Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Similar documents
Daily Activity Report

19,683 8,

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig


1042 FNL, 1935 FEL - ECTOR, TX

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

Callon Petroleum Company Drilling Report

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DAILY DRILLING REPORT DATE : 08/01/2012

Daily Drilling Summary Report

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT

Daily Drilling Report


DAILY DRILLING REPORT

DAILY DRILLING REPORT

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

Daily Drilling Report

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

DAILY DRILLING REPORT

DAILY DRILLING REPORT

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

OPERATIONS SUMMARY REPORT

DAILY DRILLING REPORT

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

Daily Drilling Report

Current Depth. Proposed TD. Current Operation

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

APACHE CORPORATION. Daily Land - Orig Comp Report

3/25/15 University DC 1H Devonian Completion

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

Daily Drilling Report

Current Depth. Proposed TD. Current Operation

DAILY OPERATIONS REPORT Date:

APACHE CORPORATION. Daily Land - Orig Comp Report

Drilling & Completion Summary - Ascending

Drilling & Completion Summary

McKissick 200mt. Stabbing board

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

Rotary Snubbing Technology Option for Long Reach

RIG 32. Rig 32. Page 1 of 13

DAILY DRILLING REPORT DATE : 04/20/2011

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

DATE: 01/03/ DAILY COMPLETION REPORT

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

LOC 400 Drilling Rig

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

Ideco - H25 Information Document

MORNING DRILLING REPORT

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

VDD 370 Super Single Rig - Automatic Pipehandling System

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

MORNING DRILLING REPORT

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

Elevation Resources LLC

VDD 200 Super Single Rig - Automated Pipehandling System

Superintendent Rig Checklist

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

DRILLING BARGE SS AMEQ CASPIAN SEA

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

LAGO Energy Presents,

About Cobra Downhole Motors

About Cobra Downhole Motors

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Daily Drilling Report

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

Schede tecniche Corsair 300 PDB

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Atlas Copco Oil and Gas Rigs. The Predator Advantage

VDD 400 Offshore Super Single - Automated Pipehandling System

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

THE OFFSHORE Drilling Solution

Rig 90. Rig 97. Future Technology From NOV

Ashmin HammR Drill Motor

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

HYDRAULIC WORKOVER SERVICES

4.7 Formation Temperature

Transcription:

Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT. AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: 4247536999 AFE DHC: $3,180,125 Days from Spud: -4 Rig Supervisor 1: CODY CHAMBERS 832-314-9929 Daily Costs: $25,427 Field Name: Wellcore Rig Supervisor 2: BENJAMIN DUCOT 318-509-9166 This AFE DHC to Date: $25,427 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER 318-780-1745 This AFE CWC to Date: $25,427 Start Depth(ft): 0 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 0 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $0 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: FINISH CLEANING PITS. RIG DOWN ALL 3RD PARTY EQUIPMENT. START RIGGING DOWN RIG EQUIPMENT. TRANSPORT ALL DRILL PIPE & MISC. EQUIPMENT TO NEW LOCATION. PREP RIG FOR TRANSPORT TO NEW LOCATION. RIGGED DOWN- 80% TRANSPORTED- 20% RIGGED UP- 0% Next Day Operations: FINSH RIGGING DOWN ON OLD LOCATION. TRANSPORT ALL TO NEW LOCATION. TRANSPORT ALL HOUSING. START RIG UP ON NEW WELL. RIG RELEASED FROM UNIVERSITY 21-17 #1R @ 06:00 HRS. ON 6-4-2015. SPUD: XX/XX/2015 @ XX:XX HRS. TOTAL RIG MOVE HRS.: 24 / DAYS: X.XX TOTAL HRS. FROM SPUD: ----- TOTAL DAYS TO TD: ----- TOTAL DAYS TO RELEASE: ----- DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY 24-17 #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST. 54-4 #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY 21-17 #1R, ON 6/4/2015. CSI. SAFETY MTG.: SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. DAYS SINCE LAST LTA: 342 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** 20'' CONDUCTOR CSG SET @ XXX' 13 3/8" SURFACE CSG SET @ X,XXX' 9 5/8'' INT. CSG SET @ X,XXX' 7" INT. CSG SET @ XX,XXX' 4.5'' PRO. CASING LINER @ XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: 0 Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling 0.00 0 Rotating 0.00 0 Trips 0.00 0 Circulating 0.00 0 Down 0.00 0 Other 24.00 24 Operations Start Hrs Code Remarks Start Depth End Depth Run 6:00 24.00 01 FINISH CLEANING RIG. RIG DOWN ALL 3RD PARTY EQUIPMENT. START HAULING ALL DRILL PIPE & MISC. EQUIPMENT. HANG OFF BLOCKS, SEPARATE FROM TOP DRIVE, PREP TO LOWER SUBS. RIG DOWN MUD PITS, CHOKE SKID, GAS BUSTER. PREP ALL BACK YARD FOR TRANSPORT. LOWER SUB STUCTURE. LOAD OUT CATWALK, CUMMY, TRIP TANK, BULK TANKS, AND WATER TANKS. Total: 24.00 0 0 NIH 6/5/2015 1 0 01 - Rig Up & Tear Down $25,427 $25,427 $6,116,398 Page 1 of 2 Powered by Production Access

Report No: 1 Report Date: 6/5/2015 Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: ON Remarks: NONE Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD-1600 6 12 4450 115 0 0 0 0/0 0/0 0/0 2 FD-1600 6 12 4450 115 0 0 0 0/0 0/0 0/0 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER 1 24.00 New Prospect Company CO MAN 2 24.00 Precision Drilling Rig Crews 11 132.00 Totals 14.00 180.00 Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/4/2015 ISION / ENERGEN / RED S ALL SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - DRILL - CONTRAC 20.950.103 PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $22,500 IDC - DRILL - EQUIPMEN 20.950.105 PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $191 IDC - DRILL - SURFACE 20.950.114 K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $2,736 IDC - DRILL - SURFACE 20.950.114 RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $2,736 IDC - DRILL - SURFACE 20.950.114 TAN MAR HOUSING PACKAGE $650 $2,736 IDC - DRILL - SURFACE 20.950.114 PRIME TIME R/U WATER TANKS $1,250 $2,736 IDC - DRILL - SURFACE 20.950.114 LEOS TRUCKING 2 X FRAC TANKS $60 $2,736 IDC - DRILL - SURFACE 20.950.114 PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $2,736 Total IDC: $25,427 $25,427 Total Cumulative Well Costs: $25,427 $25,427 Lost Time First Aid Med Visit 6/5/2015 1 0 01 - Rig Up & Tear Down $25,427 $25,427 $6,116,398 Page 2 of 2 Powered by Production Access

Report No: 2 Report Date: 6/6/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 2 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIG MOVE. LOAD OUT SUB AND DERRICK AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: 4247536999 AFE DHC: $3,180,125 Days from Spud: -3 Rig Supervisor 1: CODY CHAMBERS 832-314-9929 Daily Costs: $24,177 Field Name: Wellcore Rig Supervisor 2: BENJAMIN DUCOT 318-509-9166 This AFE DHC to Date: $49,604 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER 318-780-1745 This AFE CWC to Date: $49,604 Start Depth(ft): 0 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 0 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $0 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: CONTINUE RIGGING DOWN ELECTRICAL LINES. LOAD OUT BACK YARD AND GEN HOUSES. LOWER DERRICK, REMOVE BOARD, PREP DERRICK FOR TRANSPORT. SPLIT DERRICK. SPLIT SUB STRUCTURE, REMOVE DRAWWORKS, BOP CART, AND SUB STRUCTURE. SET IN PITS, MUD PUMPS, WATER TANK, AND GEN HOUSES. RIGGED DOWN- 100% TRANSPORTED- 85% RIGGED UP- 20% Next Day Operations: TRANSPORT DERRICK AND SUB TO NEW LOCATION. START RIG UP ON NEW WELL. RIG RELEASED FROM UNIVERSITY 21-17 #1R @ 06:00 HRS. ON 6-4-2015. SPUD: XX/XX/2015 @ XX:XX HRS. TOTAL RIG MOVE HRS.: 48 / DAYS: 2 TOTAL HRS. FROM SPUD: ----- TOTAL DAYS TO TD: ----- TOTAL DAYS TO RELEASE: ----- DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY 24-17 #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST. 54-4 #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY 21-17 #1R, ON 6/4/2015. CSI. SAFETY MTG.: SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. DAYS SINCE LAST LTA: 344 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** 20'' CONDUCTOR CSG SET @ XXX' 13 3/8" SURFACE CSG SET @ X,XXX' 9 5/8'' INT. CSG SET @ X,XXX' 7" INT. CSG SET @ XX,XXX' 4.5'' PRO. CASING LINER @ XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling 0.00 0 Rotating 0.00 0 Trips 0.00 0 Circulating 0.00 0 Down 0.00 0 Other 24.00 48 Operations Start Hrs Code Remarks Start Depth End Depth Run 6:00 24.00 01 CONTINUE RIGGING DOWN ELECTRICAL LINES. LOAD OUT BACK YARD AND GEN HOUSES. LOWER DERRICK, REMOVE BOARD, PREP DERRICK FOR TRANSPORT. SPLIT DERRICK. SPLIT SUB STRUCTURE, REMOVE DRAWWORKS, BOP CART, AND SUB STRUCTURE. SET IN PITS, MUD PUMPS, WATER TANK, AND GEN HOUSES. Total: 24.00 Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: ON Remarks: NONE 0 0 NIH 6/6/2015 2 0 01 - Rig Up & Tear Down $24,177 $49,604 $6,116,398 Page 1 of 2 Powered by Production Access

Report No: 2 Report Date: 6/6/2015 Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD-1600 6 12 4450 115 0 0 0 0/0 0/0 0/0 2 FD-1600 6 12 4450 115 0 0 0 0/0 0/0 0/0 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER 1 24.00 New Prospect Company CO MAN 2 24.00 Precision Drilling Rig Crews 11 132.00 Totals 14.00 180.00 Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/6/2015 / ENERGEN / RED STONE ALL RIG PERSONEL SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - DRILL - CONTRAC 20.950.103 PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $45,000 IDC - DRILL - EQUIPMEN 20.950.105 PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $382 IDC - DRILL - SURFACE 20.950.114 K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $4,222 IDC - DRILL - SURFACE 20.950.114 LEOS TRUCKING 2 X FRAC TANKS $60 $4,222 IDC - DRILL - SURFACE 20.950.114 PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $4,222 IDC - DRILL - SURFACE 20.950.114 RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $4,222 IDC - DRILL - SURFACE 20.950.114 TAN MAR HOUSING PACKAGE $650 $4,222 Total IDC: $24,177 $49,604 Total Cumulative Well Costs: $24,177 $49,604 Lost Time First Aid Med Visit 6/6/2015 2 0 01 - Rig Up & Tear Down $24,177 $49,604 $6,116,398 Page 2 of 2 Powered by Production Access

Report No: 3 Report Date: 6/7/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 3 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING UP DERRICK AND GROUND AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: 4247536999 AFE DHC: $3,180,125 Days from Spud: -2 Rig Supervisor 1: CODY CHAMBERS 832-314-9929 Daily Costs: $28,377 Field Name: Wellcore Rig Supervisor 2: BENJAMIN DUCOT 318-509-9166 This AFE DHC to Date: $77,981 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER 318-780-1745 This AFE CWC to Date: $77,981 Start Depth(ft): 0 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 0 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $0 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: LOAD OUT SUB STRUCTURE, RIG MATS, AND DERRICK. SET IN RIG MATS. SET IN SUB AND CENTER OVER HOLE. INSTALL CENTER STEEL AND DRAWORKS. REMOVE TDS AND REPLACE ROLLERS. PIN DERRICK TO SUB AND SET ON HEADACHE RACK. SET IN BOP WRANGLER AND CATWALK. INSTALL BOARD. ATTACH HYDRAULIC CYLINDERS TO DERRICK. RIG UP ELECTRICAL LINES AND PITS. RIG UP DIESEL LINES TO GEN HOUSES. RIGGED DOWN- 100% TRANSPORTED- 100% RIGGED UP- 40% Next Day Operations: CONTINUE RIGGING UP GROUND. RAISE DERRICK AND SUB STRUCTURE. RIG UP FLOOR AND PREP FOR SPUD IN. RIG RELEASED FROM UNIVERSITY 21-17 #1R @ 06:00 HRS. ON 6-4-2015. SPUD: XX/XX/2015 @ XX:XX HRS. TOTAL RIG MOVE HRS.: 72 / DAYS: 3 TOTAL HRS. FROM SPUD: ----- TOTAL DAYS TO TD: ----- TOTAL DAYS TO RELEASE: ----- DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY 24-17 #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST. 54-4 #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY 21-17 #1R, ON 6/4/2015. CSI. SAFETY MTG.: SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. DAYS SINCE LAST LTA: 344 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** 20'' CONDUCTOR CSG SET @ XXX' 13 3/8" SURFACE CSG SET @ X,XXX' 9 5/8'' INT. CSG SET @ X,XXX' 7" INT. CSG SET @ XX,XXX' 4.5'' PRO. CASING LINER @ XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Hours Summary ( Daily / Cumulative ) Drilling 0.00 0 Rotating 0.00 0 Trips 0.00 0 Circulating 0.00 0 Down 0.00 0 Other 24.00 72 Operations Start Hrs Code Remarks Start Depth End Depth Run 6:00 24.00 01 LOAD OUT SUB STRUCTURE, RIG MATS, AND DERRICK. SET IN RIG MATS. SET IN SUB AND CENTER OVER HOLE. INSTALL CENTER STEAL AND DRAWORKS. REMOVE TDS AND REPLACE ROLLERS. PIN DERRICK TO SUB AND SET ON HEADACHE RACK. SET IN BOP WRANGLER AND CATWALK. INSTALL BOARD. ATTACH HYDRAULIC CYLINDERS TO DERRICK. RIG UP ELECTRICAL LINES AND PITS. RIG UP DIESEL LINES TO GEN HOUSES. Total: 24.00 0 0 NIH 6/7/2015 3 0 01 - Rig Up & Tear Down $28,377 $77,981 $6,116,398 Page 1 of 2 Powered by Production Access

Report No: 3 Report Date: 6/7/2015 Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: ON Remarks: NONE Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD-1600 6 12 4450 115 0 0 0 0/0 0/0 0/0 2 FD-1600 6 12 4450 115 0 0 0 0/0 0/0 0/0 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER 1 24.00 New Prospect Company CO MAN 2 24.00 Precision Drilling Rig Crews 11 132.00 Totals 14.00 180.00 Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/7/2015 / ENERGEN / RED RIVER T ALL RIG PERSONEL SAFETY MEETINGS & JSA'S COVERING RIG WITH 3RD PARTY EQUIPMENT, OVERHEAD LOADS, & USE OF TAG LINES. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - DRILL - CONTRAC 20.950.103 PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $67,500 IDC - DRILL - EQUIPMEN 20.950.105 PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $573 IDC - DRILL - SURFACE 20.950.114 TAN MAR HOUSING PACKAGE $650 $9,908 IDC - DRILL - SURFACE 20.950.114 PRIME TIME WATER S RIG UP WATER TANKS FOR $4,200 $9,908 IDC - DRILL - SURFACE 20.950.114 K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $9,908 IDC - DRILL - SURFACE 20.950.114 LEOS TRUCKING 2 X FRAC TANKS $60 $9,908 IDC - DRILL - SURFACE 20.950.114 PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $9,908 IDC - DRILL - SURFACE 20.950.114 RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $9,908 Total IDC: $28,377 $77,981 Total Cumulative Well Costs: $28,377 $77,981 Lost Time First Aid Med Visit 6/7/2015 3 0 01 - Rig Up & Tear Down $28,377 $77,981 $6,116,398 Page 2 of 2 Powered by Production Access

Report No: 4 Report Date: 6/8/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 4 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING UP GROUND AND FLOOR AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: 4247536999 AFE DHC: $3,180,125 Days from Spud: -1 Rig Supervisor 1: CODY CHAMBERS 832-314-9929 Daily Costs: $38,765 Field Name: Wellcore Rig Supervisor 2: BENJAMIN DUCOT 318-509-9166 This AFE DHC to Date: $116,746 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER 318-780-1745 This AFE CWC to Date: $116,746 Start Depth(ft): 0 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 0 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $0 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $0 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: RE-POSITION TOP DRIVE TRACK. PREP DERRICK TO BE RAISED. PERFORM HYDRAULIC CYLINDER BLEED OFF PROCEDURE. RAISE DERRICK AND PIN. UN-PIN HYDRAULIC CYLINDERS FROM DERRICK AND RE- POSITION TO SUB STRUCTURE. RIG UP WIRE TREY AND RUN ELECTRICAL LINES TO RIG FLOOR. RIG UP STAND PIPE. RIG UP SUB AND PREP TO RAISE SUB STRUCTURE. PERFORM BLEED OFF PROCEDURE TO SUBS HYDRAULIC CYLINDERS. RAISE AND PIN SUB STRUCTURE. INSTALL FLOWLINE AND RIG UP CATWALK AND V-DOOR. RIG UP PIPE WRANGLER. RIG UP MISC. ON GROUND AND PITS. UN-HANG BLOCKS AND PIN TO TOP DRIVE. RIG UP MISC. ON RIG FLOOR. HANG TONGS, RIG UP ST-80,... ETC. TRANSPORTED- 100% RIGGED UP- 80% Next Day Operations: CONTINUE RIGGING UP GROUND AND FLOOR. INSTALL CONDUCTOR. PREP BHA AND MAKE UP BHA #1. SPUD IN WELL RIG RELEASED FROM UNIVERSITY 21-17 #1R @ 06:00 HRS. ON 6-4-2015. SPUD: XX/XX/2015 @ XX:XX HRS. TOTAL RIG MOVE HRS.: 96 / DAYS: 4 TOTAL HRS. FROM SPUD: ----- TOTAL DAYS TO TD: ----- TOTAL DAYS TO RELEASE: ----- DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY 24-17 #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST. 54-4 #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY 21-17 #1R, ON 6/4/2015. CSI. SAFETY MTG.:SAFETY MEETING ON RAISING DERRICK AND SUB. JSA ON HEAVY LIFTING AND OVERHEAD LOADS. DAYS SINCE LAST LTA: 345 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** 20'' CONDUCTOR CSG SET @ XXX' 13 3/8" SURFACE CSG SET @ X,XXX' 9 5/8'' INT. CSG SET @ X,XXX' 7" INT. CSG SET @ XX,XXX' 4.5'' PRO. CASING LINER @ XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 6/8/2015 27.50 1440.18 13.375 54.50 J-55 12.615 17.500 1440.00 10.00 1 0 600 86 0 Circulated No.1 Spacer, 20, 0, FRESH WATER,, 0, 0 No.2 Tail, 0, 1315, 4% GEL + 1/4#/SK CELLO FLAKE + 5% SALT +.004 GPS CF-41L, Class C, 1.79, 13.5 No.3 Displacement, 216, 0, FRESH WATER,, 0, 0 Last BOP Test: Last BOP Drill Date: Casing BOP Test and Inspection Dates Days Since BOP Tested: BOP Test Due: Last Inspection: 6/8/2015 4 0 01 - Rig Up & Tear Down $38,765 $116,746 $6,116,398 Page 1 of 2 Powered by Production Access

Report No: 4 Report Date: 6/8/2015 Hours Summary ( Daily / Cumulative ) Drilling 0.00 0 Rotating 0.00 0 Trips 0.00 0 Circulating 0.00 0 Down 0.00 0 Other 24.00 96 Operations Start Hrs Code Remarks Start Depth End Depth Run 6:00 24.00 01 RE-POSITION TOP DRIVE TRACK. PREP DERRICK TO BE RAISED. PERFORM HYDRAULIC CYLINDER BLEED OFF PROCEDURE. RAISE DERRICK AND PIN. UN-PIN HYDRAULIC CYLINDERS FROM DERRICK AND RE-POSITION TO SUB STRUCTURE. RIG UP WIRE TREY AND RUN ELECTRICAL LINES TO RIG FLOOR. RIG UP STAND PIPE. RIG UP SUB AND PREP TO RAISE SUB STRUCTURE. PERFORM BLEED OFF PROCEDURE TO SUBS HYDRAULIC CYLINDERS. RAISE AND PIN SUB STRUCTURE. INSTALL FLOWLINE AND RIG UP CATWALK AND V-DOOR. RIG UP PIPE WRANGLER. RIG UP MISC. ON GROUND AND PITS. UN-HANG BLOCKS AND PIN TO TOP DRIVE. RIG UP MISC. ON RIG FLOOR. HANG TONGS, RIG UP ST-80,... ETC. Total: 24.00 Drilling Data Hook Load: 0 Pick Up: 0 Slack Off: 0 Over Pull: 0 ROP: 0.00 Pres on Bot: 0 Press Off Bot: 0 Kickoff Depth: 0 WOB: Rotary RPM: 0 Motor RPM: 0 Torque: 0 BHA Hours: 0.00 Crew Status: ON Remarks: NONE Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 1 1 6/8/2015 17 1/2 Ulterra U616S 25697 0 1440 1310 1310 14.00 14.00 93.6 0 0 Date Out 6/9/2015 Jets 14 / 14 / 14 / 14 / 14 / 14 / 14 / 14 TFA 1.20 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / A / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 9.675 IMPACT 6/7 5.0 1.5 ADJ.13 RPG 383 383 6 6.0 644 84 Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter 1 1.50 17.500 0.000 1.50 ULTERRA U616S S/N: 25697 9x14's TFA: 1.352 Motor - steerable 1 30.75 9.675 0.000 32.25BEND // 17" STAB. // MAX DIFF. 1182 // GPM: 600 / 1 Stab - Undergauge 1 8.03 8.487 2.872 40.28 17" NM IBS S/N: 5016 Sub - Orienting 1 5.60 8.000 3.250 45.88 HANG OFF SUB S/N: 1179945 Monel 1 30.89 8.000 2.987 76.77 NMDC S/N: AWS800-30-5086 Sub - Shock 1 11.74 7.875 2.872 88.51 8" SHOCK SUB S/N: SD900154 Sub - XO 1 3.21 7.875 2.872 91.72 X-O SUB 6 5/8 REG x 4 1/2 XH S/N: 1305 Drill collar 12 365.79 6.500 2.875 457.51 6.5" DRILL COLLARS Sub - XO 1 3.39 6.500 2.750 460.90 X-O SUB 4 1/2 XH x 4 1/2 IF S/N: 5120 HWDP 9 278.04 5.000 3.000 738.94 5" HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD-1600 6 12 4450 115 0 0 0 0/0 0/0 0/0 2 FD-1600 6 12 4450 115 0 0 0 0/0 0/0 0/0 Inventory Item Units Beg Inv Received Used Lost Transfrd End Inv Diesel gal 0 7000 0 0 0 7000 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER 1 24.00 New Prospect Company CO MAN 2 24.00 Precision Drilling Rig Crews 11 132.00 Totals 14.00 180.00 Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/7/2015 PRECISION/ENERGEN/RED STONE TRANSPORT ALL RIG PERSONEL SAFETY MEETING ON RAISING DERRICK AND SUB. JSA ON HEAVY LIFTING AND OVERHEAD LOADS. Drilling 6/8/2015 ENERGEN NOTIFY TRRC OF INTENT TO SPUD AND SET SURFACE CASING @ 15:00 HRS. 6-8-2015 JOB # 8028. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - DRILL - CONTRAC 20.950.103 PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $90,000 IDC - DRILL - EQUIPMEN 20.950.105 PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $764 IDC - DRILL - FUEL 20.950.106 Blue Streak Transportati DELIVER 7000 GAL OFF ROA $14,588 $14,588 IDC - DRILL - SURFACE 20.950.114 LEOS TRUCKING 2 X FRAC TANKS $60 $11,394 IDC - DRILL - SURFACE 20.950.114 K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $11,394 IDC - DRILL - SURFACE 20.950.114 TAN MAR HOUSING PACKAGE $650 $11,394 IDC - DRILL - SURFACE 20.950.114 RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $11,394 IDC - DRILL - SURFACE 20.950.114 PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $11,394 Total IDC: $38,765 $116,746 Total Cumulative Well Costs: $38,765 $116,746 0 0 Lost Time First Aid NIH Med Visit 6/8/2015 4 0 01 - Rig Up & Tear Down $38,765 $116,746 $6,116,398 Page 2 of 2 Powered by Production Access

Report No: 5 Report Date: 6/9/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 5 Rpt T. Activity: 02 - Drilling AFE #: PBE1510032 Operation Desc: DRILLING AHEAD IN 17 1/2" SURFACE HOLE @ 513' AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: 4247536999 AFE DHC: $3,180,125 Days from Spud: 1 Rig Supervisor 1: MICHAEL MCCART 940-366-6615 Daily Costs: $357,373 Field Name: Wellcore Rig Supervisor 2: CODY CHAMBERS 832-314-9929 This AFE DHC to Date: $474,119 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER 318-780-1745 This AFE CWC to Date: $474,119 Start Depth(ft): 130 Formation: Surface Total Project Costs: $3,400,564 Ending Depth(ft): 513 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 513 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $9,927 Rig Company: Precision Drilling 24 Hr. Footage: 383 Develop To: 0 Cum Mud Costs: $9,927 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: CONTINUE RIGGING UP GROUND AND FLOOR. PICK UP AND MAKE UP BHA #1 AND BIT #1. SPUD IN WELL @ 00:00 ON 6-9-2015. DRILL AHEAD IN 17 1/2" SURFACE SECTION F/ 130' T/ 513' 24 HOUR FOOTAGE: 383 AVG ROP: 64 FPH Next Day Operations: DRILL AHEAD IN 17 1/2" SURFACE HOLE TO TD. POOH AND LAY DOWN BHA #1. RUN 13 3/8" CASING. CEMENT 13 3/8" CASING RIG RELEASED FROM UNIVERSITY 21-17 #1R @ 06:00 HRS. ON 6-4-2015. SPUD: 06/09/2015 @ 00:00 HRS. TOTAL RIG MOVE HRS.: 106 / DAYS: 4.42 TOTAL HRS. FROM SPUD: 6 TOTAL DAYS TO TD: ----- TOTAL DAYS TO RELEASE: ----- DOWNTIME HRS.: 0.0 TODAY / 0.0 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 0% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY 24-17 #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST. 54-4 #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY 21-17 #1R, ON 6/4/2015. CSI. SAFETY MTG: RIGGING UP TOP DRIVE SYSTEM. LOCK OUT / TAG OUT. JSA'S ON PICKING UP COLLARS, PROPER LIFTING TECHINQUE DAYS SINCE LAST LTA: 346 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: NONE FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** BHA #1 17 ½" ULTERRA U616S BIT // 9 5/8" 6/7 5.0 STAGE ADJUSTABLE BEND 1.5 W/ 17" STABILIZER // 17" STEEL IBS // 8" NMDC // 8" HANG-OFF SUB // 8" NMDC // 8" SHOCK SUB // X-O SUB 6 5/8 REG x 4 ½ XH // 12 x 6 ½" DRILL COLLARS // X-O SUB 4 ½ XH x 4 ½ IF // 9 x HWDP ( DRILLING HOURS: 6 // CIRC HOURS: O ) 20'' CONDUCTOR CSG SET @ XXX' 13 3/8" SURFACE CSG SET @ X,XXX' 9 5/8'' INT. CSG SET @ X,XXX' 7" INT. CSG SET @ XX,XXX' 4.5'' PRO. CASING LINER @ XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: TRRC: NOTIFY TRRC OF INTENT TO SPUD @ 15:00 HRS 6-8-2015 Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 1 6/9/2015 275 0.35 122.91 0.00 275.00-0.46-0.46 0.71 0.13 Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 6/8/2015 27.50 1440.18 13.375 54.50 J-55 12.615 17.500 1440.00 10.00 1 0 600 86 0 Circulated No.1 Spacer, 20, 0, FRESH WATER,, 0, 0 No.2 Tail, 0, 1315, 4% GEL + 1/4#/SK CELLO FLAKE + 5% SALT +.004 GPS CF-41L, Class C, 1.79, 13.5 No.3 Displacement, 216, 0, FRESH WATER,, 0, 0 6/9/2015 5 513 02 - Drilling 8.4 $357,373 $474,119 $6,116,398 Page 1 of 3 Powered by Production Access

Report No: 5 Report Date: 6/9/2015 BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand 130 23:00 8.40 8.40 39 5 10 3/5/7 100.0 0.0 0 0.00 4.0% 96.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost 0.0 10.00 0.70 0.20 0.40 20000 320 0 0.00 0.13 320 0 0.00 0 Water Lost LCM ECD FL Temp Remarks 0 0.0 0.0 Hours Summary ( Daily / Cumulative ) Drilling 6.00 6 Rotating 6.00 6 Trips 4.00 4 Circulating 0.00 0 Down 0.00 0 Other 14.00 110 Operations Start Hrs Code Remarks Start Depth End Depth Run 6:00 10.00 01 RIG UP MISC GROUND RUN PVC FROM STEEL PITS TO RESERVE. HOOK UP 0 0 NIH REMAINIG ELECTRICAL LINES. HOOK UP VIBRATING HOSES TO PUMPS AND TANKS. RIG UP SHAKER SCREENS AND SHAKER SLIDE. RIG UP MISC FLOOR HOOK UP SERVICE LOOP TO TDS RUN DIAGNOSTICS ON TDS ELECTRICAL SYSTEM. INSTALL BELLS AND ELEVATORS. PICK UP 5" HANDLEING TOOLS. INSTALL 4 1/2" IF SAVER SUB AND 5" DIE BLOCKS. HOOK UP LINK TILTS TO BELLS. INSTALL MOUSEHOLE. LOAD RACKS AND STAGE BHA. 16:00 4.00 14 INSTALL 20" CONDUCTOR AND NIPPLE UP SAME. INSTALL FLOWLINE AND FILL UP 0 0 NIH LINE. HOOK UP TURNBUCKLES AND CENTER 20" CONDUCTOR 20:00 4.00 06 PICK UP AND MAKE UP BHA #1. SCRIBE MOTOR AND TEST MWD 0 0 1 0:00 6.00 02 SPUD IN WELL. DRILL F/ 130' T/ 513' ( 383' @ 64 FPH ) WOB: 20K RPM: 65 GPM: 650 MM RPM: 84 TOTAL RPM: 149 MUD WT: 8.4 VIS: 39. Total: 24.00 Drilling Data Hook Load: 88000 Pick Up: 90000 Slack Off: 83000 Over Pull: 2000 ROP: 63.83 Pres on Bot: 1250 Press Off Bot: 1500 Kickoff Depth: 0 WOB: 20 Rotary RPM: 65 Motor RPM: 84 Torque: 8000 BHA Hours: 6.00 Crew Status: ON Remarks: NONE Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 1 1 6/8/2015 17 1/2 Ulterra U616S 25697 0 1440 1310 1310 14.00 14.00 93.6 0 0 Date Out 6/9/2015 Jets 14 / 14 / 14 / 14 / 14 / 14 / 14 / 14 TFA 1.20 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / A / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 9.675 IMPACT 6/7 5.0 1.5 ADJ.13 RPG 383 383 6 6.0 644 84 Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter 1 1.50 17.500 0.000 1.50 ULTERRA U616S S/N: 25697 9x14's TFA: 1.352 Motor - steerable IMPACT 1 30.75 9 7/8" 7/89.675 // 5.0 STAGE 0.000 // ADJ. 32.25 1.5 BEND // 17" STAB. // MAX DIFF. 1182 // GPM: 600 / 1200 // MA Stab - Undergauge 1 8.03 8.487 2.872 40.28 17" NM IBS S/N: 5016 Sub - Orienting 1 5.60 8.000 3.250 45.88 HANG OFF SUB S/N: 1179945 Monel 1 30.89 8.000 2.987 76.77 NMDC S/N: AWS800-30-5086 Sub - Shock 1 11.74 7.875 2.872 88.51 8" SHOCK SUB S/N: SD900154 Sub - XO 1 3.21 7.875 2.872 91.72 X-O SUB 6 5/8 REG x 4 1/2 XH S/N: 1305 Drill collar 12 365.79 6.500 2.875 457.51 6.5" DRILL COLLARS Sub - XO 1 3.39 6.500 2.750 460.90 X-O SUB 4 1/2 XH x 4 1/2 IF S/N: 5120 HWDP 9 278.04 5.000 3.000 738.94 5" HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD-1600 6 12 4450 115 77 322 1500 0/0 0/0 0/0 2 FD-1600 6 12 4450 115 77 322 1500 0/0 0/0 0/0 Inventory Item Units Beg Inv Received Used Lost Transfrd End Inv Diesel gal 7000 2000 722 0 0 8278 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER 1 24.00 New Prospect Company CO MAN 2 24.00 Precision Drilling Rig Crews 11 132.00 Totals 14.00 180.00 Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/8/2015 PRECISION / ENERGEN ALL RIG PERSONEL RIGGING UP TOP DRIVE SYSTEM. LOCK OUT / TAG OUT. JSA'S ON PICKING UP COLLARS, PROPER LIFTING TECHINQUE 130 513 Lost Time First Aid 1 Med Visit 6/9/2015 5 513 02 - Drilling 8.4 $357,373 $474,119 $6,116,398 Page 2 of 3 Powered by Production Access

Report No: 5 Report Date: 6/9/2015 Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - ROAD & SITE CON 20.950.030 Unknown ROADS AND LOCATION / PIT $175,000 $175,000 IDC - INSURANCE & BO 20.950.070 Various INS AND BOND CONTINGEN $10,000 $10,000 IDC - PERMITS SURVEY 20.950.080 Various PERMITS AND SURVEYS CO $45,000 $45,000 IDC - DRILL - CONTRAC 20.950.103 PRECISION DRILLING RIG & CREWS MOBILIZATION $22,500 $112,500 IDC - DRILL - EQUIPMEN 20.950.105 PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $955 IDC - DRILL - FUEL 20.950.106 $14,588 IDC - DRILL - EQUIPMEN 20.950.107 TOM-E-LEE TRUCKING DELIVER DIRECTIONAL TOO $1,126 $2,014 IDC - DRILL - EQUIPMEN 20.950.107 RAM ROD TRUCKING, I DELIVER MWD TOOLS TO LO $444 $2,014 IDC - DRILL - EQUIPMEN 20.950.107 RAM ROD TRUCKING, I DELIVER MWD TRAILER TO L $444 $2,014 IDC - DRILL - DIRECTIO 20.950.109 PREMIER DIRECTIONA DAILY DIRECTIONAL COSTS $16,255 $16,255 IDC - DRILL - MOBDEMO 20.950.111 RED STONE OPERATI RIG MOVE TO UNIVERSITY 4 $75,000 $75,000 IDC - DRILL - SURFACE 20.950.114 K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $12,880 IDC - DRILL - SURFACE 20.950.114 LEOS TRUCKING 2 X FRAC TANKS $60 $12,880 IDC - DRILL - SURFACE 20.950.114 PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $12,880 IDC - DRILL - SURFACE 20.950.114 TAN MAR HOUSING PACKAGE $650 $12,880 IDC - DRILL - SURFACE 20.950.114 RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $12,880 Total IDC: $347,446 $474,119 Total Cumulative Well Costs: $347,446 $474,119 6/9/2015 5 513 02 - Drilling 8.4 $357,373 $474,119 $6,116,398 Page 3 of 3 Powered by Production Access

Report No: 6 Report Date: 6/10/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 6 Rpt T. Activity: 12 - Run Casing & Cement AFE #: PBE1510032 Operation Desc: WAIT ON CEMENT AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: 4247536999 AFE DHC: $3,180,125 Days from Spud: 2 Rig Supervisor 1: MICHAEL MCCART 940-366-6615 Daily Costs: $96,361 Field Name: Wellcore Rig Supervisor 2: CODY CHAMBERS 832-314-9929 This AFE DHC to Date: $570,480 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER 318-780-1745 This AFE CWC to Date: $570,480 Start Depth(ft): 513 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 1440 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $9,927 Rig Company: Precision Drilling 24 Hr. Footage: 927 Develop To: 0 Cum Mud Costs: $19,854 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: DRILL AHEAD IN 17 1/2" HOLE SECTION F/ 513' T/ 1440'. CIRCULATE HOLE CLEAN AND POOH FOR 13 3/8" CASING RUN. RIG UP CASING CREW AND RUN 35 JOINTS OF 13 3/8" CASING. RIG UP CEMENTERS AND CEMENT 13 3/8" CASING. RIG DOWN CEMENTERS. TOTAL 24 HOUR FOOTAGE: 927 AVG ROP: 116 Next Day Operations: INSTALL WELLHEAD. NIPPLE UP BOP'S / TEST BOP'S. MAKE UP BHA #2 AND DRILL AHEAD IN 12 1/4" HOLE SECTION. RIG RELEASED FROM UNIVERSITY 21-17 #1R @ 06:00 HRS. ON 6-4-2015. SPUD: 06/09/2015 @ 00:00 HRS. TOTAL RIG MOVE HRS.: 106 / DAYS: 4.42 TOTAL HRS. FROM SPUD: 30 TOTAL DAYS TO TD: ----- TOTAL DAYS TO RELEASE: ----- DOWNTIME HRS.: 1 TODAY / 1 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 1% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY 24-17 #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST. 54-4 #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY 21-17 #1R, ON 6/4/2015. CSI. SAFETY MTG:JSA'S & SAFETY MEETINGS OVER, MAKING CONNECTIONS, MIXING CHEMICALS, DAILY HOUSEKEEPING, SETTING PULLING SLIPS. DAYS SINCE LAST LTA: 347 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: 0 FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** BHA #1 17 ½" ULTERRA U616S BIT // 9 5/8" 6/7 5.0 STAGE ADJUSTABLE BEND 1.5 W/ 17" STABILIZER // 17" STEEL IBS // 8" NMDC // 8" HANG-OFF SUB // 8" NMDC // 8" SHOCK SUB // X-O SUB 6 5/8 REG x 4 ½ XH // 12 x 6 ½" DRILL COLLARS // X-O SUB 4 ½ XH x 4 ½ IF // 9 x HWDP ( DRILLING HOURS: 14 // CIRC HOURS: 3 TOTAL HOURS: 17 ) REASON PULLED: SURFACE CASING POINT BIT GRADE: 1/1 20'' CONDUCTOR CSG SET @ 130' 13 3/8" SURFACE CSG SET @ 1,440' WEATHERFORD FLOAT SHOE @ 1,440.18' 1 JOINT 13 3/8" 54.5# J-55 BTC CASING WEATHERFORD FLOAT COLLAR @ 1,397.43' 34 JOINTS 13 3/8" 54.5# J-55 BTC CASING TOTAL CENTRALIZERS: 12 1 CENTRALIZER ON FIRST JOINT @ 1,415' 1 CENTRALIZER EVERY 3RD JOINT TO 77' 9 5/8'' INT. CSG SET @ X,XXX' 7" INT. CSG SET @ XX,XXX' 4.5'' PRO. CASING LINER @ XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: DEPTH: 1,375' INC:.73 AZM: 281.29 TRRC: NOTIFY TRRC OF INTENT TO SPUD AND SURFACE CASING @ 15:00 HRS 6-8-2015 6/10/2015 6 1440 12 - Run Casing & Cement 9.4 $96,361 $570,480 $6,116,398 Page 1 of 4 Powered by Production Access

Report No: 6 Report Date: 6/10/2015 Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 2 6/10/2015 517 0.38 193.71 0.00 516.99-1.64-1.64 1.14 0.18 3 6/10/2015 972 0.40 312.50 0.00 971.98-2.03-2.03-0.39 0.15 4 6/10/2015 1375 0.73 281.29 0.00 1374.96-0.58-0.58-3.95 0.11 Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 6/8/2015 27.50 1440.18 13.375 54.50 J-55 12.615 17.500 1440.00 10.00 1 0 600 86 0 Circulated No.1 Spacer, 20, 0, FRESH WATER,, 0, 0 No.2 Tail, 0, 1315, 4% GEL + 1/4#/SK CELLO FLAKE + 5% SALT +.004 GPS CF-41L, Class C, 1.79, 13.5 No.3 Displacement, 216, 0, FRESH WATER,, 0, 0 BOP Test and Inspection Dates Last BOP Test: Days Since BOP Tested: Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand 1440 23:00 9.40 9.40 38 5 10 3/5/7 100.0 0.0 0 0.00 4.0% 96.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost 0.0 10.00 0.70 0.20 0.40 45000 900 0 0.00 0.13 320 0 0.00 0 Water Lost LCM ECD FL Temp Remarks 0 0.0 0.0 Hours Summary ( Daily / Cumulative ) Drilling 8.00 14 Rotating 8.00 14 Trips 4.00 8 Circulating 2.50 3 Down 1.00 1 Other 8.50 119 Operations Start Hrs Code Remarks Start Depth End Depth Run 6:00 8.00 02 ROT & SLIDE DRILL 17 ½ SURFACE HOLE F/ 513' T/ 1,440' ( 927 @ 116 FPH) // WOB: 10-20K // GPM: 630 // SPM: 150 // SPP: 1,725 // RPM: 60 // MOTOR RPM: 91 // TOTAL RPM: 151 // DIFF. PSI: 150-275 513 1440 1 **** CONTROL DRILLING @ 300 FPH**** 14:00 1.50 05 ROT & RECIPROCATE @ 100 FPM PUMPING 650 GPM, 90 RPM, PUMP FIRST HIGH VIS SWEEP (90 VIS) 80 BBLS, SWEEP BACK TO SURFACE WITH 100% COVERAGE, MIX & PUMP SECOND HIGH VIS SWEEP (90 VIS) 60 BBLS, AND CIRCULATE OUT WITH 10-15% COVERAGE HOLE CLEAN. CALC. 6% EXCESS WASH OUT, 1440 1440 1 **TUBULAR COUNT CORRECT IN HOLE VS. OUT** 15:30 1.50 06 TOOH TO RUN 13 3/8 CASING F/ 1,440' - T/ 95', (SLM) MONITORING DISPLACEMENT T/F TRIP TANK HOLE TAKING CORRECT DISP. 1440 1440 1 **NO OVERPULL OR TIGHT SPOT SEEN** 17:00 2.00 06 L/D MONELS, UBHO, STAB, MTR. & BIT, BIT GRADE 2/1, CLEAR RIG FLOOR FOR 1440 1440 1 CASING RUNNING. 19:00 1.00 08 TROUBLESHOOT AND REPAIR PIPE WRANGLER 1440 1440 NIH 20:00 0.50 06 LAY DOWN 9 5/8" MOTOR 1440 1440 NIH 20:30 0.50 12 HOLD PJSM AND RIG UP BUTCH'S CASING CREW 1440 1440 NIH 21:00 5.00 12 MAKE UP SHOE TRACK AND RUN 35 TOTAL JOINTS OF 13 3/8' 54.5# J-55 BTC CASING 1440 1440 NIH // 13 3/8" SURFACE CSG SET @ 1,440' WEATHERFORD FLOAT SHOE @ 1,440.18' 1 JOINT 13 3/8" 54.5# J-55 BTC CASING WEATHERFORD FLOAT COLLAR @ 1,397.43' 34 JOINTS 13 3/8" 54.5# J-55 BTC CASING TOTAL CENTRALIZERS: 12 1 CENTRALIZER ON FIRST JOINT @ 1,415' 1 CENTRALIZER EVERY 3RD JOINT TO 77' 2:00 1.00 05 CIRCULATE CASING 2X CAPACITY 1440 1440 NIH 3:00 0.50 12 HOLD PJSM AND RIG UP O-TEX CEMENTERS 1440 1440 NIH 3:30 2.00 12 SWITCH OVER TO O-TEX, CEMENT SURFACE CASING AS FOLLOWS: PRESSURE TEST 1440 1440 NIH LINES TO 2000 PSI. TEST GOOD. PUMP 20 BBL FRESH WATER SPACER. THEN PUMP LEAD SLURRY- 1315 SACKS OF 12.8 PPG 35:65 CLASS C + 6% GEL + 3% SALT + ¼#/SK CELLOFLAKE + CASING. INSTALL CAP. KICK OUT PLUG WITH 10 BBLS FRESHWATER, PUMPED 216 BBLS DISPLACE WITH FRESH WATER DISPLACEMENT. SLOWED 10 BBLS BEFORE END OF DISPLACEMENT AND BUMPED PLUG @ 600 PSI OVER PSI TO 1300. HOLD PRESSURE 2 MINUTES. BLED OFF. BLED BACK 1 BBLS. FLOAT HOLDING FULL CIRCULATION THROUGHOUT CEMENT JOB, CIRCULATED 488 SX (156 BBLS) GOOD CEMENT BACK TO SURFACE. 5:30 0.50 12 RIG DOWN CEMENTERS / WAIT ON CEMENT 1440 1440 NIH Total: 24.00 6/10/2015 6 1440 12 - Run Casing & Cement 9.4 $96,361 $570,480 $6,116,398 Page 2 of 4 Powered by Production Access

Report No: 6 Report Date: 6/10/2015 Drilling Data Hook Load: 88000 Pick Up: 90000 Slack Off: 83000 Over Pull: 2000 ROP: 115.88 Pres on Bot: 1250 Press Off Bot: 1500 Kickoff Depth: 0 WOB: 20 Rotary RPM: 65 Motor RPM: 84 Torque: 8000 BHA Hours: 0.00 Crew Status: ON Remarks: NONE Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 1 1 6/8/2015 17 1/2 Ulterra U616S 25697 0 1440 1310 1310 14.00 14.00 93.6 0 0 Date Out 6/9/2015 Jets 14 / 14 / 14 / 14 / 14 / 14 / 14 / 14 TFA 1.20 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / A / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 1 9.675 IMPACT 6/7 5.0 1.5 ADJ.13 RPG 383 383 6 6.0 644 84 BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 2 2 6/10/2015 12 1/4 Ulterra U616M 29421 1440 4910 3470 3470 34.50 34.50 100.6 0 0 Date Out 6/13/2015 Jets 18 / 18 / 18 / 16 / 16 / 16 / 0 / 0 TFA 1.35 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / N / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 2 7.75 NOV 6/7 4.0 1.5 ADJ.15 RPG 1876 1876 15.5 15.5 754 113 Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter 1 1.00 12.250 0.000 1.00 12 1/4" ULTERRA PDC BIT. Motor - steerable 1 29.90 7.750 0.000 30.90 6/7 4.0 1.5 ADJ.15 RPG MOTOR. Stab - Undergauge 1 6.48 8.250 2.872 37.38 12 1/8" IBS Monel 1 30.82 8.000 2.987 68.20 NMDC Sub - Orienting 1 5.60 8.000 3.250 73.80 UBHO Monel 1 30.89 8.000 3.250 104.69 NMDC Sub - Shock 1 11.74 7.875 2.872 116.43 SD SHOCK SUB. Sub - XO 1 3.21 7.875 2.872 119.64 XO Drill collar 12 365.79 6.500 2.875 485.43 6.5" D.C'S Sub - XO 1 3.39 6.500 2.750 488.82 XO HWDP 9 278.04 5.000 3.000 766.86 5" HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD-1600 6 12 4450 115 77 322 1500 0/0 0/0 0/0 2 FD-1600 6 12 4450 115 77 322 1500 0/0 0/0 0/0 Inventory Item Units Beg Inv Received Used Lost Transfrd End Inv Diesel gal 8278 0 1481 0 0 6797 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER 1 24.00 New Prospect Company CO MAN 2 24.00 Precision Drilling Rig Crews 11 132.00 Totals 14.00 180.00 Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/9/2015 PRECISION, PREMIER, ENERGEN, ANCHOR ALL PERSONAL ONSITE. JSA'S & SAFETY MEETINGS OVER, MAKING CONNECTIONS, MIXING CHEMICALS, DAILY HOUSEKEEPING, SETTING PULLING SLIPS. Lost Time First Aid Med Visit 6/10/2015 6 1440 12 - Run Casing & Cement 9.4 $96,361 $570,480 $6,116,398 Page 3 of 4 Powered by Production Access

Report No: 6 Report Date: 6/10/2015 Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - ROAD & SITE CON 20.950.030 $175,000 IDC - INSURANCE & BO 20.950.070 $10,000 IDC - PERMITS SURVEY 20.950.080 $45,000 IDC - DRILL - CONTRAC 20.950.103 PRECISION DRILLING RIG & CREWS $23,500 $136,000 IDC - DRILL - EQUIPMEN 20.950.105 PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $1,146 IDC - DRILL - FUEL 20.950.106 $14,588 IDC - DRILL - EQUIPMEN 20.950.107 $2,014 IDC - DRILL - DIRECTIO 20.950.109 PREMIER DIRECTIONA DAILY DIRECTIONAL COSTS $7,725 $23,980 IDC - DRILL - MOBDEMO 20.950.111 $75,000 IDC - DRILL - SURFACE 20.950.114 LEOS TRUCKING 2 X FRAC TANKS $60 $15,566 IDC - DRILL - SURFACE 20.950.114 PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $15,566 IDC - DRILL - SURFACE 20.950.114 TAN MAR HOUSING PACKAGE $650 $15,566 IDC - DRILL - SURFACE 20.950.114 K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $15,566 IDC - DRILL - SURFACE 20.950.114 RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $15,566 IDC - DRILL - SURFACE 20.950.114 PRIMETIME WATER SU 6000 GAL. FRESHWATER FO $1,200 $15,566 IDC - DRILL - SPECIAL S 20.950.117 Butch's Rathole CASING CREW TO RUN 13 3/ $3,062 $3,062 Total IDC: $37,164 $521,210 TDC Code Vendor Remarks Daily Exp Cum Exp TDC - DE - SURFACE CA 20.940.106 Weatherford 13 3/8" FLOAT EQUIPMENT $1,585 $49,270 TDC - DE - SURFACE CA 20.940.106 Sooner Pipe, L.L.P. 13 3/8" ESTIMATED CASING $47,685 $49,270 Total TDC: $49,270 $49,270 Total Cumulative Well Costs: $86,434 $570,480 6/10/2015 6 1440 12 - Run Casing & Cement 9.4 $96,361 $570,480 $6,116,398 Page 4 of 4 Powered by Production Access

Report No: 7 Report Date: 6/11/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 7 Rpt T. Activity: 21 - Other AFE #: PBE1510032 Operation Desc: INSTALLING WEAR BUSHING AFE Total: $6,116,398 Spud Date: 6/9/2015 API Code: 4247536999 AFE DHC: $3,180,125 Days from Spud: 3 Rig Supervisor 1: MICHAEL MCCART 940-366-6615 Daily Costs: $129,390 Field Name: Wellcore Rig Supervisor 2: CODY CHAMBERS 832-314-9929 This AFE DHC to Date: $699,870 Sec/Twn/Rng: 40 / / Tool Pusher: JAMES WALKER 318-780-1745 This AFE CWC to Date: $699,870 Start Depth(ft): 1440 Formation: Total Project Costs: $3,400,564 Ending Depth(ft): 1440 RKB to MSL: 25 RKB to THF: 25 Total w/ Assoc AFEs : $3,400,564 TVD: 0 RKB to LMF: 27.5 RKB to CHF: 26.5 Daily Mud Costs: $861 Rig Company: Precision Drilling 24 Hr. Footage: 0 Develop To: 0 Cum Mud Costs: $20,715 Rig Name: Precision 594 Location Survey: UL Abstract: U39 24-Hour Summary/Remarks: WAIT ON CEMENT AND INSTALL WELLHEAD. NIPPLE UP BOP'S. TEST BOP'S. INSTALL WEAR BUSHING. Next Day Operations: MAKE UP BHA #2. TEST CASING. DRILL OUT CEMENT AND FLOAT EQUIPMENT. DRILL AHEAD IN 12 1/4" HOLE SECTION. RIG RELEASED FROM UNIVERSITY 21-17 #1R @ 06:00 HRS. ON 6-4-2015. SPUD: 06/09/2015 @ 00:00 HRS. TOTAL RIG MOVE HRS.: 106 / DAYS: 4.42 TOTAL HRS. FROM SPUD: 54 TOTAL DAYS TO TD: ----- TOTAL DAYS TO RELEASE: ----- DOWNTIME HRS.: 0 TODAY / 1 TOTAL, PERCENTAGE OF DOWNTIME / NPT: 1% LAST 5" D/P INSPECTION WAS ON THE UNIVERSITY 24-17 #1H, ON 12/20/2014. CAT-4 INSPECTION - CSI LAST 4'' D/P INSPECTION WAS ON THE SPECTRE ST. 54-4 #1H ST1, ON 3/8/2015. CAT-4 INSPECTION - CSI LAST BHA INSPECTION WAS ON THE UNIVERSITY 21-17 #1R, ON 6/4/2015. CSI. SAFETY MTG:JSA'S & SAFETY MEETINGS OVER, NIPPLING UP B.O.P, TESTING B.O.P, OVERHEAD LOADS, MAKING CONNECTIONS, MIXING CHEMICALS, DAILY HOUSEKEEPING, SETTING PULLING SLIPS DAYS SINCE LAST LTA: 348 ORI'S TODAY: 0 CREW SHORTAGES: NONE.// DOUBLES: 0 FLUID LOST TO WELL: 0 BBLS TODAY / 0 TOTAL BBLS, **NO LEAKS OR SPILLS REPORTED OR OBSERVED** BHA #1 17 ½" ULTERRA U616S BIT // 9 5/8" 6/7 5.0 STAGE ADJUSTABLE BEND 1.5 W/ 17" STABILIZER // 17" STEEL IBS // 8" NMDC // 8" HANG-OFF SUB // 8" NMDC // 8" SHOCK SUB // X-O SUB 6 5/8 REG x 4 ½ XH // 12 x 6 ½" DRILL COLLARS // X-O SUB 4 ½ XH x 4 ½ IF // 9 x HWDP ( DRILLING HOURS: 14 // CIRC HOURS: 3 TOTAL HOURS: 17 ) REASON PULLED: SURFACE CASING POINT BIT GRADE: 1/1 BHA #2: ULTERRA 12 1/4" U616M JETS: 3x18 / 3x16 TFA: 1.35 // 8" GYRODATA 7/8 4.0 ADJ. 1.5 BEND W/ 11 ¾" STABILIZER // 12 1/8" STABILIZER // 8" NMDC // 8" UBHO SUB // 1 X 8" NMDC S // 8" SHOCK SUB // X-O SUB // 12-6 ½" DRILL COLLARS // X-O SUB // 9 - HWDP ( DRLG HRS:, CIRC. HRS:, TOTAL HRS: ) 20'' CONDUCTOR CSG SET @ 130' 13 3/8" SURFACE CSG SET @ 1,440' 9 5/8'' INT. CSG SET @ X,XXX' 7" INT. CSG SET @ XX,XXX' 4.5'' PRO. CASING LINER @ XX,XXX' PROPOSED TD: 12,500' LAST SURVEY: DEPTH: 1,375' INC:.73 AZM: 281.29 TRRC: NOTIFY TRRC OF INTENT TO SPUD AND SURFACE CASING @ 15:00 HRS 6-8-2015 JOB # 8028 Weather Time Wind Dir Wind Knots Sky Conditions Temp Remarks Surveys Survey No. Survey Date Tie In Meas. Depth Inclination Azimuth Des Azi TVD Vert Sect N/S(+/-) E/W(+/-) DLS 2 6/10/2015 517 0.38 193.71 0.00 516.99-1.64-1.64 1.14 0.18 3 6/10/2015 972 0.40 312.50 0.00 971.98-2.03-2.03-0.39 0.15 4 6/10/2015 1375 0.73 281.29 0.00 1374.96-0.58-0.58-3.95 0.11 6/11/2015 7 1440 21 - Other 9.4 $129,390 $699,870 $6,116,398 Page 1 of 3 Powered by Production Access

Report No: 7 Report Date: 6/11/2015 Casing Type Date Run Casing Top Set Depth Size Weight Grade Drift Hole Size TD Shoe Test Surface 6/8/2015 27.50 1440.18 13.375 54.50 J-55 12.615 17.500 1440.00 10.00 1 0 600 86 0 Circulated No.1 Spacer, 20, 0, FRESH WATER,, 0, 0 No.2 Tail, 0, 1315, 4% GEL + 1/4#/SK CELLO FLAKE + 5% SALT +.004 GPS CF-41L, Class C, 1.79, 13.5 No.3 Displacement, 216, 0, FRESH WATER,, 0, 0 BOP Test and Inspection Dates Last BOP Test: 6/11/2015 Days Since BOP Tested: 0 Last Inspection: Last BOP Drill Date: BOP Test Due: Mud Properties Depth Time Wt In Wt Out Vis PV YP Gels FL HTFL FC HTFC Solid Water Oil Sand 1440 23:00 9.40 9.40 38 5 10 3/5/7 100.0 0.0 0 0.00 4.0% 96.0% 0.0% 0.0% MBT ph Pm Pf Mf Cl Ca ES Pom Lime Total Sal. CaCl2 EDTA O/W Ratio Mud Lost 0.0 10.00 0.70 0.20 0.40 45000 900 0 0.00 0.13 320 0 0.00 0 Water Lost LCM ECD FL Temp Remarks 0 0.0 0.0 Hours Summary ( Daily / Cumulative ) Drilling 0.00 14 Rotating 0.00 14 Trips 0.00 8 Circulating 0.00 3 Down 0.00 1 Other 24.00 143 Operations Start Hrs Code Remarks Start Depth End Depth Run 6:00 4.50 13 WOC, FLUSH OUT DIVERTER & CONDUCTER, RIGGING DOWN CEMENTERS, CONDUCTER, & DIVERTER 10:30 4.50 21 MAKE FINAL CUT ON CONDUCTOR & CASING, DRESS CASING & INSTALL WELL HEAD. WELD ON 13 3/8" SOW X 11" 10M WELL HEAD AND TEST TO 1500 PSI (OK) AS PER FMC INSTALLATION PROCEDURES, INSTALL WITNESSED BY WEIR REP. 15:00 9.00 14 NIPPLE UP B.O.P'S, INSTALL DSA, SPOOLS, MUD CROSS. INSTALL NEW HCR VALVE AND 2" CHECK VALVE. HOOK UP KILL LINE. CHANGE OUT 4" PIPE RAMS FOR 5" PIPE RAMS. HOOK UP CUMMY LINES. FUNCTION TEST ALL LINES. INSTALL TURNBUCKLES AND CENTER BOP. 0:00 5.00 15 TESTING BOP'S. TEST BLIND RAMS, PIPE RAMS, CHOKE LINE, 4" MANUAL, CHOKE LINE HCR, KILL LINE, KILL LINE MANUAL, KILL LINE HCR, KILL LINE CHECK VALVE, CHOKE MANIFOLD, ALL MANUAL VALVES ON MANIFOLD, HYDRAULIC CHOKES TO 250 PSI LOW, 5,000 PSI HIGH. 5 MINUTE LOW TEST & 5 MINUTE HIGH TESTS. TEST ANNULAR TO 3500 PSI. TEST FLOOR VALVES TO 5,000 PSI. TEST MUD LINES FROM TOP DRIVE TIW VALVE BACK TO PUMP TO 4000 PSI., FULL KOOMEY DRAW DOWN TEST, R/D TESTER **TOP OF CEMENT @ 10' BELOW WELLHEAD** 5:00 0.50 07 SERVICE RIG AND TOP DRIVE 1440 1440 NIH 5:30 0.50 21 PICK UP AND INSTALL WEAR BUSHING 1440 1440 NIH Total: 24.00 Drilling Data Hook Load: 88000 Pick Up: 90000 Slack Off: 83000 Over Pull: 2000 ROP: 0.00 Pres on Bot: 1250 Press Off Bot: 1500 Kickoff Depth: 0 WOB: 20 Rotary RPM: 65 Motor RPM: 84 Torque: 8000 BHA Hours: 0.00 Crew Status: ON Remarks: NONE 1440 1440 1440 1440 1440 1440 1440 1440 NIH NIH NIH NIH 6/11/2015 7 1440 21 - Other 9.4 $129,390 $699,870 $6,116,398 Page 2 of 3 Powered by Production Access

Report No: 7 Report Date: 6/11/2015 Daily Bits BHA Bit Date In Size Manufac. Type Serial No. In Out Ftg Tot Ftg Hrs Tot Hrs ROP WOB RPM MRPM Torq 2 2 6/10/2015 12 1/4 Ulterra U616M 29421 1440 4910 3470 3470 34.50 34.50 100.6 0 0 Date Out 6/13/2015 Jets 18 / 18 / 18 / 16 / 16 / 16 / 0 / 0 TFA 1.35 Char (I/O/D/O/L/B/G/R) 1 / 1 / CT / NO / N / 0 / 1 / TD Mud Motors Motor Size Brand Type Ftg Cum Ftg Hrs Cum Hrs GPM MRPM 2 7.75 NOV 6/7 4.0 1.5 ADJ.15 RPG 1876 1876 15.5 15.5 754 113 Drilling Assembly Component Qty Length OD Avg ID Avg Tot Length Remarks Bit - PDC - Fixed Cutter 1 1.00 12.250 0.000 1.00 12 1/4" ULTERRA PDC BIT. Motor - steerable 1 29.90 7.750 0.000 30.90 6/7 4.0 1.5 ADJ.15 RPG MOTOR. Stab - Undergauge 1 6.48 8.250 2.872 37.38 12 1/8" IBS Monel 1 30.82 8.000 2.987 68.20 NMDC Sub - Orienting 1 5.60 8.000 3.250 73.80 UBHO Monel 1 30.89 8.000 3.250 104.69 NMDC Sub - Shock 1 11.74 7.875 2.872 116.43 SD SHOCK SUB. Sub - XO 1 3.21 7.875 2.872 119.64 XO Drill collar 12 365.79 6.500 2.875 485.43 6.5" D.C'S Sub - XO 1 3.39 6.500 2.750 488.82 XO HWDP 9 278.04 5.000 3.000 766.86 5" HWDP Mud Pumps Pump No Model Liner Size Stroke Max PSI Max SPM SPM GPM Press. Slow Pump Rates/Pres. 1 FD-1600 6 12 4450 115 77 322 1500 0/0 0/0 0/0 2 FD-1600 6 12 4450 115 77 322 1500 0/0 0/0 0/0 Inventory Item Units Beg Inv Received Used Lost Transfrd End Inv Diesel gal 6797 0 0 0 0 6797 Personnel Data Company Service Qty. Hours Company Service Qty. Hours ANCHOR DRILLING FL MUD ENGINEER 1 24.00 New Prospect Company CO MAN 2 24.00 Precision Drilling Rig Crews 11 132.00 Totals 14.00 180.00 Health Safety and Environment Type Date Activity Company Name Personnel Drilling 6/10/2015 PRECISION, PREMIER, ENERGEN, ANCHOR ALL PERSONAL ONSITE. JSA'S & SAFETY MEETINGS OVER, NIPPLING UP B.O.P, TESTING B.O.P, OVERHEAD LOADS, MAKING CONNECTIONS, MIXING CHEMICALS, DAILY HOUSEKEEPING, SETTING PULLING SLIPS. Daily Cost Details IDC Code Vendor Remarks Daily Exp Cum Exp IDC - ROAD & SITE CON 20.950.030 $175,000 IDC - INSURANCE & BO 20.950.070 $10,000 IDC - PERMITS SURVEY 20.950.080 $45,000 IDC - DRILL - CEMENT & 20.950.102 Weatherford 13 3/8" FLOAT EQUIPMENT & $1,713 $37,063 IDC - DRILL - CEMENT & 20.950.102 OTEX PUMPING LLC CEMENT 13 3/8" CASING. $35,349 $37,063 IDC - DRILL - CONTRAC 20.950.103 PRECISION DRILLING RIG & CREWS $23,500 $159,500 IDC - DRILL - EQUIPMEN 20.950.105 PRECISION/ NEFF FORK LIFT & MAN LIFT RENT $191 $1,337 IDC - DRILL - FUEL 20.950.106 $14,588 IDC - DRILL - EQUIPMEN 20.950.107 $2,014 IDC - DRILL - DIRECTIO 20.950.109 PREMIER DIRECTIONA DAILY DIRECTIONAL COSTS $7,725 $31,705 IDC - DRILL - MOBDEMO 20.950.111 $75,000 IDC - DRILL - SURFACE 20.950.114 LEOS TRUCKING 2 X FRAC TANKS $60 $18,822 IDC - DRILL - SURFACE 20.950.114 PORTABLE MUD SYS. 300 BBL. PRE-MIX & TRANSF $500 $18,822 IDC - DRILL - SURFACE 20.950.114 RIG NET/ LANDTEL COMMUNICATIONS PACKAG $186 $18,822 IDC - DRILL - SURFACE 20.950.114 TAN MAR HOUSING PACKAGE $650 $18,822 IDC - DRILL - SURFACE 20.950.114 IRON HORSE TOOLS, L INSTALL AND RIG UP FLARE $1,770 $18,822 IDC - DRILL - SURFACE 20.950.114 K.C. SERVICES 2 X LIGHT TOWERS & TRASH $90 $18,822 IDC - DRILL - SPECIAL S 20.950.117 WEIR OIL & GAS FIELD TECH TO SUPERVISE $960 $13,590 IDC - DRILL - SPECIAL S 20.950.117 Monahans Nipple-Up NIPPLE UP BOPS $4,165 $13,590 IDC - DRILL - SPECIAL S 20.950.117 Monahans Nipple-Up TEST BOPS $2,340 $13,590 IDC - DRILL - SPECIAL S 20.950.117 BUTCH'S CASING DIVI RUN 13 3/8" CASING. $3,063 $13,590 Total IDC: $82,262 $604,333 TDC Code Vendor Remarks Daily Exp Cum Exp TDC - DE - SURFACE CA 20.940.106 SOONER PIPE 1,440' OF 13 3/8" SURFACE C $46,267 $95,537 Total TDC: $46,267 $95,537 Total Cumulative Well Costs: $128,529 $699,870 Lost Time First Aid Med Visit 6/11/2015 7 1440 21 - Other 9.4 $129,390 $699,870 $6,116,398 Page 3 of 3 Powered by Production Access