क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

Similar documents
क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

2.0 TEST RECORDS - All records of inspection and tests shall be kept in suitable forms approved by the Bureau of Indian Standard (BIS).

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

4. MARKING: Each cistern shall be provided with a label containing the following information or the information paper strip pasted to it.

2. TEST RECORDS: All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

Marking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER ALLOY GATE, GLOBE AND CHECK VALVES FOR WATER WORKS PURPOSES ACCORDING TO IS 778:1984

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

ईट ड 11/ ट

सम मनत यहद प ई ह त ल हदए गए प र चपक म म ख प रपक च म खत पक त पक अध हस त क ष प भ ज

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

ववषय ववद य त पक व ट र व ह ज म पक प वव (AIS 040:2015 प अमभन अमभग रहण )

प र ख स ख य ववषय TED 27 (13009) W - II ववद य त पक व ट र व ह प पक व तथ 30 मम ट प अ पतम पक व म पक (AIS 041:2015 प अमभन अमभग रहण)

(URL: F /KV Damoh/ / Date:

DOCUMENT DESPATCH ADVICE. Technical Committee: Petroleum and Related Products Sectional Committee, PCD 3

भ रत य म नक य र य र क इ ज ननयरर ग व भ ग य पक पररच लन म मस द रल ख र षण स ञ पन

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI


इल क र क स लल ग प ख व वषक टट ( प न क ण)

म नक भवन, 9 बह द रश ह फर म ग, नई दद ल

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

ईट ड 16/ ट

Automotive Vehicles Safety Belts, Restraint Systems and Safety Belt Reminder Installation Requirements

Technical Committee: Petroleum and their Related Products of synthesis or biological origin Sectional Committee, PCD 3

य पक प रच लन मस द प स ड 25(2700) तकन क स म त प स ड 25

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India


MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI Phone: , , Extn 8406, ; Website:

ETD 39 (10038 ) ETD 39 (10039 ) ETD 39 (10040 )

Solutions for Full Length Test - 4

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II(L)/16:

ट ईड 6/ TED 7/T

Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j

ट ईड 6/ TED 7/T

Application is to be sent to the undersigned in two sealed covers on or before 21st July 2018 by 1500 hrs. as under:

भ रत य म नक ब य र य त क इ ज ननयरर ग व भ ग. एम.ई.ड.20/ट March 2018

SOUTHERN REGIONAL POWER COMMITTEE

ब जल स स रक ष ELECTRICAL SAFETY. Dr. H. K. Verma Distinguished Professor (EEE) Sharda University, Greater Noida

LT ATUL KATARYA MEMORIAL SCHOOL. Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon,

THE CORE BANKING SOFTWARE. Guide is Under Development. It will be soon available for online references.

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

व द य त स रक ष व द य त स च म डण रचन / आर खड प रम णपत र अभ य सक रम स म न यत द ण य ब बत.

भ रत य म नक य क इ ज नय र ग वभ ग फ़ न पर अन प कर : ; फ + : ; ईम ल

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

ल ख षणस पन व य पकप रच लनमस द प स ड 3(12109)C

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

स त य; त, प रश सनक क य ष य,

रलख रषण स चन /DOCUMENT DESPATCH ADVICE ट ईड 29/ट -11,TED 29/T PASSIVE SAFETY CRASH PROTECTION SYSTEMS SECTIONAL COMMITTEE, TED 29

DOCUMENT DESPATCH ADVICE. Biodiesel, Diesel Fuel Blend ( B6 to B20) Specification

दय अन फ ध क स चन. Tender Ref. No.: SCIC/Tenders/2014/001, Date: 10 th Oct, 2014

THERMODYNAMIC AND HEAT TRANSFER STUDIES ON THERMOELECTRIC POWER GENERATION AND COOLING OPTIONS S.MANIKANDAN

Remote Village Electrification

BUREAU OF INDIAN STANDARDS MECHANICAL ENGINEERING DEPARTMENT Please correspond at Phone: , Fax: ,

Manak Bhavan, 9 Bahadur Shah Zafar Marg New Delhi TeleFax Website : :

Disclosure to Promote the Right To Information

Session IV ESMAP Approach and Pilot Overview

तकन क सममतत : ईट ड 14

Disclosure to Promote the Right To Information

Copy to : Head (ITSD)- With a request to host this circular on BIS Intranet and website. : Head (VZBO) : Head (MED)

प 7 म, ज र करन क त र ख.., व ट क न च, न न ल खत अ त: थ पत

DRAFT IN WIDE CIRCULATION PCD 25(10012)C 15/02/2016

/ Telefax : No: 1(2)2015-E/ Battery& Charger TVH/ Dated:

BUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014

THE ASIAN SCHOOL, BAHRAIN MONTHWISE DISTRIBUTION OF SYLLABUS FOR THE YEAR

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

INDUSTRY SALES REVIEW. July 2017

Disclosure to Promote the Right To Information

द क षण क ष तर य व त स म त

AIRPORTS AUTHORITY OF INDIA OFFICE OF THE AIRPORT DIRECTOR ल. ग. ब. हव ई L G B I AIRPORT, GUWAHATI TECHNICAL DIRECTORATE क ट शन

/ I S S : / S T S I

Rajasthan Public Service Commission 2016

DESIGN, DEVELOPMENT AND CONTROL OF COPPER ROTOR INDUCTION MOTORS FOR ELECTRIC VEHICLE

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

INDRA MARSHAL POWER TILLER

Disclosure to Promote the Right To Information

Compendium of Scheme for Testing of Additives for Petrol & Diesel

File No.CEA-PS-13-17(14)/2/2018-PSPM Division. CEA /PS/PSPM/07/07/2018/ Dated:

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

Ph. No: Fax No: Website:

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

VIJAY VR-15L POWER TILLER

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

HYDRAULICALLY REGULATED DOOR CLOSER

All members of Pumps Sectional Committee MED 20

Government Of India Ministry of Power Central Electricity Authority New Delhi

CENTRAL MARKS DEPARTMENT II (Legal) Our Ref: CMD-II/16: July 2014

PRODUCT MANUAL FOR DISINFECTANT FLUID, PHENOLIC TYPE According to IS 1061: 2017

Ph. No: Fax No: Website:

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

Ph. No: Fax No: Website:

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information

Transcription:

क न द र य म ह व भ ग - III भ स द भ- स ए ड -III/16: IS 14587 07 न म बभ 2017 ग षय म ह- आई एस 14587 : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017 इस उपर क त व षय क स दर भ ह सक षम प र ध क र न IS 14587 : 1998 क अन स र उत प द क प रम णन ह त प नर क षक षत एस.ट.आई Doc: STI/14587/3, क अन म ददत कर ददय ह सर स ब ध त पक षक र स अन र ह कक इसक अन प लन तत क ल प रर स स ननश च त कर प र वख (स ए ड -III) (एस ड भ ण ) ज ञ ननक ई (स ए ड -III) स क ष त र य म ह/श ख क य म ह भलय म ह आई ट एस ग ब आईएस इ ट र न ट पभ ड लन त Page 1 of 8

CENTRAL MARKS DEPARTMENT-III Our Ref: CMD-III/16: IS 14587 07 November 2017 Subject: Revised STI Doc: Doc: STI/14587/3, for certification of IS 14587 : 1998. This has reference to the subject mentioned above. The Competent Authority has approved the revised STI, Doc: STI/14587/3, for certification of the product as per IS 14587 : 1998. All concerned are requested to ensure compliance of above STI with immediate effect. (S D Rane) Sc-E (CMD- III) Head (CMD-III) Circulated to all RO/BO Copy to: ITS for hosting on BIS Intranet.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PRELAMINATED MEDIUM DENSITY FIBRE BOARD ACCORDING TO IS 14587 : 1998 1. LABORATORY 1.1 A laboratory shall be maintained which shall be suitably equipped and staffed, where different tests given in the Specification shall be carried out in accordance with the methods given in the Indian Standard. 1.2 All test equipments shall be periodically checked, verified and calibrated and records of such checks/verification/calibration shall be maintained. 2. TEST RECORDS 2.1 All records of tests as per this Scheme of Testing and Inspection shall be kept in suitable forms. 2.2 Copies of any such records that may be required by BIS shall be made available at any time on request. 3. QUALITY CONTROL 3.1 It is recommended that, as far as possible, Statistical Quality Control (SQC) methods may be used for controlling the quality of the product during production as envisaged in this Scheme [see IS 397 (various parts)]. 3.2 In addition, effort should be made to gradually introduce a Quality Management System in accordance with IS/ISO 9001. 4. STANDARD MARK 4.1 The Standard Mark, as given in Column (1) of the First Schedule of the licence shall be applied on each prelaminated medium density fibre board, provided always that the boards to which the Standard Mark is applied conforms to every requirement of the specification. 5. MARKING 5.1 In addition to the Standard Mark, the information as per clause 12.1 of IS 14587 : 1998 shall be legibly and indelibly marked on any edge of each prelaminated medium density fibre board.

6. LEVELS OF CONTROL 6.1 The tests as indicated in Table 1, and at the levels of control specified therein, shall be carried out on the whole production of the factory covered by this scheme and appropriate records maintained in accordance with clause 2 above and charts may be maintained as per clause 3 above. All the production which conforms to the Indian Standard and covered by this licence shall be marked with Standard Mark. 6.2 Control Unit: For the purpose of this Scheme, Prelaminated Medium Density Fibre Boards of the same type and grade manufactured with the same batch of adhesive compound during a shift of eight hours subject to a maximum 1000 boards shall constitute a control. 6.3 On the basis of the test results, decision regarding conformity or otherwise of the production shall be made as follows: 6.3.1 Samples of the boards shall be selected and tested for all requirements as per the frequency specified in the Table1. If samples meets the requirements of Indian Standard, product covered by the licence shall be marked with standard mark. 6.3.2 In case of failure in dimensions, all the boards manufactured during last hour shall be checked and those confirming to the requirements shall be marked. 6.3.3 For tests other than measurement of dimensions and cyclic test, two samples shall be tested from the same control. If both the samples fail, the control shall be rejected and shall not be marked. If one sample fails, then two additional samples shall be taken from the same control for retesting. If any sample retested fails, the control shall be rejected and shall not be marked. 6.4 In respect of all other clauses of the Specification and at all stages of manufacture, the factory shall maintain appropriate control and checks to ensure that the product conforms to various requirements of the Specification. 7. REJECTIONS 7.1 A separate record shall be maintained giving information relating to the rejection of the production not conforming to the requirements of the Specification and the method of disposal. Such material shall in no case be stored together with that conforming to the Specification. The Standard Mark (if already applied) on rejected material shall be defaced. 8. SAMPLES 8.1 The licensee shall supply, free of charge, the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations, 1988, as amended from time to time, from the factory or godown. BIS may draw samples from the open market, if available.

9. REPLACEMENT 9.1 Whenever a complaint is received soon after the goods with Standard Mark have been purchased and used, and if there is adequate evidence that the goods have not been misused, defective goods shall be replaced free of cost by the licensee in case the complaint is found to be genuine and the warranty period (where applicable) has not expired. The final authority to judge the conformity of the product to the Indian Standard shall be with BIS. 9.2 In the event of any damage caused by the goods bearing the Standard Mark, or any claim being filed by the consumers against BIS Standard Mark and not conforming to the relevant Indian Standard, entire liability arising out of such non-conforming product shall be of the licensee and BIS shall not in any way be responsible in such cases. 10 STOP MARKING 10.1 The marking of the product shall be stopped under intimation to BIS if, at any time, there is some difficulty in maintaining the conformity of their product to the Specification, or the testing equipment goes out of order or due to any other reason. The marking may be resumed as soon as the defects are removed under intimation to BIS. 10.2 The marking of the product shall be stopped immediately if directed to do so by BIS for any reason. The marking may then be resumed only after permission by BIS. The information regarding resumption of marking shall also be sent to BIS. 11 PRODUCTION DATA The licensee shall send to BIS a statement of quantity produced, marked and exported by him and the value thereof at the end of each operative year of the licence as per the enclosed proforma which has to be authenticated by a Chartered Accountant.

TABLE 1 LEVELS OF CONTROL (Clause 6 of the Scheme of Testing and Inspection) Test Details Level of control Remarks Clause Requirement Test Method No of Frequency Clause Reference Samples 5.1 Medium density fibre board 5.1 IS 14587 Each lot No further testing is required if IS 12406 medium density fibre boards received are with ISI marked. 5.2 Impregnated base paper 5.2 IS 14587 Each lot - 5.3 Impregnated overlay 5.3 IS 14587 Each lot - 7 Finish 7 IS 14587 Each board 8 Dimension and tolerances 8 IS 14587 Three IS 12406 - - Every hour production In case of failure, refer 6.3.2 of the STI. 9.2(a), Table 1 and 10.2 9.2(b) and 10.3 9.2(c), Table 1 and 10.4 Density 10.2 IS 14587 IS 2380 (Part 3) Moisture content 10.3 IS 14587 IS 2380 (Part 3) Water absorption test 10.4 IS 14587 a) 2 h IS 2380 (Part 16) b) 24 h In case of failure, refer 6.3.3 of the STI. 9.2(d), Table 1 and 10.5 9.2(e), Table1 and 10.6 Swelling in water test 10.5 IS 14587 IS 2380(Part 17) Modulus of rupture (MOR) 10.6 IS 14587 and Modulus of IS 2380(Part 4) elasticity(moe)

Test Details Level of control Remarks Clause Requirement Test Method No of Lot size Clause Reference Samples 9.2(f), Table 1 Tensile strength 10.7 IS 14587 In case of failure, refer 6.3.3 of the and 10.7 perpendicular to surface IS 2380(Part 5) STI. 9.2(g), Table 1 and 10.8 10.8 IS 14587 IS 2380(Part 5) 9.2(h), Table 1 and 10.9 9.2(j), Table 1 and 10.10 9.2(k) and 10.11 9.2(m) and 10.12 9.2(n) and 10.13 9.2(p) and 10.14 Tensile strength perpendicular to surface after ageing test a) Cyclic test or Once in three months for each type and grade. b) Accelerated water resistance test 10.8 IS 14587 IS 2380(Part 5) Screw withdrawal test 10.9 IS 14587 IS 2380(Part 14) Resistance to abrasion Annex B IS 14587 Resistance to steam Annex C IS 14587 Resistance to crack Annex D IS 14587 Resistance to cigarette burns Annex E IS 14587 Resistance to stain Annex F IS 14587 10.15 Steady state formaldehyde emission value 10.15 IS 14587 IS/ISO 12460-1: 2007 If any sample fails, marking shall be stopped. Marking shall be resumed only after passing of improved lots produced after taking corrective actions. Frequency of testing shall be maintained as once in a month for each type and grade of boards till three consecutive samples pass and thereafter original frequency of testing shall be resumed. In case of failure, refer 6.3.3 of the STI.

PROFORMA FOR OBTAINING PRODUCTION DETAILS DOC: STI/12406/3 Period covered Name of Licensee CM/L No. Name of Articles (s) IS No. Grade/Type/Size/Variety/Class/Rating Brand/Trade/Name(s) of Product covered under BIS Certification Mark Total production of the articles(s) licensed for certification marking Total production of the article(s) conforming to Indian Standard Production covered with BIS Certification Mark and its Value : a) Quantity b) Value (Rs.) Brand Name used on production covered under BIS Certification Mark Calculation of marking fee on -rate basis; Marking Fee per a) Unit b) Quantity covered with BIS Certification Mark c) Marking fee rounded off in whole rupees as obtained by applying rates given in (a) on quantity given in (b) NOTE: In case a clause is not applicable, suitable remarks may be given against it Quantity not covered with BIS Certification Mark, if any. Reasons for such non-coverage Brand Name under which non-isi goods were sold Quantity exported with BIS Standard Mark and its value Brand Name under which BIS Certified goods are exported Authentication by Chartered Accountant