Network. October 2014

Standards, Procedures and Policies for Grid Connection

PSNH INTERCONNECTION REQUEST

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

Louisville Gas and Electric Company

Connecting your business diesel generation

Technical Standard - TS 129. Small Inverter Energy Systems (IES) - Capacity not exceeding 30kW. SA Power Networks. Published: November 2017

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 25 kw)

Appendix A2: Technical Requirements for Distributed Generators > 10 kw to be Connected to Kitchener-Wilmot Hydro Inc. s Distribution System

Technical Requirements for Renewable Energy Power System

GRID CONNECTION ISSUES FOR DISTRIBUTED GENERATION REVIEW & STANDARDS

Section 6. Generation Interconnection

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

Net Metering Interconnection Requirements

DISTRIBUTION SOLUTIONS HA Breaker Retrofit. Medium Voltage Service Marketing and Sales

Net Metering Interconnection Requirements. Customer Generation Capacity Not Exceeding 100 kw. Date: Version: 1

Net Metering Service. Customer Information Package

Micro Embedded generation

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Customer Guidelines for Low Voltage Connected. Embedded Generation

Embedded Generation Network Access Standards

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Connecting your home or small business generation

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

Micro-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

NRS 097-series / Grid Code Discussion:

Request for Payment Instructions Rule 21 Export Submittal Instructions

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

TERMS AND CONDITIONS

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

Net +Plus Connection Code

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

If any further information is required for CHELCO to fulfill its reporting requirements, please let us know.

Definitions. Scope. Customer Generation Interconnection Requirements

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Form G5-1 PACIFIC GAS AND ELECTRIC COMPANY GENERATION PRE-PARALLEL INSPECTION

TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 NOVEMBER 2015

CUSTOMER / ACCOUNT INFORMATION Electric Utility Customer Information (As shown on utility bill)

Embedded Generation Guidelines

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Renewable Energy System - Electricity System Connection Application Form

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota

To complete the process for a net metering interconnection, please follow the steps below:

Municipality Generator Interconnection Application Single Meter Application Part I

NET METERING APPLICATION

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS

TECHNICAL SPECIFICATION

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Distributed Generation Interconnection Policy

GUIDELINES FOR OPERATING, METERING AND PROTECTIVE RELAYING FOR. NET METERED SYSTEMS UP TO 50 kw AND BELOW 750 VOLTS

Marina Bay Sands Guidelines for Electrical and Wiring Service

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

GENERATOR INTERCONNECTION APPLICATION

Power Conditioning of Microgrids and Co-Generation Systems

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

Request for Payment Instructions form. Rule 21 Non-Exporting Generators Submittal Instructions

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

RULES & REGULATIONS FOR RENEWABLE GENERATION SYSTEMS 2. SUMMARY OF APPLICATION AND INTERCONNECTION PROCESS

Technical Guidance for Customer Export Limiting Schemes

Power System Operating Incident Report Trip of Red Cliffs Horsham and Red Cliffs-Wemen Kerang 220 kv transmission lines on 15 January 2014

Interconnection Feasibility Study Report GIP-222-FEAS-R3

National Distributed Energy Resources Grid Connection Guidelines. Technical Guidelines for Basic Micro EG Connections

Transcription:

Connection Applicant (Embedded Generating Unit Owner/Proponent) Business name: ABN: Contact name: Address: Telephone number: E-mail address: Connection Applicant acting and working on behalf of the above Proponent (Agent). Business name: ABN: Contact name: Address: Telephone number: E-mail address: Connection Applicant s (Owner) confirmation the nominated agent is acting on their behalf for the connection process. (Submit the owner s confirmation statement, letter or email to UE). 1

Installation Miscellaneous Information Does the Generating unit seek to provide non-network support of published network constraint? (Y/N) Is the Generating unit exempt from AEMO registration (less than 5MW)? (Y/N) Connection Applicant to is aware of generator license obligation as part of the Essential Services Commission compliance (This is independent from AEMO)? (Y/N) Is the Generating unit to be (please note SGA framework): Market or non-market Is the Generating unit to be (please note SGA framework): Scheduled, semi-scheduled or non-scheduled dispatch. Expected operating hours: (Hours and days of operation: Mon Fri, 7am to 11pm etc.) Expected energy production per annum (MWh). Calculated or measured facility load demand during normal working hours (kw or kva). Estimated facility load to be offset via embedded generator during facility normal working hours (kw or KVA). Export of excess generated power (Y/N). Maximum net power exported over meter measuring interval based on calculated or measured. This needs to reflect the maximum generator export during facility minimum self-consumption period. (kw or kva). Confirm presence (Y/N) of any other disturbing load/system with potential to disturb the voltage waveform and or power quality, such as: PFC, DOL motor, rectifier, other generator etc If Yes, specify the nature of equipment and capacity. Purpose of Generating unit and envisaged operating date? (What is the functional intent of the Generating unit: demand off-set, power export, district power system, etc...) The Connection Applicant has/shall address all environmental compliance requirements applicable for the embedded generator installation? (Y/N) 2

Small Generator Aggregator Framework Is the installation to be registered with AEMO as a Small Generator Aggregator (SGA)? (Y/N) If yes to SGA, does metering comply? (Y/N). Submit supporting documentation. If registered SGA, provide generator NMI If registered SGA, provide load NMI 3

The following sections are primarily applicable for inverter based generation systems such as: Solar PV, wind, fuel cell, micro turbines etc Inverter Generating Plant Address of generator installation: Proposed connection point and NMI number: Energy source / fuel (e.g. Solar, Wind, Fuel Cell, Natural Gas etc.). Energy storage features (Battery)? Type of generating plant or technology (e.g. Synchronous generator, Photovoltaic or Wind Inverter etc.). Inverter AS4777 compliant (Y/N). Number of generating units/inverters: Nominal voltage of generating unit/inverter (V). Rating of each unit/inverter (kw or kva). Power Factor of generating unit/inverter to be operated: Number of panels or turbines (if applicable). Max rating of each panel or turbine (W/kW). Maximum total power generation of installation (kw or kva). Over/Under voltage (V). Over/Under frequency (Hz). 4

Additional protection in the form of inverter independent protection such as: overcurrent, anti-islanding (ROCOF & Vector Shift), phase failure detection and or negative sequence protection could be warranted or specified by United Energy. (refer to UE ST 2008 Table 14, P112) 5

This section is applicable to all forms of generation technology and to be completed by all Connection Applicants. Network and plant technical data of equipment at or near the connection point Installation main switchgear and components Manufacturer and model number. Main circuit breaker nominal current rating (A). Rated short time withstand current rating (ka). Rated short time withstand current maximum time (sec). Power Quality Inverter THD level and installation design of load balancing complies with Australian Standards, Electrical Distribution Code, Victorian Services and Installation Rule. (Y/N). Submit installation voltage rise report (consult reference document) Metering Facility bi-directional metering upgrade required (Y/N). Retailor and metering service provider (text) Retailor and or metering service provider have been notified of new generation? (Y/N) Meter class / classification: 6

Network Configuration Single Line Diagrams (SLD) to emphasize: Demarcation of existing and new equipment Circuit voltages Protection systems Facility main isolation point with respect to Utility Embedded generator main isolation point with respect to facility setup Meter location and details Embedded generator collector system layout Installation individual collection section/string isolation points Include all isolation device ratings where possible Earthing system Installation and Earthing Standards Embedded generator installation will comply with all current and relevant Australian Standards and the Victorian SIR (Y/N). State the earthing standards to be employed for embedded generator installation (AS3000, AS5033, AS2067 any other applicable standards). 7

Network Plant, Secondary Design and Apparatus Setting Data Protection Data for Protection relevant to the Connection Point Protection, control design and operating report (detailed report). This detailed report shall contain: Description of the generating plant and how it operates; Electrical schematics; protection and control schemes; Devices the protection and control schemes are implemented in; Description of each fault scenario and the protection that shall be used to detect and clear the fault; Risk assessment of equipment failure and the failsafe features, backup equipment, or alarms and monitoring or other methods used to reduce the risk; Data sheets providing full specifications for all AC circuit and related major plant. 8

Document Submissions to UE To be submitted inclusive with the Enquiry Form : The Single Line Diagrams (SLD), conceptual or otherwise. (Note: only formally drafted documents shall be accepted) To be submitted upon request by UE: (Note: For inverter based project below 500kW, which are committed and or firm, it s requested to submit these documents and studies with the Enquiry Form to expedite the process). Engineering studies such as: Protection study and system study (installation voltage rise report as minimum) The generation system functional statement document, which articulates as minimum: How the generation system normally and abnormally operates and interacts with the whole facility. Critical protection/control/generation system remote monitoring. Any implemented interlocks. Protection/control system failsafe provision (i.e. system response upon the control/protection UPS system failure). Generator protection/control, trip device (CB) and critical system UPS maintenance frequency proposal (particular emphasis should be made with equipment protection systems and UPS). Emergency and operational contact details (customer or otherwise). 9

Commissioning Commissioning procedure: UE reserves the right to witness commissioning of the all critical protection/control scheme and where determined, tripping of the main generator CB (trip test). Prescribed Certificate of Electrical Safety (CES). Note: Prescribed CES must be submitted to UE prior to installation energisation. Signed and dated installation, commissioning, inspection and test report (reflecting the protection settings and all applicable relevant standards). Documented evidence (signed notification statement by installer and customer) that end customer has been notified of safe operation and maintenance obligation as per the NER, EDC and UE standard, in accordance with manufacturer manual (periodic anti-islanding test will be one of these requirements). Note: Customers are required to keep minimum 3 ~ 7 years maintenance record for audit/traceability depending on generation capacity. Main component manufacturer specifications (Inverter, panels, turbine, protection relay, switchgear etc ). If applicable, SGA supporting documentation. 10

Schedule 2 Generator and generating plant information (To be completed by all proponents) 1. Generator Customer: ABN: Address: Telephone: E-mail: Attention: 2. Generating plant Description. Generator Manufacturer: Model: Machine rating: MW 3. Number of units 4. Maximum export capacity MW 5. Generator Impedances (Note: Not applicable for inverter based Generators such as solar, wind, fuel cell etc ) G1 G2 G3 Rating (MVA) 1 pu (Ohms) = Impedances: Xd direct axis synchronous react. = X d direct axis transient react. = X d direct axis subtransient react. = Xq quad. axis synchronous react. = X q direct axis subtransient react. = X2 negative sequence = X0 zero sequence = All pu values on a base of machine rating and voltage of V. 6. Capacitor bank 7. Expiry date Five (5) years from distribution connected generator agreement execution. 8. Connection point 9. Connection point voltage 10. Maximum import capacity 11. Generator Premises 12. National Meter Identifier NMI = 11