Progress of the JT-60SA Project
|
|
- Curtis Crawford
- 5 years ago
- Views:
Transcription
1 Progress of the JT-60SA Project P. Barabaschi, Y. Kamada, H. Shirai For the JT-60SA Integrated Project Team EU: F4E-CEA-ENEA-CNR/RFX-KIT-CIEMAT-SCKCEN JA: QST C.R.FRASCATI- ITALY 1
2 JT-60SA Project Agreement signed in 2007 Redesigned to meet cost targets in Mission: contribute to early realization of fusion energy by addressing key physics and engineering issues for ITER and DEMO 1. Support ITER using break- even- equivalent class high temperature D-plasmas lasting for a duration (typically 100s) 2. Supplement ITER toward DEMO with long sustainment (~100s) of high pressure steady-state plasmas necessary in DEMO 3. Foster Next Generation playing leading roles in ITER & DEMO
3 Machine Parameters Basic machine parameters Plasma Current 5.5 MA P-NBI Cryostat P-NBI Toroidal Field, B t 2.25 T Major Radius, R p 2.96 ECH Minor Radius, a 1.18 Elongation, X 1.95 Triangularity, X 0.53 Aspect Ratio, A 2.5 N-NBI Shape Parameter, S 6.7 Safety Factor, q 95 ~3 Flattop Duration 100 s Heating & CD Power 41 MW N-NBI 10 MW P-NBI 24 MW ECRF 7 MW Divertor wall load 15 MW/m 2
4 Sharing
5
6 Progress since 2016 Procurement and delivery largely completed All TF coils tested, delivered Basic Torus Assembly Completed Individual commissioning of many plant systems completed Integrated Commissioning started Preparing plans for enhancements and operation
7 JT-60SA timeline 18 TF + 6EF coils Mar., 2013 Cryostat Base TF Coil Cold Test Facility Jan., 2014 Lower Poloidal Field Coils Aug., 2015 Sep., 2016 Aug., 2018 Vacuum Vessel VV thermal shield TF Coils Upper Poloidal Field Coils and Central Solenoid JT-60SA Cryostat Current Lead Cryostat QPC TF Coils power supplies MG SCMP S SNU cryoplant NBI First Plasma Sep ECRF diagnostics, etc
8 Present Status of Tokamak Assembly TF Coils of 18 are successfully assembled with the high accuracy of ±1mm. EF Coil and port thermal shield are under installation. VV Closed
9
10 Vacuum Vessel closed with high accuracy VV Assembly was taken account of welding shrinkage (4mm/line, total 52mm/13 lines) in toroidal direction. Aug m 110 Block 6.4mm D07 D09 6.4mm D01 D08 2.4mm D06 D02 D05 D03 D Block welding 2.4mm 110 Block direct welding D07 D09 D08 D D06 Splice-plate welding D02 D03 D05 D04 Sector connection by direct welding and splice-plate welding. 6.6 m Requirement Achieved Inboard ±10 mm ±4 mm Outboard ±10 mm +8/-2 mm High dimensional accuracy was achieved by careful welding work.
11 JT-60SA in-vessel components Upper divertor = Open, activecooled CFC FW:Start with Carbon,=> Full metal-coated ~2030 Lower divertor = ITER-shaped, active-cooled monoblock, Cryopump Stabilizing Plate Fast Plasma Position Control coil 18 Error Field Correction Coils RWM Control coil: 18 coils MGI valves as DMS
12 EF & CS: SC coils with high accuracy (~10-4 ) winding Deviation of current center from exact circle Achieved CS2 module 1.6m 2.0m CS4 module CS1 module 6 EF coils : completed by August CS modules: completed by March Integration of 4 CS modules will be finished by December m 2.0m CS3 module EF1 EF2 EF3 EF4 EF5 EF6 CS1 CS2 CS3 CS4 0.3 mm 0.4 mm 0.2 mm 0.6 mm 0.6 mm 1.3 mm 0.3 mm 0.4 mm 0.4 mm 0.4 mm
13 TF Coils Cable in Conduit Conductor, 72 turns, 25.7kA each 6 double pancakes, 6 turns/pancake. Helium inlets in high field side joints in external low field side Windings enclosed in steel casings Steel casings inboard wedged, connected in inboard curved regions by Inner Intercoil Structure Steel casings sliding radially but supported toroidally by Outer Intercoil Structure JT-60SA ITER JET
14 Design concept
15 TF Coils: Cold testing concluded All spare TF coils have been tested Electrical insulation tests, warm->cold->test->warm Full current tests, joint resistance (nohm range), prior and after quench tests Quench test, Tcs<7.47 consistent and in accordance to predictions Hydraulic flow resistance tests Cryostat and valve box
16 Air Transportation of last 2 TF coils 15 Feb.:loading at Vatry Airport 21 st Feb. At Naka 17 Feb at Nagoya airport
17 Assembly: Standing & lifting
18 Assembly: Rotation
19 Assembly: Inner Intercoil Structures
20 Assembly: Outer Intercoil Structure
21 Assembly: 20 gap for final sector insertion
22 Assembly: Final sector insertion
23 Assembly: Final sector inserted 23
24 Torus Assembly Mechanical assembly of the TF magnet completed in summer 2018 Assembly considered throughout the design process All interfaces adjustable and all machined with respect to winding pack centrelines High assembly accuracy helped keep winding pack centreline positions within acceptable limits
25 Cryogenic System & Cryodistribution system The cryogenic system was completed by Oct Cryolines, all Valve Boxes(VB),all Coil Terminal Boxes(CTB) fabricated. 25
26 Cryostat Vessel Body Cryostat Top Lid, Delivery to Naka in Sep Cylindrical Section: completed
27 High Temp Superconductor Current Leads HTS-CL decreases required capacity of the cryoplant by 20%. All 26 HTS-CL Fabricated at KIT tested at KIT CuLTKa facility Delivered in Naka 27
28 Magnet PS ~ close to completion C.R.FRASCATI- ITALY (20 ka, 5 kv) C.R.FRASCATI- ITALY Typical PF coil PS circuit (CS1) SNU (High-voltage Generation Circuit) Completion of Magnet PS system is planned in Mar Quench Protection Circuits (QPC) Switching Network Units (SNU) Superconducting Magnet PSs (Base PS) Booster PSs (reused) Motor Generator (reused) Water Cooling Systems for Magnet PSs Major Component Quantity Current Status CS1 4, EF1 6, TF units Ready for Operation CS1 4 4 units Ready for Operation EF3,4 2 units Ready for Operation EF2 5, TF 5 units Ready for Operation CS1 4, EF1,6 8 units On site Tests on going EF1,2,5,6 H MG 4 units 1 unit Maintenance and Modification ongoing Overhaul Completed, Ready for Operation PF, TF 2 units Ready for Operation DC Feeders PF, TF 11 circuits Ready for Operation PS Supervisory Control Systems PS SC, PS IPS, PS SIS, PS PLC 4 units Development on going
29 JT-60SA Research Phases Operation-1: Integrated Commissioning + Equilibrium Controllability of MA-class diverted plasmas BA Phase II 34MW x 100s
30 IPT Structure BA Agreement foresees Very limited size central team with mainly coordination functions Procurement Arrangements signed between Implementing Agencies -> collaboration between EU and JA Considering this arrangement, a Common Management and Quality Program was developed 10 yrs ago to define R&R and common processes, including the sharing of integration functions EURATOM JA Government C.R.FRASCATI- ITALY STP Project Committee Broader Approach Steering Committee (SC) Project Team IPT EU Home Team F4E+CEA+ENEA +CRPP+SCK -CEN +CIEMAT+FZK JA Home Team JAEA
31 Management model worked out well The IPT Competent and committed persons from many institutions A light but integrated set of common processes valid for all Agile & motivated team able to quickly tackle the many technical and administrative problems which were encountered This is a software success story which should be valued as much as the hardware produced Thank you all in the JT-60SA IPT for your good will and dedication
32 BA Phase 2 BA Agreement does not end in 2020 Scope of additional activities for a further 5 years prepared and under approval by Parties o Maintenance/Operation o Scientific Exploitation o Enhancements o And IFMIF/EVEDA (mainly LIPAc in Rokkasho) o And IFERC (DEMO related) IPT Management model to be extended to Research and Operation activities 32
33 Conclusions TF Coils tested, delivered, last sector assembled Overall delivery mostly completed, 90% the credit value accepted Torus assembly nearly completed Commissioning underway First Plasma planned for Sept 2020 IPT Management model successful JT-60SA research plan elaborated Onward plans under approval C.R.FRASCATI- ITALY
JT-60SA Newsletter. Cryoplant arrives at the JAEA Naka Site. No. 65, 31 May Headline
JT-60SA Newsletter Headline Cryoplant arrives at the JAEA Naka Site No. 65, 31 May 2015 After the successful discharge at the port of Hitachi on 21 March 2015, the refrigerator cold box (RCB) and the auxiliary
More informationKSTAR Assembly. National Fusion Research Center, Daejeon, Korea
1 FT/2-2 KSTAR Assembly H. L. Yang, H. K. Kim, K. M. Kim, J. W. Sa, S. T. Kim, H. T. Kim, K. H. Hong, W. C. Kim, K. H. Kim, Y. S. Kim, J. Y. Kim, C. H. Choi, Y. K. Oh, Y. M. Park, M. Kwon, J. S. Bak, G.
More informationNo. 64, 30 April 2015
JT-60SA Newsletter No. 64, 30 April 2015 Headline Ceremony for JT-60SA On 20 April 2015, JAEA held a Celebration of the delivery of main components and start of their on-site installation by EU, and completion
More informationEU Procurement of In Vessel Components for ITER
EU Procurement of In Vessel Components for ITER State of progress and next steps Patrick Lorenzetto ITER Business Forum 2013, Toulon, 21 22 March 2013 1 Content Blanket First Wall Procurement Package Blanket
More informationPF Coil 2-6 Supply. Main technical aspects. P. Valente
PF Coil 2-6 Supply Main technical aspects P. Valente PF Coils EI Information Meeting Cadarache, 19 February 2013 This presentation is intended for reference purposes only and is not a legally binding document
More informationTHE Gersh Budker Prize PRIZE FOR.THE SUCCESSFUL CONSTRUCTION AND COMMISSIONING OF THE SPALLATION NEUTRON SOURCE
THE Gersh Budker Prize PRIZE FOR.THE SUCCESSFUL CONSTRUCTION AND COMMISSIONING OF THE SPALLATION NEUTRON SOURCE EPAC08, Genoa (Italy) 26 June 2008 1451 1506 1918 1977 Norbert Holtkamp Principal Deputy
More informationUPDATES ON ARIES-ACT1 POWER CORE CONFIGURATION
UPDATES ON ARIES-ACT1 POWER CORE CONFIGURATION AND SYSTEM INTEGRATION X.R. Wang, M. S. Tillack, S. Malang, C. Koehly, F. Najmabadi and the ARIES Team ARIES-Pathways Project Meeting UC San Diego January
More informationJT-60SA Newsletter No. 80, 31 August 2016
JT-60SA Newsletter No. 80, 31 August 2016 Headline First TF coil - Annie - arrives at Naka site Figure 1: TF coil in the engineering experiment building at the QST Naka site after its packaging has been
More informationApproaches to Maintenance. S. Malang
Approaches to Maintenance S. Malang FNST Meeting, UCLA, August 12-14, 2008 Areas involved in the selection of methods for blanket maintenance: (Emphasis may be different for FNF and DEMO) - Segmentation
More informationStatus of ITER at the Transition to Construction
Status of ITER at the Transition to Construction Guenter Janeschitz Deputy Head of Central Integration Office ITER Organisation Page 1 Outline Fusion Basics and History of ITER (very brief): ITER and its
More informationITER G A0 FDR R1.0
2.1 Magnets 2.1.1 Magnet System General Description 1 2.1.1.1 System Description and Main Parameters 1 2.1.1.2 Physical and Functional Interfaces 4 2.1.1.3 Heat Loads 6 2.1.2 Magnet Structures 7 2.1.2.1
More informationITER PROJECT J. FARINEAU ITER ORGANIZATION. September 29th, 2010 SOFT PORTO: ITER-ORG 1
ITER PROJECT J. FARINEAU ITER ORGANIZATION September 29th, 2010 SOFT PORTO: ITER-ORG 1 Contents ITER Context and Background ITER Technical Systems ITER: Organization & Contractual Rules New ITER Project
More informationITER Magnets Update European perspective
ITER Magnets Update European perspective Hannu Rajainmaki, Boris Bellesia, Alessandro Bonito-Oliva, Eva Boter, Thierry Boutboul, Eugen Bratu, Marc Cornelis, John Fanthome, Robert Harrison, Peter Readman,
More informationCONFIGURATION DESIGN AND MAINTENANCE APPROACH FOR THE ARIES-CS STELLARATOR POWER PLANT
CONFIGURATION DESIGN AND MAINTENANCE APPROACH FOR THE ARIES-CS STELLARATOR POWER PLANT X.R. Wang 1, S. Malang 2, A. R. Raffray 1 and The ARIES Team 1 University of California, San Diego, CA, 9500 Gilman
More informationRecent progress on R&D toward Neutral Beam Injector for ITER and JT-60SA
Recent progress on R&D toward Neutral Beam Injector for ITER and JT-60SA Rapporteur; Hiroyuki TOBARI (Japan Atomic Energy Agency) (FIP/2-5Ra) Development of DC ultra-high voltage insulation technology
More informationGENERAL ATOMICS ITER CEnTRal SolEnoId ModulE FabRICaTIon September 2018
GENERAL ATOMICS ITER Central Solenoid Module Fabrication September 2018 ITER Central Solenoid The heart of the international fusion energy device The Central Solenoid (CS) is the heart of ITER. The 5-story,
More informationITER Vacuum Vessel Loads. Jake Blanchard October 2011
ITER Vacuum Vessel Loads Jake Blanchard October 2011 Introduction As we consider alternative materials for our vacuum vessel, it is natural to compare to the ITER vessel To make appropriate use of their
More informationPower and Particle Control in JT-60SA to Support and Supplement ITER and DEMO
Power and Particle Control in JT-60SA to Support and Supplement ITER and DEMO Shinji Sakurai and JT-60SA design team Division of Advanced Plasma Research, Japan Atomic Energy Agency, Naka, Japan Abstract:
More informationPresented by B. Nelson for the QPS team QPS Conceptual Design Review June 23-24, 2003 ORNL
QPS Project Implementation Presented by B. Nelson for the QPS team QPS Conceptual Design Review June 23-24, 2003 ORNL Presentation Outline Fabrication Plans How we plan to build QPS R&D, primarily Modular
More informationGENERAL ATOMICS ITER CENTRAL SOLENOID MODULE FABRICATION
GENERAL ATOMICS ITER CENTRAL SOLENOID MODULE FABRICATION January 2018 ITER Central Solenoid The heart of the international fusion energy device The Central Solenoid (CS) is the heart of ITER. The 5-story,
More informationEU TF coils status. A.Bonito Oliva F4E Magnets Project Manager
EU TF coils status A.Bonito Oliva F4E Magnets Project Manager Slide 1 Presentation Outline TF coils Main Manufacture Steps Procurement strategy Status of the production Contracts and industries involved
More informationDEMO FUSION CORE ENGINEERING: Blanket Integration and Maintenance
DEMO FUSION CORE ENGINEERING: Blanket Integration and Maintenance 1.) Overview on European Blanket Concepts and Integration principles 2.) Large Module Integration 3.) Multi Module Segment (MMS) Integration
More informationPRELIMINARY ACT-2 POWER CORE DESIGN DEFINITION
PRELIMINARY ACT-2 POWER CORE DESIGN DEFINITION X.R. Wang, C. Koehly, M. S. Tillack, S. Malang and F. Najmabadi ARIES-Pathways Project Meeting Germantown, DC May 21-22, 2013 OVERALL LAYOUT OF THE ACT-2
More informationFuture opportunities for Industry
Neutral Beam Test Facility Heating Neutral Beam Injectors Electron Cyclotron Power Supplies and Sources Tullio Bonicelli and the NB&EC PSS Project Team with thanks to all European Laboratories and Industries
More informationINTEGRATION OF THE MODULAR DUAL COOLANT PB-17LI BLANKET CONCEPT IN THE ARIES-CS POWER PLANT
INTEGRATION OF THE MODULAR DUAL COOLANT PB-17LI BLANKET CONCEPT IN THE ARIES-CS POWER PLANT X.R. Wang 1, S. Malang 2, L.A. El-Guebaly 3, A. R. Raffray 1 and the ARIES Team 1 University of California, San
More informationITER Shield Blanket Design Activities At SWIP
1 ITER Shield Blanket Design Activities At SWIP F. Zhang 1), W. S. Kang 1), J. H. Wu 1), Y. K. Fu 1), J. M. Chen 1) F. Elio 2) 1) Southwestern Institute of Physics, P. O. Box 432 Chengdu, 610041, China
More informationGENERAL ATOMICS ITER CEnTRal SolEnoId ModulE FabRICaTIon August 2016
GENERAL ATOMICS ITER Central Solenoid Module Fabrication August 2016 ITER Central Solenoid The heart of the international fusion energy program The Central Solenoid (CS) is the heart of ITER. The 5-story,
More informationThe Results of the KSTAR Superconducting Coil Test
1 FT/3-2 The Results of the KSTAR Superconducting Coil Test Y. K. Oh, Y. Chu, S. Lee, S. J. Lee, S. Baek, J. S. Kim, K. W. Cho, H. Yonekawa, Y. Chang, K. R. Park, W. Chung, S. H. Lee, S. H. Park, I. S.
More informationDesign Description Document: DDD 11 ITER_D_22HV5L v2.2. Magnet
Design Description Document: DDD 11 ITER_D_22HV5L v2.2 Magnet Section 1. Engineering Description 14 Oct 2006 Table of Contents 1 Engineering Description...7 1.1 System Description...7 1.1.1 Design Philosophy...10
More informationMu2e Solenoids! Michael Lamm! L2 for the Mu2e Solenoid! July 27, 2015!
Mu2e Solenoids Michael Lamm L2 for the Mu2e Solenoid July 27, 2015 Mu2e Solenoids Perform many functions in the Mu2e Experiment One continuous field, generated by 3 unique superconducting solenoid systems
More informationUPDATE ON THE LHC MAIN MAGNETS. Lucio Rossi CERN - LHC MAC 15
UPDATE ON THE LHC MAIN MAGNETS Lucio Rossi CERN - LHC MAC 15 Content Cable Components Production of dipoles and learing curves Fiedl quality Collared cois CM production Results and Delivery Plan for dipoles
More informationBarcelona, 26/06/2018
Barcelona, 26/06/2018 F4E_D_2CEBYC Subject: In accordance with the provisions defined in Article 124 of the Commission Delegated Regulation (EU) No 1268/2012 1, the table below summarizes modifications
More informationNeutronic Performance Issues of the Breeding Blanket Options for the European DEMO Fusion Power Plant
Neutronic Performance Issues of the Breeding Blanket Options for the European DEMO Fusion Power Plant U. Fischer, KIT Contributors C. Bachmann EUROfusion/PMU, Garching, Germany J. C. Jaboulay CEA Saclay,
More informationThe Electron Cyclotron Heating & Current Drive (EC H&CD) Power Supply Procurement. F. Albajar, T. Bonicelli (F4E)
The Electron Cyclotron Heating & Current Drive (EC H&CD) Power Supply Procurement F. Albajar, T. Bonicelli (F4E) Overview Introduction: the ECRH system for ITER The 2001 technical specifications The Design
More informationKey Stellarator Engineering Issues and Constraints
Key Stellarator Engineering Issues and Constraints P. Heitzenroeder for the NCSX Engineering Team ARIES Meeting at PPPL - October, 2002 1 How The Engineering of a Compact Stellarator Differs from Most
More informationCosting of Test Articles Ancillary Equipment and Costing Methodology
Costing of Test Articles Ancillary Equipment and Costing Methodology 0.504 m x 1.71 m x 0.413 m C. Wong, S. Malang, M. Youssef, N. Morley, M. Ulrickson and the TBM design team US ITER-TBM Meeting August
More informationHall C SHMS Progress
Hall C SHMS Progress Paul Brindza Hall C Senior Engineer January 25, 2013 Page 1 SHMS and Magnet Systems Overview Cryo-Control Reservoirs Cryogenics Infrastructure Power Supplies & Controls HB Q1 Q2 Q3
More informationM. A. Green, and S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA
LBNL-48445 SCMAG-749 SUPERCONDUCTING MAGNETS FOR INDUCTION LINAC PHASE-ROTATION IN A NEUTRINO FACTORY M. A. Green, and S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA ABSTRACT The neutrino
More informationPower converters for ITER
Power converters for ITER I. Benfatto EFDA, Garching, Germany Abstract The International Thermonuclear Experimental Reactor (ITER) is a thermonuclear fusion experiment designed to provide long deuterium
More informationOverview of the ITER In-Vessel coil (IVC)
Overview of the ITER In-Vessel coil (IVC) 1. Purpose of the market survey With the present survey we would like to get from the Domestic Agencies a list of potential suppliers around the world for the
More informationTechnical Summary for BOP-Group 5 Installation Works The BOP Group 5 works include installation and commissioning of all the Items included in
IDM UID T244BP VERSION CREATED ON / VERSION / STATUS 03 May 2017 / 1.2 / Approved EXTERNAL REFERENCE / VERSION Technical Specifications (In-Cash Procurement) Technical Summary for BOP-Group 5 Installation
More informationPreliminary ARIES-RS-DCLL Radial Build for ASC
Preliminary ARIES-RS-DCLL Radial Build for ASC L. El-Guebaly Fusion Technology Institute University of Wisconsin - Madison http://fti.neep.wisc.edu/uwneutronicscenterofexcellence Contributors: C. Kessel
More informationDual-Cooled Blanket Modular Replacement Design Approach
Dual-Cooled Blanket Modular Replacement Design Approach Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray, and The ARIES Team ARIES Meeting General Atomics, San Diego February 24-25, 2005 Outline
More informationDraft Working List to be done at CERN for ATLAS Central Solenoid. Originated, Dec. 4, 2001 Revised, Dec.5, 2001 Akira Yamamoto (KEK)
Draft Working List to be done at CERN for ATLAS Central Solenoid Originated, Dec. 4, 2001 Revised, Dec.5, 2001 Akira Yamamoto (KEK) 1 General Working List Works in Bldg. 180: CS system delivered and acceptance
More informationVacuum pumps for the ESRF EBS project Michael Hahn
3 rd Rencontres Nationales DU RESEAU TECHNOLOGIES DU VIDE SEVRIER, 10 13 October 2016 Vacuum pumps for the ESRF EBS project Michael Hahn On behalf of the EBS Accelerator Project Team OUTLINE Project definition
More informationLow Beta Cryomodule Development at Fermilab. Tom Nicol March 2, 2011
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011 Concepts of SC CW 3GeV, 1mA Linac H - gun RFQ MEBT SSR0 SSR1 SSR2 β=0.6 β=0.9 ILC RT (~15m) 325 MHz 2.5-160 MeV 650 MHz 0.16-2 GeV 1.3
More informationCreated: 4/23/2003 Page: 1 of 12. Abstract
Collimators and Transport Solenoid Shielding Reference Design Document No: Created: 4/23/2003 Page: 1 of 12 MECO-MUB-03-002 Modified: 10/13/03 Version: 1.01 Prepared by: M. Hebert, V. Tumakov Approved
More informationPumping Systems for ITER, FIRE and ARIES
Pumping Systems for ITER, FIRE and ARIES P. W. Fisher Oak Ridge National Laboratory C. A. Foster Cryogenic Applications F, Inc. March 6, 2001 1 ITER Vacuum System Tritium compatible batch regenerating
More informationImpact of Medium-Temperature Magnet and 2-FP Configuration on Radial Build
Impact of Medium-Temperature Magnet and 2-FP Configuration on Radial Build Laila El-Guebaly Fusion Technology Institute University of Wisconsin - Madison With input from: L. Bromberg (MIT), J. Lyon (ORNL),
More informationHigh Availability Remote Maintenance Approach for the European DEMO Breeder Blanket options
1 High Availability Remote Maintenance Approach for the European DEMO Breeder Blanket options T. Ihli 1, D. Nagy 2, C. Koehly 1, J. Rey 1 1 Forschungszentrum Karlsruhe, Postfach 36 40, 76021 Karlsruhe,
More informationTechnical Specifications (In-Cash Procurement)
IDM UID VLHSLE VERSION CREATED ON / VERSION / STATUS 12 Feb 2018 / 1.2 / Approved EXTERNAL REFERENCE / VERSION Technical Specifications (In-Cash Procurement) Technical Summary for BOP-Group 6 Installation
More informationSolenoid Magnets for the Front End of a Neutrino Factory
Solenoid Magnets for the Front End of a Neutrino Factory M.A. Green and S.S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720 J.R. Miller and S. Prestemon National High Magnetic Field Laboratory,
More informationGrain LNG: A Collaborative Approach To LNG Terminal Business Performance Improvement
Grain LNG: A Collaborative Approach To LNG Terminal Business Performance Improvement Nick Blair, Grain LNG, Commercial Operations Marco Fahl, Honeywell, Senior Consultant 2012 Business Optimization Conference
More information9-O-3A-4 Cryogenic system for the 43 T Hybrid Magnet at LNCMI Grenoble From the needs to the commissioning
9-O-3A-4 Cryogenic system for the 43 T Hybrid Magnet at LNCMI Grenoble From the needs to the commissioning L. Ronayette, G. Caplanne, P. Hanoux, R. Pfister, M. Pissard, P. Pugnat CNRS-LNCMI, Grenoble,
More informationDesign and manufacturing status of Trim Coils for the Wendelstein 7-X stellarator experiment
Design and manufacturing status of Trim Coils for the Wendelstein 7-X stellarator experiment K. Riße a, Th. Rummel a, S. Freundt a, A. Dudek a, S. Renard a, V. Bykov a, M. Köppen a ; S. Langish b, G.H.
More informationInterconnected Power Systems with Superconducting Magnetic Energy Storage
Extended Summary pp.251 256 Interconnected Power Systems with Superconducting Magnetic Energy Storage Shinichi Nomura Member (Tokyo Institute of Technology, shin@nr.titech.ac.jp) Takushi Hagita Non-member
More informationSystem Status Briefing
System Status Briefing Phakamani Hadebe Interim Group Chief Executive 3 May 2018 Contents 1 Performance summary 2 Operational highlights 3 Generation performance 4 Distribution overview 5 Transmission
More informationTEMPERATURE AND STRESS IN ALCATOR C-MOD DUE TO THE DIVERTOR UPGRADE
THERMAL ANALYSIS TO CALCULATE THE VESSEL TEMPERATURE AND STRESS IN ALCATOR C-MOD DUE TO THE DIVERTOR UPGRADE Han Zhang 1, Peter H. Titus 1, Robert Ellis 1, Soren Harrison 1,2, Rui Vieira 2 1 Princeton
More informationState-of-the-Art 3-D Assessment of Elements Degrading TBR of ARIES-ACT SiC/LiPb Blanket
State-of-the-Art 3-D Assessment of Elements Degrading TBR of ARIES-ACT SiC/LiPb Blanket L. El-Guebaly, A. Jaber, L. Mynsberge and the ARIES-ACT Team Fusion Technology Institute University of Wisconsin-Madison
More informationEnergy Performance Information Request Timeline
Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when
More informationStrategy for Promoting Centers of Excellence (CoE) Activities
Strategy for Promoting Centers of Excellence (CoE) Activities 1. The Background of the ITU Centers of Excellence (CoEs) Network: The Centres of Excellence project was established pursuant to resolutions
More informationGalapagos San Cristobal Wind Project. VOLT/VAR Optimization Report. Prepared by the General Secretariat
Galapagos San Cristobal Wind Project VOLT/VAR Optimization Report Prepared by the General Secretariat May 2015 Foreword The GSEP 2.4 MW Wind Park and its Hybrid control system was commissioned in October
More informationMagnet. Status Report. Pablo Campero Detector Support Group
Magnet Status Report Pablo Campero Detector Support Group DSG STAFF 2 Overview Solenoid Torus Contents Control, Monitoring, and Interlock Systems Cryogenics Distribution Box Solenoid Torus Tasks Torus
More informationDevelopment of Full-size Mockup Bushing for 1 MeV ITER NB System
1 ITR/P1-15 Development of Full-size Mockup Bushing for 1 MeV ITER NB System H. Tobari 1), T. Inoue 1), M. Hanada 1), M. Dairaku 1), K. Watanabe 1), N. Umeda 1), M. Taniguchi 1), M. Kashiwagi 1), H. Yamanaka
More informationFACILITY DEVELOPMENT AND OPERATIONS
FACILITY DEVELOPMENT AND OPERATIONS by J.L. Luxon Presented to Advisory Committee San Diego, California January 20 21, 2000 003 00/JLL/ci OUTLINE/SUMMARY Completed successful in-vessel installations Cryopump
More informationSupported by. NSTX Liquid Lithium Divertor Status, Plans, and Future Liquid Lithium R&D Needs
NSTX Supported by NSTX Liquid Lithium Divertor Status, Plans, and Future Liquid Lithium R&D Needs College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar
More informationReview and update on MAGLEV
EUROPEAN CRYOGENICS DAYS 2017 (Karlsruhe, Germany, September 13, 2017) Review and update on MAGLEV Hiroyuki Ohsaki The University of Tokyo, Japan Outline Review and update on MAGLEV 1. Introduction 2.
More informationStatus of the Nuclotron-M project
Status of the Nuclotron-M project PAC for Particle Physics, Dubna, 14 Jan 2010 G. Trubnikov for the project team NICA: Nuclotron based Ion Collider facility Nuclotron provides now performance of experiments
More informationThis chapter gives details of the design, development, and characterization of the
CHAPTER 5 Electromagnet and its Power Supply This chapter gives details of the design, development, and characterization of the electromagnets used to produce desired magnetic field to confine the plasma,
More information2016 ADVISORY PANEL SUPERCONDUCTING & OTHER ROTATING MACHINES. Jon Hahne Center for Electromechanics The University of Texas at Austin 5/10/2016
2016 ADVISORY PANEL SUPERCONDUCTING & OTHER ROTATING MACHINES Jon Hahne Center for Electromechanics The University of Texas at Austin 5/10/2016 Rotating Machine s Niche Offer balanced and efficient energy
More informationTorus Coil. Construction and Geometry for Modeling. D. Kashy CLAS12 Collaboration Meeting March 6, 2018
Torus Coil Construction and Geometry for Modeling D. Kashy CLAS12 Collaboration Meeting March 6, 2018 Introduction We all know in general what the CLAS12 Torus is In this talk I will attempt to explain
More informationCALL FOR IDEAS FOR THE RE-USE OF THE MARS EXPRESS PLATFORM PLATFORM CAPABILITIES. D. McCoy
Mars Express Reuse: Call for Ideas CALL FOR IDEAS FOR THE RE-USE OF THE MARS EXPRESS PLATFORM PLATFORM CAPABILITIES D. McCoy PARIS 23 MARCH 2001 page 1 Mars Express Reuse: Call for Ideas PRESENTATION CONTENTS
More informationThe Wendelstein 7-X trim coil system
1 The Wendelstein 7-X trim coil system Thomas Rummel, Konrad Riße, Frank Füllenbach, Matthias Köppen, Johann Kißlinger, Tom Brown, Ron Hatcher, Stephen Langish, Mike Mardenfeld, and Hutch Neilson Abstract
More informationELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 BACKGROUND
ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 Project Manager: Chris Hayes Advisor: Paul I-Hai Lin 1 BACKGROUND Kraft Foods 35 uction of Energy Costs Over The Next 5 Yrs. (2005
More informationHTS Machines for Applications in All-Electric Aircraft
University Research Engineering Technology Institute on Aeropropulsion & Power Technology Power Engineering Society General Meeting 2007 HTS Machines for Applications in All-Electric Aircraft Philippe
More informationMaking Electricity since December Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada
Making Electricity since December 2015 Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada Cambridge 1 Company Culture Vision Woodstock TMMC's goal is to maintain a
More informationSuper-Critical Water-cooled Reactor
Super-Critical Water-cooled Reactor SCWR System Steering Committee Y.P. Huang (Chair, China) L. Leung (Co-Chair, Canada, Presenter) R. Novotny (EU, awaiting confirmation) A. Sedov (Russian Federation)
More informationCase Study. Modernising gas fired power plant boiler damper drives and damper bearings
Case Study Modernising gas fired power plant boiler damper drives and damper bearings Boiler Damper Drives & Bearings Modernisation Case Study - 10th December 2014 Boiler Damper Drives & Bearings Modernisation
More informationGhassan Y. Antar University of California San Diego
Progress in understanding Intermittency in Magnetically Confined Plasma Devices Ghassan Y. Antar University of California San Diego Acknowledgments G. Counsell (MAST, UK) P. Devynck (Tore Supra, France)
More informationITER International Partnerships - France & China -
ITER International Partnerships - France & China - Claude FOULON French Embassy in China Mission Economique de Pékin ITER Business Forum Nice - December 2007 CHINA & ITER in 10 A favorable economical context
More informationRojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia
Rojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia CONTENTS Background Renewable Resources Potential Institutional Framework Namibian ESI Current RE Procurement Status Challenges
More informationCHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.
25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements
More informationFueling System Proposal for KSTAR
Fueling System Proposal for KSTAR D.A. Rasmussen, L.R. Baylor, S. K. Combs, M.J. Cole, P.B. Parks* Oak Ridge National Laboratory KSTAR fueling system parameters Parameter Gas Fueling System Pellet Fueling
More information600 A CURRENT LEADS WITH DRY AND COMPACT WARM TERMINALS
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 605 600 A CURRENT LEADS WITH DRY AND COMPACT WARM TERMINALS T.P. Andersen
More informationTechnical Manual Index
Technical Manual Index Manuals March 1, 2017 Publication Number CFMI-TP. Nomenclature Version Next CD.512-2A Shop Manual SM.6 - R82 Illustrated Parts Catalog PC.9 R62 Service Bulletins Up to Oct 17, 2016
More informationSOFE
KOREAN R&D ON THE 6-PULSE CONVERTER UNIT FOR ITER AC/DC CONVERTERS SOFE 2011 2011. 06. 27 J. S. Oh 1), J. Choi 1), J. H. Suh 1), H. Liu 2), S. Lee 2), H. Park 2), W. Jung 2), S. Jo 2), H. Tan 3), J. Tao
More informationELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL BACKGROUND
ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL Project Manager: Chris Hayes BACKGROUND Kraft Foods 35 Reduction of Energy Costs Over The Next 5 Yrs. (5 Benchmark) Kraft Foods Financial Model
More informationCollaboration between CELLS in Barcelona and BINP in Novosibirsk in the construction of ALBA Synchrotron
Collaboration between CELLS in Barcelona and BINP in Novosibirsk in the construction of ALBA Synchrotron Josep Campmany on behalf of CELLS Accelerators Division 10/11/2011 J. Campmany ALBA- CELLS (Barcelona)
More informationSAE Mini BAJA: Suspension and Steering
SAE Mini BAJA: Suspension and Steering By Zane Cross, Kyle Egan, Nick Garry, Trevor Hochhaus Team 11 Project Progress Submitted towards partial fulfillment of the requirements for Mechanical Engineering
More informationEU Interregional Cooperation
EUROPEAN REGIONAL DEVELOPMENT FUND EU Interregional Cooperation State of play and perspectives Verena Priem Project Officer Joint Technical Secretariat ECOTALE final conference 14 May 2014, Poznan ECOTALE
More informationAsymmetry of W7-X magnet system introduced by torus assembly
Asymmetry of W7-X magnet system introduced by torus assembly Joris Fellinger, Konstantin Egorov, Johannes Peter Kallmeyer, Victor Bykov, Felix Schauer Max-Planck-Institut Für Plasmaphysik, Teilinstitut
More informationAMBR* Engine for Science Missions
AMBR* Engine for Science Missions NASA In Space Propulsion Technology (ISPT) Program *Advanced Material Bipropellant Rocket (AMBR) April 2010 AMBR Status Information Outline Overview Objectives Benefits
More informationF4E NEWS CARDBOARD VIRTUAL REALITY GLASSES INSIDE! ITER Worksite Contracts Components Innovation Events
F4E NEWS Fusion for Energy Newsletter No. 20 / December 2016 ITER Worksite Contracts Components Innovation Events Drilling, building, lifting! 100 million EUR for ITER robotics contracts Europe first cryoplant
More informationArtesis MCM Case Studies. March 2011
Artesis MCM Case Studies March 2011 Case 1 Automotive Company: Automobile Manufacturer A Equipment: Pump Stator Isolation Breakdown Decreasing current unbalance level Case 1 Automotive Company: Automobile
More informationUpdate on superconducting high-speed flywheel energy storage systems
Page 1 Babcock Noell GmbH Update on superconducting high-speed flywheel energy storage systems Michael Gehring, Achim Hobl, Wolfgang Walter, Cristian Boffo Babcock Noell GmbH Outline Page 2 Motivation
More informationConceptual Design Report on JT-60SA Fuelling System Gas Fuelling System
3.10 Fuelling System 3.10.1 Gas Fuelling System 3.10.1.1 Overview The gas fuelling system is the equipment to inject gas into the vacuum vessel. The equipment consists of injection, delivery, vacuum pumping
More informationMIRI Cooler System Design Update
1 MIRI Cooler System Design Update M. Petach, D. Durand, M. Michaelian, J. Raab, and E. Tward Northrop Grumman Aerospace Systems Redondo Beach, CA 90278 ABSTRACT The Mid InfraRed Instrument (MIRI) for
More informationPreliminary Neutronics Assessment of Molten Salt Blanket Concepts
Preliminary Neutronics Assessment of Molten Salt Blanket Concepts Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI ITER TBM Meeting UCLA Feb. 23-25, 2004 1 Preliminary Neutronics
More informationProduct Brochure Fan coil units for suspended ceilings HyPower-Geko. Energy efficient Powerful Hygienic Low noise
Product Brochure Fan coil units for suspended ceilings HyPower-Geko Energy efficient Powerful Hygienic Low noise Optimal climate: Hygienic. Efficient. Sustainable. The HyPower-Geko fan coil units generate
More informationNanoRacks External Payload Platform
NanoRacks External Payload Platform Introduction NanoRacks has developed a hosted payload service, NanoRacks External Payload Platform (NREP) NREP will be installed on the JEM EF Hosted payloads will utilize
More information