Pre-Bid Clarifications -2

Similar documents
NOTIFICATION RURAL ELECTRIFICATION PLAN

Need Assessment Document (NAD) DDUGJY

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Supply, Installation and Commissioning of 1 No 50 Watt LED. based SPV SLS at Nadia District Library, Krishna Nagar, Nadia.

Promoting Technical Quality Measures for PV Mini-grid Development in Indonesia

Queries received on. Page No. / Clause No. Queries / Modifications / Changes Suggested. S. No. Technical Specifications as per RFP

Solar Energy Corporation of India New Delhi-17

Anil Agarwal Dialogue 2014

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL

SUBSIDY SCHEME FOR GRID CONNCTED AND OFF GRID SOLAR SYSTEMS AT IOCL PETROL PUMPS

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

OFF GRID SOLAR PV SYSTEMS

Supply of Batteries

NOTICE INVITING TENDER

Joint Inspection Report

Deen Dayal Upadhyaya Gram Jyoti Yojana Creating Efficiency in Electricity Distribution

2681-IND: Bihar Power System Improvement Project

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

CORRIGENDUM. Page 1 of 16

Frequently Asked Questions for Grid Connected Solar Rooftop Systems

Chapter 1 POPULATION

Marina Bay Sands Guidelines for Electrical and Wiring Service

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48

POPULATION. Chapter 1

Construction and Connection of Street Light Assets

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

RPO-REC Framework: Emerging Challenges and way forward. Background Presentation

PUBLIC NOTICE. 1. Central Electricity Authority (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, 2013.

The table shown below gives the status of basic documents submitted by different tenderers.


REQUEST FOR QUOTATION

Unnat Jyoti by Affordable LEDs for All Conserve Electricity, Conserve Energy

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

To Date: 23/03/2017. Respective Bidders,

Central Electronics Limited Materials Management Division

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

REFERENCE CP_TSSPEC_138 0 DATE: JUNE 2006 PAGE: 1 OF 17 TITLE SPECIFICATION FOR POLE- MOUNTED AUTO-RECLOSERS TABLE OF CONTENTS

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet.

INDIAN INSTITUTE OF TECHNOLOGY, KANPUR DEPARTMENT OF ELECTRICAL ENGINEERING

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

TECHNICAL BID T 3627

PINANK ENERGY An ISO 9001: 2015 (QMS) Certified Company Channel Partner: Ministry of New and Renewable Energy, Govt of India

REGIONAL MANAGER (VADODARA REGION)

SOLAR PLANT PERFORMANCE IN INDIA

Solar Multi-Utility Centre and Smart Minigrid Experience in implementing and maintaining off-grid projects in rural areas

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

Generalised Technical Specifications for Grid Tie Solar Power plants

Microgeneration Installation Standard: MCS

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

Roadmap for providing banking services in every village having population below 2000-Progress June, 2017

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

Panel Discussion on Accelerating Large Scale Deployment of Rooftop SPV in India

SECTION GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

EarthSpark International 1616 H St. NW Suite 900 Washington, DC USA REQUEST FOR QUOTES REPAIRS TO THE LES ANGLAIS GRID. To Whom It May Concern:

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

SPECIFICATION FOR HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV/22KV LINE

VOLUME -III TECHNICAL SPECIFICATION FOR MISCELLANEOUS PUMPS (HORIZONTAL)

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENT AND QUANTITIES

Uttar Pradesh Electricity Regulatory Commission, Lucknow

023 : 2006 CEB STANDARD. 12kV & 36kV LOAD BREAK SWITCHES CEYLON ELECTRICITY BOARD SRI LANKA

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

Technical Specifications

TECHNICAL SPECIFICATIONS

Appendix Item Addendum

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore (M.P.) REQUIREMENT

northeast group, llc India Smart Grid: Market Forecast ( ) January group.com

Electric Power Train Vehicles - Method of Measuring the Range

CORRIGENDUM. For more details visit website. Further, clarifications regarding queries are attached herewith.

Clarifications Note 2 ITB GP

Solar*Rewards Frequently asked questions system size and customer usage

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK

Dakshin Gujarat Vij Company Limited

CORRIGENDUM # 1. Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM15118

MAHARASHTRA NATURAL GAS LIMITED

Section 6 - Employer s Requirements

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

Off-grid lighting testing and certification processes. Pradeep Kumar

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

DETAILED NOTE ON SOLAR STREET LIGHTING SYSTEM General Information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

Estimating the cost of electrification technology options to aid electricity access scale up: The case of Ghana

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

INVITATION FOR QUOTATION. TEQIP-II/2015/GJ1G02/Shopping/M-EE-09

SPECIFICATIONS FOR MOTOR OPERATED VALVES

Open Tender Enquiry OUTSOURCING OF PHOTOCOPY WORK AT SCOOTERS INDIA LIMITED SINGLE BID SYSTEM. SCOOTERS INDIA LIMITED Page 1

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT DETAILED PROJECT REPORT AERO SPACE MATERIALS PVT LTD

TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY.

Transcription:

RURAL ELECTRIFICATION CORPORATION LIMITED (A Government of India Enterprise) Registered Office: Core 4, SCOPE Complex, 7, Lodi Road, New Delhi 110 003. Tel.: 24365161 Fax: 24360644 Gram: RECTRIC Pre-Bid Clarifications -2 Date: 24.10.2017 Tender Number - REC /PCM/DDG/RQM/2017-18/02 Details of Assignment - Appointment of REC Quality Monitors (RQM) for DDG Projects under DDUGJY Tender: Appointment of REC Quality Monitors for Decentralized Distribution Generation Projects under DDUGJY S.No. 1. Clause No. Page No.17, Clause No.2.3 Reference TUV SUD Query REC Reply Village s inspection/site Inspection: Village/habitations are to be done as per approved FQP/Drawings/Technical Specifications/Datasheet/ standard format survey report. The inspection of REC Quality Monitors shall commence in a state as and when villages/ habitations are offered to them by the respective Chief Program Manager of REC Regional office(s). Kindly Share the Standard Format of Survey Report and quality assurance plan. (if any) This shall be finalized on award of contract. However a tentative format is attached as Annexure F

2. Page No.18, Clause No.2.3. 1 2.3.1. Site Inspection: The scope of works includes inspection of 100% of un-electrified villages (all associated habitations of the village should be inspected) and 10% habitations & intensive electrified villages (all associated habitations in that particular villages should be inspected) covered in the State. Is any sampling criteria applicable for inspection of SPV system or 100% verification of all SPV systems per village is required? Tender terms and conditions shall prevail. 3. 4. What would be the quantum of minimum & maximum number of systems or average number of systems to be inspected per village as it mandatorily required for costing purpose. Page Kindly clarify as below: No.5, Clause Region-A - Material Inspection (nos.)- 0 Nos. No.8.1 Region-B- Material Inspection (nos.)- 16 Nos. Whether this number Region-C- Material Inspection (nos.)- 16 Nos. indicates number of inspections to be Region-D- Material Inspection (nos.)- 20 Nos. performed or number of manufactures to be visited for inspection. If these are number of manufactures, then how many inspections per manufacturer to be performed by RQM. In general, one Solar Mini-grid power plant is installed in a village, however some villages based on no habitations, may have more than one Mini-grid Solar power plants (SPV).100% beneficiaries shall be visited. Revised Annexure-D enclosed The Region-wise number represents number of visits performed by RQM agency for inspection of materials at manufacturer works

5. Page No.28, Clause No.15. 4 Instruments for quality checks: The agency shall arrange for such instruments as required for successful checking of the quality of works. Instruments such as clamp meter, RFID reader, solar power meter, meggar, earth tester, vernier calipers, measuring tape, rodometer, GPS device, DSLR professional camera with proper zooming (minimum 15 Mega Pixel and 4X Zoom) etc. are to be arranged by the agency. The instrument must be calibrated on the day of inspection and calibration certificate should be possessed by operating personal. Please clarify whether it is mandatory to use DSLR professional camera with proper zooming (minimum 15 Mega Pixel and 4X Zoom) or equivalent camera device or high quality Mobile Camera can be used during site inspection. Tender terms and conditions shall prevail. 6. Page No.2, Data Sheet Last Date & Time for bids submission 25.10.2017 at 15.00 Hrs (IST) Deadline is very much stringent looking into bid requirements. We request extension in submission deadline as lot of activities such as arrangement of EMD through DD for all four regions, updating bio data of experts, working on costing including expenses for 3668 villages and Diwali holidays between 18th 20th October.We request to extend last date of submission on Online Bid and Physical Support Documents to 7th November 2017. Tender terms and conditions shall prevail.

Revised Annexure-D S.N o. Region State Name Name of District Plan Capacity (KW)* Total HHs (Inc. BPL) Total No. of Habitations Sanctioned Technology (SPV/) Category ( /IEV) Name of Implementing Agency Vishakapatna XI 57 SPV _ m Vishakapatna XII 183 SPV _ m 1402.5 8852 Srikulam XII 11 SPV _ APEPDCL Prakasam XII 11 SPV _ APSPDCL 1 Andhra Pradesh Vishakapatna m East Godavari Rajamahendr avaram DDUGJY 464 2106 162 SPV _ 52 SPV 12 SPV APEPDCL Eluru 3 SPV Region-A Sub Total 1866.5 10958 491 0 2 Telangana Adilabad 19 SPV XI 202 1275 Khammam 20 SPV TSNPDCL Sub Total 202 1275 39 0 3 Kerala Pallakkad XII 131.5 731 7 Sub Total 131.5 731 7 0 SPV KSEB 4 Karnataka Chamarajana gar 9 Chamarajana XII 591.2 2791 gar 8 Chikkamagal ore 0 SPV SPV SPV CESC CESCL MESCOM

Dakshin kannada 0 Sheribichanall y 1 SPV SPV MESCOM KREDL Madikeri 5 SPV CESC Mysore 11 SPV CESC Mysore 2 SPV CESCL Shimago 0 SPV MESCOM Udupi 0 SPV MESCOM Uttar Kannda 1 SPV KREDL Shimoga 2 Uttar DDUGJY Kannada 0 SPV MESCOM HESCOM Belgaum 0 SPV HESCOM Sub Total 591.2 2791 39 Total 2791.2 15755 576 S.N o. Region(s) State Name Name of District Plan Capacity (KW) Total HHs (Inc. BPL) Total no. of villages(nos) Technology (SPV/) Category ( /IEV) Name of Implementing Agency 5 Region-B Odisha Gajapati Boudh Mayurbhanj Anugul BARGARH Debagarh Dhenkanal XII DDUGJY 3545.5 12157 6 SPV 21 SPV + 34 SPV + 16 SPV + 2 SPV + 16 SPV + 3 SPV + OREDA

6 Chhattisgarh Ganjam 39 SPV + Kalahandi 49 SPV + Kendujhar 1 SPV Keonjhar 2 SPV Koraput 44 SPV + Nabarangpur 3 SPV + Nayagarh 15 SPV + Nuapada 6 SPV Rayagada 12 SPV + Kandhamal 6 SPV Sub Total 3545.5 12157 275 Sarguja XI 102 645 3 SPV Korba 5 SPV Surajpur 13 SPV Balrampur XII 523 3923 8 SPV Sarguja 3 SPV Balrampur 3 SPV Balrampur 4 SPV IEV Surguja 1 SPV Surguja 5 SPV IEV DDUGJY 4723 51322 Surguja 2 SPV Dantewada 12 SPV Gariyaband 2 SPV Gariyaband 25 SPV IEV CREDA

Jashpur 2 SPV Jashpur 20 SPV IEV Jashpur 1 SPV Kabirdham 1 SPV Kondagaon 2 SPV + Kondagaon 1 SPV IEV Surajpur 3 SPV /IEV Surajpur 11 SPV IEV Surajpur 2 SPV Narayanpur 9 SPV + Narayanpur 77 SPV + Narayanpur 31 SPV + Bijapur 92 SPV + Bijapur 3 SPV + Bijapur 78 SPV + Sukma 161 SPV + Bastar 2 SPV Bastar 1 SPV Balodabazar 17 SPV IEV Dhamtari 22 SPV IEV Kanker 6 SPV / IEV Korba 12 SPV IEV

7 Madhya Pradesh Koriya 70 SPV / IEV Rajnandgaon 9 SPV IEV Sub Total 5348 55890 719 Katni 4 SPV Umaria 242 1151 6 SPV Damoh 10 SPV + Sub Total 242 1151 20 Total 9135.5 69198 1014 Sonebhadra 6 SPV Bhraich 2 SPV 8 Uttar Pradesh Hamirpur Lakhimpur Kheri XI 577 3765 2 SPV 3 SPV UPNEDA Lalitpur 4 SPV Sub Total 577 3765 17 9 Region-C Uttarakhand Pithoragarh DDUGJY 402 1093 13 SPV+ UPCL Sub Total 402 1093 13 Chittaurgarh 1 10 Rajasthan Pratapgarh 4 Udaipur 26 Barmer 19 AVVNL Churu 2 JDVVNL Ganganagar 1

Jaisalmer 26 Jodhpur 7 Pali 4 Alwar 1 Baran 16 Bharatpur 3 Bundi 1 Dausa 1 JVVNL Jhalawar 1 Karauli 7 Sub Total 0 0 120 Banka 1 SBPDCL Bhagalpur 8 SBPDCL Jamui 1 SBPDCL Kaimur 120 SBPDCL Munger 3 SBPDCL 11 Bihar Nawada 5466.4661 38052 8 SBPDCL Rohtas 11 SBPDCL Gopalganj 2 2 NBPDCL Khagaria_ 1 1 NBPDCL Samastipur 1 1 NBPDCL Supau 33 33 NBPDCL

West Champaran 25 25 Sub Total 5466.4661 38052 214 NBPDCL Gumla 23 SPV West XII SPV+ Singhbhum 58 Simdega 6 SPV Garhwa 16 SPV 12 Jharkhand Hazaribagh Pakur Sahebganj DDUGJY 7116.155 10775 6 SPV+ 17 SPV+ 43 SPV+ JREDA Chatra 60 SPV+ Pakur 1 SPV Sub Total 7116.155 10775 230 13 Region-D Assam Total 13561.621 53685 594 KAMRUP KARBI ANGLONG LAKHIMPUR Kokrajhar Goalpara Barpeta Darrang Dhubri DDUGJY 8949 45520 12 290 15 SPV + SPV + SPV + 2 SPV 45 10 14 48 SPV + SPV + SPV + SPV + APDCL

N.C. Hills JORHAT Sonitpur Tinsukia Dhemaji Dibrugarh Morigaon BONGAIGAO N Sub Total 8949 45520 521 14 17 18 19 3 8 5 SPV + SPV + SPV + SPV + SPV + SPV + SPV + 1 SPV Anjaw 21 Changlang 16 Dibang Valley 26 East Kameng 107 14 Arunachal Pradesh East Siang 4 Kurung 304 Kumey DDUGJY 12393 Lohit 2 Lower Dibang Valley Lower Subansiri 46 176 SECI Papum Pare 41 Tawang 10 Upper Siang 7

Upper Subansiri West Kameng 5 West Siang 35 Sub Total 0 12393 895 95 Jaintia Hills XII 154 8 SPV+ MePDCL 16 Meghalaya Ri-Bhoi 1 MePDCL West Khasi Hills West Garo Hills 2697 2 MePDCL 4 MePDCL Jaintia Hills 10 MNREDA West Khasi Hills East Garo Hills East Khasi Hillls West Garo Hills 11 MNREDA 2 MNREDA 1 MNREDA 2 MNREDA Ri Bhoi 16 MNREDA Ri - Bhoi 1 MePDCL Jaintia Hills 1 MePDCL West Khasi Hills East Khasi Hills West Garo Hills East Garo Hills Sub Total 154 2697 68 1 MePDCL 6 MePDCL 1 MePDCL 1 MePDCL

Gra nd tota l *Solar Standalone System capacity not included Total 9103 60610 1484 34591.321 199248 3668 SPV-Solar Mini-Grid Project -Un-electrified village -Solar Standalone System IEV-Intensive electrified village

Annexure-F Quality Monitoring of Decentralized Distributed Generation projects under DDUGJY Scheme

Index Sl. Description Nos. 1 Copy of inspection notice issued by REC Joint signatures of inspectors with supervising and verifying officers in 2 the hierarchy of the RQM 3 Brief Profile of the signatories of the report Field inspection report Abstract : Details of physical quantity of work executed Mini-grid /Standalone system, verification of Quantity awarded, Quality of work, 4 General observation ( hrs. of supply etc.), comments on verification of test reports, verification of BPL connections Annexure-I: Verification of Quantity of material w.r.t sanctioned 5 /Awarded quantities in tabular form Annexure-II: Major deviations from Technical specification of PIA 6 /Approved drawings Diagrams /DDG quality plan guidelines Checklist for Inspection of in tabular form showing type of defect, 7 category, their location in photograph & 8 9 Annexure-III: List of BPL & APL Beneficiaries Duly certified by authorized signatory Annexure-IV: Verification of BPL & APL connections by RQM tabulated form Page Nos. 10 Annexure-V: Approved Drawing, SLD & BoQ of PIA 11 12 13 14 Annexure-VI: GPS Points Superimposed on Google Earth of infrastructure actually built in the village as seen by RQM inspector, duly indexed using GPS Device ( with nomenclature of Solar power plant as SPV1, SPV2,... and Solar Standalone System as SS1, SS2,...or any other identification provided by PIA to mark the location of defects ) Annexure-VII: Photographs ( with good resolution and zoom) with underlying text describing defects Annexure-VIII: Group photograph of the inspector with leading members of villagers with SPV/SS or other prominent installation in background Annexure-IX: Copy of Village Electrification certificate issued by PIA /Gram Panchayat Certificate 15 Annexure-X: Comments on TPIA inspection reports 16 Annexure-XI: Copy of test reports of major equipments like Solar Panel, Battery, Inverter/PCU/Solar Charge controller, conductor, pole, ACDB/DCDB, energy meter, cable whose test report is verified 17 Library of Photos of Solar System installed in village

Copy of Inspection Notice issued by REC

Inspection call No. REC/DDG/2017-18/ <Name and Address of RQM> RURAL ELECTRIFICATION CORPORATION LIMITED (A Government of India Enterprise) Regd Office: Core-4, SCOPE Complex, 7 Lodi Road New Delhi 110003Tele. 24365161 Fax 24360644 Email reccorp@recl.nic.in Gram RECTRICWebsite www.recindia.com & www.recindia.nic.in Date: Kind Attn: Ms/Shri Sub: DDG (RE) Inspection of Rural Electrification works by REC Quality Monitors in. projects of. State Stage- Ref: Our LoA No... dated Ma M/Sir, This has reference to our Letter of Award (LoA) under reference nominating your agency as National Quality Monitor under Quality Control Mechanism for DDUGJY (RE) Projects in projects of State under Plan. In line with the terms of LoA, it is requested to carryout inspection as per details given below-: S. No. Plan (XI/XII/DDUGJY) District Nos. of Villages* *The associated habitations, majra, tolaetc are also to be inspected. List of associated habitations, majra, tolaetc covered under DDUGJY may be obtained from PIA. The details of villages and substations to be inspected are enclosed at Annexure-I. Further, it is requested to submit the inspection reports as per the prescribed format at the earliest. The inspections carried out by your agency may be cross-examined by REC team. Also, your agency is requested to review the inspections carried out by TPIA and submit the comments on their reports. Your agency is requested to submit the report (Hard copy as well as Scanned copy) to REC. Thanking You, Yours Sincerely, () Chief Program Manager Copy to: (i) <Name and Details of PIA for providing necessary assistance to RQM agency (ii) REC CO, DDG Division, New Delhi for kind information.

List of Villages to be inspected by RQM in. State Stage S. No. Name of Project Name of PIA Name of Village with census code* Category of village (UE/PE) SPV plant / (kwp) Infrastructure Details Standalone system (Wp) Remarks *RQM agency is also requested to inspect all the habitations (covered under DDUGJY-RE) associated with aforementioned villages.

Joint Signatures of RQM Agency s Personnel Involved

Brief Profile of the Signatories of the report

Brief Profile of Finaliser and/or Reviewer of inspection report: Name of the Person: Date of Birth: Designation: Qualification: Experience (with Details in Brief): Brief Profile of inspecting officer: Name of the Person: Date of Birth: Designation: Qualification: Experience (with Details in Brief):

Abstract Of Village Inspection Report

DDG (RE): Village Inspection Report by RQM viz. (Agency Name) (Village include all majras/tolas/habitations under the revenue village covered under sanctioned DDUGJY-RE project) 1 Inspection Call Reference No. 2 Date of Inspection (i) District (Census code) / Project (DPR Code) (ii) Block & Census code 3 (iii) Details of Village Name Census Code Status (UE/PE) (iv) Details of Habitation Name Census Code Status (UE/PE) 4 Name of the Project Implementing Agency (PIA) 5 Name of the Turnkey Contractor 6 Total No. of Households coverage as per DPR BPL APL Total 7 BPL households Latest BPL Coverage (As per latest sanction) BPL Connections Released Actual No. of BPL HHs Inspected No. of BPL HHs charged out of the inspected BPL HHs Nos.of BPL HHs yet to be charged out of the inspected BPL HHs Total S C S T Oth ers Tot al Total Total Total 8 APL households No. of APL HHs applied for connection No. of connecti ons released to APL HH No. of APLs not willing to avail connection Reason for APL HHs not availing connection

9 Details of Physical Quantity of executed work in inspected village Name of the material/ equipment as per scheme coverage in the inspection area Unit As per DPR/ Sancti on As per approved BOQ/as built drawing Quantity verified by RQM at field Variations, if any and remarks I. Major physical quantities: Solar Mini-grid/Standalone system 1 Solar Mini-grid PV Plant /Standalone System Capacity 2 Battery Bank Capacity 3 No of Inverter/PCU /Charge Controller & Rating kwp/ Wp Volt, Ah KVA 4 LT circuit Length Km. 5 Array Structure /Pole (Hot dip galvanized MS / Steel /Aluminium ) 6 ACDB/DCDB - 7 Energy Meter - 8 LED Bulbs/Fan - 9 Control Room size Sq. m Street light - Solar Panel Wp Battery Pole (Hot dip galvanized MS / Steel / Aluminium ) V, Ah 10 Sl. No Review of Material Test Reports: Name of Equipment/material s of which test report checked Whether Predispatch inspections carried out (Yes/No) Whether All tests performed as per relevant latest IS / Technical Spec. Whether Test results are acceptable as per IS / Technical Spec. (Yes/No) Discrepancies found in test report of equipment/ma terial 1 Solar Panel 2 Battery 3 No of Inverter/PCU & Rating 4 Poles 5 Conductor 6 LED Bulbs/Fan/etc,.

11 General Aspects Sr. No 1 2 3 Component No. of Hours of power supply in the village (Avg. hours of supply per day in a month) Specific comments about the difficulties/ constraints and various reasons for not providing of power supply Whether the newly developed system has been charged/commissioned? Details (Flag with page no.) 4 PV modules are made in India Yes/No 5 Type, Rating, Make and year of manufacturing of Modules 6 Whether the modules contain information about company name, serial no and year manufacturing etc 7 Inverter Type, Rating, Make & year of manufacturing 8 Battery Type, Rating, Make & year of manufacturing 9 Array Structure /Pole (Hot dip galvanized MS / Steel /Aluminium ) 10 Solar Power Plant(Mini-grid) 10A Whether the system was installed in shadow free area or not? If not mention the details 10B Gap between rows of the modules(in case of SPV ) 10C Tilt Angle of Modules 10D Lighting arrester installed (In case of SPV ) 10E 10F Solar Irradiance sensor, Temperature sensor mounted on Plane of the array. (In case of SPV ) Earthling and protections (Array Structure, PCU, ACDB and DCDB ) -In case of SPV 10G 10H 10I 10J 10K Energy Generation during the date of visit (kwh) Fire extinguishers available in Control room and Solar Array area Fencing provided for Solar Array Earthing system provide Lightning Arrestor installed in solar array area 11 Type of Control Room (RCC/Pre-fabricated) 11A Whether control room constructed as per approved drawing of PIA. (If any defect may specifically highlight )

12 13 14 Provision of Solar Power Plant /Standalone system Energy Generation monitoring (whether Data logger is installed by Developer and generation data is being recorded ) Whether village electrification certificate from PIA/ Gram Panchayat furnished Whether Turnkey contractor /PIA operating and maintaining the solar system 15A Did beneficiaries aware about the details to register complaint /Any Mechanism? 15B Is there any contact details & telephone no. to register the faults by Beneficiary -If yes please provide the contact details 16 Verification of Electrification of public facilities viz., Hospital, School, Panchayat office etc., if any:(y/n) Access available Access available but not charged Electrified 17 18 Comment on socio-economic improvement in the village on account of DDUGJY programme and that due to availability of power: Whether Technical Specification of PIA/DDG Quality guidelines were followed for award of contract and execution of project? List out major deviations from Technical specification/guidelines including deviation if any in e-tendering, payment terms, PQR, Quality guidelines etc. Yes/No (Enclosed at Annexure - V ) 19 Feedback from Public: Note : RQM Agency requested to capture the details of photos in Sr. 3 to 14 in Annexure-XII 12 Observations: Sl. No. Category No. of instances where Deviation observed (Nos.) Reason for deviation 1 Electrification of all BPL HHs as per DDUGJY (RE) guidelines 2 Minimum hours of power supply to the village

3 Physical quantity with reference to the reported executed quantity (Refer Annexure I) 13 Deficiencies/Discrepancies on executed works and non-compliance of construction standards: Sl. No 1 2 Category Quantity of materials installed/ commissioned Quality of works/ workmanship/ Defects observed in checklist* No. of discrepancies (Nos) Nature of Discrepanci es/deviatio ns Refer Annexure - I Refer Annexure - VII Suggestion for corrective action Total No. of Discrepancies * PIA to ensure rectification of these defects at all locations/installations in the whole project. 14 General observations including design parameters: (i) (ii) (iii) Comments on Adequacy of battery storage/capacity with respect to installed plant capacity. Views on adequacy of Installed plant capacity considering the connected load incl. HH load, common facilities load, street light load, battery autonomy etc. Technical Comments on overall design of the systems viz. solar panel location, tilt angle, protection and tripping mechanism, losses in the system, inverter capacity etc. Seal and Signature: Name: Designation: Date: Phone no.: Seal and Signature: Name: Designation: Date: Phone no.:

Annexure-I (Verification of Quantity of Materials)

Annexure-I Quantity of Material (Verification w.r.t. sanctioned/awarded BOQ refer Item No. 9 of village inspection report) Solar power plant(mini-grid) /Standalone system Sr. No. Description as per LoA Unit As per BOQ/LOA Awarded by PIA Verification done by RQM Variation in Quantity Category of Defect (Critical/Maj or/minor) Remarks 1. Solar Mini-grid PV Plant /Standalone System Capacity KWp. 2. Battery Bank Capacity V,Ah sets 3. No of Inverter/PCU /Charge Controller & Rating kva sets 4. LT circuit Length Mtr 5. Array Structure /Pole (Hot dip galvanized MS / Steel /Aluminium ) sets. 6. ACDB/DCDB No. 7 Energy Meter No. 8 LED Bulbs No. 9 Fan No. 10 Control Room size Sq.m 11 Street Light No. 11A Solar Panel 11B Battery 11C LED Luminare 11D Pole Wp V,Ah Set. No. No. *Any specific items RQM, Agency may add the rows as per requirement Definition: Critical: 1. If number of Quantity is less than BOQ Major: 1. If no. quantity installed is less than BOQ Minor: 1. If sought out items are short wrt. drawings

Annexure-II Major deviations from Technical specification of PIA / DDG Quality Plan Guidelines

Annexure-III List of BPL & APL Beneficiaries Certified by Authorized Signatory

Annexure-VIII (Verification of BPL& APL Connections)

Verification of BPL Connections (Connections Released) S. No. Consumer Name Father s Name Consumer No. BPL Card No. Meter no. Date of connection Category (SC/ST/Other) Whether Connection provided (Y / N) Connected Load (Actually used by BPL) Remarks / Observations Verification of APL Connections (Connections Released) S. No. Consumer Name Father s Name Consumer No. Meter no. Date of connection Category (SC/ST/Other) Whether Connection provided (Y / N) Connected Load (Actually used by APL) Whether DDUGJY Beneficiary (Y/N) Remarks / Observations Seal and Signature: Name: Designation Date:

Annexure-V Copy of Approved Drawings/ Diagram/Technical Specification of PIA

Annexure-VI GPS Points Superimposed on Google Earth

Block Name-Virat Nagar Code- 0002 Village Name-Band Mujaffar Census Code:-1462800

Annexure-VII (Photographs Describing Defects)

District: Block: Village: Census Code: 1. Vegetation control is required to remove the risk of vegetation shading modules and reducing performance Streetlight covered with vegetation

2. Heavy soiling in desert conditions needs to be considered as part of the O&M strategy. Shading of modules by adjacent rows can be avoided at the design stage. 2. Poorly designed foundations and improper anchor bolts can result in mounting structures that are not properly bolted/secured.

3. Poor DC cable management. DC cables should be kept neat and Secured with cable ties, respecting cable-bending radii. 4. Cables should be protected from sharp metallic edges using appropriate padding

5. Glands should be used for all cables entering combiner boxes, to Prevent cable movement and damage to cable insulation 6. Cable not crimped properly pressed with pliers rather than cramping tool

Annexure-VIII (Group Photograph of inspectors with villagers)

Annexure-IX (Copy of village electrification certificated issued by PIA /Gram Panchayat Certificate)

Annexure-X Comments on TPIA Inspection Reports

Format for Comments on TPIA reports Name of State: Name of Project: Name of Village/habitation: (with census code) Name of PIA: Name of contractor: Name of Agency Date of inspection Name of the material/ equipment Unit As per latest DPR/RCE / approved BOQ/As built drawing TPIA: TPIA: Quantity Verified by TPIA Quantity Verified by RQM Quantity Verified by RQM Deviation w.r.t. TPIA & RQM/Rema rks if, any I. Major physical quantities 1 2 3 Solar Mini-grid PV Plant /Standalone System Capacity Battery Bank Capacity No of Inverter/PCU /Charge Controller & Rating No. No./ each KVA Km. 4 LT circuit Length Km. 5 Array Structure /Pole (Hot dip galvanized MS / Steel /Aluminium ) Nos. Sr. No. Description of Defects (Pic no. & Location) RQM Comments TPIA Comments RQM Comments Attended by PIA Yes/No Remarks 1. 2. 3. 4.. Avg. Hrs of Supply Newly Electrified Solar System Charged (Y/N) General observation: - TPIA: TPIA:

Annexure-XII (Copy of Test Reports/Inspection Reports of Major Materials)

Annexure-XII Library Of Photos of Solar System Installed in village

District: Block: Village: Census Code: Solar Array Area

Module details

Mounting Structure Junction box

Control Room Battery Details

Power conditioning units Rating of PCU

AC &DC Distribution Panel

Meter Reading Earthing Connections

Street light Beneficiary

Beneficiary

Electricity connections to Stationary shop