1 Generalised Technical Specifications for Grid Tie Solar Power plants The Grid tie Solar Power Plants without battery may be installed for any office buildings. As the office buildings have day time energy consumption, Solar System without battery is suggested, as the battery is the weak link in the system and requires regular maintenance as well as replacement in every 2-3 years. Also the efficiency of the battery based system is less due to loss in the battery (around 15%). The shadow free area required for installation of solar plant is appx 150 sq.feet (14 Sq.m) per KW. The Solar panels may be installed on the roof of the building. Sufficient area shall be available for servicing the system. The minimum clearance required from the parapet wall & in between row of panels is min 2 feet for cleaning the panels & servicing. In between the row of solar panels sufficient gap need to be provided to avoid falling of shadow of previous row on the next row. The Inverter /Power Conditioning Unit (PCU) shall be placed indoor in a safe and easily accessible place. The bench mark cost fixed by Ministry of New and Renewable Energy (MNRE) for Solar Power Plants without battery is as below: Upto 5 kwp Rs.160/Wp > 5 kwp to 100 kwp Rs.140/Wp MNRE provides 30% of the benchmark cost (or) 30% of actual cost whichever is less as capital subsidy for a maximum capacity of 100KWp per system. The details on how to decide the capacity of the solar system required for a particular building is enclosed as Annexure -I The detailed Technical Specifications, Standards & suggested Tender Eligibility Criteria are enclosed as Annexure IIA, IIB & IIC respectively.

2 ANNEXURE I Grid tie Solar Power Plant consists of following main components: 1. Solar Photo Voltaic (SPV) Array 2. Power Conditioning Unit (PCU) The SPV array & PCU may be sized as below: 1. Solar Photo Voltaic (SPV) Array The Capacity of the Solar Power Plant (Wp) ie., Wattage of the SPV array, required for a particular building, may be calculated in following 3 steps. The minimum of the 3 values may be taken as the capacity of plant. Step I: Capacity of Solar Plant (Wp) = 50% of the connected load of the building For example: Sl. Connected Wattage of Number of Total Connected No Loads each load (W) Load Load (W) (4 * 5) Tube Lights CFLs Fans Computers Printer Air Conditioner (1.5 ton split AC) Total Connected Load % of the Connected Load = 4090/2 =2045 W (Value I) Hence recommended capacity of Solar Plant in the building with total connected load of 4090 W is 2 KWp. Step II: Capacity of Solar Plant (Wp) may be such that it generates 25% of the energy requirement of connected loads in the building in a day. For example Sl. Connected Wattage of Number Total Connected Hours of Energy Required No Loads each load of Load Load (W) operation (Kwhr)* (W) (4 * 5) in a day (5*6) / Tube Lights CFLs Fans Computers Printer Air Conditioner (1.5 ton split AC) Total Energy Consumption in a day 34.7

3 25% of 35 Units = 8.75 Units 1 KWp Solar Plant generates approximately units a day. Hence 2 KWp (Value II) plant may be installed. Step III: Capacity of Solar Plant (Wp) may be such that, the maximum energy generated by the plant in an hour is 50% of the energy consumption of the building in an hour. Energy consumption during 10 am to 3 pm (good sunshine period) may be taken for this calculation. For example the energy consumption may be calculated as below: Date Energy meter Energy meter Difference Average consumption Hrs (3-2) in an hour in Units Hrs (4/(15 Hrs- 10 Hrs)) /5 = 2 50% of the energy consumption in an hour = 2/2 = 1 unit Hence 1 KWp (Value III) solar plant which generates maximum 1 Unit in an hour may be installed. The minimum among the 3 values is 1 KW. Hence 1 KW SPV array may be selected. 2. Power Conditioning Unit (PCU) The PCU / Inverter capacity, mentioned in KVA, shall be equal to SPV array capacity. Eg., 1 KWp PV array shall have PCU of 1 KVA capacity & 5 KWp PV array shall have PCU of 5 KVA capacity.

4 ANNEXURE-IIA TECHNICAL SPECIFICATION FOR GRID TIE SPV POWER PLANTS Solar PV Array (KWp) Power Conditioning Unit (KVA) To be filled based on the capacity of plant ---- do----- DEFINITION A Grid Tie Solar Photo Voltaic (SPV) power plant consists of SPV array, Module Mounting Structure, Power Conditioning Unit (PCU) consisting Maximum Power Point Tracker (MPPT), Inverter, Controls & Protections, interconnect cables and switches. PV Array is mounted on a suitable structure. Grid tie SPV system is without battery and should be designed with necessary features to supplement the grid power during day time. Components and parts used in the SPV power plants including the PV modules, metallic structures, cables, junction box, switches, PCUs etc., should conform to the BIS or IEC or international specifications, wherever such specifications are available and applicable. I. Technical Specifications of Major Components of Solar PV Power Plant 1. Solar PV modules and array 2. Module mounting structure 3. Junction Boxes 4. Power Conditioning Unit 5. DC & AC Switches 6. Cables and installation accessories 7. Earthing and lightning protection 1. SOLAR PV MODULES AND ARRAY (i) Only indigenous modules shall be used in the project. Solar module shall be Crystalline (Mono/Poly) (or) Thin Film (or) Concentrator PV modules type. The peak power output of the PV Module shall be min 100Wp under STC. Module Voc shall be minimum 21V. The total array capacity shall not be less than KWp (to be filled based on the

5 capacity of the plant) and this shall be operating at the DC voltage of V (to be selected based on capacity of the plant). The power output of the PV module must be reported under standard test conditions (STC). I_V curve of the sample module should be submitted. (ii) The mechanical structure shall withstand gusts of wind / cyclonic wind up to 150km/hr from back side of the panel. (iii) The offered modules must conform to the latest edition of any of the following IEC/ equivalent BIS Standards for PV module design qualification and type approval: Crystalline Silicon Terrestrial PV Modules : IEC 61215/IS14286 Thin Film Terrestrial PV Modules : IEC 61646/ Equivalent IS (Under Dev.) Concentrator PV Modules & Assemblies : IEC (iv) (v) (vi) (vii) In addition, the modules must conform to IEC requirements for construction & Part 2 requirements for testing, for safety qualification or Equivalent IS ( Under Dev.) PV modules must also qualify Salt Mist Corrosion Testing as per IEC 61701/IS SPV modules shall be certified by NABL/IECQ accredited test centre. The bidder shall submit appropriate certificates. Protective devices against surges at the PV module shall be provided. Low voltage drop bypass diodes shall be provided. (viii) Module Junction box (weather proof), where the module terminals shall be interconnected and output taken, shall be designed for long life out door operation in harsh environment as per the relevant BIS specifications and protected against surges. It should have a provision for Opening for replacing the cable, if required. (ix) PV modules used in solar power plants must be warranted for output wattage, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years.

6 (x) Each PV module must use a RF identification tag (RFID), which must contain the following information: a. Name of the manufacturer of PV Module b. Name of the manufacturer of Solar cells c. Unique Serial Number & Model No. of the module d. Month and year of the manufacture (separately for Solar cells and module) e. Country of origin ( separately for solar cells and module) f. I-V curve for the module g. Peak Wattage of the module,im, Vm and FF for the module h. Date and year of obtaining IEC PV module qualification certificate i. Name of the test lab issuing IEC certificate j. Other relevant information on traceability of solar cells and module as per ISO 9000 series RFID shall be mandatorily placed inside the module laminate. A distinctive serial number starting with NSM will be engraved on the frame of the module or screen printed on the tedlar sheet of the module. 1.1 ORIENTATION AND TILT OF PV MODULES Modules shall be North South oriented at the Tilt Angle of 11 o - 13 o 2. MOUNTING STRUCTURES The PV modules will be mounted on fixed metallic structures of adequate strength and appropriate design, which can withstand load of modules and high wind velocities up to 150 km per hour. The support structure used in the power plants will be hot dip Galvanized Iron (G.I). The Mounting Structure should have the following features: The modules support structure shall be Mild Steel /hot dipped Galvanized (atleast 120 micron) Iron for holding the PV modules. The size of angle iron should not be less than 50x50x5 mm. Each panel frame structure shall be so fabricated as to be grouted on roof on its legs. The legs of the structure shall be fixed and grouted in the PCC foundation column made with 1:2:4 cement concrete. The

7 foundation shall support SPV modules at a given orientation, absorb and transfer the mechanical loads to the ground properly and shall withstand maximum wind speed of 150 km/hr. All nuts and bolts should be made of good quality Stainless Steel. The structure should be designed to allow easy replacement of any module. The array structure shall be so designed that it will occupy minimum space without sacrificing the output from the SPV panels. The minimum clearance of the lowest part of the module structure and the developed ground level shall not be less than 500 mm. The minimum clearance required from the parapet wall of the roof & in between row of panels is min 2 feet for cleaning the panels & servicing. The bidder shall specify installation details of the PV modules and the support structures with appropriate diagrams and drawings. The work shall be carried out as per the designs approved by the procuring entity. 4. JUNCTION BOXES The junction boxes shall be dust proof, vermin and waterproof and made of FRP / Thermo Plastic. The terminals shall be connected to copper bus bar arrangement of proper sizes. The junction boxes shall have suitable cable entry points fitted with cable glands of appropriate sizes for both incoming and outgoing cables. Suitable markings shall be provided on the bus bar for easy identification and cable ferrules shall be fitted at the cable termination points for identification. Each main junction box shall be fitted with appropriate rating blocking diode. The junction boxes shall be of reputed make. 4. POWER CONDITIONING UNIT (PCU) As SPV array produce direct current electricity, it is necessary to convert this direct current into alternating current and adjust the voltage levels to match the grid voltage. Conversion shall be achieved using an electronic Inverter and the associated control and protection devices. All these components of the system are termed the Power Conditioning Unit (PCU). In addition, the PCU shall also house MPPT (Maximum Power Point Tracker), an interface between Solar PV array & the Inverter, to

8 maximize Solar PV array energy input into the System. PCU including MPPT & protection conform to IEC 61683/IS 61683, IEC (1,2,14,30)/Equivalent BIS Std., DETAILED SPECIFICATION Nominal DC Array 1) Input Voltage DC Array Input 2) Operating Voltage Type of Solar Charge 3) Controller 4) Switching device Continuous inverter 5) Output Rating 6) Output Wave Form Total 7) Distortion Harmonic To be filled up based on the capacity of PV plant DC Voltage of the PV array shall be suitable for the MPPT range of PCU -20% to +15% of the DC Array input voltage in Sl.No. 1 above MPPT Based Solar Charge Controller MOSFET/IGBT based Equal to capacity of PV plant. To be mentioned in KVA Pure Sine Wave Output < 3% with resistive load 8) Output Voltage % in case of 1phase PCU % in case of 3 phase PCU 9) Output Frequency 10) Power Factor 11) PCU efficiency 12) Idle Current 13) Regulation 14) Overload Features 15) Cooling Operating 16) temperature > Hz. ± 0.5 Hz. > 90% at nominal voltage & power < 4% of rated capacity Line regulation & Load regulation 2 % 150% for 1 minute Forced Air cooling, with temperature controlled cooling fan C

9 17) Relative Humidity 18) LED/LCD Display : Indications Data monitor and 19) display controls 95% Maximum Display shall indicate system functional parameters and protection functional indicator RS485, Ethernet OR RS232 connectivity 20) Protections 1) Input over voltage 2)Low/high frequency 3) Short circuit 4) Under/over output voltage 6)Grid Input under 5) Over Temperature voltage / over voltage with auto recovery 7) DC disconnect 8)DC reverse polarity device 9) Anti Islanding Protection as per the standard 21) Enclosure Protection 22) Safety 5. DC & AC Switches IP 21(for indoor) as per IEC IEC IEC Part 1 & 2 3. Galvanic Isolation at input & output through transformer a. DC SIDE (i) MCB of suitable rating shall be provided for connection and disconnection of array & PCU for maintenance purpose. (ii) Switches and Circuit Breakers on DC side shall be DC rated or they shall be sufficiently de-rated, if AC rated switches are used. b. AC SIDE MCB of suitable rating shall be provided for connection and disconnection of PCU & load 6. Cables and accessories All the cables shall be supplied conforming to IEC 60227/IS 694 & IEC 60502/IS 1554 shall be of 1.1 kv grade as per requirement. Only PVC copper cables shall be used. The size of the cables between array interconnections, array to junction boxes, junction box to PCU, PCU to

10 AC Distribution Box etc shall be so selected to keep the voltage drop and losses to the minimum. Permissible Wire Drop on DC side shall be <= 1% The bidder shall supply installation accessories, which are required to install and successfully commission the power plant. 7. Earthing and Lightning Protection: Earthing : The array structure of the PV yard shall be grounded properly using adequate number of earthing kits. All metal casing or shielding of the power plants shall be thoroughly grounded to ensure safety of the solar power plants. Lightning: The SPV power plants shall be provided with lightning &over voltage protection. The main aim in this protection shall be to reduce the over voltage to a tolerable value before it reaches the PV or other sub system components. The source of over voltage can be lightning, atmosphere disturbances etc 8. OPERATION AND MAINTENANCE MANUAL An Operation and Maintenance Manual, in English and Tamil, should be provided with the solar PV power plants. The following minimum details must be provided in the Manual: (a) About Photo Voltaic & PV Module (b) Clear instructions about mounting of PV module. (c) About electronics used in (d) DO's and DONT's, (e) (f) Clear instructions on regular maintenance and Trouble Shooting of the power plants. Name & address of the person or Centre to be contacted in case of failure or complaint.

11 ANNEXURE-IIC TENDER ELIGIBILITY CRITERIA The suggested Tender Eligibility Criteria are as follows: S.No Minimum Eligibility Criteria Proof to be submitted for fulfilling the Eligibility Criteria 1. a) Bidder shall be a Registered Company/ Certificate of Incorporation or Firm in existence for at least past One Registration shall be submitted. audited year. b) Consortium not exceeding three i. Certificate of Incorporation or partners. Each partner of the Consortium Registration of all the partners shall be a Registered Company / Firm in shall be submitted. existence for at least past one audited ii. Copy of consortium agreement year. shall be submitted (OR) A letter of intent to execute a consortium agreement in the event of a successful bid shall be signed by all the partners and submitted with the bid along with the copy of proposed Consortium Agreement. ii. In case of Consortium, all partners of the consortium shall be liable jointly and severally for the execution of the contract in accordance to the contract terms and a statement to this effect shall be included in the letter of intent. 2. The Bidder shall use only SPV modules Necessary Self undertaking letter shall manufactured in India be submitted 3. Bidder should have experience in Copy of Work Orders and installation of SPV power plants of 1 KW performance certificate for satisfactory & above and shall have installed at least function of power plants obtained 10% of the quantity tendered (Power from the agency issuing work order plants installed minimum 6 months prior to the date of bid submission will only be considered ) & these systems should be working satisfactorily. 4. PV Modules & PCU of the SPV system Copy of test certificates along with shall conform to the MNRE standards as reports shall be submitted. per clause

12 5. Bidder should not be blacklisted by any Necessary Undertaking letter should of the State or Central Government or be furnished. organizations of the State or Central Government as on date of submission of tender 6. Annual Turnover of the bidder shall be as A summarized sheet of turnover per the following. In case of consortium, certified by registered CA should be each consortium partner shall have 50% furnished of the average annual turnover as per criteria (2) or (3) & Prime bidder shall satisfy the criteria (1) : CRITERIA Tender Tender Tender Tender Tender <Rs.50 Rs.50L Rs.2- Rs.10- >Rs.25 L -2Cr. 10Cr. 25Cr. Cr Turnover in PV Field in the last financial year - Min. Min. Min. Min. (OR in the current financial year) Rs.25 Rs.1 Rs.5 Rs.10 L Cr. Cr. Cr. Average annual Turnover in the last two - Min. Min. - - financial years Rs.50 Rs.2 L Cr. Average annual Turnover in the last three Min. Min. financial Rs.10 Rs.25 Cr Cr. years

13 1. PV MODULES: ANNEXURE- IIB MINIMAL TECHNICAL REQUIREMENTS / STANDARDS 1.1 The PV modules must conform to the latest edition of any of the following IEC/equivalent BIS Standards for PV module design qualification and type approval: Crystalline Silicon Terrestrial PV Modules Thin Film Terrestrial PV Modules IEC / IS14286 IEC / Equivalent IS (Under Dev.) Concentrator PV Modules & Assemblies IEC In addition, the modules must conform to IEC Part 1-requirements for construction & Part 2 - requirements for testing, for safety qualification or Equivalent IS (Under Dev.) 1.3 PV modules to be used in a highly corrosive atmosphere (coastal areas,etc.) must qualify Salt Mist Corrosion Testing as per IEC / IS IDENTIFICATION AND TRACEABILITY Each PV module must use a RF identification tag (RFID), which must contain the following information: (i) Name of the manufacturer of PV Module (ii) Name of the Manufacturer of Solar cells (iii) Month and year of the manufacture (separately for solar cells and module) (iv) Country of origin (separately for solar cells and module) (v)i-v curve for the module (v) Peak Wattage, Im, Vm and FF for the module (vi) Unique Serial No and Model No of the module (vii) Date and year of obtaining IEC PV module qualification certificate (viii)name of the test lab issuing IEC certificate (ix) Other relevant information on traceability of solar cells and module as per ISO 9000 series. RFID shall be mandatorily placed inside the module laminate

14 1.5 AUTHORIZED TESTING LABORATORIES/ CENTERS PV modules must qualify (enclose test reports/ certificate from IEC/NABL accredited laboratory) as per r e l e v a n t IEC standard. Additionally the performance of PV modules at STC conditions must be tested and approved by one of the IEC / NABL Testing Laboratories including Solar Energy Centre. For small capacity P V modules upto 50Wp capacity S T C perform a n c e as above will be sufficient. However, qualification certificate from IEC/NABL accredited laboratory as per relevant standard for any of the higher wattage regular module should be accompanied with the STC report/ certificate Details of Test Labs are given in Annexure I. 1.6 WARRANTY PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. 2. BALANCE OF SYSTEM (BOS) ITEMS/ COMPONENTS: 2.1The BOS items / components of the SPV power plants/ systems deployed under the Mission must conform to the latest edition of IEC/ E quivalent BIS Standards/ MNRE specifications / as specified below: BOS Item / System Standard Description Applicable BIS /Equivalent IEC Standard Standard Number Power Conditioners/ Inverters**including MPPT and Protections Storage Batteries Efficiency Measurements Environmental Testing General Requirements & Methods of Testing Tubular Lead Acid / VRLA / GEL Capacity Test Charge/Discharge Efficiency Self-Discharge IEC / IS IEC (1, 2, 14, 30) / Equivalent BIS Std. As per relevant BIS Std.

15 Cables General Test and Measuring IEC / IS 694 Method PVC insulated cables for working voltage up to and IEC / IS 1554 (Pt. I & II) including 1100 V and UV resistant for outdoor installation Switches/Circuit General Requirements IEC part I,II, III / Breakers Connectors safety /Connectors IS Part I,II,III A.C. /D.C. EN Junction Boxes General Requirements IP 54(for outdoor)/ IP 21(for /Enclosures indoor) as per IEC 529 for Inverters/Charge Controllers/Luminaries **In case if the Charge controller is in-built in the inverter, no separate IEC test is required and must additionally conform to the relevant national/international Electrical Safety Standards wherever applicable 2.2 AUTHORIZED TESTING LABORATORIES/ CENTERS Test certificates / reports for the BoS items/ components can be from any of the NABL/ IEC Testing Laboratories or MNRE approved test centers. 2.3 WARRANTY The mechanical structures, electrical works including power conditioners/inverters/charge controllers/ maximum power point tracker units/distribution boards/digital meters/ switchgear/ storage batteries, etc. and overall workmanship of the SPV power plants/ systems must be warranted against any manufacturing/ design/ installation defects for a minimum period of 5 years.

16 Test centers for MNRE Off-Grid Programme Lighting Systems Inverter Charge Controller >100 W Lab/ Organizat PV Module as per Battery MNRE Environment ion Efficiency Environmental protections Environmental Specificatio al ns (Including (IEC61215up MNRE (upto (Including IP) (Including IP) IP) MNRE SEC to100w P) MNRE MNRE 10KVA) MNRE MNRE NABL MNRE STC Test NABL/ NABL/ ERTL Facility NABL/ NABL/ NABL/ NABL/ MNRE MNRE (east) MNRE MNRE MNRE Up to 1000AH MNRE MNRE NABL/ (IEC61215)u MNRE (up to nder ICEEE- 3KVA) NABL/ NABL/ ETDC CB, NABL/ NABL/ MNRE MNRE (B) IEC MNRE Up to 100 AH MNRE NABL/ (upto100w P) MNRE NABL NABL/ (up to MNRE 10KVA) NABL/ NABL/ CPRI NABL/ NABL/ No MNRE MNRE (B) MNRE Up to 500 AH MNRE NABL/ MNRE Only NABL NABL NABL Electronics (up to (up to ERTL (N) No No & luminaire 5KVA) 5KW) NABL

17 NABL NABL (IEC61215 IEC (up to (up to (except NABL NABL NABL Pt.II and IEC 6KVA) 6KW) UL (B) battery) No 61701) NABL upto400w P NABL NABL NABL (IEC61215 & (up to NABL NABL (up to NABL TUV Pt-II) 10KVA) NO No 10KW) Rhineland upto400w P NABL NABL NABL Only (up to (up to Electronics NABL NABL NABL 5KVA) 5KW) Inter Tek No & luminaire No NABL NABL NABL PDF to Word *Beyond 10KVA self certification by the manufactures is acceptable.

SPECIFICATIONS OF WHITELED (W-LED) BASED SOLAR LANTERN

SPECIFICATIONS OF WHITELED (W-LED) BASED SOLAR LANTERN SPECIFICATIONS OF WHITELED (W-LED) BASED SOLAR LANTERN White Light Emitting Diode (W-LED) is a solid state device which emits light when an electric current passes through it. A Solar lantern is a lighting

More information

NOTICE INVITING TENDER

NOTICE INVITING TENDER TENDER FOR SUPPLY, INSTALLATION AND COMMISSIONING OF 30kWp On Grid SOLAR POWER PLANT AT FACC/CHRD/LAKE HALL, BIDHAN CHANDRA KRISHI VISWAVIDYALAYA (BCKV), KALYAN, DIST NADIA, WEST BENGAL, INDIA, PIN 741235

More information

No.RSA/Nov 2013/ (R) INDIAN INSTITUTE OF TECHNOLOGY. Tender Enquiry

No.RSA/Nov 2013/ (R) INDIAN INSTITUTE OF TECHNOLOGY. Tender Enquiry No.RSA/Nov 2013/2 Phone :+91-512-597102(O) Electrical Engineering Department +91-512-598772 (R) INDIAN INSTITUTE OF TECHNOLOGY Fax: +91-512-590063 KANPUR 208016 INDIA e-mail: rsanand@iitk.ac.in Home page:

More information

IDCOL Technical Standard for Solar Irrigation Pump (SIP) Under TR/KABITA Program

IDCOL Technical Standard for Solar Irrigation Pump (SIP) Under TR/KABITA Program IDCOL Technical Standard for Solar Irrigation Pump (SIP) Under TR/KABITA Program Details of approved packages Program Daily water output (Lt/day) Maximum TDH (m) 100,000 15 50,000 30 TR/KABITA 200,000

More information

IDCOL Technical Standard for Solar Irrigation Pump (SIP) Under Ownership Model

IDCOL Technical Standard for Solar Irrigation Pump (SIP) Under Ownership Model IDCOL Technical Standard for Solar Irrigation Pump (SIP) Under Ownership Model Configuration of approved packages: Program Daily water output (Lt/day) 100,000 Maximum TDH (m) Minimum PV capacity (kwp)

More information

3.6 Kwp Solar system Supply, Installation, Commissioning & Maintenance of Solar Systems to YEMAC office in HADDA street, Sana a city

3.6 Kwp Solar system Supply, Installation, Commissioning & Maintenance of Solar Systems to YEMAC office in HADDA street, Sana a city LOT1 3.6 Kwp Solar system Supply, Installation, Commissioning & Maintenance of Solar Systems to YEMAC office in HADDA street, Sana a city 1 LOT 1 3.6 Kwp Solar PV Power Solution with Battery Backup Table

More information

LOT Kwp Solar PV Power Solution with Battery Backup

LOT Kwp Solar PV Power Solution with Battery Backup LOT 3 1.2 Kwp Solar PV Power Solution with Battery Backup Supply, Installation, Commissioning & Maintenance of Solar Systems to Veterinary Laboratory in Sherton street, Sana a city No. Item Description

More information

Technical standard for AC, DC and street light systems

Technical standard for AC, DC and street light systems Technical standard for AC, DC and street light systems Concept of design: Solar Street Lighting System Street lighting in off-grid areas is a necessity to ensure security in night time. Solar technology

More information

Supply, Installation and Commissioning of 1 No 50 Watt LED. based SPV SLS at Nadia District Library, Krishna Nagar, Nadia.

Supply, Installation and Commissioning of 1 No 50 Watt LED. based SPV SLS at Nadia District Library, Krishna Nagar, Nadia. Supply, Installation and Commissioning of 1 No 50 Watt LED based SPV SLS at Nadia District Library, Krishna Nagar, Nadia. TENDER DOCUMENT. (A Govt. of West Bengal Company) Bikalpa Shakti Bhavan, Plot J1/10,

More information

Technical Specifications

Technical Specifications LT Distribution Box Technical Specifications 1. SCOPE 1.1 This specification covers design, manufacture, testing at manufacturer works before dispatch and supply of L.T. Distribution Cabinet suitable for

More information

SOMALI ENERGY TRANSFORMATION (SET) PROJECT

SOMALI ENERGY TRANSFORMATION (SET) PROJECT SOMALI ENERGY TRANSFORMATION (SET) PROJECT Solar PV installation BOQ JUNE 2016 School 1. Gob Secondary School- Awdal Region. 2. Godmo Biyo CAS Primary School Sanaag Region. 3. Lafarug Primary School- Sahil

More information

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Form B Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Grid Connected Rooftop and Small SPV Power Plants (For the project above 5 kwp & upto

More information

TECHNICAL SPECIFICATIONS OF 2 KVA POWER CONDITIONING UNIT

TECHNICAL SPECIFICATIONS OF 2 KVA POWER CONDITIONING UNIT TECHNICAL SPECIFICATIONS OF 2 KVA POWER CONDITIONING UNIT 1.0 PURPOSE: 1. To charge the battery bank through Solar PV source and AC supply. 2. To invert and produce utility quality sine wave. 3. Inverters

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS 1.1 INTRODUCTION In grid-connected Solar Photo-Voltaic (SPV) systems, solar energy is fed into the building loads that are connected to the public electricity grid through a service

More information

Dakshin Gujarat Vij Company Limited

Dakshin Gujarat Vij Company Limited Dakshin Gujarat Vij Company Limited CIN U40102GJ2003SGCO42909 Regd. & Corporate Office: Urja Sadan, Nana Varachha Road, Kapodara Char Rasta,Surat 395 006 C & R DEPARTMENT Phone No.: 0261 2506100-200-175

More information

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED GUIDELINES FOR EMPANELMENT OF GRID TIED INVERTER MANUFACTURERS FOR IMPLEMENTATION OF SRTPV PROGRAM IN BESCOM. I. NEW EMPANELMENT 1. The grid tied inverter manufacturer shall register their application

More information

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48 INVITATION FOR QUOTATION TEQIP-III/2018/uceo/Shopping/48 29-Dec-2018 To, Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for the

More information

Technical Specifications for Solar PV System for Retail Outlets. 5.3 Technical specifications of major components of Solar PV power plant

Technical Specifications for Solar PV System for Retail Outlets. 5.3 Technical specifications of major components of Solar PV power plant 1. Introduction 2. Design basis 3. Transmission and distribution voltage 4. Scope of work 5. Operation of the system 5.1 Theory of operation 5.2 System features 5.3 Technical specifications of major components

More information

HIMURJA. H.P. Govt. Energy Development Agency. 8-A,SDA Complex, Kasumpti, Shimla Himachal Pradesh, INDIA. Telephone No:

HIMURJA. H.P. Govt. Energy Development Agency. 8-A,SDA Complex, Kasumpti, Shimla Himachal Pradesh, INDIA. Telephone No: Document No. HIMURJA (F-7) / SPV Plant / RTS / 2017-18 Rate Contract for the installation of Grid Connected Rooftop Solar Power Plants under empanelment scheme for the Design, manufacture, supply, erection,

More information

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB) 020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB) CEYLON ELECTRICITY BOARD SRI LANKA Telephone: +94 11 232 0953 Fax: +94 11 232 3935 CONTENTS Page 1.0 Scope 3 2.0 System Parameters 3 3.0 Service

More information

IDCOL Technical Standard for Solar Irrigation Pump (SIP) Projects

IDCOL Technical Standard for Solar Irrigation Pump (SIP) Projects P a g e 1 IDCOL Technical Standard for Solar Irrigation Pump (SIP) Projects Scope of standardization: Equipment standardization : 1. Pump & Motor 2. PV panels 3. Controller Civil construction standardization:

More information

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7 TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH 1.0 SCOPE:

More information

Joint Inspection Report

Joint Inspection Report Joint Inspection Report CERTIFICATE (To be furnished by SNA/PSU/Channel Partner) This is to certify that Shri... (Name & designation) of.... (Organization) visited the. Nos. of plant sites on (date). and

More information

PROJECT PROPOSAL FOR INSTALLATION OF INDIVIDUAL SOLAR ROOF TYPE POWER PLANT 30 KW PV system at Chennai

PROJECT PROPOSAL FOR INSTALLATION OF INDIVIDUAL SOLAR ROOF TYPE POWER PLANT 30 KW PV system at Chennai PROJECT PROPOSAL FOR INSTALLATION OF INDIVIDUAL SOLAR ROOF TYPE POWER PLANT 30 KW PV system at Chennai Customer Location : Shree Mithai (P) Ltd. : No. 39/1A, Poonamallee Bypass Road, Poonamalle, Chennai,

More information

CORRIGENDUM. Page 1 of 16

CORRIGENDUM. Page 1 of 16 CORRIGENDUM In the light of pre-bid meeting held on 27.07.2018 (Friday) at 1.00 P.M. & suggestions received from the prospective bidders, JREDA has decided to make following amendments/addendum in the

More information

SOLAR POWER PACKS OFF-GRID SYSTEMS (150Wp-10kWp:Single Phase)

SOLAR POWER PACKS OFF-GRID SYSTEMS (150Wp-10kWp:Single Phase) MAINS INV. BATT. LOW CHARGING OVER SOLAR POWER PACKS OFF-GRID SYSTEMS (150Wp-10kWp:Single Phase) Get 4-5 hrs. of backup on recommended load Reduce dependence on DG - save fuel & money JS-850 Generate your

More information

GRID CONNECTED 400kWp SOLAR ROOF TOP POWER PLANT NET METERING AT KARNATAKA STATE CRICKET ASSOCIATION M. CHINNASWAMY STADIUM, BENGALURU

GRID CONNECTED 400kWp SOLAR ROOF TOP POWER PLANT NET METERING AT KARNATAKA STATE CRICKET ASSOCIATION M. CHINNASWAMY STADIUM, BENGALURU MGIRED Journal Volume 2(1) : 125-128 ISSN 2393-9605 GRID CONNECTED 400kWp SOLAR ROOF TOP POWER PLANT NET METERING AT KARNATAKA STATE CRICKET ASSOCIATION M. CHINNASWAMY STADIUM, BENGALURU Punati Sridhar,

More information

DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT. TENDER NOTICE NO.1287/2009/JDO Dated

DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT. TENDER NOTICE NO.1287/2009/JDO Dated DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT TENDER NOTICE NO.1287/2009/JDO Dated 12.11.2009 Sealed Tenders are invited from reputed manufacturers/ Firms for the supply of following

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS The proposed projects shall be commissioned as per the technical specifications given below. Any shortcomings will lead to cancelation of subsidy in full or part as decided by

More information

Document No. HIMURJA (F-7) / SPV Plant / RTS /

Document No. HIMURJA (F-7) / SPV Plant / RTS / Document No. HIMURJA (F-7) / SPV Plant / RTS / 2018-19 RATE CONTRACT (Under Empanelment Scheme) Design, manufacture, supply, erection, testing and Commissioning including warranty, operation & maintenance

More information

PINANK ENERGY An ISO 9001: 2015 (QMS) Certified Company Channel Partner: Ministry of New and Renewable Energy, Govt of India

PINANK ENERGY An ISO 9001: 2015 (QMS) Certified Company Channel Partner: Ministry of New and Renewable Energy, Govt of India 1 P a g e PINANK ENERGY An ISO 9001: 2015 (QMS) Certified Company Channel Partner: Ministry of New and Renewable Energy, Govt of India PROPOSAL FOR: ROOF-TOP SOLAR PV PLANT Pinank Engineering and services

More information

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India SECI/SD/EoI/20000 MW Mfg./I/2017 18.12.2017 Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India 1. Objective of EOI: SECI intends to invite Expression of Interest from the

More information

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS 013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS FOR OVERHEAD NETWOKS CEYLON ELECTRICITY BOARD SRI LANKA Specification for MOULDED CASE CIRCUIT BREAKERS FOR OVERHEAD NETWOKS CEB Specification

More information

Sun-Grid Electric Private Limited. Presented by:

Sun-Grid Electric Private Limited. Presented by: SUN-GRID ELECTRIC PVT LTD (All Types of Solar and Electric Projects) For Residential & Commercial Buildings Offices Industries Hospitals Educational Institutions Hotels & Resorts Presented by: Sun-Grid

More information

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation SUN MAGIC SUN MAGIC is a state of art PCU product from ENERTECH product basket with Global standards. This unit will give operational flexibility to its customers to enjoy the benefits of advanced monitoring

More information

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications) Ministry of New and Renewable Energy Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications) Format for Submitting Project Proposals for installing Standalone SPV power

More information

100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT DETAILED PROJECT REPORT AERO SPACE MATERIALS PVT LTD

100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT DETAILED PROJECT REPORT AERO SPACE MATERIALS PVT LTD EXECUTIVE SUMMARY 100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT 1. Location i) State : TAMIL NADU, ii) Locality : KOVILPALAYAM, POLLACHI iii) Latitude : 10 45 16.22 N iv) Longitude : 77 01 15.27 E

More information

TENDER DOCUMENT TENDER ENQUIRY FOR PROVIDING 15 KW GRID CONNECTED ROOFTOP SOLAR PV PLANT

TENDER DOCUMENT TENDER ENQUIRY FOR PROVIDING 15 KW GRID CONNECTED ROOFTOP SOLAR PV PLANT TENDER DOCUMENT Thapar University PATIALA Tele : 1) 9878912570 2)8872743511 To TENDER ENQUIRY FOR PROVIDING 15 KW GRID CONNECTED ROOFTOP SOLAR PV PLANT Sir/Madam, 1. This Institute is interested in providing

More information

Tender Document for. NAME OF THE SUPPLIER / MANUFACTURER: NREDCAP Registration No: /

Tender Document for. NAME OF THE SUPPLIER / MANUFACTURER: NREDCAP Registration No: / Tender Document for Supply of around 50,000 Nos of Solar Lanterns to the P.O, ITDA's of West Godavari, East Godavari, Visakhapatnam, Vizianagaram and Srikakulam Districts for distribution to all S.T students

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

Details and specification for 30 W solar powered LED street lights.

Details and specification for 30 W solar powered LED street lights. Details and specification for 30 W solar powered LED street lights. 2 P a ge Solar LED Lighting System A Solar LED Lighting System is a solar Photovoltaic System designed for outdoor application especially

More information

RFQ-YEM Solar Lighting System for UNDP

RFQ-YEM Solar Lighting System for UNDP AMENDMENT 1 for RFQ-YEM-0076-2016 Solar Lighting System for UNDP This Amendment is issued after the Pre-bid meeting and site visit arranged as mentioned on the RFQ docs and the results as following: To

More information

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) BARSINGSAR PROJECT, CONTRACTS & PURCHASE DIVISION A.O Building, Barsingsar-334402, Bikaner

More information

Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation

Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation RFP No. 16-17-07 Solar Energy for City Hall, Page 1 of 10 Contents Site Description... 3 Panels (provide panel

More information

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation SUN MAGIC + SUN MAGIC + is a state of art PCU product from ENERTECH product basket with Global standards. This unit will give operational flexibility to its customers to enjoy the benefits of advanced

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant Chandigarh Renewal Energy, Science & Technology Promotion Society (CREST) Under the Aegis of Department of Science & Technology, Chandigarh Administration), Paryavaran Bhawan, First Floor, Sec-19B, Madhya

More information

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7 TECHNICAL SPECIFICATION FOR 11 KV.CAPACITOR BANK 1.0 SCOPE: This specification covers

More information

The table shown below gives the status of basic documents submitted by different tenderers.

The table shown below gives the status of basic documents submitted by different tenderers. TENDER FOR SETTING UP OF 20 kwp BUILDING INTEGRATED SOLAR PHOTOVOLTAIC POWER PLANT IN THE PROPOSED SEMINAR HALL OF THE STATE LEVEL ENERGY PARK AT SIDDU-KANU UDYAN, RANCHI, JHARKHAND The above-mentioned

More information

Queries received on. Page No. / Clause No. Queries / Modifications / Changes Suggested. S. No. Technical Specifications as per RFP

Queries received on. Page No. / Clause No. Queries / Modifications / Changes Suggested. S. No. Technical Specifications as per RFP Pre-Bid Queries for NIT Supply of 13179 Nos. of 300Wp Solar Home Power Packs and 4184 Nos. of 40Wp Solar Street Lights including 5 years comprehensive guarantee for Electrification of 895 Nos. of Off-Grid

More information

SUBSIDY SCHEME FOR GRID CONNCTED AND OFF GRID SOLAR SYSTEMS AT IOCL PETROL PUMPS

SUBSIDY SCHEME FOR GRID CONNCTED AND OFF GRID SOLAR SYSTEMS AT IOCL PETROL PUMPS SUBSIDY SCHEME FOR GRID CONNCTED AND OFF GRID SOLAR SYSTEMS AT IOCL PETROL PUMPS FIRSTGREEN CONSULTING PVT LTD MA, 74, DLF Phase III Gurgaon 122002 info@firstgreen.co +91-124-6450224 1. ABOUT THE PROGRAM

More information

: Material Description Quantity UOM

: Material Description Quantity UOM Page : 1 / 2 OIL INDIA LIMITED (A Govt. Of India Enterprise) Tel :033 2230 1657, 1658 4, India Exchange Place, Fax :91 33 2230 2596 Kolkata-700001 E-mail :oilcalmn@cal2.vsnl.net.in ANNEXURE-I Item No./

More information

THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore (M.P.) REQUIREMENT

THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore (M.P.) REQUIREMENT THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore -452003 (M.P.) ANNEXURE -III REQUIREMENT OICL intends to procure reputed brand Exide or Amara Raja or

More information

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL Submitted By: FIRSTGREEN CONSULTING PVT LTD MA, 74, DLF Phase III Gurgaon 122002 info@firstgreen.co

More information

f. The successful bidder shall undertake to supply spares free of cost for the maintenance of the offered items during the warranty period (2 years).

f. The successful bidder shall undertake to supply spares free of cost for the maintenance of the offered items during the warranty period (2 years). NOTICE INVITING TENDER The tenderers should submit the Bid as follows: 1. Technical Bid (EMD and all technical details duly signed on all pages) to be submitted in sealed cover by addressing Chief Manager

More information

Lot 26 WBS 1150 Bill of Quantities

Lot 26 WBS 1150 Bill of Quantities UNITED NATIONS DEVELOPMENT PROGRAMME ITB 2016-196 Lot 26 WBS 1150 Bill of Quantities Programme Title: Right to Education in the Gaza Strip Project name: Extension and Rehabilitation Works For The Governmental

More information

: IEC System for Conformity testing and Certification of Electro technical Equipment

: IEC System for Conformity testing and Certification of Electro technical Equipment List of Abbreviation AEPC : Alternative Energy Promotion Centre AGM : Absorbed Glass Mat CRI : Color Rendering Index DOD : Depth of Discharge ESAP : Energy Sector Assistance Programme HVD : High Voltage

More information

SPG-400. Solar-powered generators

SPG-400. Solar-powered generators SPG-400 Solar-powered generators Features & Benefits: - The GS-SPG series features four 100 Watt solar panels installed on a single support with adjustable tilt angle. - The 480 Amp hour battery assembly,

More information

شركة كهرباء محافظة القدس المساهمة المحدودة

شركة كهرباء محافظة القدس المساهمة المحدودة Our Ref: Date: Messrs. Dear Sir, Tender 22/2017 (re-bidding) 11& 33Kv Fuse Cutouts and Links You are kindly requested to bid for supply and delivery (DDP) for the medium voltage overhead line accessories

More information

Section V DC Nickel Cadmium Alkaline BATTERY

Section V DC Nickel Cadmium Alkaline BATTERY Section - 7 TECHNICAL SPECIFICATION OF 110V DC Nickel Cadmium Alkaline BATTERY TECHNICAL SPECIFICATIONS & REQUIREMENTS OF 110V DC Nickel Cadmium Alkaline Battery 7. 1 GENERAL This section of the document

More information

Station Identification. Results. PV System Specifications. Energy Specifications. Solar Radiation (kwh/m 2 /day) Energy Value ($) AC Energy (kwh)

Station Identification. Results. PV System Specifications. Energy Specifications. Solar Radiation (kwh/m 2 /day) Energy Value ($) AC Energy (kwh) Energy & Cost Savings The Friends Meeting of Austin 3701 Martin Luther King Blvd. Austin, TX. 78721 (20) Sharp 208 W Modules = 4.16 kw 0.77/0.94*0.945=0.774 Derate Factor Station Identification City: Austin

More information

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

56-SDMS-07 REV. 01 SPECIFICATIONS FOR 56-SDMS-07 REV. 01 SPECIFICATIONS FOR UNIT SUBSTATIONS UP TO 36 kv ALUMINUM TRANSFORMER ALUMINUM BUS BARS LVDP This specification is property of SEC and subject to change or modification without any notice

More information

045 : 2000 CEB STANDARD

045 : 2000 CEB STANDARD 045 : 2000 CEB STANDARD LOW VOLTAGE FUSE SWITCH DISCONNECTOR CEYLON ELECTRICITY BOARD SRI LANKA Specification for LOW VOLTAGE FUSE SWITCH DISCONNECTOR CEB Standard 045 : 2000 CEYLON ELECTRICITY BOARD No.

More information

P H O T O V O LTA I C

P H O T O V O LTA I C PHOTOVOLTAIC SOLAR PANEL Crystalline Solar Cells XM-125 (R165) 125 x 125 mm Mono Crystalline Solar Cell XM-156 (R200) 156 x 156 mm Mono Crystalline Solar Cell XP-156 156 x 156 mm Poly/ Quasi Mono Crystalline

More information

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX Dr. Rajendra Prasad Road,Block-27,Neyveli-607807.Tamilnadu,India.

More information

Technical specifications

Technical specifications KINGDOM OF SAUDI ARABIA THE SAUDI FUND FOR DEVELOPMENT ( SFD) ITB -207-7 Technical specifications Project name: Reconstruction, Furniture and Equipping of Three Schools Photovoltaic Solar System for Holly

More information

Off-grid lighting testing and certification processes. Pradeep Kumar

Off-grid lighting testing and certification processes. Pradeep Kumar Off-grid lighting testing and certification processes Pradeep Kumar Centre for Research on Sustainable Building Science The Energy and Resources Institute (TERI) Indian Habitat Centre, New Delhi, India

More information

Tender Document for. NAME OF THE SUPPLIER / MANUFACTURER: NREDCAP Registration No: /

Tender Document for. NAME OF THE SUPPLIER / MANUFACTURER: NREDCAP Registration No: / Tender Document for Supply, Installation & Commissioning of 1490 No s of Solar Lanterns, 235 No s of 12 Watt LED Based Solar Street lights, 6 No s of 5 HP Solar Water Pumping Systems, 2No s of 1HP Solar

More information

CENTAURI ENERGY SERVER TECHNICAL DATA kw POWER

CENTAURI ENERGY SERVER TECHNICAL DATA kw POWER Chassis Inverter power Rated input Rated output Battery pack Safeties Environment Others Input Voltage Lower Limit Input Voltage Upper Limit Power Input Current Output Voltage Output accuracy Transient

More information

SPECIFICATIONS FOR 50 V, 600 AH LEAD ACID BATTERY

SPECIFICATIONS FOR 50 V, 600 AH LEAD ACID BATTERY (I) INTRODUCTION: Power Line Carrier Communication (PLCC) System is being used by Gujarat Energy Transmission Corporation Ltd. for Speech, Data, Protection and Teleprinter signal transmission purpose throughout

More information

MERU Solar Off-Grid Inverters

MERU Solar Off-Grid Inverters 1 kva / 2 kva Off-Grid Solar Inverters with LCD and LED displays 24 / 48 VDC battery versions for 1 kva and 48 VDC for 2 kva Pure sine wave with highest efficiency Fully configurable (PV / Grid priority

More information

Bill of Quantity (BOQ) PAL / Renewable Energy for ALL: Photo Voltaic Cells for Gaza Hospitals

Bill of Quantity (BOQ) PAL / Renewable Energy for ALL: Photo Voltaic Cells for Gaza Hospitals ITB-PAL-000004959 Bill of Quantity (BOQ) PAL0-00098/ Renewable Energy for ALL: Photo Voltaic Cells for Gaza Hospitals Invitation to Bid No: ITB-PAL-000004959 - Construction Of Solar Panels To Operate Four

More information

SKN_N0106AnnexJ_R2. Annex J - Specific requirements for PVT collector Certification. 1. Introduction and definition

SKN_N0106AnnexJ_R2. Annex J - Specific requirements for PVT collector Certification. 1. Introduction and definition Annex J - Specific requirements for PVT collector Certification 1. Introduction and definition PVT collectors (named hybrid collectors in ISO 9806) generate heat and electric power at the same time. They

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION)

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION) INTER PLANT STANDARD STEEL INDUSTRY I P S S SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION) Corresponding IS does not exist IPSS: 1-10-036-12 0 FOREWORD 0.1 This

More information

SPECIFICATION FOR AUTOMATIC PRIMING AND OPERATING SYSTEM FOR CENTRIFUGAL PUMPS.

SPECIFICATION FOR AUTOMATIC PRIMING AND OPERATING SYSTEM FOR CENTRIFUGAL PUMPS. DRAFT SPECIFICATION NO : RDSO/PE/SPEC/D/PS/0010-99 (REV. 0 ) SPECIFICATION FOR AUTOMATIC PRIMING AND OPERATING SYSTEM FOR CENTRIFUGAL PUMPS. 0. FOREWORD 0.1 This specification covers manufacturing and

More information

023 : 2006 CEB STANDARD. 12kV & 36kV LOAD BREAK SWITCHES CEYLON ELECTRICITY BOARD SRI LANKA

023 : 2006 CEB STANDARD. 12kV & 36kV LOAD BREAK SWITCHES CEYLON ELECTRICITY BOARD SRI LANKA 023 : 2006 CEB STANDARD 12kV & 36kV LOAD BREAK SWITCHES CEYLON ELECTRICITY BOARD SRI LANKA Specification for 12kV & 36kV LOAD BREAK SWITCHES CEB Standard 023 : 2006 CEYLON ELECTRICITY BOARD No. 50, Sir

More information

Guideline No.: E-07(201610) E-07 TRANSFORMERS. Issued date: October 28,2016. China Classification Society

Guideline No.: E-07(201610) E-07 TRANSFORMERS. Issued date: October 28,2016. China Classification Society Guideline No.: E-07(201610) E-07 TRANSFORMERS Issued date: October 28,2016 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection and

More information

UNIVERSITY OF CALCUTTA Centre for Research in Nanoscience and Nanotechnology JD-2, Sector-III, Salt Lake City Kolkata

UNIVERSITY OF CALCUTTA Centre for Research in Nanoscience and Nanotechnology JD-2, Sector-III, Salt Lake City Kolkata UNIVERSITY OF CALCUTTA Centre for Research in Nanoscience and Nanotechnology JD-2, Sector-III, Salt Lake City Kolkata- 700106 NOTICE INVITING QUOTATION Sealed Quotations are invited from reputed suppliers

More information

STANDARD SPECIFICATION FOR. LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs DOCUMENT NO: 44LK-5100/E.02/011

STANDARD SPECIFICATION FOR. LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs DOCUMENT NO: 44LK-5100/E.02/011 Page 1 of 6 STANDARD SPECIFICATION FOR LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs Rev No. Issue Date Pages Rev Description Prepared By Checked By Approved By 0 15.07.2008 6 Issued for FEED MSJ VDV VDV

More information

Tamil Nadu Handicrafts Development Corporation Ltd, Chennai. (Government of Tamil Nadu Undertaking)

Tamil Nadu Handicrafts Development Corporation Ltd, Chennai. (Government of Tamil Nadu Undertaking) Tamil Nadu Handicrafts Development Corporation Ltd, Chennai. (Government of Tamil Nadu Undertaking) Tender No: THDC/1611/DC/2017 dated 26.09.2017 Tender for the supply, erection and commissioning of machineries,

More information

Special Specification 6058 Battery Back-Up System for Signal Cabinets

Special Specification 6058 Battery Back-Up System for Signal Cabinets Special Specification Battery Back-Up System for Signal Cabinets 1. DESCRIPTION 2. DEFINITIONS Install a Battery Back-Up System (BBU System) for traffic signals that will provide reliable emergency power

More information

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655) - (SMUD FORM 2655) A. Applicability: This Generating Facility Interconnection Application (Application) shall be used to request the interconnection of a Generating Facility to Sacramento Municipal Utility

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY Phone: +91 431 257 79 38 Fax

More information

AC MODULE P72PCS-300W

AC MODULE P72PCS-300W AC MODULE P72PCS-300W Features Industry leading module power output warranty International quality, safety and performance certifications High-reliability with guaranteed 0/+5 Wp peak power Manufacturing

More information

Section 7: Price Schedule Form 1

Section 7: Price Schedule Form 1 Section 7: Price Schedule Form The Bidder is required to prepare the Price Schedule as indicated in the Instruction to Bidders. The Price Schedule must provide a detailed cost breakdown of all goods and

More information

Guideline No.: E-07(201501) E-07 TRANSFORMERS. Issued date: October 20,2015. China Classification Society

Guideline No.: E-07(201501) E-07 TRANSFORMERS. Issued date: October 20,2015. China Classification Society Guideline No.: E-07(201501) E-07 TRANSFORMERS Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection and

More information

017: 1998 CEB STANDARD RING MAIN UNIT CEYLON ELECTRICITY BOARD SRI LANKA

017: 1998 CEB STANDARD RING MAIN UNIT CEYLON ELECTRICITY BOARD SRI LANKA 017: 1998 CEB STANDARD RING MAIN UNIT CEYLON ELECTRICITY BOARD SRI LANKA CONTENTS PAGE 1. Scope 2 2. System Parameters 2 3. Service Conditions 2 4. Applicable Standards 3 5. Basic Features 4 6. Quality

More information

Section 6 - Employer s Requirements

Section 6 - Employer s Requirements Section 6 - Employer s Requirements 6-1 Section 6 - Employer s Requirements This Section contains the Specifications, the Drawings, Supplementary Information that describe the Works to be procured, Personnel

More information

SAMPLE PERMIT APPLICATION PACKAGE

SAMPLE PERMIT APPLICATION PACKAGE 2013 Lennox Industries Inc. Dallas, Texas, USA SOLAR - KIT / ACCESSORIES 507154-01 3/2013 Supersedes 506555-01 LITHO U.S.A. SAMPLE PERMIT APPLICATION PACKAGE SUNSOURCE HOME ENERGY SYSTEM SAMPLE PERMIT

More information

Energy & Cost Savings The Friends Meeting of Austin 3701 Martin Luther King Blvd. Austin, TX (46) Sharp 208 W Modules = 9.

Energy & Cost Savings The Friends Meeting of Austin 3701 Martin Luther King Blvd. Austin, TX (46) Sharp 208 W Modules = 9. Energy & Cost Savings The Friends Meeting of Austin 371 Martin Luther King Blvd. Austin, TX. 78721 (46) Sharp 28 W Modules = 9.568 kw Station Identification City: Austin State: TX Latitude: 3.3 N Longitude:

More information

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society

Guideline No.: E-07(201712) E-07 TRANSFORMERS. Issued date: December 26, China Classification Society Guideline No.: E-07(201712) E-07 TRANSFORMERS Issued date: December 26, 2017 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

Supply, testing, installation and commissioning of 5 ky A UPS system as per the following specification:

Supply, testing, installation and commissioning of 5 ky A UPS system as per the following specification: Supply, testing, installation and commissioning of 5 ky A UPS system as per the following specification: 1 Capacity 5 ky A UPS system with APFC system 2 Input supply Suitable for400±15% Y, 3 phase, 50

More information

INTER PLANT STANDARD STEEL INDUSTRY. Corresponding IS does not exist

INTER PLANT STANDARD STEEL INDUSTRY. Corresponding IS does not exist INTER PLANT STANDARD STEEL INDUSTRY IPSS SPECIFICATION FOR ac ROLLER TABLE MOTORS (Second Revision) Corresponding IS does not exist IPSS:1-03-007-14 Formerly : IPSS:1-03-007-03 0. FOREWORD 0.1 This Inter

More information

INTER PLANT STANDARD - STEEL INDUSTRY THYRISTOR CONVERTORS FOR ARMATURE AND FIELD OF MAIN DRIVE MOTORS. Corresponding IS does not exist

INTER PLANT STANDARD - STEEL INDUSTRY THYRISTOR CONVERTORS FOR ARMATURE AND FIELD OF MAIN DRIVE MOTORS. Corresponding IS does not exist INTER PLANT STANDARD - STEEL INDUSTRY IPSS THYRISTOR CONVERTORS FOR ARMATURE AND FIELD OF MAIN DRIVE MOTORS Corresponding IS does not exist IPSS: 1-10-038-08 0 FOREWORD 0.1 This Inter Plant Standard has

More information

ABB central inverters ULTRA-750/1100/ kW to 1560kW

ABB central inverters ULTRA-750/1100/ kW to 1560kW Solar inverters ABB central inverters ULTRA-750/1100/1500 750kW to 1560kW * ABB s utility-scale ULTRA inverters combine high efficiency with a wide input voltage range and multiple maximum power point

More information

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing

More information

Technical Specification

Technical Specification Section - 7 Technical Specification OF 33KV OUTDOOR DROP OUT FUSE CUT-OUT AND FUSE LINK AND 33KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER 84 7.1. TECHNICAL SPECIFICATION OF

More information

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System Roof Top Solar Power Net Metering Solution Guidelines for implementation of Net Metering for Roof Top Solar Power System 1. Net Metering arrangement is permitted for 3 Phase connections only. The interconnection

More information

TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY.

TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY. TECHNICAL SPECIFICATIONS FOR LT DISTRIBUTION BOX MADE FROM THERMOSETTING PLASTIC HAVING 200 /400 AMP CAPACITY. 1.0 SCOPE: This specification covers the design, manufacturing and testing of LT Distribution