Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018

Similar documents
STH 60 Northern Reliever Route Feasibility Study Report

IMPROVEMENT CONCEPTS

Non-ABM Component Status. Presented to project status meeting: 11/27/2017

Prioritization 3.0 Total Scores September 24, 2014

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Cape Fear RPO P5.0 Final Division Needs tier Local Input Point Assignments

ANDERSON PROPERTY SITE ANALYSIS

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Triangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

Revised Evaluation Scores. System Preservation

Corridor Sketch Summary

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

Develop ground transportation improvements to make the Airport a multi-modal regional

Kentucky Highway District 6

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Transit Access Study

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

METRO Orange Line BRT American Boulevard Station Options

WAKE TRANSIT PLAN Summer 2018

Waco Rapid Transit Corridor (RTC) Feasibility Study

Proposed Project I 35 Improvements from SH 195 to I 10

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

The Screening and Selection of Regionally Significant Projects

City of Houston Fondren Road Paving and Drainage

Legend. 0 1,000 2,000 Feet

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

Maryland Gets to Work

Rare ±1 Acre Drive Thru Opportunity 281 S Cannon Blvd, Kannapolis, NC 28083

Transportation Improvement Program (TIP) Candidate Project List for Public Review

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

Alpine Highway to North County Boulevard Connector Study

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

Public Information Workshop

Williamson County Projects

Public Works. Capital Projects FY

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

US 70 Corridor Planning for the Future

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Purpose and Need Report

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

2.0 Development Driveways. Movin Out June 2017

Regional Transportation Plan: APPENDIX P

Attachment A RONALD REAGAN WASHINGTON NATIONAL AIRPORT ROADWAY NETWORK IMPROVEMENTS ENVIRONMENTAL ASSESSMENT

PUBLIC INFRASTRUCTURE PROJECTS

Parks and Transportation System Development Charge Methodology

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

CTA Blue Line Study Area

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

Upcoming Meetings: MPO Policy Board September 25, 2018 Joint CAMPO SAWMPO Meeting October, 10 11:30-1:00 Basic City Brewery, Waynesboro.

Tempe Streetcar. March 2, 2016

New Haven Hartford Springfield Rail

Middle Georgia Transportation Executive Committee. September 27, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

Kentucky Highway District 1

Wentzville Parkway South Phase 2 & 2A

Major Widening/New Roadway

MBTA Key Bus Route Improvement Program. Community Meeting Route 57 - Boston. January 31, 2011 Boston Arts Academy, 174 Ipswich St.

Existing CTA Blue Line: From Clinton Station to Forest Park Station IDOT Expansion Alternative: Forest Park Station to Mannheim Road

Rural Planning. Highway Projects - CULLMAN COUNTY

IH 35 FEASIBILITY STUDY

Introduction and Background Study Purpose

800 Access Control, R/W Use Permits and Drive Design

TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS

PUBLIC TRANSPORTATION

MBTA Key Bus Route. Community Meeting Route 1 - Boston

Chapter 7: Corridor Visions

Transit in Bay Area Blueprint

Proposed CVS/pharmacy

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

Dixie Transportation Planning Office

Traffic Engineering Study

Transportation Data in Southeast Michigan

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

Alternatives Analysis Findings Report

Capital Needs Assessment Riders Advisory Council July2, 2008

Letter of Transmittal

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

US 67 WIDENING PROJECT

GODURHAM PROGRESS REPORT

5. OPPORTUNITIES AND NEXT STEPS

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

The $600 Million Rebirth of San Diego Trolley

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

FUTURE MOBILITY IN WYOMING:

Executive Summary October 2013

State Avenue Corridor Bus Rapid Transit (BRT)

2015 Water and Wastewater Impact Fee Study. City of Mesquite, Texas DRAFT. Prepared by: Texas Registration Number 928

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Transcription:

Mid-East RPO P5. Scores: Local Point Assignment - TAC Amended on October 8, 218 SPOT ID Mode TIP Project Category Route / Name From / Cross To / Cross Description Specific Improvement Type Cost to NCDOT Total Score (Out of 5) Weight (25%) Weight (25%) Project Development Points Total Score MERPO Local Point Assignment (12 Total) Percent of Project in the Mid-East RPO Area (s) H141635 NC 36 (in Co) Pamlico Line Widen road from 22 feet to 28 feet and resurface $ 14,5, 12.63 - - - - 1 - by 2 under High /Low Cost Pot H17812 US 13, Main St in Improve intersection for safety. Open to suggestions from congestion management. 1 - Improve $ 2,, 27.31 - - - - - - at the Level H17813 NC 32 Brick Kiln Rd Improve intersection for safety 1 - Improve $ 1,8, 32.29 - - - - - - at the Level H1414 SR 118 (Littlefield Improve intersection 1 - Improve $ 6, 28.7 1 25 1 25 1 88.7 5 5% H17881 R-2513 SR 1438 (Spruill Town South of SR 1127 (Possum Track Existing $ 14,4, 29.97 1 25 1 25 5 84.97 27 27% Craven, B17822 BikePed E Main in Boulevard River Road Install sidewalks and curb ramps outside of drainage ditch. 7 - Protected Linear Pedestrian $ 8, 34.7 1 25 1 25 84.7 1 T17211 Area - Modular Construct a 2,56 square foot modular building to serve as administration facility for Area. Future trip growth was based on 29, trips per year (FY 16-17 data) and steps in submittal guidance for administrative facility additional trip values were followed. 8 - - $ 144, 31.73 1 25 1 25 81.73 1 A13373 AV-5788 MCZ - MCZ - T- Taxilanes and Apron Construction of new T- Taxilanes. Construction of apron for two corporate hangars, including site preparation for hangars (approximately 154 sqyd..). (includes Project Request Numbers: 2155/2836 ) 124 - Corporate and T-hangar Taxi: Construction $ 26, 3.93 1 25 1 25 8.93 1 T171252 Area Office - Brick Construct a 2,56 square foot brick building to serve as the administration facility for Area. Future trip growth was based on 29, trips per year (FY 16-17 data) and steps in submittal guidance for administrative facility additional trip values were followed. 8 - - $ 252, 3.86 1 25 1 25 8.86 1 H17366 SR 1755 (Blackjack- Simpson SR 176 (Mobleys Bridge Widen existing section of to 4-lane divided boulevard with paved shoulders. Improve select intersections and create partial access control at minor intersections improving safety; Replace bridge over Chicod Creek. Existing $ 82,8, 3.24 1 25 1 25 8.24 48 48% H17331 SR 1711 (Worthington NC 12 Widen existing 2-lane road to a 4-lane divided boulevard with paved shoulders and select intersection improvements and partial access control. Existing $ 76,4, 29.94 1 25 1 25 79.94 64 64%

H17183 I-87, Roanoke River Bridge Upgrade Interstate Standards /Express $ 137,5, 34.25 75 18.75 1 25 78. 1 H9224-C R-347C NC 222 at Belvoir Bypass Existing $ 44,4, 28.33 75 18.75 1 25 5 77.8 1 5% T172112 Area Maintenance Construct a covered maintenance shelter for vehicle maintenance and repairs, including a wash area, electricity, water and a locked storage area. Future trips were based on 29, trips per year (FY 16-17 data) and the instructions for maintenance facility additional trips in the submittal guidance was followed. 9 - - Maintenance $ 36, 31.54 75 18.75 1 25 75.29 1 T1352 Area FY18 Expansion Vehicle BATS provides five demand response daily routes in. Other daily routes includes dialysis, medicals, senior trips, blind center trips, employment trips, and RGP's. Their goal is to provide safe, reliable, effective, accessible transportation at an affordable cost. Future hour & trip growth was estimated based on average annual growth in trips from 212-216 (-2%), and average annual growth in hours from 212-216 (+12%). The annual result was multiplied by 1 for 1 yr growth 4 - Demand Response $ 37,8 31.48 75 18.75 1 25 75.23 1 H921 R-29 NC 93 in US 13 Bypass North of Ahoskie in Hertford Bertie, Existing $ 215,699, 3.32 5 12.5 1 25 67.82 8 8% Hertford, H15862 R-5815 Proposed Greenville Southwest Bypass Proposed Harvey Park Extension Upgrade to Interstate Standards. 3 - Upgrade Express to $ 162,4, 24.87 75 18.75 5 12.5 1 66.12 35 35% Lenoir, H913-E R-2513E SR 113 (C.C. South of SR 1127 (Possum Track. Existing $ 23,5, 26.16 1 25 5 12.5 63.66 1 H141716 I-587, Wilson Line Bypass in Greenville Upgrade road to interstate standards 17 - Upgrade to Interstate Standards $ 23,6, 26.12 1 25 5 12.5 63.62 55 55%, Greene H9738-B SR 1565 (Grimesland Bridge, Widen road to three lanes Existing $ 41,, 23.11 1 25 5 12.5 6.61 63, H17181 I-87, Line Upgrade existing free to Interstate Standards. To include ITS and Signing Improvements, existing ramps (Exits 52,55, 57, 512, & 514) widen to 16' lane width. 17 - Upgrade to Interstate Standards $ 3,5, 24.8 75 18.75 5 12.5 5 6.33 B1782 BikePed Install sidewalks and curb ramps along the Washington St in Garrett Road Peele west side of Washington St between the drainage ditch and easement limits. 7 - Protected Linear Pedestrian $ 88, 27.29 75 18.75 5 12.5 58.54 H17817 NC 12 SR 1477 (Powell in Craven Widen road to 4-lane divided with 46' depressed median and paved shoulders Existing $ 38,7, 26.74 75 18.75 5 12.5 57.99 49 49% Craven,

H9233 (New Route - Washington Northern Bypass) east of at Asbury Church Road Construct Multi-lanes on New 5 - Construct on New $ 192,5, 25.22 5 12.5 5 12.5 5 55.22 H14211 bypass east of Upgrade road to free standards.. /Express $ 212,4, 26.1 63 15.63 5 12.5 54.13 75%, H9224-B R-347B NC 42 at Scott'S NC 222 at Belvoir Existing $ 64,4, 22.95 5 12.5 5 12.5 5 52.95 65%, H17819 SR 1159 SR 1159 (3rd St Ext / Robersonville Products Rd) Three-laned section east of Robersonville NC 93 Widen road from 2 to 28 feet and pavement strengthening. $ 16,2, 2.84 1 25 25 6.25 52.9 H141724 I-87, at US 13 North at Windsor Upgrade road to Interstate /Express $ 328,, 25.36 5 12.5 5 12.5 5.36 1% Bertie, H9182 R-27 Relocation North of Bethel NC 93 Widen to Four Lanes with a Bypass of Oak City on New. 6 - Widen Existing and Construct Part on New $ 176,9, 24.2 5 12.5 5 12.5 49.2 87%, H9688-B US 258 NC 123 Modernize US 258, Widen to Twenty-Eight Alternative US- Feet, Construct Paved Shoulders, Provide 264 (E. Marlboro Turn Lanes at Various s and Realign Where Appropriate. $ 11,5, 24.13 5 12.5 5 12.5 49.13 21% Greene, H171916 SR 145 SR 145 (Twin Bridges SR 144 ( Construct extension of Twin Bridges Road on new location. 2-lane undivided road with 12 foot lanes and 2 foot paved shoulders. 5 - Construct on New $ 8,3, 17.7 1 25 25 6.25 48.95 H9738-A NC 36 Widen road to three lanes Existing $ 124,7, 21.21 75 18.75 25 6.25 46.21 H15861, US 13 Bypass Upgrade road to Interstate Standards. Note: Existing median type is depressed grass but there is no guardrail. There was not an option for depressed grass median with no guardrail. 3 - Upgrade Express to $ 168,, 21.35 5 12.5 25 6.25 5 45.1 71%, A13374 AV-5836 MCZ - MCZ - Corporate Construct 6'x6' corporate hangar. (includes Project Request Numbers: 2837 ) 19 - s $ 265, 16.73 75 18.75 25 6.25 41.73 H17816 Cemetery Rd in Belhaven Main St in Belhaven Elevate road to address flooding in Belhaven. Revisit cost, cost to elevate will not show in modernization cost. $ 25,1, 1.58 75 18.75 25 6.25 5 4.58 H17818 NC 92 North of Back Creek South of Back Creek Modernize or replace bridge including widening and sidewalks on both sides. Revisit cost, no option for bridge project. $ 4,9, 1.53 75 18.75 25 6.25 35.53

A1338 Gravity Sewer Line to serve hangars Project involves installation of approximately 24 LF of new gravity sewer line from the intersection of Road and Market to the terminal area to serve existing and future corporate hangar tenants and the maintenance hangar. (includes Project Request Numbers: 32 ) 19 - s $ 36, 16.47 5 12.5 25 6.25 35.22 A13379 Mantenance Project incudes design and construction of new 1' x 1' maintenance hangar. The existing hangar was damaged during the tornado that hit the airport in 212. The airport request the ability to reserve FY 17, 18 and 19 vision 1 Funds to complete this project. (includes Project Request Numbers: 33 ) 19 - s $ 68, 15.44 5 12.5 25 6.25 34.19 A13378 T- and Taxi Includes construction of a new 6 unit T-, Site Preparation, and necessary taxi located south of the existing T- development. The airport requests the ability to reserve FY 17, 18, and 19 Vision 1 Funds to complete this project. (includes Project Request Numbers: 2672 ) 19 - s $ 821,99 14.82 5 12.5 25 6.25 33.57 A13375 AV-5837 MCZ - MCZ - T- s Construct a 1 unit T- Construct an access road to existing T-hangars (includes Project Request Numbers: 2156/2154 ) 19 - s $ 9, 14.46 5 12.5 25 6.25 33.21 T17214 Bus Stops Install 8 bus stops with benches and shelters. s: Walmart, Piggly Wiggly, Downtown, Roanoke Landing, Food Lion, MC Farmer's Market in, and Food Lion, Downtown in Robersonville. Trips have been declining by an avg of -8% 6 - - per year from 212-216. This project hopes Stop/Shelter to reverse that trend. Research shows that bus stop accommodations increase ridership. A modest 2% annual growth rate is assumed for the 1 year growth projection as a result of the bus stop projects. $ 64,8 14.4 5 12.5 25 6.25 32.79

Mid-East RPO P5. Scores: Local Point Assignment TAC Amended October 8, 218 Projects SPOT ID Points Assigned 8/8 No Points Assigned Points/Max. Points allowed 1/1 1/1 1/1 (in Co) Pamlico Line Main St in 1 - Improve H17813 NC 32 Brick Kiln Rd 1 - Improve H1414 SR 118 (Littlefield 1 - Improve 5 5% SR 1438 (Spruill Town 63/1 1/1 2.25 4.5 9 13.5 Miles 18 Eliud De Jesus, Mid-East RPO Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, OpenMap contributors, and the GIS User Community A13373 MCZ - 124 - Corporate and Thangar Taxi: Construction 1 T171252 Area Office - Brick 8 - - 1 H17366 SR 1755 (BlackjackSimpson SR 176 (Mobleys Bridge Existing 48 48% H17331 SR 1711 (Worthington NC 12 Existing 64 64% H17183 I-87, Roanoke River Bridge /Express 1 NC 222 at Belvoir Bypass Existing 1 5% T172112 Area Maintenance 9 - - Maintenance 1 T1352 Area FY18 Expansion Vehicle 4 - Demand Response 1 H921 NC 93 in US 13 Bypass North Existing of Ahoskie in Hertford 8 8% Bertie, Hertford, H15862 Proposed Greenville Southwest Bypass Proposed Harvey Park Extension 3 - Upgrade Express to 35 35% Lenoir, SR 113 (C.C. South of SR 1127 (Possum Track Existing 1 Wilson Line Bypass in Greenville 17 - Upgrade to Interstate Standards 55 55%, Greene SR 1565 (Grimesland Existing Bridge, 63, I-587, Boulevard MCZ - T- Taxilanes and Apron Line 17 - Upgrade to Interstate Standards B1782 Washington St in Garrett Road Peele 7 - Protected Linear Pedestrian H17817 NC 12 SR 1477 (Powell in Craven Existing 49 49% Craven, H9233 (New Route east of Leggett Washington Northern Road Bypass) at Asbury Church Road 5 - Construct on New bypass east of /Express 75%, NC 42 at Scott'S NC 222 at Belvoir Existing 65%, H17181 I-87, H17819 SR 1159 SR 1159 (3rd St Ext / Robersonville Products Rd) Three-laned section east of Robersonville NC 93 H141724 I-87, at US 13 North at Windsor /Express 1% Bertie, 6 - Widen Existing and Construct Part on New 87%, NC 123 Alternative US-264 (E. Marlboro 21% Greene, SR 145 (Twin Bridges SR 144 ( 5 - Construct on New NC 36 Existing 3 - Upgrade Express to 71%, SR 145 H9738-A 1 1 H9688-B US 258 27/27 River Road 8 - - H171916 35/35 27% 7 - Protected Linear Pedestrian H9182 49/49 27 Craven, Area - Modular H9224-B 5/5 Existing T17211 H14211 64/64 South of SR 1127 (Possum Track E Main in H9738-B 1/1 1/1 1/1 1/1 B17822 H141716 48/48 MERPO Local % of Project Point in the (s) Assignment MERPO Area (12 Total) NC 36 H913-E 55/55 Specific Improvement Type US 13, H9224-C 1/5 To / Cross H141635 No Points Assigned Greenville MPO Area From / Cross H17812 H17881 Points Assigned Route / Name Relocation North of NC 93 Bethel H15861, US 13 Bypass A13374 MCZ - MCZ - Corporate 19 - s H17816 Cemetery Rd in Belhaven Main St in Belhaven H17818 NC 92 North of Back Creek South of Back Creek A1338 Washington Gravity Sewer Line to serve hangars 19 - s A13379 Washington Mantenance 19 - s A13378 Washington T- and Taxi 19 - s A13375 MCZ - MCZ - T-s 19 - s T17214 Bus Stops 6 - - Stop/Shelter