Future opportunities for Industry

Similar documents
EU Procurement of In Vessel Components for ITER

NBI Systems for DEMO: Status and Prospects Ursel Fantz, Christian Hopf P. Sonato, A. Simonin, R. McAdams, M. Tran,.

Recent progress on R&D toward Neutral Beam Injector for ITER and JT-60SA

The Electron Cyclotron Heating & Current Drive (EC H&CD) Power Supply Procurement. F. Albajar, T. Bonicelli (F4E)

THE Gersh Budker Prize PRIZE FOR.THE SUCCESSFUL CONSTRUCTION AND COMMISSIONING OF THE SPALLATION NEUTRON SOURCE

PF Coil 2-6 Supply. Main technical aspects. P. Valente

ITER Magnets Update European perspective

Progress of the JT-60SA Project

ITER PROJECT J. FARINEAU ITER ORGANIZATION. September 29th, 2010 SOFT PORTO: ITER-ORG 1

Barcelona, 26/06/2018

Overview of the ITER In-Vessel coil (IVC)

Development of Full-size Mockup Bushing for 1 MeV ITER NB System

Technical Summary for BOP-Group 5 Installation Works The BOP Group 5 works include installation and commissioning of all the Items included in

UPDATES ON ARIES-ACT1 POWER CORE CONFIGURATION

Power converters for ITER

ITER Shield Blanket Design Activities At SWIP

Status of ITER at the Transition to Construction

Low Beta Cryomodule Development at Fermilab. Tom Nicol March 2, 2011

Vacuum pumps for the ESRF EBS project Michael Hahn

Technical Specifications (In-Cash Procurement)

Costing of Test Articles Ancillary Equipment and Costing Methodology

Technical Summary. Contract for Procurement of Manual Valves, Relief Valves, Control Valves, and Valve Actuators (IO/15/CFT/11867/ACS CP/3)

U.S. BACKGROUND IN ITER FUELING SYSTEMS AND FUTURE CONTRIBUTIONS

This chapter gives details of the design, development, and characterization of the

Pumping Systems for ITER, FIRE and ARIES

GENERAL ATOMICS ITER CEnTRal SolEnoId ModulE FabRICaTIon September 2018

Status of the Nuclotron-M project

Carlo J. Bocchetta ESLS XIX Aarhus, Denmark November Status of Solaris

GENERAL ATOMICS ITER CENTRAL SOLENOID MODULE FABRICATION

Interconnected Power Systems with Superconducting Magnetic Energy Storage

GENERAL ATOMICS ITER CEnTRal SolEnoId ModulE FabRICaTIon August 2016

PF Coil Fabrication Overview

EU TF coils status. A.Bonito Oliva F4E Magnets Project Manager

F4E NEWS. ITER Worksite Components Components Innovation Documentary. Fusion for Energy Newsletter No. 21 / May 2017

Neutronic Performance Issues of the Breeding Blanket Options for the European DEMO Fusion Power Plant

Advanced Superconductor Motor Demonstrator (ASuMED)

Design and manufacturing status of Trim Coils for the Wendelstein 7-X stellarator experiment

Preliminary ARIES-RS-DCLL Radial Build for ASC

UIC WORKSHOP ON ENERGY EFFICIENCY OF FUTURE TRAINS

High-Voltage Terminal Test of Test Stand. for 1-MV Electrostatic Accelerator

Power and Particle Control in JT-60SA to Support and Supplement ITER and DEMO

Key Stellarator Engineering Issues and Constraints

Solenoid Magnets for the Front End of a Neutrino Factory

SOFE

2016 ADVISORY PANEL SUPERCONDUCTING & OTHER ROTATING MACHINES. Jon Hahne Center for Electromechanics The University of Texas at Austin 5/10/2016

Sensors for hybrid power generation system

MOLLER Hybrid Toroid Engineering Design

Superconducting Fault Current Limiter Project

CONFIGURATION DESIGN AND MAINTENANCE APPROACH FOR THE ARIES-CS STELLARATOR POWER PLANT

JT-60SA Newsletter. Cryoplant arrives at the JAEA Naka Site. No. 65, 31 May Headline

M. A. Green, and S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA

Presented by B. Nelson for the QPS team QPS Conceptual Design Review June 23-24, 2003 ORNL

Benteler Distribution. Steel tube solutions for hydraulic and pneumatic applications

INTEGRATION OF THE MODULAR DUAL COOLANT PB-17LI BLANKET CONCEPT IN THE ARIES-CS POWER PLANT

European technology leadership to address infrastructure bottlenecks

Status of the DARHT 2 nd Axis Accelerator at Los Alamos National Laboratory

Formation and finishing

SNS Operation and Upgrade Plans

Cryogenic Improvements for the ATLAS Energy Upgrade

Review and update on MAGLEV

Gas-insulated medium-voltage switchgear. For the mining industry. Answers for energy.

Innovations in Electric Vehicle Charging

New 30 m Flexible Hybrid Energy Transfer Line with Liquid Hydrogen and Superconducting MgB2 Cable Development and Test Results

ELECTRICAL PART OF EPR DESIGN, APPLIED STANDARDS AND POSSIBILITY OF COOPERATION WITH POLISH INDUSTRY SUPPLIERS

Customcells. Tailormade Energystorage Solutions.

Versatile Transceiver and Transmitter Production for Phase I Upgrades of LHC Experiments

5G as an enabler for the safety of vulnerable road users. Nigel Jefferies (Huawei, WWRF Chair) Klaus David (Kassel University)

GLAST Large Area Telescope:

The DRYSMES4GRID project: development of a cryogen free cooled 500 kj / 200 kw SMES demonstrator based on MgB 2

Power/Vac Switchgear Concepts And Basic Configurations

15 steel septum magnets MSD of three types MSDA, MSDB, and MSDC, located around IP6;

Modular High Current Systems based on Supercapacitors As Pulsed Power Sources

Support and Infrastructure

Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada

No. 64, 30 April 2015

Collaboration between CELLS in Barcelona and BINP in Novosibirsk in the construction of ALBA Synchrotron

NXPLUS C Single busbar. Maintenance-free for lifetime

Supported by. NSTX Liquid Lithium Divertor Status, Plans, and Future Liquid Lithium R&D Needs

Next Generation Drive Train Superconductivity for Large-Scale Wind Turbines*

Visions for Power Electronics in Automotive Applications

ECH MIRROR INTERFACE TANK FOR 110 GHz, 1 MW GYROTRON

m e c h a t r o n i c c o m p a n y p r o t e c t i o n air & fluid s y s t e m s GB We protect technology.

Gas-insulated medium-voltage switchgear. For marine and offshore applications. Answers for energy.

Design Study for Passive Shutdown System of the PGSFR

General. Main electric circuits Fuses compartment Operating mechanisms Cables connection compartment

Cutting-edge technologies backed by a century of experience

Roberto Benato and Lorenzo Fellin

EMERGING TRENDS IN AUTOMOTIVE ACTIVE-SAFETY APPLICATIONS

The Development of ITS Technology, Current Challenges and Future Prospects Antonio Perlot Secretary General

HMI, APRIL, Test Laboratories in Ratingen

WBG Power Electronics Traineeship

Silent centrifugal air heater hot water supply

The ProNova SC360 Gantry!

MEDIUM VOLTAGE CE-B METAL CLAD SWITCHBOARDS. CE-B-C-en-REV

Approaches to Maintenance. S. Malang

High Voltage Copper, Smooth Aluminum Shield/Sheath

PRELIMINARY ACT-2 POWER CORE DESIGN DEFINITION

DEMO FUSION CORE ENGINEERING: Blanket Integration and Maintenance

Torus Coil. Construction and Geometry for Modeling. D. Kashy CLAS12 Collaboration Meeting March 6, 2018

TEMPERATURE AND STRESS IN ALCATOR C-MOD DUE TO THE DIVERTOR UPGRADE

Transcription:

Neutral Beam Test Facility Heating Neutral Beam Injectors Electron Cyclotron Power Supplies and Sources Tullio Bonicelli and the NB&EC PSS Project Team with thanks to all European Laboratories and Industries cooperating with F4E Monaco ITER International Fusion Energy Days (MIIFED) ITER Business Forum (IBF) 8 11 February 2016 OBJECTIVES OF THIS TALK Status of procurements (hints) Scope of main future European industrial procurements in the NB and EC Power Supplies and Sources areas Future opportunities for Industry 2

THE ITER HEATING NEUTRAL BEAM (NB) SYSTEM AND THE NB TEST FACILITY HNB (1 &2) injector full scope of procurement shared with Japan HNB1 HNB2 HNB3 (option) EU to procure: components located floor 0 (picture) power supplies (not represented) 3 NEUTRAL BEAM TEST FACILITY MITICA SPIDER Located in Padua (Italy) Host Consorzio RFX providing Buildings and Infrastructures F4E, Japan DA and India DA providing all components and auxiliaries under PAs with IO SPIDER (Source for Production of Ion of Deuterium Extracted from Radio frequency plasma) MITICA (Megavolt ITer Injector & Concept Advancement) 4

NBTF- Recent Pictures SPIDER Bio-shield and Vacuum Vessel SPIDER Vacuum Vessel installed inside the Bio shield 100 kv High Voltage bushing installed on VV NBTF Cooling System (70 MW) secondary heat transfer system pumps 5 NBTF- Recent Pictures SPIDER Ion Source Power Supplies and HV Deck SPIDER HV Deck SPIDER Transmission Line under Assembly SPIDER Ion Source Power Supplies installed inside HV Deck 6

NBTF CONTRACTS SUMMARY List of main NBTF Calls for Tender to be launched by F4E (delivery NBTF, Padua) Component CfT 1 MITICA SF6 Plant CfT closed Bids under evaluation 2 MITICA Beam Source CfT on-going Deadline 4.3.2016 3 MITICA Beam Line Components (Neutralizer, Calorimeter, RID) 2016 (Q4) 4 MITICA Cryopump See A Teissier s this Forum 5 MITICA Cryogenic Plant See A Teissier s this Forum 7 MITICA BEAM LINE COMPONENTS (BLCS) Actively cooled - 2.4 MPa water pressure Water cooled OFHC copper (Max power density 0.5 MW/m 2 ). Water Cooled Panels or tubes in CuCrZr (Power density > to 1MW/m 2 ) Structure and piping manifold made out of AISI 316 L. Numerous heterogeneous joints are present Welding techniques needed. Electron Beam (EB) Welding foreseen Deep drilling technology for the walls of NED and RID Vacuum expertise necessary. Assembly and metrology (alignment) competencies required Calorimeter 14MW/m 2 18MW 7tons Electrostatic Residual Ions Dump (RID) 6MW/m 2 19MW 5 tons Neutraliser (NED) (0,5 MW/m 2 to 3MW/m 2 leading edges) 5,5MW 15 tons 8

ITER HNB CONTRACTS SUMMARY List of main HNB contracts for ITER to be launched by F4E (delivery Cadarache) Component 1 Beam Sources (included in FWC presently under CfT) 2 Beam Line Components (Neutralizer, Calorimeter, RID) 3 4 lots: Vessel (Beam Line + Beam Source), Drift Duct, Exit Scraper, Fast Shutter- All except Exit Scraper are SIC-1 (RCC-MR code) 4 Absolute Valve - SIC-1 (RCC-MR code) 5 ACC-Coils 6 Passive Magnetic Shielding 7 Assembly of HNB1 & HNB2 CfT aligned to ITER 2016 scheduling underway 9 ITER HNB components The NBI Vessel An extension of the primary vacuum confinement and of the primary safety barrier SIC1 (RCC MR code) BLV + BSV 2 x 2 Stainless Steel Tanks (Beam Line Vessel and Source Vessel) (5 x 5 x 15 m2) Weight: BLV about 40 tons BSV about 30 tons 10

ITER HNB components Passive Magnetic Shield (PMS) With Active Magnetic Field, reduction of almost three orders of magnitude of the external Magnetic field to ensure a good beam transmission PMS: Steel (S235) Plates 75mm thick all around the vessels To reduce the activation dose in NB cell, the interspace between the layers of the PMS will be filed in with polyethylene (10cm) and its external face with lead (between 1 and 2.5 cm). Total weight = 700 tons (each injector) 11 ITER HNB components Active Compensation Correction Coils ACC Coils) Acting together with PMS, reduction of almost three orders of magnitude of the external Magnetic field to ensure a good beam transmission ACC Coils: 2 x 6 Coils Water Cooled Conductor in OFHC Dimension about 3,3m x 3m 92000 katurns to 200000 ka turns Coil Cross section typically 400x200 mm 2 Coils Weight = 9 and 18 Tons) 12

ITER HNB components (Front End components) Drift Duct High vacuum Absolute Valve SIC1 (RCC-MR code) Stainless Steel Casing High vacuum Double Bellows Liner SIC1 (RCC-MR code) Casing and Stainless Steel Bellows Non SIC Internal liner Deep Drilled in CuCrZr High vacuum Fast Shutter SIC1 (RCC-MR code) Stainless Steel Casing High vacuum Exit Scraper - Non SIC Stainless Steel Support + Deep Drilled Panel in CuCrZr 13 Electron Cyclotron (EC) System The EU gyrotron development programme Development programme carried out in collaboration with EGYC Consortium of EU Labs and Thales Full design verification planned in 2016 1MW CW 170 GHz industrial prototype gyrotron (based on successful results from a shortpulse tube): delivered in Nov 15, current under conditioning at the KIT (Karlsruhe) gyrotron test stand Cryogen free Superconductive Magnet for the CW gyrotron prototype (6.87 T at the cavity): Contract signed in 2015 delivery planned in Autumn 16 14

EC PS&S Contracts Summary List of main EC Power Supplies and Sources Calls for Tender to be launched by F4E 1 Series production of Gyrotron tubes - (expected procedure: negotiated) 2 Series production of gyrotron superconducting magnets (cryogenfree) 3 Auxiliaries for the RF Sources (cooling manifold, supporting structures, control-command, etc.) CfT aligned to ITER 2016 scheduling underway 15..AND THANKS TO. 16

Contact: Fusion for Energy s Market Intelligence Group Benjamin Perier benjamin.perier@f4e.europa.eu +34.93.489.7410 Mehdi Daval mehdi.daval@f4e.europa.eu +34.93.489.7454 Follow us on: www.f4e.europa.eu www.twitter.com/fusionforenergy www.youtube.com/fusionforenergy www.linkedin.com/company/fusion for energy www.flickr.com/photos/fusionforenergy Subscribe to F4E News Visit the F4E Industry and Fusion Laboratories Portal