Brion Energy Corporation

Similar documents
Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station.

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.

Coalspur Mines (Operations) Ltd.

Wal-Mart Canada Corp.

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Decision The City of Calgary. 30-kW Solar Power Plant. March 8, 2012

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

University of Alberta

Direct Energy Regulated Services

Bohn to Kettle River Transmission Project

Kettle River Transmission Project

Currant Lake Transmission Project

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities

conversation SHAPE the May 2015 The AUC

Decision D Finlay Group. Complaint Regarding FortisAlberta Inc. Distribution Line Rebuild Project. February 3, 2016

Grande Cache Coal Corporation

APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP)

Included in this Stakeholder Information Package:

Alberta Energy and Utilities Board. Application to Construct and Operate Transmission Facilities

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

ENMAX Power Corporation

Electric system improvements near you

Declaration naming Richard J. Nixon and Dale Brand under section 106 of the Oil and Gas Conservation Act

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

February 13, Docket No. ER ; ER Response to Request for Additional Information

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

Proposed Dounreay - Mybster 275 kv / 132 kv

Dawes Substation Project

Wainwright 51S Substation Connection Enhancement Needs Identification Document

APPENDIX C - AESO PIP SUMMARY

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Grid Energy Storage: Policies

DFO STATEMENT OF NEED REPORT

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington

SOUTHWEST CALGARY RING ROAD (SWCRR)

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

specifying the applications each has before the AER and the AER licences and approvals such licensee or approval holder holds.

Powering Sydney s Future

Willingdon Substation Decommission

Merger of the generator interconnection processes of Valley Electric and the ISO;

CLS Bank Protocol for FX. Overview

DEPARTMENT OF TRANSPORTATION. Commercial Driver s License Standards: Application for Exemption; Daimler Trucks North America (Daimler)

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

Addressing ambiguity in how electricity industry legislation applies to secondary networks

DEPARTMENT OF TRANSPORTATION. Commercial Driver s License Standards: Application for Renewal of Exemption; Daimler Trucks North America (Daimler)

ENMAX Power Corporation

MICRO-GENERATION NOTICE SUBMISSION GUIDELINE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Legal Considerations Related to Distributed Energy Resources

Key DRAFT OPERATING CODE 2 LEGAL TEXT

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

April 20, Dear Mr. Wruck:

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

HydroGenerations PROGRAM HANDBOOK

Consolidated Edison Company of New York, Inc.

Energy Regulation : Australian Experience. Engr.Khondkar Abdus Saleque

Sumitomo Rubber Industries, Ltd., Grant of Petition for Decision. AGENCY: National Highway Traffic Safety Administration (NHTSA),

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

DEPARTMENT OF TRANSPORTATION. Hours of Service; Electronic Logging Devices; Limited 90-Day Waiver; Truck Renting and Leasing Association, Inc.

Explaining AER Setbacks

CITY OF SASKATOON ADMINISTRATIVE POLICY

Large General Service Time-of-Use Storage Program

Net Metering Program

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

ATCO GAS AND PIPELINES LTD. ATCO GAS SOUTH RATE SCHEDULES. May 1, 2017

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. [Docket No. NHTSA ]

RE: January 9, Electronic Service Only. Marc Weintraub, Esq. Counsel, Applicants Bailey & Glasser, LLP 209 Capitol Street Charleston, WV 25301

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

The Commonwealth of Massachusetts

The Commonwealth of Massachusetts

SYNOPSIS OF PROPOSED GEORGIA DEPARTMENT OF PUBLIC SAFETY RULES CHAPTER TRANSPORTATION NETWORK COMPANIES AND TAXI SERVICES

Permit Holder. Permitted Equipment

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014

SGS North America, Inc.: Grant of Expansion of Recognition. AGENCY: Occupational Safety and Health Administration (OSHA), Labor.

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Sumitomo Rubber Industries, Ltd., Receipt of Petition for. AGENCY: National Highway Traffic Safety Administration (NHTSA),

Penn West Petroleum Ltd. Well Blowout W5M August 17, 2010

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Automated and Electric Vehicles Bill

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B;

Transcription:

Decision 20907-D01-2015 MacKay River Commercial Project October 29, 2015

Alberta Utilities Commission Decision 20907-D01-2015 MacKay River Commercial Project Proceeding 20907 Application 20907-A001 October 29, 2015 Published by the: Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: 403-592-8845 Fax: 403-592-4406 Website: www.auc.ab.ca

Alberta Utilities Commission Calgary, Alberta Decision 20907-D01-2015 MacKay River Commercial Project Proceeding 20907 Application 20907-A001 1 Introduction and background 1. On November 25, 2014, the Alberta Utilities Commission issued Decision DA2014-262 1 and Order U2014-462, 2 designating the MacKay River Commercial Project (MRCP) as an industrial system pursuant to Section 4 of the Hydro and Electric Energy Act and providing an exemption from the operation of the Electric Utilities Act regarding the electric energy produced from and consumed by the proposed industrial system, pursuant to Section 117 of the Electric Utilities Act. 2. (Brion) filed an application with the AUC seeking an amendment to the industrial system designation (ISD) by adding a new 35-kilovolt overhead power line to serve an industrial operation not currently under Brion s ownership. This application was registered as Application 20907-A001 on October 14, 2015. 3. The ISD encompasses all facilities at the MRCP. These facilities are located in Townships 87 to 91, Ranges 11 to 14, west of the Fourth Meridian, and Townships 91 to 93, Ranges 14 to 16, west of the Fourth Meridian as further described in Application 1608471. 4. Brion proposed to construct and operate a new overhead power line, from its AMR02 substation to the adjacent Camp A. The new overhead power line would be located entirely within its already approved ISD boundary in the northeast quarter of Section 2, Township 90, Range 14, west of the Fourth Meridian. Four 300-kilowatt natural gas standby/backup generators would also be added to service Camp A. 5. Brion stated that Camp A exists entirely to support operations at the MRCP but is currently owned by Horizon North Camps and Catering. Camp A currently runs on remote generation power, approved in Decision 2014-083. 3 Brion also stated that it identified an opportunity for significant cost savings by supplying power from its AMR02 substation, and eliminating the costs associated with generator rental and fuel consumption. The temporary power plant, approved in Decision 2014-083, would no longer be required under Brion s proposal. 6. Brion stated that Section 4(4) of the Hydro and Electric Energy Act makes provisions for the AUC to approve an ISD where there is a lack of common ownership of all of the components of the industrial operation, provided all components are part of an integrated industrial process. 1 2 3 Decision DA2014-262: Industrial System Designation, Power Plant and Substation Ownership Change, Proceeding 3511, Application 1610985, November 25, 2014. Industrial System Designation Order U2014-462, Proceeding 3511, Application 1610985, November 25, 2014. Decision 2014-083, Horizon North Logistics Inc., Temporary Power Plant at MacKay River Commercial Project Worker Campsite, Proceeding 2647, Application 1609656, April 3, 2014. Decision 20907-D01-2015 (October 29, 2015) 1

MacKay River Commercial Project Brion submitted that Camp A is a highly integrated piece of infrastructure that exists entirely to support the operations at the MRCP, and is located on Crown Disposition No. DML 110157, leased by Brion, and located adjacent to the AMR02 substation. 7. Brion conducted a noise impact assessment and an environmental impact assessment as part of its commercial application for the MRCP, which were considered during the original ISD application. Brion stated that the proposed amendment to the ISD would have no effect on the previously considered noise impact assessment and environmental impact assessment. 8. Brion notified all Crown disposition holders within 800 metres of the proposed project, as well as aboriginal communities that had previous interest in the MRCP. Brion submitted that no concerns were expressed by any person or party during the consultation program. 9. Brion contacted ATCO Electric Ltd. (ATCO) to inform it of the proposal and requested an amendment to ATCO s original Electric Utilities Act Section 101(2) conditional approval. ATCO stated that Camp A is located less than 300 metres from the MacKay Central Plant and that it would be economical for Camp A to receive electric service from Brion s AMR02 substation. ATCO agreed to amend its Electric Utilities Act Section 101(2) conditional approval. 10. AltaLink Management Ltd. filed a statement of intent to participate on October 22, 2015; however; it stated it did not anticipate to be actively involved in the proceeding and only had interest with respect to principles of issues that may arise since it was also an Alberta transmission facility owner. To the extent that certain issues surface that in AltaLink s view are material in nature, then AltaLink may, at that time, choose to actively participate in this proceeding. 11. Due to the nature of the application, a notice of application was not issued and, therefore, a hearing was not required as the Commission considered that its decision or order would not directly and adversely affect the rights of a person pursuant to Section 9 of the Alberta Utilities Commission Act. 2 Findings 12. The Commission has reviewed the application and has determined that the technical aspects of the amendments for the industrial system designation amendment have been met. The Commission finds that the applicant has demonstrated that providing electric service to Camp A from Brion s AMR02 substation is an efficient source of power for the camp, that the efficiency of the interconnected electric system is improved, and that there is no duplication of the interconnected electric system. 13. The Commission finds that the new power line will be located within the existing ISD boundary and would have no effect on the previously considered noise impact assessment and environmental impact assessment. 14. The Commission finds that Brion s participant involvement program has been conducted and there are no outstanding public or industry objections or concerns. 2 Decision 20907-D01-2015 (October 29, 2015)

MacKay River Commercial Project 15. With respect to the supply of power to a third party, without a common owner, the Commission finds that Camp A is sufficiently integrated to Brion s industrial process because the camp exists solely to support the operations at the MRCP. 16. Based on the foregoing, the Commission considers the project to be in the public interest in accordance with Section 17 of the Alberta Utilities Commission Act. 3 Decision 17. Pursuant to Section 4 of the Hydro and Electric Energy Act and sections 2(1)(d) and 117 of the Electric Utilities Act, the Commission approves the application and grants to Brion the approval set out in Appendix 1 MacKay River Commercial Project Industrial System Designation Order 20907-D02-2015 October 29, 2015 (Appendix 1 will be distributed separately). Dated on October 29, 2015. Alberta Utilities Commission (original signed by) Tudor Beattie, QC Commission Member Decision 20907-D01-2015 (October 29, 2015) 3