Tender No. CL1 GEOTECHNICAL ENGINEERING LAB. CIVIL ENGINEERING DEPT.

Similar documents
Soil Testing Equipment

U tube viscometer. Kinematic viscosity bath RASAYAN

Tex-614-J, Testing Epoxy Materials

HS CYCLIC CUM STATIC TRIAXIAL TEST SYSTEM

Environmental/Analytical LabCivil Engineering Lab Equipment

SPECIFICATION FOR HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV/22KV LINE

TECHNICAL SPECIFICATION FOR SHACKLE HARDWARE FITTINGS SUITABLE FOR TENSION STRING TO BE USED FOR 11KV LINE

Index for Labs under Civil Engineering

HA Thickness Gauge IS:2386 (part 1)- 1963

CEMENT TEST EQUIPMENTS

Dakshin Gujarat Vij Company Limited

Penetration. Test Methods

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet.

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES :

GLASSCO LABORATORY EQUIPMENTS PVT. LTD.

Operating Instructions

Tex-614-J, Testing Epoxy Materials

SPECIFICATION SHEET Pulse tool / Impact Wrench Testing System MODEL : IWT-101

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

MOTHER DAIRY A UNIT OF GUJARAT CO-OPERATIVE MILK MARKETING FEDERATION LIMITED PURCHASE ENQUIRY

SECTION AXIAL HVAC FANS

INDIAN MARITIME UNIVERSITY KOLKATA CAMPUS

Guideline No.M-10(201510) M-10 Marine Diesel Engine Fuel Injection Pump

FECR. World Class Testing Equipments An ISO 9001 Certified co. Paper & Packaging Equipments

Ref:CL/Mech./ Cal /BID-01(13-14) Date: 10 July 2013

TITLE: SPECIFICATION FOR BENCH VICE & BENCH GRINDER TABLE OF CONTENTS. 0.1 Circulation List. 0.2 Amendment Record

TECHNICAL SPECIFICATIONS FOR BATTERY OPERATED HEAVY DUTY FORK LIFT TRUCK - 20 T

TECHNICAL BID T 3627

Heating chamber with mechanical convection

Laboratory Vane Apparatus SL800. Impact Test Equipment Ltd & User Guide. User Guide

Heating oven with mechanical control

SECTION CENTRIFUGAL HVAC FANS

Model No Multimix HTM Power. Drive. Digital Inverter Sensor less Vector Control. Speed. Material Mixing capacity Lifting.

Heating chamber with mechanical convection

CARBON & SULPHUR APPARATUS

PARTS MANUAL. PS314SBI Gas and Electric Ovens. Models: for domestic and standard export ovens PS314SBI Middleby Marshall, Inc.

VERTEX UNIVERSAL TESTING MACHINE

( Group D ) Detailed Tender Notice No. DTE/PUR/14/ 328 Dated Civil Engineering Department. Kulgam. Anantnag

Heating oven with mechanical convection

Draft Indian Standard SAFES Part 1 Specification (Fifth Revision)

Geotechnical Testing Equipment

Heating chamber with mechanical convection

Safety drying ovens. Advantages: Areas of application: FDL series 115

Heating chamber with mechanical convection

INVITATION FOR QUOTATION. TEQIP-II/2015/GJ1G02/Shopping/M-EE-09

Annexure-1. Annexure- 1 TECHNICAL SPECIFICATIONS FOR THE MODULAR LABORATORY FURNITURE (CNSNT/RL-4)

532: 2006 Bicycle tube valves and valve tubing Specification (third revision) 2414: 2005 Cycle and rickshaw pneumatic tyres (fourth revision)

SPECIFICATIONS OF SINGLE GIRDER UNDER SLUNG E.O.T. CRANE CAPACITY: 5 MT

REQUEST FOR QUOTATION

NATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA

Heating oven with natural convection

STATE OF NORTH CAROLINA D DEPARTMENT OF ADMINISTRATION MARCH 20, 1995 PURCHASE AND CONTRACT DIVISION 7125-LM-2C November 9, 1989

FlexChem Model 404 Rotating Oven

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

Measuring. Affordable. Effective. Instruments

Features. HTHP Filter Press for Drilling Fluid Testing DRILLING FLUIDS EQUIPMENT

ADVANCE ENGINEERING WORKS. Spare Parts

INSTRUCTION MANUAL VISCOTESTER VT-05 / VT-06 PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION

M-11 MARINE DIESEL ENGINE FUEL INJECTOR

Hi-Tech Calibration, 307, 3rd Floor, Govinda Complex, Char Rasta, Vapi, Gujarat. Discipline Mechanical Calibration Issue Date

NIT No.:-10/WEX/MCR/HYD. PRESS/2-303/ /Dt

LAB SCALE EQUIPMENTS.

Supply of 63 kva DIESEL GENERATOR SET WITH AMF

Technosys Blood Bank Refrigerator

TECHNICAL SPECIFICATION FOR 11 KV DROP OUT (D.O.) FUSE with Polymeric Insulators:

IEC SYSTEM FOR CONFORMITY TESTING AND COMMITTEE OF TESTING LABORATORIES CERTIFICATION OF ELECTRICAL EQUIPMENT

Draft Indian Standard SYN GAS/ AMMONIA TURBO COMPRESSOR LUBRICATING OILS SPECIFICATION

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK

SITRANS F flowmeters. SITRANS F R Drum meters Overview 4/355. Overview

M-14 Stern Shaft Sealing Apparatus

2500/2700 Series Gas Convection Oven

BOHLENDER GmbH Phone: +49(0)9346 / Fax: +49(0)9346 / Internet:

MOREHOUSE INSTRUMENT COMPANY, INC. 60,000 LBS CAPACITY AIRCRAFT PART NUMBER SCALE S FORCE CALIBRATION PRESS PART NO.

Marking Fee for IS 636:1988 Non-percolating Flexible Delivery Hose for Fire Fighting

Technical Specification of 11KV 200Amp. (3-Pole/2-Pole) Air Break Switch Scope Description of the materials Standards Insulator make

SHREE RAMCHANDRA EDUCATION SOCIETY S LONIKAND, PUNE DEPARTMENT OF MECHANICAL ENGINEERING LAB MANUAL. Applied Thermodynamics (ATD) Semester-IV

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

GH-BETTIS OPERATING & MAINTENANCE INSTRUCTIONS DISASSEMBLY & ASSEMBLY FOR THE T80X-M4-S DOUBLE ACTING SERIES HYDRAULIC ACTUATORS

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

Alcalab Private Limited, 3rd Floor, Ashiana Trade Centre, Adityapur, Jamshedpur, Jharkhand. Discipline Mechanical Calibration Issue Date

S840, S845, S846 Series Single-break changeover, NC or NO contacts, positive opening operation and wiping action Catalogue D40.en

Stirrers. DAIHAN Scientific. Magnetic Stirrers, Magnetic Stirring P. 197~200, Magnetic Stirring with Heating P. 201~207

REPORT ON SCALA PENETROMETER IRREGULARITY

OCTOPUS SERVICE PROCEDURE - SP007 REV NEW 15-FEB-2008

Draft Indian Standard Specification for Rubber Gaskets (First Revision of IS : 1984) ICS , ,

3. BEARING ARRANGEMENT DESIGN

Small Tool Instruments and Data Management

Safety drying ovens with expanded temperature range

Safety drying oven with expended temperature range

MGVCL//11KV D.O.FUSE/SPECIFICATIONS -:11KV DROP OUT FUSE CUTOUTS:-

Tender documents for supply, erection & commissioning of Plante Type Battery to 2x210 MW IB Thermal Power Station.

INVITATION FOR QUOTATION. TEQIP-III/2018/mmug/Shopping/29 To,

TECHNICAL SPECIFICATION FOR 11 KV AIR BREAK (A.B.) SWITCHES:

ENGINE MECHANICAL <134>

Liquid, semi-liquid, dry, humidified, pressurized test chamber

GUWAHATI MUNICIPAL CORPORATION WATER WORKS :: PANBAZAR GUWAHATI

Laboratory Glassware, Instruments & Accessories

SJSZ 80/173 Foam Board Extrusion Line

The FMM force tester can be controlled using L1 software for limit, cycling, hold and coefficient of friction testing.

Transcription:

Tender No. CL1 GEOTECHNICAL ENGINEERING LAB. CIVIL ENGINEERING DEPT. I. EQUIPMENT/ASSESSORIES/GOODS FOR GEOTECHNICAL ENGINEERING LABORATORY A. LIST OF ITEMS &APPROVED MANUFACTURERS/SUPPLIERS Sr. No Equipment/Apparatus/Accessories/Goods Common Accessories to be used for Items 3 to 6 1 Compression-Tension proving ring fitted with a dial gauge accurate to 0.002mm accuracy, capacity: 2 kn 2. Calibrated Dial gauge 0-25mm x 0.01mm Approved Manufacturers/Suppliers AIMIL, HEICO, CONTROLS, WykehamFerrance, HUMBOLT Main Apparatus to use accessories 1 to 3 to be procured from a single supplier 3 Direct Shear Test AIMIL, HEICO, 4 Unconfined Compression Test 5 Swell Test 6 Laboratory Vane shear Test 7 Consolidation Test 3 Gang, Bench Type Minor Appartus / Support items CONTROLS, WykehamFerrance, HUMBOLT 8 Liquid Limit Device AIMIL, HEICO, 9 Shrinkage Limit 10 Hydrometer 11 High Speed Stirrer 12 Post Hole Augur out Fit with required Extension rods 13 Thin Walled Undisturbed Sampler 40, 65, 80mm Dia With alternate size given in specs. 14 Hot Air Oven with Digital Temperature Display and Auto Off Timer : 605 x 605 x 605 (approx..) 15 Hot Air Oven with Digital Temperature Display and Auto Off Timer, with blower : 605 x 605 x 910 (approx.) CONTROLS, WykehamFerrance, HUMBOLT, Other Suppliers may quote with user List for Reference

B :DETAILED SPECIFICATIONS General Requirements: The Item Nos. 1 to 7 will be procured from a single supplier. There has to be feasibility or should provide fixtures to use Proving Rings and Dial Gauges (having same range) as per Item 1 and 3 for multiple apparatus in item 3 to 5. 1. Proving Ring 2 kn/2.5kn - Capacity : - 02 No a. Compression-Tension proving ring fitted with a dial gauge accurate to 0.002mm accuracy, capacity: 2 kn/2.5 kn, compatible to be used with item nos. 3 to 5. b. Calibration Certificate from approved agency. 2. Dial Gauge 0-25mm x 0.01mm : - 02 No a. Dial Guage with 25mm travel having least count 0.01mm compatible to be used with item no. 3 to 5 b.certificate of accuracy in measurement. 3. DIRECT SHEAR TEST APPARATUS :- 01 No (Excluding Proving Ring & Dial Gauges) The complete working set up to comply and to perform the test for 60x60x25mm soil sample as per SP-36 part-1. The set up should include following main parts: a. Loading Frame:Motorized loading with 6 speed gear box assembly to apply the load at the rate of 0.025, 0.050, 0.125, 0.25, 0.625 and 1.25 mm/min. It shouldbe with base anchor bolts & necessary provisions with details. The frame should have a loading yoke assembly to apply normal load to the shear box upto 3 kg/cm2, with fixtures for proving ring, shear load application, shear box housing, brackets for holding vertical and horizontal dial gauges etc. complete as required. The assembly should have

smooth finish and have trace free powder coated paint. It should be operated with 220 V, 50Hz, Single phase AC Supply. b. Shear Box assembly for 60x60x25mm samples: 2 Sets (Complete assembly as per : IS 11229-1985), All metallic parts to be chrome plated Brass material. Each set comprises of : 1. Halves of the shear box, Plane gripper plates, Perforated Gripper plates all 2 nos. 2. Porous stones,4 Nos., Base plate and loading pad 1 no. with Steel Balls 2 No. c. Shear Box Housing Jacket to be place on loading frame, act as water reservoir and transfer load to the box. 1 no. d. Specimen cutter:1 No., Specimen Compacter : 1 No e. Surcharge weight set comprise of following weight: 0.05 kg/cm2 1 Nos. 0.1 kg/cm2 1 No. 0.2 kg/cm2 2 No. 0.5 kg/cm2 2 Nos. 1 kg/cm2 2 No. 4. UNCONFINED COMPRESSION TEST APPARATUS: 01 NO (Excluding Proving Ring & Dial Gauges) The complete working set up to comply and to perform the test as per SP-36 part-1. The set up should include following main parts : a. Loading frame 50 kn capacity, Motorized with three speed gear box assembly to apply the load at the rate of 1.25, 1.50, 2.50 mm/min. The assembly should have smooth finish and have trace free powder coated paint/ chrome plated.it should be operated with 220 V, 50Hz, Single phase AC Supply. It should have fixtures as adapter for proving ring, vertical displacement dial gauge holder etc. b. Plain Platen 150mm dia. with adapter (1 no) and steel ball (02nos). c. Pair of conical seating with conical grooving tool for 38mm and 50mm dia. samples. d. Split mould size: 38 diax 76 mm long, 50 dia. x 100mm long e. Rubber Sheath for 38 and 50 mm dia specimen-12nos each. It should be operated with 220 V, 50Hz, Single phase AC Supply.

5. SWELL TEST APPARATUS : 1 No. (Excluding Proving Ring & Dial Gauges) The complete working set up to comply and to perform the Swell Pressure Test for 100mm dia. soil sample as per SP-36 part-1. The set up should include following main parts : 1. Load frame, hand operated, capacity: 5 kn 2. Mould 100 mm dia. x127.3 mm height (1000 ml volume) with base plate and collar. ( Brass) 3. Perforated Swell Plate 100 mm dia. X 16 mm thick. 4. Spacer 100 mm dia. X 12.7 mm thick. 5. Porous Stones 100 mm dia. X 12.7 mm thick: 2 Nos. + 2 Nos. Addl. 6. Load Transfer Bar 1 no. & Steel Ball : 2 Nos. 7. Soaking Tank, approx250 mm dia. X 210 mm high to be fitted in a groove in Base of Frame. 6. LABORATORY VANE SHEAR TEST: - 1 No. The complete working set up to comply and to performthe test for 38mm dia. soil sample as per SP-36 part-1 for shear strength upto 0.50 kg/cm 2. The set up should include following main parts : A torque application having a base with hole for holding the specimen mould in position, torque head is electrically driven by a small reduction geared motor (220volts, 50 Hz single phase AC supply) with a strain of 1/60 revolution (6 º per minute) attached to a measuring device 1. A set of four springs, one each of with different stiffness to measure shear strength upto 0.5 kg/cm2. The spring calibration certificate to attached with the stiffness of spring mentioned in kg-cm/revolution 2. A vane of size 12.0 X 24.0 mm long with a vane rod, 3. 38mm dia. container and Stand with necessary fixtures the container.

8. BENCH TYPE CONSOLIDOMETER 3 GANG : 01 No The complete working set up to comply and to perform the consolidation test for 60mm dia.soil sample as per SP-36 part-1. The set up should include following main parts : a. Loading Frame: The frame is Aluminum cast body, powder coated paint, 1:10 loading yoke assembly with arrangement for self alignment and jerk less load transfer to specimen for all 3 Gangs. The frame capacity should be for load transfer of 20 kg/cm 2 in each of the three loading units mounted on frame. : 1 No. b. Set of calibrated weights 3 sets 0.05 kg/cm 2 : 1nos. 0.10 kg/cm 2 : 4 nos. 0.20 kg/cm 2 : 6 nos. 0.50 kg/cm 2 : 4 nos. 1.00 kg/cm 2 : 8 nos. c. Fix Ring type Consolidometer Cells for testing specimen of 60 dia x 20mm with main components as : 1. Consolidation Cell Assembly: 3 nos. 2. Fixed ring with Guide Ring: 3 Nos. 3. Specimen Cutting Ring 3 nos 4. Porous stones: (6 Nos.+6 Nos. Addl.) 5. Pressure pad : 3 Nos. each size + Steel Balls ( 6 nos.) 6. Channel base with water inlet : 3Nos 7. Gaskets : (3 Nos. + 3 Nos. Addl.) 8. Water jacket : 3 Nos. 9. Water reservoirs (3 nos.)with plastic tube, T connection & a pinch cock- 3 sets + 3 addl. sets.) d. Dial Gauge with 5mm travel having least count 0.01mm with Certificate of Accuracy in measurement. Extra Item: e. Fix Ring type Consolidometer Cells for testing specimen of 100 dia x 25mm with main components as : 1. Consolidation Cell Assembly: 1 nos. 2. Fixed ring with Guide Ring: 1 Nos. 3. Specimen Cutting Ring 1 nos 4. Porous stones: (2 Nos.+2 Nos. Addl.) 5. Pressure pad : 1 Nos. each size + Steel Balls ( 2 nos.)

6. Channel base with water inlet : 1Nos 7. Gaskets : (1 Nos. + 1 Nos. Addl.) 8. Water jacket : 1 Nos. 9. Water reservoirs (1 nos.) with plastic tube, T connection & a pinch cock - 1 sets + 1 addl. sets.) 9. LIQUID LIMIT DEVICE :03 Nos. The complete working set up to comply and to perform the test as per SP-36 part -1 using Cassagrande s device, complete assembly as per: IS-2720 (part-05)-1985. Each set up should include following main parts : 1. Brass cup, as crank and cam mechanism, mounted on rubber base with standardhardness as per code provisions, with drop adjustment mechanism and blow counter. 2. Brass Grooving tool Type A and B and Gauging Block, 3mm dia brass rod as per IS:9259 IS: 2720 3. Spatula 2nos. 10. SHRINKAGE LIMIT DEVICE : 03 Nos. The required components are : a. 75mm square acrylic plate 3mm thick with 3 metal prongs b. 75mm square acrylic plain plate 3mm thick c. Stainless steel shrinkage dish 45mm dia15mm deep d. Glass cup with 50/55mm dia, 25 mm deep e. Spatula 11.HYDROMETER : 06 Nos. For use in the Hydrometer test as per SP-36 part-1. 1. Hydrometer graduated having surface tension 55 dynes/cm, 2. Range of density marked 0.995 to 1.030 with graduation line intervals 0.0005, Basis of scale density 27 C other requirements as per IS 3104-1965, 3. permissible error +/- 1 scale division

12. HIGH SPEED STIRRER : 1 Nos For use in the Hydrometer test as per SP-36 part-1. 1. A mechanical stirring device fitted with a motor rotating the shaft at 8,000 to 10,000rpm when loaded. The shaft equipped with replaceable stirring paddle which made of plastic or hard rubber provide replaceable paddle 2 no. addl. 2. Dispersion cup made of Brass with baffles for use in dispersion cup 3. To be operated with 220 volts 50 Hz, single phase AC supply. 13. POST HOLE AUGUR WITH TEE PIECE &HANDLE 2 NOS. WITH EXTENTION RODS & HEXAGONAL COUPLINGS 12 NOS.. Post hole type Auger out fit, 100 mm diameter with blades made from steel conforming to designation T 90 of Schedule VI of IS 1570 : 1961 with a maximum sulphur and phosphorus content of 0.05 percent. The edges of the blade shall be backed with nonerodable welding so as to have hardness 600 to 700 HV 10 (see IS 1501 :1968) so as to perform as cutting edge for auguring in soil. The out is fitted with coupling for connection to extension rods. The connecting T and Handle shall be made from heavy grade MS (IS 1239-pt1) Extension Rod each 1m longshall be made from heavy grade MS (IS 1239-pt1) with hardened hexagonal coupling and threading for its connectivity. The outfit to be coated with one coat of red oxide followed by trace free coats of Enamel paint. 14. THIN WALLED UNDISTURBED SAMPLER : 40, 65 and 80mm dia. : 3 nos each. ( Complete sampler assembly as per: IS-11594 / SP-36 pt-2. Chrome Plated MS sampling tubs for collecting undisturbed soil sample from bore hole. The Area Ratio upto 10% and inside clearance 1 to 3 % for each size. Attached with sampling heads as detailed in the code and provision for connecting to square threaded A- Rods. (Preferred Length for 40, 65 and 80mm dia are 300, 300 and 450mm respectively). Alternate diameters 38, 50 and 70/75mmmay be quoted if IS sizes are not available, provided other details comply code provisions.

15. HOT AIR OVEN-605 mm X 605 mm X 605mm : 01 No. The outer body is made from MS with powder coated paint and the inner body from Stainless Steel (304Q) with a gap of 75 mm filled with Glass Wool heat insulator. The perforated selves 4 nos. are made from stainless steel wires. The door should be fully insulated with insulation gaskets and provision of brass lock hinges and aluminum ventilators with chrome plated spring type automatic roller to and fro latch. The other features include : a. The range temperature should be ambient to 250 C with a Temperature sensitivity +/- 1 C & Uniformity of +1 C /-2 C or betterall around the Chamber. b. Power supply: - 230V, AC 50 Hz c. There should be exhaust holes which may also be used to calibrate the oven. d. It should be provided with Temperature Control Display using digital Dual display Temperature controller with PT 100 sensor and on/off Light Indicator - (PID temperature controller cum Indicator), with NABL Calibration Certificate e. Heating elements: - NICROM wire/fins type heater at bottom & sides for better circulation. f. Instruction manual to be provided for operation & maintenance. g. There should be provision of Digital Electronic Time for Auto Switch off. h. Blower fitted with ISI marked motor to circulate the inside air and to provide forced dry air to the samples. 16. HOT AIR OVEN - 605 mm X 605 mm X 910mm (height) : 01 No. The outer body is made from GI/MS with powder coated paint and the inner body from Stainless Steel (304Q) with a gap of 75 mm filled with Glass Wool heat insulator. The perforated selves 4 nos. are made from stainless steel wires. The door should be fully insulated with insulation gaskets and provision of brass lock hinges and aluminum ventilators with chrome plated spring type automatic roller to and fro latch. The other features include : a. The range temperature should be ambient to 250 C with a Temperature sensitivity +/- 1 C & Uniformity of +1 C / -2 C or better all around the Chamber. b. Power supply: - 230V, AC 50 Hz c. There should be exhaust holes which may also be used to calibrate the oven. d. It should be provided with Temperature Control Display using digital Dual display Temperature controller with PT 100 sensor and on/off Light Indicator - (PID temperature controller cum Indicator), with NABL Calibration Certificate

e. Heating elements: - NICROM wire/fins type heater or bottom & sides for better circulation f. Instruction manual to be provided for easy operation & maintenance. g. There should be provision of Digital Electronic Time for Auto Switch off. h. Blower fitted with ISI marked motor to circulate the inside air and to provide forced dry air to the samples. C : TERMS AND CONDITIONS : i) The vendor must provide Certificate of authorized dealership if the vendor is not a manufacturer. ii) The basic rates quoted should be including packing, forwarding, transportation,, installation, demonstration as applicable, F.O.R. - D. D. Uni., Nadiad only. Vendor s representative to install the set ups items 1 to 8 and to demonstrate for item 15 & 16. iii) The rates to be inclusive of all taxes or clearly mention all applicable taxes (VAT etc) iv) The quantity of the items mentioned may vary as per requirements. v) Delivery Period 4 Weeks from the date of receipt of order by the vendor, vi) 100 % payment against satisfactory inspection/demonstration of the goods as per specifications. No advance payment. vii) If the goods supplied failed to comply prescribed specifications,will be taken back by the supplier with no cost implication to DDU. viii) There will be 1 year replacement Guarantee against any manufacturing defect. ix) The vendor should provide minimum 2 services by companies authorized engineer during the Guarantee period. x) Validity of the Quotation: 4 Weeks from the last date of receipt of Tender. xi) Last date to submit Tender 22/9/2014, Monday 4.30pm Any quotation violating the above Terms and Conditions may be rejected without further communication. The quotations in sealed envelope super scribed Quotation for Civil Engg. Department shall be addressed to: The Vice Chancellor Dharmsinh Desai University, P.O.Box No. 35, College Road, Nadiad- 387001