1 Clarksville Street Department Fiscal Year 2018 Budget Presentation
2 Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay
3 Clarksville Street Department Services Provided: 6 basic areas Pavement Management o 637 miles of road maintained o $4.65 million annually on street maintenance o Resurfacing done both in-house and by bid/contract o Pavement management system streets rated 1 to 100 Drainage o o Traffic o o o o 3 crews Maintain culverts, ditches, sinkholes and other drainage structures 21,800 +/- street signs 11,000 +/- street lights 99 traffic signals traffic operations center at office complex pavement markings and guardrail
4 Clarksville Street Department R-O-W Maintenance o Street sweeping o Mowing o Trash pickup o o o Snow and ice removal Beautification Riverview Cemetery Concrete o 5 person crew maintains sidewalks, curb & gutter, other concrete structures Mosquito Control o done all by bid/contract with McGee pest control of Hopkinsville: $122, o Phone Number:
5 Clarksville Street Department Engineering Division: o Engineering Staff - Manager, Traffic Engineer, Storm Water Drainage Engineer o 5 Inspectors monitor construction of new subdivisions and capitol projects o GIS Administrator maintains computerized mapping system of City of Clarksville, pavement management system o NPDES Coordinator Recently Completed Capital Projects: o Ringgold Bridge Removal o Drainage Mitigation Happy Hollow Culvert Repair
6 Clarksville Street Department FY 2018 Proposed Budget Actual 2016 Original Budget 2017 Projected 2017 Proposed 2018 Salaries/Benefits $5,178, $5,369, $5,349, $5,483, Operating Expenses $7,066, $6,951, $6,941, $7,023, Capital Outlay $454, $727, $757, $548, TOTAL $12,700, $13,047, $13,047, $13,054,944.00
7 FTE/New Employee Requests Full-time Equivalent FY 2014 FY 2015 FY 2016 FY 2017 Proposed FY 2018 # of Full-time # of Part-time Full-time Equivalent New Employee Requests Expected Cost Reason for Position None
8 Increases Contract Paving Increased $250,000 Inflation More miles of road to maintain
9 Capital Vehicle Outlay Requests Request: Ford F-550 Truck with Platform Lift Cost: $117, Justification: Better response to traffic signal maintenance and street light repair. Traffic Division
10 Capital Vehicle Outlay Requests Request: Ford F-450 Truck with Landscape Body Cost: $40, Justification: Hauling Mowing Equipment
11 Capital Vehicle Outlay Requests Request: (2) Ford F-350 Super Duty Trucks with Utility Beds and Dual Rear Wheels Cost: $83, Justification: Replaces (2) 2006 Ford F-250 Trucks
12 Capital Vehicle Outlay Requests Request: Ford F-350 Sign Truck with Air Compressor Traffic Division Cost: $53, Justification: Replaces 2005 Ford F-350
13 Capital Equipment Outlay Requests Request: Caterpillar 926M Wheel Loader Cost: $188, Justification: Loading Salt, Rock and Dirt
14 Capital Equipment Outlay Requests Request: 5000 Gallon oil Tank Cost: $56, Justification: Storage for Emulsified Asphalt
15 Capital Equipment Outlay Requests Request: Image PROGRAF Large Format Printer Cost: $8, Justification: Used by Engineering Department to print plans and large maps.
16 Capital Projects
17 Recently Completed Capital Project Ringgold Bridge Removal
18 Recently Completed Drainage Mitigation Happy Hollow Culvert Repair
19 Recently Completed Paving Miles of Paving $3,451,000.00
20 Capital Project Northeast Connector New Roadway from Trenton Rd to Wilma Rudolph Blvd including widening of Trenton Rd from Tiny Town Rd To Relieve Traffic on I-24 and SR374 and Connect the high density commercial areas to the high density residential areas Continuation of design: Additional $300,000.00
21 Capital Project Edmondson Ferry Intersection Improvement Safety improvement Install traffic signal, curb and gutter, and sidewalk, along with grade improvements at the intersection of Edmondson Ferry Road and the 41-A By-Pass Construction $630,000 additional
22 Capital Project Adaptive Signal Control Wilma Rudolph Blvd Estimated Cost - $200,000 additional City will seek Federal and State Funding 10 intersections Adjusts Timing based on current conditions Responds to Seasonal Demands, I-24 Incident Traffic Diversions and Military Deployments
23 Continue with new sidewalk according to the Sidewalk Priority Indicator Design and Construction $250,000 Capital Project New Sidewalk
24 Capital Project Drainage Mitigation ADDRESS LARGE DRAINAGE PROJECTS WITHIN THE CITY AND FACILITATE SYSTEM EMERGINCIES COSTS ASSOCIATED WITH MITIGATING DRAINAGE PROBLEMS IN THE CITY ROW and Construction $100,000.00
25 Capital Project Dunlop Lane International Blvd. Intersection Design In anticipation of additional traffic due to Hankook opening Add signalization and additional turn lanes ROW and Construction $745,000.00
26 Capital Project Professional Park Improvement New Alignment Connection from Rossview Road to Professional Park Drive New Alignment Connection from Cardinal Lane to the Frontage Road 10 Sidewalks Around Inner Loop of School Campuses ROW Plans $400,000.00
CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS
9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000
More informationSection III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year
Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,
More information2005 Land Development Review/ State of Public Works
2005 Land Development Review/ State of Public Works Overview Of Public Works Department Organization 2005 Land Development Review 2005 Positives Challenges Facing Public Works Department Organizational
More information5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES
5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements
More informationHURON COUNTY ENGINEER S OFFICE
HURON COUNTY ENGINEER S OFFICE 2017 ENGINEER S ANNUAL REPORT The Ohio Revised Code requires that each Ohio County Engineer publish an annual report to the commissioners outlining the general condition
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationColumbia County Road Department. Department Presentation June, 2013 By David Hill
Columbia County Road Department Department Presentation June, 2013 By David Hill Columbia County Road Department Presentation: Work Performed Revenues / Expenses Projects Completed / Planned Issues and
More informationAgility Service Exchanges
Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01
More informationSPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS
SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS CITY OF GRAND PRAIRIE TRANSPORTATION SERVICES DEPARTMENT SPEED CUSHION INSTALLATION POLICY A. GENERAL Speed cushions are an effective
More informationDate of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)
County of Wellington Engineering Services Department Roads Division 74 Woolwich Street Guelph, Ontario N1H 3T9 Phone: (519) 837-2601 Fax: (519) 837-8138 Email: roadsinfo@wellington.ca ENTRANCE PERMIT OWNER/APPLICANT
More informationCapital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget
Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is
More informationCITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN
Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add
More informationPublic Works Department
Public Works Department SUBJECT: Consideration of Resolutions authorizing one-year contract extensions for snow/ice removal services during the 2015-2016 winter season with: 1. Tovar Snow Professionals
More informationTABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...
Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED
More informationBrigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction
Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will
More information.MAINTENANCE. Strategic Initiative Four:
The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining
More informationApril 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation
Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation
More informationDIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION
DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara
More informationTRAFFIC CALMING PROGRAM
TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic
More informationCITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE
CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects
More informationFY 2013 Candidate Projects ($ Thousands) Street & Traffic Control Program - Thoroughfares
Need Area: NT032 Alternative No.: 1 Name: Drive Council District: G Limits: Dallas to Dickson Key Map No.: 492M Type: Major Thoroughfare and Collector Super Neighborhood: WBS No.: (To be assigned by the
More informationAPPENDIX G. Greenhouse Gas and Climate Change Analysis
APPENDIX G Greenhouse Gas and Climate Change Analysis GHG Running Exhaust and Fuel Cycle Emissions (CO2e) Year Emission Factor (g/mi)* ADT (vehicles per day) Length (mi) g/day MT/day MT/year 2015 638.13
More informationCOUNTY ROAD FUND ESTIMATED ENDING UNRESERVED FUND BALANCE 2,132, ESTIMATED ENDING RESERVED FUND BALANCE 0
COUNTY ROAD FUND 11-2- 58 58 ESTIMATED ENDING UNRESERVED FUND BALANCE 2,132,164 58 5 5 ESTIMATED ENDING RESERVED FUND BALANCE 541 ROADWAY 1,617,697 541 3 Roadway Preservation 1,617,697 542 ROAD AND STREET
More informationOver-Dimensional Vehicle Restriction Study for US 129 in TN
Over-Dimensional Vehicle Restriction Study for US 129 in TN July 30,2015 TDOT Region 1 US 129 Location Map US 129 Topography and Scenery Operational and Safety Study August 2014, US129 Operational and
More informationPerformance-Based Communication Tools for Maintenance Budgets. 11th National Conference on Transportation Asset Management July 12th, 2016.
Performance-Based Communication Tools for Maintenance Budgets 11th National Conference on Transportation Asset Management July 12th, 2016 Rob Zilay Presentation Outline Performance-based maintenance tools
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationExpo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015
Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015 Meeting Agenda Phase 2 Construction Update Meeting Meeting Purpose and Format Construction Update Expo Bikeway
More informationELMORE COUNTY HIGHWAY DEPARTMENT
Adopted 11/27/06 Effective 2/1/07 Amended 4/10/08 ELMORE COUNTY HIGHWAY DEPARTMENT 155 County Shop Road Wetumpka, Alabama 36092 Phone (334) 567-1162 Fax (334) 567-1100 Access Management Policy The Elmore
More informationHighway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary
Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared
More informationPublic Works. Annual Report 2016
Public Works Annual Report 2016 This page intentionally left blank. Page 2 of 26 MISSION STATEMENT The Mission of Public Works is to provide essential services to sustain and enhance the quality of life
More informationDelaware County Engineer s Office
Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying
More informationWilliamson County Projects
Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior
More informationEffingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018
Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018 Brief History Ash from Georgia Pacific was applied to dirt roads starting in 2001 Georgia Environmental Protection Division approves
More informationGuam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012
Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and
More informationChicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015
Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015 1 History: Chicago-St. Louis Corridor» IDOT has actively developed the Chicago to St. Louis corridor since the mid 1980 s» In
More informationRoads & Bridges SPLOST. Transportation Special Purpose Local Option Sales Tax
Roads & Bridges SPLOST Transportation Special Purpose Local Option Sales Tax What is a Roads & Bridges SPLOST? The Transportation Special Purpose Local Option Sales Tax, or Roads & Bridges SPLOST, is a
More informationPublic Information Workshop
Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)
More informationa. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department.
WASHOE COUNTY POLICY FOR INSTALLATION OF SPEED HUMPS BACKGROUND The quality of life in residential neighborhoods can be significantly affected by the traffic issues of speeding and high vehicle volumes.
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More information2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others...
2018 Proposed Budget Table of Contents Appropriation Act. 1 Budget by Fund. 2 Michigan Transportation Funds.. 3 Work Performed for Others.... 4 Construction and Preservation... 5 Primary Construction......
More informationPUBLIC INFRASTRUCTURE PROJECTS
PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING
More informationAPPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way
IONIA COUNTY ROAD COMMISSION 170 E. Riverside Drive; P.O. Box 76, Ionia MI 48846 (616) 527-1700 (office) or (616) 527-8848 (fax) APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove
More informationFIRE DEPARTMENT ACCESS Based on the 2012 edition of the International Fire Code
FIRE DEPARTMENT ACCESS Based on the 2012 edition of the International Fire Code The Fire Department is required to respond to a multitude of emergencies in various types of buildings and occupancies. These
More informationRural Planning. Highway Projects - CULLMAN COUNTY
4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION
More informationCity of University Place
City of University Place City Engineering Department Six Year Transportation Improvement Plan Amended November 10, 2008 Resolution No. 604 City of University Place, Washington SIX-YEAR TRANSPORTATION PLAN
More informationPurpose and Need Report
Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental
More informationNASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER
WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air
More informationService Department Information Service Department Personnel Service Department New Equipment.. 5. Service Department Activity Summary...
1 Service Department Information..... 3 Service Department Personnel.... 4 Service Department New Equipment.. 5 Service Department Activity Summary.... 6 Service Requests Received 2017 7 Service Request
More informationWestern ND Meeting. February 19, 2014 Grant Levi, NDDOT Director
Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide
More information2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager
Outreach 2017 2017 Jefferson County Outreach Jefferson County Maintenance Matthew Burkett ~ Jefferson County Maintenance Manager MATERIAL 2016-2017 Jefferson County Outreach Winter Maintenance Information
More informationCITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS
CITY OF FONTANA HANDBOOK ON RESIDENTIAL APPROACH CONSTRUCTION PERMITS GENERAL INFORMATION A driveway approach is an area, construction or improvement between the roadway of a public street and private
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationTransportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.
Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,
More information2. ELIGIBILITY REQUIREMENTS
Speed Hump Policy 1. GENERAL The purpose of this policy is to provide guidelines for the application of speed humps. A "speed hump" is a gradual rise and fall of pavement surface across the width of the
More informationDRAFT ACCESS MANAGEMENT POLICY
DRAFT ACCESS MANAGEMENT POLICY Minnehaha County Highway Department Transportation Excellence. East 0 th Street North Sioux Falls, SD 0 June 0 The following guidelines are hereby set forth to serve as the
More informationExhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup
Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting
More informationHighways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) LEVY COUNTY Highways: State Highways 4135251 D2-LEVY COUNTY TRAFFIC SIGNAL
More informationArkansas Rural Development Conference
Arkansas Rural Development Conference Highway Funding How Do We Get Where We Are Going Wednesday, May 25, 2016 Where Have We Come From? Prior to 1913 We are always yapping about the Good Old Days and how
More informationPOLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013
CITY OF MORENO VALLEY DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION Administration Policy #A-14A POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION Effective Date: July 10, 2013 Approved
More informationCAPITAL IMPROVEMENT PROGRAM
The Capital Improvement Program provides the means through which the City of Palm Coast takes a planned and programmed approach to utilizing its financial resources in the most responsive and efficient
More informationTulsa Transportation Management Area. Urbanized Area Surface Transportation Program
Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha
More informationTBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014
TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...
More informationCity of Houston Fondren Road Paving and Drainage
City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial
More informationDRIVEWAY/SIDEWALK PERMIT APPLICATION
JOB INFORMATION CITY OF ALEXANDRIA 704 Broadway Alexandria, MN 56308 Phone: 320-763-6678 Fax: 320-763-3511 DRIVEWAY/SIDEWALK PERMIT APPLICATION Permit Fee: $50.00 Deposit: $300.00 PERMIT NUMBER: ROW DATE:
More informationSuccessful Revenue Generators for Pavement Management and Pavement Preservation
Successful Revenue Generators for Pavement Management and Pavement Preservation Presented By: Lenny Hulme Transportation Department Director City of Mesa Matt Manthey Pavement Management Supervisor City
More informationCity of Vallejo Public Works Department
Streets & Potholes Frequently Asked Questions A Guide to Potholes What is a pothole? How do we fix a pothole? Why do some potholes get fixed faster? I reported a pothole but it wasn't fixed - why not?
More information2008 Annual Report. Ashland County Engineer s Office & Highway Department. Contents
28 Annual Report Ashland County Engineer s Office & Highway Department Ashland County Commissioners Ashland, Ohio 4485 March 19, 29 Your Honorable Body: This report from the Ashland County Engineer is
More informationCITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES
CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required
More informationMayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator
City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement
More informationCity of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt
Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year
More informationSAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018
SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 The Wednesday, March 21, 2018, meeting of the St. Charles County Road Board was called to order at 4:30 p.m. in Room 542 of the Administration
More informationCITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014
CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 IN THE SPOTLIGHT Roadway Improvement Projects - Package #2 Construction Package #2 is the second of four groupings of similar
More informationCity of Freeport Water & Sewer Capital Improvement Program FY2019-FY2024
City of Freeport Water & Sewer Capital Improvement Program FY2019-FY2024 Current Issues $210 million in depreciated water & sewer assets are in need of replacement Many items: Production Wells, Treatment
More informationOpen Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.
Board of County Commissioners of Washington County, Maryland Agenda Report Form Open Session Item SUBJECT: Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications,
More informationMid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018
Mid-East RPO P5. Scores: Local Point Assignment - TAC Amended on October 8, 218 SPOT ID Mode TIP Project Category Route / Name From / Cross To / Cross Description Specific Improvement Type Cost to NCDOT
More informationCHAPTER 140 DRIVEWAYS
CHAPTER 140 DRIVEWAYS 140.01 Purpose 140.10 Driveway Location 140.02 Definitions 140.11 Driveway Maintenance 140.03 Driveway Construction 140.12 Failure To Maintain 140.04 Driveway Surfaces 140.13 Permit
More informationCOLERAIN TOWNSHIP PUBLIC WORKS DEPARTMENT BENCHMARKING PROJECT
COLERAIN TOWNSHIP PUBLIC WORKS DEPARTMENT BENCHMARKING PROJECT July 16, 2012 INTRO TO DEPARTMENT The primary role of the Colerain Township Public Works Department is to enhance the public infrastructure
More informationNorth America s leader in Track, Transit and Systems construction & maintenance services
Your Track Investment Maintaining Your Track. It s a Smart Investment. You wouldn t think of operating your vehicle without oil. Why risk a safety hazard, costly repair bill or compromising the value of
More informationDixie Transportation Planning Office
A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation
More informationValley Metro: Past, Present and Future. September 11, 2014
Valley Metro: Past, Present and Future September 11, 2014 Valley Metro Who are We? Two Boards of Directors Regional Public Transportation Authority Fund and operate regional transit services Valley Metro
More informationTSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0
TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects
More informationCITY OF OVERLAND PARK POSITION DESCRIPTION
CITY OF OVERLAND PARK POSITION DESCRIPTION TITLE: Maintenance Worker, Senior BAND/LEVEL: Oprs II DEPARTMENT: Public Works JOB NO: 7505 DIVISION: Maintenance DATE: 10/22/2013 REPORTS TO: Supervisor, Public
More informationRiverside County Transportation Department Summary of Bids
Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00
More informationS.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016
635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing
More informationSnow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site
Snow Dump Sites Understanding What to Do with Collected Snow Québec City Among cities with a population of 500,000 or more, Québec City ranks second in the world for the highest snowfall, behind Sapporo,
More informationSC Highway 41 Existing Conditions
SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next
More information3. Application Fees, Certificate Of Insurance & Performance Bond
SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner
More informationMIDWAY CITY Municipal Code
TITLE 8 STREETS AND SIDEWALKS MIDWAY CITY Municipal Code CHAPTER 8.01 UTAH CRIMINAL AND TRAFFIC CODE ADOPTED CHAPTER 8.02 UNLAWFUL PARKING CHAPTER 8.03 TRAFFIC REGULATIONS CHAPTER 8.04 RIGHT-OF-WAY REGULATIONS
More informationCITY of NOVI CITY COUNCIL
CITY of NOVI CITY COUNCIL Agenda Item 3 July 9, 2018 ci tyofnovi.org SUBJECT: Approval to award design engineering services to AECOM Great Lakes, Inc., for the Flint Street Realignment and Reconstruction
More informationDenver Volunteer Fire Department. Insurance Services Office Rating: 5-9E. Number of Volunteers on Roster: 15
Denver Volunteer Fire Department Insurance Services Office Rating: 5-9E Number of Volunteers on Roster: 15 Number of Paid Staff (including Part-time): 42 Main Station Location: Sub-Station Location: Sub-Station
More informationMUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION
REPORT NO. TS-07-15 MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION TO: Mayor and Members of Council FROM: Mike LeBlanc, Director of Operations DATE: March 23, 2015 SUBJECT:
More informationTransportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1
Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network
More informationAGENDA REPORT Capital Improvement Program (CIP) General Plan Conformity Review
City of Camarillo Planning Commission AGENDA REPORT DATE: May 16, 2017 TO: FROM: SUBMITTED BY: SUBJECT: Planning Commission Joseph R. Vacca, Director Department of Community Development Oksana Buck, Associate
More informationSTREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault
CIP_215 Title Pages 217:Layout 1 8/16/16 4:2 PM Page 7 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Underground Vault A D O P T E D C A P I T A L I M P R O V E M E N T P R O G R A M B U D G E T
More informationGeneral Provisions. Obstructions
CHAPTER 98: STREETS AND SIDEWALKS Section General Provisions 98.01 Throwing or burning of trash on street prohibited 98.02 Tree trimmings 98.03 Snow and ice removal 98.04 Damages to bridges and culverts
More informationHighways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST
More informationHighways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) PUTNAM COUNTY Highways: State Highways 4135331 D2-PUTNAM COUNTY TRAFFIC SIGNAL
More informationPLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153
PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 APPLICATION/PERMIT TO INSTALL ACCESS DRIVEWAY TO A COUNTY TRUNK HIGHWAY