1 West of Hudson Regional Transit Access Study Open House presentation July 20, Agenda Progress To date Summary of Level 2 Alternatives and Screening Service Plans Bus and Rail Operating and Capital Costs Methodology Demand Forecasting Methodology Air Passenger Model Development and Forecasting Level 2 Screening Results and Recommendations Next Steps 2 1
2 Purpose WHRTAS is evaluating alternatives for improved commuter transit services between central Orange County and Manhattan, and improved transit access to Stewart International Airport and the Mid-Hudson Valley and New York City metro area markets. 3 Need Mobility and Access to regional Transit in the West of Hudson Study Area is inadequate. Stewart International Airport Lacks Transit Capable of Supporting Long Term Growth. 2
3 Goals and Objectives Improve commuter transit access and mobility between central Orange County and New York City Provide transit options for access to/from SWF Airport to serve the needs of air travelers, employees, and others in the Mid-Hudson and New York City Markets Contribute to the attainment of regional and local environmental goals Support smart residential and economic growth in the SWF airport area, Orange County, and the region Improve efficiency, convenience, and integration of transportation services 5 Coordination and Collaboration Newburgh Area Land Use & Transportation Study New Windsor Master Plan Access to the Region s Core (ARC) Tappan Zee Bridge / I-287 Environmental Review Other agency studies & initiatives Current ongoing residential and commercial development efforts MPO Coordination NJTPA, OCTC, NYMTC, Poughkeepsie-Dutchess and UCTC 6 3
4 Alternatives Analysis Process Level 1 Screening Over 100 Alternatives and Options Level 2 Screening 22 Alternatives and Options Short List of Alternatives Short, Mid and Long-Term Options We Are Here Analysis of Short List of Alternatives Locally Preferred Alternative 7 Level I Screening Results Group Mode Markets Served 1A Direct Bus Airport 1B Direct Bus/BRT Direct Commuter Rail from Port Jervis Line Rail (PJL) + Bus/BRT via Salisbury Mills Rail (HL) + Bus via Beacon 7 TSM/TDM Airport & Commuter Airport & Commuter Airport & Commuter Airport & Commuter Airport & Commuter Locations Served Mid-Hudson Valley NYC CBD & Metro NJ/CT NYC CBD & Metro NJ NYC CBD & Metro NJ Options NYC CBD 1 Study Area Various 8 4
5 Level 2 Alternatives 1A Mid Hudson Bus Sussex, NJ Kingston / New Paltz Danbury, CT White Plains Stamford Patterson Hackensack GW Bus Terminal Port Authority Bus Terminal 9 Level 2 Alternatives 1A Mid Hudson Bus 1B CBD Bus/BRT Sussex, NJ Kingston / New Paltz Danbury, CT White Plains Stamford Patterson Hackensack GW Bus Terminal Port Authority Bus Terminal 10 5
6 Level 2 Alternatives 1A Mid Hudson Bus 1B CBD Bus/BRT Sussex, NJ Kingston / New Paltz BRT Danbury, CT White Plains Stamford Patterson Hackensack GW Bus Terminal Port Authority Bus Terminal 11 Level 2 Alternatives 1A Mid Hudson Bus 1B CBD Bus/BRT Busway in Median Busway in Shoulder (one side shown) 6
7 Level 2 Alternatives 1A Mid Hudson Bus 1B CBD Bus/BRT 2 Direct Rail (PJL) Sussex, NJ Kingston / New Paltz Danbury, CT White Plains Stamford Patterson Hackensack GW Bus Terminal Port Authority Bus Terminal 13 Level 2 Alternatives 1A Mid Hudson Bus 1B CBD Bus/BRT 2 Direct Rail (PJL) Sussex, NJ Kingston / New Paltz Danbury, CT 4 Stamford White Plains Hybrid (PJL) Patterson Hackensack GW Bus Terminal Port Authority Bus Terminal 14 7
8 Level 2 Alternatives 1A Mid Hudson Bus 1B CBD Bus/BRT 2 Direct Rail (PJL) Sussex, NJ Kingston / New Paltz Danbury, CT 4 Stamford White Plains Hybrid (PJL) 5 Hybrid (HL) Patterson Hackensack GW Bus Terminal Port Authority Bus Terminal 15 Level 2 Screening Approach Main screening categories - Transportation, Environment and Cost expanded to address each of the project goals and objectives. 16 8
9 Level 2 Screening Approach Alternatives were developed to greater conceptual engineering detail Relied on Travel Demand and airport modeling estimate ridership. Forecast assumed build year of 2035 Airport assumed 7 million annual passengers. Utilized GIS in greater capacity to obtain more detail on the natural and build environment Considered capital and O & M costs in greater detail to assess cost effectiveness. 17 Level 2 Screening Approach The screening evaluation performed in two steps: 1. Compared alternatives within each modal group 2. Compared alternatives against each other Key screening differentiators were: Capital Cost Operating and Maintenance Cost Travel Time Ridership 18 9
10 Level 2 Methodologies Bus and Commuter Rail Service Plans Headways, Span of Service, Fares Capital Cost Guideways and Track Elements (for rail) Busway, Roads (for busses) Stations, Equipment, Vehicles, Park and Ride Facilities, etc.. Operating & Maintenance Cost Infrastructure and Equipment Maintenance, Fuel, Labor Costs, etc. 19 Travel Demand Component Models Input NYMTC Socio-Economic Data Employment, Population, Income Distribution Highway and Transit Network Input NYMTC Socio-Economic Data Enplanement p Data Skims (Transportation ti system Others characteristics) Travel Time & Cost Commuter Model BPM Output Commuter Ridership Skims Airport Passenger Model Output Airport Choice O&D and Mode Input Census Journey to work data Airport Employee Model Output O&D and Mode 20 10
11 Results 21 Group 1A Mid Hudson Valley Bus Preliminary Level 2 Screening Results: Travel time within the HV region to the Airport minutes depending on extent and location Low capital costs: $28-$39 million Annual O&M costs $3-4M Ramp at Rt. 207 for buses from South - $66 Million Attracts very low ridership 22 11
12 Preliminary Level 2 Screening Results: Travel time to NYC minutes depending on extent and location BRT - about 15 minutes shorter travel time with significant capital cost investment Major Up elements/impacts to 700 daily transit airports trips 30 Up miles to 1,200 of pavement daily transit on commuter retain fill trips Widening 10 out of 12 bridges Capital costs: Bus $75-91 M, BRT Widening 19 overpasses $2 B Relocation of 2 miles of I-87 (at Rt. Ramp at Rt. 207 for buses from 207) South - $66 Million Ramp at median to Rt. 207 Annual O&M costs $5-7 M New signalized intersection with bus priority (at Rt. 207) Group 1B Bus/BRT to NYC & CBD 23 Preliminary Level 2 Screening Results: Travel time to NYC minutes depending on extent and location BRT - about 15 minutes shorter travel time with significant capital cost investment Up to 700 daily transit airports trips Up to 1,200 daily transit commuter trips Capital costs: Bus $75-91 M, BRT $2 B Ramp at Rt. 207 for buses from South - $66 Million Annual O&M costs $5-7 M Group 1B Bus/BRT to NYC & CBD 24 12
13 Group 2 Direct Commuter Rail (PJL) Preliminary Level 2 Screening Results: Travel time to NYC minutes Highly reliable run times not subject to traffic congestion Up to 3,700 daily transit commuter trips and Up to 1,100 Airport trips including via Beacon/shuttle Network capacity constraints frequency of SWF-NYC peak period service Preliminary capital costs range from $ M Annual O&M costs are $26M 25 Rail Alignment Options Key Issues Compatibility with new SWF Terminal (siting and operations) Compatibility with New Windsor development plans Providing direct and convenient access to Airport vs. shuttle service Right-of-way g o ay a and d Environmental o e a issues Security requirements Traffic Issues and access Study area for Rail alignments/station 26 13
14 Group 4 Rail (PJL) + Bus/BRT via Salisbury Mills Preliminary Level 2 Screening Results: Travel time for Bus ranges from 97 to 102 minutes depending on route and market Bus version is unreliable on local roads About 92 minutes to NYC for BRT version, with increased reliability Up to 100 daily transit commuter trips and 800 daily airport trips Preliminary capital costs range from $3M - $17M for bus version and $118M - $146M for BRT version Annual O&M costs are about $1 M BRT 27 Group 5 Preliminary Level 2 Screening Results: Travel time range to 111 minutes to NYC (depending on market) Some travel time variability due to I- 84 congestion Up to 400 daily commuter trips and 680 airport trips Preliminary capital costs range from $6-18M Annual O&M costs are $ M Rail (HL) + Bus via Beacon 28 14
15 Alternative Group (Mode) 1A Direct Bus 1B Direct Bus / BRT 2 Direct Commuter Rail 4 Hybrid Mills 5 Hybrid Beacon Summary of Level 2 screening Alternative Kingston, NY (B-XN); Suffern, NY (B-XS); Danbury, CT (B-XE); Sussex, NJ (B-XW) Short- Term Consultant s Recommendations Airport Market Mid - Term Long- Term Commuter Market Short- Term Mid- Term Long- Term X X X N/A N/A N/A White Plains, NY (B-XWP); Stamford, CT (B-XC); Hoboken, NJ (B-XH); X X X X X X Midtown, NY (B-XM) George Washington Bridge, NYC (B-XG) X X X Patterson, NJ (B-XP); Hackensack, NJ (B-XHA) X X X I-87 BRT (B-C1) N/A N/A X N/A N/A X RC-Eastern (2 Options) N/A N/A X N/A N/A X RC-Breunig, RC Aqueduct Balsam, and RC-Aqueduct Reed St N/A N/A N/A N/A RX-C1 (Bus) X X X X X X RB-C1 (BRT) N/A X N/A X RX-B1 (Bus) RB-B1 (Queue Jump) 29 N/A X X N/A X X TSM/TDM Various Consultants Proposed Short List of Alternatives Short -Term Serves Airport Market Serves Commuter Market Group 1B - Direct Bus to Midtown Group 1B - Direct Bus to GWB Group 1B - Direct Bus to Hackensack Group 5 - Hybrid Rail (Bus connection to Beacon) Mid -Term Group 4- Hybrid Rail (BRT connection to Salisbury Mills) Long-Term Group 2- Direct Rail PJL to Airport 30 15
16 Next Steps Complete Phase 1 Level 2 Screening Initiate Phase 2 Implement short-term initiatives 31 Questions and Answers 32 16
Appendix C. Operating Assumptions (Service Plan) Tables and Figures. Travel time and Ridership Data - Tables
Operating Assumptions ( Plan) Tables and Figures Travel time and Ridership Data - Tables C Plans One of the key measures utilized in level 2 screening under the transportation criteria was the travel
More informationFigure 3-1 Level 1 Screening Process
3 Chapter 3 The focus of the Level 1 screening process was to develop and then screen a Long List of Alternatives, resulting in a set of fewer but more promising alternatives that meet the Study s goals
More informationStakeholders Advisory Working Groups (SAWGs) Traffic and Transit SAWG Meeting #7
Presentation Tappan Zee Bridge/I-287 Corridor Environmental Review December 4, 2008 Slide 1 Title Slide Slide 2 This presentation discusses the contents of the Transit Mode Selection Report. Slide 3 The
More informationValley Metro Overview. ITE/IMSA Spring Conference March 6, 2014
Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and
More informationAlternatives Analysis Findings Report
6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop
More informationWELCOME. Transit Options Amherst - Buffalo Public Workshops
WELCOME Transit Options Amherst - Buffalo Public Workshops Sponsored by Niagara Frontier Transportation Authority Greater Buffalo Niagara Regional Transportation Council Where do you live? Where do you
More informationEUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT
EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING
More informationNorth Shore Alternatives Analysis. May 2012
North Shore Alternatives Analysis May 2012 Agenda Study Process and Progress to Date Short List Alternatives Screening Traffic Analysis Conceptual Engineering Ridership Forecasts Refinement of Service
More informationI-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018
I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station
More informationExecutive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.
Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections
More informationMETRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only
METRONext Vision & Moving Forward Plans Board Workshop December 11, 2018 Disclaimer This presentation is being provided solely for discussion purposes by the Board of Directors of the Metropolitan Transit
More informationI-26 Fixed Guideway Alternatives Analysis
I-26 Fixed Guideway Alternatives Analysis Steering & Technical Advisory Committees Joint Meeting January 15, 2016 @ 10:00 AM SC/TAC Meeting Winter 2016 Agenda I. Welcome & Introductions II. III. Project
More informationWaco Rapid Transit Corridor (RTC) Feasibility Study
Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM
More informationThe capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.
Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More information4.0 TIER 2 ALTERNATIVES
4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation
More informationThe Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix
The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project
More informationBus Congestion on the West Side of Manhattan. 6/6/14 Manha*an Community Baord 4 1
Bus Congestion on the West Side of Manhattan 6/6/14 Manha*an Community Baord 4 1 Hudson Yards Economic Impact ~120,000 direct jobs (and potential for another 120K of indirect jobs) ~$60B of tax revenue
More informationGreen Line Long-Term Investments
Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect
More informationMaryland Gets to Work
I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast
More informationExecutive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1
Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line
More information2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT
2 VALUE PROPOSITION The purpose of the Value Proposition is to define a number of metrics or interesting facts that clearly demonstrate the value of the existing Xpress system to external audiences including
More informationTransit on the New NY Bridge
Transit on the New NY Bridge TZB Cross Section North bridge incorporating 12ft shared use path and space for future bus lane South bridge with space for a future bus lane Gap between the two decks for
More informationUS 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017
US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master
More informationPreliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives
3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation
More informationCEDAR AVENUE TRANSITWAY Implementation Plan Update
CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,
More informationREPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES
TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who
More informationNeeds and Community Characteristics
Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationNEW YORK SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL)
NEW YORK SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL) October 2003 New York: The New York commuter rail service area consists of 20.3 million people, spread over 4,700 square miles at an average
More informationBi-County Transitway/ Bethesda Station Access Demand Analysis
Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationWhither the Dashing Commuter?
Whither the Dashing Commuter? The MTA in a Changing Region William Wheeler Director of Special Project Development and Planning Travel in the New York Region has changed from the days of the 9 to 5 commute
More informationPublic Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development
Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation
More informationPortland Area Mainline Needs Assessment DRAFT. Alternative 4 Public Transportation: New or Improved Interstate Bus Service
Portland Area Mainline Needs Assessment DRAFT Alternative 4 Public Transportation: New or Improved Interstate Bus Service HNTB Corporation April 2018 Table of Contents 4.1 Overview... 4-1 4.2 Key Assumptions...
More informationI-26 Fixed Guideway Alternatives Analysis
I-26 Fixed Guideway Alternatives Analysis Public Meetings: North Charleston, January 25, 2016 Charleston: January 26, 2016 Summerville: January 28, 2016 Agenda I. Project Update II. III. IV. Screen Two
More informationUnified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report
Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations
More informationRTSP Phase II Update
Washington Metropolitan Area Transit Authority RTSP Phase II Update Presentation to the Technical Advisory Group July 18, 2013 Meeting 1 Presentation Outline RTSP Integration with Momentum RTSP Process
More informationTRANSIT IDEA STRATEGIC INITIATIVE On BUS RAPID TRANSIT (BRT)
TRANSIT IDEA STRATEGIC INITIATIVE On BUS RAPID TRANSIT (BRT) The panel for the Transit IDEA program has endorsed a Bus Rapid Transit (BRT) strategic initiative and focus area as part of the Transit IDEA
More informationRECOMMENDED ALTERNATIVE REPORT
DRAFT METROCENTER CORRIDOR STUDY RECOMMENDED ALTERNATIVE REPORT JULY 12, 2005 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 2.0 TIER 1 ALTERNATIVES EVALUATION... 1 3.0 TIER 2 ALTERNATIVES EVALUATION...
More informationStatus of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS
Status of Plans March 2011 Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS Transit project update Project rationale The system New Britain Hartford Busway New Haven/Hartford/ Springfield Passenger Rail
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationSERVICE DESIGN GUIDELINES
VTA TRANSIT SUSTAINABILITY POLICY: APPENDIX A SERVICE DESIGN GUIDELINES Adopted February 2007 COMMUNITYBUS LOCALBUS EXPRESSBUS BUSRAPIDTRANSIT LIGHTRAILTRANSIT STATIONAREAS S A N T A C L A R A Valley Transportation
More informationMTA Long Island Rail Road (LIRR) and MTA Metro-North Railroad (MNR) System-wide Service Standards
MTA Long Island Rail Road (LIRR) and MTA (MNR) System-wide Service Standards The following system-wide service standards apply to LIRR and MNR operations. 1. Service Availability Service Availability is
More informationPHILADELPHIA SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL)
PHILADELPHIA SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL) October 2003 The Philadelphia commuter rail service area consists of 5.1 million people, spread over 1,800 square miles at an average population
More informationTier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis
LAKE COUNTY ORANGE COUNTY Ticket and Transportation Center Walt Disney / Reedy Creek Improvement District CR 535 John Young Parkway 441 17 92 Florida s Turnpike VE 92 mee Hall JOHN YOUNG PKY 192 OAK ST
More informationRegional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Presentation Outline Transit System Facts Economic Challenges in the Truckee Meadows RTC Transit
More informationCITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6
2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY
More informationWhat IS BRT, Really? Not BRT and RNY
What IS BRT, Really? 2007 Winter TexITE Meeting Presented by Jeff Arndt, TTI Not BRT and RNY 1 What is Bus Rapid Transit? A flexible, rubber-tired from of rapid transit that combines stations, vehicles,
More informationAttachment 5. High Speed Transit Planning Study REPORT SUMMARY. Prepared by: City of Edmonton Transportation Planning Branch. Stantec Consulting Ltd.
Attachment 5 High Speed Transit Planning Study Prepared by: City of Edmonton Transportation Planning Branch Stantec Consulting Ltd. Transportation Management & Design, Inc. with Lea Consulting Ltd. [135-35130]
More informationMass Transit in Charlotte and San Antonio. Keith T. Parker, AICP
Mass Transit in Charlotte and San Antonio Keith T. Parker, AICP President/CEO Presentation Overview Charlotte Agency and Customer Profile San Antonio Agency and Customer Profile Attracting New Customers
More informationTBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014
TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...
More informationSEPULVEDA PASS CORRIDOR
SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000
More information5. OPPORTUNITIES AND NEXT STEPS
5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours
More informationEnergy Technical Memorandum
Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter
More informationUTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018
UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms
More informationLeadership NC. November 8, 2018
v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the
More informationTRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury
TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based
More informationTECHNICAL COORDINATING COMMITTEE (TCC) UPDATE PRESENTATION APRIL 26, 2017
TECHNICAL COORDINATING COMMITTEE (TCC) UPDATE PRESENTATION APRIL 26, 2017 THE TRANSIT DEVELOPMENT PLAN (TDP) WILL IDENTIFY: TRANSIT NEEDS AND DESIRES OF THE COMMUNITY COMMUNITY AND AGENCY STAKEHOLDER S
More informationMETRO Light Rail Update
American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations
More informationKenosha-Racine-Milwaukee (KRM)
Kenosha-Racine-Milwaukee (KRM) Commuter Rail #147925 November 6, 2009 1 Guidance of KRM Commuter Rail Studies Intergovernmental Partnership Technical Steering Committee Temporary and Limited Authority
More informationNortheast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study
Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for
More informationDowntown Transit Connector. Making Transit Work for Rhode Island
Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project
More informationTier 3 Screening and Selection. of the Recommended Alternative KISSIMMEE CORRIDOR. June Downtown CRA. US 192 Alternatives Analysis
LAKE COUNTY ORANGE COUNTY Ticket and Transportation Center Walt Disney / Reedy Creek Improvement District CR 535 John Young Parkway 441 17 92 Florida s Turnpike VE 92 mee Hall JOHN YOUNG PKY 192 OAK ST
More informationChapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle
Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP
More informationMadison BRT Transit Corridor Study Proposed BRT Operations Plans
Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is
More information2012 MULTIMODAL OPERATIONS WORKSHOP
New Haven-Hartford-Springfield Rail Program Gateway to New England Jeffrey T. Schultz, PMP Senior Principal Technical Specialist Parsons Brinckerhoff Glastonbury, CT July 31, 2012 2012 MULTIMODAL OPERATIONS
More informationCLRP. Performance Analysis of The Draft 2014 CLRP. Long-Range Transportation Plan For the National Capital Region
NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD Item 12 CLRP Financially Constrained Long-Range Transportation Plan For the National Capital Region 2014 Performance Analysis of The Draft 2014 CLRP
More informationKing County Metro. Sustainably and equitably achieving a zero-emission fleet
King County Metro Sustainably and equitably achieving a zero-emission fleet Agenda Background Purpose Service area Fleet size Climate goals Process Stakeholder engagement Analyses Service Equity Final
More informationChallenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007
EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component
More informationMETRO Orange Line BRT American Boulevard Station Options
METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN
More informationAPPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]
APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2
More informationCENTRAL FLORIDA EXPRESSWAY AUTHORITY Master Plan Update Board Workshop #2
CENTRAL FLORIDA EXPRESSWAY AUTHORITY 2040 Master Plan Update Board Workshop #2 May 14, 2015 Workshop Agenda Introduction Schedule Review Community Outreach Update Transportation Planning and Regional Growth
More informationTIER TWO SCREENING REPORT
TIER TWO SCREENING REPORT November 2012 Parsons Brinckerhoff DRAFT November 2012 1 Parsons Brinckerhoff DRAFT November 2012-2 TABLE OF CONTENTS Table of Contents...3 List of Tables...4 List of Figures...5
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS
More informationV03. APTA Multimodal Operations Planning Workshop August Green Line LRT
V03 APTA Multimodal Operations Planning Workshop August 2016 Green Line LRT 2 Presentation Outline Past Present Future 3 16/03/2016 RouteAhead Update 4 4 16/03/2016 RouteAhead Update 5 5 16/03/2016 6 6
More informationNICTI Alternatives Analysis
EXECUTIVE SUMMARY Development of Detailed Alternatives Report Prepared for: Northern Illinois Commuter Transportation Initiative City of Rockford, Illinois Prepared by: 222 South Riverside Plaza, Suite
More informationThe City of Toronto s Transportation Strategy July 2007
The City of Toronto s Transportation Strategy July 2007 Presentation Outline Transportation Statistics Transportation Building Blocks Toronto s Official Plan Transportation and City Building Vision Projects
More informationNew Haven Hartford Springfield Rail
New Haven Hartford Springfield Rail Opportunities for Economic Growth NHHS Rail Conference, October 25, 2011 NHHSrail.com Tom Maziarz, CT DOT, Bureau of Policy & Planning Thomas.Maziarz@ct.gov New Haven
More informationTRAVEL DEMAND FORECASTS
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components
More informationDraft Results and Recommendations
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System
More informationSean P. McBride, Executive Director Kalamazoo Metro Transit. Presentation to Michigan Transportation Planning Association July 13, 2016
Sean P. McBride, Executive Director Kalamazoo Metro Transit Presentation to Michigan Transportation Planning Association July 13, 2016 Metro Transit in Kalamazoo County Square Miles = 132 Urbanized Population:
More informationTransit on the SC Rail Corridor
Transit on the SC Rail Corridor Framing the Debate Premature Question: Rail or BRT? Rather Transit or no Transit Rail AND BRT more likely Save the Rails becomes Save the ROW for now Unified Corridors Investment
More informationTEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS
TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS This document reviews the methodologies and tools used to calculate the projected ridership and parking space needs from the proposed Texas City Park & Ride to
More informationSubarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.
Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology
More informationA Presentation to: Project Advisory Group Meeting #10
A Presentation to: Project Advisory Group Meeting #10 October 21, 2015 Agenda Introductions Action Items From Last PAG Meeting (August 26, 2015) Recent Agency Involvement Update on Refined Alternative
More informationMichigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS
TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:
More informationMetro Green Line to LAX Alternatives Analysis. March 2012
Metro Green Line to LAX Alternatives Analysis 1 2 The Crenshaw/LAX Project Foundation for Metro Green Line to LAX 8.5 mile extension Metro Exposition Line (Crenshaw Exposition) to Metro Green Line (Aviation/LAX
More informationEGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)
WELCOME TO OUR PUBLIC OPEN HOUSE EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) Preliminary Planning for a Transit Project Assessment Open House Martin Grove Road to Pearson International Airport September
More informationThe $600 Million Rebirth of San Diego Trolley
The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and
More informationWest Broadway Transit Study. Community Advisory Committee September 17, 2015
West Broadway Transit Study Community Advisory Committee September 17, 2015 Introductions Community Engagement Summer Outreach Fall Outreach Technical Analysis Process Update Alternatives Review Economic
More informationTransit Access to the National Harbor
Transit Access to the National Harbor December 2014 Table of Contents Executive Summary... 3 Introduction and Project Purpose... 6 Methodology.. 9 Definition of Alternatives..... 9 Similar Project Implementation
More informationFeasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study
Feasibility Study Community Meeting March, 2017 1 Agenda 1. Welcome / Introductions 2. Background / Meeting Purpose 3. Progress to Date Options Evaluated Capital/Operating Costs Ridership 4. Financial
More informationClick to edit Master title style
Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment
More informationARTERIAL BRT OVERVIEW
ARTERIAL BRT OVERVIEW Key Question: Could arterial Bus Rapid Transit (BRT) routes improve near-term mobility in the northwest area until rail can be built? Key Findings: 6 arterial BRT routes have been
More informationExpanding Capacity for the Northeast Corridor The Gateway Program
Expanding Capacity for the Northeast Corridor The Gateway Program Petra Todorovich Messick March 4, 2013 Raritan Valley Rail Coalition Somerville, NJ The Northeast Corridor Mainline and Branches 899 Route-miles
More informationTravel Time Savings Memorandum
04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost
More informationSound Transit Operations July 2016 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link
More informationKANSAS CITY STREETCAR
KANSAS CITY STREETCAR KAREN CLAWSON MID-AMERICA REGIONAL COUNCIL KANSAS CITY STREETCAR Regional Context Alternatives Analysis Kansas City Streetcar Project KANSAS CITY REGION KANSAS CITY REGION KANSAS