JBS-100-STB Single Entry Power Connection with Junction Box Installation Instructions

Similar documents
JBS-100-A, A6 SINGLE ENTRY POWER CONNECTION WITH JUNCTION BOX INSTALLATION INSTRUCTIONS

JBM-100-STB NEMA 4X-rated connection kit Installation Instructions

SPC-P Smart Power Connection with Temperature Monitoring Transmitter Pipe Mounted Installation Instructions

C A Heating Cable Gland Kit Installation Instructions

PMKG-JS POLYMATRIX SPLICE CONNECTION KIT INSTALLATION INSTRUCTIONS

PMKG-J2LP PolyMatrix Powered Splice Kit Installation Instructions

C A HEATING CABLE GLAND KIT INSTALLATION INSTRUCTIONS

AutoMatrix Power Connection Kit. (1) This type 4X enclosure is intended for indoor or outdoor use primarily to. (2) May be required (see step 1).

EMK-XP ElectroMelt Power Connection and End Seal Kit Installation Instructions

Power-Limiting Cables

ET-PWR-END-KIT Installation Instructions (part #JSR00)

Modified polyolefin (-CR) or fluoropolymer (-CT) outer jacket

HAK-C-100 CONNECTION KIT FOR DIVISION 1 HAZARDOUS LOCATIONS INSTALLATION INSTRUCTIONS

SRK02 Hard Wire Power Connection Kit. Installation, Operation and Maintenance Instructions

HAK-C-100 CONNECTION KIT FOR DIVISION 1 HAZARDOUS LOCATIONS INSTALLATION INSTRUCTIONS

Power Connection Kit installation instructions

Product Overview. Application

HTP PTP/ PTJ Power Connection Kit for Pipes

PRO-Tect Pipe Freeze Protection Self-Regulating Heating Cable Install Manual (PT-Series)

C Power Connection Kit

H900 WinterGard Power Connection Kit with End Seal Installation Instructions

MI Heating Cable. HDPE jacketed, copper sheathed MI cable. For surface snow melting in concrete, asphalt, and pavers. MI Heating Cable Configuration

XMI-L STAINLESS STEEL, LOW TEMPERATURE SHEATH CONSTANT WATTAGE MINERAL INSULATED HEATING CABLES

WarmlyYours ET-SR Series Heating Cable Installation Manual for Roof & Gutter Deicing

Self-regulating cables

UPC Power Connection Kit

UES-LL End Termination Kit

Power Connection Kit Installation Instructions. Terminator ZP-M for use with TEK and HTEK series constant watt heating cables

PIPE FREEZE PROTECTION AND FLOW MAINTENANCE XL-TRACE SYSTEM

SELF-REGULATING CABLES

Nuheat WEATHER-READY HEAT TRACE PIPE FREEZE PROTECTION SYSTEM. Self-Regulating Heating Cable Installation Guide. UV Resistant Polyolefin Outer Jacket

TSRT TSRT Tee Splice Kit Installation Instructions

QUICKTERM TERMINATION KIT

Installation & Operation Instructions. Type USL Signal Light Kit for Self-Regulating Constant Wattage Heating Cables. Constant Wattage Grommet

Self-Regulating Cables

Terminator DL-S for use with BSX *, HTSX, KSX self-regulating, HPT power-limiting, and FP constant watt heating cables

HWAT System INSTALLATION AND OPERATION MANUAL FOR HOT WATER TEMPERATURE MAINTENANCE SYSTEMS FOR THERMALLY INSULATED PIPES

Power Connection Kit Installation Instructions. Terminator DP-M for use with TEK and HTEK series constant watt heating cables

XL-Trace System. Installation and Operation manual for pipe freeze protection and flow maintenance

STAINLESS STEEL, LOW TEMPERATURE SHEATH CONSTANT WATTAGE MINERAL INSULATED HEATING CABLES

Terminator DP/FAK-2 and FAK-2L. Elbow Splice Kit for Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

PETK Power and End Termination Kit

Ecoflex potable PEX plus pre-insulated pipe system Installation guide

MI HEATING CABLE COPPER AND HDPE JACKETED COPPER SHEATHED MI CABLE. For heat loss replacement, floor heating and radiant space heating

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

MI HEATING CABLE COPPER AND HDPE JACKETED COPPER SHEATHED MI CABLE. For commercial and industrial applications. Heating cable construction

1 GENERAL INFORMATION

Terminator ZP/FAK-4L Kit Electrically Heated TubeTrace Bundles

Terminator ZP/FAK-1 Kit Electrically Heated TubeTrace Bundles

WARNING. Important Notice

Terminator DP/FAK-4LHT Kit for In-Line Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

3M Cold Shrink QT-III Silicone Rubber Three-Core Termination Kits

Environmental Distribution Center (EDC-06P-NH)

Installation Instructions

American Standard ProAx Triaxial Camera Connectors Installation Instructions

Terminator DP/FAK-4 and FAK-4L for In-Line Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

Terminator DP/FAK-5 and FAK-5L

3M Cold Shrink Silicone Rubber Termination QT-III 7600-S-3G Series Three-Core Outdoor Termination

SLiC Aerial Terminal and Spiral End Seal for use with AMP* Quiet Front Terminal Blocks

Terminator DP/FAK-5LHT Kit for Tee Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

HARNESS KIT 3 PORT ISOLATION MODULE LIGHT SYSTEM. Parts List and Installation Instructions CAUTION

Terminator ZP/FAK-5 and 5L

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

AquaLumin III - Nicheless Light Installation Guide IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Slide on the heat shrink tubing and connect the wire to the color matched cable on the Junction Box, making sure to line up the cable properly

WRSS Wraparound Repair Sleeve Installation Instructions

Pretium Wall-Mountable Housing (PWH-02P/-04P/- 06P/-12P and FZB-02P-JB)

FIST-GSS2 FIST-GSS3. Fist Generic Splicing Shelf. Contents. 1 Introduction. 2 General. 3 Installation of the shelf. 5 Termination of the pigtails

WOC & WOC Top & Back Installation Instructions

Fiber Connector Shelf (CCS)

Job Sheet 6 Installing the Combiner Box

FIST-GSS2. Fist Generic Splicing Shelf MK2. Contents. 1 Introduction. 2 General. 3 Installation of the shelf. 5 Termination of the pigtails

The Go Baby Go Build Manual

PETK Power and End Termination Kit

VITALink Taped Splice Pigtail Crimp

POWERHEAT TYPE AHT TERMINATION INSTRUCTIONS. Ref TK/AHT Issue C Date 16 August 1999

INSTALLATION INSTRUCTIONS

Step #1 From your spool of 18 gauge primary wire, cut between 11 and 21 three inch strips of wire. You will only need 11 for the ROV, but it is good t

COYOTE LCC (Low Count Closure)

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Full Top Deck Kit. Installation Instructions

PETK Power and End Termination Kit

In-Line / T-Splice Kit Installation Instructions. Terminator DS-L for use with RSX, TSX, VSX self-regulating heating cables

1.1 Quad Valve and Tri-Valve. Contents WATER DUMP BODY O-RING EXHAUST VALVE QUAD VALVE TIE WRAP EXHAUST MAIN BODY O-RING

SYSTIMAX GS3 and 1100GS6 Evolve Modular Panel Instructions

Termination Procedure for Subminiature SolderTacts Contacts for Coaxial Cable: D & D D & D

FIST-GMS2. FIST Generic Mixed Shelf MK2. Contents. 1 Introduction. 5 Termination of the pigtails. 2 General. 6 Splicing + fiber storage

Assembly Instruction EL OCHITO WHITE CONTACTS 1000BASE-T/10GBASE-T TYPE I: PIN /SKT CABLE: S/FTP

INSTALLATION INSTRUCTIONS

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

INSTALLATION GUIDES DekaFlex Connectors DEKAFLEX MC-HL CONNECTOR INSTALLATION GUIDE FOR HAZARDOUS LOCATIONS

Handyman Motor Capacitor Meter PART NO

LEXUS RC 350/RC-F ILLUMINATED DOOR SILLS Preparation

GENUINE PARTS INSTALLATION INSTRUCTIONS

CS Fiber Optic Splice Case. Instruction

UniTrak Sensor Assembly Kit Horizontal, Vertical, and Combination Sashes

Product Installation Instructions. Raychem Corporation Electrical Products 8000 Purfoy Road Fuquay-Varina, NC 27526

GENUINE PARTS INSTALLATION INSTRUCTIONS

Fabric Replacement Top Installation Instructions

WORLDWIDE GUARDWIRE ACCESSORIES INSTALLATION MANUAL PROVEN PERIMETER PROTECTION

Transcription:

JBS-100-STB Single Entry Power Connection with Junction Box Installation Instructions Description The JBS-100-STB is a NEMA 4X rated power connection kit. It is designed for use with Raychem BTV-CR, BTV-CT, QTVR-CT, XTV-CT, KTV-CT and VPL-CT industrial parallel heating cables. The JBS-100-STB utilizes screw terminal blocks to connect the heating cable to power. This kit may be installed at temperatures as low as 40 F ( 40 C). For easier installation store above freezing until just before installation. For technical support call your local Pentair Industrial Heat Tracing Solutions representative. Tools Required Wire cutters Pliers or adjustable wrench Utility knife Needle nose pliers Large slotted screwdriver Marker 1/4 in or smaller flat-blade screwdriver Wire stripper (for VPL-CT) Approvals Hazardous Locations CLI, ZN1, AEx e II* (1) Ex e ll T* Class I, Div. 2, Groups A, B, C, D Class II, Div. 1 and 2, Groups E, F, G Class III -WS (1) Except VPL Temp Code* *For system Temperature Code, see heating cable or design documentation. Additional Materials Required Pipe strap GT-66 or GS-54 glass cloth tape Optional Materials Recommended conduit drain: JB-DRAIN-PLUG-3/4IN P/N 278621-000 Small pipe adapter for 1 in (25 mm) and smaller pipes: Catalog number JBS-SPA P/N E90515-000 Kit Contents Item Qty Description A 1 Stand B 1 Core sealer C 1 Green/yellow tube D 1 Cable lubricant E 1 Cable tie F 1 Lid G 1 Box with terminal block A B C G F D E WARNING: This component is an electrical device that must be installed correctly to ensure proper operation and to prevent shock or fire. Read these important warnings and carefully follow all of the installation instructions. To minimize the danger of fire from sustained electrical arcing if the heating cable is damaged or improperly installed, and to comply with the requirements of Pentair Industrial Heat Tracing Solutions, agency certifications, and national electrical codes, ground-fault equipment protection must be used. Arcing may not be stopped by conventional circuit breakers. Component approvals and performance are based on the use of Pentair Industrial Heat Tracing Solutions-specified parts only. Do not use substitute parts or vinyl electrical tape. The black heating cable core and fibers are conductive and can short. They must be properly insulated and kept dry. Damaged bus wires can overheat or short. Do not break bus wire strands when scoring the jacket or core. Keep components and heating cable ends dry before and during installation. Use only fire-resistant insulation materials, such as fiberglass wrap and flame-retardant foam. CAUTION: Health Hazard: Prolonged or repeated contact with the sealant in the core sealer may cause skin irritation. Wash hands thoroughly. Overheating or burning the sealant will produce fumes that may cause polymer fume fever. Avoid contamination of cigarettes or tobacco. Consult MSDS VEN 0058 for further information. CHEMTREC 24-hour emergency telephone: (800) 424-9300 Non-emergency health and safety information: (800) 545-6258. 1 / 8

Heating cable types Braid Inner jacket Conductive core Bus wire Outer jacket Outer jacket Braid Braid Inner jacket Inner jacket Heating element Conductive fiber Bus wire connection Spacer Clear jacket Bus wire Insulated bus wire Outer jacket BTV-CR, BTV-CT, QTVR-CT XTV-CT, KTV-CT VPL-CT 1 2 Allow approximately 24 in (60 cm) of heating cable for installation. For VPL, cut cable 12 in (30 cm) from bus indentation. Cut off heating cable end at about 45 for easier insertion. Indentation (bus wire connection on VPL heating cables only). 12 in (30 cm) Optional: If stand is to be installed on bottom side of pipe, knock out drain hole prior to inserting cable. With label on stand facing desired direction of box opening, push 18 in (45 cm) of heating cable through stand. Use cable lubricant if needed. Square off cable end with 90 cut. Drain hole 18 in (45 cm) Label on stand indicates direction of box opening. Do not attach stand to pipe until step 12. 3 4 Lightly score outer jacket around and down as shown. Bend heating cable to break jacket at score, then peel off jacket. Do not cut braid. BTV and QTVR Go to Step 5A XTV and KTV Go to Step 5B 7 1/2 in (190 mm) VPL Go to Step 5C 2 / 8

5A BTV and QTVR 5B XTV and KTV Push braid back to create a pucker. At pucker use a screwdriver to open braid. Push braid back to create a pucker. At pucker use a screwdriver to open braid. Bend heating cable and work it through opening in braid. Bend heating cable and work it through opening in braid. Lightly score inner jacket around and down as shown. 6 1/2 in (165 mm) Lightly score inner jacket around and down as shown. 6 1/2 in (165 mm) Peel off inner jacket. Peel off inner jacket. Notch core. Peel bus wire from core. 1/4 in (5 mm) Cut and remove all fiber strands. Score and remove center spacer. Score core between bus wires at inner jacket. Bend and snap core. Peel core from bus wire. Remove any remaining fiber material from bus wires. Pull braid tight to make pigtail. Remove any remaining core material from bus wires. Pull braid tight to make pigtail. Go to Step 6 Go to Step 6 3 / 8

5C VPL Push braid back and bunch as tight as possible. Lightly score inner jacket around and down as shown. 6 in (152 mm) Peel off inner jacket. Unwind heating element, cut and remove as shown. Lightly score clear jacket around and down as shown. 6 in (152 mm) Bend heating cable to break jacket at the score then peel off jacket. Push braid forward. Use a screwdriver to open braid as shown. Bend heating cable and work it through opening in braid. Remove insulation from ends of bus wires. Pull braid tight to make pigtail. 1/2 in (13 mm) Go to Step 6 4 / 8

6 7 Mark the jacket as shown. Caution: Health Hazard. Wash hands after contact with sealant in core sealer. Consult material safety data sheet VEN 0058. If needed, re-twist and straighten bus wires, then insert into the guide tubes as shown. 5/8 in (15 mm) Make sure all strands go into the tubes. Tubes 8 Push core sealer onto the heating cable to the mark made in step 6. Note: Extra force may be required for larger cables or at lower temperatures. 9 Remove the guide tubes and dispose of them in a plastic bag. Slip the green/yellow tube onto the braid. Heat-shrinking is not required. Make sure the bus wires do not kink, bunch, or crossover. 10 11 Trim bus wires and braid. Pull heating cable back into stand so 1 in (25 mm) is exposed as shown. Use cable lubricant if needed. 1/2 in (13 mm) 1/2 in (13 mm) 1 in (25 mm) 5 / 8

12 Fasten stand to pipe with label facing desired direction of box opening. Do not pinch heating cable. Loop and tape extra heating cable to pipe. 1 in (25 mm) Glass cloth tape Note: For 1 in (25 mm) and smaller pipes use adapter (purchased separately) and install between stand and pipe. JBS-SPA adapter for small pipes Position adapter this side up. Pipe strap 13 14 (Optional) To change direction of box opening: Screw box onto stand until it stops. Do not overtighten. Loosen locknut. Lift box and rotate. Make sure tab on threaded piece fits into one of the four notches in box. Tighten locknut. Notch 15 Insert cable tie through slots on stand and box, and tighten firmly to prevent box rotation. Trim 6 / 8

16 This kit uses screw style terminals. To connect wires, fully insert into opening on side of terminal block 1. Insert small flat-blade screwdriver through round opening and firmly tighten screw 2. Bend conductors for easier insertion into terminal block. Wire insertion 1. Use green terminal for braid and ground wire. Tighten screws 2. Repeat 1 and 2 for remaining wires. 7 / 8

17 Install conduit and fittings as shown. To minimize loosening due to pipe vibration, use flexible conduit. Pull in power and ground wires, strip off 1/2 in (13 mm) of insulation and terminate. 3/4 in locknut Water tight conduit seal Conduit drain Make sure conductors are not exposed. Pentair Industrial Heat Tracing Solutions recommends the use of a conduit drain to prevent water condensation build-up. 18 Install lid. Apply insulation and cladding. Weather-seal the stand entry. Leave these instructions with the end user for future reference. Weather seal www.pentairthermal.com NORTH AMERICA Europe, Middle East, Africa Asia Pacific Latin America Tel: +1.800.545.6258 Fax: +1.800.527.5703 Tel: +1.650.216.1526 Fax: +1.650.474.7711 thermal.info@pentair.com Tel: +32.16.213.511 Fax: +32.16.213.603 thermal.info@pentair.com Tel: +86.21.2412.1688 Fax: +86.21.5426.2937 cn.thermal.info@pentair.com Tel: +1.713.868.4800 Fax: +1.713.868.2333 thermal.info@pentair.com Pentair, BTV, JBS, QTVR, XTV, KTV and VPL are owned by Pentair or its global affiliates. All other trademarks are the property of their respective owners. Pentair reserves the right to change specifications without prior notice. 2005-2015 Pentair. PN P000000363 8 / 8