WarmlyYours ET-SR Series Heating Cable Installation Manual for Roof & Gutter Deicing

Similar documents
Power Connection Kit installation instructions

PRO-Tect Pipe Freeze Protection Self-Regulating Heating Cable Install Manual (PT-Series)

ET-PWR-END-KIT Installation Instructions (part #JSR00)

H900 WinterGard Power Connection Kit with End Seal Installation Instructions

SRK02 Hard Wire Power Connection Kit. Installation, Operation and Maintenance Instructions

EMK-XP ElectroMelt Power Connection and End Seal Kit Installation Instructions

C A Heating Cable Gland Kit Installation Instructions

AutoMatrix Power Connection Kit. (1) This type 4X enclosure is intended for indoor or outdoor use primarily to. (2) May be required (see step 1).

SPC-P Smart Power Connection with Temperature Monitoring Transmitter Pipe Mounted Installation Instructions

Nuheat WEATHER-READY HEAT TRACE PIPE FREEZE PROTECTION SYSTEM. Self-Regulating Heating Cable Installation Guide. UV Resistant Polyolefin Outer Jacket

JBM-100-STB NEMA 4X-rated connection kit Installation Instructions

PMKG-J2LP PolyMatrix Powered Splice Kit Installation Instructions

PMKG-JS POLYMATRIX SPLICE CONNECTION KIT INSTALLATION INSTRUCTIONS

JBS-100-STB Single Entry Power Connection with Junction Box Installation Instructions

Snow Melting Mats Price Sheet

C A HEATING CABLE GLAND KIT INSTALLATION INSTRUCTIONS

Selection Guide. Freeze Protection Heating Cable. Thermwire - Wrap. Thermwire - Wrap Pre-Assembled. Thermwire - Comp. Thermwire - Melt.

HTP PTP/ PTJ Power Connection Kit for Pipes

JBS-100-A, A6 SINGLE ENTRY POWER CONNECTION WITH JUNCTION BOX INSTALLATION INSTRUCTIONS

C Power Connection Kit

3M Self Regulating Heating Cables

NAMSR SELF-REGULATING FREEZE PROTECTION HEATING CABLE SELECTION

HWAT System INSTALLATION AND OPERATION MANUAL FOR HOT WATER TEMPERATURE MAINTENANCE SYSTEMS FOR THERMALLY INSULATED PIPES

MI HEATING CABLE COPPER AND HDPE JACKETED COPPER SHEATHED MI CABLE. For commercial and industrial applications. Heating cable construction

Power-Limiting Cables

120/240 Volts 3 Watt Floor Heating Cable System

FLX TM Self-Regulating Winterization/Freeze Protection INSTALLATION PROCEDURES

TSRT TSRT Tee Splice Kit Installation Instructions

HAK-C-100 CONNECTION KIT FOR DIVISION 1 HAZARDOUS LOCATIONS INSTALLATION INSTRUCTIONS

Installation Instructions CONSTANT WATT (CW) AND SELF-REGULATING (SR) PIPE TRACING CABLES

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

Installation Instructions

NAMSR SELF-REGULATING CABLE FOR PIPE FREEZE PROTECTION / SPECIFICATION SHEET WSC-0930

Type HLT Self-Regulating Heater Cable For use in Ordinary and Hazardous (Classified) Locations

Type LT Self-Regulating Heater Cable For use in Ordinary and Hazardous (Classified) Locations

Introduction to Heat Trace Cable Systems

HAK-C-100 CONNECTION KIT FOR DIVISION 1 HAZARDOUS LOCATIONS INSTALLATION INSTRUCTIONS

Self-Regulating Freeze Protection Heating Cable

Power Connection Kit Installation Instructions. Terminator DP-M for use with TEK and HTEK series constant watt heating cables

Connection kits for joining all types of DEVI self-limiting heating cables to cold tails

Terminator DP/FAK-4LHT Kit for In-Line Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

NAMSR SELF-REGULATING CABLE FOR PIPE FREEZE PROTECTION / SPECIFICATION SHEET WSC-0930

Type LT Self-Regulating Heater Cable For use in Ordinary (Unclassified) and Hazardous (Classified) Locations

PIPE FREEZE PROTECTION AND FLOW MAINTENANCE XL-TRACE SYSTEM

MASTERsine Inverter PXA Series Installation Guide

Power Connection Kit Installation Instructions. Terminator ZP-M for use with TEK and HTEK series constant watt heating cables

QUICKTERM TERMINATION KIT

Terminator DP/FAK-5 and FAK-5L

Ecoflex potable PEX plus pre-insulated pipe system Installation guide

Pictorial Index... A-14 Introduction to Heat Trace Cable Systems Installation Examples Engineering Guide Heat Loss Tables...

XL-Trace System. Installation and Operation manual for pipe freeze protection and flow maintenance

SELF-REGULATING CABLES

MODEL HSC-24 AUTOMATIC SNOW/ICE MELTING SYSTEM CONTROL PANEL

Chapter 8 Interior Wiring and Lighting

Electric Heat Tracing INSTALLATION PROCEDURES

Terminator DP/FAK-4 and FAK-4L for In-Line Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

Terminator DL-S for use with BSX *, HTSX, KSX self-regulating, HPT power-limiting, and FP constant watt heating cables

FAK-7HTS High Temperature Tubing Bundle End Seal Kit INSTALLATION PROCEDURES

Self-Regulating Cables

MODEL SIT -6E PAVEMENT-MOUNTED SNOW AND ICE SENSOR

Pipe Freeze Protection Design/Install Guide

Terminator DP/FAK-5LHT Kit for Tee Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

Terminator. DP Power Connection Kit INSTALLATION PROCEDURES

Busway Construction. Bus Bars

QAA 132 Operating Manual for Heat Tracing System ELSR-MA and ELSR-WA

WRSS Wraparound Repair Sleeve Installation Instructions

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

Installation Instructions Mineral Insulated (M.I.)

Thermal Protector (as applied to motors). Thermally Protected (as applied to motors).

Self-regulating cables

WarmTrace TM HSX Hot Water Temperature Maintenance INSTALLATION PROCEDURES

Safe-T-element Installation Instructions

GC-1. Roof and Gutter De-Icing Control Installation and Operating Instructions FOR EXTERIOR INSTALLATION ONLY

PETK Power and End Termination Kit

Pavement-Mounted Deicing Controller SNOW SWITCH MODEL HSC 24. Installation and Operation Manual

WOC & WOC Top & Back Installation Instructions

Revision THERMO TECHNOLOGIES. USDT 2001 Differential Controller. Installation and User s Guide

LCD Annunciator Installation Instructions

Terminator TM DL Lighted Power Connection/End Termination Kit INSTALLATION PROCEDURES. For Power Connection or End Termination Applications

Terminator DP/FAK-2 and FAK-2L. Elbow Splice Kit for Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

Heating Cable. Construction

Heating Cable. Cut to Length in Field. Description

HPNLS-HO. Installation Manual

THERMO TECHNOLOGIES USDT 2005 Analog Differential Controller

Solar PV Standard Electrical Plan

Installation and Service Instructions for 87,000 & 87,100 Series Self-Adjust Brakes (rev. B)

TracePlus. VIL-6 End of Circuit Light Kit INSTALLATION PROCEDURES. VIL-6-H for BSX, HTSX, KSX, HPT, FP VIL-6-V for RSX, TSX, VSX

RigMaster Power Service and Repair Manual Document # S901009

Kompensator External Low Voltage Heating Cable System

OPERATING & SERVICE PARTS MANUAL 700ES ENERGY SMART WRAPPER SERIES B

PETK Power and End Termination Kit

PARTS AND SERVICE MANUAL

SERIES VAC Microprocessor Based Direct Spark Ignition Control FEATURES DESCRIPTION APPLICATIONS THE TOTAL SOLUTION FOR GAS IGNITION CONTROL

TOYOTA VENZA HANDS FREE BLU LOGIC Preparation

SAFETY INFORMATION AND WARNINGS

INSTALL SERVICE- ENTRANCE SYSTEMS

INSTRUCTIONS. for ZONE HEATERS STACKPAK

LAWN SPRINKLER, IRRIGATION PUMP

Operations and Service Manual. X30208 Load Bank

Transcription:

WarmlyYours ET-SR Series Heating Cable Installation Manual for Roof & Gutter Deicing Free Design Service 24/7 Installation Support (800) 875-5285 www.warmlyyours.com

Assembly Tools Needed Utility knife Wire cutter Needle-nose pliers Adjustable wrench Pen Screwdriver Heat gun Measuring tape Other Materials Required Certified junction box appropriate for the site Aluminum 3-prong clips Double-sided tape pads (to adhere clips to shingles, gutters, and roofs) Primer (for adhering clips to EPDM or rubber) General Safety Information Read and understand all instructions in this manual, including all installation instructions and safety warnings, before beginning the installation. Electrical cables can present a fire, shock, and arcing hazard if they are damaged or not installed correctly. 1. Installation must be in compliance with the National Electrical Code (NEC). 2. Use 30-mA ground-fault protection on each heating cable branch circuit for maximum protection. 3. The black heating cable core is conductive and can short. It must be properly insulated and kept dry. 4. The conductive layer of this heating device must have a suitable grounding terminal. 5. Installer should apply the nameplate label to surface of the junction box. 6. Keep components and ends of heating cable dry before installation. 7. Do not break braid or bus wire strands when scoring the jacket or core. Damaged bus wires can overheat or short. 8. Keep the bus wires separated. The bus wires will short if they touch each other. 9. Replace damaged parts. Heat-damaged components can short. 10. Use heat gun or torch with a soft yellow, low-heat flame--not a blue flame. Keep the flame moving to prevent overheating or blistering the heat-shrinkable tubes. 11. Do not heat other components. 12. Use only fire-resistant insulation materials such as fiberglass wrap. 13. De-energize all circuits before installation or service. 14. The heating cable should not be embedded in insulation or roofing material. 15. Do not twist cable during installation. 16. Save all instructions for future reference. CAUTION: Charring or burning the heat-shrinkable tubes in this kit will produce fumes that may cause eye, skin, nose, and throat irritation. 1

D A E F B C Item Description Quantity A ET-SR (Roof and Gutter Cable) 1 B ET-PWR-KIT (Power Connection Kit) Available Separately C ET-END-KIT (End Seal Kit) Available Separately D ET-CL-AL-P25 (Aluminum Clips) Available Separately E ET-VHB-PAD-P25 (Double-Sided Tape) Available Separately F ET-94-PRIMER (1 Quart Primer) Available Separately 2

Roof & Gutter Deicing HEATING CABLE SELECTION (ET-SR SERIES) Calculate the total length of cable required: 1. Multiply the total roof edge length (ft.) by feet of heating cable per foot of roof edge (refer to Table 4) to find the total roof edge cable length required. 2. Add the total gutter length (ft.). For standard roofs, add 1 foot of heating cable for each foot of gutter. 3. Add the total downspout length (ft.), i.e. 1 foot of heating cable per foot of downspout. 4. Add 1 foot for each power connection. 5. If downspout is in the middle of the gutter run, loop the cable down and back. Double the length of the downspout for determining the length of the cable to install. 6. For roof valleys, run the heating cable two-thirds of the way up and down the valley. Add this additional length to the overall cable length. 7. The circuit length for a given overcurrent protection device shall not exceed the maximum length specified by the manufacturer. Example (standard roof): Roof edge length... 100 ft. (with roof overhang of 1 ft.) Gutter length... 100 ft. Downspout length... 30 ft. Power connection... 2 ea. Voltage available... 240V Heating cable... ET-SR-240 Roof Clip Standard Roof Metal Roof Length of heating cable required: Roof edge length... 100 ft. (x 2) (see roof illustrations) Gutter length... 100 ft. Downspout length... 60 (+1) ft. Power connection... 1 ft. x 2 ea. Total... 363 ft. Roof Clip Table 4 - Cable triangle length multiplier and triangle heights Feet of Heating Cable per Foot of Roof Edge Multiplier 5 Cable Triangle Height Roof Overhang Standard Roof Metal Roof (18 ) Metal Roof (24 ) Standard Roof Metal Roof None 2.5 2.5 2.0 18 18 12 3.1 2.8 2.4 18 18 24 4.2 3.6 2.9 30 36 36 5.2 4.3 3.6 42 48

INSTALLATION OF DEICING CABLES FOR ROOF, GUTTERS, AND DOWNSPOUTS Use only the following kits and accessories to satisfy code and agency requirements: ET-END-KIT End Seal Kit Roof clips Tape pads for clips Primer for mounting tape 1. Carefully plan the routing of the heating cable for roof and gutter deicing. 2. Route the heating cable to avoid mechanical damage from ladders and other sources. 3. Cut the heating cable to proper length. This can be done before or after the cable is on the roof, gutter and downspouts. 4. Before installing the heating cable, make sure the roof, gutter and downspouts are free from debris, leaves, pine needles or any combustibles. 5. Check the maximum exposure temperature rating of all roof, gutters, and downspouts, and select a heater that will not exceed their temperature ratings. 6. The minimum installation temperature is 0 F (-18 C). 7. The heating device shall be connected to nonheating leads of a weather-resistant type. The installer should protect the nonheating leads from damage by installing them in a rigid metal or nonmetallic raceway. 8. Use roof clips to attach the heating cable to the roof. (5 clips per each triangle) 9. When attaching cable in the gutter, use clips every 10 feet. Add a clips before and after each downspout. 10. For roof valleys, run the heating cable two-thirds of distance up and down the valley. Add the additional length to the overall cable length. 11. Protect the heating cable ends from moisture or mechanical damage before connection. 12. Field-assembled end terminations should not be located in an area where moisture is present or at the lowest point of downspouts. 13. Install end seals and power connection before turning on power. Follow all ET-PWR-KIT kit installation instructions. 14. Use only Listed weatherproof junction boxes approved for wet locations when installing ET-SR series heating cables with the ET-PWR-KIT Power Connection Kit. 15. Use only Listed watertight construction or enclosure Type 3, 3S, 4, 4X, 6, or 6P junction box when installing. 16. Attach the two warning labels included with the heating cable. The labels must be clearly visible on the premises. 17. The heating device shall be connected to nonheating leads of a weather-resistant type. The installer should protect the nonheating leads from damage by installing them in a rigid metal or nonmetallic raceway. 18. After installation is complete, turn the circuit breaker on to give power to the cable. Standing water in the gutter should feel warm within one hour. 6

MAINTENANCE CHECKS 1. Only qualified persons should service or install the system. 2. Inspect the system annually. Check for any damage to the heating cable. Check any ground-fault protection device for proper operation. If any damage to cable is found, DO NOT operate until it is replaced. 3. With a 2500Vdc megohmmeter (500Vdc minimum), test the insulation resistance between the bus wire and the heater grounding braid or metal pipe. The reading should be 20 megohms (regardless of cable length). Table 5 - Roof & Gutter Maximum Circuit Size at 0ºF 120V 240V 15 amp = 107 ft. max. length 15 amp = 214 ft. max. length 20 amp = 142 ft. max. length 20 amp = 286 ft. max. length 30 amp = 214 ft. max. length 30 amp = 429 ft. max. length *Use the 0ºF start-up lengths. NOTE: Circuit breaker sizing is based on Section 427 of the National Electrical Code. Maximum circuit lengths are based on start-up load. Steady-state amps per foot depend on heating cable temperature. Table 6 - Product Data for ET-SR Series Heating Cables for Roof and Gutter Deicing Model Service Voltage Thermal Output @32ºF (in Ice & Snow) Min. Installation Temp. Max. Exposure Temp. Chemical Exposure Environmental Restrictions ET-SR-120 120 10 W/ft 0ºF 150ºF None Use only in ordinary (nonhazardous) areas ET-SR-240 240 10 W/ft 0ºF 150ºF None Use only in ordinary (nonhazardous) areas 7