SOUTHWEST CALGARY RING ROAD (SWCRR)

Similar documents
FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

Currant Lake Transmission Project

Bohn to Kettle River Transmission Project

Kettle River Transmission Project

Included in this Stakeholder Information Package:

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Electric system improvements near you

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Willingdon Substation Decommission

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document

conversation SHAPE the May 2015 The AUC

APPENDIX C - AESO PIP SUMMARY

APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP)

Wainwright 51S Substation Connection Enhancement Needs Identification Document

Coalspur Mines (Operations) Ltd.

welcome to the BC Hydro community open house

DFO STATEMENT OF NEED REPORT

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station.

Decision The City of Calgary. 30-kW Solar Power Plant. March 8, 2012

Powering Sydney s Future

The Engineering Department recommends Council receive this report for information.

Dawes Substation Project

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

Brion Energy Corporation

JCP&L Verbatim Response to Middletown Township s Questions

Harrow Station Bishop Grandin Transmission Project. Welcome

Please Refer to Attached Sample Form

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Our proposal is to replace the existing pipeline with a new pipeline, to ensure the continued safe transportation of refined petroleum products.

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Western Alberta Transmission Line (WATL) HVDC Project

Peninsula Corridor Electrification Project (PCEP)

Wal-Mart Canada Corp.

Green Line LRT: Beltline Segment Update April 19, 2017

ENMAX Power Corporation

Rail alignment and benefits (rab) study

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

1 Downtown LRT Connector: Draft Concept

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

Explaining AER Setbacks

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

The Capital Grid Project:

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

This page is intentionally left blank.

Sheridan 2085S Substation. Needs Identification Document

Direct Energy Regulated Services

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities

Vantage to Pomona Heights Transmission Project Frequently asked questions

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Confederation Line West Queensway Terrace North. May 27, 2017

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Network. ENMAX Power Corporation Network Planning & Design November 4, 2011

Michigan Thumb Loop Transmission Line Project

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Functional Specification Revision History

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

Chirmorie Wind Farm Grid Connection

Please Refer to Attached Sample Form

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Alberta Energy and Utilities Board. Application to Construct and Operate Transmission Facilities

Welcome. Green Line in Your Community

Application for Service Residential Subdivision / Development

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

K2 Wind Community Liaison Committee Meeting #2 Wednesday, May 28, 2014

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015

Net Metering Policy Framework. July 2015

Decision D Finlay Group. Complaint Regarding FortisAlberta Inc. Distribution Line Rebuild Project. February 3, 2016

FREQUENTLY ASKED QUESTIONS

HEARING STATEMENT - PALMERSTON NORTH CITY COUNCIL PLAN CHANGE 15A - RURAL ZONE (GENERAL ISSUES)

Title 24: Building Codes for Plug-in Electric Vehicles September 22, 2015 Webinar Questions

Rail alignment and benefits (rab) study

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Evaluating Stakeholder Engagement

WELCOME. North Central LRT Open Houses. June 11, Ascension of Our Lord School June 12, Winston Heights June 13, Thorncliffe Community Hall

Crestmont Development Update 2017 AGM

ATTACHMENT - DFO STATEMENT OF NEED

BC Pilot Car Load Movement Guidelines. Task Force on Vehicle Weights and Dimensions Policy. December 14, 2016

THORNTON SUBSTATION. Why is the substation needed? How were the three potential sites identified?

Proposed Dounreay - Mybster 275 kv / 132 kv

Fixing the Line s Canarsie Tunnel. Manhattan CB6 11/5/2018

Chair and Members, The Etobicoke York Community Council. Mark Sraga, Director and Deputy Chief Building Official

Weasel Creek Transmission Project

Goals, Objectives, Performance Measurements. Mayor s Transition Team Public Input Session: Finance & Budget/Pensacola Energy 1/22/2019

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

Grid Energy Storage: Policies

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

ATTACHMENT [B] PROJECT DESCRIPTION REQUESTED CITY OF LOS ANGELES ACTIONS

Corporate Engagement in Wetlands Restoration

Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington

Appendix D Black Hills Project Summary

University of Alberta

Transcription:

PROJECT OVERVIEW Alberta Transportation has started planning for the construction of the SW portion of the road that will complete the Calgary Ring Road. The completion of the SWCRR requires the relocation of several utilities that are directly impacted by the road construction. The Province is working collaboratively with the impacted utility companies to help facilitate their planning and design. The road design for the SWCRR conflicts with existing transmission infrastructure. Alberta Transportation has requested ENMAX Power (ENMAX) to relocate its transmission lines away from the road alignment and into the new Power Line Component of the newly established Transportation Utility Corridor (TUC) along the SWCRR. This land was transferred from the Tsuu T ina Nation to the Government of Alberta to accommodate a portion of the SWCRR and TUC.

DISCOVERY RIDGE SIGNAL HILL GLAMORGAN 28 LINCOLN PARK ALTADORE GLENMORE TR SW 50 AV SW Tsuu T'ina Nation Weaselhead Road Two Crossing Road Bullhead Road Old Age ncy Road 35 30 37 ST SW LAKEVIEW GLENMORE PARK 90 AV SW OAKRIDGE CEDARBRAE 24 ST SW CROWCHILD TR SW Glenmore Reservoir SOUTHLAND DR SW ANDERSON RD SW BAYVIEW PALLISER PUMP HILL BRAESIDE WOODLANDS WOODBINE 14 ST SW Map Legend FISH CREEK PARK ENMAX Existing Substation ENMAX Proposed Substation FISH CREEK BV SW Altalink Substation MILLRISE Existing Transmission Infrastructure New Transmission Infrastructure Transmission Infrastructure Removal 85 ST SW Transportation Utility Corridor 06 SARCEE TR SW EVERGREEN 162 AV SW JAMES MCKEVITT RD SW SHAWNESSY Calgary City Limits BRIDLEWOOD SOMERSET

TRANSMISSION STRUCTURES The proposed single circuit transmission structures will be self-supporting expandable steel monopoles with a height of 18 to 24 metres ( 58 to 78 feet). The transmission line running east west to connect to Substation 35 at 90 Avenue SW will be a double circuit line ranging in height from 22 to 27 metres ( 72 to 89 feet ). Distance between structures will be approximately 100 to 140 metres (325 to 459 feet) Alberta Infrastructure advised ENMAX only 25 metres wide right of way is available in the TUC for current and future line use with a height restriction of 44 metres. Single Circuit Steel Monopole Double Circuit Steel Monopole

PROPOSED SCHEDULE ENMAX plans to file the Facility Application (FA) with the Alberta Utilities Commission in late November 2015. Subject to approvals being granted, ENMAX expects construction to begin in June 2016 with a proposed in-service date of September 2017. SEPTEMBER 2015 - NOVEMBER 2015 Initial Stakeholder Engagement NOVEMBER 2015 ENMAX submits FA to the AUC MAY 2016 Permit and Licence from AUC granted to ENMAX Power JUNE 2016 Construction begins SEPTEMBER 2017 Inservice-date NOVEMBER 2015 - SEPTEMBER 2017 Ongoing Stakeholder Engagement

ENMAX POWER CORPORATION For more than 100 years, ENMAX and its predecessors have provided Albertans with safe and reliable electricity to power the success of our province. ENMAX Power Corporation (ENMAX Power) owns, operates and maintains the City of Calgary s electricity distribution infrastructure. Our transmission and distribution system covers 1,089 square kilometres, comprising 300 km of transmission wires and 7,800 km of underground distribution lines. For more information about ENMAX Power, visit enmaxpower.com.

ELECTRICITY 101 GENERATION Where it all starts Electricity sometimes travels long distances from generation plants to your homes, schools, hospitals and businesses. Canada s entire electricity grid is crisscrossed with power lines that move the electricity to you. When electricity comes out of the generation plant it usually has a voltage of about 20,000 volts. A volt is the measurement of how much electric force is pushing electrons around a circuit. At the generation plant, the electricity is boosted up to 245,000 volts by a transformer. This higher voltage helps the electricity travel more efficiently long distances. TRANSMISSION Cross-country journey The electricity then goes into long thick cables called transmission lines. The wires are made of copper and aluminum because these metals let electricity flow through them easily. You can tell you are looking at transmission lines when you see high towers often made of steel - with many wires attached to them going across the countryside. When the electricity on the transmission lines gets close to where it will be used it goes into a substation. The substation contains electrical equipment such as transformers. The transformers lower the voltage of the electricity to match where it will be used. Factories, mass transit systems, streetlights, businesses and homes all need the electricity to be at a different voltage DISTRIBUTION Moving from the substation to your community Electricity leaves the substation on smaller wires called distribution lines to take it to homes and businesses. In some communities, distribution lines are overhead and you can see them. Newer neighborhoods have the distribution lines underground so you may not even know they are there. YOUR NEIGHBORHOOD It arrives When the distribution wires reach your neighborhood, another small transformer, mounted on a pole or in a utility box, lowers the voltage of the electricity even more so it can be used in your house. The voltage is eventually reduced to 220 volts for larger appliances, like stoves and clothes dryers, and 120 volts for lights, televisions and other smaller appliances. When electricity enters your home, it must pass through a meter. A member of the ENMAX Power Corporation team reads the meter so we ll know how much electricity you used and can provide you with an accurate bill. After being metered, the electricity goes through a fuse box into your home. The fuse box protects the house in case of problems. When a fuse or a circuit breaker blows or trips, something went wrong with an appliance or something short-circuited.

REGULATORY PROCESS NEED Alberta Electric System Operator (AESO) identifies a need to upgrade transmission system AESO directs Transmission Facility Owner (TFO), DIRECTION in this instance ENMAX Power, to prepare a Facility Application in accordance with the Electric Utilities Act. TFO conducts necessary studies to ensure STUDIES transmission routing is the safest, most economical, with the least impact on landowners and the environment TFO conducts a public engagement program as ENGAGEMENT identified in Alberta Utilities Commission (AUC) Rule 007 to all potentially affected landowners, occupants and residents adjacent to the project. TFO consolidates information from engagement and APPLICATION studies, and prepares final Facility Application and submits to the AUC. AUC REVIEW AND APPROVAL AUC reviews application and issues a notice in local newspapers. Interested parties are offered an opportunity to participate in the application process. Refer to the AUC booklet for information on the regulatory process following submission of the Facilities Application.

ENVIRONMENT At ENMAX, we strive to reduce impacts to air, water, land and wildlife during construction and maitenance of infrastructure. We do this by: Identifying potential impacts to the environment during the planning phase of every project. Working with regulatory agencies including the City of Calgary, Alberta Environment and Parks, Fisheries and Oceans Canada, and Environment Canada to ensure all required approvals and permits are obtained before starting any project. Complying with relevant environmental legislation, regulations, guidelines, policies and operating approvals. Developing a site specific Environmental Management Plan for each project, which describes mitigation measures to be implemented prior to and during construction to minimize potential impacts to the environment. The plan is communicated to all ENMAX employees and Contractors working on the site. Conducting frequent on-site inspections to ensure workers are adhering to the Environmental Management Plan, and that all mitigation measures are effective. Conducting follow-up site visits to ensure impacted areas are remediated. Maintaining and continually improving upon our Environmental Management System, which is based on the International Standard ISO 14001 and supports our Corporate Environment Policy.

RING ROAD UPDATE - DISTRIBUTION 35 South Glenmore Park DISTRIBUTION In Calgary, once the electricity is delivered to one of our 37 substations, low voltage power lines transport electricity over short distances 90 AV SW to distribute the power to local homes and businesses. South Glenmore Park 35 OAKWOOD DR SW PROJECT OVERVIEW PALLISER DR SW Several overhead distribution lines need Tsuu T'ina Nation 37 ST SW City of Calgary OAKMOUNT CO SW 90 AV SW OAKMOUNT DR SW OAKMOUNT DR SW to be relocated to make way for the ring road. A stretch of lines near 90 Avenue and Southland Drive are being buried in a trench that is currently being constructed adjacent to the bike path in the area. Construction began in August and will last until December. These ducts will be connected to the new MAP LEGEND substation being built at 90 Avenue SW in the Proposed 35 Substation Heightened Pole New Pole New Underground Distribution Duct Phase 1 OAKFIELD DR SW OAKMOOR DR SW southwest corner of Glenmore Park and are required to feed electricity to the neighbouring New Underground Distribution Duct Phase 2 New Underground Distribution Duct Phase 3 SOUTHLAND DR SW communities.

COMMITMENT TO COMMUNITY ENMAX is committed to being a responsible corporate neighbour in the community. This commitment includes providing timely and meaningful engagement with stakeholders about this project. We have developed a comprehensive public involvement program to provide opportunities for area residents, occupants and landowners to be informed about this proposal and to engage with ENMAX in dialogue from the planning phase through to construction. We hope we ve answered your questions and have your comments. Please take a couple of minutes to fill out a comment card. Your input will be included in our consultation report which will be incorporated into our application to the AUC. ENMAX POWER CORPORATION Phone: (403) 514-1471 E-mail: stakeholderrelations@enmax.com Website: enmax.com/ringroad Website: sw-crr.ca THANK YOU FOR ATTENDING OUR OPEN HOUSE